1. CELL: 00971503322142
CELL: 00971558758161
E-MAIL: Waqas.ly@gmail.com
OBJECTIVE:
Looking for a good career where there is a scope for demonstration. To use my skills and
potential to assist organization in achieving its goals and seeking long term career with optimum growth.
PERSONAL:
FATHER’S NAME: MUHAMMAD ASLAM
MARITAL STATUS: SINGLE
NATIONALITY: PAKISTAN
VISA STATUS: NOW WORKING IN WOOD GROUP OIL & GAS FIELD SERVICE ABU DHABI.
DRIVING LICENSE: YES(EMIRATES DRIVING COMPANY)
EDUCATION:
DEGREE YEAR MARKS %AGE
D.A.E (DIPLOMA IN
MECHANICAL 3 YEARS)
2009 2519/3350 75.2%
MATRICULATION
(S.S.C)
2006 750/1050 71.4%
EXPERIENCE:
WOOD GROUP ENGINEERING OIL & GAS FIELD SERVICES
NOW WORKING IN WOOD GROUP Eng Service for OIL & GAS Field ABU DHABI.
POST: VALVE TECHNICIAN(API 6A/16A 598 OIL FIELD EQUIPMENT)
WORKING: 6TH
2012 August TO STILL
PAKISTAN OIL REFINERY Ltd.
Apprenticeship: PAKISTAN OIL REFINERY LIMITED.
Worked: 2 YEARS 17-May-2010 to 16-May-2012
HAVING 5 YEARS EXPERIENCE IN MECHANICAL VARIOS TECHNICAL FIELDS.
OFFSHORE EXPERIENCE:
6 MONTH WORKED IN OFFSHORE TOTAL PLANT ABU DHABI.WHERE I DID WORK IN GAS TURBINE,
VALVE SECTION,HEAT EXCHANGER BUNDLE CHANGING, ALSO ATTENED THE SHUTDOWN
WAQAS NAEEM
D.O.B : 20-MARCH-1991 ADDRESS: P.O BOX NO 294846 DUBAI U.A.E.
2. VALVE SERVICING:
• API (6A &16A) GATE VALVE, X’MASS TREE, MANIFOLD, BOP.
• VALVES SERVICE, (GATE VALVES, BALL VALVES, PLUG VALVES, BUTTERFLY, check valve).
• PSV. SERVICING, CALLIBRATION, AND TESTING.
• CONTROL VALVE. SERVICE AND TESTING.
• VALVE TESTING (AIR, HYDRO, HYDRAULIC, NITROGEN).
• ALL TYPES OF ACTUATOR (HYDRAULIC, PNEUMATIC) SERVICE.
• MANIFOLDS SERVICE AND TESTING.
PRESSURE TESTING:
• HIGH PRESSURE NITROGEN (N2) TESTING OF X’MASS TREE ON RIG.
• PSV TESTING(NITROGEN , HYDRAULIC)
• PIPES HYDROTESTS TO THEIR PERMISSIBLE PRESSURE.
• TESTING OF ALL TYPES OF VALVES AND SPOOL, WELLHEAD EQUIPMENT, BOP.
SHUTDOWN:
• SHUTDOWN OF TAKREER REFINERY ABU DHABI( VALVE SERVICE)
• BROUGE IN RUWAIS SHUTDOWN(VALVE SERVICE)
• TOTAL OFFSHORE SHUTDOWN OF GAS TURBINE, VALVE SECTION.
• ALSO ATTENED A MAJOR SHUT DOWN OF 40 DAYS IN PAKISTAN REFINERY Ltd.
• WHERE I GET SKILLS ABOUT PLANT.WHICH INCLUD THE GENERAL FITTINGS OF PLANT, HEATEXCHANGER,
BIOLER, AIR COOLER, & DISSITILATION COLOUMN.
FABRICATION WORK:
• ALSO WORK IN PIPE FABRICATION.
• GAS CUTTING OF PLATES & PIPES OF M.S (MILD STEEL OR CORBON STEEL).
• READING THE PIPING DRAWING ISOMETRIC DRAWING.
GENERAL FITTING:
• SHUTDOWN OF WATER TUBES (BABCOCK &WILCOX) BOILERS.WHICH INCLUDING IN DRUM’S FITTINGS
CLEANING (STEAM & MUD DRUMS).AND ALSO THE HYDROTEST OF BOILER AS PER REQUIRED PRESSURE.
• TUBE HEATEXCHANGERS.
H.S.E.Q TRAINING:
• FIRST AID & FIRE FIGHTING TRAINING.
• H.S.E.Q (HEALTH & SAFETY ENVIRONMENT QUALITY) TRAINING.
• BREATHING APPRATUS(HYDROGEN SULPHIDE H2S)
• SAFETY ABOUT PLANT & WORKSHOPS.
• RIGGING & SILLING & OVERHEAD CRANE OPERATING.