The Details
Chapel Lofts, Leeds
architecture 2B
Contents 0.0

                                                   Registered Company Number
architecture 2B
1.1   Company Profile                              4850345

1.2   Awards and Recognition
                                                   Registered address
1.3   Insurance
                                                   Graphical House
1.4   Technical Resources / Quality Assurance      2 Wharf Street
                                                   The Calls
1.5   Company Structure / CV’s of Key Personnel
                                                   Leeds
1.6   Project Directory                            LS2 7EQ

1.7   Detailed Project Studies
                                                   t         0113 247 1497
1.8   Registration with Appropriate Trade Bodies   f         0113 245 6850
                                                   e         info@architecture2B.com
1.9   References                                   w         www.architecture2B.com
Arc Design, Leeds
                          architecture 2B
         White RoseChapel Lofts, Morley
                     Award Winner 2007
Leeds Architecture Award Commendation
                          architecture 2B
Company Profile 1.1

The Company                                                       Design Approach                                                         Company Objectives

Founded in August 2003 by Darren Bailey and Nick Brown,           architecture 2B believes in producing bespoke design                    • To sell good design as good value.
architecture 2B has quickly established a reputation for their    solutions for each project. Each site, each client, each brief,
quality of design, and their proactive ‘can-do’ attitude to       is different, and the architectural solution should reflect this        • To create high quality contemporary buildings that exceed
service delivery. This success has seen the company grow          diversity. The result of this approach is the creation of ‘identity’.   the expectations of the client, and that are responsive to
steadily to the current level of 13 staff.                        Our quality of design has already been recognised through               sustainability and social issues.
                                                                  several Awards, and by the many Local Authorities we deal
Company Structure                                                 with. We love what we do, and this passion is contagious.               • To maintain a reputation for the quality of the detailed design
                                                                  Projects are successful when the whole team are excited                 stages as much as for the original creation of the idea.
architecture 2B’s team is comprised of the Directors, team        about the quality of the building that is to be created.
leaders, and the company administrator / office manager.                                                                                  • To maintain a reputation for a high quality service.
Each project has Director level input at all stages, Nick         Environment
Brown concentrating on the design stages, and Darren                                                                                      • To continuously develop and push to keep moving forward.
Bailey concentrating on the detailed design and construction      architecture 2B are committed to the pressing environmental
phases.                                                           issues that exist in the construction industry and beyond. A            • To always enjoy what we are doing.
Each new commission is given to a team leader, who retains        member of AECB, Association of Environmentally Conscious
ownership throughout the project. This ownership is critical to   Buildings, and a pioneering company in the field of modern              • To create a dynamic, productive and enjoyable working
the success of the project, enabling a constant flow of design    methods of construction, architecture 2B incorporate                    environment.
thought process, and a high level of coordination at the latter   sustainable principles into their projects from the outset.
stages.                                                           Starting with ways to reduce energy consumption and                     • To create and maintain effective levels of communication
Project reviews, in line with the quality management system,      lowering the carbon footprint, and ensuring construction                at all times.
are important to maintain quality.                                waste is minimised with the use of prefabrication technology,
                                                                  architecture 2B are very vocal in the need to keep this issue           • To create and maintain a motivated, loyal and well balanced
                                                                  at the forefront of each project we work on.                            team.
Midland Mills, Leeds
architecture 2B
Awards and Recognition 1.2




Jun 08                              May 08                        Mar 08                              Jan 08                      Jan 08
Insider Property Industry Awards:   Yorkshire Property Awards:    Wakefield Civic Society Design      Leeds Architecture Awards   Leeds Architecture Award Winner
Architect of the Year               Best Architect                Awards Commendation for Manygates   Commendation                Tao
                                                                  Park                                York Street




Nov 07                              Nov 07                        Jul 07                              Jun 07                      Mar 07
White Rose Award                    RIBA Brockholes Competition   AJ Kings Cross Charrette            Kirkstall Forge Phase 1     4x4 Lecture Series
York Street                         Finalist                                                          Shortlisted                 Speaker




Feb 07                              Jan 06                        Mar 05
Leeds Variety Club Awards           Halifax Civic Trust Award     Howden Civic Society Awards
Best Residential Architect          Beaconsfield Centre           Hailgate House
tao, Leeds
architecture 2B
Insurance Certificates 1.3

Employers liability

Insurer: Hiscox Insurance Company Limited
Policy number: HU PIB 1306388
Extent of cover: £ 10,000,000
Period of insurance: 19 April 2008 to 18 April 2009

Public liability

Insurer: Elite Hiscox
Policy number: HU PIB 1306388
Extent of cover: £ 5,000,000
Period of insurance: 19 April 2008 to 18 April 2009

Professional indemnity

Insurer: Zurich Insurance Company
Policy number: PIP07001187
Extent of cover: £ 5,000,000
Expiry date: 18 November 2009
RIBA Brockholes Competition
              architecture 2B
                     Finalist
Technical Resources / Quality Assurance 1.4

Information Technology

architecture 2B uses a PC-based system linked using a                Risk Management                                                 Health & Safety
LAN (Local Area Network) with a dedicated server with an
uninterrupted power supply, this is backed up daily and stored       Implementing the QMS means we can standardise and make          Architecture 2B has a written Health & Safety policy a copy of
off site, outputting to colour and B&W large format plotters. This   routine procedures consistent and accurate, enabling more       which is attached.
enables all the team to view the information ensuring excellent      time to be devoted to dealing with the bespoke requirements
co-ordination.                                                       of each project.                                                This is managed and up-dated with the assistance of an external
                                                                                                                                     consultant:
AutoCAD is used throughout to produce drawn information.             Environmental assurances
                                                                                                                                     John Grant
NBS Specification Writer is used to create specification which       At architecture 2B we regard sustainability as a key element    Employment Lawyer, Law@Work
accords with CPI Codes. The information for specifications is        in the design process. As part of our quality management        Howard Cohen & Co
drawn from the CIS web-based library system.                         system we are striving towards compliance with BS EN ISO        29 Park Square, Leeds LS1 2PQ
                                                                     14001:2004.                                                     Tel: 0113 244 0597
All designs are modelled in 3D using Sketch-Up.
                                                                     Following the philosophy of ‘think globally act locally’ at     No injuries have yet been entered into the Accident Book and
All information is then managed by Archetype which is a              architecture 2B we actively encourage and participate in a      architecture 2B have not been served with an improvement
bespoke system for architects which manages all data                 cycle to work scheme and have an effective recycling scheme     notice and we would welcome any inspections.
including projects, contacts, email, drawings, documents,            in place. Once a year a bursary is offered to a member of the
correspondence, meetings, CDM and contract documents                 team to enhance and educate our knowledge of sustainability.
ensuring standardisation and easy document retrieval.
                                                                     Investors in People
Quality Assurance
                                                                     architecture 2B is currently in the assessment stage of
architecture 2B’s Quality Management System (QMS) is split           achieving Investors in People status.
into two sections, ‘the way we do it’ and the procedures.

Each team has a QMS representative who reports feedback to
the Quality Co-ordinator, Darren Bailey, ensuring the system is
constantly monitored.

Projects are constantly audited internally and tested against BS
EN ISO 9001:2000

The system is also aligned to the RIBA charted practice status
requirements.
1.5 Company Structure




Directors                Architects / Technicians / Assistants
Darren Bailey            James Lancaster
Nick Brown               Matt Lobley
                         Matt Sharp
Associate                Matthew McColl
Simon Brayshaw           Kate Scholes
                         Yasar Awais
Office manager / admin   Thomas Taylor
Heather Bellis
Carys Marshall

Team leader
Martin Cook
Indigo Blu, Leeds
architecture 2B
1.5 Darren Bailey

                                                                                                                                                                            Qualifications
                                                                                                                                                                              BSc (Hons)
                                                                                                                                                                                    MBIAT

                                                                                                                                                                              Date of birth
                                                                                                                                                                                      1972




Darren Bailey                                                     current projects                                             previous projects / experience
Director
                                                                  The Camberwell Project                                       Yorkshire County Cricket Club redevelopment, Leeds
Darren is a founding member of architecture 2B. Darren has        Business incubator units and managed workspace, Leeds        £13.0M
significant experience in the office market having successfully   £2.5m
completed numerous new build and refurbishment projects.                                                                       The source, Sheffield
                                                                  Bracken Development                                          £4.5M.
                                                                  Reuse of an existing building to create managed workspace,
                                                                  Leeds                                                        Conversion of school into residential, Ripon
                                                                  £4m                                                          £4.5M

                                                                  Linea                                                        Central square south, Newcastle
                                                                  114 residential apartments, Scunthrope                       £11M
                                                                  £5.2M
                                                                                                                               Parabola Estates
                                                                  Citispace                                                    Creation of BreeAM excellent offices from former post office
                                                                  Residential development : Citispace Apartments, Leeds        sorting office, housing Northern Arts
                                                                  £15M                                                         Newcastle upon Tyne
                                                                                                                               £6.5M

                                                                                                                               Western Campus Leeds University
                                                                                                                               £6.5M
1.5 Nick Brown

                                                                                                                                                                   Qualifications
                                                                                                                                                                      BA (Hons)
                                                                                                                                                                          DipArch
                                                                                                                                                                             rIBA

                                                                                                                                                                    Date of birth
                                                                                                                                                                            1969




Nick Brown                                                       current projects                                     previous projects / experience
Director
                                                                 Mixed use scheme: Manor Road , Leeds                 Whitehall Phase 2, Leeds
Nick was an integral part of Carey Jones (1992 - 1999) and       £6.5M                                                £11.0M
Aedas Architects (1999 - 2003), before forming architecture 2B
with Darren Bailey. Nick is also a part-time tutor at Leeds      Mixed use scheme: Prestige Salvage, Leeds            City Point, Leeds
School of Architecture.                                          £7.5M                                                £9.2M

                                                                 Mixed use scheme: Globe Road, Leeds                  Government Office, Leeds
                                                                 £6.5M                                                £13.0M

                                                                 Residential scheme: Bethel Chapel, Morley            Leeds International Business School, Leeds
                                                                 £2.0M                                                £6.5M

                                                                 Refurbishment of Listed Mill: Midland Mills, Leeds   Simpson’s Fold II, Leeds
                                                                 £4.0M                                                £3.0M

                                                                                                                      Charles Schwabb building, Milton Keynes
                                                                                                                      £7.0M

                                                                                                                      Western Campus - Leeds University
1.5 Simon Brayshaw

                                                                                                                                                                     Qualifications
                                                                                                                                                      Higher National Diploma in the
                                                                                                                                                                  Built Environment

                                                                                                                                                                      Date of birth
                                                                                                                                                                              1978




Simon Brayshaw                                                    current projects                                       previous projects / experience
Associate
                                                                  Residential development: Alverthorpe, Wakefield        Retail: Debenhams Department store, Leeds
                                                                  £1.2M                                                  £8.0M
Simon started his professional career at Carey Jones (1994
- 2000) and then moved to Aedas Architects (2000 - 2003),         Residential development: Normanton, Wakefield          Innovation Centre, Leeds
before joining JM Architects (2003 - 2004). Since joining         £1.5M                                                  £6.0M
architecture 2B, in March 2004, Simon has proved to be a
valuable team member. As team leader he demonstrates              Residential development: Howden Phase 2, Howden        Baines Wing, Leeds
his leadership skills well and has the ability to assist others   £2M                                                    £5.0M
effectively in their roles.
                                                                  Residential development: Arc, Leeds                    Office Development: City Point, Leeds
                                                                  £19M                                                   £9.2M

                                                                  Residential development: Citispace Apartments, Leeds
                                                                  £15.0M

                                                                  Conversion of Grade II listed building, Howden
                                                                  £600,000

                                                                  Housing Programme for Hazel Homes, Nationwide
                                                                  £6.0M
1.5 Martin Cook

                                                                                                                                                                     Qualifications
                                                                                                                                                      Higher National Diploma in the
                                                                                                                                                                  Built Environment

                                                                                                                                                                      Date of birth
                                                                                                                                                                              1978




Martin Cook                                                         current projects                                     previous projects / experience
Team Leader
                                                                    Office development: Harehills, Leeds                 Residential development: Montpelier Hall,London
Since joining architecture 2B Martin has be come an integral        £2.5M                                                £6.7m
part of the company. He is in charge of, amongst other
projects, The Camberwell Project which is a LEGI funded             Office development: Calls Wharf Phase 1 - 3, Leeds   Residential development: Lowndes Square, London
workspace scheme, which aims to encourage new businesses            £2.5M                                                £5.0m
in the Harehills area of Leeds. He is also in charge of the Calls
Wharf project which is a refurbished serviced office scheme.        Private house: Delphstone House, Leeds               Residential development: Highcliffe House, London
                                                                    £undisclosed                                         Value - £6.7m

                                                                                                                         Residential development: Rock Gardens, London
                                                                                                                         £5m
1.6 Project Directory - Residential
Project Directory - Mixed use 1.6
1.6 Project Directory - Commercial
Project Directory - Masterplanning 1.6
Project Directory - Other 1.6




PDF created with pdfFactory trial version www.pdffactory.com
York Street, Leeds
architecture 2B
1.7 Detailed Project Case Studies

Harehills Middle School,   This project leverages enterprise focus for regeneration
                           and community benefit. The building is about doing more
Leeds
                           than “just good enough” and sending a message to the
£3M                        community that this asset, their asset, can be/will be the
                           hub of activity and commerce. The project draws in LEGI,
                           ERDF, Private Equity, Bank Finance, and 3rd sector
                           underwriting to deliver a £3M renovation. The building
                           will hold a community incubator, a high growth incubation
                           space, start-up offices, conference space, a restaurant, a
                           credit union, a crèche and plenty of full service features.
                           The project will be a national exemplar of private / public
                           relationships both from an operational and financial stand-
                           point. It will deliver on the ETHOS of LEGI with an invest-
                           ment mindset.

                           Importantly, it has been designed to realise a benefit for
                           both disadvantaged groups in the top 3% and the existing
                           businesses who need a hand up in the area. By design, it
                           will draw inward investment to the area and operate as a
                           hub of activity for new and existing streams of support. All
                           of this occurs through a process of integrating design with
                           enterprise and a focus on creating a lasting (sustainable)
                           social benefit (regeneration, reduced wordlessness, more
                           start-ups and increased aspirations for the community).
1.7 Detailed Project Case Studies

Calls Wharf, Leeds   Phase 1 of Bracken Developments Calls Wharf scheme
Phase I              consists of the refurbishment of 2-12 The Calls into
                     high quality serviced office accommodation. The office
£2.5M                accommodation will be arranged around a new central
                     reception area. The building is to become Bracken
                     Development’s new accommodation. This will set the
                     benchmark for the development of the buildings on the
                     site.
1.7 Detailed Project Case Studies

York Street, Leeds   Is the new headquarters for arc design; well respected
                     furniture designers. The nature of the client’s business
£300,000
                     created an interest for us in exploring the nature of
                     ‘texture’ and ‘layers’ . A fabric of steel mesh has been
                     ‘draped’ over the building elements, providing a defensive
                     screen at ground level and adding to the drama of the
                     stair tower. The texture and dramatic form of the stair-
                     tower help improve the visual weight of the existing
                     building within its challenging context. The project was
                     completed in March 2007.

                     RIBA White Rose Award 2007
                     Leeds Architecture Award Commendation 2008
1.7 Detailed Project Case Studies

Chapel Lofts, Morley   Chapel Lofts is the first collaboration between architecture
                       2B and CITU. The project introduces many of the ideas
£1.1M
                       that are central to the team’s approach to development;
                       high quality contemporary design, good sustainable
                       credentials, attention to detail, and ‘thinking outside the
                       box’. The scheme successfully introduces a modern
                       extension to the existing chapel building, and each
                       apartment has its own identity and character. The scheme
                       was completed in January 2007.
1.7 Detailed Project Case Studies

Tao, Leeds      This project for CITU Developments incorporates the
                sensitive conversion of the Mabgate Inn into living accom-
£600,000
                modation and a small bar / deli, plus the insertion of ‘Tao’
                within the old beer garden. Tao, is a study of simplicity;
                a simple object sitting within the street, and simplicity of
                detail within the 6 studio apartments.

                Leeds Architecture Award 2008
1.7 Detailed Project Case Studies

Arc, Leeds      This progressive scheme of 142 apartments provides
                a considered approach to an adjoining listed building,
£12M
                whilst reflecting the site’s importance to the wider urban
                context of Leeds. The building is derived directly from its
                location, a fluid and dynamic form that addresses the site
                conditions and the surrounding scale. The site acts as a
                Northern focal point to both New Briggate and Vicar Lane
                at a key intersection on the route into Leeds city centre.
1.7 Detailed Project Case Studies

Lock Lane, Castleford   There is strong optimism towards the future of Castleford
                        as designers and locals work together to rejuvenate
£10M
                        forgotten areas of land and breathe new life into the heart
                        of the town.
                        This landmark scheme, incorporating a riverside terrace,
                        cafés, office accommodation and 141 contemporary
                        living apartments, is intended to act as a catalyst for
                        improvement within the local area and of public spaces in
                        terms of its design quality, pivotal position along a main
                        public route and its presence within the town.
                        The building makes reference to the region’s wealth of
                        local sculptors, and focuses specifically on the work of
                        Henry Moore and Andy Goldsworthy. The narrative and
                        language of the form subsequently becomes a dialogue
                        between two objects, as much concerned with mass as
                        with the absence of it.
                        Additional reference to the work of Andy Goldsworthy is
                        made in the use of reed-like fins along the riverfront and
                        Lock Lane elevations.
1.7 Detailed Project Case Studies

Citispace, Leeds   The Citispace Urban Apartment concept is the result
                   of intensive research into the real and sustainable
£13M
                   requirements of those wanting and needing to live in high
                   quality, genuinely affordable apartments at the centre of
                   Leeds. All apartments are stylishly furnished with secure
                   car parking, laundry facilities and a bar/restaurant are all
                   available on site. The development also features a large
                   landscaped courtyard garden for the exclusive use of
                   residents – a combination which gives Citispace its own
                   private and secure living environment.
                   Citispace consists of three phases, phase one involved
                   the installation of an extra two floors of residential
                   accommodation over what was an existing office building,
                   these were manufactured off site and craned into place,
                   supported on an independent ‘goalpost’ frame. Phase two
                   involved the conversion of the existing office space into
                   residential and phase three employed the same methods
                   as phase one. Phase three is eight stories high.
1.7 Detailed Project Case Studies

Linea, Scunthorpe   Linea is one of a number of projects with client G&W
                    Developments. Conceived as a modern interpretation of
£5.2M
                    the traditional terraced house, Linea takes its design cue
                    from the rhythm and repetition of fenestration patterns.

                    Linea Consists of 111 apartments grouped around a
                    central glazed atrium creating a dynamic public space.
1.7 Detailed Project Case Studies

Calls Wharf, Leeds   A mixed use development for Bracken Developments
                     The challenge for this site was to create the primary
Phase ll
                     riverside destination space for Leeds. Dramatic building
£12M                 forms, high quality materials, contemporary detailing,
                     are all central to the design, but above all it is the quality
                     of the public realm that will determine its success as a
                     destination. As a result, the proposed design focuses
                     on the spaces, their connectivity, their quality of light,
                     their activities, and their detailing. Bars and restaurants
                     surround the public space and terrace levels with the
                     commercial offices located above. Calls Wharf will be a
                     great place to relax, to enjoy yourself, and a rewarding
                     place to work.
1.7 Detailed Project Case Studies

Aspley Heights, Hudersfield architecture 2B were commissioned to unlock the
                            potential of this challenging sloping site. The innovative
£1.2M
                                    design solution enabled 20 contemporary apartments
                                    to be created, each with panoramic views of the valley
                                    and town centre beyond. The concept for this scheme
                                    was that of an ‘inhabited ruin’. Stone walls with random
                                    openings step down the hillside, the ruin. Rising out of
                                    these walls, and filling the openings, are the new modern
                                    elements of glass and timber. Balconies protrude through
                                    the walls to add further depth and detail. The project was
                                    completed in December 2006.
1.7 Detailed Project Case Studies

Management Archives,   Management Archives is a mixed use scheme adjacent
                       to the grade 1 listed Temple Works in Holbeck, Leeds. It
Leeds
                       incorporates 140 residential units of varying sizes, and
                       nearly 20,000 sqft of commercial & retail space.

                       The traditionally industrial materials and simple forms
                       of the scheme are intentionally robust, reflecting the
                       strong industrial heritage of the area. The contemporary
                       openings carved from such forms give the scheme a
                       modern outlook whilst maintaining a sense of integrity
                       of place. The two main blocks along with the real wall to
                       Temple Works creates a large public amenity space from
                       the existing cast iron structures that remain from its former
                       building, merging the boundaries of past and present.
1.7 Detailed Project Case Studies

Many Gates, Wakefield   Once a prestigious suburb of Wakefield, the Manygates
                        area has suffered a drop in recent years. Evidence of
                        grand buildings nevertheless still remain, and Manygates
                        Park is such an example. The existing No. 2 had been
                        left somewhat dilapidated and tarnished, along with No.
                        1 which fronts the site onto Barnsley Road. The client
                        bought these houses as bedsits, and approached us to
                        help restore them and the subsequent surrounding area.

                        As part of their redevelopment the new-build elements
                        were conceived. In the heart of the site the extension to
                        the main house was designed to be a simple extension
                        which respects the main house, but also contrasts it
                        in a contemporary manner. The extension takes the
                        language of the original brick structure, grey slate roof and
                        large bay windows, and translates them into a modern
                        interpretation. The same red brick for the main structures
                        are then complimented with terned-coated stainless
                        steel bay windows and crisp grey roofs. The timber then
                        contrasts these robust, almost industrial blocks with a
                        much softer, tactile finish.

                        At the entrance to the site the second building uses a
                        similar pallet to the extension building to the rear. This
                        building along with the refurbished gatehouse building
                        act as entrance markers to the site, signalling the two
                        opposite of the site…the modern present and the past
                        traditional.
1.7 Detailed Project Case Studies

Walton House    This private residence is to be found in the wonderful      The history of the site suggests that local schools used
                countryside of Kirklees. A sensitive greenbelt area         to visit the garden centre for educational field days,
                provides strict restrictions for any new build scheme, so   which has led the design to encourage this practice.
                the brief for this house was to have “exceptional” as a     The gatehouse building could double as a classroom for
                starting point.                                             visiting school trips, allowing a base to venture from on
                                                                            educational walks around the site. These not only could
                The house builds upon very traditional principles set out   concentrate on the wealth of natural micro-ecologies
                by the great manor houses that scatter the countryside,     around the site such as the natural pond to the south or
                but boldly re-interprets them for contemporary living.      the woodland verges to the north, but could show how
                The house has traditional elements such as the hidden       the house works with the landscape such as the reed-bed
                driveway, the gatehouse, the inner courtyard and “piano     filtration, the dry-stone walls, or the orchard in contrast
                nobile”, along with controlled vistas, follies, orchard     with the natural woodland.
                gardens and water features.

                Integration and contrast with the landscape were key
                to the design of this house - a man-made element in
                a natural setting. Dry-stone walls emerge from the
                landscape to form boundary walls, then building walls.
                Contrasting Ashlar stone then mixes with the more natural
                rough cut stone to form different reliefs, whilst timber
                adds a warmer, softer touch. Glass allows the inside and
                outside spaces to blur, bringing the landscape into the
                house, and at the same time offering grand vistas of the
                countryside beyond.

                Ecology is also key to this house. The house aims to
                reduce its environmental footprint as much as possible by
                using renewable energy resources such as ground tubes
                for tempered fresh air and biomass fuel systems, along
                with the grey water recycling and reed-bed filtration, to
                minimise waste impact.
1.7 Detailed Project Case Studies

Midland Mills, Leeds   Midland Mills is a refurbishment of an existing building
                       found in the Holbeck Urban Village. Typical of many of
                       the buildings in the area, they are very much practical
                       buildings, showing the signs now of long, hard use.

                       The scheme here takes the original buildings and restores
                       and recycles them where necessary and then adds
                       to them to create a modern commercial complex with
                       integrated private communal spaces. The new extensions
                       are clad in Cor-Ten steel, which reflects both the colour of
                       the existing buildings and the industrial past associated
                       with the area. Indeed the rusted steel makes reference to
                       the rails of the passing viaduct that once carried materials
                       into the area.
1.7 Detailed Project Case Studies

Kirkstall Forge                     architecture2B were shortlisted by Commercial Estates
Phase 1 Architectural Competition   Group to assist them in realising their vision to deliver a
June 2007                           high quality and sustainable development on the former
                                    Kirkstall Forge site in Leeds. Phase 1 forms part of a
                                    £250m mixed use development to include residential,
                                    office, leisure, hotel, retail and bars/restaurants which
                                    extends over 22.93Ha.
1.7 Detailed Project Case Studies

SLP College, Leeds   This project for SLP College, a private dance faculty in
                     Garforth, near Leeds incorporates additional teaching and
                     performance space over two levels, together with three
                     new singing rooms within the roof space of a third storey.
                     The additional facilities provide an extension to a former
                     chapel which has been home to the thriving school for
                     performing arts since 1991.
                     The college is one of the U.K.’s leading training grounds
                     for young artistic performing talent, as such our inspiration
                     for the scheme was to generate a series of spaces that
                     and external façade elements that reflected the vibrant
                     creativity of the students.
                     The extension utilizes the existing red brick ground floor
                     level to create a plinth for a modern extension above,
                     using zinc cladding and coloured window reveals to add
                     interest, whilst remaining respectful of the surrounding
                     context and original chapel building.
                     The project is due for completion in August 2008 in
                     preparation for the forthcoming academic year, whilst
                     building works continue on site, we are commencing
                     consultation with the LPA with regards to Phase II,
                     an additional building detached from the existing
                     faculty, incorporating recording studios and staff living
                     accommodation.
1.7 Detailed Project Case Studies

Lincoln Castings   Outline Planning Application by CBRE Investors for the
                   redevelopment of the former industrial buildings and land
                   at Lincoln Castings, Station Road, North Hykeham.

                   Working closely with the Local Council and the local
                   community the design team are proposing an extensive
                   redevelopment of approximately 15ha which consists
                   of 315No new dwellings, 20,000sqft of A3, A4, A5, D1
                   and D2 uses and 32,000sqft of B2 use. Recreational
                   facilities including sports pitches and changing facilities
                   are proposed alongside improvements to the local train
                   station, bus stops and a new pedestrian footbridge.

                   Sustainability has played an important role in the
                   proposals with the dwellings being constructed under
                   the guidance of Building For Life and aiming to achieve
                   a minimum of 3 stars under the Code for Sustainable
                   Homes. The commercial and industrial buildings are to
                   be constructed using the BREEAM guidance with the
                   minimum level of Very Good being achieved.
1.7 Detailed Project Case Studies

Bury college, Bury   In collaboration with Britspace Modular buildings
                     architecture 2B designed this two storey examination and
£1.1M
                     sports facility.

                     As part of their rapid expansion the college required
                     additional examination rooms that could double as a
                     sports facility. The building was constructed using off site
                     manufacturing techniques by Britspace. It took 6 weeks
                     for the building to manufactured in the factory and just 3
                     days to install the units on site providing a modest cost
                     effective building within a tight construction programme.
1.8 Registration with Appropriate Trade Bodies

                                       RIBA certificate
                                             3137465
References 1.9

Mr Matthew Fuller         Mr Chris Thompson                Mr John Thorpe
Director                  Director                         Civic Architect

Bracken Developments      Citu Ltd                         Leeds Civic Architect
Bracken House             38 The Calls                     Leonardo Building
9 Kerry Street            Leeds                            Rossington Street
Horsforth, Leeds          LS2 7EW                          Leeds LS2 8HD
LS18 4AW
                          t 0113 234 6690                  t 0113 234 6690
t 0113 281 9044           f 0113 234 6696                  f 0113 234 6696
f 0113 281 9045           e cthompson@sumonline.co.uk      e john.thorpe@leeds.gov.uk
e matt@brackendev.com




Mr Tom Beesley            Mr Matthew Greenwood
Director                  Director

Arc Design Partners Ltd   G&W Developments
80A York Street           Hamnett House
Leeds                     Gibbett Street
LS9 8AA                   Halifax HX2 0AX
                          t 01422 356 847
t 0113 244 6252           f 01422 356 852
f 0113 243 1858           e matthew@gwdevelopments.co.uk
e tom@arcdesign.co.uk
© architecture 2B Ltd
Graphical House
2 Wharf Street
The Calls
Leeds
LS2 7EQ

t 0113 247 1497
f 0113 245 6850
e info@architecture2B.com
w www.architecture2B.com

More Related Content

What's hot

Ds Design Architects Brochure
Ds Design Architects BrochureDs Design Architects Brochure
Ds Design Architects Brochuredstockless
 
IBA Service Offerings
IBA Service OfferingsIBA Service Offerings
IBA Service Offeringstjakab
 
Meinhardt Capability Brochure 2010 Lowres
Meinhardt Capability Brochure 2010 LowresMeinhardt Capability Brochure 2010 Lowres
Meinhardt Capability Brochure 2010 Lowresgbowery
 
Meinhardt Capability Brochure 2010
Meinhardt Capability Brochure 2010Meinhardt Capability Brochure 2010
Meinhardt Capability Brochure 2010hamadagkhater
 
Alan D Souza Overview
Alan D Souza OverviewAlan D Souza Overview
Alan D Souza Overviewdsouzalan
 
katy curtis commercial work
katy curtis commercial workkaty curtis commercial work
katy curtis commercial workKaty Curtis
 
Brittain Hadley Brochure
Brittain Hadley BrochureBrittain Hadley Brochure
Brittain Hadley BrochureNathanSproule
 
Nick Borcescu Cv 2pg May2011
Nick Borcescu Cv 2pg May2011Nick Borcescu Cv 2pg May2011
Nick Borcescu Cv 2pg May2011minidisco72
 
Final presentation draft 1
Final presentation draft 1Final presentation draft 1
Final presentation draft 1djk447
 
Yale red ox presentation draft 1
Yale red ox presentation draft 1Yale red ox presentation draft 1
Yale red ox presentation draft 1djk447
 
Poly prep lower school leed certification
Poly prep lower school leed certificationPoly prep lower school leed certification
Poly prep lower school leed certificationjpetr0s
 
NAHB Green Building
NAHB Green BuildingNAHB Green Building
NAHB Green Buildingtrekie66
 
Rossetti Marketing Sheet
Rossetti Marketing SheetRossetti Marketing Sheet
Rossetti Marketing Sheetguest5a0f8c6
 
Portfolio Robert Abell Linkin
Portfolio Robert Abell LinkinPortfolio Robert Abell Linkin
Portfolio Robert Abell Linkinbobabell
 
Nvc presenting to raise $$
Nvc presenting to raise $$Nvc presenting to raise $$
Nvc presenting to raise $$CU_NVC
 
Ex Stream Eng Design Group Corporate Profile
Ex Stream Eng Design Group Corporate ProfileEx Stream Eng Design Group Corporate Profile
Ex Stream Eng Design Group Corporate Profileggurudev
 
Jwilkeson 2013 portfolio_web
Jwilkeson 2013 portfolio_webJwilkeson 2013 portfolio_web
Jwilkeson 2013 portfolio_webJessica Wilkeson
 

What's hot (20)

Ds Design Architects Brochure
Ds Design Architects BrochureDs Design Architects Brochure
Ds Design Architects Brochure
 
James Brew Portfolio Small
James Brew Portfolio SmallJames Brew Portfolio Small
James Brew Portfolio Small
 
IBA Service Offerings
IBA Service OfferingsIBA Service Offerings
IBA Service Offerings
 
Meinhardt Capability Brochure 2010 Lowres
Meinhardt Capability Brochure 2010 LowresMeinhardt Capability Brochure 2010 Lowres
Meinhardt Capability Brochure 2010 Lowres
 
Meinhardt Capability Brochure 2010
Meinhardt Capability Brochure 2010Meinhardt Capability Brochure 2010
Meinhardt Capability Brochure 2010
 
Alan D Souza Overview
Alan D Souza OverviewAlan D Souza Overview
Alan D Souza Overview
 
katy curtis commercial work
katy curtis commercial workkaty curtis commercial work
katy curtis commercial work
 
Brittain Hadley Brochure
Brittain Hadley BrochureBrittain Hadley Brochure
Brittain Hadley Brochure
 
Nick Borcescu Cv 2pg May2011
Nick Borcescu Cv 2pg May2011Nick Borcescu Cv 2pg May2011
Nick Borcescu Cv 2pg May2011
 
Final presentation draft 1
Final presentation draft 1Final presentation draft 1
Final presentation draft 1
 
Yale red ox presentation draft 1
Yale red ox presentation draft 1Yale red ox presentation draft 1
Yale red ox presentation draft 1
 
Poly prep lower school leed certification
Poly prep lower school leed certificationPoly prep lower school leed certification
Poly prep lower school leed certification
 
NAHB Green Building
NAHB Green BuildingNAHB Green Building
NAHB Green Building
 
Rossetti Marketing Sheet
Rossetti Marketing SheetRossetti Marketing Sheet
Rossetti Marketing Sheet
 
Portfolio Robert Abell Linkin
Portfolio Robert Abell LinkinPortfolio Robert Abell Linkin
Portfolio Robert Abell Linkin
 
Sustainable communities - Porrecca
Sustainable communities  - PorreccaSustainable communities  - Porrecca
Sustainable communities - Porrecca
 
Cpl Interiors Plc
Cpl Interiors PlcCpl Interiors Plc
Cpl Interiors Plc
 
Nvc presenting to raise $$
Nvc presenting to raise $$Nvc presenting to raise $$
Nvc presenting to raise $$
 
Ex Stream Eng Design Group Corporate Profile
Ex Stream Eng Design Group Corporate ProfileEx Stream Eng Design Group Corporate Profile
Ex Stream Eng Design Group Corporate Profile
 
Jwilkeson 2013 portfolio_web
Jwilkeson 2013 portfolio_webJwilkeson 2013 portfolio_web
Jwilkeson 2013 portfolio_web
 

Viewers also liked

our interiors work
our interiors workour interiors work
our interiors workDarrenBailey
 
Resume Tjumic 7 2009
Resume Tjumic 7 2009Resume Tjumic 7 2009
Resume Tjumic 7 2009TJUMIC
 
FriendRunner 101 (A Facebook testing tool)
FriendRunner 101 (A Facebook testing tool)FriendRunner 101 (A Facebook testing tool)
FriendRunner 101 (A Facebook testing tool)Sericon Technology
 
Paywalls in action by Lior Kodner
Paywalls in action by Lior KodnerPaywalls in action by Lior Kodner
Paywalls in action by Lior KodnerHolesinthenet
 
מי אתם דור Z
מי אתם דור Zמי אתם דור Z
מי אתם דור ZHolesinthenet
 
Chapter 12 Geog
Chapter 12 GeogChapter 12 Geog
Chapter 12 Geoghoongyang
 
ケータイ白書2009山本パート
ケータイ白書2009山本パートケータイ白書2009山本パート
ケータイ白書2009山本パートchonmage
 
Marketing Database
Marketing DatabaseMarketing Database
Marketing DatabaseJo Gielen
 
מצגת של אשלי וקסמן בקשי, יוטיוברית ויוצרת תוכן
מצגת של אשלי וקסמן בקשי, יוטיוברית ויוצרת תוכןמצגת של אשלי וקסמן בקשי, יוטיוברית ויוצרת תוכן
מצגת של אשלי וקסמן בקשי, יוטיוברית ויוצרת תוכןHolesinthenet
 
מצגת של עינבר יגור, סמנכ"לית אסטרטגיית תוכן בחברת טאבולה
מצגת של עינבר יגור, סמנכ"לית אסטרטגיית תוכן בחברת טאבולהמצגת של עינבר יגור, סמנכ"לית אסטרטגיית תוכן בחברת טאבולה
מצגת של עינבר יגור, סמנכ"לית אסטרטגיית תוכן בחברת טאבולהHolesinthenet
 
W.2000
W.2000W.2000
W.2000may
 
ThờI Trang Có CầN ThiếT Cho CôNg Sở
ThờI Trang Có CầN ThiếT Cho CôNg SởThờI Trang Có CầN ThiếT Cho CôNg Sở
ThờI Trang Có CầN ThiếT Cho CôNg Sởguest8cd3cc
 
Innovation in Online News
Innovation in Online NewsInnovation in Online News
Innovation in Online NewsHolesinthenet
 

Viewers also liked (15)

architecture 2B
architecture 2Barchitecture 2B
architecture 2B
 
our interiors work
our interiors workour interiors work
our interiors work
 
Resume Tjumic 7 2009
Resume Tjumic 7 2009Resume Tjumic 7 2009
Resume Tjumic 7 2009
 
FriendRunner 101 (A Facebook testing tool)
FriendRunner 101 (A Facebook testing tool)FriendRunner 101 (A Facebook testing tool)
FriendRunner 101 (A Facebook testing tool)
 
Paywalls in action by Lior Kodner
Paywalls in action by Lior KodnerPaywalls in action by Lior Kodner
Paywalls in action by Lior Kodner
 
מי אתם דור Z
מי אתם דור Zמי אתם דור Z
מי אתם דור Z
 
Chapter 12 Geog
Chapter 12 GeogChapter 12 Geog
Chapter 12 Geog
 
Chapter 12 Geog
Chapter 12 GeogChapter 12 Geog
Chapter 12 Geog
 
ケータイ白書2009山本パート
ケータイ白書2009山本パートケータイ白書2009山本パート
ケータイ白書2009山本パート
 
Marketing Database
Marketing DatabaseMarketing Database
Marketing Database
 
מצגת של אשלי וקסמן בקשי, יוטיוברית ויוצרת תוכן
מצגת של אשלי וקסמן בקשי, יוטיוברית ויוצרת תוכןמצגת של אשלי וקסמן בקשי, יוטיוברית ויוצרת תוכן
מצגת של אשלי וקסמן בקשי, יוטיוברית ויוצרת תוכן
 
מצגת של עינבר יגור, סמנכ"לית אסטרטגיית תוכן בחברת טאבולה
מצגת של עינבר יגור, סמנכ"לית אסטרטגיית תוכן בחברת טאבולהמצגת של עינבר יגור, סמנכ"לית אסטרטגיית תוכן בחברת טאבולה
מצגת של עינבר יגור, סמנכ"לית אסטרטגיית תוכן בחברת טאבולה
 
W.2000
W.2000W.2000
W.2000
 
ThờI Trang Có CầN ThiếT Cho CôNg Sở
ThờI Trang Có CầN ThiếT Cho CôNg SởThờI Trang Có CầN ThiếT Cho CôNg Sở
ThờI Trang Có CầN ThiếT Cho CôNg Sở
 
Innovation in Online News
Innovation in Online NewsInnovation in Online News
Innovation in Online News
 

Similar to Architecture 2b The Details

Westera Commercial Industrial Multi Res
Westera Commercial Industrial Multi ResWestera Commercial Industrial Multi Res
Westera Commercial Industrial Multi Resadamide
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011Hans Goetze
 
Westera Residential
Westera ResidentialWestera Residential
Westera Residentialadamide
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conferencecassie111
 
CV-Lynsey Dyer
CV-Lynsey DyerCV-Lynsey Dyer
CV-Lynsey Dyerlynseydyer
 
Traditional IPD Transition
Traditional IPD TransitionTraditional IPD Transition
Traditional IPD TransitionEDeLaPaz_PDA
 
Inscape Leed Presentation
Inscape Leed PresentationInscape Leed Presentation
Inscape Leed Presentationcharliel50
 
a2d architecture
a2d architecturea2d architecture
a2d architecturea2d
 
Portfolio writing and headshot for Designer
Portfolio writing and headshot for DesignerPortfolio writing and headshot for Designer
Portfolio writing and headshot for DesignerJessie Hannah
 
mklopper_curriculum vitae
mklopper_curriculum vitaemklopper_curriculum vitae
mklopper_curriculum vitaeMatthew Klopper
 
Bluemotif Portfolio
Bluemotif PortfolioBluemotif Portfolio
Bluemotif Portfoliomellis3060
 
Charles Ytzen project architect
Charles Ytzen project architectCharles Ytzen project architect
Charles Ytzen project architectCharles Ytzen
 
Capability Statement REV 4
Capability Statement REV 4Capability Statement REV 4
Capability Statement REV 4Keith Callanan
 
Richard Stucki - Selected Work
Richard Stucki - Selected WorkRichard Stucki - Selected Work
Richard Stucki - Selected WorkRichard Stucki
 
Dimitri's Project Portfolio
Dimitri's Project PortfolioDimitri's Project Portfolio
Dimitri's Project Portfoliodkakaletris
 
Westera Civil And Environmental
Westera Civil And EnvironmentalWestera Civil And Environmental
Westera Civil And Environmentaladamide
 
K3 Construction Group at a Glance
K3 Construction Group at a GlanceK3 Construction Group at a Glance
K3 Construction Group at a Glancebkovar1125
 

Similar to Architecture 2b The Details (20)

Westera Commercial Industrial Multi Res
Westera Commercial Industrial Multi ResWestera Commercial Industrial Multi Res
Westera Commercial Industrial Multi Res
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
 
Westera Residential
Westera ResidentialWestera Residential
Westera Residential
 
Jonathan Braddick - Architect Devon
Jonathan Braddick - Architect DevonJonathan Braddick - Architect Devon
Jonathan Braddick - Architect Devon
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conference
 
CV-Lynsey Dyer
CV-Lynsey DyerCV-Lynsey Dyer
CV-Lynsey Dyer
 
Traditional IPD Transition
Traditional IPD TransitionTraditional IPD Transition
Traditional IPD Transition
 
Cv 2012
Cv 2012Cv 2012
Cv 2012
 
Inscape Leed Presentation
Inscape Leed PresentationInscape Leed Presentation
Inscape Leed Presentation
 
a2d architecture
a2d architecturea2d architecture
a2d architecture
 
Portfolio writing and headshot for Designer
Portfolio writing and headshot for DesignerPortfolio writing and headshot for Designer
Portfolio writing and headshot for Designer
 
mklopper_curriculum vitae
mklopper_curriculum vitaemklopper_curriculum vitae
mklopper_curriculum vitae
 
Bluemotif Portfolio
Bluemotif PortfolioBluemotif Portfolio
Bluemotif Portfolio
 
Resume
ResumeResume
Resume
 
Charles Ytzen project architect
Charles Ytzen project architectCharles Ytzen project architect
Charles Ytzen project architect
 
Capability Statement REV 4
Capability Statement REV 4Capability Statement REV 4
Capability Statement REV 4
 
Richard Stucki - Selected Work
Richard Stucki - Selected WorkRichard Stucki - Selected Work
Richard Stucki - Selected Work
 
Dimitri's Project Portfolio
Dimitri's Project PortfolioDimitri's Project Portfolio
Dimitri's Project Portfolio
 
Westera Civil And Environmental
Westera Civil And EnvironmentalWestera Civil And Environmental
Westera Civil And Environmental
 
K3 Construction Group at a Glance
K3 Construction Group at a GlanceK3 Construction Group at a Glance
K3 Construction Group at a Glance
 

Architecture 2b The Details

  • 3. Contents 0.0 Registered Company Number architecture 2B 1.1 Company Profile 4850345 1.2 Awards and Recognition Registered address 1.3 Insurance Graphical House 1.4 Technical Resources / Quality Assurance 2 Wharf Street The Calls 1.5 Company Structure / CV’s of Key Personnel Leeds 1.6 Project Directory LS2 7EQ 1.7 Detailed Project Studies t 0113 247 1497 1.8 Registration with Appropriate Trade Bodies f 0113 245 6850 e info@architecture2B.com 1.9 References w www.architecture2B.com
  • 4. Arc Design, Leeds architecture 2B White RoseChapel Lofts, Morley Award Winner 2007 Leeds Architecture Award Commendation architecture 2B
  • 5. Company Profile 1.1 The Company Design Approach Company Objectives Founded in August 2003 by Darren Bailey and Nick Brown, architecture 2B believes in producing bespoke design • To sell good design as good value. architecture 2B has quickly established a reputation for their solutions for each project. Each site, each client, each brief, quality of design, and their proactive ‘can-do’ attitude to is different, and the architectural solution should reflect this • To create high quality contemporary buildings that exceed service delivery. This success has seen the company grow diversity. The result of this approach is the creation of ‘identity’. the expectations of the client, and that are responsive to steadily to the current level of 13 staff. Our quality of design has already been recognised through sustainability and social issues. several Awards, and by the many Local Authorities we deal Company Structure with. We love what we do, and this passion is contagious. • To maintain a reputation for the quality of the detailed design Projects are successful when the whole team are excited stages as much as for the original creation of the idea. architecture 2B’s team is comprised of the Directors, team about the quality of the building that is to be created. leaders, and the company administrator / office manager. • To maintain a reputation for a high quality service. Each project has Director level input at all stages, Nick Environment Brown concentrating on the design stages, and Darren • To continuously develop and push to keep moving forward. Bailey concentrating on the detailed design and construction architecture 2B are committed to the pressing environmental phases. issues that exist in the construction industry and beyond. A • To always enjoy what we are doing. Each new commission is given to a team leader, who retains member of AECB, Association of Environmentally Conscious ownership throughout the project. This ownership is critical to Buildings, and a pioneering company in the field of modern • To create a dynamic, productive and enjoyable working the success of the project, enabling a constant flow of design methods of construction, architecture 2B incorporate environment. thought process, and a high level of coordination at the latter sustainable principles into their projects from the outset. stages. Starting with ways to reduce energy consumption and • To create and maintain effective levels of communication Project reviews, in line with the quality management system, lowering the carbon footprint, and ensuring construction at all times. are important to maintain quality. waste is minimised with the use of prefabrication technology, architecture 2B are very vocal in the need to keep this issue • To create and maintain a motivated, loyal and well balanced at the forefront of each project we work on. team.
  • 7. Awards and Recognition 1.2 Jun 08 May 08 Mar 08 Jan 08 Jan 08 Insider Property Industry Awards: Yorkshire Property Awards: Wakefield Civic Society Design Leeds Architecture Awards Leeds Architecture Award Winner Architect of the Year Best Architect Awards Commendation for Manygates Commendation Tao Park York Street Nov 07 Nov 07 Jul 07 Jun 07 Mar 07 White Rose Award RIBA Brockholes Competition AJ Kings Cross Charrette Kirkstall Forge Phase 1 4x4 Lecture Series York Street Finalist Shortlisted Speaker Feb 07 Jan 06 Mar 05 Leeds Variety Club Awards Halifax Civic Trust Award Howden Civic Society Awards Best Residential Architect Beaconsfield Centre Hailgate House
  • 9. Insurance Certificates 1.3 Employers liability Insurer: Hiscox Insurance Company Limited Policy number: HU PIB 1306388 Extent of cover: £ 10,000,000 Period of insurance: 19 April 2008 to 18 April 2009 Public liability Insurer: Elite Hiscox Policy number: HU PIB 1306388 Extent of cover: £ 5,000,000 Period of insurance: 19 April 2008 to 18 April 2009 Professional indemnity Insurer: Zurich Insurance Company Policy number: PIP07001187 Extent of cover: £ 5,000,000 Expiry date: 18 November 2009
  • 10. RIBA Brockholes Competition architecture 2B Finalist
  • 11. Technical Resources / Quality Assurance 1.4 Information Technology architecture 2B uses a PC-based system linked using a Risk Management Health & Safety LAN (Local Area Network) with a dedicated server with an uninterrupted power supply, this is backed up daily and stored Implementing the QMS means we can standardise and make Architecture 2B has a written Health & Safety policy a copy of off site, outputting to colour and B&W large format plotters. This routine procedures consistent and accurate, enabling more which is attached. enables all the team to view the information ensuring excellent time to be devoted to dealing with the bespoke requirements co-ordination. of each project. This is managed and up-dated with the assistance of an external consultant: AutoCAD is used throughout to produce drawn information. Environmental assurances John Grant NBS Specification Writer is used to create specification which At architecture 2B we regard sustainability as a key element Employment Lawyer, Law@Work accords with CPI Codes. The information for specifications is in the design process. As part of our quality management Howard Cohen & Co drawn from the CIS web-based library system. system we are striving towards compliance with BS EN ISO 29 Park Square, Leeds LS1 2PQ 14001:2004. Tel: 0113 244 0597 All designs are modelled in 3D using Sketch-Up. Following the philosophy of ‘think globally act locally’ at No injuries have yet been entered into the Accident Book and All information is then managed by Archetype which is a architecture 2B we actively encourage and participate in a architecture 2B have not been served with an improvement bespoke system for architects which manages all data cycle to work scheme and have an effective recycling scheme notice and we would welcome any inspections. including projects, contacts, email, drawings, documents, in place. Once a year a bursary is offered to a member of the correspondence, meetings, CDM and contract documents team to enhance and educate our knowledge of sustainability. ensuring standardisation and easy document retrieval. Investors in People Quality Assurance architecture 2B is currently in the assessment stage of architecture 2B’s Quality Management System (QMS) is split achieving Investors in People status. into two sections, ‘the way we do it’ and the procedures. Each team has a QMS representative who reports feedback to the Quality Co-ordinator, Darren Bailey, ensuring the system is constantly monitored. Projects are constantly audited internally and tested against BS EN ISO 9001:2000 The system is also aligned to the RIBA charted practice status requirements.
  • 12. 1.5 Company Structure Directors Architects / Technicians / Assistants Darren Bailey James Lancaster Nick Brown Matt Lobley Matt Sharp Associate Matthew McColl Simon Brayshaw Kate Scholes Yasar Awais Office manager / admin Thomas Taylor Heather Bellis Carys Marshall Team leader Martin Cook
  • 14. 1.5 Darren Bailey Qualifications BSc (Hons) MBIAT Date of birth 1972 Darren Bailey current projects previous projects / experience Director The Camberwell Project Yorkshire County Cricket Club redevelopment, Leeds Darren is a founding member of architecture 2B. Darren has Business incubator units and managed workspace, Leeds £13.0M significant experience in the office market having successfully £2.5m completed numerous new build and refurbishment projects. The source, Sheffield Bracken Development £4.5M. Reuse of an existing building to create managed workspace, Leeds Conversion of school into residential, Ripon £4m £4.5M Linea Central square south, Newcastle 114 residential apartments, Scunthrope £11M £5.2M Parabola Estates Citispace Creation of BreeAM excellent offices from former post office Residential development : Citispace Apartments, Leeds sorting office, housing Northern Arts £15M Newcastle upon Tyne £6.5M Western Campus Leeds University £6.5M
  • 15. 1.5 Nick Brown Qualifications BA (Hons) DipArch rIBA Date of birth 1969 Nick Brown current projects previous projects / experience Director Mixed use scheme: Manor Road , Leeds Whitehall Phase 2, Leeds Nick was an integral part of Carey Jones (1992 - 1999) and £6.5M £11.0M Aedas Architects (1999 - 2003), before forming architecture 2B with Darren Bailey. Nick is also a part-time tutor at Leeds Mixed use scheme: Prestige Salvage, Leeds City Point, Leeds School of Architecture. £7.5M £9.2M Mixed use scheme: Globe Road, Leeds Government Office, Leeds £6.5M £13.0M Residential scheme: Bethel Chapel, Morley Leeds International Business School, Leeds £2.0M £6.5M Refurbishment of Listed Mill: Midland Mills, Leeds Simpson’s Fold II, Leeds £4.0M £3.0M Charles Schwabb building, Milton Keynes £7.0M Western Campus - Leeds University
  • 16. 1.5 Simon Brayshaw Qualifications Higher National Diploma in the Built Environment Date of birth 1978 Simon Brayshaw current projects previous projects / experience Associate Residential development: Alverthorpe, Wakefield Retail: Debenhams Department store, Leeds £1.2M £8.0M Simon started his professional career at Carey Jones (1994 - 2000) and then moved to Aedas Architects (2000 - 2003), Residential development: Normanton, Wakefield Innovation Centre, Leeds before joining JM Architects (2003 - 2004). Since joining £1.5M £6.0M architecture 2B, in March 2004, Simon has proved to be a valuable team member. As team leader he demonstrates Residential development: Howden Phase 2, Howden Baines Wing, Leeds his leadership skills well and has the ability to assist others £2M £5.0M effectively in their roles. Residential development: Arc, Leeds Office Development: City Point, Leeds £19M £9.2M Residential development: Citispace Apartments, Leeds £15.0M Conversion of Grade II listed building, Howden £600,000 Housing Programme for Hazel Homes, Nationwide £6.0M
  • 17. 1.5 Martin Cook Qualifications Higher National Diploma in the Built Environment Date of birth 1978 Martin Cook current projects previous projects / experience Team Leader Office development: Harehills, Leeds Residential development: Montpelier Hall,London Since joining architecture 2B Martin has be come an integral £2.5M £6.7m part of the company. He is in charge of, amongst other projects, The Camberwell Project which is a LEGI funded Office development: Calls Wharf Phase 1 - 3, Leeds Residential development: Lowndes Square, London workspace scheme, which aims to encourage new businesses £2.5M £5.0m in the Harehills area of Leeds. He is also in charge of the Calls Wharf project which is a refurbished serviced office scheme. Private house: Delphstone House, Leeds Residential development: Highcliffe House, London £undisclosed Value - £6.7m Residential development: Rock Gardens, London £5m
  • 18. 1.6 Project Directory - Residential
  • 19. Project Directory - Mixed use 1.6
  • 20. 1.6 Project Directory - Commercial
  • 21. Project Directory - Masterplanning 1.6
  • 22. Project Directory - Other 1.6 PDF created with pdfFactory trial version www.pdffactory.com
  • 24. 1.7 Detailed Project Case Studies Harehills Middle School, This project leverages enterprise focus for regeneration and community benefit. The building is about doing more Leeds than “just good enough” and sending a message to the £3M community that this asset, their asset, can be/will be the hub of activity and commerce. The project draws in LEGI, ERDF, Private Equity, Bank Finance, and 3rd sector underwriting to deliver a £3M renovation. The building will hold a community incubator, a high growth incubation space, start-up offices, conference space, a restaurant, a credit union, a crèche and plenty of full service features. The project will be a national exemplar of private / public relationships both from an operational and financial stand- point. It will deliver on the ETHOS of LEGI with an invest- ment mindset. Importantly, it has been designed to realise a benefit for both disadvantaged groups in the top 3% and the existing businesses who need a hand up in the area. By design, it will draw inward investment to the area and operate as a hub of activity for new and existing streams of support. All of this occurs through a process of integrating design with enterprise and a focus on creating a lasting (sustainable) social benefit (regeneration, reduced wordlessness, more start-ups and increased aspirations for the community).
  • 25.
  • 26. 1.7 Detailed Project Case Studies Calls Wharf, Leeds Phase 1 of Bracken Developments Calls Wharf scheme Phase I consists of the refurbishment of 2-12 The Calls into high quality serviced office accommodation. The office £2.5M accommodation will be arranged around a new central reception area. The building is to become Bracken Development’s new accommodation. This will set the benchmark for the development of the buildings on the site.
  • 27.
  • 28. 1.7 Detailed Project Case Studies York Street, Leeds Is the new headquarters for arc design; well respected furniture designers. The nature of the client’s business £300,000 created an interest for us in exploring the nature of ‘texture’ and ‘layers’ . A fabric of steel mesh has been ‘draped’ over the building elements, providing a defensive screen at ground level and adding to the drama of the stair tower. The texture and dramatic form of the stair- tower help improve the visual weight of the existing building within its challenging context. The project was completed in March 2007. RIBA White Rose Award 2007 Leeds Architecture Award Commendation 2008
  • 29.
  • 30. 1.7 Detailed Project Case Studies Chapel Lofts, Morley Chapel Lofts is the first collaboration between architecture 2B and CITU. The project introduces many of the ideas £1.1M that are central to the team’s approach to development; high quality contemporary design, good sustainable credentials, attention to detail, and ‘thinking outside the box’. The scheme successfully introduces a modern extension to the existing chapel building, and each apartment has its own identity and character. The scheme was completed in January 2007.
  • 31.
  • 32. 1.7 Detailed Project Case Studies Tao, Leeds This project for CITU Developments incorporates the sensitive conversion of the Mabgate Inn into living accom- £600,000 modation and a small bar / deli, plus the insertion of ‘Tao’ within the old beer garden. Tao, is a study of simplicity; a simple object sitting within the street, and simplicity of detail within the 6 studio apartments. Leeds Architecture Award 2008
  • 33.
  • 34. 1.7 Detailed Project Case Studies Arc, Leeds This progressive scheme of 142 apartments provides a considered approach to an adjoining listed building, £12M whilst reflecting the site’s importance to the wider urban context of Leeds. The building is derived directly from its location, a fluid and dynamic form that addresses the site conditions and the surrounding scale. The site acts as a Northern focal point to both New Briggate and Vicar Lane at a key intersection on the route into Leeds city centre.
  • 35.
  • 36. 1.7 Detailed Project Case Studies Lock Lane, Castleford There is strong optimism towards the future of Castleford as designers and locals work together to rejuvenate £10M forgotten areas of land and breathe new life into the heart of the town. This landmark scheme, incorporating a riverside terrace, cafés, office accommodation and 141 contemporary living apartments, is intended to act as a catalyst for improvement within the local area and of public spaces in terms of its design quality, pivotal position along a main public route and its presence within the town. The building makes reference to the region’s wealth of local sculptors, and focuses specifically on the work of Henry Moore and Andy Goldsworthy. The narrative and language of the form subsequently becomes a dialogue between two objects, as much concerned with mass as with the absence of it. Additional reference to the work of Andy Goldsworthy is made in the use of reed-like fins along the riverfront and Lock Lane elevations.
  • 37.
  • 38. 1.7 Detailed Project Case Studies Citispace, Leeds The Citispace Urban Apartment concept is the result of intensive research into the real and sustainable £13M requirements of those wanting and needing to live in high quality, genuinely affordable apartments at the centre of Leeds. All apartments are stylishly furnished with secure car parking, laundry facilities and a bar/restaurant are all available on site. The development also features a large landscaped courtyard garden for the exclusive use of residents – a combination which gives Citispace its own private and secure living environment. Citispace consists of three phases, phase one involved the installation of an extra two floors of residential accommodation over what was an existing office building, these were manufactured off site and craned into place, supported on an independent ‘goalpost’ frame. Phase two involved the conversion of the existing office space into residential and phase three employed the same methods as phase one. Phase three is eight stories high.
  • 39.
  • 40. 1.7 Detailed Project Case Studies Linea, Scunthorpe Linea is one of a number of projects with client G&W Developments. Conceived as a modern interpretation of £5.2M the traditional terraced house, Linea takes its design cue from the rhythm and repetition of fenestration patterns. Linea Consists of 111 apartments grouped around a central glazed atrium creating a dynamic public space.
  • 41.
  • 42. 1.7 Detailed Project Case Studies Calls Wharf, Leeds A mixed use development for Bracken Developments The challenge for this site was to create the primary Phase ll riverside destination space for Leeds. Dramatic building £12M forms, high quality materials, contemporary detailing, are all central to the design, but above all it is the quality of the public realm that will determine its success as a destination. As a result, the proposed design focuses on the spaces, their connectivity, their quality of light, their activities, and their detailing. Bars and restaurants surround the public space and terrace levels with the commercial offices located above. Calls Wharf will be a great place to relax, to enjoy yourself, and a rewarding place to work.
  • 43.
  • 44. 1.7 Detailed Project Case Studies Aspley Heights, Hudersfield architecture 2B were commissioned to unlock the potential of this challenging sloping site. The innovative £1.2M design solution enabled 20 contemporary apartments to be created, each with panoramic views of the valley and town centre beyond. The concept for this scheme was that of an ‘inhabited ruin’. Stone walls with random openings step down the hillside, the ruin. Rising out of these walls, and filling the openings, are the new modern elements of glass and timber. Balconies protrude through the walls to add further depth and detail. The project was completed in December 2006.
  • 45.
  • 46. 1.7 Detailed Project Case Studies Management Archives, Management Archives is a mixed use scheme adjacent to the grade 1 listed Temple Works in Holbeck, Leeds. It Leeds incorporates 140 residential units of varying sizes, and nearly 20,000 sqft of commercial & retail space. The traditionally industrial materials and simple forms of the scheme are intentionally robust, reflecting the strong industrial heritage of the area. The contemporary openings carved from such forms give the scheme a modern outlook whilst maintaining a sense of integrity of place. The two main blocks along with the real wall to Temple Works creates a large public amenity space from the existing cast iron structures that remain from its former building, merging the boundaries of past and present.
  • 47.
  • 48. 1.7 Detailed Project Case Studies Many Gates, Wakefield Once a prestigious suburb of Wakefield, the Manygates area has suffered a drop in recent years. Evidence of grand buildings nevertheless still remain, and Manygates Park is such an example. The existing No. 2 had been left somewhat dilapidated and tarnished, along with No. 1 which fronts the site onto Barnsley Road. The client bought these houses as bedsits, and approached us to help restore them and the subsequent surrounding area. As part of their redevelopment the new-build elements were conceived. In the heart of the site the extension to the main house was designed to be a simple extension which respects the main house, but also contrasts it in a contemporary manner. The extension takes the language of the original brick structure, grey slate roof and large bay windows, and translates them into a modern interpretation. The same red brick for the main structures are then complimented with terned-coated stainless steel bay windows and crisp grey roofs. The timber then contrasts these robust, almost industrial blocks with a much softer, tactile finish. At the entrance to the site the second building uses a similar pallet to the extension building to the rear. This building along with the refurbished gatehouse building act as entrance markers to the site, signalling the two opposite of the site…the modern present and the past traditional.
  • 49.
  • 50. 1.7 Detailed Project Case Studies Walton House This private residence is to be found in the wonderful The history of the site suggests that local schools used countryside of Kirklees. A sensitive greenbelt area to visit the garden centre for educational field days, provides strict restrictions for any new build scheme, so which has led the design to encourage this practice. the brief for this house was to have “exceptional” as a The gatehouse building could double as a classroom for starting point. visiting school trips, allowing a base to venture from on educational walks around the site. These not only could The house builds upon very traditional principles set out concentrate on the wealth of natural micro-ecologies by the great manor houses that scatter the countryside, around the site such as the natural pond to the south or but boldly re-interprets them for contemporary living. the woodland verges to the north, but could show how The house has traditional elements such as the hidden the house works with the landscape such as the reed-bed driveway, the gatehouse, the inner courtyard and “piano filtration, the dry-stone walls, or the orchard in contrast nobile”, along with controlled vistas, follies, orchard with the natural woodland. gardens and water features. Integration and contrast with the landscape were key to the design of this house - a man-made element in a natural setting. Dry-stone walls emerge from the landscape to form boundary walls, then building walls. Contrasting Ashlar stone then mixes with the more natural rough cut stone to form different reliefs, whilst timber adds a warmer, softer touch. Glass allows the inside and outside spaces to blur, bringing the landscape into the house, and at the same time offering grand vistas of the countryside beyond. Ecology is also key to this house. The house aims to reduce its environmental footprint as much as possible by using renewable energy resources such as ground tubes for tempered fresh air and biomass fuel systems, along with the grey water recycling and reed-bed filtration, to minimise waste impact.
  • 51.
  • 52. 1.7 Detailed Project Case Studies Midland Mills, Leeds Midland Mills is a refurbishment of an existing building found in the Holbeck Urban Village. Typical of many of the buildings in the area, they are very much practical buildings, showing the signs now of long, hard use. The scheme here takes the original buildings and restores and recycles them where necessary and then adds to them to create a modern commercial complex with integrated private communal spaces. The new extensions are clad in Cor-Ten steel, which reflects both the colour of the existing buildings and the industrial past associated with the area. Indeed the rusted steel makes reference to the rails of the passing viaduct that once carried materials into the area.
  • 53.
  • 54. 1.7 Detailed Project Case Studies Kirkstall Forge architecture2B were shortlisted by Commercial Estates Phase 1 Architectural Competition Group to assist them in realising their vision to deliver a June 2007 high quality and sustainable development on the former Kirkstall Forge site in Leeds. Phase 1 forms part of a £250m mixed use development to include residential, office, leisure, hotel, retail and bars/restaurants which extends over 22.93Ha.
  • 55.
  • 56. 1.7 Detailed Project Case Studies SLP College, Leeds This project for SLP College, a private dance faculty in Garforth, near Leeds incorporates additional teaching and performance space over two levels, together with three new singing rooms within the roof space of a third storey. The additional facilities provide an extension to a former chapel which has been home to the thriving school for performing arts since 1991. The college is one of the U.K.’s leading training grounds for young artistic performing talent, as such our inspiration for the scheme was to generate a series of spaces that and external façade elements that reflected the vibrant creativity of the students. The extension utilizes the existing red brick ground floor level to create a plinth for a modern extension above, using zinc cladding and coloured window reveals to add interest, whilst remaining respectful of the surrounding context and original chapel building. The project is due for completion in August 2008 in preparation for the forthcoming academic year, whilst building works continue on site, we are commencing consultation with the LPA with regards to Phase II, an additional building detached from the existing faculty, incorporating recording studios and staff living accommodation.
  • 57.
  • 58. 1.7 Detailed Project Case Studies Lincoln Castings Outline Planning Application by CBRE Investors for the redevelopment of the former industrial buildings and land at Lincoln Castings, Station Road, North Hykeham. Working closely with the Local Council and the local community the design team are proposing an extensive redevelopment of approximately 15ha which consists of 315No new dwellings, 20,000sqft of A3, A4, A5, D1 and D2 uses and 32,000sqft of B2 use. Recreational facilities including sports pitches and changing facilities are proposed alongside improvements to the local train station, bus stops and a new pedestrian footbridge. Sustainability has played an important role in the proposals with the dwellings being constructed under the guidance of Building For Life and aiming to achieve a minimum of 3 stars under the Code for Sustainable Homes. The commercial and industrial buildings are to be constructed using the BREEAM guidance with the minimum level of Very Good being achieved.
  • 59.
  • 60. 1.7 Detailed Project Case Studies Bury college, Bury In collaboration with Britspace Modular buildings architecture 2B designed this two storey examination and £1.1M sports facility. As part of their rapid expansion the college required additional examination rooms that could double as a sports facility. The building was constructed using off site manufacturing techniques by Britspace. It took 6 weeks for the building to manufactured in the factory and just 3 days to install the units on site providing a modest cost effective building within a tight construction programme.
  • 61.
  • 62. 1.8 Registration with Appropriate Trade Bodies RIBA certificate 3137465
  • 63. References 1.9 Mr Matthew Fuller Mr Chris Thompson Mr John Thorpe Director Director Civic Architect Bracken Developments Citu Ltd Leeds Civic Architect Bracken House 38 The Calls Leonardo Building 9 Kerry Street Leeds Rossington Street Horsforth, Leeds LS2 7EW Leeds LS2 8HD LS18 4AW t 0113 234 6690 t 0113 234 6690 t 0113 281 9044 f 0113 234 6696 f 0113 234 6696 f 0113 281 9045 e cthompson@sumonline.co.uk e john.thorpe@leeds.gov.uk e matt@brackendev.com Mr Tom Beesley Mr Matthew Greenwood Director Director Arc Design Partners Ltd G&W Developments 80A York Street Hamnett House Leeds Gibbett Street LS9 8AA Halifax HX2 0AX t 01422 356 847 t 0113 244 6252 f 01422 356 852 f 0113 243 1858 e matthew@gwdevelopments.co.uk e tom@arcdesign.co.uk
  • 64. © architecture 2B Ltd Graphical House 2 Wharf Street The Calls Leeds LS2 7EQ t 0113 247 1497 f 0113 245 6850 e info@architecture2B.com w www.architecture2B.com