MEUR 4-6/2020 CHANGE 1-6/2020 CHANGE
Order intake 1,011 -27% 2,259 -19%
of which services 486 -22% 1,120 -12%
Order book 5,401 -12%
Net sales 1,220 0% 2,390 +1%
of which services 510 -17% 1,103 -7%
Book-to-bill 0.83 -0.30 0.95 -0.23
Comparable operating result 55 -51% 111 -48%
% of net sales 4.5% -4.8 pp 4.7% -4.4 pp
Earnings per share, EUR 0.04 -0.07 0.09 -0.12
Cash flow from operating activities 252 +289 293 +295
KEY FIGURES
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20203
© Wärtsilä
0
10
20
30
40
50
60
70
80
90
01-11
06-11
11-11
04-12
09-12
02-13
07-13
12-13
05-14
10-14
03-15
08-15
01-16
06-16
11-16
04-17
09-17
02-18
07-18
12-18
05-19
10-19
03-20
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0
50
100
150
200
250
01-11
06-11
11-11
04-12
09-12
02-13
07-13
12-13
05-14
10-14
03-15
08-15
01-16
06-16
11-16
04-17
09-17
02-18
07-18
12-18
05-19
10-19
03-20
Total vessel contracting Specialised tonnage
VESSEL ORDERS REMAINED AT A VERY LOW LEVEL
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20204
Source: Clarksons Research, contracting as per 1 July, 2020
CGT= gross tonnage compensated with workload
Number of vessels Million CGT Number of vessels
Cruise and Ferry
Merchant
3 months moving average in CGT
Special vessels
Offshore
Cruise and Ferry
Offshore
LNG carriers
Special vessels LPG carriers
© Wärtsilä5
17% 13% 14% 15% 14% 17% 9% 8%
0
5,000
10,000
15,000
20,000
25,000
Q317-Q218 Q417-Q318 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419 Q219-Q120
Wärtsilä Others
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020
ENERGY MARKETS AT A STABLE LEVEL
The total market, including also power plants with prime movers above 500 MW, decreased by 2% to 46.2 GW during the twelve-month period ending in March 2020 (47.2 at the end of December).
The market data includes all Wärtsilä power plants and other manufacturers’ gas and liquid fuelled gas turbine based power plants with prime movers below 500 MW, as well as the estimated output of steam turbines
for combined cycles. The data is gathered from the McCoy Power Report. The main gas turbine competitors are GE, Siemens, Mitsubishi, and Ansaldo. Other combustion engines are not included.
MW, 12m rolling
Market for gas and liquid fuel power plants <500 MW
© Wärtsilä
39%
12%5%
39%
5%
Marine Power
Marine Systems
Voyage
Energy
Portfolio Business
48%52%
Services
Equipment
1,377
1,011
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Q318-Q219 Q418-Q319 Q119-Q419 Q219-Q120 Q319-Q220
ORDER INTAKE
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20206
Q2
-27%
Order intake
by business area
Second quarter development
MEUR, 12m rolling
Second quarter 2020 and comparison 2019
Order intake
by business type
(3)
(32)
(5)
(14)
(55)
(45)
(46)
© Wärtsilä
3%
1%
5%
42%
16%
6%
35%
32%
9%
3%
13%
32%
8%
6%
6%
3%
16%
7%
3%
3%
35%
5%
12%
11%
5%
18%
7%
1%
15%
24%
45%
20%
38%
45%
25%
19%
1%
21%
1%
3%
Services
Equipment
Services
Equipment
Services
Equipment
VoyageMarineSystemsMarinePower
Gas carriers Cruise & ferry Offshore Navy Special vessels Merchant Other
33% 30%
24%
59%
30%
11%14%
Services Equipment
Other
Industrials
Independent
Power
Producers
Utilities
Marine Businesses Energy
JANUARY–JUNE ORDER INTAKE BY CUSTOMER SEGMENT
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20207
(15) (34) (3) (16) (11) (20)
(16) (27) (13) (9) (12) (22) (2)
(45) (18) (30) (5)
(5) (9) (5) (34) (9) (38)
(0) (47) (11) (4) (3) (19) (17)
(1) (50) (5) (1) (7) (36) (0)
(32)
(23)
(35)
(10)
(62)
(19)
(19)
(0)(1) (0)
© Wärtsilä
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
31.3.2018* 30.9.2018* 31.3.2019** 30.9.2019** 31.3.2020
Marine Businesses total Marine Power Marine Systems
Voyage Energy Portfolio Business
Book-to-bill, QTD
0
500
1,000
1,500
2,000
2,500
3,000
Delivery
current year
Delivery next
year
Delivery after
next year
30.6.2018 30.6.2019** 30.6.2020
Order book by business area Order book delivery schedule
ORDER BOOK
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20208
*2018 figures not restated to accommodate the establishment of Portfolio Business entity
**As published in the Interim report January-March 2020, order book figures for 2019 have been restated due to stricter requirements for booking new orders.
MEUR MEUR
© Wärtsilä
1,217 1,220
0
1,000
2,000
3,000
4,000
5,000
6,000
Q318-Q219 Q418-Q319 Q119-Q419 Q219-Q120 Q319-Q220
NET SALES
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20209
Second quarter 2020 and comparison 2019
34%
20%
5%
37%
4%
Marine Power
Marine Systems
Voyage
Energy
Portfolio Business
42%
58%
Services
Equipment
Net sales
by business area
Second quarter development
Net sales
by business type
(5)
(33)
(37)
(6)
(19)
(50)
(50)
MEUR, 12m rolling
Q2
0%
© Wärtsilä
0
500
1,000
1,500
2,000
2,500
3,000
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
1-3/2018 7-9/2018 1-3/2019 7-9/2019 1-3/2020
Services Equipment Service sales, 12m rolling
23%
13%
4%
4%
56%
Spare parts
Field service
Service agreements
Service projects
Equipment
17%
5%
14%
4%
60%
NET SALES BY BUSINESS TYPE
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202010
(48)
(7)
(16)
(25)
(4)
(53)
(18)
(4)
(19)
(5)
MEUR MEUR, 12m rolling
Second quarter development
Marine
Businesses
EUR 715 million
(756)
Energy
EUR 457 million
(400)
© Wärtsilä11 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020
NET SALES BRIDGE
MEUR
© Wärtsilä
11.1%
9.6%
8.8%
7.9%
6.8%
0%
2%
4%
6%
8%
10%
12%
0
100
200
300
400
500
600
700
Q318-Q219 Q418-Q319 Q119-Q419 Q219-Q120 Q319-Q220
Comparable operating result Comparable operating result, %
9.1%
4.7%
-2%
0%
2%
4%
6%
8%
10%
-50
0
50
100
150
200
250
1-6/2019 1-6/2020
Marine Power Marine Systems
Voyage Energy
Portfolio Business Total, % of sales
Review period development
COMPARABLE OPERATING RESULT
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202012
MEUR, 12m rolling MEUR
© Wärtsilä
0
100
200
300
400
500
600
700
2015 2016 2017 2018 2019
-50
0
50
100
150
200
250
300
350
1-6/2019 1-6/2020
Review period development
CASH FLOW FROM OPERATING ACTIVITIES
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202013
MEUR MEUR
© Wärtsilä14
490 563 581 732
492
10.2%
11.5% 11.2%
14.2%
9.5%
0%
2%
4%
6%
8%
10%
12%
14%
16%
-4,000
-3,000
-2,000
-1,000
0
1,000
2,000
3,000
4,000
2016 2017 2018 2019 30.6.2020
Other non-interest-bearing liabilities
Advances received
Trade payables
Other non-interest-bearing receivables
Trade receivables
Inventories
Working capital
Working capital / net sales, 12m rolling
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020
WORKING CAPITAL
MEUR
© Wärtsilä
0.00
0.10
0.20
0.30
0.40
0.50
2015 2016 2017 2018 2019
0.00
0.10
0.20
0.30
0.40
0.50
30.6.2019 30.6.2020
Review period development
GEARING
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202015
© Wärtsilä
© Wärtsilä
• Order intake decreased by 38% to EUR 391
million (632)
• Ordering activity under pressure due to
idling of fleet and customers adjusting their
capital and operating expenditures
• Net sales decreased by 6% to EUR 420 million
(447)
• Comparable operating result amounted to
EUR 24 million (62) or 5.7% of net sales (13.8)
• Profitability weakened primarily due to an
unfavourable sales mix and weaker fixed
cost absorption
0
100
200
300
400
500
600
700
Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20
Order intake
0%
2%
4%
6%
8%
10%
12%
14%
16%
18%
20%
0
100
200
300
400
500
600
700
Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20
Net sales and profitability
Services Equipment Comparable operating result, %
MARINE POWER
MARINE POWER
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202017
MEUR
MEUR
© Wärtsilä18
0
50
100
150
200
250
300
350
400
450
30.6.2017 30.6.2018 30.6.2019 30.6.2020
A new remote service to overcome travel
restrictions
• Wärtsilä introduced its Assured Operations
remote support service for Wärtsilä 4-stroke
and 2-stroke engine customers
• The service enables technical experts to
assess and resolve operational issues via
remote connection between the vessel and
Wärtsilä’s Expertise Centres
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020
NET SALES FROM INSTALLATIONS UNDER AGREEMENT
MARINE POWER
MEUR, 12m rolling
© Wärtsilä
• Order intake decreased by 40% to EUR 119
million (198)
• Reduced fuel spreads resulted in lower
demand for scrubber investments
• Net sales increased by 1% to EUR 238 million
(237)
• Comparable operating result amounted to
EUR 27 million (23) or 11.2% of net sales (9.7)
• Increased scrubber delivery volumes
boosted both net sales and profitability
0
50
100
150
200
250
300
Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20
Order intake
0%
2%
4%
6%
8%
10%
12%
14%
0
50
100
150
200
250
300
Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20
Net sales and profitability
Services Equipment Comparable operating result, %
MARINE SYSTEMS
MARINE SYSTEMS
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202019
MEUR
MEUR
© Wärtsilä
• Order intake decreased by 23% to EUR 56
million (72)
• Net sales decreased by 23% to EUR 56 million
(73)
• COVID-19 caused project postponements
and less transactional service business
• Comparable operating result amounted to EUR
-12 million (-9) or -20.8% of net sales (-12.8)
• Negative impacts from lower sales volumes,
a less favourable service mix, and
increased investments in digital
competences
0
20
40
60
80
100
120
Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20
Order intake
-25%
-20%
-15%
-10%
-5%
0%
5%
10%
0
20
40
60
80
100
120
Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20
Net sales and profitability
Services Equipment Comparable operating result, %
VOYAGE
VOYAGE
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202020
MEUR
MEUR
© Wärtsilä21
Voyage is committed to creating a Smart
Marine Ecosystem, whereby every
vessel can connect to digital services
that make voyaging safer and greener
Connected vessels enable:
• Significant cost savings
• Faster and safer voyage planning
• On time arrival, less anchorage
• Transparent ship-to-shore data
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020
VESSELS CONNECTED TO VOYAGE DIGITAL SERVICES INCREASED 90% –
RECORD HIGH NUMBER OF VESSELS IN ORDER BOOK
VOYAGE
+90%
Commissioned,
cumulative
Order Book
Number of connected vessels
Q2/20Q3/19 Q4/19Q1/18 Q2/18 Q1/19Q3/18 Q4/18 Q2/19 Q1/20
© Wärtsilä
• Order intake decreased by 10% to EUR 390
million (435)
• Received equipment orders included a 200
MW flexible baseload power plant to be
delivered to South America
• Net sales increased by 14% to EUR 457 million
(400), driven by equipment deliveries
• Comparable operating result amounted to
EUR 19 million (38) or 4.0% of net sales (9.6)
• Decline in profitability mainly due to an
unfavourable sales mix and COVID-19
impacts
0
100
200
300
400
500
600
700
Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20
Order intake
-4%
-2%
0%
2%
4%
6%
8%
10%
12%
14%
0
100
200
300
400
500
600
700
Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20
Net sales and profitability
Services Equipment Comparable operating result, %
ENERGY
ENERGY
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202022
MEUR
MEUR
© Wärtsilä23
0%
5%
10%
15%
20%
25%
30%
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2015 2016 2017 2018 2019 30.6.2020
MW under agreement* % of Energy installed base
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020
ENERGY INSTALLED BASE COVERED BY LONG-TERM
SERVICE AGREEMENTS
ENERGY
MW
*Includes agreements covering both installed assets and assets to be installed in the future
© Wärtsilä
ENERGY
ORDERS RECEIVED FOR ENERGY EQUIPMENT GLOBALLY
IPP’s
(Independent
Power Producers)
Utilities
Industrials
ORDER INTAKE 1-6/2020:
912 MW (1,058)
Others
17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202024
Americas
719 (248)
Africa and
Middle East
70 (291)
Europe
22 (24)
Asia
101 (525)
© Wärtsilä
The COVID-19 outbreak and the measures
taken to contain the pandemic will materially
impact the demand for Wärtsilä’s solutions
and services, as well as the company’s
financial performance in 2020. The full
financial impact cannot be quantified at this
time.
Consequently, Wärtsilä withdrew its market
outlook for 2020 on 31 March 2020 pending
an improvement in visibility.
THANK YOU
Further information:
NATALIA VALTASAARI
Vice President, Investor Relations
Tel: +358 (0) 10 709 5637
E-mail: natalia.valtasaari@wartsila.com

More Related Content

What's hot

Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018Wärtsilä Corporation
 
Wärtsilä - Q4 & Full Year Results 2015
Wärtsilä - Q4 & Full Year Results 2015Wärtsilä - Q4 & Full Year Results 2015
Wärtsilä - Q4 & Full Year Results 2015Wärtsilä Corporation
 
Gruppo Hera 2014-2018 business plan
Gruppo Hera 2014-2018 business planGruppo Hera 2014-2018 business plan
Gruppo Hera 2014-2018 business planHera Group
 
Enea 2014 H1
Enea 2014 H1Enea 2014 H1
Enea 2014 H1Enea
 
Analyst presentation H1 2015
 Analyst presentation H1 2015 Analyst presentation H1 2015
Analyst presentation H1 2015Hera Group
 
Elringklinger - Conference Call Q2 2014
Elringklinger - Conference Call Q2 2014Elringklinger - Conference Call Q2 2014
Elringklinger - Conference Call Q2 2014Company Spotlight
 
Hera Group - 9M Financial Results
Hera Group - 9M Financial ResultsHera Group - 9M Financial Results
Hera Group - 9M Financial ResultsHera Group
 
ACCIONA H1 2015 results
ACCIONA H1 2015 resultsACCIONA H1 2015 results
ACCIONA H1 2015 resultsacciona
 
ACCIONA Q1 2015 Results Report
ACCIONA Q1 2015 Results ReportACCIONA Q1 2015 Results Report
ACCIONA Q1 2015 Results Reportacciona
 
Analyst presentation: business plan to 2019
Analyst presentation: business plan to 2019Analyst presentation: business plan to 2019
Analyst presentation: business plan to 2019Hera Group
 
Stora Enso second quarter results 2013
Stora Enso second quarter results 2013Stora Enso second quarter results 2013
Stora Enso second quarter results 2013Stora Enso
 
Analyst presentation: business plan to 2020
Analyst presentation: business plan to 2020Analyst presentation: business plan to 2020
Analyst presentation: business plan to 2020Hera Group
 
Analyst Presentation Business Plan 2017-2021
Analyst Presentation Business Plan 2017-2021Analyst Presentation Business Plan 2017-2021
Analyst Presentation Business Plan 2017-2021Hera Group
 

What's hot (20)

Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018
 
Result presentation Q2 2018
Result presentation Q2 2018Result presentation Q2 2018
Result presentation Q2 2018
 
Result presentation Q1 2017
Result presentation Q1 2017Result presentation Q1 2017
Result presentation Q1 2017
 
Result presentation 2016
Result presentation 2016Result presentation 2016
Result presentation 2016
 
Wärtsilä Q1 2014 presentation
Wärtsilä Q1 2014 presentationWärtsilä Q1 2014 presentation
Wärtsilä Q1 2014 presentation
 
Result presentation Q1 2016
Result presentation Q1 2016Result presentation Q1 2016
Result presentation Q1 2016
 
Result presentation Q3 2019
Result presentation Q3 2019Result presentation Q3 2019
Result presentation Q3 2019
 
Wärtsilä - Q4 & Full Year Results 2015
Wärtsilä - Q4 & Full Year Results 2015Wärtsilä - Q4 & Full Year Results 2015
Wärtsilä - Q4 & Full Year Results 2015
 
Gruppo Hera 2014-2018 business plan
Gruppo Hera 2014-2018 business planGruppo Hera 2014-2018 business plan
Gruppo Hera 2014-2018 business plan
 
Enea 2014 H1
Enea 2014 H1Enea 2014 H1
Enea 2014 H1
 
Result presentation Q2 2014
Result presentation Q2 2014Result presentation Q2 2014
Result presentation Q2 2014
 
Analyst presentation H1 2015
 Analyst presentation H1 2015 Analyst presentation H1 2015
Analyst presentation H1 2015
 
Elringklinger - Conference Call Q2 2014
Elringklinger - Conference Call Q2 2014Elringklinger - Conference Call Q2 2014
Elringklinger - Conference Call Q2 2014
 
Hera Group - 9M Financial Results
Hera Group - 9M Financial ResultsHera Group - 9M Financial Results
Hera Group - 9M Financial Results
 
ACCIONA H1 2015 results
ACCIONA H1 2015 resultsACCIONA H1 2015 results
ACCIONA H1 2015 results
 
ACCIONA Q1 2015 Results Report
ACCIONA Q1 2015 Results ReportACCIONA Q1 2015 Results Report
ACCIONA Q1 2015 Results Report
 
Analyst presentation: business plan to 2019
Analyst presentation: business plan to 2019Analyst presentation: business plan to 2019
Analyst presentation: business plan to 2019
 
Stora Enso second quarter results 2013
Stora Enso second quarter results 2013Stora Enso second quarter results 2013
Stora Enso second quarter results 2013
 
Analyst presentation: business plan to 2020
Analyst presentation: business plan to 2020Analyst presentation: business plan to 2020
Analyst presentation: business plan to 2020
 
Analyst Presentation Business Plan 2017-2021
Analyst Presentation Business Plan 2017-2021Analyst Presentation Business Plan 2017-2021
Analyst Presentation Business Plan 2017-2021
 

Similar to Wärtsilä Half Year Report Summary

Rr results q2_2015_en_final
Rr results q2_2015_en_finalRr results q2_2015_en_final
Rr results q2_2015_en_finalRamirent Group
 
HeidelbergCement Trading Statement 2016
HeidelbergCement Trading Statement 2016HeidelbergCement Trading Statement 2016
HeidelbergCement Trading Statement 2016HeidelbergCement
 
Acciona 9 M 2015 Results Report
Acciona 9 M 2015 Results ReportAcciona 9 M 2015 Results Report
Acciona 9 M 2015 Results Reportacciona
 
Dürr AG Conference Call 9M / Q3 2018
Dürr AG Conference Call 9M / Q3 2018Dürr AG Conference Call 9M / Q3 2018
Dürr AG Conference Call 9M / Q3 2018Dürr
 
Metso Interim Review Q1 2015 presentation
Metso Interim Review Q1 2015 presentationMetso Interim Review Q1 2015 presentation
Metso Interim Review Q1 2015 presentationMetso Group
 
Metso Capital Markets Day 2013 presentations: Harri Nikunen, CFO
Metso Capital Markets Day 2013 presentations: Harri Nikunen, CFOMetso Capital Markets Day 2013 presentations: Harri Nikunen, CFO
Metso Capital Markets Day 2013 presentations: Harri Nikunen, CFOMetso Group
 
HeidelbergCement: Annual Results 2014
HeidelbergCement: Annual Results 2014HeidelbergCement: Annual Results 2014
HeidelbergCement: Annual Results 2014HeidelbergCement
 
Lassila & Tikanoja interim report Q2/2015
Lassila & Tikanoja interim report Q2/2015Lassila & Tikanoja interim report Q2/2015
Lassila & Tikanoja interim report Q2/2015Lassila & Tikanoja Oyj
 
HeidelbergCement Results 2015
HeidelbergCement Results 2015HeidelbergCement Results 2015
HeidelbergCement Results 2015HeidelbergCement
 
Leonardo First Half 2018 results presentation
Leonardo First Half 2018 results presentationLeonardo First Half 2018 results presentation
Leonardo First Half 2018 results presentationLeonardo
 

Similar to Wärtsilä Half Year Report Summary (20)

Result presentation Q3 2015
Result presentation Q3 2015Result presentation Q3 2015
Result presentation Q3 2015
 
Result presentation Q1 2019
Result presentation Q1 2019Result presentation Q1 2019
Result presentation Q1 2019
 
Rr results q2_2015_en_final
Rr results q2_2015_en_finalRr results q2_2015_en_final
Rr results q2_2015_en_final
 
Result presentation Q2 2019
Result presentation Q2 2019Result presentation Q2 2019
Result presentation Q2 2019
 
Result presentation Q3 2018
Result presentation Q3 2018Result presentation Q3 2018
Result presentation Q3 2018
 
Result presentation Q1 2018
Result presentation Q1 2018Result presentation Q1 2018
Result presentation Q1 2018
 
Result presentation Q2 2017
Result presentation Q2 2017Result presentation Q2 2017
Result presentation Q2 2017
 
Result presentation Q3 2016
Result presentation Q3 2016Result presentation Q3 2016
Result presentation Q3 2016
 
Result presentation Q3 2017
Result presentation Q3 2017Result presentation Q3 2017
Result presentation Q3 2017
 
Result presentation Q2 2015
Result presentation Q2 2015Result presentation Q2 2015
Result presentation Q2 2015
 
HeidelbergCement Trading Statement 2016
HeidelbergCement Trading Statement 2016HeidelbergCement Trading Statement 2016
HeidelbergCement Trading Statement 2016
 
Acciona 9 M 2015 Results Report
Acciona 9 M 2015 Results ReportAcciona 9 M 2015 Results Report
Acciona 9 M 2015 Results Report
 
Dürr AG Conference Call 9M / Q3 2018
Dürr AG Conference Call 9M / Q3 2018Dürr AG Conference Call 9M / Q3 2018
Dürr AG Conference Call 9M / Q3 2018
 
Metso Interim Review Q1 2015 presentation
Metso Interim Review Q1 2015 presentationMetso Interim Review Q1 2015 presentation
Metso Interim Review Q1 2015 presentation
 
Metso Capital Markets Day 2013 presentations: Harri Nikunen, CFO
Metso Capital Markets Day 2013 presentations: Harri Nikunen, CFOMetso Capital Markets Day 2013 presentations: Harri Nikunen, CFO
Metso Capital Markets Day 2013 presentations: Harri Nikunen, CFO
 
HeidelbergCement: Annual Results 2014
HeidelbergCement: Annual Results 2014HeidelbergCement: Annual Results 2014
HeidelbergCement: Annual Results 2014
 
Lassila & Tikanoja interim report Q2/2015
Lassila & Tikanoja interim report Q2/2015Lassila & Tikanoja interim report Q2/2015
Lassila & Tikanoja interim report Q2/2015
 
HeidelbergCement Results 2015
HeidelbergCement Results 2015HeidelbergCement Results 2015
HeidelbergCement Results 2015
 
Result presentation 2017
Result presentation 2017Result presentation 2017
Result presentation 2017
 
Leonardo First Half 2018 results presentation
Leonardo First Half 2018 results presentationLeonardo First Half 2018 results presentation
Leonardo First Half 2018 results presentation
 

More from Wärtsilä Corporation

Biogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by WärtsiläBiogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by WärtsiläWärtsilä Corporation
 
Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...Wärtsilä Corporation
 
Marine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunitiesMarine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunitiesWärtsilä Corporation
 
Wartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overviewWartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overviewWärtsilä Corporation
 
GHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa MarttinenGHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa MarttinenWärtsilä Corporation
 

More from Wärtsilä Corporation (7)

Compact Reliq™
Compact Reliq™Compact Reliq™
Compact Reliq™
 
Biogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by WärtsiläBiogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by Wärtsilä
 
Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...
 
Marine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunitiesMarine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunities
 
Modern gas-fueled power generation
Modern gas-fueled power generationModern gas-fueled power generation
Modern gas-fueled power generation
 
Wartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overviewWartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overview
 
GHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa MarttinenGHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa Marttinen
 

Recently uploaded

OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...NETWAYS
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)Basil Achie
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptxBasil Achie
 

Recently uploaded (20)

OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
 

Wärtsilä Half Year Report Summary

  • 1. 17 JULY 2020 JAAKKO ESKOLA, PRESIDENT & CEO
  • 3. © Wärtsilä MEUR 4-6/2020 CHANGE 1-6/2020 CHANGE Order intake 1,011 -27% 2,259 -19% of which services 486 -22% 1,120 -12% Order book 5,401 -12% Net sales 1,220 0% 2,390 +1% of which services 510 -17% 1,103 -7% Book-to-bill 0.83 -0.30 0.95 -0.23 Comparable operating result 55 -51% 111 -48% % of net sales 4.5% -4.8 pp 4.7% -4.4 pp Earnings per share, EUR 0.04 -0.07 0.09 -0.12 Cash flow from operating activities 252 +289 293 +295 KEY FIGURES 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20203
  • 4. © Wärtsilä 0 10 20 30 40 50 60 70 80 90 01-11 06-11 11-11 04-12 09-12 02-13 07-13 12-13 05-14 10-14 03-15 08-15 01-16 06-16 11-16 04-17 09-17 02-18 07-18 12-18 05-19 10-19 03-20 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 0 50 100 150 200 250 01-11 06-11 11-11 04-12 09-12 02-13 07-13 12-13 05-14 10-14 03-15 08-15 01-16 06-16 11-16 04-17 09-17 02-18 07-18 12-18 05-19 10-19 03-20 Total vessel contracting Specialised tonnage VESSEL ORDERS REMAINED AT A VERY LOW LEVEL 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20204 Source: Clarksons Research, contracting as per 1 July, 2020 CGT= gross tonnage compensated with workload Number of vessels Million CGT Number of vessels Cruise and Ferry Merchant 3 months moving average in CGT Special vessels Offshore Cruise and Ferry Offshore LNG carriers Special vessels LPG carriers
  • 5. © Wärtsilä5 17% 13% 14% 15% 14% 17% 9% 8% 0 5,000 10,000 15,000 20,000 25,000 Q317-Q218 Q417-Q318 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419 Q219-Q120 Wärtsilä Others 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020 ENERGY MARKETS AT A STABLE LEVEL The total market, including also power plants with prime movers above 500 MW, decreased by 2% to 46.2 GW during the twelve-month period ending in March 2020 (47.2 at the end of December). The market data includes all Wärtsilä power plants and other manufacturers’ gas and liquid fuelled gas turbine based power plants with prime movers below 500 MW, as well as the estimated output of steam turbines for combined cycles. The data is gathered from the McCoy Power Report. The main gas turbine competitors are GE, Siemens, Mitsubishi, and Ansaldo. Other combustion engines are not included. MW, 12m rolling Market for gas and liquid fuel power plants <500 MW
  • 6. © Wärtsilä 39% 12%5% 39% 5% Marine Power Marine Systems Voyage Energy Portfolio Business 48%52% Services Equipment 1,377 1,011 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Q318-Q219 Q418-Q319 Q119-Q419 Q219-Q120 Q319-Q220 ORDER INTAKE 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20206 Q2 -27% Order intake by business area Second quarter development MEUR, 12m rolling Second quarter 2020 and comparison 2019 Order intake by business type (3) (32) (5) (14) (55) (45) (46)
  • 7. © Wärtsilä 3% 1% 5% 42% 16% 6% 35% 32% 9% 3% 13% 32% 8% 6% 6% 3% 16% 7% 3% 3% 35% 5% 12% 11% 5% 18% 7% 1% 15% 24% 45% 20% 38% 45% 25% 19% 1% 21% 1% 3% Services Equipment Services Equipment Services Equipment VoyageMarineSystemsMarinePower Gas carriers Cruise & ferry Offshore Navy Special vessels Merchant Other 33% 30% 24% 59% 30% 11%14% Services Equipment Other Industrials Independent Power Producers Utilities Marine Businesses Energy JANUARY–JUNE ORDER INTAKE BY CUSTOMER SEGMENT 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20207 (15) (34) (3) (16) (11) (20) (16) (27) (13) (9) (12) (22) (2) (45) (18) (30) (5) (5) (9) (5) (34) (9) (38) (0) (47) (11) (4) (3) (19) (17) (1) (50) (5) (1) (7) (36) (0) (32) (23) (35) (10) (62) (19) (19) (0)(1) (0)
  • 8. © Wärtsilä 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 31.3.2018* 30.9.2018* 31.3.2019** 30.9.2019** 31.3.2020 Marine Businesses total Marine Power Marine Systems Voyage Energy Portfolio Business Book-to-bill, QTD 0 500 1,000 1,500 2,000 2,500 3,000 Delivery current year Delivery next year Delivery after next year 30.6.2018 30.6.2019** 30.6.2020 Order book by business area Order book delivery schedule ORDER BOOK 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20208 *2018 figures not restated to accommodate the establishment of Portfolio Business entity **As published in the Interim report January-March 2020, order book figures for 2019 have been restated due to stricter requirements for booking new orders. MEUR MEUR
  • 9. © Wärtsilä 1,217 1,220 0 1,000 2,000 3,000 4,000 5,000 6,000 Q318-Q219 Q418-Q319 Q119-Q419 Q219-Q120 Q319-Q220 NET SALES 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 20209 Second quarter 2020 and comparison 2019 34% 20% 5% 37% 4% Marine Power Marine Systems Voyage Energy Portfolio Business 42% 58% Services Equipment Net sales by business area Second quarter development Net sales by business type (5) (33) (37) (6) (19) (50) (50) MEUR, 12m rolling Q2 0%
  • 10. © Wärtsilä 0 500 1,000 1,500 2,000 2,500 3,000 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 1-3/2018 7-9/2018 1-3/2019 7-9/2019 1-3/2020 Services Equipment Service sales, 12m rolling 23% 13% 4% 4% 56% Spare parts Field service Service agreements Service projects Equipment 17% 5% 14% 4% 60% NET SALES BY BUSINESS TYPE 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202010 (48) (7) (16) (25) (4) (53) (18) (4) (19) (5) MEUR MEUR, 12m rolling Second quarter development Marine Businesses EUR 715 million (756) Energy EUR 457 million (400)
  • 11. © Wärtsilä11 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020 NET SALES BRIDGE MEUR
  • 12. © Wärtsilä 11.1% 9.6% 8.8% 7.9% 6.8% 0% 2% 4% 6% 8% 10% 12% 0 100 200 300 400 500 600 700 Q318-Q219 Q418-Q319 Q119-Q419 Q219-Q120 Q319-Q220 Comparable operating result Comparable operating result, % 9.1% 4.7% -2% 0% 2% 4% 6% 8% 10% -50 0 50 100 150 200 250 1-6/2019 1-6/2020 Marine Power Marine Systems Voyage Energy Portfolio Business Total, % of sales Review period development COMPARABLE OPERATING RESULT 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202012 MEUR, 12m rolling MEUR
  • 13. © Wärtsilä 0 100 200 300 400 500 600 700 2015 2016 2017 2018 2019 -50 0 50 100 150 200 250 300 350 1-6/2019 1-6/2020 Review period development CASH FLOW FROM OPERATING ACTIVITIES 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202013 MEUR MEUR
  • 14. © Wärtsilä14 490 563 581 732 492 10.2% 11.5% 11.2% 14.2% 9.5% 0% 2% 4% 6% 8% 10% 12% 14% 16% -4,000 -3,000 -2,000 -1,000 0 1,000 2,000 3,000 4,000 2016 2017 2018 2019 30.6.2020 Other non-interest-bearing liabilities Advances received Trade payables Other non-interest-bearing receivables Trade receivables Inventories Working capital Working capital / net sales, 12m rolling 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020 WORKING CAPITAL MEUR
  • 15. © Wärtsilä 0.00 0.10 0.20 0.30 0.40 0.50 2015 2016 2017 2018 2019 0.00 0.10 0.20 0.30 0.40 0.50 30.6.2019 30.6.2020 Review period development GEARING 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202015
  • 17. © Wärtsilä • Order intake decreased by 38% to EUR 391 million (632) • Ordering activity under pressure due to idling of fleet and customers adjusting their capital and operating expenditures • Net sales decreased by 6% to EUR 420 million (447) • Comparable operating result amounted to EUR 24 million (62) or 5.7% of net sales (13.8) • Profitability weakened primarily due to an unfavourable sales mix and weaker fixed cost absorption 0 100 200 300 400 500 600 700 Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Order intake 0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20% 0 100 200 300 400 500 600 700 Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Net sales and profitability Services Equipment Comparable operating result, % MARINE POWER MARINE POWER 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202017 MEUR MEUR
  • 18. © Wärtsilä18 0 50 100 150 200 250 300 350 400 450 30.6.2017 30.6.2018 30.6.2019 30.6.2020 A new remote service to overcome travel restrictions • Wärtsilä introduced its Assured Operations remote support service for Wärtsilä 4-stroke and 2-stroke engine customers • The service enables technical experts to assess and resolve operational issues via remote connection between the vessel and Wärtsilä’s Expertise Centres 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020 NET SALES FROM INSTALLATIONS UNDER AGREEMENT MARINE POWER MEUR, 12m rolling
  • 19. © Wärtsilä • Order intake decreased by 40% to EUR 119 million (198) • Reduced fuel spreads resulted in lower demand for scrubber investments • Net sales increased by 1% to EUR 238 million (237) • Comparable operating result amounted to EUR 27 million (23) or 11.2% of net sales (9.7) • Increased scrubber delivery volumes boosted both net sales and profitability 0 50 100 150 200 250 300 Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Order intake 0% 2% 4% 6% 8% 10% 12% 14% 0 50 100 150 200 250 300 Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Net sales and profitability Services Equipment Comparable operating result, % MARINE SYSTEMS MARINE SYSTEMS 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202019 MEUR MEUR
  • 20. © Wärtsilä • Order intake decreased by 23% to EUR 56 million (72) • Net sales decreased by 23% to EUR 56 million (73) • COVID-19 caused project postponements and less transactional service business • Comparable operating result amounted to EUR -12 million (-9) or -20.8% of net sales (-12.8) • Negative impacts from lower sales volumes, a less favourable service mix, and increased investments in digital competences 0 20 40 60 80 100 120 Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Order intake -25% -20% -15% -10% -5% 0% 5% 10% 0 20 40 60 80 100 120 Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Net sales and profitability Services Equipment Comparable operating result, % VOYAGE VOYAGE 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202020 MEUR MEUR
  • 21. © Wärtsilä21 Voyage is committed to creating a Smart Marine Ecosystem, whereby every vessel can connect to digital services that make voyaging safer and greener Connected vessels enable: • Significant cost savings • Faster and safer voyage planning • On time arrival, less anchorage • Transparent ship-to-shore data 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020 VESSELS CONNECTED TO VOYAGE DIGITAL SERVICES INCREASED 90% – RECORD HIGH NUMBER OF VESSELS IN ORDER BOOK VOYAGE +90% Commissioned, cumulative Order Book Number of connected vessels Q2/20Q3/19 Q4/19Q1/18 Q2/18 Q1/19Q3/18 Q4/18 Q2/19 Q1/20
  • 22. © Wärtsilä • Order intake decreased by 10% to EUR 390 million (435) • Received equipment orders included a 200 MW flexible baseload power plant to be delivered to South America • Net sales increased by 14% to EUR 457 million (400), driven by equipment deliveries • Comparable operating result amounted to EUR 19 million (38) or 4.0% of net sales (9.6) • Decline in profitability mainly due to an unfavourable sales mix and COVID-19 impacts 0 100 200 300 400 500 600 700 Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Order intake -4% -2% 0% 2% 4% 6% 8% 10% 12% 14% 0 100 200 300 400 500 600 700 Q1/19 Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Net sales and profitability Services Equipment Comparable operating result, % ENERGY ENERGY 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202022 MEUR MEUR
  • 23. © Wärtsilä23 0% 5% 10% 15% 20% 25% 30% 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 2015 2016 2017 2018 2019 30.6.2020 MW under agreement* % of Energy installed base 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 2020 ENERGY INSTALLED BASE COVERED BY LONG-TERM SERVICE AGREEMENTS ENERGY MW *Includes agreements covering both installed assets and assets to be installed in the future
  • 24. © Wärtsilä ENERGY ORDERS RECEIVED FOR ENERGY EQUIPMENT GLOBALLY IPP’s (Independent Power Producers) Utilities Industrials ORDER INTAKE 1-6/2020: 912 MW (1,058) Others 17 July 2020 HALF YEAR REPORT JANUARY-JUNE 202024 Americas 719 (248) Africa and Middle East 70 (291) Europe 22 (24) Asia 101 (525)
  • 25. © Wärtsilä The COVID-19 outbreak and the measures taken to contain the pandemic will materially impact the demand for Wärtsilä’s solutions and services, as well as the company’s financial performance in 2020. The full financial impact cannot be quantified at this time. Consequently, Wärtsilä withdrew its market outlook for 2020 on 31 March 2020 pending an improvement in visibility.