1. Integrity DiligenceCuriosityMotivation
Inductotherm Group Taiwan
Electrical Engineer (2015/8-2016/9)
• Main tasks:
– Designed, customized, organized, debugged and revised units’ power
circuit diagrams.
– Drew and designed water circuit diagrams, water pipes connection
diagrams, and water control panel single wires.
– Verified units’ components and established BOM.
– Calculated induction coils.
– Translated technology documents and interpreted inquiries from engineers
or clients to find the solutions.
• Distributions:
– Save budget, let melting department from debt situation to profit situation.
Name: Yeh, Chuan Ching E-mail:
oweeisme@gmail.com
2. Integrity DiligenceCuriosityMotivation
Inductotherm Group Taiwan
Electrical Engineer (2015/8-2016/9)
Water circuit design BOM establishedData collection(unassigned)
Revised unit’s power circuit Water control wire design Pipes connection design
Name: Yeh, Chuan Ching E-mail:
oweeisme@gmail.com
3. Integrity DiligenceCuriosityMotivation
Inductotherm Group Taiwan
Electrical Engineer (2015/8-2016/9)
Name: Yeh, Chuan Ching E-mail:
oweeisme@gmail.com
Assisted test engineer to debug
Verified components and established BOM
Verified IC’s functions
Calculated coils and checked