SlideShare a Scribd company logo
1 of 3
NAME: __________________                                  DATE: ___________



                            Quiz Review
It’s a beautiful Sunday afternoon, George and Bettie decide to go for a long
BIKE RIDE!!!! Their rates are given in the table below.

    Time (seconds)           George’s distance           Bettie’s distance
          0                      0 meters                    0 meters
          1                     10 meters                    6 meters
          2                     20 meters                   12 meters
          3                     30 meters                   18 meters

1. What is George’s rate?       ____________

2. What is Bettie’s rate?       ____________

3. Using the variable “t” for time and “d” for distance write an equation for
George and Bettie.

      George: _______________                Bettie: _______________

4. How long would it take each person to ride 255 meters? PLEASE GIVE
YOUR ANSWER IN MINUTES AND SECONDS!

GEORGE:                                      BETTIE:
George and Bettie decide to join a bike-a-thon fundraiser. Before joining
they each have to develop their own pledge plan. The pledge plans are
explained below:

George:       his sponsors will pay $3 per km

Bettie:       her sponsors will make a $6 donation and pay $2 per km

5. Complete the table below for the first 4 km of the bike-a-thon.

          Distance             George’s $ (m)             Bettie’s $ (m)
             0
             1
             2
             3
             4


6.    Write an equation for George and Bettie’s pledge plan:

      George: ______________                 Bettie: ___________________




7.    Which graph would the point (7, 20) be on? EXPLAIN YOUR
      ANSWER!
8. Study the three tables below. For each, decide if the table is linear or not
      linear. Circle your answer and explain why or why not.

  x        y         LINEAR            EXPLAIN:
  1        3
  2        7
                     NONLINEAR
  3       11




  x        y                           EXPLAIN:
                      LINEAR
  0       15
  1       11
  2        7          NONLINEAR




  x        y
                      LINEAR           EXPLAIN:
  0        2
  1        4
  2        8          NONLINEAR

More Related Content

Viewers also liked

Robotika eta Scratch (Presentación)
Robotika eta Scratch (Presentación)Robotika eta Scratch (Presentación)
Robotika eta Scratch (Presentación)Scratch Eguna
 
Market in Number - Home Appliance
Market in Number - Home ApplianceMarket in Number - Home Appliance
Market in Number - Home ApplianceMicko ArteCast
 
SCRATCH ETA ROBOTIKA. (Manual)
SCRATCH ETA ROBOTIKA. (Manual)SCRATCH ETA ROBOTIKA. (Manual)
SCRATCH ETA ROBOTIKA. (Manual)Scratch Eguna
 
Kissy maternity hospital
Kissy maternity hospitalKissy maternity hospital
Kissy maternity hospitalJoseph Wagner
 
Clerk job advert revised march 2013
Clerk job advert   revised march 2013Clerk job advert   revised march 2013
Clerk job advert revised march 2013Donald Jones
 
Working With Technology
Working With TechnologyWorking With Technology
Working With TechnologyOmni Video
 

Viewers also liked (7)

Robotika eta Scratch (Presentación)
Robotika eta Scratch (Presentación)Robotika eta Scratch (Presentación)
Robotika eta Scratch (Presentación)
 
Market in Number - Home Appliance
Market in Number - Home ApplianceMarket in Number - Home Appliance
Market in Number - Home Appliance
 
SCRATCH ETA ROBOTIKA. (Manual)
SCRATCH ETA ROBOTIKA. (Manual)SCRATCH ETA ROBOTIKA. (Manual)
SCRATCH ETA ROBOTIKA. (Manual)
 
Kissy maternity hospital
Kissy maternity hospitalKissy maternity hospital
Kissy maternity hospital
 
Clerk job advert revised march 2013
Clerk job advert   revised march 2013Clerk job advert   revised march 2013
Clerk job advert revised march 2013
 
Riswan Hayee-awae
Riswan Hayee-awaeRiswan Hayee-awae
Riswan Hayee-awae
 
Working With Technology
Working With TechnologyWorking With Technology
Working With Technology
 

More from Cinnaminson Public Schools (20)

2015SupervisorResume
2015SupervisorResume2015SupervisorResume
2015SupervisorResume
 
1.8 lab
1.8 lab1.8 lab
1.8 lab
 
Budget project
Budget projectBudget project
Budget project
 
Scale drawing table
Scale drawing tableScale drawing table
Scale drawing table
 
Linear equation graphic
Linear equation graphicLinear equation graphic
Linear equation graphic
 
Slope
SlopeSlope
Slope
 
Scale drawing project
Scale drawing projectScale drawing project
Scale drawing project
 
Scale drawing do nows
Scale drawing do nowsScale drawing do nows
Scale drawing do nows
 
Lifeline project grade sheet (2)
Lifeline project grade sheet (2)Lifeline project grade sheet (2)
Lifeline project grade sheet (2)
 
Lifelineproject
LifelineprojectLifelineproject
Lifelineproject
 
Polygons and quadrilaterals
Polygons and quadrilateralsPolygons and quadrilaterals
Polygons and quadrilaterals
 
L4 angles in polygons
L4 angles in polygonsL4 angles in polygons
L4 angles in polygons
 
Congruent angles go
Congruent angles goCongruent angles go
Congruent angles go
 
Lesson 3 line and angle relationships
Lesson 3 line and angle relationshipsLesson 3 line and angle relationships
Lesson 3 line and angle relationships
 
Angle relationships
Angle relationshipsAngle relationships
Angle relationships
 
Angle relationships
Angle relationshipsAngle relationships
Angle relationships
 
Building blocks of geometry
Building blocks of geometryBuilding blocks of geometry
Building blocks of geometry
 
Sample questions 2013
Sample questions 2013Sample questions 2013
Sample questions 2013
 
7th ask prep jeopardy
7th ask prep jeopardy7th ask prep jeopardy
7th ask prep jeopardy
 
8th ask prep jeopardy
8th ask prep jeopardy8th ask prep jeopardy
8th ask prep jeopardy
 

Review

  • 1. NAME: __________________ DATE: ___________ Quiz Review It’s a beautiful Sunday afternoon, George and Bettie decide to go for a long BIKE RIDE!!!! Their rates are given in the table below. Time (seconds) George’s distance Bettie’s distance 0 0 meters 0 meters 1 10 meters 6 meters 2 20 meters 12 meters 3 30 meters 18 meters 1. What is George’s rate? ____________ 2. What is Bettie’s rate? ____________ 3. Using the variable “t” for time and “d” for distance write an equation for George and Bettie. George: _______________ Bettie: _______________ 4. How long would it take each person to ride 255 meters? PLEASE GIVE YOUR ANSWER IN MINUTES AND SECONDS! GEORGE: BETTIE:
  • 2. George and Bettie decide to join a bike-a-thon fundraiser. Before joining they each have to develop their own pledge plan. The pledge plans are explained below: George: his sponsors will pay $3 per km Bettie: her sponsors will make a $6 donation and pay $2 per km 5. Complete the table below for the first 4 km of the bike-a-thon. Distance George’s $ (m) Bettie’s $ (m) 0 1 2 3 4 6. Write an equation for George and Bettie’s pledge plan: George: ______________ Bettie: ___________________ 7. Which graph would the point (7, 20) be on? EXPLAIN YOUR ANSWER!
  • 3. 8. Study the three tables below. For each, decide if the table is linear or not linear. Circle your answer and explain why or why not. x y LINEAR EXPLAIN: 1 3 2 7 NONLINEAR 3 11 x y EXPLAIN: LINEAR 0 15 1 11 2 7 NONLINEAR x y LINEAR EXPLAIN: 0 2 1 4 2 8 NONLINEAR