10 MWp Solar PV Power Project,
      Rajasthan – INDIA
       – Detailed Financial Report




        M/s XXXXX, New Delhi
10 MWp Solar PV Power Financial




               DETAILED FINANCIAL
                     REPORT
                        10 MWp SOLAR PHOTOVOLTAIC POWER PLANT,




                  PLANT LOCATION: VILLAGE: AAAAA, DISTT: BBBBB,
                             RAJASTHAN, INDIA

Project Developers

XXXXXXXX




Project Consultants
Pan Exergy Pvt Ltd
D-32, Sector-7, Noida – 201301,
INDIA.
Ph: +91-9999676750; +91-9654436886
Web: www.exergy.in Email: info@exergy.in




           2|P a g e
10 MWp Solar PV Power Financial




 1     PROJECT FINANCIALS

 1.1     Project Cost
 The cost of the power project is estimated, on the basis of the prevailing prices rates and the estimation
 is for the installation of power generation facilities described in the earlier sections of this report.


 The cost of the Solar PV power plant, presented in this section of the report covers all the costs
 associated with the construction of the plant and included civil construction cost, cost of equipment for
 power generation, cost of auxiliaries and utilities.
 Note: CER distribution: yr-1, 100% to project developer (PD); yr-2, 90% to PD; yr-3, 80% to PD; yr-4, 70% to
 PD; yr-5, 60% to PD; year 6 onwards, 50% to PD.


 1.2     Data Sheet
Site Information
Site Name                                                                          Mandali
Price of Land/Acre (Rs Lakh)                                                           0.1
Distance from the Evacuation Point(Km)                                                  17
Estimated Generation (KwH/MW)                                                      1465238
Cost of Evacuation/Km (Rs. Lakh/Km)                                                     30

Technology Information
Technology Used                                                Solar Semi (Poly Crystalline)
Cost of Solar Modules/MW (Rs. Lakh)                                                     850
Area Required (Acre/MW)                                                                    6

Cost Estimates Per MW
Item                                                                          Cost (Rs Lakh)
Solar Panel                                                                              850
Inverter (Central Inverter)                                                              150
Power Evacuation Cost (Total)                                                            510
BOS & Commissioning Cost                                                                 250
Total Technology Cost/MW                                                               1250

Financial Information
Tariff (Rs/Unit)                                                                        15.3
Debt Interest Rate (%)                                                               12.50%




           3|P a g e
10 MWp Solar PV Power Financial



 1.3      Assumptions

Sl No   Assumption Head             Sub-Head              Sub-Head (2)                                 Units          Assumptions
                                                          Installed Capacity                           MW                              10

  1        Power Generation              Capacity         CUF                                          %                        16.73%
                                                          Deration Factor                              %                         0.80%
                                                          Useful Life                                  Years                        25
                                                          Power Plant Cost                             Rs Lakh/MW                 1250
                                                          Power Evacuation Cost                        Rs Lakh                     510
  2           Project Cost           Capital Cost/MW      Land Cost                                    Rs Lakh/Acre                   0.1
                                                          Land Needed                                  Acre/MW                          6
                                                          Total Fixed cost/PW                          Rs Laks                      13016
                                                          Tariff Period                                Years                          25
                                                          Tariff                                       Rs                            15.3
                                                          Debt                                         %                             70%
                                                          Equity                                       %                             30%
                                       Debt-Equity
                                                          Total Debt Amount                            Rs Lakh                  9111.2
                                                          Total Equity Amount                          Rs Lakh                  3904.8
  3      Financial Assumptions
                                                          Loan Amount                                  Rs Lakh                  9111.2
                                                          Moratorium Period                            Years                         0
                                     Debt Component
                                                          Repayment Period (Inc Moratorium Period)     Years                        10
                                                          Interest Rate                                %                        12.50%
                                    Equity Component      Equity Amount                                Rs Lakh                  3904.8
                                                          Income Tax                                   %                        33.22%
                                    Fiscal Assumptions    MAT Rate (for 10 years)                      %                       19.931%
                                                          80 IA Benefit                                Yes/No         Yes
  4     Financial Assumptions (2)
                                                          Depreciation Rate for First 10 Years         %                               7%
                                       Depreciation       Depreciation Rate 11th year onwards          %                            1.33%
                                                          Years of 7% rate                             Years                            10
             Operations &                                 O&M                                          Lakh/MW                        9.00
  5
             Maintenance                                  Total O&M escalation                         %                            5.72%
                                                          Expected to be generated per year for next
                                    CER Produced          21 years                                     CER/MW/Year                   1500
  6          CDM Benefits
                                                          Based on Average ECX rates,( conversion
                                    CER Price             rate of 1EUR=INR65.26)                       Rs/CER                       744.7
                                         Inverter         Current Price of Inverter                    Rs Lakh/MW                     150
                                    Replacement to be
  7             Inverter
                                    done after every 10
                                           years          Replacement year                             Year                            10




            4|P a g e
10 MWp Solar PV Power Financial



1.4     Cash Flow

Note: Detailed Cash Flow for 25years can be provided if asked for




   Pre Tax Equity IRR                              18%
   Pre Tax Project IRR                             15%




          5|P a g e
10 MWp Solar PV Power Financial



                1.5          Profit & Loss Account

Year                               1         2             3           4            5          6              7         8            9         10       11        12        13
Profit Before         Rs
Tax                   Lakh     213.92    243.02        279.88     325.48     380.92     561.57         537.55       641.69    761.62       899.30    294.64   1769.12   1743.21
ROE (Before
Tax)                  %           5%        6%            7%          8%          10%     14%            14%          16%       20%          23%        8%       45%       45%
ROI (Before
Tax)                  %           2%        2%            2%          3%          3%          4%          4%           5%        6%           7%        2%       14%       13%
                       Rs
Tax                   Lakh        43        48            56          65           76         112        107          128        152         179        98       588       579
                       Rs
Profit after tax      Lakh     171.29    194.58        224.10     260.61     305.00     449.65         430.41       513.80    609.82       720.06    196.77   1181.46   1164.16

ROE(After Tax)        %           4%        5%            6%          7%          8%      12%            11%          13%       16%          18%        5%       30%       30%

ROI (After Tax)       %           0%        0%            0%          0%          1%          1%          1%           1%        1%           1%        1%        5%        4%




Year                               14             15             16         17           18             19            20       21            22         23         24        25
Profit Before         Rs
Tax                   Lakh     1716.88    1690.12        1662.88      1635.12       1606.81         1577.91       1548.38    18.17       1431.39    1399.68   1367.15   1333.74
ROE (Before
Tax)                  %           44%        43%                43%        42%          41%            40%           40%       0%           37%        36%       35%       34%
ROI (Before
Tax)                  %           13%        13%                13%        13%          12%            12%           12%       0%           11%        11%       11%       10%
                      Rs
Tax                   Lakh        570         561               552         543         534            524           514        6           475        465       454        443
                      Rs
Profit after tax      Lakh     1146.58    1128.70        1110.51      1091.97       1073.07         1053.77       1034.05    12.14        955.92     934.74    913.02    890.70

ROE(After Tax)        %           29%        29%                28%        28%          27%            27%           26%       0%           24%        24%       23%       23%

ROI (After Tax)       %            4%             4%            4%          4%          4%              4%            4%       0%            4%         4%        3%        3%



Average ROE (BT)                                                       26.27%
Average ROI (BT)                                                           7.88%


Average ROE (AT)                                                       18.20%
Average ROI (AT)                                                           2.42%




                              6|P a g e

More Related Content

What's hot

Solar PV manufacturing
Solar PV manufacturingSolar PV manufacturing
Solar PV manufacturingEAI
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Gensol Engineering Limited
 
The Great and Challenging Indian Solar Opportunity
The Great and Challenging Indian Solar OpportunityThe Great and Challenging Indian Solar Opportunity
The Great and Challenging Indian Solar OpportunityTobias Engelmeier
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Harish Sharma
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabHeadway Solar
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012Bakul Haria
 
New base special 25 july 2014
New base special  25 july 2014New base special  25 july 2014
New base special 25 july 2014Khaled Al Awadi
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...ank_
 
Power distribution tariff in india 2016 discom wise and consumer wise compre...
Power distribution tariff in india 2016  discom wise and consumer wise compre...Power distribution tariff in india 2016  discom wise and consumer wise compre...
Power distribution tariff in india 2016 discom wise and consumer wise compre...Sakshi Saini
 
Solar Power Market 2015
Solar Power Market 2015Solar Power Market 2015
Solar Power Market 2015Naresh Baluja
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Gensol Engineering Limited
 
Ceew cef market_handbook_q1_2020
Ceew cef market_handbook_q1_2020Ceew cef market_handbook_q1_2020
Ceew cef market_handbook_q1_2020Mayank Munjal
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Gensol Engineering Limited
 
#Forecasting Daily Power #Generation of #SolarPlant
#Forecasting Daily Power #Generation of #SolarPlant#Forecasting Daily Power #Generation of #SolarPlant
#Forecasting Daily Power #Generation of #SolarPlantDas A. K.
 
T&D India (July 2017) - Power T&D Contracting
T&D India (July 2017) - Power T&D ContractingT&D India (July 2017) - Power T&D Contracting
T&D India (July 2017) - Power T&D ContractingT&D India
 

What's hot (20)

National Solar Mission Status (July'17)
National Solar Mission Status (July'17)National Solar Mission Status (July'17)
National Solar Mission Status (July'17)
 
Solar PV manufacturing
Solar PV manufacturingSolar PV manufacturing
Solar PV manufacturing
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
The Great and Challenging Indian Solar Opportunity
The Great and Challenging Indian Solar OpportunityThe Great and Challenging Indian Solar Opportunity
The Great and Challenging Indian Solar Opportunity
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
New base special 25 july 2014
New base special  25 july 2014New base special  25 july 2014
New base special 25 july 2014
 
Cashing on the sun
Cashing on the sunCashing on the sun
Cashing on the sun
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...
 
Power distribution tariff in india 2016 discom wise and consumer wise compre...
Power distribution tariff in india 2016  discom wise and consumer wise compre...Power distribution tariff in india 2016  discom wise and consumer wise compre...
Power distribution tariff in india 2016 discom wise and consumer wise compre...
 
Solar Power Market 2015
Solar Power Market 2015Solar Power Market 2015
Solar Power Market 2015
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
Final faq booklet
Final faq bookletFinal faq booklet
Final faq booklet
 
Ceew cef market_handbook_q1_2020
Ceew cef market_handbook_q1_2020Ceew cef market_handbook_q1_2020
Ceew cef market_handbook_q1_2020
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
#Forecasting Daily Power #Generation of #SolarPlant
#Forecasting Daily Power #Generation of #SolarPlant#Forecasting Daily Power #Generation of #SolarPlant
#Forecasting Daily Power #Generation of #SolarPlant
 
T&D India (July 2017) - Power T&D Contracting
T&D India (July 2017) - Power T&D ContractingT&D India (July 2017) - Power T&D Contracting
T&D India (July 2017) - Power T&D Contracting
 

Similar to Solar PV Financials

Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Rick Borry
 
Wind Vs Conventional Electricity Economics
Wind Vs Conventional Electricity EconomicsWind Vs Conventional Electricity Economics
Wind Vs Conventional Electricity Economicsvijcons
 
Ancillary Services
Ancillary ServicesAncillary Services
Ancillary ServicesIPPAI
 
State of heart state policies for solar pv
State of heart   state policies for solar pvState of heart   state policies for solar pv
State of heart state policies for solar pvEAI
 
Webinar - Cost of Losses for Network Investment
Webinar - Cost of Losses for Network Investment Webinar - Cost of Losses for Network Investment
Webinar - Cost of Losses for Network Investment Leonardo ENERGY
 
Hodnik - Environmental Progress and Challenges
Hodnik - Environmental Progress and ChallengesHodnik - Environmental Progress and Challenges
Hodnik - Environmental Progress and ChallengesEnvironmental Initiative
 
7x24 Exchange 2011 National Fall Conference
7x24 Exchange 2011 National Fall Conference7x24 Exchange 2011 National Fall Conference
7x24 Exchange 2011 National Fall ConferenceJames Grice
 
Conference call presentation 4 q10
Conference call presentation 4 q10Conference call presentation 4 q10
Conference call presentation 4 q10MPX_RI
 
Conference call presentation 4 q10 28.03
Conference call presentation 4 q10 28.03Conference call presentation 4 q10 28.03
Conference call presentation 4 q10 28.03MPX_RI
 
1 q08 earnings call presentation
1 q08 earnings call presentation1 q08 earnings call presentation
1 q08 earnings call presentationAES Tietê
 
Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_finalLoren Schwappach
 
GC Advisors - RPO
GC Advisors - RPOGC Advisors - RPO
GC Advisors - RPOGCAdvisors
 
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...pManifold
 
Energy Pricing for Carlsbad Seawater Desalination Facility
Energy Pricing for Carlsbad Seawater Desalination FacilityEnergy Pricing for Carlsbad Seawater Desalination Facility
Energy Pricing for Carlsbad Seawater Desalination FacilitySan Diego County Water Authority
 
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Burton Lee
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALfinance29
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALfinance29
 
Renewable energy in South Korea
Renewable energy in South KoreaRenewable energy in South Korea
Renewable energy in South Koreauniquened
 
MP_DF_Pre_bid_PPT_17_Oct_2011
MP_DF_Pre_bid_PPT_17_Oct_2011MP_DF_Pre_bid_PPT_17_Oct_2011
MP_DF_Pre_bid_PPT_17_Oct_2011pManifold
 

Similar to Solar PV Financials (20)

Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
 
Wind Vs Conventional Electricity Economics
Wind Vs Conventional Electricity EconomicsWind Vs Conventional Electricity Economics
Wind Vs Conventional Electricity Economics
 
Ancillary Services
Ancillary ServicesAncillary Services
Ancillary Services
 
State of heart state policies for solar pv
State of heart   state policies for solar pvState of heart   state policies for solar pv
State of heart state policies for solar pv
 
Webinar - Cost of Losses for Network Investment
Webinar - Cost of Losses for Network Investment Webinar - Cost of Losses for Network Investment
Webinar - Cost of Losses for Network Investment
 
Hodnik - Environmental Progress and Challenges
Hodnik - Environmental Progress and ChallengesHodnik - Environmental Progress and Challenges
Hodnik - Environmental Progress and Challenges
 
Cost summery
Cost summeryCost summery
Cost summery
 
7x24 Exchange 2011 National Fall Conference
7x24 Exchange 2011 National Fall Conference7x24 Exchange 2011 National Fall Conference
7x24 Exchange 2011 National Fall Conference
 
Conference call presentation 4 q10
Conference call presentation 4 q10Conference call presentation 4 q10
Conference call presentation 4 q10
 
Conference call presentation 4 q10 28.03
Conference call presentation 4 q10 28.03Conference call presentation 4 q10 28.03
Conference call presentation 4 q10 28.03
 
1 q08 earnings call presentation
1 q08 earnings call presentation1 q08 earnings call presentation
1 q08 earnings call presentation
 
Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_final
 
GC Advisors - RPO
GC Advisors - RPOGC Advisors - RPO
GC Advisors - RPO
 
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
Webinar: Market, Customer and Investment Intelligence on Ujjain for Distribut...
 
Energy Pricing for Carlsbad Seawater Desalination Facility
Energy Pricing for Carlsbad Seawater Desalination FacilityEnergy Pricing for Carlsbad Seawater Desalination Facility
Energy Pricing for Carlsbad Seawater Desalination Facility
 
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINAL
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINAL
 
Renewable energy in South Korea
Renewable energy in South KoreaRenewable energy in South Korea
Renewable energy in South Korea
 
MP_DF_Pre_bid_PPT_17_Oct_2011
MP_DF_Pre_bid_PPT_17_Oct_2011MP_DF_Pre_bid_PPT_17_Oct_2011
MP_DF_Pre_bid_PPT_17_Oct_2011
 

Solar PV Financials

  • 1. 10 MWp Solar PV Power Project, Rajasthan – INDIA – Detailed Financial Report M/s XXXXX, New Delhi
  • 2. 10 MWp Solar PV Power Financial DETAILED FINANCIAL REPORT 10 MWp SOLAR PHOTOVOLTAIC POWER PLANT, PLANT LOCATION: VILLAGE: AAAAA, DISTT: BBBBB, RAJASTHAN, INDIA Project Developers XXXXXXXX Project Consultants Pan Exergy Pvt Ltd D-32, Sector-7, Noida – 201301, INDIA. Ph: +91-9999676750; +91-9654436886 Web: www.exergy.in Email: info@exergy.in 2|P a g e
  • 3. 10 MWp Solar PV Power Financial 1 PROJECT FINANCIALS 1.1 Project Cost The cost of the power project is estimated, on the basis of the prevailing prices rates and the estimation is for the installation of power generation facilities described in the earlier sections of this report. The cost of the Solar PV power plant, presented in this section of the report covers all the costs associated with the construction of the plant and included civil construction cost, cost of equipment for power generation, cost of auxiliaries and utilities. Note: CER distribution: yr-1, 100% to project developer (PD); yr-2, 90% to PD; yr-3, 80% to PD; yr-4, 70% to PD; yr-5, 60% to PD; year 6 onwards, 50% to PD. 1.2 Data Sheet Site Information Site Name Mandali Price of Land/Acre (Rs Lakh) 0.1 Distance from the Evacuation Point(Km) 17 Estimated Generation (KwH/MW) 1465238 Cost of Evacuation/Km (Rs. Lakh/Km) 30 Technology Information Technology Used Solar Semi (Poly Crystalline) Cost of Solar Modules/MW (Rs. Lakh) 850 Area Required (Acre/MW) 6 Cost Estimates Per MW Item Cost (Rs Lakh) Solar Panel 850 Inverter (Central Inverter) 150 Power Evacuation Cost (Total) 510 BOS & Commissioning Cost 250 Total Technology Cost/MW 1250 Financial Information Tariff (Rs/Unit) 15.3 Debt Interest Rate (%) 12.50% 3|P a g e
  • 4. 10 MWp Solar PV Power Financial 1.3 Assumptions Sl No Assumption Head Sub-Head Sub-Head (2) Units Assumptions Installed Capacity MW 10 1 Power Generation Capacity CUF % 16.73% Deration Factor % 0.80% Useful Life Years 25 Power Plant Cost Rs Lakh/MW 1250 Power Evacuation Cost Rs Lakh 510 2 Project Cost Capital Cost/MW Land Cost Rs Lakh/Acre 0.1 Land Needed Acre/MW 6 Total Fixed cost/PW Rs Laks 13016 Tariff Period Years 25 Tariff Rs 15.3 Debt % 70% Equity % 30% Debt-Equity Total Debt Amount Rs Lakh 9111.2 Total Equity Amount Rs Lakh 3904.8 3 Financial Assumptions Loan Amount Rs Lakh 9111.2 Moratorium Period Years 0 Debt Component Repayment Period (Inc Moratorium Period) Years 10 Interest Rate % 12.50% Equity Component Equity Amount Rs Lakh 3904.8 Income Tax % 33.22% Fiscal Assumptions MAT Rate (for 10 years) % 19.931% 80 IA Benefit Yes/No Yes 4 Financial Assumptions (2) Depreciation Rate for First 10 Years % 7% Depreciation Depreciation Rate 11th year onwards % 1.33% Years of 7% rate Years 10 Operations & O&M Lakh/MW 9.00 5 Maintenance Total O&M escalation % 5.72% Expected to be generated per year for next CER Produced 21 years CER/MW/Year 1500 6 CDM Benefits Based on Average ECX rates,( conversion CER Price rate of 1EUR=INR65.26) Rs/CER 744.7 Inverter Current Price of Inverter Rs Lakh/MW 150 Replacement to be 7 Inverter done after every 10 years Replacement year Year 10 4|P a g e
  • 5. 10 MWp Solar PV Power Financial 1.4 Cash Flow Note: Detailed Cash Flow for 25years can be provided if asked for Pre Tax Equity IRR 18% Pre Tax Project IRR 15% 5|P a g e
  • 6. 10 MWp Solar PV Power Financial 1.5 Profit & Loss Account Year 1 2 3 4 5 6 7 8 9 10 11 12 13 Profit Before Rs Tax Lakh 213.92 243.02 279.88 325.48 380.92 561.57 537.55 641.69 761.62 899.30 294.64 1769.12 1743.21 ROE (Before Tax) % 5% 6% 7% 8% 10% 14% 14% 16% 20% 23% 8% 45% 45% ROI (Before Tax) % 2% 2% 2% 3% 3% 4% 4% 5% 6% 7% 2% 14% 13% Rs Tax Lakh 43 48 56 65 76 112 107 128 152 179 98 588 579 Rs Profit after tax Lakh 171.29 194.58 224.10 260.61 305.00 449.65 430.41 513.80 609.82 720.06 196.77 1181.46 1164.16 ROE(After Tax) % 4% 5% 6% 7% 8% 12% 11% 13% 16% 18% 5% 30% 30% ROI (After Tax) % 0% 0% 0% 0% 1% 1% 1% 1% 1% 1% 1% 5% 4% Year 14 15 16 17 18 19 20 21 22 23 24 25 Profit Before Rs Tax Lakh 1716.88 1690.12 1662.88 1635.12 1606.81 1577.91 1548.38 18.17 1431.39 1399.68 1367.15 1333.74 ROE (Before Tax) % 44% 43% 43% 42% 41% 40% 40% 0% 37% 36% 35% 34% ROI (Before Tax) % 13% 13% 13% 13% 12% 12% 12% 0% 11% 11% 11% 10% Rs Tax Lakh 570 561 552 543 534 524 514 6 475 465 454 443 Rs Profit after tax Lakh 1146.58 1128.70 1110.51 1091.97 1073.07 1053.77 1034.05 12.14 955.92 934.74 913.02 890.70 ROE(After Tax) % 29% 29% 28% 28% 27% 27% 26% 0% 24% 24% 23% 23% ROI (After Tax) % 4% 4% 4% 4% 4% 4% 4% 0% 4% 4% 3% 3% Average ROE (BT) 26.27% Average ROI (BT) 7.88% Average ROE (AT) 18.20% Average ROI (AT) 2.42% 6|P a g e