Multinational Energy Company Equinor experienced damage to the 18-5/8 in. casing at approximately 740m (2,428 ft.) MD in a well on the Oseberg B field in the North Sea. The client required a repair solution that would cover the damaged section while providing post-expanded drift ID of at least 16 in. to allow for a conventional 16 in. drilling BHA needed to drill the next section of the well.