SlideShare a Scribd company logo
1 of 33
LOGISTICS AND SUPPLY CHAIN OF CBU
(COMPLETE BUILT UNIT) IN TOYOTA
SAFETY FIRST QUALITY MUST
Faculty Guide Department Guide Presented By
DR. Ch. Venkataiah Mr. Arun Manager Gelli.V.S.Ch.Swamy
Chair person PGP Mr. Vijay N S, Asst. Manager
GSIB, GITAM University VLD, Toyota Kirloskar Motors
ARUN SAN
Manager of
VLD
VIJAY SAN
Asst. Manager
of VLD
SIDDESH SAN
Dy. Manager of
VLD
KEEPS THE FRESH QUALITY OF CBU FROM PLANT TO
CUSTOMERS
VLD treats, CBU is similar to perishable goods, if is there any delay in delivery
or damage in CBU it’s expensive and difficult to recover fresh quality of product
and we lose customer loyalty.
Production Receive Storage Dispatch
Port
Delivery
Shipment
Dealer
Delivery
Retails
Domestic :
Exports :
H/O from Plant H/O to LP
OVERALL VEHICLE LOGISTICS OWNERSHIP
RECEIVING CARS FROM PLANT – UPTO – DELIVERY TO DEALERS / PORT
....basically, we are the last link from TKM, in the Supply Chain
Getting the right product, to the right customer, in the right quantity, in the
right condition, at the right place, at the right time, and at the right cost
finally it increases the value of company
CUSTOMER
DEALERCUSTOMER TRANSPORTER
VLDPRODUCTION
SALES &
OPERATION
DEALER
In out-bound logistics communication between stakeholders plays a
vital role for improving the quality of services
CUSTOMER
GREET
SALES
EXECUTIVE
ABOUT
TOYOTA
TEST DRIVE
NEEDS OF
CUSTOMER
DEMONSTRATI
ONS
PRODUCT
PRESENTATIO
N
PAYMENT
SMILE &
E.M
ACCESSORIES
PLACE AN
ORDER
CONFORM B.P
DATE
DEALER CAN
RECEIVE C.B.U
ESTIMATED
DELIVERY DATE
ACCESSORIES &
STICKERING
WASHING
POLISHINGBUDJET,
FAMILY, DAILY
TRAVELLING
DISTANCES
DELIVERED
CASH/IN-
FIN/OUT-FIN
ENGINE,
SITTING,
FEATURES
4W D/L FINALIZE THE
COST
CONFORM THE
PAYMENT MODE
MAINTENANCE
Q.C
CUSTOMER
REQUEST
PAYMENT
DONE
1:5
WHEN CUSTOMER WAS READY TO PURCHASE CAR
MODEL ADVANCE BOOKING
PAYMENT
Etios, Etios-Liva 50,000
INNOVA 50,000
Corolla-Altis 50,000
Fortuner 1,00,000 lk
Camry 5,00,000 lk
L.C 200, Prado, Prius 10,00,000 lk
AFTER BOOKING CUSTOMER CAN CONFORM MODE OF PAYMENT
FULL CASH IN-HOUSE
FINANCE
OUT-HOUSE FINANCE
Balance Payment Date Finance Documents Bank Details
Registrations Finance Agreement With
Balance of Payment
Hypothecations Entry In
Bank(form 21)
Delivery Registrations Mode of Payment like DD
or E-transfer
Delivery Registrations
Delivery
SALES EXECUTIVES
TEAMS MODELS
3 Etios, Liva
3 Innova, Fortuner
1 Corolla, Camry
BUSINESS PROVIDED AT
TEAMS PLACE
2 Field
2 Showroom
2 Corporate
1 Government
DPP (M-15) H.O can Divided
Region wise Allocation
like E,W,N,S (M-14)
H.O can consolidate
and fix FIRM ORDER
(M-10)
By using FIRM ORDER
and DPP, H.O can
prepare ASSIGNMENT
up to LOD (M-7)
VLD can provide ETD
& ETA (M-5)
By using
ASSIGNMENT
VLD can prepare
R.O can divided Dealer
wise Allocations
H.O sales
L.P
R.O sales DEALER
M-2CTDMS
PRODUCTION VLDSALES
• Lot making
• Parked in Dispatch Bay
•Physically checked and
inform to EXERCISE
person
FUNDSPLAN
DEALER
CTDMS
MDDP
SAL
F.R can
Generated
FFB/I.F
STOCK
LOGISTICSFINANCE
CTDMSINVOICE
 Cross Check
Share that
Information to
EXERCISE person
15 mints
KEEPS THE FRESH QUALITY OF CBU FROM PLANT TO CUSTOMER
KAKU VLD
QC-
Gate
1
DISPATCH
QC-
Gate
2
NG
OK OK
NG
YARD
DEALER
TRANSIT
QC-
Gate
3
OK
POD
Inform
to
VLD/LP
BILL
NG
Customer Feel
Happy
DOMESTIC EXPORTS
COUNTRY NO. OF
SHIPMENTS
Liners
SOUTH
AFRICA
3/Month NYK/K-LINE
MOURITIUS 1/Month MOL
SEYCELLES 1/Month MOL
ZIMBABWE 1/Month NYK/K-LINE
SRI LANKA 1/Month NYK/K-LINE
ZONES OUTLETS 3S 1S 2S BP
EAST 28 21 7 0 0
3
WEST 50 33 13 3 1
2 3
NORTH 90 61 16 11 2
6 2 1
SOUTH 70 48 8 10 4
6 1
TOTAL 238 238
100Km Lashing/
60kmph/ no ND/
460km per day
YARD-INVLDKAKU
OUT-TRAY
REMOVE
KANBAN
AND PLACE
DEALER
TAG/BAY
Num.
LOT
MAKING
SALES/
BILLING
INVOICE/6 EXCISE PERSON CAN CHK
THE DETAILS OF THE RESP.
FR Num. By RCV. MAIL
FROM FINANCE
VLD /
PHY CHK
DRIVERS CAN
PARK IN RESP.
BAY
QG-2
GRN/4
TRANSPORTER
E-SUGAM
SECURITY
PASSDRIVER
LP send TT as
per matrix/ LF
UN-LOAD
DEALER
QG-1
TRASIT
DOCUMENTS
BANKMDDP STOCK
E-TRANSFERMAIL
POD/
NVRR
QG-2
TKM
TMC/
TMAP
EXPORTER IMPORTER
CONTRACT
• PURCHASE ORDER
• SHIPPING SCHEDULE
CUSTOMS/
ENNORE
CUSTOMS/
DURBAN
TSAM
DELIVER POINT
TKM
CBU’S/ DOC. CBU’S/ DOC.
NEXT MONTH 25TH
LT- 12days
FOB ( Free on Board)
 D/C ( DOCUMENTS AGAINST CREDIT)
WHY SHOULD WE
EXPORTS?
GOVT. INCENTIVES (TOKENS)
INDO-THAI
ASIAN REGION (8 COUNTRIES )
FMS(FOCUS MARKET SCHEME)
FPS(FOCUS PRODUCT SCHEME)
• Wrap guard for export CBU on hood, luggage door, roof panel,
wrist handle.
• Anti rust papers for front wheel discs
• Owner manual book color i.e., Green for exports, Blue for domestic
• Mirror No Caution
• In Engine , Air cleaner with side branch
• VIN slot number at Windshield glass and chassis num on LH RR
door glass.
• Homologation mark was on wireless door lock control
• Engine control unit (ECU) software was changed
• Kaku, for exports we generate A4 sheet of Kaku
• Eye bolt was fitted in front of CBU, for lashing purpose in linear
LOT
MAKING
Yard inKaku
6 5
7 4
8 3
9 2
C 1
wind
ENNORE
PORT
OUT-TRAY
WITH BAY
no.
REMOVE
ONE
KAKU
AND
PASTE ON
A4 SHEET
LOT CONFORMATION
INVOICE/
3
VLD /
PHY CHK
DRIVERS
CAN PARK
IN RESP.
BAY
E-SUGAM
GRN/ 4
ARE/ 5
QG-1
QG-2
TRANSPORTER
SECURITY
PASSDRIVER
WITH- IN
36 Hrs
CONSULT
LP FOR
MATRIX/LF
SON
By using SON IMPEX
generate
DOCUMENTS
BAR CODE
SHEET
CASE
NUMBER
GENERATE
PRE-
ASSIGNM
ENT
CBU
SHIFTED
TO P-YARD
CBU
UNLOADED
BY DRIVER
VEHICLE
SHIFTING TO
GCB
CUSTOMS
CLEARING
(S-1)
CUSTOMS
INSPECTIONS
(S-2)
FINAL
ASSIGNME
NT (S-3)
PORT IN
CHK, write
vessel &
country name,
Barcode
OK
QC
NG
T.P.Y
IMPEX
INFORM
TO
LINEAR
Driver want to
submit
GRN, ARE,
INVOICE,
BARCODE Sheet
DOCUMENTS GIVEN By EXPORTER
To CUSTOMS
•EXPORT INVOICE
•SHIPPING BILL
•EXPORT VALUE DECLARATIONS
•SELF DECLARATIONS
•SEA WAY BILL
CUSTOMER
DEALERCUSTOMER TRANSPORTER
VLDPRODUCTION
SALES &
OPERATION
DEALER
0.00%
20.00%
40.00%
60.00%
80.00%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
India Europe U.S Japan
27%
23%21%
7%
4%
5%
4%
4%
3% 2%
Automotive
Engineering
Others
Chemicals/Fertilizers
Metals
FMCG
Textiles/Apparel
Services
Telecommunications
Transportation
SHARE
COST
TKM
TCI
TLKI
TLI
KTS
TOYOTO
YUSO
TTC
MITSUI
SUB CON
LISTED-769 TT
51 DEDICATED
SUB CON
LISTED-1149 TT
115 DEDICATED
LP’S
J.V
TKM MDDP
Sub con’s are
interested on
particular zones
only
TLKI-CC person can
generate DDP for whole
month by sync. Zone-wise,
dealer-wise
64%
36%
22%
51%
51%
49%
27%
TKM
TLKI
SUB CON
send CC
S-14
TLKI 51 SUB-
CON’S
C-17B-19A-11
TRAINING
/ TESTING
EDUCATION
OTHER
OEM’S
REPAIR
INSP
ECTI
ON
NG
OK
10K
10K
For loading
it takes
2days,
driver
wages
3k=23k
•NO INSPECTION,
•NO REPAIR COST
•NO TRAINING,
•NO TESTING,
•NO WAITING COST
20K
ON DAY
LOADING
….ASSUMPTION
EDUATIO
NS/
TRAINING
CC
INSPECTI
ON
CCM/
FLEET
Mang.
TT
FROM THE PLAN
OF TKM, TLKI
MEMBER CAN
SHARE THE
INFORMATION
PARK
SEND CC
TO TKM
DISPATCH
CONTROL
LER
TOTAL 77
CHK
POINTS
PRE-
DISPATCH
ROOL CALL
VMD
INFORM
BAY
NUM
DISPATCH DOCUMEN
TATION
LOADING
WAITING
FOR
INSPECTION
DEALER
DAILY ROLL
CALL
2TIMES ROLL
CALL,
60KMPH(over
speed), night drive,
lashing chk for
100km… UPDATE in
TKM WEB-TRACK
POD/ NVVR
UNLOADING
QC
CUSTOMER
DEALER
SALES
PRODUCTIONVLD
LOGISTICS
PARTNER
DEALER
1. At kaku area, kaku person can miss handle the form-22. because he want
to close the hood and open the door by carrying form-22 & kaku labels.
Counter measure: Prepare Proper Sop For Carrying Form-22
2. Delay in billing, Waiting until 11a.m due to this the dispatch was started
after 11.30 only and its make burden on closing time of day.
counter measure: We Hope For Coming Months Sales Become Stable
3. washing bay, with washing dispatch the cycle time is 12mints and without
washing dispatch the cycle time is 8mints.
Counter measure: Automatic Washing System Or Water Spray In Yard
4. If heavy winds are coming due to clouded sky, we want to check the yard
due to quality & damage issues, it was happen after we identify heavy wind
flow. So there is a chance any object is hit to CBU.
Counter measure: Place A Wind Identifier, By Placing This Instrument It
Gives Alarm Before Wind Was Coming(expensive).
Toyota gives more importance to Kaizen for every
operation
Its main objective is to Eliminate 3M’s(MUDA,
MURA, MURI)
Project @ Toyota
Project @ Toyota

More Related Content

Similar to Project @ Toyota

Logisticsandsupplychainmanagement napm-wichita-140121142320-phpapp02
Logisticsandsupplychainmanagement napm-wichita-140121142320-phpapp02Logisticsandsupplychainmanagement napm-wichita-140121142320-phpapp02
Logisticsandsupplychainmanagement napm-wichita-140121142320-phpapp02
RakeshNimhan
 
Workshop service blueprint - Detailed
Workshop service blueprint - DetailedWorkshop service blueprint - Detailed
Workshop service blueprint - Detailed
Walter De Weer
 
Six Sigma Project Final
Six Sigma Project FinalSix Sigma Project Final
Six Sigma Project Final
Naman Kapoor
 
daimler presentataion
daimler presentataiondaimler presentataion
daimler presentataion
Anubhav goel
 
Zonic TotalReach Booklet
Zonic TotalReach BookletZonic TotalReach Booklet
Zonic TotalReach Booklet
Crystal Amante
 
Slides for chapter 5
Slides for chapter 5Slides for chapter 5
Slides for chapter 5
khanhdv071
 

Similar to Project @ Toyota (20)

31122016
3112201631122016
31122016
 
Automation of Order-To-Cash process in Oil & Gas for Water Management Services
Automation of Order-To-Cash process in Oil & Gas for Water Management ServicesAutomation of Order-To-Cash process in Oil & Gas for Water Management Services
Automation of Order-To-Cash process in Oil & Gas for Water Management Services
 
Logisticsandsupplychainmanagement napm-wichita-140121142320-phpapp02
Logisticsandsupplychainmanagement napm-wichita-140121142320-phpapp02Logisticsandsupplychainmanagement napm-wichita-140121142320-phpapp02
Logisticsandsupplychainmanagement napm-wichita-140121142320-phpapp02
 
Tech Innovations in the Last-Mile Delivery Sector
Tech Innovations in the Last-Mile Delivery Sector Tech Innovations in the Last-Mile Delivery Sector
Tech Innovations in the Last-Mile Delivery Sector
 
Workshop service blueprint - Detailed
Workshop service blueprint - DetailedWorkshop service blueprint - Detailed
Workshop service blueprint - Detailed
 
Bussines Plan for Car Manufacturing
Bussines Plan for Car ManufacturingBussines Plan for Car Manufacturing
Bussines Plan for Car Manufacturing
 
Final ams power_point_slides-------newwww
Final ams power_point_slides-------newwwwFinal ams power_point_slides-------newwww
Final ams power_point_slides-------newwww
 
Six Sigma Project Final
Six Sigma Project FinalSix Sigma Project Final
Six Sigma Project Final
 
daimler presentataion
daimler presentataiondaimler presentataion
daimler presentataion
 
BROUCHER
BROUCHERBROUCHER
BROUCHER
 
Sun telematics 3 pl
Sun telematics 3 plSun telematics 3 pl
Sun telematics 3 pl
 
Zonic TotalReach Booklet
Zonic TotalReach BookletZonic TotalReach Booklet
Zonic TotalReach Booklet
 
test E4.pptx
test E4.pptxtest E4.pptx
test E4.pptx
 
Role of sale promotion in Banco Product INDIA LTD
Role of sale promotion in Banco Product INDIA LTDRole of sale promotion in Banco Product INDIA LTD
Role of sale promotion in Banco Product INDIA LTD
 
PLC problem troubleshooting
PLC problem troubleshooting PLC problem troubleshooting
PLC problem troubleshooting
 
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #1
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #1Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #1
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #1
 
Slides for chapter 5
Slides for chapter 5Slides for chapter 5
Slides for chapter 5
 
Evaluation and Reduction of Truck Turnaround Time
Evaluation and Reduction of Truck Turnaround Time Evaluation and Reduction of Truck Turnaround Time
Evaluation and Reduction of Truck Turnaround Time
 
Wind Turbine Case Study - June, 2014
Wind Turbine Case Study - June, 2014Wind Turbine Case Study - June, 2014
Wind Turbine Case Study - June, 2014
 
Strategic Sourcing Case Study – Wind Turbine Industry
Strategic Sourcing Case Study – Wind Turbine IndustryStrategic Sourcing Case Study – Wind Turbine Industry
Strategic Sourcing Case Study – Wind Turbine Industry
 

Project @ Toyota

  • 1. LOGISTICS AND SUPPLY CHAIN OF CBU (COMPLETE BUILT UNIT) IN TOYOTA SAFETY FIRST QUALITY MUST Faculty Guide Department Guide Presented By DR. Ch. Venkataiah Mr. Arun Manager Gelli.V.S.Ch.Swamy Chair person PGP Mr. Vijay N S, Asst. Manager GSIB, GITAM University VLD, Toyota Kirloskar Motors
  • 2.
  • 3.
  • 4.
  • 5. ARUN SAN Manager of VLD VIJAY SAN Asst. Manager of VLD SIDDESH SAN Dy. Manager of VLD KEEPS THE FRESH QUALITY OF CBU FROM PLANT TO CUSTOMERS VLD treats, CBU is similar to perishable goods, if is there any delay in delivery or damage in CBU it’s expensive and difficult to recover fresh quality of product and we lose customer loyalty.
  • 6. Production Receive Storage Dispatch Port Delivery Shipment Dealer Delivery Retails Domestic : Exports : H/O from Plant H/O to LP OVERALL VEHICLE LOGISTICS OWNERSHIP RECEIVING CARS FROM PLANT – UPTO – DELIVERY TO DEALERS / PORT ....basically, we are the last link from TKM, in the Supply Chain
  • 7. Getting the right product, to the right customer, in the right quantity, in the right condition, at the right place, at the right time, and at the right cost finally it increases the value of company CUSTOMER DEALERCUSTOMER TRANSPORTER VLDPRODUCTION SALES & OPERATION DEALER In out-bound logistics communication between stakeholders plays a vital role for improving the quality of services
  • 8. CUSTOMER GREET SALES EXECUTIVE ABOUT TOYOTA TEST DRIVE NEEDS OF CUSTOMER DEMONSTRATI ONS PRODUCT PRESENTATIO N PAYMENT SMILE & E.M ACCESSORIES PLACE AN ORDER CONFORM B.P DATE DEALER CAN RECEIVE C.B.U ESTIMATED DELIVERY DATE ACCESSORIES & STICKERING WASHING POLISHINGBUDJET, FAMILY, DAILY TRAVELLING DISTANCES DELIVERED CASH/IN- FIN/OUT-FIN ENGINE, SITTING, FEATURES 4W D/L FINALIZE THE COST CONFORM THE PAYMENT MODE MAINTENANCE Q.C CUSTOMER REQUEST PAYMENT DONE 1:5
  • 9. WHEN CUSTOMER WAS READY TO PURCHASE CAR MODEL ADVANCE BOOKING PAYMENT Etios, Etios-Liva 50,000 INNOVA 50,000 Corolla-Altis 50,000 Fortuner 1,00,000 lk Camry 5,00,000 lk L.C 200, Prado, Prius 10,00,000 lk AFTER BOOKING CUSTOMER CAN CONFORM MODE OF PAYMENT FULL CASH IN-HOUSE FINANCE OUT-HOUSE FINANCE Balance Payment Date Finance Documents Bank Details Registrations Finance Agreement With Balance of Payment Hypothecations Entry In Bank(form 21) Delivery Registrations Mode of Payment like DD or E-transfer Delivery Registrations Delivery SALES EXECUTIVES TEAMS MODELS 3 Etios, Liva 3 Innova, Fortuner 1 Corolla, Camry BUSINESS PROVIDED AT TEAMS PLACE 2 Field 2 Showroom 2 Corporate 1 Government
  • 10.
  • 11.
  • 12. DPP (M-15) H.O can Divided Region wise Allocation like E,W,N,S (M-14) H.O can consolidate and fix FIRM ORDER (M-10) By using FIRM ORDER and DPP, H.O can prepare ASSIGNMENT up to LOD (M-7) VLD can provide ETD & ETA (M-5) By using ASSIGNMENT VLD can prepare R.O can divided Dealer wise Allocations H.O sales L.P R.O sales DEALER M-2CTDMS PRODUCTION VLDSALES
  • 13. • Lot making • Parked in Dispatch Bay •Physically checked and inform to EXERCISE person FUNDSPLAN DEALER CTDMS MDDP SAL F.R can Generated FFB/I.F STOCK LOGISTICSFINANCE CTDMSINVOICE  Cross Check Share that Information to EXERCISE person 15 mints
  • 14. KEEPS THE FRESH QUALITY OF CBU FROM PLANT TO CUSTOMER KAKU VLD QC- Gate 1 DISPATCH QC- Gate 2 NG OK OK NG YARD DEALER TRANSIT QC- Gate 3 OK POD Inform to VLD/LP BILL NG
  • 16. DOMESTIC EXPORTS COUNTRY NO. OF SHIPMENTS Liners SOUTH AFRICA 3/Month NYK/K-LINE MOURITIUS 1/Month MOL SEYCELLES 1/Month MOL ZIMBABWE 1/Month NYK/K-LINE SRI LANKA 1/Month NYK/K-LINE ZONES OUTLETS 3S 1S 2S BP EAST 28 21 7 0 0 3 WEST 50 33 13 3 1 2 3 NORTH 90 61 16 11 2 6 2 1 SOUTH 70 48 8 10 4 6 1 TOTAL 238 238
  • 17. 100Km Lashing/ 60kmph/ no ND/ 460km per day YARD-INVLDKAKU OUT-TRAY REMOVE KANBAN AND PLACE DEALER TAG/BAY Num. LOT MAKING SALES/ BILLING INVOICE/6 EXCISE PERSON CAN CHK THE DETAILS OF THE RESP. FR Num. By RCV. MAIL FROM FINANCE VLD / PHY CHK DRIVERS CAN PARK IN RESP. BAY QG-2 GRN/4 TRANSPORTER E-SUGAM SECURITY PASSDRIVER LP send TT as per matrix/ LF UN-LOAD DEALER QG-1 TRASIT DOCUMENTS BANKMDDP STOCK E-TRANSFERMAIL POD/ NVRR QG-2
  • 18. TKM TMC/ TMAP EXPORTER IMPORTER CONTRACT • PURCHASE ORDER • SHIPPING SCHEDULE CUSTOMS/ ENNORE CUSTOMS/ DURBAN TSAM DELIVER POINT TKM CBU’S/ DOC. CBU’S/ DOC. NEXT MONTH 25TH LT- 12days FOB ( Free on Board)  D/C ( DOCUMENTS AGAINST CREDIT)
  • 19. WHY SHOULD WE EXPORTS? GOVT. INCENTIVES (TOKENS) INDO-THAI ASIAN REGION (8 COUNTRIES ) FMS(FOCUS MARKET SCHEME) FPS(FOCUS PRODUCT SCHEME)
  • 20. • Wrap guard for export CBU on hood, luggage door, roof panel, wrist handle. • Anti rust papers for front wheel discs • Owner manual book color i.e., Green for exports, Blue for domestic • Mirror No Caution • In Engine , Air cleaner with side branch • VIN slot number at Windshield glass and chassis num on LH RR door glass. • Homologation mark was on wireless door lock control • Engine control unit (ECU) software was changed • Kaku, for exports we generate A4 sheet of Kaku • Eye bolt was fitted in front of CBU, for lashing purpose in linear
  • 21. LOT MAKING Yard inKaku 6 5 7 4 8 3 9 2 C 1 wind ENNORE PORT OUT-TRAY WITH BAY no. REMOVE ONE KAKU AND PASTE ON A4 SHEET LOT CONFORMATION INVOICE/ 3 VLD / PHY CHK DRIVERS CAN PARK IN RESP. BAY E-SUGAM GRN/ 4 ARE/ 5 QG-1 QG-2 TRANSPORTER SECURITY PASSDRIVER WITH- IN 36 Hrs CONSULT LP FOR MATRIX/LF SON By using SON IMPEX generate DOCUMENTS BAR CODE SHEET
  • 22. CASE NUMBER GENERATE PRE- ASSIGNM ENT CBU SHIFTED TO P-YARD CBU UNLOADED BY DRIVER VEHICLE SHIFTING TO GCB CUSTOMS CLEARING (S-1) CUSTOMS INSPECTIONS (S-2) FINAL ASSIGNME NT (S-3) PORT IN CHK, write vessel & country name, Barcode OK QC NG T.P.Y IMPEX INFORM TO LINEAR Driver want to submit GRN, ARE, INVOICE, BARCODE Sheet
  • 23. DOCUMENTS GIVEN By EXPORTER To CUSTOMS •EXPORT INVOICE •SHIPPING BILL •EXPORT VALUE DECLARATIONS •SELF DECLARATIONS •SEA WAY BILL
  • 25.
  • 26. 0.00% 20.00% 40.00% 60.00% 80.00% 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 14.00% India Europe U.S Japan 27% 23%21% 7% 4% 5% 4% 4% 3% 2% Automotive Engineering Others Chemicals/Fertilizers Metals FMCG Textiles/Apparel Services Telecommunications Transportation SHARE COST
  • 27. TKM TCI TLKI TLI KTS TOYOTO YUSO TTC MITSUI SUB CON LISTED-769 TT 51 DEDICATED SUB CON LISTED-1149 TT 115 DEDICATED LP’S J.V TKM MDDP Sub con’s are interested on particular zones only TLKI-CC person can generate DDP for whole month by sync. Zone-wise, dealer-wise 64% 36% 22% 51% 51% 49% 27%
  • 28. TKM TLKI SUB CON send CC S-14 TLKI 51 SUB- CON’S C-17B-19A-11 TRAINING / TESTING EDUCATION OTHER OEM’S REPAIR INSP ECTI ON NG OK 10K 10K For loading it takes 2days, driver wages 3k=23k •NO INSPECTION, •NO REPAIR COST •NO TRAINING, •NO TESTING, •NO WAITING COST 20K ON DAY LOADING ….ASSUMPTION
  • 29. EDUATIO NS/ TRAINING CC INSPECTI ON CCM/ FLEET Mang. TT FROM THE PLAN OF TKM, TLKI MEMBER CAN SHARE THE INFORMATION PARK SEND CC TO TKM DISPATCH CONTROL LER TOTAL 77 CHK POINTS PRE- DISPATCH ROOL CALL VMD INFORM BAY NUM DISPATCH DOCUMEN TATION LOADING WAITING FOR INSPECTION DEALER DAILY ROLL CALL 2TIMES ROLL CALL, 60KMPH(over speed), night drive, lashing chk for 100km… UPDATE in TKM WEB-TRACK POD/ NVVR UNLOADING QC
  • 31. 1. At kaku area, kaku person can miss handle the form-22. because he want to close the hood and open the door by carrying form-22 & kaku labels. Counter measure: Prepare Proper Sop For Carrying Form-22 2. Delay in billing, Waiting until 11a.m due to this the dispatch was started after 11.30 only and its make burden on closing time of day. counter measure: We Hope For Coming Months Sales Become Stable 3. washing bay, with washing dispatch the cycle time is 12mints and without washing dispatch the cycle time is 8mints. Counter measure: Automatic Washing System Or Water Spray In Yard 4. If heavy winds are coming due to clouded sky, we want to check the yard due to quality & damage issues, it was happen after we identify heavy wind flow. So there is a chance any object is hit to CBU. Counter measure: Place A Wind Identifier, By Placing This Instrument It Gives Alarm Before Wind Was Coming(expensive). Toyota gives more importance to Kaizen for every operation Its main objective is to Eliminate 3M’s(MUDA, MURA, MURI)

Editor's Notes

  1. 6