6. Place stone or log under rock, as close to center as
possible, but still on the raised sides half. Dig out
other side to allow rock to rock back into steep
angle.
7. Rock rock back to other side, over new, taller
point of rotation.
8. Place new log or stone to change point of rotation
to other side again,, fill hole with dirt to support
new point of rotation.