SlideShare a Scribd company logo
1 of 2
WAYNE HINCHLIFFE
21 Ranch Park Drive  PACIFIC HAVEN 4659, QLD.  PHONE 0417703109  wayne5238@gmail.com
CONSTRUCTION PROFESSIONAL
Versatile and results-focused
Construction leader with more than
thirty years of experience driving
success in construction environments.
Communicative, with the demonstrated
ability to lead Boiler Making,
Pipefitting, Welding, Stainless Steel
Special Projects, Flange Management,
and Installing for large oil and gas
construction projects.
KEY SKILLS
 pipefitting
 Boiler Making
 Stainless Steel Specialized Work
 Flange Management
 welding
 Sheet metal
 Mechanical Air Conditioning Unit Installation and piping
 Stainless Steel, Aluminum, and Steel Fabrication, marine products , boat building
 Marine protective coatings
 Cryogenic Lagging
 Sheet Metal Pipe Cladding
Trade certificate - no, 751617
Construction safety induction – QLD
30215, 0599313
Working at height – MWS001640
Confined space – MWS001741
High risk – LF -0003148174
Driver licence – CO, RO. no -017 857 697
CERTIFICATIONS
REFEREES
STEVE PURDON–MONADELPHOUS -PH–0448 960415
LEE WHITTAKER–CLOUGH/DOWNER- PH–0458 601637
PETERAUSTERBERRY–DOWNERS - PH– 0418502 043
CLIENT NAME, PAGE 2
123 Jefferson Street  City, ST  123.456.7890  ClientName@Email.com
PROFESSIONAL EXPERIENCE
MONADELPHOUS APLNG,Spring Gulley , dutiespipefitterfrom- 02/ 02/2015 to 25/07/2015.
BECHTEL GLNG,Citrus Island , dutiespipefitter from- 17/09/2014 to 21/12/2014.
THIES QCLNG,CPP , ProjectJordon , dutiespipefitterfrom- 16/12/2013 to 10/09/2014.
CLOUGH/DOWNER,GLNG,HUB 5 , dutiespipefitterfrom- 11/06/2013 to 12/12/2013.
DOWNER, Ranger Uranium,NT, brine concentrator , dutiespipefitter from – 09/01/2013 to 07/06/2013.
IIM, BP, Island,bitumenplant , dutiespipefitterfrom- 19/06/2012 to 21/12/2012 .
TRANSFIELD,Caltex Lytton shut down , dutiesboilermaker / pipefitterfrom– 05/03/2012 to 15/06/2012.
UGL,PROJECT AURORA, ammonia plant ,Moranbah ,dutiespipefitterfrom– 02/02/2011 to 29/02/2012.
DOWNERS, PROJECT DHU2,Caltex Lytton, dutiespipefitter from-16/02/2010 to 21/12/2010.
WATPAC,Suncorp stadium
HASTIE A/C, Southbank
CRANE STAINLESS STEEL, Owner
ALSTOM, Swanbank power station gas turbine.
TARONG ,powerstation .
CALTEX SHUT DOWNS,High Rise,Shopping Center.
TARONG,Power Station
Position Title

More Related Content

What's hot (7)

Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
 
Shane connely romero 2016 resume p
Shane connely romero 2016 resume pShane connely romero 2016 resume p
Shane connely romero 2016 resume p
 
AK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre QualificationAK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre Qualification
 
Hogan Greg 20100624
Hogan Greg 20100624Hogan Greg 20100624
Hogan Greg 20100624
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
2nd Offshore Wind Construction, Installation & Commissioning Conference
2nd Offshore Wind Construction, Installation & Commissioning Conference 2nd Offshore Wind Construction, Installation & Commissioning Conference
2nd Offshore Wind Construction, Installation & Commissioning Conference
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 

Viewers also liked (13)

Formularios e inforemes en access
Formularios e inforemes en accessFormularios e inforemes en access
Formularios e inforemes en access
 
NAP Global Network: Coordinating Climate-Resilient Development
NAP Global Network: Coordinating Climate-Resilient DevelopmentNAP Global Network: Coordinating Climate-Resilient Development
NAP Global Network: Coordinating Climate-Resilient Development
 
Anthony Bowes Work flow 3D Game
Anthony Bowes Work flow 3D  GameAnthony Bowes Work flow 3D  Game
Anthony Bowes Work flow 3D Game
 
RICS CPD day April 2016
RICS CPD day April 2016 RICS CPD day April 2016
RICS CPD day April 2016
 
Doc1
Doc1Doc1
Doc1
 
Calentamiento global(marisol)
Calentamiento global(marisol)Calentamiento global(marisol)
Calentamiento global(marisol)
 
Mapa curricular 2011
Mapa curricular 2011Mapa curricular 2011
Mapa curricular 2011
 
SMART Microsoft case study
SMART Microsoft case studySMART Microsoft case study
SMART Microsoft case study
 
SMART Podium Interactive Pen Display Fact Sheet
SMART Podium Interactive Pen Display Fact SheetSMART Podium Interactive Pen Display Fact Sheet
SMART Podium Interactive Pen Display Fact Sheet
 
Ttt
TttTtt
Ttt
 
Ficha de inscripcion
Ficha de inscripcionFicha de inscripcion
Ficha de inscripcion
 
NP Escombrera Perales del Río
NP Escombrera Perales del RíoNP Escombrera Perales del Río
NP Escombrera Perales del Río
 
翡翠與剛玉地球的早期歷史提供線索
翡翠與剛玉地球的早期歷史提供線索翡翠與剛玉地球的早期歷史提供線索
翡翠與剛玉地球的早期歷史提供線索
 

Similar to wayne_revcube (20)

Thomas Dowie CV
Thomas Dowie CVThomas Dowie CV
Thomas Dowie CV
 
Shaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copy
 
liams resume pdf
liams resume pdfliams resume pdf
liams resume pdf
 
Liam Ciruis Resume 1
Liam Ciruis Resume 1Liam Ciruis Resume 1
Liam Ciruis Resume 1
 
Resume (apr16)
Resume (apr16)Resume (apr16)
Resume (apr16)
 
ROBS RESUME 15 5 15
ROBS RESUME 15 5 15ROBS RESUME 15 5 15
ROBS RESUME 15 5 15
 
Kim Resume
Kim ResumeKim Resume
Kim Resume
 
theo-michael-thomson-resume-2
theo-michael-thomson-resume-2theo-michael-thomson-resume-2
theo-michael-thomson-resume-2
 
stevenfrench_coordinator
stevenfrench_coordinatorstevenfrench_coordinator
stevenfrench_coordinator
 
CV - Paul Pugh -December2015
CV - Paul Pugh -December2015CV - Paul Pugh -December2015
CV - Paul Pugh -December2015
 
Resume New updated August
Resume New updated August Resume New updated August
Resume New updated August
 
NewSTS Brochure
NewSTS BrochureNewSTS Brochure
NewSTS Brochure
 
Shane Pyke Resume
Shane Pyke ResumeShane Pyke Resume
Shane Pyke Resume
 
Garry Hursts CV
Garry Hursts CVGarry Hursts CV
Garry Hursts CV
 
Craig Resume new
Craig Resume newCraig Resume new
Craig Resume new
 
Resume of Craig Lancaster updated
Resume of Craig Lancaster updatedResume of Craig Lancaster updated
Resume of Craig Lancaster updated
 
Mark a farmer (4)
Mark a farmer (4)Mark a farmer (4)
Mark a farmer (4)
 
Mark_A_Farmer (4)
Mark_A_Farmer (4)Mark_A_Farmer (4)
Mark_A_Farmer (4)
 
Morritt andrew cv 2017 ref
Morritt andrew cv 2017 refMorritt andrew cv 2017 ref
Morritt andrew cv 2017 ref
 
MORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 RefMORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 Ref
 

wayne_revcube

  • 1. WAYNE HINCHLIFFE 21 Ranch Park Drive  PACIFIC HAVEN 4659, QLD.  PHONE 0417703109  wayne5238@gmail.com CONSTRUCTION PROFESSIONAL Versatile and results-focused Construction leader with more than thirty years of experience driving success in construction environments. Communicative, with the demonstrated ability to lead Boiler Making, Pipefitting, Welding, Stainless Steel Special Projects, Flange Management, and Installing for large oil and gas construction projects. KEY SKILLS  pipefitting  Boiler Making  Stainless Steel Specialized Work  Flange Management  welding  Sheet metal  Mechanical Air Conditioning Unit Installation and piping  Stainless Steel, Aluminum, and Steel Fabrication, marine products , boat building  Marine protective coatings  Cryogenic Lagging  Sheet Metal Pipe Cladding Trade certificate - no, 751617 Construction safety induction – QLD 30215, 0599313 Working at height – MWS001640 Confined space – MWS001741 High risk – LF -0003148174 Driver licence – CO, RO. no -017 857 697 CERTIFICATIONS
  • 2. REFEREES STEVE PURDON–MONADELPHOUS -PH–0448 960415 LEE WHITTAKER–CLOUGH/DOWNER- PH–0458 601637 PETERAUSTERBERRY–DOWNERS - PH– 0418502 043 CLIENT NAME, PAGE 2 123 Jefferson Street  City, ST  123.456.7890  ClientName@Email.com PROFESSIONAL EXPERIENCE MONADELPHOUS APLNG,Spring Gulley , dutiespipefitterfrom- 02/ 02/2015 to 25/07/2015. BECHTEL GLNG,Citrus Island , dutiespipefitter from- 17/09/2014 to 21/12/2014. THIES QCLNG,CPP , ProjectJordon , dutiespipefitterfrom- 16/12/2013 to 10/09/2014. CLOUGH/DOWNER,GLNG,HUB 5 , dutiespipefitterfrom- 11/06/2013 to 12/12/2013. DOWNER, Ranger Uranium,NT, brine concentrator , dutiespipefitter from – 09/01/2013 to 07/06/2013. IIM, BP, Island,bitumenplant , dutiespipefitterfrom- 19/06/2012 to 21/12/2012 . TRANSFIELD,Caltex Lytton shut down , dutiesboilermaker / pipefitterfrom– 05/03/2012 to 15/06/2012. UGL,PROJECT AURORA, ammonia plant ,Moranbah ,dutiespipefitterfrom– 02/02/2011 to 29/02/2012. DOWNERS, PROJECT DHU2,Caltex Lytton, dutiespipefitter from-16/02/2010 to 21/12/2010. WATPAC,Suncorp stadium HASTIE A/C, Southbank CRANE STAINLESS STEEL, Owner ALSTOM, Swanbank power station gas turbine. TARONG ,powerstation . CALTEX SHUT DOWNS,High Rise,Shopping Center. TARONG,Power Station Position Title