11732/17 RGP/kg
DG G 2A EN
Council of the
European Union
Brussels, 29 August 2017
(OR. en)
11732/17
FIN 512
COVER NOTE
From: Mr Günther OETTINGER, Member of the European Commission
date of receipt: 28 August 2017
To: Mr Märt KIVINE, President of the Council of the European Union
Subject: Proposal for transfer of appropriations No DEC 18/2017 within Section III -
Commission - of the general budget for 2017
Delegations will find attached Commission document DEC 18/2017.
Encl.: 18/2017
EN 1 EN
EUROPEAN COMMISSION
BRUSSELS, 24/08/2017
GENERAL BUDGET - 2017
SECTION III - COMMISSION TITLES: 18, 32
TRANSFER OF APPROPRIATIONS N° DEC 18/2017
FROM
CHAPTER - 1802 Internal security
ITEM - 18 02 01 01 Support of border management and a common visa policy to
facilitate legitimate travel
Payments -80 000 000,00
ITEM - 18 02 01 02 Prevention and fight against cross-border organised crime and
better management of security- related risks and crisis
Payments -45 000 000,00
ARTICLE - 18 02 51 Completion of operations and programmes in the field of
external borders, security and safeguarding liberties
Payments -105 000 000,00
CHAPTER - 1803 Asylum and migration
ARTICLE - 18 03 51 Completion of operations and programmes in the field of
return, refugees and migration flows
Payments -54 000 000,00
TO
CHAPTER - 3205 ITER
ITEM - 32 05 01 02 Construction, operation and exploitation of the ITER facilities --
European Joint Undertaking for ITER -- Fusion for Energy (F4E)
Payments 144 357 200,00
ARTICLE - 32 05 51 Completion of the European Joint Undertaking for ITER --
Fusion for Energy (F4E) (2007 to 2013)
Payments 139 642 800,00
EN 2 EN
Introduction:
This transfer concerns the proposal to reinforce the International Thermonuclear Experimental Reactor (ITER)
programme by EUR 284 million in payment appropriations. The sources of the reinforcement are the Asylum, Migration
and Integration Fund (AMIF) and Internal Security Fund (ISF) programmes.
EN 3 EN
I. DECREASE
I.1
a) Heading
18 02 01 01 - Support of border management and a common visa policy to facilitate legitimate travel
b) Figure at 07/07/2017
Payments
1 Appropriation in budget (Initial Budget + AB) 364 282 173,00
2 Transfers 0,00
3 Final appropriation for the year (1+2) 364 282 173,00
4 Utilisation of final appropriation 97 201 273,56
5 Amount not used/available (3-4) 267 080 899,44
6 Requirements up to year-end 187 080 899,44
7 Proposed decrease 80 000 000,00
8 Decrease as percentage of appropriation in budget (7/1) 21,96 %
9 Decrease, as a percentage of the final appropriation for the year, in the sum
of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated
in accordance with Article 14 of the Rules of Application
n/a
c) Receipts arising from recovery (carried over from previous year)
Payments
1 Appropriations available at start of the year 25 929 340,29
2 Appropriations available on 07/07/2017 0,00
3 Rate of utilisation [(1-2)/1] 100,00 %
d) Detailed grounds for the transfer
The implementation of the Internal Security Fund (ISF) appropriations has experienced a delay since Member States
(MS) needed to complete their designation of the national authorities (responsible authorities and audit authorities). MS
need to designate a Responsible Authority (RA) in charge of the proper management and control of the national
programme in line with the principles of sound financial management. The Responsible Authority may delegate some of
its task to a Delegated Authority. Last but not least, an Audit Authority (AA) needs to be appointed, which should
function independently from the Responsible Authority and which would be responsible for issuing annually an opinion
on the accounts. Most of the final designations were completed in 2016, while the last designations of national
authorities by the MS took place in June 2017.
The Commission, when preparing the Draft Budget 2017, expected a higher pace of implementation of the national
programmes by the MS, in terms of receiving higher levels of declared payments in the accounts. The assumptions were
based on programme set-up experience and were calculated as an estimate based on past implementation of
programmes under similar funding instruments. The accounts for the period from 16 October 2015 to 15 October 2016
were submitted by the MS by 15 February 2017 (or by 1 March 2017). However, the declared payments were lower than
the estimates.
EN 4 EN
The level of payments reported by MS to the Commission by March 2017 does not provide the full picture of the rate of
implementation of the national programmes on the ground. While the projects may be in full implementation, payments
to beneficiaries might only be declared at the end of such projects, after the necessary controls have been completed.
Consequently, the submission of national accounts could not include all on-going projects until national authorities (RA
and AA) prove the full eligibility of the expenses submitted. Due to this cautious approach of some MS, the information
provided does not necessarily equal the level of expenditure incurred by beneficiaries for the reporting period.
On the basis of the above, EUR 80 million can become available for use elsewhere. The appropriations remaining on
this line are considered to be sufficient to cover the needs until the end of the year.
EN 5 EN
I.2
a) Heading
18 02 01 02 - Prevention and fight against cross-border organised crime and better management of security-
related risks and crisis
b) Figure at 07/07/2017
Payments
1 Appropriation in budget (Initial Budget + AB) 162 872 986,00
2 Transfers 0,00
3 Final appropriation for the year (1+2) 162 872 986,00
4 Utilisation of final appropriation 45 167 925,86
5 Amount not used/available (3-4) 117 705 060,14
6 Requirements up to year-end 72 705 060,14
7 Proposed decrease 45 000 000,00
8 Decrease as percentage of appropriation in budget (7/1) 27,63 %
9 Decrease, as a percentage of the final appropriation for the year, in the sum
of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated
in accordance with Article 14 of the Rules of Application
n/a
c) Receipts arising from recovery (carried over from previous year)
Payments
1 Appropriations available at start of the year 448 512,10
2 Appropriations available on 07/07/2017 0,00
3 Rate of utilisation [(1-2)/1] 100,00 %
d) Detailed grounds for the transfer
In new funding instruments such as Internal Security Fund (ISF) - Police, the beneficiaries (mainly, State bodies such as
police force) are new to the process and are still in a capacity building stage, therefore delays in implementation may
occur.
Therefore, EUR 45 million can become available for use elsewhere. The appropriations remaining on this line are
sufficient to cover the needs until the end of the year.
Please consider also the justification for line 18 02 01 01 (pages 3 and 4).
EN 6 EN
I.3
a) Heading
18 02 51 - Completion of operations and programmes in the field of external borders, security and safeguarding
liberties
b) Figure at 07/07/2017
Payments
1 Appropriation in budget (Initial Budget + AB) 190 000 000,00
2 Transfers 0,00
3 Final appropriation for the year (1+2) 190 000 000,00
4 Utilisation of final appropriation 46 191 119,31
5 Amount not used/available (3-4) 143 808 880,69
6 Requirements up to year-end 38 808 880,69
7 Proposed decrease 105 000 000,00
8 Decrease as percentage of appropriation in budget (7/1) 55,26 %
9 Decrease, as a percentage of the final appropriation for the year, in the sum
of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated
in accordance with Article 14 of the Rules of Application
n/a
c) Receipts arising from recovery (carried over from previous year)
Payments
1 Appropriations available at start of the year 6 480 151,44
2 Appropriations available on 07/07/2017 12 616,81
3 Rate of utilisation [(1-2)/1] 99,81 %
d) Detailed grounds for the transfer
At the end of 2016, the Commission was able to carry out important closure payments for the 2007-2013 programmes,
earlier than foreseen when establishing the Draft Budget 2017. Consequently, these payment appropriations can be
released in 2017, while sufficient appropriations will remain on the line to cover the needs until the end of the year.
EN 7 EN
I.4
a) Heading
18 03 51 - Completion of operations and programmes in the field of return, refugees and migration flows
b) Figure at 07/07/2017
Payments
1 Appropriation in budget (Initial Budget + AB) 155 000 000,00
2 Transfers 0,00
3 Final appropriation for the year (1+2) 155 000 000,00
4 Utilisation of final appropriation 27 344 786,35
5 Amount not used/available (3-4) 127 655 213,65
6 Requirements up to year-end 73 655 213,65
7 Proposed decrease 54 000 000,00
8 Decrease as percentage of appropriation in budget (7/1) 34,84 %
9 Decrease, as a percentage of the final appropriation for the year, in the sum
of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated
in accordance with Article 14 of the Rules of Application
n/a
c) Receipts arising from recovery (carried over from previous year)
Payments
1 Appropriations available at start of the year 5 623 252,81
2 Appropriations available on 07/07/2017 805 359,25
3 Rate of utilisation [(1-2)/1] 85,68 %
d) Detailed grounds for the transfer
Please see justification for line 18 02 51 (page 6).
EN 8 EN
II. INCREASE
II.1
a) Heading
32 05 01 02 - Construction, operation and exploitation of the ITER facilities -- European Joint Undertaking for
ITER -- Fusion for Energy (F4E)
b) Figure at 07/07/2017
Payments
1 Appropriation in budget (Initial Budget + AB) 188 140 000,00
2 Transfers 0,00
3 Final appropriation for the year (1+2) 188 140 000,00
4 Utilisation of final appropriation 98 493 890,78
5 Amount not used/available (3-4) 89 646 109,22
6 Requirements up to year-end 234 003 309,22
7 Proposed increase 144 357 200,00
8 Increase as percentage of appropriation in budget (7/1) 76,73 %
9 Increase, as a percentage of the final appropriation for the year, in the sum of
transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated in
accordance with Article 14 of the Rules of Application
n/a
c) Receipts arising from recovery (carried over from previous year)
Payments
1 Appropriations available at start of the year 20 708,14
2 Appropriations available on 07/07/2017 0,00
3 Rate of utilisation [(1-2)/1] 100,00 %
d) Detailed grounds for the transfer
Based on the most recent estimates, an additional EUR 284 million will be needed in total for the International
Thermonuclear Experimental Reactor (ITER) programme as from September 2017, in relation to all main contracts
managed by the Fusion for Energy (F4E) Joint Undertaking. This increase is a result of the speeding up of the project
after the revision of the schedule for the construction and operation of ITER in 2016. With this revision a more proactive
project management approach has been introduced in order to recover as much as possible the delays incurred in the
past. The Fusion for Energy Joint Undertaking has renegotiated and amended its contracts in view to secure important
improvements and acceleration of work. This has resulted in additional payment needs in the upcoming months.
Construction services and goods contracted are being delivered up to, or even ahead of the schedule and the Fusion for
Energy Joint Undertaking is receiving invoices from its suppliers, which need to be paid promptly. In particular, the
following initiatives safeguarding project performance have been taken to keep the project on track:
Vacuum Vessel: Remedy measures involving the engagement of additional capacity from contractors in Germany,
France, Spain and a reinforced coordination through a specialised international management firm. The progress so far
by this reinforced consortium is yielding results, so payments in the second half of the year will be needed to accompany
the accelerated progress.
EN 9 EN
Building project TB-03: This is the part of the building that accumulated in the past serious delays (up to 14 months).The
correction measures decided by the Governing Board will now permit to recover some of these delays. An extra amount
for extension-of-time costs, extra design effort and increased complexity was approved by the Governing Board in
February 2017. These measures are already effective and are reducing the delay. Given the progress achieved and an
improved performance of the contractor, there is a need for additional payments.
Building project TB-04: This part of the buildings was delayed until a new more efficient partnership was made with the
ITER Organisation (IO). It was decided by the Governing Board to continue the design up to the Final Design approval in
September 2017. By this date, the new repartition of tasks between F4E and IO will be ready and material and
accelerated works will have to be paid for.
While the project is now performing on the ground, credibility has to be re-established with supplier companies from all
over Europe, many of them SMEs, in order to ensure their commitment to ITER delivery and avoid late payment costs
and claims.
From the total amount needed, it is proposed to increase line 32 05 01 02 by EUR 144 357 200, and the completion line
32 05 51 by EUR 139 642 800.
EN 10 EN
II.2
a) Heading
32 05 51 - Completion of the European Joint Undertaking for ITER -- Fusion for Energy (F4E) (2007 to 2013)
b) Figure at 07/07/2017
Payments
1 Appropriation in budget (Initial Budget + AB) 182 000 000,00
2 Transfers 0,00
3 Final appropriation for the year (1+2) 182 000 000,00
4 Utilisation of final appropriation 182 000 000,00
5 Amount not used/available (3-4) 0,00
6 Requirements up to year-end 139 642 800,00
7 Proposed increase 139 642 800,00
8 Increase as percentage of appropriation in budget (7/1) 76,73 %
9 Increase, as a percentage of the final appropriation for the year, in the sum of
transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated in
accordance with Article 14 of the Rules of Application
n/a
c) Receipts arising from recovery (carried over from previous year)
Payments
1 Appropriations available at start of the year 0,00
2 Appropriations available on 07/07/2017 0,00
3 Rate of utilisation [(1-2)/1] n/a
d) Detailed grounds for the transfer
Please see justification for line 32 05 01 02 (pages 8 and 9).

More Related Content

Similar to EU uses 284 million EUR from Internal Security budget for ITER

Budget performance for the biennium 2014–2015 as at 30 June 2014
 Budget performance for the biennium 2014–2015 as at 30 June 2014  Budget performance for the biennium 2014–2015 as at 30 June 2014
Budget performance for the biennium 2014–2015 as at 30 June 2014
Dr Lendy Spires
 

Similar to EU uses 284 million EUR from Internal Security budget for ITER (20)

Ekiti 2017 budget Q3 appraisal
Ekiti 2017 budget Q3 appraisalEkiti 2017 budget Q3 appraisal
Ekiti 2017 budget Q3 appraisal
 
EU laat teugels vieren bij begroting 2018
EU laat teugels vieren bij begroting 2018EU laat teugels vieren bij begroting 2018
EU laat teugels vieren bij begroting 2018
 
Budget performance for the biennium 2014–2015 as at 30 June 2014
 Budget performance for the biennium 2014–2015 as at 30 June 2014  Budget performance for the biennium 2014–2015 as at 30 June 2014
Budget performance for the biennium 2014–2015 as at 30 June 2014
 
Europe: surplus of 6,4 billion euros in 2016
Europe: surplus of 6,4 billion euros in 2016Europe: surplus of 6,4 billion euros in 2016
Europe: surplus of 6,4 billion euros in 2016
 
Europa boekte overschot van 6,4 miljard in 2016
Europa boekte overschot van 6,4 miljard in 2016Europa boekte overschot van 6,4 miljard in 2016
Europa boekte overschot van 6,4 miljard in 2016
 
Ekiti State 2016 Budget Q4 Appraisal.
Ekiti State 2016 Budget Q4 Appraisal.Ekiti State 2016 Budget Q4 Appraisal.
Ekiti State 2016 Budget Q4 Appraisal.
 
Monitoring of power decentralisation - 15.08.2017 en
Monitoring of power decentralisation  - 15.08.2017 enMonitoring of power decentralisation  - 15.08.2017 en
Monitoring of power decentralisation - 15.08.2017 en
 
Les conclusions du Conseil européen de juillet 2020
Les conclusions du Conseil européen de juillet 2020Les conclusions du Conseil européen de juillet 2020
Les conclusions du Conseil européen de juillet 2020
 
Acuerdo UE fondo de recuperacion pandemia
Acuerdo UE fondo de recuperacion pandemiaAcuerdo UE fondo de recuperacion pandemia
Acuerdo UE fondo de recuperacion pandemia
 
EU budžet 2021 - 2027
EU budžet 2021 - 2027EU budžet 2021 - 2027
EU budžet 2021 - 2027
 
Special meeting of the European Council - Conclusions
Special meeting of the European Council - ConclusionsSpecial meeting of the European Council - Conclusions
Special meeting of the European Council - Conclusions
 
Draft act on the financing of the counties 6.7.2016
Draft act on the financing of the counties 6.7.2016Draft act on the financing of the counties 6.7.2016
Draft act on the financing of the counties 6.7.2016
 
2017 Budget Q1 Appraisal
2017 Budget Q1 Appraisal2017 Budget Q1 Appraisal
2017 Budget Q1 Appraisal
 
Budgeting in Croatia - Ivana JAKIR BAJO, Croatia
Budgeting in Croatia - Ivana JAKIR BAJO, CroatiaBudgeting in Croatia - Ivana JAKIR BAJO, Croatia
Budgeting in Croatia - Ivana JAKIR BAJO, Croatia
 
2018 Budget Q2 Appraisal
2018 Budget Q2 Appraisal2018 Budget Q2 Appraisal
2018 Budget Q2 Appraisal
 
BASF Analyst Conference Q3
BASF Analyst Conference Q3BASF Analyst Conference Q3
BASF Analyst Conference Q3
 
Aguas Andinas Q2 Results Presentation
Aguas Andinas Q2 Results Presentation Aguas Andinas Q2 Results Presentation
Aguas Andinas Q2 Results Presentation
 
Best practice products from the PBO Networks - Ales Delakorda, Slovenian Fisc...
Best practice products from the PBO Networks - Ales Delakorda, Slovenian Fisc...Best practice products from the PBO Networks - Ales Delakorda, Slovenian Fisc...
Best practice products from the PBO Networks - Ales Delakorda, Slovenian Fisc...
 
AT&S Interim Report Q3 2019_20
AT&S Interim Report Q3 2019_20AT&S Interim Report Q3 2019_20
AT&S Interim Report Q3 2019_20
 
2018 Budget Q1 Appraisal
2018 Budget Q1 Appraisal2018 Budget Q1 Appraisal
2018 Budget Q1 Appraisal
 

More from Thierry Debels

More from Thierry Debels (20)

Oprichtingsakte firma Lincelles prins Andrew
Oprichtingsakte firma Lincelles prins AndrewOprichtingsakte firma Lincelles prins Andrew
Oprichtingsakte firma Lincelles prins Andrew
 
Pro Justitia 8/12/89 Jean Deprêtre over videocassette in zaak -Mendez
Pro Justitia 8/12/89 Jean Deprêtre over videocassette in zaak -MendezPro Justitia 8/12/89 Jean Deprêtre over videocassette in zaak -Mendez
Pro Justitia 8/12/89 Jean Deprêtre over videocassette in zaak -Mendez
 
Notities Willy Acke over de Bende van Nijvel
Notities Willy Acke over de Bende van NijvelNotities Willy Acke over de Bende van Nijvel
Notities Willy Acke over de Bende van Nijvel
 
Rapport Bende van Nijvel onderzoeksrechter Guy Wezel
Rapport Bende van Nijvel onderzoeksrechter Guy WezelRapport Bende van Nijvel onderzoeksrechter Guy Wezel
Rapport Bende van Nijvel onderzoeksrechter Guy Wezel
 
AVROX - Modification non statutaire de mandataires
AVROX -  Modification non statutaire de mandatairesAVROX -  Modification non statutaire de mandataires
AVROX - Modification non statutaire de mandataires
 
AstraZeneca - Transparency register EU
AstraZeneca - Transparency register  EUAstraZeneca - Transparency register  EU
AstraZeneca - Transparency register EU
 
Kamerbrief erkenning Stay Behind
Kamerbrief erkenning Stay BehindKamerbrief erkenning Stay Behind
Kamerbrief erkenning Stay Behind
 
Financiering moskeeën in Vlaanderen
Financiering moskeeën in VlaanderenFinanciering moskeeën in Vlaanderen
Financiering moskeeën in Vlaanderen
 
Verslag vzw Platform van Vlaamse Imams en Moslimdeskundigen
Verslag vzw Platform van Vlaamse Imams en MoslimdeskundigenVerslag vzw Platform van Vlaamse Imams en Moslimdeskundigen
Verslag vzw Platform van Vlaamse Imams en Moslimdeskundigen
 
EudraVigilance - Moderna covid MRNA vaccine up to 13/2/21
EudraVigilance - Moderna covid MRNA vaccine up to 13/2/21EudraVigilance - Moderna covid MRNA vaccine up to 13/2/21
EudraVigilance - Moderna covid MRNA vaccine up to 13/2/21
 
Mogelijke bijwerkingen Pfizer-vaccin Europa tot 13/2/21
Mogelijke bijwerkingen Pfizer-vaccin Europa tot 13/2/21Mogelijke bijwerkingen Pfizer-vaccin Europa tot 13/2/21
Mogelijke bijwerkingen Pfizer-vaccin Europa tot 13/2/21
 
Afsprakennota LGU Academy vzw 2018
Afsprakennota LGU Academy vzw 2018Afsprakennota LGU Academy vzw 2018
Afsprakennota LGU Academy vzw 2018
 
The number of individual cases identified in EudraVigilance for TOZINAMERAN i...
The number of individual cases identified in EudraVigilance for TOZINAMERAN i...The number of individual cases identified in EudraVigilance for TOZINAMERAN i...
The number of individual cases identified in EudraVigilance for TOZINAMERAN i...
 
List of meetings Bill & Melinda Gates Foundation has held with Commissioners,...
List of meetings Bill & Melinda Gates Foundation has held with Commissioners,...List of meetings Bill & Melinda Gates Foundation has held with Commissioners,...
List of meetings Bill & Melinda Gates Foundation has held with Commissioners,...
 
EudraVigilance - Comirnaty - Individual cases
EudraVigilance - Comirnaty - Individual casesEudraVigilance - Comirnaty - Individual cases
EudraVigilance - Comirnaty - Individual cases
 
Démission administrateur Avrox
Démission administrateur AvroxDémission administrateur Avrox
Démission administrateur Avrox
 
So Sense SA
So Sense SASo Sense SA
So Sense SA
 
Registratie BioNTech in lobbyregister EU
Registratie BioNTech in lobbyregister EURegistratie BioNTech in lobbyregister EU
Registratie BioNTech in lobbyregister EU
 
POLITIËLE CRIMINALITEITSSTATISTIEKEN - STAD BRUSSEL
POLITIËLE CRIMINALITEITSSTATISTIEKEN - STAD BRUSSELPOLITIËLE CRIMINALITEITSSTATISTIEKEN - STAD BRUSSEL
POLITIËLE CRIMINALITEITSSTATISTIEKEN - STAD BRUSSEL
 
Projectoproep delen Antwerpse stadsvloot
Projectoproep delen Antwerpse stadsvlootProjectoproep delen Antwerpse stadsvloot
Projectoproep delen Antwerpse stadsvloot
 

Recently uploaded

Recently uploaded (20)

NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Spring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive SufferingSpring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive Suffering
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdf
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
Harbin-Gross-Spring2022.pdf Yale Historical Review
Harbin-Gross-Spring2022.pdf Yale Historical ReviewHarbin-Gross-Spring2022.pdf Yale Historical Review
Harbin-Gross-Spring2022.pdf Yale Historical Review
 
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdfEDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
 
Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
 
2024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 332024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 33
 
ℂall Girls Thane Hire Me Neha 9920874524 Top Class ℂall Girl Serviℂe Available
ℂall Girls  Thane  Hire Me Neha 9920874524 Top Class ℂall Girl Serviℂe Availableℂall Girls  Thane  Hire Me Neha 9920874524 Top Class ℂall Girl Serviℂe Available
ℂall Girls Thane Hire Me Neha 9920874524 Top Class ℂall Girl Serviℂe Available
 
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
 
Nitrogen filled high expansion foam in open Containers
Nitrogen filled high expansion foam in open ContainersNitrogen filled high expansion foam in open Containers
Nitrogen filled high expansion foam in open Containers
 
Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.
 
BioandPicforRepKendrick_LastUpdatedMay2024
BioandPicforRepKendrick_LastUpdatedMay2024BioandPicforRepKendrick_LastUpdatedMay2024
BioandPicforRepKendrick_LastUpdatedMay2024
 
Electric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning OrganizationsElectric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning Organizations
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
Managing large-scale outbreaks at Farrow-to-Weaner Farms
Managing large-scale outbreaks at Farrow-to-Weaner FarmsManaging large-scale outbreaks at Farrow-to-Weaner Farms
Managing large-scale outbreaks at Farrow-to-Weaner Farms
 
"Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant..."Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant...
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 

EU uses 284 million EUR from Internal Security budget for ITER

  • 1. 11732/17 RGP/kg DG G 2A EN Council of the European Union Brussels, 29 August 2017 (OR. en) 11732/17 FIN 512 COVER NOTE From: Mr Günther OETTINGER, Member of the European Commission date of receipt: 28 August 2017 To: Mr Märt KIVINE, President of the Council of the European Union Subject: Proposal for transfer of appropriations No DEC 18/2017 within Section III - Commission - of the general budget for 2017 Delegations will find attached Commission document DEC 18/2017. Encl.: 18/2017
  • 2. EN 1 EN EUROPEAN COMMISSION BRUSSELS, 24/08/2017 GENERAL BUDGET - 2017 SECTION III - COMMISSION TITLES: 18, 32 TRANSFER OF APPROPRIATIONS N° DEC 18/2017 FROM CHAPTER - 1802 Internal security ITEM - 18 02 01 01 Support of border management and a common visa policy to facilitate legitimate travel Payments -80 000 000,00 ITEM - 18 02 01 02 Prevention and fight against cross-border organised crime and better management of security- related risks and crisis Payments -45 000 000,00 ARTICLE - 18 02 51 Completion of operations and programmes in the field of external borders, security and safeguarding liberties Payments -105 000 000,00 CHAPTER - 1803 Asylum and migration ARTICLE - 18 03 51 Completion of operations and programmes in the field of return, refugees and migration flows Payments -54 000 000,00 TO CHAPTER - 3205 ITER ITEM - 32 05 01 02 Construction, operation and exploitation of the ITER facilities -- European Joint Undertaking for ITER -- Fusion for Energy (F4E) Payments 144 357 200,00 ARTICLE - 32 05 51 Completion of the European Joint Undertaking for ITER -- Fusion for Energy (F4E) (2007 to 2013) Payments 139 642 800,00
  • 3. EN 2 EN Introduction: This transfer concerns the proposal to reinforce the International Thermonuclear Experimental Reactor (ITER) programme by EUR 284 million in payment appropriations. The sources of the reinforcement are the Asylum, Migration and Integration Fund (AMIF) and Internal Security Fund (ISF) programmes.
  • 4. EN 3 EN I. DECREASE I.1 a) Heading 18 02 01 01 - Support of border management and a common visa policy to facilitate legitimate travel b) Figure at 07/07/2017 Payments 1 Appropriation in budget (Initial Budget + AB) 364 282 173,00 2 Transfers 0,00 3 Final appropriation for the year (1+2) 364 282 173,00 4 Utilisation of final appropriation 97 201 273,56 5 Amount not used/available (3-4) 267 080 899,44 6 Requirements up to year-end 187 080 899,44 7 Proposed decrease 80 000 000,00 8 Decrease as percentage of appropriation in budget (7/1) 21,96 % 9 Decrease, as a percentage of the final appropriation for the year, in the sum of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated in accordance with Article 14 of the Rules of Application n/a c) Receipts arising from recovery (carried over from previous year) Payments 1 Appropriations available at start of the year 25 929 340,29 2 Appropriations available on 07/07/2017 0,00 3 Rate of utilisation [(1-2)/1] 100,00 % d) Detailed grounds for the transfer The implementation of the Internal Security Fund (ISF) appropriations has experienced a delay since Member States (MS) needed to complete their designation of the national authorities (responsible authorities and audit authorities). MS need to designate a Responsible Authority (RA) in charge of the proper management and control of the national programme in line with the principles of sound financial management. The Responsible Authority may delegate some of its task to a Delegated Authority. Last but not least, an Audit Authority (AA) needs to be appointed, which should function independently from the Responsible Authority and which would be responsible for issuing annually an opinion on the accounts. Most of the final designations were completed in 2016, while the last designations of national authorities by the MS took place in June 2017. The Commission, when preparing the Draft Budget 2017, expected a higher pace of implementation of the national programmes by the MS, in terms of receiving higher levels of declared payments in the accounts. The assumptions were based on programme set-up experience and were calculated as an estimate based on past implementation of programmes under similar funding instruments. The accounts for the period from 16 October 2015 to 15 October 2016 were submitted by the MS by 15 February 2017 (or by 1 March 2017). However, the declared payments were lower than the estimates.
  • 5. EN 4 EN The level of payments reported by MS to the Commission by March 2017 does not provide the full picture of the rate of implementation of the national programmes on the ground. While the projects may be in full implementation, payments to beneficiaries might only be declared at the end of such projects, after the necessary controls have been completed. Consequently, the submission of national accounts could not include all on-going projects until national authorities (RA and AA) prove the full eligibility of the expenses submitted. Due to this cautious approach of some MS, the information provided does not necessarily equal the level of expenditure incurred by beneficiaries for the reporting period. On the basis of the above, EUR 80 million can become available for use elsewhere. The appropriations remaining on this line are considered to be sufficient to cover the needs until the end of the year.
  • 6. EN 5 EN I.2 a) Heading 18 02 01 02 - Prevention and fight against cross-border organised crime and better management of security- related risks and crisis b) Figure at 07/07/2017 Payments 1 Appropriation in budget (Initial Budget + AB) 162 872 986,00 2 Transfers 0,00 3 Final appropriation for the year (1+2) 162 872 986,00 4 Utilisation of final appropriation 45 167 925,86 5 Amount not used/available (3-4) 117 705 060,14 6 Requirements up to year-end 72 705 060,14 7 Proposed decrease 45 000 000,00 8 Decrease as percentage of appropriation in budget (7/1) 27,63 % 9 Decrease, as a percentage of the final appropriation for the year, in the sum of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated in accordance with Article 14 of the Rules of Application n/a c) Receipts arising from recovery (carried over from previous year) Payments 1 Appropriations available at start of the year 448 512,10 2 Appropriations available on 07/07/2017 0,00 3 Rate of utilisation [(1-2)/1] 100,00 % d) Detailed grounds for the transfer In new funding instruments such as Internal Security Fund (ISF) - Police, the beneficiaries (mainly, State bodies such as police force) are new to the process and are still in a capacity building stage, therefore delays in implementation may occur. Therefore, EUR 45 million can become available for use elsewhere. The appropriations remaining on this line are sufficient to cover the needs until the end of the year. Please consider also the justification for line 18 02 01 01 (pages 3 and 4).
  • 7. EN 6 EN I.3 a) Heading 18 02 51 - Completion of operations and programmes in the field of external borders, security and safeguarding liberties b) Figure at 07/07/2017 Payments 1 Appropriation in budget (Initial Budget + AB) 190 000 000,00 2 Transfers 0,00 3 Final appropriation for the year (1+2) 190 000 000,00 4 Utilisation of final appropriation 46 191 119,31 5 Amount not used/available (3-4) 143 808 880,69 6 Requirements up to year-end 38 808 880,69 7 Proposed decrease 105 000 000,00 8 Decrease as percentage of appropriation in budget (7/1) 55,26 % 9 Decrease, as a percentage of the final appropriation for the year, in the sum of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated in accordance with Article 14 of the Rules of Application n/a c) Receipts arising from recovery (carried over from previous year) Payments 1 Appropriations available at start of the year 6 480 151,44 2 Appropriations available on 07/07/2017 12 616,81 3 Rate of utilisation [(1-2)/1] 99,81 % d) Detailed grounds for the transfer At the end of 2016, the Commission was able to carry out important closure payments for the 2007-2013 programmes, earlier than foreseen when establishing the Draft Budget 2017. Consequently, these payment appropriations can be released in 2017, while sufficient appropriations will remain on the line to cover the needs until the end of the year.
  • 8. EN 7 EN I.4 a) Heading 18 03 51 - Completion of operations and programmes in the field of return, refugees and migration flows b) Figure at 07/07/2017 Payments 1 Appropriation in budget (Initial Budget + AB) 155 000 000,00 2 Transfers 0,00 3 Final appropriation for the year (1+2) 155 000 000,00 4 Utilisation of final appropriation 27 344 786,35 5 Amount not used/available (3-4) 127 655 213,65 6 Requirements up to year-end 73 655 213,65 7 Proposed decrease 54 000 000,00 8 Decrease as percentage of appropriation in budget (7/1) 34,84 % 9 Decrease, as a percentage of the final appropriation for the year, in the sum of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated in accordance with Article 14 of the Rules of Application n/a c) Receipts arising from recovery (carried over from previous year) Payments 1 Appropriations available at start of the year 5 623 252,81 2 Appropriations available on 07/07/2017 805 359,25 3 Rate of utilisation [(1-2)/1] 85,68 % d) Detailed grounds for the transfer Please see justification for line 18 02 51 (page 6).
  • 9. EN 8 EN II. INCREASE II.1 a) Heading 32 05 01 02 - Construction, operation and exploitation of the ITER facilities -- European Joint Undertaking for ITER -- Fusion for Energy (F4E) b) Figure at 07/07/2017 Payments 1 Appropriation in budget (Initial Budget + AB) 188 140 000,00 2 Transfers 0,00 3 Final appropriation for the year (1+2) 188 140 000,00 4 Utilisation of final appropriation 98 493 890,78 5 Amount not used/available (3-4) 89 646 109,22 6 Requirements up to year-end 234 003 309,22 7 Proposed increase 144 357 200,00 8 Increase as percentage of appropriation in budget (7/1) 76,73 % 9 Increase, as a percentage of the final appropriation for the year, in the sum of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated in accordance with Article 14 of the Rules of Application n/a c) Receipts arising from recovery (carried over from previous year) Payments 1 Appropriations available at start of the year 20 708,14 2 Appropriations available on 07/07/2017 0,00 3 Rate of utilisation [(1-2)/1] 100,00 % d) Detailed grounds for the transfer Based on the most recent estimates, an additional EUR 284 million will be needed in total for the International Thermonuclear Experimental Reactor (ITER) programme as from September 2017, in relation to all main contracts managed by the Fusion for Energy (F4E) Joint Undertaking. This increase is a result of the speeding up of the project after the revision of the schedule for the construction and operation of ITER in 2016. With this revision a more proactive project management approach has been introduced in order to recover as much as possible the delays incurred in the past. The Fusion for Energy Joint Undertaking has renegotiated and amended its contracts in view to secure important improvements and acceleration of work. This has resulted in additional payment needs in the upcoming months. Construction services and goods contracted are being delivered up to, or even ahead of the schedule and the Fusion for Energy Joint Undertaking is receiving invoices from its suppliers, which need to be paid promptly. In particular, the following initiatives safeguarding project performance have been taken to keep the project on track: Vacuum Vessel: Remedy measures involving the engagement of additional capacity from contractors in Germany, France, Spain and a reinforced coordination through a specialised international management firm. The progress so far by this reinforced consortium is yielding results, so payments in the second half of the year will be needed to accompany the accelerated progress.
  • 10. EN 9 EN Building project TB-03: This is the part of the building that accumulated in the past serious delays (up to 14 months).The correction measures decided by the Governing Board will now permit to recover some of these delays. An extra amount for extension-of-time costs, extra design effort and increased complexity was approved by the Governing Board in February 2017. These measures are already effective and are reducing the delay. Given the progress achieved and an improved performance of the contractor, there is a need for additional payments. Building project TB-04: This part of the buildings was delayed until a new more efficient partnership was made with the ITER Organisation (IO). It was decided by the Governing Board to continue the design up to the Final Design approval in September 2017. By this date, the new repartition of tasks between F4E and IO will be ready and material and accelerated works will have to be paid for. While the project is now performing on the ground, credibility has to be re-established with supplier companies from all over Europe, many of them SMEs, in order to ensure their commitment to ITER delivery and avoid late payment costs and claims. From the total amount needed, it is proposed to increase line 32 05 01 02 by EUR 144 357 200, and the completion line 32 05 51 by EUR 139 642 800.
  • 11. EN 10 EN II.2 a) Heading 32 05 51 - Completion of the European Joint Undertaking for ITER -- Fusion for Energy (F4E) (2007 to 2013) b) Figure at 07/07/2017 Payments 1 Appropriation in budget (Initial Budget + AB) 182 000 000,00 2 Transfers 0,00 3 Final appropriation for the year (1+2) 182 000 000,00 4 Utilisation of final appropriation 182 000 000,00 5 Amount not used/available (3-4) 0,00 6 Requirements up to year-end 139 642 800,00 7 Proposed increase 139 642 800,00 8 Increase as percentage of appropriation in budget (7/1) 76,73 % 9 Increase, as a percentage of the final appropriation for the year, in the sum of transfers referred to in Article 26(1)(b) of the Financial Regulation, calculated in accordance with Article 14 of the Rules of Application n/a c) Receipts arising from recovery (carried over from previous year) Payments 1 Appropriations available at start of the year 0,00 2 Appropriations available on 07/07/2017 0,00 3 Rate of utilisation [(1-2)/1] n/a d) Detailed grounds for the transfer Please see justification for line 32 05 01 02 (pages 8 and 9).