SlideShare a Scribd company logo
1 of 7
SAP PP CONSULTANT
K.VAMSI KRISHNA CONTACT NO: +91-
7022655062
vamsisap.pp@gmail.com
Having 10 years of experience in production planning and control, in which 4 years of
experience in SAP R/3 PP consulting in which 1 year of experience in SAP MM, PM with
good exposure to all stages of implementation and support. Having 6 years of Domain
experience in Production Planning control. Has worked in implementations and support
projects. Currently working for MSPL limited. (Baldota Group).
• Experience includes understanding customer requirements, system landscape,
existing business processes.
• Worked on mapping of Production Planning in SAP, having integration Knowledge with
other modules.
• Having experience in SAP Material Management and Plant Maintenance modules.
• Have an exposure on SAP Quality Management.
• Standard production process with discrete and Repetitive manufacturing.
• Master data: Material master, BOM, Work centers, Routing, vendor master, functional
location, Equipment master.
• Production: Demand management, MRP, standard and split production order,
scheduling, and production version.
• Production Handling: Batch management, joint production, by-products and co-
products.
• Material Management: Release Strategy, Excise Master, split valuation, Pricing
procedure, Purchase Requisition, RFQ, Purchase order, GR, invoice.
• Plant Maintenance : Functional Location, Equipment, Measuring Point, Maintenance
Order.
• Quality Management : Inspection Lot, User Decision, Inspection characteristics.
• work experience on SAP solution manager 7.0.
Education:
• PG Diploma in Automobile Engineering, annamalai university, Chidambaram.
• B.TECH in Mechanical Engineering, JNTU Hyderabad.
Project 1 : Support
Employer : MSPL Limited (Baldota Group),
Location : Corporate office, Hospet, Karnataka.
Period : JAN 2015 - till date
Position : SAP - PP, MM, PM Consultant
Environment : ECC 6.0
1
Website :www.mspllimited.com, www.baldota.co.in
MSPL Limited is a flagship company of the BALDOTA Group Of Companies. MSPL is a
leading iron ore mining, processing and export company with 53 years of expertise
behind it. It is one of the India's largest iron ore mining companies and posses the
largest installed capacity of green energy in the country.
Apart from mining the BALDOTA group also have there businesses in pelletisation,
Aviation, Shipping, Wind Power, Industrial Gases and Rear Earth Mineral Mining.
My responsibilities:
SUPPORT:
• Analysis of day-to-day issues and solutions after communicating with users.
• monitoring the trip-sheet entries and need to carryout any corrections in the
trip-sheet data table level.
• Creation of production version, batches and rout codes.
• Configuration of release procedure for purchasing document like Purchase
requisition and purchase order.
Project 2 : Support
Employer : MSPL Limited Pellet Plant (Baldota Group).
Location : Corporate office, Hospet, Karnataka.
Period : JAN 2015 - till date
Position : SAP - PP, MM, PM, QM Consultant
Environment : ECC 6.0
Website : www.mspllimited.com, www.baldota.co.in
The Pellet Plant of 1.2 MTPA capacity is being set by the groups of flagship company
MSPL at Koppal. Company has Business contracts with Sino steel MECC,China for supply
of technology and the company is setting Up a captive power plant of 70Mw capacity.
Apart from pelletisation the BALDOTA group also have there businesses in Mining,
Aviation, Shipping, Wind Power, Industrial Gases and Rear Earth Mineral Mining.
My responsibilities:
SUPPORT:
• Finding root cause analysis and Document solution once it is solved.
• Resolved various tickets in the area of Production, Purchase and Maintenance.
• Supporting the client with PP, MM and PM Configuration.
• Interacting with the cross functional teams.
• A strong knowledge in building logics to make customized reports according to
business scenarios.
• Release strategy is configured as per the client requirement.
2
Project 3 : Support
Employer : MSPL Gases Limited (Baldota Group).
Location : Corporate office, Hospet, Karnataka.
Period : JAN 2015 - till date
Position : SAP - PP, MM, PM Consultant
Environment : ECC 6.0
Website : www.msplgases.com, www.baldota.co.in
Company has 16 tons per day oxygen plant to produce oxygen, nitrogen and medical
oxygen simultaneously at Hosahalli. This plant is state of the art technology to produce
gases at a very low power consumption maintaining the products at high quality
standards First Indian plant executed on ‘build own and operate’ basis and the plant is
running to the satisfaction of the customer meeting the quality, quantity, pressure of the
products with very low power consumption.
Apart from Industrial Gases the BALDOTA group also have there businesses in
pelletisation, Aviation, Shipping, Wind Power and Rear Earth Mineral Mining.
My responsibilities:
SUPPORT:
• Analysis of day-to-day issues and solutions for SAP PP and MM modules.
• creation of new plants , depots, storage location and maintaining all the required
assignments.
• Preparation of master data templates for various object like material master,
vendor master, purchase order.
Project 4 : Implementation and support
Employer : Info It Solutions.
Client : Emaar Alloys Pvt. Ltd.
Location : Tatanagar, Jharkhand.
Period : Aug 2013- Jan 2015
Position : SAP - PP Consultant
Environment : ECC 6.0
Emaar Alloys Pvt. Ltd. (formerly known as Shiva Rama Sponge Iron) incorporated in
the year 2000, manufacturer and supplier of sponge iron having two 100 TPD’s Kiln.
It is into the manufacturing of various iron ore products like sponge iron, dri sponge
iron, sponge iron fines.
Base location is in Jamshedpur, Jharkhand with more than 1000 employees.
My responsibilities:
Implementation:
• Requirements gathering and understanding the client’s business and preparation
of document.
• Mapping the requirement in sap and concluding after business agrees.
• Configuring shop floor activities, production schedule profiles, automatic transfer
3
order creation, scheduling, confirmation of production orders.
• Defined data fields for PP master data such as Material master, BOM, Work
center, and Routing.
• Defined settings for transactional data, functionalities such as material
requirement planning (MRP).
• Configured Batch Management, predefined batches with split valuation.
• Carrying Production Process with Joint Production, Production order split, co-
products and by-products.
• Master data’s data are up loaded in Quality and Production servers and
transaction data’s are uploaded in Production server , these done with close
interaction with technical and the client.
• Preparation of test scripts and getting signoff after UAT from client
• Communicate with users about issues and resolving within the time fence
• Go live support issues.
SUPPORT:
Responsibilities:
• Analysis of day-to-day issues and solutions after communicating with users
• Performed analysis on shop floor activities as per business process, configured and
executed functions such as order creation, order release, availability check shop
floor papers, order confirmation, and order information system.
• Creating change order request to make necessary changes in production server
with formal approval.
• Resolve and designing solution while continuing to ensure that it meets the
business requirements.
• Tracking the user issues and prioritizing the same as per the service level
agreement.
Project 5 : Implementation and support
Employer : Info It solutions.
Client : Sriram Minerals Pvt. Ltd.
Location : Tatanagar, Jharkhand.
Period : Sep 2012- Jan 2015
Position : SAP – Associate PP Consultant.
Environment : ECC 6.0.
SRMCO’s iron ore mines are located at Khas jamda which is situated in Noamundi tehsil
and located in Pashchimi singhbhum district of Jharkhand. Iron ore from SRMCO mines
ensures consistency in the quality of raw material used in sponge iron kilns. Operational
since 2003 it served many sponge iron companies.
4
My responsibilities:
Implementation:
• Prepared As-Is business execution flow charts and discussed with other
consultants to identify the gap from integration point of view.
• Worked with the master data team, in setting up master data such as BOM,
Routing, and Production version.
• Configured Material types, material groups according to user business
requirements.
• Realization of components in Production Planning.
• Defined MRP profiles, groups, MRP areas.
• Responsible for preparation of presentations for training end users besides
development of quick reference guides for users.
Support:
• Creating change order request to make necessary changes in production server.
• Analysis of day-to-day issues and solutions after communicating with users.
• Interacting with the cross functional teams.
• Resolve and designing solution while continuing to ensure that it meets the
business requirements.
• Tracking the user issues and prioritizing the same as per the service level
agreement.
Project 6 :
Organization : Reliance Global Services Pvt. Ltd
Client : In House Project.
Designation : PP Consultant
Duration : Jul 2011 to Aug 2012.
As a member of the team for development of SAP PP module customization during the
implementation, the following responsibilities were entrusted to me:
• Study of As Is and prepare To Be document for Production Planning.
• Configuration of Production Planning processes like Master Data.
• Creation of configuration documents.
• Worked on Demand Management, MRP, production order creation and
confirmation.
• Maintained good integration with other modules like MM/SD/FI.
• Uploading of Master Data in by using LSMW method.
5
• Conducting the unit test, integration test.
Domain Experience:
Company :SKM Technologies Pvt. Ltd.
Location :Hyderabad
Designation :Production Planning Control Engineer (Sep 2005 to Jan 2011)
Client :HAL Koraput, HAL Nasik and HAL Hyderabad.
Company Profile:
SKM Technologies Pvt. Ltd, established in the year 1986 as S.K.M. Tools Private
Limited has emerged as a leading world class manufacturer of high precision
components and assemblies for some of the reputed companies in India and abroad.
Roles and Responsibilities:-
• Plan production control activities to improve runtime while maintaining high
quality, timely delivery and cost-effectiveness.
• Plan, schedule and monitor material movement in production cycle to ensure
continuous operations.
• Identify new suppliers and manage existing suppliers to meet production needs.
• Develop process improvements for inventory, manufacturing and production
control systems.
• Evaluate production control activities to ensure that final product meets
customer specifications.
• Plan equipment, material and manpower requirements to meet production
schedule.
Personal Details:
Date of Birth: 25-09-1983
(Vamsi Krishna.k)
6
• Conducting the unit test, integration test.
Domain Experience:
Company :SKM Technologies Pvt. Ltd.
Location :Hyderabad
Designation :Production Planning Control Engineer (Sep 2005 to Jan 2011)
Client :HAL Koraput, HAL Nasik and HAL Hyderabad.
Company Profile:
SKM Technologies Pvt. Ltd, established in the year 1986 as S.K.M. Tools Private
Limited has emerged as a leading world class manufacturer of high precision
components and assemblies for some of the reputed companies in India and abroad.
Roles and Responsibilities:-
• Plan production control activities to improve runtime while maintaining high
quality, timely delivery and cost-effectiveness.
• Plan, schedule and monitor material movement in production cycle to ensure
continuous operations.
• Identify new suppliers and manage existing suppliers to meet production needs.
• Develop process improvements for inventory, manufacturing and production
control systems.
• Evaluate production control activities to ensure that final product meets
customer specifications.
• Plan equipment, material and manpower requirements to meet production
schedule.
Personal Details:
Date of Birth: 25-09-1983
(Vamsi Krishna.k)
6

More Related Content

What's hot

What's hot (20)

Resume - SAP MM
Resume - SAP MMResume - SAP MM
Resume - SAP MM
 
AJY_SAP MM PROCUREMENT RESUME
AJY_SAP MM PROCUREMENT RESUMEAJY_SAP MM PROCUREMENT RESUME
AJY_SAP MM PROCUREMENT RESUME
 
Poonam Shelke SAP PP QM Consultant
Poonam Shelke SAP PP QM ConsultantPoonam Shelke SAP PP QM Consultant
Poonam Shelke SAP PP QM Consultant
 
Chinmaya.prince2
Chinmaya.prince2Chinmaya.prince2
Chinmaya.prince2
 
SAMBIT Resume-SAP PM & PP Consultant
SAMBIT Resume-SAP PM & PP ConsultantSAMBIT Resume-SAP PM & PP Consultant
SAMBIT Resume-SAP PM & PP Consultant
 
Srikanth SAP-MM-WM
Srikanth SAP-MM-WMSrikanth SAP-MM-WM
Srikanth SAP-MM-WM
 
Imran_SAP_BI_BW_BODS_RESUME
Imran_SAP_BI_BW_BODS_RESUMEImran_SAP_BI_BW_BODS_RESUME
Imran_SAP_BI_BW_BODS_RESUME
 
Basem zidan resume
Basem zidan  resumeBasem zidan  resume
Basem zidan resume
 
Naveen resume
Naveen resumeNaveen resume
Naveen resume
 
Resume
Resume Resume
Resume
 
Vinod Krishnan Ramakrishnan
Vinod Krishnan RamakrishnanVinod Krishnan Ramakrishnan
Vinod Krishnan Ramakrishnan
 
SAP_Resume_20thJuly
SAP_Resume_20thJulySAP_Resume_20thJuly
SAP_Resume_20thJuly
 
Joy SAP BW/HANA
Joy SAP BW/HANAJoy SAP BW/HANA
Joy SAP BW/HANA
 
Kamal_SAP_MM_WM_SD_SRM
Kamal_SAP_MM_WM_SD_SRMKamal_SAP_MM_WM_SD_SRM
Kamal_SAP_MM_WM_SD_SRM
 
Butch Resume - Oct 2105
Butch Resume - Oct 2105Butch Resume - Oct 2105
Butch Resume - Oct 2105
 
Pratibha Saharan - CV
Pratibha Saharan - CVPratibha Saharan - CV
Pratibha Saharan - CV
 
Kamal_SAP_MM_WM_SD_SRM
Kamal_SAP_MM_WM_SD_SRMKamal_SAP_MM_WM_SD_SRM
Kamal_SAP_MM_WM_SD_SRM
 
Kishor_gst
Kishor_gstKishor_gst
Kishor_gst
 
Haitham Seleem
Haitham SeleemHaitham Seleem
Haitham Seleem
 
RESUME Jitendra Dixit - Copy
RESUME Jitendra Dixit - CopyRESUME Jitendra Dixit - Copy
RESUME Jitendra Dixit - Copy
 

Similar to C V (20)

Amar Patil SAP IT
Amar Patil SAP ITAmar Patil SAP IT
Amar Patil SAP IT
 
VENKATESH.RESUME
VENKATESH.RESUMEVENKATESH.RESUME
VENKATESH.RESUME
 
VENKATESH.RESUME
VENKATESH.RESUMEVENKATESH.RESUME
VENKATESH.RESUME
 
Pravin_SAP MM-CIN
Pravin_SAP MM-CINPravin_SAP MM-CIN
Pravin_SAP MM-CIN
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-Resume
 
Resume__Pramod_Mishra
Resume__Pramod_MishraResume__Pramod_Mishra
Resume__Pramod_Mishra
 
Kunal Patil SAP MM_July 2016
Kunal Patil SAP MM_July 2016Kunal Patil SAP MM_July 2016
Kunal Patil SAP MM_July 2016
 
SAP PP
SAP PPSAP PP
SAP PP
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Ashok_Grandhi
Ashok_GrandhiAshok_Grandhi
Ashok_Grandhi
 
SAP SD 3+ years
SAP SD 3+ years SAP SD 3+ years
SAP SD 3+ years
 
Resume Devang Rohit SAP SD Consultant
Resume Devang Rohit SAP SD ConsultantResume Devang Rohit SAP SD Consultant
Resume Devang Rohit SAP SD Consultant
 
Srinivas-SAP_SD&LE10.9 years
Srinivas-SAP_SD&LE10.9 yearsSrinivas-SAP_SD&LE10.9 years
Srinivas-SAP_SD&LE10.9 years
 
Srinivas-SAP_SD&LE10.9 years
Srinivas-SAP_SD&LE10.9 yearsSrinivas-SAP_SD&LE10.9 years
Srinivas-SAP_SD&LE10.9 years
 
Anand Singh FICO
Anand Singh FICOAnand Singh FICO
Anand Singh FICO
 
SunilBhalla-SAP MM
SunilBhalla-SAP MMSunilBhalla-SAP MM
SunilBhalla-SAP MM
 
Mathew
MathewMathew
Mathew
 
rushi
rushirushi
rushi
 

C V

  • 1. SAP PP CONSULTANT K.VAMSI KRISHNA CONTACT NO: +91- 7022655062 vamsisap.pp@gmail.com Having 10 years of experience in production planning and control, in which 4 years of experience in SAP R/3 PP consulting in which 1 year of experience in SAP MM, PM with good exposure to all stages of implementation and support. Having 6 years of Domain experience in Production Planning control. Has worked in implementations and support projects. Currently working for MSPL limited. (Baldota Group). • Experience includes understanding customer requirements, system landscape, existing business processes. • Worked on mapping of Production Planning in SAP, having integration Knowledge with other modules. • Having experience in SAP Material Management and Plant Maintenance modules. • Have an exposure on SAP Quality Management. • Standard production process with discrete and Repetitive manufacturing. • Master data: Material master, BOM, Work centers, Routing, vendor master, functional location, Equipment master. • Production: Demand management, MRP, standard and split production order, scheduling, and production version. • Production Handling: Batch management, joint production, by-products and co- products. • Material Management: Release Strategy, Excise Master, split valuation, Pricing procedure, Purchase Requisition, RFQ, Purchase order, GR, invoice. • Plant Maintenance : Functional Location, Equipment, Measuring Point, Maintenance Order. • Quality Management : Inspection Lot, User Decision, Inspection characteristics. • work experience on SAP solution manager 7.0. Education: • PG Diploma in Automobile Engineering, annamalai university, Chidambaram. • B.TECH in Mechanical Engineering, JNTU Hyderabad. Project 1 : Support Employer : MSPL Limited (Baldota Group), Location : Corporate office, Hospet, Karnataka. Period : JAN 2015 - till date Position : SAP - PP, MM, PM Consultant Environment : ECC 6.0 1
  • 2. Website :www.mspllimited.com, www.baldota.co.in MSPL Limited is a flagship company of the BALDOTA Group Of Companies. MSPL is a leading iron ore mining, processing and export company with 53 years of expertise behind it. It is one of the India's largest iron ore mining companies and posses the largest installed capacity of green energy in the country. Apart from mining the BALDOTA group also have there businesses in pelletisation, Aviation, Shipping, Wind Power, Industrial Gases and Rear Earth Mineral Mining. My responsibilities: SUPPORT: • Analysis of day-to-day issues and solutions after communicating with users. • monitoring the trip-sheet entries and need to carryout any corrections in the trip-sheet data table level. • Creation of production version, batches and rout codes. • Configuration of release procedure for purchasing document like Purchase requisition and purchase order. Project 2 : Support Employer : MSPL Limited Pellet Plant (Baldota Group). Location : Corporate office, Hospet, Karnataka. Period : JAN 2015 - till date Position : SAP - PP, MM, PM, QM Consultant Environment : ECC 6.0 Website : www.mspllimited.com, www.baldota.co.in The Pellet Plant of 1.2 MTPA capacity is being set by the groups of flagship company MSPL at Koppal. Company has Business contracts with Sino steel MECC,China for supply of technology and the company is setting Up a captive power plant of 70Mw capacity. Apart from pelletisation the BALDOTA group also have there businesses in Mining, Aviation, Shipping, Wind Power, Industrial Gases and Rear Earth Mineral Mining. My responsibilities: SUPPORT: • Finding root cause analysis and Document solution once it is solved. • Resolved various tickets in the area of Production, Purchase and Maintenance. • Supporting the client with PP, MM and PM Configuration. • Interacting with the cross functional teams. • A strong knowledge in building logics to make customized reports according to business scenarios. • Release strategy is configured as per the client requirement. 2
  • 3. Project 3 : Support Employer : MSPL Gases Limited (Baldota Group). Location : Corporate office, Hospet, Karnataka. Period : JAN 2015 - till date Position : SAP - PP, MM, PM Consultant Environment : ECC 6.0 Website : www.msplgases.com, www.baldota.co.in Company has 16 tons per day oxygen plant to produce oxygen, nitrogen and medical oxygen simultaneously at Hosahalli. This plant is state of the art technology to produce gases at a very low power consumption maintaining the products at high quality standards First Indian plant executed on ‘build own and operate’ basis and the plant is running to the satisfaction of the customer meeting the quality, quantity, pressure of the products with very low power consumption. Apart from Industrial Gases the BALDOTA group also have there businesses in pelletisation, Aviation, Shipping, Wind Power and Rear Earth Mineral Mining. My responsibilities: SUPPORT: • Analysis of day-to-day issues and solutions for SAP PP and MM modules. • creation of new plants , depots, storage location and maintaining all the required assignments. • Preparation of master data templates for various object like material master, vendor master, purchase order. Project 4 : Implementation and support Employer : Info It Solutions. Client : Emaar Alloys Pvt. Ltd. Location : Tatanagar, Jharkhand. Period : Aug 2013- Jan 2015 Position : SAP - PP Consultant Environment : ECC 6.0 Emaar Alloys Pvt. Ltd. (formerly known as Shiva Rama Sponge Iron) incorporated in the year 2000, manufacturer and supplier of sponge iron having two 100 TPD’s Kiln. It is into the manufacturing of various iron ore products like sponge iron, dri sponge iron, sponge iron fines. Base location is in Jamshedpur, Jharkhand with more than 1000 employees. My responsibilities: Implementation: • Requirements gathering and understanding the client’s business and preparation of document. • Mapping the requirement in sap and concluding after business agrees. • Configuring shop floor activities, production schedule profiles, automatic transfer 3
  • 4. order creation, scheduling, confirmation of production orders. • Defined data fields for PP master data such as Material master, BOM, Work center, and Routing. • Defined settings for transactional data, functionalities such as material requirement planning (MRP). • Configured Batch Management, predefined batches with split valuation. • Carrying Production Process with Joint Production, Production order split, co- products and by-products. • Master data’s data are up loaded in Quality and Production servers and transaction data’s are uploaded in Production server , these done with close interaction with technical and the client. • Preparation of test scripts and getting signoff after UAT from client • Communicate with users about issues and resolving within the time fence • Go live support issues. SUPPORT: Responsibilities: • Analysis of day-to-day issues and solutions after communicating with users • Performed analysis on shop floor activities as per business process, configured and executed functions such as order creation, order release, availability check shop floor papers, order confirmation, and order information system. • Creating change order request to make necessary changes in production server with formal approval. • Resolve and designing solution while continuing to ensure that it meets the business requirements. • Tracking the user issues and prioritizing the same as per the service level agreement. Project 5 : Implementation and support Employer : Info It solutions. Client : Sriram Minerals Pvt. Ltd. Location : Tatanagar, Jharkhand. Period : Sep 2012- Jan 2015 Position : SAP – Associate PP Consultant. Environment : ECC 6.0. SRMCO’s iron ore mines are located at Khas jamda which is situated in Noamundi tehsil and located in Pashchimi singhbhum district of Jharkhand. Iron ore from SRMCO mines ensures consistency in the quality of raw material used in sponge iron kilns. Operational since 2003 it served many sponge iron companies. 4
  • 5. My responsibilities: Implementation: • Prepared As-Is business execution flow charts and discussed with other consultants to identify the gap from integration point of view. • Worked with the master data team, in setting up master data such as BOM, Routing, and Production version. • Configured Material types, material groups according to user business requirements. • Realization of components in Production Planning. • Defined MRP profiles, groups, MRP areas. • Responsible for preparation of presentations for training end users besides development of quick reference guides for users. Support: • Creating change order request to make necessary changes in production server. • Analysis of day-to-day issues and solutions after communicating with users. • Interacting with the cross functional teams. • Resolve and designing solution while continuing to ensure that it meets the business requirements. • Tracking the user issues and prioritizing the same as per the service level agreement. Project 6 : Organization : Reliance Global Services Pvt. Ltd Client : In House Project. Designation : PP Consultant Duration : Jul 2011 to Aug 2012. As a member of the team for development of SAP PP module customization during the implementation, the following responsibilities were entrusted to me: • Study of As Is and prepare To Be document for Production Planning. • Configuration of Production Planning processes like Master Data. • Creation of configuration documents. • Worked on Demand Management, MRP, production order creation and confirmation. • Maintained good integration with other modules like MM/SD/FI. • Uploading of Master Data in by using LSMW method. 5
  • 6. • Conducting the unit test, integration test. Domain Experience: Company :SKM Technologies Pvt. Ltd. Location :Hyderabad Designation :Production Planning Control Engineer (Sep 2005 to Jan 2011) Client :HAL Koraput, HAL Nasik and HAL Hyderabad. Company Profile: SKM Technologies Pvt. Ltd, established in the year 1986 as S.K.M. Tools Private Limited has emerged as a leading world class manufacturer of high precision components and assemblies for some of the reputed companies in India and abroad. Roles and Responsibilities:- • Plan production control activities to improve runtime while maintaining high quality, timely delivery and cost-effectiveness. • Plan, schedule and monitor material movement in production cycle to ensure continuous operations. • Identify new suppliers and manage existing suppliers to meet production needs. • Develop process improvements for inventory, manufacturing and production control systems. • Evaluate production control activities to ensure that final product meets customer specifications. • Plan equipment, material and manpower requirements to meet production schedule. Personal Details: Date of Birth: 25-09-1983 (Vamsi Krishna.k) 6
  • 7. • Conducting the unit test, integration test. Domain Experience: Company :SKM Technologies Pvt. Ltd. Location :Hyderabad Designation :Production Planning Control Engineer (Sep 2005 to Jan 2011) Client :HAL Koraput, HAL Nasik and HAL Hyderabad. Company Profile: SKM Technologies Pvt. Ltd, established in the year 1986 as S.K.M. Tools Private Limited has emerged as a leading world class manufacturer of high precision components and assemblies for some of the reputed companies in India and abroad. Roles and Responsibilities:- • Plan production control activities to improve runtime while maintaining high quality, timely delivery and cost-effectiveness. • Plan, schedule and monitor material movement in production cycle to ensure continuous operations. • Identify new suppliers and manage existing suppliers to meet production needs. • Develop process improvements for inventory, manufacturing and production control systems. • Evaluate production control activities to ensure that final product meets customer specifications. • Plan equipment, material and manpower requirements to meet production schedule. Personal Details: Date of Birth: 25-09-1983 (Vamsi Krishna.k) 6