The hospital needed more filing space for medical records but did not want a completely new system. A solution doubled their storage capacity from 2471 to 4060 linear meters by mobilizing their existing shelving and adding 227 new bays through a phased installation process, which moved files to temporary shelving to allow sections to be replaced without disrupting records or the building infrastructure.