Considering safety in all phases of a construction project, even nearing the end somethings may not seem important but are still necessary to decrease injury on the job site and reduce liability.

  • Be the first to comment

Construction Safety.

  1. 1. Considering Safety nearing completion of a Project
  2. 2. Approaching the Project <ul><li>Newly Constructed addition to a pre-existing building. </li></ul>
  3. 3. Analyzing the present state <ul><li>Rough masonry and metal lath with beading to prepare for masonry finish application. </li></ul><ul><li>Scaffolding is erect and set up with 1926 CFR code standard </li></ul>
  4. 4. Taking a Look Inside <ul><li>The upper deck shows the main channel A/C ductwork above it, where it is 6’ above the lower walking/working surface and has to have a guardrail system for fall protection. </li></ul><ul><li>According to OSHA guideline 1926.501.b.1: A guardrail system has to be installed 3.5 feet along this unprotected edge. </li></ul><ul><li>The galvanized stud framing is exposed on side of wall and along the lobby entrance. </li></ul>
  5. 5. Progress changes since then: <ul><li>Here there is an intermediate phase where insulation is installed between the galvanized channels. </li></ul><ul><li>Drywall covers the studs and insulation creating a rough wall surface. </li></ul>
  6. 6. More drywall <ul><li>Drywall being installed throughout the whole building. In which the scratch coat application is done in preparation for the 2 more finishes for a more refined look. </li></ul><ul><li>Galvanized studs are placed erect to create a partition for that space once sheet insulation and drywall is installed </li></ul>
  7. 7. Exploring the Site Surroundings <ul><li>Safety is taken into consideration to restrict entrance by the presence of the barricades around this area. </li></ul><ul><li>Also, very good application of safety sense by placing barricade right over open man hole. </li></ul>
  8. 8. Safety should be maintained always
  9. 9. Equipment involved <ul><li>Certain types of equipment are used in this project for purposes of lifting or digging. </li></ul><ul><li>In which you also see materials placed in proximity to where that type of work is carried out </li></ul>
  10. 10. Labor for this aspect of work <ul><li>With a 2 man crew of carpenters with a daily output of 2000SF/Daily,with a building with about 60000sf of drywall: </li></ul><ul><li>It should take 30 days to install the drywall throughout the building. </li></ul>
  11. 11. The End

×