A CITY OF OPPORTUNITIES
DNIPRO MAYOR BORYS FILATOV:
“Our goal is to relieve businessmen, investors, and ordinary citizens
of the obligation of communicating with state functionaries. By
reducing contact between the public and civil servants, we reduce
corruption and make life easier for everyone”.
Mayor Filatov personally welcomes investors to the city and will help
ease their market entry at all stages of their business activity in the city
of Dnipro.
3
5
CONTENTS
1. Message from the Mayor
2. Contents
3. Dnipro in Ukraine and the World
4. Dnipro City History
5. Dnipro Today
5.1. Dnipro at a Glance
5.2. Economy
5.3. Education
5.4. Culture & Tourism
6. City development strategy
6.1. City Development Strategy
6.2. New industrial parks and zones
of economic development
6.3. IT Cluster
6.4. Theme parks
6.5. Energy saving
6.6. Development of transport
6.7. Ecology and waste
7. Investment projects
7.1. Industrial Park
7.2. IT park offices and residential
area
7.3. Expocenters
7.4. "Space Lift" Science and
Technology Park
7.5. "Academia" Science and
Technology Park
7.6. Float-glass factory
7.7. Modernization of the transport
system
7.8. New highways
7.9. Ropeway
7.10. Dnipro International Airport
7.11. Business Aviation Terminal
7.12. Air Cargo Terminal and Hub
7.13. Thermodernization of Municipal
Buildings
7.14. Integrated
Thermo-Modernization of
Muncipal Buildings
7.15. Waste-to-Energy Processing
Complex
7.16. Agropark
7.17. Fruit And Vegetable Storage
and Sorting Facility
7.18. Leisure Centre "Golf Resor"
7.19. Logistics Center "Green Market"
7.20. Polymer Materials Sheets
Production
7.21. Production of Polimer Coatings
on Galvanized Steel or
Aluminum Sheets
7.22. Production of Bio Fuel Pellets
7.23. Production of Tanks from
Polymer Materials
7.24. Atmospheric Air monitoring
system
7.25. "Staryy Kodak" tourist and
recreation park
7.26. "Stara Samar" tourist and
recreation park
7.27. The Museum of History of the
City of Dnipro
3
5
6
7
15
16
17
18
20
27
28
29
30
31
32
32
32
33
34
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
59
60
6
Poltava 200 km
Kharkiv 220 km
Mariupol 350 km
Zaporizhzhia 80 km
Kherson 330 km
Kropivnitsky 270 km
Vinnitsa 570 km
Kyiv 480 km
Odessa 520 km
Krivy Rig 145 km
DNIPRO ON THE MAP THE WORLD
DNIPRO IN UKRAINE
DNIPRO
CITY
HISTORY
Reconstructions by Alexander Kharlan
STARYY KODAKNOVYY KODAK
COMMODITY SEALS
COINS
8
STRONG TRANSIT TRADE WITH HANSA LEAGUE, HOLLAND, OTTOMAN
EMPIRE AND POLAND IN XVI-XVIII CENTURIES
HISTORY
THE CITY AROSE ON THE BASIS OF THE SYSTEM OF COSSACK SETTLEMENTS
IN 1524
STARA SAMAR
HISTORY
AT THE END OF XVIII CENTURY RUSSIAN EMPIRE PLANNED TO CREATE
HERE ITS THIRD SOUTHERN CAPITAL AND FORPOST
GOVERNOR'S HOUSE
FIRST PLAN OF EKATERINOSLAV CITY
THE SAVIOUR'S TRANSFIGURATION CATHEDRAL
IN THE XIX CENTURY EKATERINOSLAV CITY USED TO BE THE CENTRE OF
PROVINCE OF RUSSIAN EMPIRE WITH NO INDUSTRY
HISTORY
9
ALEXANDER PAUL
10
THE RAMPANT TAKE-OFF OF THE CITY STARTS FROM THE END OF XIX
CENTURY. ALEXANDER PAUL DISCOVERED IRON ORE AND BUILT THE
RAILWAY
HISTORY
BELGIAN TRAM
FACTORIES OF THE TIMES OF "IRON FEVER"
HISTORY
11
IRON FEVER: EXPERIENCING QUICK GROWTH DUE TO GERMAN,
FRENCH AND BELGIAN INVESTMENTS, IRON AND STEEL BECAME THE
MAIN INDUSTRY OF THE CITY
HISTORY
DURING THE SECOND WORLD WAR, FIERCE FIGHTING WAS TAKING PLACE
IN THE CITY
HISTORY
AMUR BRIDGE
HOTEL "UKRAINE"
2017
2017
1941
1941
12
MAIN OFFICE BUILDING YUZHMASH FACTORY
FROM 1950TH
THE CITY BECAME THE CENTRE OF ROCKET-BUILDING
INDUSTRY OF THE SOVIET UNION
HISTORY
ROCKET "SATAN"
HISTORY
13
AFTER UKRAINE BECAME INDEPENDENT, "YUZHMASH" COMPANY
STARTED DEVELOPING SPACE ROCKETS, INCLUDING JOINT PROJECT WITH
USA "SEA LOUNCH"
REGIMENT DNIPRO-1 ON THE POSITION OF "REPUBLIC BRIDGE"
THE MEETING TO SUPPORT INDEPENDENCE OF UKRAINE, 19TH
OF FEBRUARY 2014
14
IN 2014 DNIPRO CITY OPPOSED RUSSIAN SUPPORTED HYBRID WAR.
PRO-UKRAINIAN POSITION OF THE INHABITANTS AND THE HIGHEST
NUMBER OF VOLUNTEER SOLDIERS IN UKRAINE STOPPED RUSSIAN
AGRESSION
HISTORY
DNIPRO
TODAY
DNIPRO KEY FACTS
DNIPRO INDUSTRIAL
DNIPRO INNOVATIVE
Distance to Kyiv – 465 km
Area – 405 km2
Population – 1002 thousand
Universities - 10
Age - 35% of population is from 20 to 40
9 business centers
900 m2 of retail space per 1000 inhabitants
DNIPRO TOURISTIC
67 hotels
20 shopping and entertainment complexes
460 cafes,
22 nightclubs
SPORT
The main arena of Ukraine in canoeing and kayaking
862 m cableway for water skiing and wakeboarding
Dnipro soccer arena
10,2% of the GNP OF UKRAINE
16% of total EXPORTS OF UKRAINE
1100 large and medium-sized companies
240 of them are industrial
25% of the region's total industrial products
STEEL INDUSTRY: 12 large and medium-sized enterprises
ENGINEERING: aviation, mine hydraulics, special electric
drives
CHEMICAL AND PROCESSING INDUSTRY:
rare gases production, battery production
LIGHT INDUSTRY: high quality sewing, food industry
FOOD INDUSTRY: sunflower oil
AEROSPACE:
Serial production, the most environmentally friendly
rocket carriers in the world
Telecommunication and remote sensing satellites
Participation in projects of ANTARES RN, Alcántara
High-end devices and systems
IT OUTSOURCING: 7000 EMPLOYED, TOP-3 IT
COMPANIES IN UKRAINE
DNIPRO AT A GLANCE
16
Consulate General of Germany
Honorary Consulate of the Republic of Lithuania
Honorary Consulate of the Republic of Austria
Honorary Consulate of Czech Republic
POWERFUL INDUSTRIAL POTENTIAL
Іndustrial enterprises produce 4,5% of all industrial
products of Ukraine
The basis of the cityʼs industry is the metallurgy (12 large
and middle enterprises). The metallurgical complex
produces 6,9% of the total production volume of the
ferrous metallurgy of Ukraine
The cityʼs machine-building and metal-processing
industries produce 10,5% of the national production
volume of the machine-building complex
7 enterprises of the cityʼs chemical industry produce 7,5%
of the total production volume of chemical and
petrochemical industry of Ukraine
The cityʼs light, food and processing industries produce
foodstuffs in volume of 5,6% of the total production of
Ukraine
The cityʼs building complex is on the second place in
Ukraine: 150 building organizations, 56 design companies,
540 small-scale building companies
FOREIGN TRADE
The city has foreign economic activity almost with 130
countries of the world. The volume of export-import
operations is over 7% of the external turnover of Ukraine
TWIN CITIES AGREEMENTS
CONSULATES
The volume of export in 2016 is 1,3 USD billion
The volume of import in 2016 is 1,9 USD billion
Vilnius
Herzliya
Dalian
Xian
Zilina
Kutaisi
Zugdidi
Durham
Saloniki
Tashkent
Szczecin
Szolnok
Bern
Lithuania
Israel
China
China
Slovakia
Georgia
Georgia
Canada
Greece
Uzbekistan
Poland
Hungary
Switzerland
ECONOMY
DNIPROTODAY
17
Dnipro is a major educational centre in Ukraine
and is home to two of Ukraine's top-ten
universities.
10 UNIVERSITIES
203 PRESCHOOL EDUCATIONAL
ESTABLISHMENTS
NUMEROUS OUT-OF-SCHOOL INSTITUTIONS
SUCH AS YOUTH CLUBS AND CENTERS
181 EDUCATIONAL INSTITUTIONS AMONG
THEM SCHOOLS, GYMNASIUMS AND
BOARDING SCHOOLS
18
EDUCATION
HIGHER EDUCATION
One of Dnipro cityʼs points of pride is its higher education.
It has a long and rich history. Its students, graduates and
academics have long been known and appreciated
worldwide, especially in the following areas: space
programme, creation of energy-saving and environmentally
friendly technologies in mining, metallurgy, chemical
industry, construction, agriculture. Currently, there are 87
thousand students in all higher education
establishments of Dnipro.
In 2017 Ukraineʼs Higher Education system was ranked as
the top in Eastern Europe by Universitas 21, ahead of Czech
Republic, Poland, Slovenia, Russia and Slovakia. The research
group sited high Education spending as a proportion of GDP
compared to other nations as a likely cause of Ukraine having
the best post secondary system in East Europe.
THE MOST RENOWNED UNIVERSITIES OF DNIPRO:
NATIONAL MINING UNIVERSITY OF UKRAINE
NATIONAL UNIVERSITY OF RAILWAY TRANSPORT
ALFRED NOBEL UNIVERSITY
OLES HONCHAR NATIONAL UNIVERSITY
NATIONAL METALLURGICAL ACADEMY OF UKRAINE
DNIPROTODAY
19
HIGHER EDUCATION
Art Center «Kvartira»
One-man show "The Scream" Dnipro Theater Opera and Ballet Dnipro House of Organ and Chamber
Music
Picture Gallery «TELEGA» Art Gallery ”Artsvit”
Black Lizard Gallery-book store Art center «I Gallery» Art Museum
Dnipro Philharmonic named after
L. Kogan
Dnipro Theater of Drama and Musical
Comedy
Theatre of Ukrainian Drama named after
Taras Shevchenko
20
CULTURE & TOURISM
DNIPRO IS RENOWNED FOR RICH AND ACTIVE CULTURAL LIFE HAVING 8
THEATERS, 4 MUSEUMS, 3 CONCERT HALLS, 86 LIBRARIES, 9 MOVIE HALLS,
16 CLUBS, 67 HOTELS
Technical museum RetroAuto The museum of ukrainian painting Dnipro region Antiterrorist operation
museum
Dnipro National Historical Museum named after
D. Yavornitsky
Dnipro Museum of D. Yavornitsky
Museum centre of O. Blavatska and her family Dnipro Planetarium
Museum “Jewish Memory and Holocaust in Ukraine”The museum “Literary Dnipro”
DNIPROTODAY
21
Dnipro is a place of considerable touristic charm. Located on the banks of the Dnipro River in a region rich in
natural beauty and steeped in Ukrainian Cossack tradition, todayʼs Dnipro offers a range of recreation and
leisure activities that make it a fun city break destination.
This chic boulevard is a relatively new and fresh arrival to the Dnipro downtown architectural ensemble. It is one of the cityʼs
most popular eating out and retail focuses. The district includes a range of fountains and other funky design elements such as
overhead decorations. In the long and sultry summer months, it plays host to a series of terraces and streetside cafes that attract
Dniproʼs beautiful people.
EKATERINOSLAVSKIY BOULEVARD
22
TOP DNIPRO TOURIST ATTRACTIONS
MONASTERY ISLAND
This downtown natural treasure is a wonderful place for
family strolls and romantic interludes all year round.
Connected to the city via a pedestrian bridge, it forms part of
Dniproʼs largest park complex – Shevchenko Park. Monastery
Island is home to one of Ukraineʼs largest Shevchenko
monuments and boasts some of the cityʼs best beaches.
Weekenders can also enjoy a zoo, pony riding club, and
various cafes. The island abounds in greenery and is a great
place to chill out if you are looking to get away from the big
city bustle without travelling out of town.
Known to many as "Ukrainian House" or "The House of
Khrennikov", this local landmark is a classic example of
Ukrainian modernist architecture. Built in 1912 by prominent
businessman Vladimir Khrennikov, this four-story building
has won plaudits as the architectural embodiment of
Ukrainian national traditions. Ukrainian ethnographer and
historian Dmytro Yavornytsky played a key role in the
development of the architectural plans behind the building
and helped to add elements of authenticity. With its tower
topped by wrought iron spikes, tiled roof and white walls, the
building is reminiscent of architectural styles common during
the era of the Zaporizhia Sich and the heyday of the
Ukrainian Cossacks. The buildingʼs ornate and detailed
decorations include the Coat of Arms of the Zaporizhia Army
– a Cossack with a musket and a sword. This monument to
Ukrainian architectural heritage miraculously survived the
destruction of WWII and serves today as one of the cityʼs top
hotels.
Dnipro is home to Ukraineʼs largest aquatic sports complex, the Sentosa Cable Park. The park is popular for wakeboarding
and water skiing. It has already gained a reputation beyond Ukraine as a venue for international competitions. Sentosa Cable
Park boasts state-of-the-art facilities and offers a dose of adrenaline close to the city center. This is an extremely popular
hangout during the summer season and is a great place to improve your waterski skills with the help of qualified instructors.
GRAND HOTEL "UKRAINE"
UKRAINEʼS EXTREME WATERSPORTS CAPITAL
DNIPROTODAY
23
TOP ATTRACTIONS
SAMAR DNIPRO FEST
This festival offers a window into Ukrainian history and
incorporates authentic elements from across a range of
different eras including everything from the Middle Ages to
the present day. The festivities are diverse and dynamic, with
arts and crafts alongside literature and period performances.
There is also an accent on contemporary Ukrainian music,
giving the event a traditional festival feel. The Samar Dnipro
Fest is hosted at a cultural heritage site that occupies an
important place in national folklore – Stara Samar Fortress,
which dates back to the Ukrainian Cossack period.
RELIGIOUSLY DIVERSE DNIPRO
Throughout its history, Dnipro has always been home to a
wide variety of different religious communities. This
cosmopolitan heritage is reflected in the presence of
numerous houses of worship that continue to coexist and
function in the city. For example, visitors will find a range of
different Ukrainian Orthodox, Catholic, and Protestant
churches to explore. The cityʼs diverse religious traditions
have helped to create a culture of tolerance while providing
a welcoming environment for people of all faiths.
DNIPROʼS ICONIC STONE WOMEN
The Dnipro History Museum is home to one of the worldʼs largest collections of ancient steppe sculptures. A number of
fascinating female statues stand outside the museum, offering an echo of a long-forgotten era when nomadic peoples
dominated the surrounding region. Known to locals as Dniproʼs “Stone Women”, these iconic figures serve as a reminder of the
many different cultures to leave their mark on Ukraine over the centuries. Similar stone statues dot the landscape throughout
todayʼs Ukraine, with many looking out across the countryʼs seemingly endless southern steppe lands. Female figures tend to
dominate this genre of stone sculpture, hinting at ancient associations with fertility.
24
TOP ATTRACTIONS
ROCKET PARK IN A ROCKET CITY
SENSATIONAL SUMMER SAILING
DNIPROTODAY
25
Dniproʼs status as the capital of the Soviet Unionʼs rocket program earned it the twentieth century nickname "Rocket City".
You can catch a flavor of this locally produced ballistic brilliance by visiting Dniproʼs dedicated Rocket Park complex, which
boasts a number of giant exhibits guaranteed to thrill fans of Cold War relics. The park serves as a reminder that Dnipro remains
the capital of Ukraineʼs space industry and a significant player in the international rocket and missile industry. It is also home to
the Alexander Makarov Aerospace Museum – Ukraineʼs only museum dedicated to rocket and space technologies.
Who needs the seaside when you have one of the worldʼs
biggest and most beautiful rivers running right through the
middle of town? The Dnipro River serves as a giant
playground for the entire city and is an endless source of
entertainment. Sailing is a popular pastime and visitors in the
spring and summer months will see dozens of pleasure boats
cruising up and down the river.
TOP ATTRACTIONS
CITY
DEVELOPMENT
STRATEGY
DNIPRO VISION OBJECTIVES
MEGAPOLIS
Increase population in the
city and region by 15%
NEW JOBS Create 100K new jobs
ADVANCED
INDUSTRIES
Create technological and
science parks with 20K
employees
INVESTMENTS
Attract USD 10 billion over
the next 10 years
LIVEABILITY
Achieve cleaner
environment
Advance urban agriculture
Improve recreation
industry
BRAND
Create the new image of
the city as a cosmopolitan,
spacious, and innovative
place
28
CITY DEVELOPMENT STRATEGY
19TH
CENTURY
TECHNOLOGIES
INDUSTRIAL PLANTS
20TH
CENTURY
TECHNOLOGIES
INDUSTRY 4.0
STRATEGY
29
NEW INDUSTRIAL PARKS &
ZONES OF ECONOMIC DEVELOPMENT
Industry 4.0
30
DNIPRO IT COMMUNITY KEY FACTS &
VALUE PROPOSITION
LOCATION VALUE PROPOSITION
IT CLUSTER ADVANTAGES
7000 IT LABOR POOL
7 UNIVERSITIES WITH
1000 IT GRADUATES/YEAR
170+ COMPANIES IN THE IT SECTOR
Strong math, science & engineering education
Scalable & mature IT market
High level of competences, commitment, communication
skills, cultural proximity to European countries is very
suitable for R&D tasks
Low operating costs
IT CLUSTER MISSION:
Create a balanced IT ecosystem in the region for IT
business development
IT CLUSTER GOALS:
Regional IT industry representatives consolidation for IT
industry promotion
IT business development and support of related activities
Creation of attractive investment climate in Dnipro and
Ukraine in general
Support the development of socially important industries –
education, law, infrastructure, promotion
Excellent location in terms of number of innovation and
R&D centers, product companies and startups
8+ years in the local IT market for 20+ IT companies
Very affordable senior management talents which are full
professional
Almost 80% of teams use agile development
methodologies
40%+ of IT specialists are senior software engineers
Average years of experience for Senior level close to
Western Europe standards
IT CLUSTER
KEY IT SERVICE PARTNERS
STRATEGY
31
THEME PARKS
ONE OF THE MAIN PILLARS OF DNIPRO CITY DEVELOPMENT STRATEGY IS
THE CREATION OF A MULTITUDE OF THEME PARKS. THEY WILL INCREASE
CITYʼS COMFORT OF LIVING AND ATTRACT LOCAL AND INBOUND
TOURISTS USING HUGE RECREATIONAL POTENTIAL OF OUR CITY
ENTERTAINMENT PARK EXTREME PARK
WATER SPORTS PARK
SPACE PARK
STARA SAMAR TOURIST & RECREATION PARK
In the Monitoring, based on the indicators recommended
by the International Energy Agency, the estimated energy
efficiency level in Ukraine in 2017 was 60% of the EU level.
Two thirds of the energy saving potential falls on the
industry and the residential sector
According to the Action Plan for sustainable energy
development in the city of Dnipro for the period from
2015 to 2025, Dnipro undertakes to increase energy
efficiency and increase the use of alternative and
renewable sources of energy
The "Covenant of Mayors" obliges Dnipro to reduce its CO2
emissions by at least 30% by 2030 by implementing
energy-saving technologies and renewable energy
sources. Therefore, huge investment possibilities are open
to companies investing in enegy efficiency projects in the
industry and real estate
COMPREHENSIVE PROGRAM OF ECOLOGICAL
SAFETY AND INTRODUCTION OF SUSTAINABLE
ECOLOGICAL LOW CARBON DEVELOPMENT OF THE
CITY OF DNIPRO FOR 2016-2020 HAS SEVERAL
PRIORITES:
Introduction of technologies of utilization of industrial
wastes with the purpose of maximum level of the
involvement of waste in the technological processes of
production
improvement of the system of collection, transportation,
utilization and processing of solid domestic wastes
development of the environmental monitoring system
improvement of technological processes of production,
introduction of the best available technologies for
minimization of technogenic influence on the environment
ENERGY SAVING
ECOLOGY AND WASTE
CITY TRANSPORT DEVELOPMENT
KEY STRATEGEIC POINTS:
development of transport infrastructure by means
construction of passenger terminals, rolling stock upgrade;
priority development of environmentally friendly modes of
transport (tram, trolleybus, metro, etc.);
improving the investment climate by creation of favorable
conditions for attractiveness of the transport industry;
Improvement of payment system in urban transport.
DEVELOPMENT OF TRANSPORT
32
INVESTMENT
PROJECTS
INDUSTRIAL PARK COMPONENTS
Road/transport and engineering infrastructure, office
premises, pre-school facilities, vocational school
Industrial production sites
Regional multi-purpose exhibition center
R&D, experimental production, business incubator
COMMERCIAL SITES FOR:
office premises for IT community
apartments for IT-cluster and industrial park employees
City center
distance - 4,6 km
International airport
DNK, class 4С, distance - 21,2 km
River port
Navigation: Mar-Dec
Throughput: 5,7 mln tons
3 cargo terminals
16 piers
Draught – up to 4 m
distance - 3,8 km
Railway station
"Nizhnodniprovsk – Junction Station"
Customs terminal, cargo processing terminals for 3 t, 5 t
20 and 40-feet containers (distance - 3,1 km)
INDUSTRIAL PARK 61,4 ha
INDUSTRIAL ZONE 50,4 ha
RESIDENTIAL COMPLEX 5,45 ha
PUBLIС COMPLEX 5,5 ha
PROJECT DESCRIPTION
TOTAL INVESTMENTS REQUIRED – USD 158 MLN
PROJECT PARAMETERS
34
INDUSTRIAL PARK
INDUSTRIAL PARK LOCATION:
PREFERENCES FOR RESIDENTS OF
THE INDUSTRIAL PARK
FROM THE STATE
According to the Law of Ukraine "On Industrial Parks":
Zero-Interest loans
Special purpose grants for the development of the
industrial park
Preferences in the Law of Ukraine "On amendments to
the Tax Code":
real-estate tax exemption
land tax exemption
land rent payment exemption
exemption from profit tax (to be enacted)
extension of import VAT payment (to be enacted)
Preferences stated in the Law of Ukraine
"On amendments to Customs Code":
import duties exemptions
preferences on import duties
FROM THE CITY
Roads and transport infrastructure
Engineering networks
Vocational school
Land plots ready for rent
Land plots ready for connection to engineering networks
Exemption from shared funding of the development of
municipal infrastructure in case of construction within the
industrial park (10-15% of the estimated cost of the
facility)
Preferential local taxes
Other preferences from the city
Public transportation, regional station, cableway station
(planned)
Synergy effect from close allied production sites location
FROM THE OPERATOR COMPANY
Land plots at the territory of the industrial park ready for
design and construction works
Individual approach to land plot selection
Up-to-date topographic and geodesic information
Geological research
"Turn-key" design and construction services
Legal assistance
Centralized connection to municipal engineering
networks
PR services
Security
Maintenance and logistic
Internal transport
Food courts, auxiliary services, recreational areas
PROJECTS
35
IT-PARK:
1. Office premises
2. Apartments for lT-park and industrial park
employees
3. Pre-school facilities
INDUSTRIAL ZONE:
4. Industrial production sites
5. Exhibition center
6. Business incubator, R&D, Experimental production
ADDITIONAL SERVICES:
7. Hotel
8. Park, green areas
9. Trade and catering facilities
10. Medical complex
11. Sports complex
AREA
61,4 ha
614000 m2
IT-park offices, and residential area buildings are planned
to be build on the territory of the industrial park. This area will
accommodate IT-park, Business incubator and Industrial area
specialists, as well as the visitors of the exhibition hall.
General area of office accommodation - 50 000 m2
Effective area of office accommodation - 40 000 m2
Total area of residential accommodation – 25 000 m2
Capital expenditure – USD 52,5 mln (including design
works)
Payback period – 10 years
IT PARK OFFICES & RESIDENTIAL AREA
36
PROJECT DESCRIPTION
PROJECT PARAMETERS:
PROJECT COST - USD 14 MILLION
It is planned to build a regional exhibition center on the
territory of the industrial park at Slobozhansky Highway. The
territory of the exhibition complex is 4.2 hectares.
INDUSTRIAL EXHIBITION:
I stage: 6 000 m2
II stage: 8 000 m2
Parking space: 15 000 m2
PROJECT COST - USD 80 MILLION
THE TERRITORY OF THE EXHIBITION COMPLEX IS 16
HECTARES
EXHIBITION AREA 50 000 M2
According to the decisions of the Project Master Plan,
Part of the Quay is transferred from the industrial lands to
the territory of residential and public use.
Reconstruction of Railway Square provides creation of
transitions and concourses from the station to the
embankment.
The attraction of this place is its proximity to the city center,
transport links and location on the banks of the Dnipro River.
PROJECTS
37
PROJECT DESCRIPTION
PROJECT DESCRIPTION
EXPOCENTERS
SCIENCE AND TECHNOLOGY PARK
Science and technology park is the part of innovation and
business ecosystem in Dnipro.
Science and technology park is a strategically planned,
purpose built work environment designed to locate in close
physical proximity university, government and private
research bodies involved in a particular field of endeavour.
There the knowledge can be shared, innovation promoted
and research outcomes progressed to viable commercial
products.
MOVABLE PRE-INCUBATOR
"SPACE LIFT" S&T PARK
STAGE 1: INNOVATION AND BUSINESS PARK
Apartments 25 000 m2
all-together, incl:
for S&T Park 10 000 m2
for IT - cluster 15 000 m2
Innovation & business, R&D zone 35 000 m2
all-together,
incl. 10 000 m2
already existing buildings (to be renovated),
25 000 m2
new buildings:
for S&T Park 10 000 m2
for IT- cluster 15 000 m2
STAGE 2: STAGE 1 INCLUDING UNIVERSITIES
Includes major universities of Dnipro city:
Dnipro State University, Dnipro Polytechnika, Transport
institute
STAGE 3: SERENDIPITY POLIS OF DNIPRO
Creative industry and business industrial zone:
InnoCampus (Marketing & Advertisement innovations)
10 additional business & industrial park
STAGE 4: UKRAINE - SERENDIPITY STATE
All-Ukrainian application
PROJECT COST:
Stage 1: USD 750 000
Multi-functional Mobile pre-incubator allows for the incubator's team to be closer to innovators, startups for more accessible
and faster incubation.
PROJECT DESCRIPTION
PROJECT PARAMETERS:
38
PROJECT DESCRIPTION
PROJECT PARAMETRS
Description of the project: the creation of science and
technology park in Dnipro City
Location of the project: Dnipro National University,
Dnipro National University of Railway Transport
Total cost of the project: USD 20 mln
Project duration: 3 years
Payback period: 6 years
PROJECT PRODUCT
1500 new jobs
300 residents in the technological park
20 new innovative companies annually
USD 20 mln / year annual increase in innovative products
1000 annual increase in new jobs
Involvement of international investments into the region
PROJECT ADVANTAGES
Assistance from the municipal authorities
Dnipro is the center of space, IT and agrarian branches of
Ukraine
Synergy of Science, Business and Municipal Authority
Very attractive campus area with sports facility and the
park
FORMS OF COOPERATION
Investor's share participation
PROJECT INITIATOR
Dnipro Development Agency
www.dda.dp.ua
info@dda.dp.ua
ENGINEERING INFRASTRUCTURE
Distance from the
nearest routes
Water, gas, electricity
2 km - Route H08
In sufficient quantity
Soborna SquarSoborna Squar
Gagarin ave
Gagarin ave
3 km3 km
Kazakova
str
Kazakova
str
PROJECTS
39
"ACADEMIA" SCIENCE & TECHNOLOGY
PARK
CHARACTERISTICS OF PRODUCTION PLOT
Area
Purpose of land plot
Kind of ownership
40 ha
Industrial land
Municipal land
ENGINEERING INFRASTRUCTURE
Distance from the
nearest roads
Water, gas, electricity
Access road - 100 m
Distance from the railway -
100 m
Water supply:
distance - 50 m, Gas – none.
The power line substations:
on site, 10kV
Description of the project: construction and
commissioning of a plant for the production of sheet float
glass
Location of the project: the site for the future facility may
be allocated at the territory of industrial park of the city of
Dnipro or on other available locations
Resources of the initiator (municipalities) for the project:
Land plot of 40 hectares
Description and economic feasibility of the project for the
construction and commissioning of a float glass plant
Total cost of the project: USD 150 - 300 mln (depends on
the chosen technology)
Term of the project: 1,5-2 years – the period of design
and construction
Payback period: 6-7 years
PROJECT PRODUCT
The product is sheet float glass for windows
PROJECT ADVANTAGES
Assistance from the authorities in obtaining technical
specifications, permits, licenses, certificates for construction
and operation of the plant.
Directed to 100% of import substitution.
Sites for production placement prepared.
FORMS OF COOPERATION
Credit, project finance, foreign direct investment
PROJECT INITIATOR
Dnipro Development Agency
40
FLOAT GLASS FACTORY
PROJECT DESCRIPTION
PROJECT PARAMETRS
PROJECTS
41
THE PROJECT CONSISTS OF THE CONSTRUCTION OF
THREE STAGES:
First stage – completion of construction of the existing
subway line and depot
Second stage - construction of three new stations
(Teatralna, Central, Historical Museum)
Third stage - construction of additional sites (civil defence
and dual-purpose sites) located both on the existing
subway area and at the site under construction (second
launch complex)
Construction period - 5 years, completion is scheduled for
2021
The project is financed by credit facilities for agreements
between the Ministry of Finance of Ukraine and the
European Bank for Reconstruction and Development
co-financed by the European Investment Bank, totaling
EUR 224 mln
The project envisages the construction of a trolleybus line
of 3,8 km, the modernization of one traction substation and
the construction of one dispatching center
Approximate cost of the project is USD 1,2 mln
The project envisages construction of a trolleybus line of
2,8 km, construction of one dispatching center,
modernization of one traction substation, installation of 62
contact sysyem masts
The cost of the project is USD 1 mln
The project envisages: construction of a trolleybus line of
19 km, construction of three traction substations and two
dispatching stations, modernization of two traction
substations
The estimated cost of the project is USD 9,2 mln
Purchase of 50 trolleybus machines financed by the
European Bank for Reconstruction and Development,
amounting to USD 12,3 mln and leasing of 13 Belarusian
trolley buses manufactured by OJSC "Belkommunmash"
COMPLETION OF "DNIPRO METRO LINE"
CONSTRUCTION OF THE TROLLEYBUS
LINE IN THE SOKIL RESIDENTIAL AREA
CONSTRUCTION OF THE TROLLEYBUS
LINE IN THE SONYACHNY DISTRICT
CONSTRUCTION OF THE TROLLEYBUS
LINE IN THE RESIDENTIAL AREA OF
PRIDNIPROVSK
PURCHASE AND LEASING OF
TROLLEYBUS VEHICLES
MODERNIZATION OF TRANSPORT
SYSTEM
42
To solve the problem of transit cargo transport along the
central streets of Dnipro, improve traffic flow conditions,
develop transport infrastructure and improve the ecological
condition of the city, is planned the construction of a main
road
Project implementation period – 68 months
THE TOTAL ESTIMATED COST OF THE PROJECT IS
USD 120,8 MLN, including:
construction works – USD 94,0 mln
equipment – USD 0,3 mln
other expenses – USD 26,5 mln
Construction of a traffic junction at two levels (a tunnel
overpass on the Donetsk highway under Berezynska Street)
will enable the transit transport, in particular the cargo, to
cross Berezynska street at high speed, that avoid delays at
the intersection, congestion and traffic jams at the
intersection of the Donetsk highway and adjacent streets and
improve environmental load.
THE TOTAL ESTIMATED COST OF THE PROJECT IS
USD 11,7 MLN INCLUDING:
construction works – USD 9,15 mln
equipment – USD 0,14 mln
other expenses – USD 2,39 mln
Duration of construction - 23 months
NEW HIGHWAYS
CONSTRUCTION OF A ROAD CROSSING
AT THE INTERSECTION OF DONETSK
HIGHWAY AND BEREZINSKA STREET IN
THE CITY OF DNIPRO
FROM KAYDATSKIY SHLYAH STREET TO
"KYIV – LUGANSK – IZVARINO" HIGHWAY
PROJECT DESCRIPTION
PROJECT DESCRIPTION
PROJECT PARAMETRS
PROJECT PARAMETRS
PROJECTS
43
CHARACTERISTICS OF THE ROPEWAY
Total length
Ownership
Max passenger traffic
on branches
7200 m
3000 p/hour
State, municipal,
Concession-based
public-private partnership
ENGINEERING INFRASTRUCTURE
Number of stations,
including engines
5 / 2
Electricity and city
electric network
Power lines
substations - 10kV
Project description: Construction of the first two
branches of the ropeway in Dnipro
Project Location: Levoberezhnii district, Central District
Initiator's Resources (municipalities) for the project:
Description and feasibility of the project of the ropeway in
Dnipro city
Total project cost:
USD 100 mln (Phase 1 – USD 40,3 mln)
Project duration: 2 years – the period of design and
construction
Payback period: 13-15 years (depending on technical
solutions)
PROJECT PRODUCT
Ropeway (5 stations), with a capacity of 3000 people / hour
and 7,2 km long
PROJECT ADVANTAGES
Assistance from the authorities in obtaining technical
specifications, permits, licenses, support and assistance of
relevant departments of the city
Reducing CO2 by 10%, unloading lots of traffic towards the
new bridge by 30%
Connecting remote districts and the city center
FORMS OF COOPERATION
PPP, loan, project finance, foreign direct investment, the
investor determined in collaboration with Dnipro
Development Agency
ROPEWAY POSSIBLE ROUTE
KharkivDonetsk
Dnipro River
DniproRiver
1
2
3
The current station
Construction site
Projected site
_Heroes of Maidan Square_
_Sagaydak Park_
_Industrial Park Kalynova_
_Basil Sukhomlynsky
ROPEWAYMETRO
1 2 3
4
5
ROPEWAY
PROJECT DESCRIPTION
PROJECT PARAMETRS
NEW INTERNATIONAL PASSENGER TERMINAL
Construction of a new runway (3260x60 m)
Repair of the existing runway (2850x44 m) and existing
taxiways, reconstruction of the apron, light-signal and
radio navigation systems
The new facility, located to the south-west of the operating
terminal, will significantly expand the airport's capabilities. It
will be built in 2 levels with a division into the arrival and
departure areas of passengers. The capacity of the new
terminal will be about 1000 people per hour.
At the same time, the existing terminal will serve exclusively
domestic flights in the future. The total throughput of two
terminals will exceed 1500 passengers hourly.
PASSENGER TURNOVER (PER YEAR)
3 MLN
COST OF CONSTRUCTION AND
RECONSTRUCTION
USD 165 MLN
44
DNIPRO INTERNATIONAL AIRPORT
AERODROME INFRASTRUCTURE:
Construction of a new runway (3260x60 m)
Repair of the existing runway (2850x44 m) and existing
taxiways, reconstruction of the apron, light-signal and
radio navigation systems
The new runway will be longer and wider than the existing
one, located parallel to the existing strip 150 meters from it
(towards the passenger terminals). Reconstruction and repair
of the apron, taxiways – will be implemented with increasing
coverage and increasing their bearing capacity. The apron
will be significantly expanded, its area will increase by 75%,
additional parking will be built for medium and long-haul
aircraft, the total number of aircraft stops will increase.
AIRPORT
Dnipro International Airport serves Dnipro City and the
region with the population of 7 mln people
Located: 5 km southeast of Dnipro City
Type: civil
Passenger turnover (year): 450 thousand
Airlines Austrian Airlines, Dniproavia, Windrose Airlines,
International Airlines of Ukraine, Air Baltic, Georgian
Airlines, Lufthansa
PROJECT DESCRIPTION
PROJECTS
45
PROJECT TECHNICAL PARAMETERS
LAND PLOT CHARACTERISTICS:
area: 20,9 ha
intended purpose of the use: air transport service
cadastral number: issued
leaseholder: ATC "Yuzmashavia"
ENGINEERING INFRASTRUCTURE:
electricity, water and gas supply:
available (it does not require additional investments)
COMPANY RESOURCES:
land plot with an area of 20,9 ha, territorv for parking and
reception of planes, all types of energy supply, existing
buildings/premises (including store), automobile transport,
cargo aircraft
TRANSPORT INFRASTRUCTURE:
distance from the nearest transport corridor: 1 km
distance to Dnipro: 5 krn
Iuggage custom registration
TRANSPORTATION SERVICES:
navigational support
aircraft engineering servicing
customs terminal
take-off runway, highways and railway lines
PROJECT GOALS
The construction of modern business terminal for
provision of services to VlP passengers in the territory of
acting aviation platform ATC "Yuzhmashavia" in the
international airport "Dnipro".
Servicing, receipt of charter flight parking for private planes.
BUSINESS TERMINAL PASSENGER SERVICE WILL
INCLUDE:
meeting/boarding a passenger with personal assistant
delivery of a passenger from / to a plane by a separate
transport
organization of the procedure for registration of air tickets
and Iuggage
individual passing of aviation security, customs and
passport control
wi-fi, international calls, fax, printer
luggage wrap
visiting a bar with one person
comfortable waiting rooms
parking for passengers' cars
PROJECT PARAMETERS
Project cost: USD 7 mln
Net Present Value - NPV
Internal Rate of Return - lRR
Payback Period - PP
Profitability index - PI
EBlDA
USD 1,8 mln
126%
5 years
18%
USD 14,6 mln
BUSINESS AVIATION TERMINAL
PROJECT DESCRIPTION
Construction of the modern logistic terminal for cargo
handling on aviation and other transport in the territory of
ATC "Yuzmashavia" in the lnternational Airport
"Dnipropetrovsk".
PROJECT INITIATOR
PROJECT GOALS
Reception and dispatch of cargo by regular flights from the
international Airport "Dnipropetrovsk"
Handling of charter flights on the equipped parking stands
Arrangement of cargo transits through the lnternational
Airport anipropetrovskn
Cargo storage
Customs broker services
Reception and sending of cargo by automobile transport
Aviation Transport Company "Yuzmashavia"
SE "PA UMZ named after A.Makarov"
www.yuzmashair.com.ua
PROJECT DURATION
Building of terminal for cargo handling - 12 months
Project cost: USD 2 mln
PROJECT PARAMETRS
Net Present Value - NPV
Internal Rate of Return - lRR
Payback Period - PP
Profitability index - PI
EBlDA
USD 0,6 mln
127%
5 years
18%
USD 3,8 mln
AIR CARGO TERMINAL & HUB
46
PROJECT DESCRIPTION
Increase energy efficiency in municupal institutions by
means of attracting extrabudgetary funds with the use of
"performance-contracting" the mechanism. Reduction of
energy consumption in budgetary institutions, budget
allocations for energy costs and creation comfortable
conditions for people.
PROJECTS
47
THERMODERNIZATION OF MUNICIPAL
BUILDINGS
Cost of the project: EUR 10 000 000
Borrower - municipal ESCO company
Term of credit - up to 10 years
Grace period - 36 months. The European Bank for
Reconstruction and Development loan - Euro 10 mln.
Non-repayment grant of E5P agency - Euro 2,5 mln.
One-time fee - 1,20% of the loan amount (120 thousand
euros)
Redemption fee - 0,5% pa Margin - 5,25% pa + EURIBOR
PROJECT READINESS STAGE:
The second stage of the tender is held. An analysis of
tender offers and selection of the Contractor is conducted.
METHOD OF GUARANTEEING BORROWED RESOURCES:
Dnipro City Council municipal guarantee (the volumes and
conditions are agreed with the Ministry of Finance
of Ukraine).
The payback period of the project is 20 years.
PROJECT DESCRIPTION
PROJECT PARAMETRS
INTEGRATED THERMO-MODERNIZATION
OF MUNCIPAL BUILDINGS
48
Thermo-modernization of 150 municipal buildings
(schools, kindergartens, hospitals, administrative buildings)
in order to reduce energy consumption, reduce CO2
emissions to the atmosphere, save budget funds
Project cost: USD 71,1 mln
(incl. municipal funds - USD 0,3 mln for energy monitoring,
energy audit, energy management)
Necessary investments: USD 70,8 mln
ESTABLISHMENT OF THE SYSTEM OF ENERGY
MONITORING:
Carrying out energy audit – USD 0,13 mln
Development of design and estimate documentation –
USD 2,83 mln
Carrying out works on thermo-modernization –
USD 67,92 mln
Implementation of the energy management system is –
USD 0,1 mln
Annual energy consumption before thermo-
modernization: 133 717 MWh
Annual energy consumption after thermo-modernization:
93 602 MWh
Reduced power consumption per year: 40 115 MWh
Annual savings: USD 2,94 mln
Reduction of CO2 emissions: 8729 tons per year
Financial resources: External investments, financial leasing,
credit, grant
Project readiness stage: Business plan
Method of guaranteeing borrowed resources: municipal
quarantee, insurance
Payback period - 10 years
PROJECT PARAMETERSPROJECT DESCRIPTION
PROJECTS
49
The waste recycling facility within the framework of PPP
implementation is an integral property complex created by
the joint activity of the parties of the public-private
partnership, the functional purpose of which is the
implementation of any technological operations related to
the change in the physical, chemical or biological properties
of waste with the purpose of preparing them for
environmentally safe processing, use, storage,
transportation, utilization or disposal.
This project envisages the creation of a material and
technical base that will, in the long run, minimize the costs of
utilization (recycling) of wastes and generate revenues from
the products that will be formed during the processing.
STRUCTURE OF THE WASTE RECYCLING COMPLEX
Resevoir of solid waste
Sorting line
Recycling of organic waste (AD), anaerobic reactor
Heat and power plant
Processing plastic into liquid fuel
Chipper for construction waste
Administrative buildings
The capacity of processing of solid waste -
225 000 t / year
Depth of processing of solid waste - up to 70%
Building area - 20 hectares
Investments: USD 59 MUSD
Operating profit: USD 11,5 MUSD per year
The payback period is 10 years
WASTE-TO-ENERGY PROCESSING
COMPLEX
PROJECT DESCRIPTION PROJECT PARAMETRS
Agricultural products cultivation with environmental
protection using combined heat and power system (CHP),
which supplies its electricity at premium prices to the energy
market. CHP by-products (heat and CO2) serve as a nutrient
environment for greenhouses. Agropark includes biomass
processing unit (BML), which reduces the impact on the
environment of domestic and industrial waste in the region.
TYPE OF PROJECT:
Construction. Area under construction - 60 hectares
The volume of solid waste - 350 000 t / year
Project cost: USD 275 mln
Own funds: Public-private partnership
Necessary investments: USD 275 mln
Brief description of operating income flows per project
(per year): USD 117,4 mln
Summary of capital and operational costs of the project
(per year): USD 30,1 mln
Method of attraction of resources: External investments
Stage of project readiness: Business plan
Guarantee: Insurance
Payback period of the project: 10 years
Net present value of the project (NPV): USD 404,8 mln
AGROPARK
50
PROJECT DESCRIPTION
PROJECT PARAMETRS
PROJECTS
51
FRUIT AND VEGETABLE STORAGE
& SORTING FACILITY
Construction of the refrigerator with a controlled
atmosphere, which is designed for high-quality storage of
fruits and vegetables, followed by sorting, packing, delivery
to consumers. Project implementation is expected in the
operating space of farming enterprise Vidrodzhennia, which
is placed near existing garden.
Total complex capacity will be 5 000 tonnes
Market outlets: wholesale markets, trading networks of
Ukraine.
PROJECT INITIATOR
PROJECT GOALS
The construction of complex for storage of fruit and
vegetable products and its sorting provides the
opportunity to comply with requirements for entering to
the outlet chain, namely: annual product delivery, high
volumes, lot homogeneity
The capacity of sorting line is 40 tonnes of the products
per shift. lt is supposed the everyday shipment of
production to the trade networks during 11 months
It is planned to access to international markets of fruits
and vegetables. The opportunity of project scale
expansion: in the long term it is expected the extension
of space for gardens and small fruit acreage up to 135 ha
and for vegetables up to 40 ha
Farming enterprise Vidrodzhennia.
www.eko-sad.com
PROJECT DURATION
Construction of the refrigerator with a controlled
atmosphere - 11 months
PROJECT PARAMETERS
Total project cost: USD 7,6 mln
Initiator contribution to the project implementation:
USD 2,1 mln
Required investment capital: USD 5,5 mln
Net Present Value - NPV
Internal Rate of Return - lRR
Payback Period - PP
Profitability index - PI
EBITDA
USD 1,1 mln
120%
5,3 years
16%
USD 10,8 mln
PROJECT DESCRIPTION
Project cost: USD 8 mln (depends on the selected project)
PROJECT PARAMETERS
Net present value NPV
Profitability index Pl
Internal rate of return IRR
Payback period PP
EBIDA
USD 2,1 mln
126%
18%
5 years
USD 16,8 mln
52
PROJECT INITIATOR
PROJECT GOALS
Construction of a Leisure Centre on the land plot, which is
free of buildings and located along the road. The possibility
of designing and building a playing area in Petrykivka urban
type settlement, taking into account a diverse local landscape
(forests, lakes, ravines).
PROJECT DURATION
Construction of a Leisure Centre «GOLF RESORT» -
12 months
Dnipropetrovsk Regional Investment Agency
www.dia.dp.gov.ua
Diversification of the entertainment industry of such cities
as Dnipro, Kamianske as well as Dnipro and Petrykivka
districts and promoting golf as a sport
Carrying out of professional competitions, sports,
recreation, cultural and entertainment events
THE POSSIBILITY OF PLACING:
golf academy for children and adults
tennis courts
cycle routes
conference and business meeting room
cottages, houses for living
hotels and restaurants
LEISURE CENTRE "GOLF RESORT"
PROJECT DESCRIPTION
PROJECTS
53
PROJECT GOALS
Creation of logistics center for storage and transportation
of agricultural products "Green market" for collection,
storage, package, primarv processing of agricultural
products, goods delivery during the year, expansion of
export potential of the region.
Sales markets/clients: wholesale markets, Ukraine trade
networks, foreign markets.
Project cost: USD 8 mln
Net Present Value - NPV
Profitability index - PI
Internal Rate of Return - IRR
EBlDA
Payback period - PP
USD 3,3 mln
142%
22%
USD 19 mln
5 years
Reduction of production costs and turnover costs
Create new modern warehouses and storage premises,
reduce product expenses and turnover expenses
Receipt of additional funds to the local budgets
Expand share of domestic products on the domestic
agricultural market
lncrease the economic effectiveness of distributive network
by means of traffic flow optimization
Reduced prices on agricultural products for the
population
Expansion of export potential of the region
TECHNICAL PARAMETERS OF
THE PROJECT
MECHANISMS FOR COOPERATION
LAND PLOT CHARACTERISTICS:
area: 97 ha
intended purpose of the use: agricultural lands
cadastral number: issued
ENGINEERING INFRASTRUCTURE:
needs engineering and design
it is possible to connect to the gas, electricity, water
TRANSPORT INFRASTRUCTURE:
near the highways P 52 and T 0414
railwav station - 15 km
distance to lnternational Airport "Dnipropetrovsk" - 60 km
5% - proprietary funds
95% - potential investor
LOGISTICS CENTER "GREEN MARKET"
PROJECT PARAMETERS
PROJECT DESCRIPTION
PROJECT PARAMETERS
Net Present Value - NPV
Internal Rate of Return - lRR
Payback Period - PP
Profitability index - PI
EBlDA
USD 2,3 mln
26%
5 years
156%
USD 10,4 mln
54
POLYMER MATERIALS SHEETS
PRODUCTION
Creation of a new enterprise for the production of polymer
plastic sheets of polyethvlene, polypropylene and other
polymer materials.
PROJECT INITIATOR
Ukrkhimzakhyst Ltd
PROJECT DURATION
Estimated implementation schedule - 8 years
Project cost: USD 4,3 mln
INITIATOR'S RESOURCES FOR
THE PROJECT IMPLEMENTATION:
machinery, office equipment - USD 30 K
experience in relevant projects implementation and
project solutions
PROJECT DESCRIPTION
PROJECTS
55
PROJECT DESCRIPTION
The line of Polymer Coating on galvanized steel sheet. The
design capacity is 55 K tons of steel per year
The galvanized sheet steel with polymer coating is a
primary product for production of facade and roofing
materials including sandwich panels and metal shingles
The equipment production, facility preparation and
installation will take about 12 months
ln the 3rd year of the project the planned volume of
production and sales will be 50 K tons
PROJECT INITIATOR
Elvas trading house, Ltd
www.elvas.com.ua
PROJECT GOALS
The saturation of Ukrainian market with polymer coating
galvanized sheet steel. Today there is no modern
producer in this sphere in Ukraine
Wholesale and retail trade with different coating types,
production of roofing and facade materials (metal
shingles, profiled flooring, siding), metal packaging
production
The equipment will allow to produce in small lots the
wide range of products both in the color and pattern
range and with various mechanical properties
PROJECT DURATION
PROJECT PARAMETERS
Net Present Value - NPV
Internal Rate of Return - lRR
Payback Period - PP
Profitability index - PI
EBlDA
USD 4,5 mln
35%
6 years
27%
USD 16 mln
USD 9 MLN
USD 6,8 MLN
USD 1,1 MLN
USD 1,1 MLN
REQUIRED INVESTMENTS
LINE COST
COST OF CONSTRUCTION OF
WAREHOUSES AND PRODUCTION
FACILITIES
PART OF THE REQUIRED FLOATING
CAPITAL
PRODUCTION OF POLYMER COATINGS
ON GALVANIZED STEEL OR ALUMINUM SHEETS
PROJECT PARAMETERS
Net Present Value - NPV
Internal Rate of Return - lRR
Payback Period - PP
Profitability index - PI
EBlDA
USD 6 mln
112%
5,7 years
14%
USD 6 mln
56
PRODUCTION OF BIO FUEL PELLETS
PROJECT DESCRIPTION
Creation of an enterprise for the production of bio fuel
pellets with production capacity of 40 000 tons per year
Estimated implementation schedule: 1 year
PROJECT INITIATOR
"VelLCV" Ltd
PROJECT DURATION
USD 2,63 mln
6 ha land
engineering infrastructure
INITIATOR'S RESOURCES
FOR THE PROJECT IMPLEMENTATION:
Required investment capital: USD 2,63 mln
Project cost: USD 5,26 mln
PROJECTS
57
PRODUCTION OF TANKS FROM
POLYMERIC MATERIALS
PROJECT DESCRIPTION
Creation of an enterprise for the design and construction
of tanks from polymer materials (polypropylene,
polyethylene, teflon, etc.), as well as technological equipment
based on them.
PROJECT INITIATOR
INITIATOR'S RESOURCES FOR THE
PROJECT IMPLEMENTATION:
Machinery, office equipment - USD 30 thousd
Experience in the relevant projects implementation and
project solutions
Ukrkhimzakhyst Ltd
PROJECT DURATION
Estimated implementation schedule - 5 years
PROJECT PARAMETERS
Net Present Value - NPV
Internal Rate of Return - lRR
Payback Period - PP
Profitability index - PI
EBlDA
USD 10 mln
206%
5 years
150%
USD 1,3 mln
Project cost: USD 1,1 mln
58
ATMOSPHERIC AIR MONITORING SYSTEM
Financial resources: External investments
Stage of project readiness: Project proposal
Way of guaranteeing borrowed resources:
Availability of pledged property
Acquisition and maintenance of mobile and stationary
stations of automatic continuous monitoring of atmospheric
air.
The main goal of the establishment of automatic
continuous monitoring stations is the monitoring of
environmental indicators of air pollution and informing the
population about the quality of atmospheric air.
Mobile environmental laboratories are designed to control
environmental pollution and damage to the environment at
a given point of the territory. The modern environmental
laboratory (laboratory of control) allows to assess the
sanitary-hygienic pollution of the air (or air of the working
zone), water, soil in the areas of industrial enterprises. It is
used in carrying out of natural and instrumental surveys of
sources of pollutant emissions into the atmosphere in order
to develop standards for maximum allowable emissions, and
simply for the purpose of state or departmental control.
The proposed system will allow to make operational
decisions in crisis environmental situations and inform the
population about the probable negative impact of the
ecological situation on different groups of the population.
This is the first such project in Ukraine that will attract the
attention of the whole society to environmental problems,
increase awareness and investment attractiveness of the city.
USD 1,91 mln
USD 0,146 mln
USD 1,76 mln
Project cost:
City funds:
Necessary investments:
PROJECT PARAMETERSPROJECT DESCRIPTION
PROJECTS
59
STARYY KODAK
Staryy Kodak is a fortress in the neighborhood of the city
of Dnipro that was built in 1635. This fortress appeared on the
European maps right after it had been built. Its value was in
the fact that it was constructed before the first rapid of the
river Dnipro and that it allowed to control the strategic way
from Zaporizhian Sich to well-settled Ukrainian lands. For the
time being the larger part of it was destroyed by a granite
quarry that was in operation during Soviet Union time.
A part of Kodak was saved however. Itʼs about earthen
berms, ditch and two bastions. The project point is to
reconstruct the external view of the fortress by creation of a
3D model and access points of so-called "complemented
reality" on remains of the construction. It will convert Kodak
into an important tourist object which will be interesting both
for the Ukrainian tourists and for people from Poland,
Lithuania, France, as representatives of these nations have a
direct relation to history of the fortress.
STARA SAMAR
Stara Samar is a settlement that appeared in the first fourth
of the XVI century for maintenance of the trade ferry across
the river Samara. It was used for transit trading and this fact
is confirmed by Polish, Hansa, Dutch, Russian, Tatar and
Turkish coins, product seals, things etc. A lot of
accommodations, an inn and a church have been already
discovered by archaeologists. The remains of the powerful
fortress, that was built by hetman Ivan Mazepa here in 1688
and which was reconstructed in 1730 – years, have been
saved to our time.
Since 2015 the government of the city has been actively
developing this territory. Such events as festivals of
traditional culture, The Day of the City take place here. The
historic & cultural park will be created on this territory. The
remains of accommodations, coins, and weapons have
been found here. In order to make all this legacy available
to tourists, it is supposed to create 3D models and expose
them in the Internet as well as in special information kiosks
on the territory of the fortress.
Project cost: USD 3 mln
PROJECT DESCRIPTION
PROJECT DESCRIPTION
PROJECT PARAMETRS
Project cost: USD 2 mln
PROJECT PARAMETRS
Currently, the city of Dnipro does not have its own city
history museum. Available expositions of the city in other
museums often continue to show the city as a part of Russian
history or Soviet Union history ignoring its Ukrainian basis
and its powerful national minorities, which participated and
still participate in creation of history of the city of Dnipro.
That is why the Museum of History of the city of Dnipro will
be important point for conducting of educational work with
representatives of the city community, as well as a place to
present the city to tourists. Conceptually, the Museum will
differ from existing ones because it will bring a person living
in the city and a person visiting the museum into focus. The
exposition will tell about "a person in city space", "a person in
society", "a person in productive activities" and will use
interactivity and multimedia allowing a participant to feel
empathy and to equate himself with inhabitants of the city of
Dnipro from previous ages.
The Museum of History of the city of Dnipro will be created
in two stages.
The first stage is to create mini-museum in the historical
building under the name "The Governorʼs House" with
parallel preparation of a large exposition. The second stage is
to create the full-scale museum of the city of Dnipro.
60
THE MUSEUM OF HISTORY OF THE CITY
OF DNIPRO
PROJECT PARAMETERS
Project cost (1st stage): USD 20 K
Project cost (2nd stage): USD 1,5 mln

More Related Content

Similar to Investment passport and projects of the city of Dnipro

Geo Siberia-2016
Geo Siberia-2016Geo Siberia-2016
Geo Siberia-2016
Marina Chekalina
 
City branding Moscow Rome-Istanbul
City branding Moscow Rome-IstanbulCity branding Moscow Rome-Istanbul
City branding Moscow Rome-Istanbul
marykou
 
Saint petersburg open city
Saint petersburg   open citySaint petersburg   open city
Saint petersburg open city
Daria Skrebova
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" Dnipro
Yaroslav Yaroshenko
 
“Russian Industrialist – 2016” presentation
“Russian Industrialist – 2016” presentation“Russian Industrialist – 2016” presentation
“Russian Industrialist – 2016” presentation
Marianna Polyakova
 
відкритий урок подорож 5 клас (1)
відкритий урок подорож 5 клас (1)відкритий урок подорож 5 клас (1)
відкритий урок подорож 5 клас (1)
Рената Стопчинська
 
відкритий урок подорож 5 клас (1)
відкритий урок подорож 5 клас (1)відкритий урок подорож 5 клас (1)
відкритий урок подорож 5 клас (1)
Рената Стопчинська
 
20150413.multi investments in_ poland
20150413.multi investments in_ poland20150413.multi investments in_ poland
20150413.multi investments in_ poland
BirlesmisMarkalar
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" Dnipro
Yaroslav Yaroshenko
 
Daugavpils english education 23.10.2013.
Daugavpils   english education 23.10.2013.Daugavpils   english education 23.10.2013.
Daugavpils english education 23.10.2013.
Iura Tcvetanova
 
конференция англ. яз
конференция англ. язконференция англ. яз
конференция англ. яз
alenkagg
 
Investment projects eng 2017
Investment projects eng 2017Investment projects eng 2017
Investment projects eng 2017
КМДА ДАЇ
 
Berdyansk invest pass-en
Berdyansk invest pass-enBerdyansk invest pass-en
Berdyansk invest pass-en
Alexandra Skorobogataya
 
Berdyansk invest pass-en
Berdyansk invest pass-enBerdyansk invest pass-en
Berdyansk invest pass-en
zodauzez zodauzez
 
USPA 2020 leaflet (Eng)
USPA 2020 leaflet (Eng)USPA 2020 leaflet (Eng)
USPA 2020 leaflet (Eng)
Ukrainian Sea Ports Authority (USPA)
 
Makhachkala
MakhachkalaMakhachkala
Makhachkala
School
 
Official catalogue of the participants of "Technologies of beauty–ХХІ century...
Official catalogue of the participants of "Technologies of beauty–ХХІ century...Official catalogue of the participants of "Technologies of beauty–ХХІ century...
Official catalogue of the participants of "Technologies of beauty–ХХІ century...
Polina Tashakova
 
Presenting Croatia
Presenting CroatiaPresenting Croatia
Presenting Croatia
SuncicaVu
 
Museum of News
Museum of NewsMuseum of News
Museum of News
Nina Korobko
 
Investment projects eng 2017 (l)
Investment projects eng 2017 (l)Investment projects eng 2017 (l)
Investment projects eng 2017 (l)
Sergiy1987
 

Similar to Investment passport and projects of the city of Dnipro (20)

Geo Siberia-2016
Geo Siberia-2016Geo Siberia-2016
Geo Siberia-2016
 
City branding Moscow Rome-Istanbul
City branding Moscow Rome-IstanbulCity branding Moscow Rome-Istanbul
City branding Moscow Rome-Istanbul
 
Saint petersburg open city
Saint petersburg   open citySaint petersburg   open city
Saint petersburg open city
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" Dnipro
 
“Russian Industrialist – 2016” presentation
“Russian Industrialist – 2016” presentation“Russian Industrialist – 2016” presentation
“Russian Industrialist – 2016” presentation
 
відкритий урок подорож 5 клас (1)
відкритий урок подорож 5 клас (1)відкритий урок подорож 5 клас (1)
відкритий урок подорож 5 клас (1)
 
відкритий урок подорож 5 клас (1)
відкритий урок подорож 5 клас (1)відкритий урок подорож 5 клас (1)
відкритий урок подорож 5 клас (1)
 
20150413.multi investments in_ poland
20150413.multi investments in_ poland20150413.multi investments in_ poland
20150413.multi investments in_ poland
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" Dnipro
 
Daugavpils english education 23.10.2013.
Daugavpils   english education 23.10.2013.Daugavpils   english education 23.10.2013.
Daugavpils english education 23.10.2013.
 
конференция англ. яз
конференция англ. язконференция англ. яз
конференция англ. яз
 
Investment projects eng 2017
Investment projects eng 2017Investment projects eng 2017
Investment projects eng 2017
 
Berdyansk invest pass-en
Berdyansk invest pass-enBerdyansk invest pass-en
Berdyansk invest pass-en
 
Berdyansk invest pass-en
Berdyansk invest pass-enBerdyansk invest pass-en
Berdyansk invest pass-en
 
USPA 2020 leaflet (Eng)
USPA 2020 leaflet (Eng)USPA 2020 leaflet (Eng)
USPA 2020 leaflet (Eng)
 
Makhachkala
MakhachkalaMakhachkala
Makhachkala
 
Official catalogue of the participants of "Technologies of beauty–ХХІ century...
Official catalogue of the participants of "Technologies of beauty–ХХІ century...Official catalogue of the participants of "Technologies of beauty–ХХІ century...
Official catalogue of the participants of "Technologies of beauty–ХХІ century...
 
Presenting Croatia
Presenting CroatiaPresenting Croatia
Presenting Croatia
 
Museum of News
Museum of NewsMuseum of News
Museum of News
 
Investment projects eng 2017 (l)
Investment projects eng 2017 (l)Investment projects eng 2017 (l)
Investment projects eng 2017 (l)
 

Recently uploaded

Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
MandalayResources
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
Sysco_Investors
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
Probe Gold
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
Cleades Robinson
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
f3wjr2q2
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
ybout
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
cosmo-soil
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
SOFTTECHHUB
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
Methanex Corporation
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
Philip Rabenok
 
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUESMUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
WilliamRodrigues148
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
TestOrg1
 

Recently uploaded (14)

Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
 
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUESMUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
 

Investment passport and projects of the city of Dnipro

  • 1. A CITY OF OPPORTUNITIES
  • 2. DNIPRO MAYOR BORYS FILATOV: “Our goal is to relieve businessmen, investors, and ordinary citizens of the obligation of communicating with state functionaries. By reducing contact between the public and civil servants, we reduce corruption and make life easier for everyone”. Mayor Filatov personally welcomes investors to the city and will help ease their market entry at all stages of their business activity in the city of Dnipro. 3
  • 3.
  • 4. 5 CONTENTS 1. Message from the Mayor 2. Contents 3. Dnipro in Ukraine and the World 4. Dnipro City History 5. Dnipro Today 5.1. Dnipro at a Glance 5.2. Economy 5.3. Education 5.4. Culture & Tourism 6. City development strategy 6.1. City Development Strategy 6.2. New industrial parks and zones of economic development 6.3. IT Cluster 6.4. Theme parks 6.5. Energy saving 6.6. Development of transport 6.7. Ecology and waste 7. Investment projects 7.1. Industrial Park 7.2. IT park offices and residential area 7.3. Expocenters 7.4. "Space Lift" Science and Technology Park 7.5. "Academia" Science and Technology Park 7.6. Float-glass factory 7.7. Modernization of the transport system 7.8. New highways 7.9. Ropeway 7.10. Dnipro International Airport 7.11. Business Aviation Terminal 7.12. Air Cargo Terminal and Hub 7.13. Thermodernization of Municipal Buildings 7.14. Integrated Thermo-Modernization of Muncipal Buildings 7.15. Waste-to-Energy Processing Complex 7.16. Agropark 7.17. Fruit And Vegetable Storage and Sorting Facility 7.18. Leisure Centre "Golf Resor" 7.19. Logistics Center "Green Market" 7.20. Polymer Materials Sheets Production 7.21. Production of Polimer Coatings on Galvanized Steel or Aluminum Sheets 7.22. Production of Bio Fuel Pellets 7.23. Production of Tanks from Polymer Materials 7.24. Atmospheric Air monitoring system 7.25. "Staryy Kodak" tourist and recreation park 7.26. "Stara Samar" tourist and recreation park 7.27. The Museum of History of the City of Dnipro 3 5 6 7 15 16 17 18 20 27 28 29 30 31 32 32 32 33 34 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 59 60
  • 5. 6 Poltava 200 km Kharkiv 220 km Mariupol 350 km Zaporizhzhia 80 km Kherson 330 km Kropivnitsky 270 km Vinnitsa 570 km Kyiv 480 km Odessa 520 km Krivy Rig 145 km DNIPRO ON THE MAP THE WORLD DNIPRO IN UKRAINE
  • 7. Reconstructions by Alexander Kharlan STARYY KODAKNOVYY KODAK COMMODITY SEALS COINS 8 STRONG TRANSIT TRADE WITH HANSA LEAGUE, HOLLAND, OTTOMAN EMPIRE AND POLAND IN XVI-XVIII CENTURIES HISTORY THE CITY AROSE ON THE BASIS OF THE SYSTEM OF COSSACK SETTLEMENTS IN 1524 STARA SAMAR
  • 8. HISTORY AT THE END OF XVIII CENTURY RUSSIAN EMPIRE PLANNED TO CREATE HERE ITS THIRD SOUTHERN CAPITAL AND FORPOST GOVERNOR'S HOUSE FIRST PLAN OF EKATERINOSLAV CITY THE SAVIOUR'S TRANSFIGURATION CATHEDRAL IN THE XIX CENTURY EKATERINOSLAV CITY USED TO BE THE CENTRE OF PROVINCE OF RUSSIAN EMPIRE WITH NO INDUSTRY HISTORY 9
  • 9. ALEXANDER PAUL 10 THE RAMPANT TAKE-OFF OF THE CITY STARTS FROM THE END OF XIX CENTURY. ALEXANDER PAUL DISCOVERED IRON ORE AND BUILT THE RAILWAY HISTORY
  • 10. BELGIAN TRAM FACTORIES OF THE TIMES OF "IRON FEVER" HISTORY 11 IRON FEVER: EXPERIENCING QUICK GROWTH DUE TO GERMAN, FRENCH AND BELGIAN INVESTMENTS, IRON AND STEEL BECAME THE MAIN INDUSTRY OF THE CITY HISTORY
  • 11. DURING THE SECOND WORLD WAR, FIERCE FIGHTING WAS TAKING PLACE IN THE CITY HISTORY AMUR BRIDGE HOTEL "UKRAINE" 2017 2017 1941 1941 12
  • 12. MAIN OFFICE BUILDING YUZHMASH FACTORY FROM 1950TH THE CITY BECAME THE CENTRE OF ROCKET-BUILDING INDUSTRY OF THE SOVIET UNION HISTORY ROCKET "SATAN" HISTORY 13 AFTER UKRAINE BECAME INDEPENDENT, "YUZHMASH" COMPANY STARTED DEVELOPING SPACE ROCKETS, INCLUDING JOINT PROJECT WITH USA "SEA LOUNCH"
  • 13. REGIMENT DNIPRO-1 ON THE POSITION OF "REPUBLIC BRIDGE" THE MEETING TO SUPPORT INDEPENDENCE OF UKRAINE, 19TH OF FEBRUARY 2014 14 IN 2014 DNIPRO CITY OPPOSED RUSSIAN SUPPORTED HYBRID WAR. PRO-UKRAINIAN POSITION OF THE INHABITANTS AND THE HIGHEST NUMBER OF VOLUNTEER SOLDIERS IN UKRAINE STOPPED RUSSIAN AGRESSION HISTORY
  • 15. DNIPRO KEY FACTS DNIPRO INDUSTRIAL DNIPRO INNOVATIVE Distance to Kyiv – 465 km Area – 405 km2 Population – 1002 thousand Universities - 10 Age - 35% of population is from 20 to 40 9 business centers 900 m2 of retail space per 1000 inhabitants DNIPRO TOURISTIC 67 hotels 20 shopping and entertainment complexes 460 cafes, 22 nightclubs SPORT The main arena of Ukraine in canoeing and kayaking 862 m cableway for water skiing and wakeboarding Dnipro soccer arena 10,2% of the GNP OF UKRAINE 16% of total EXPORTS OF UKRAINE 1100 large and medium-sized companies 240 of them are industrial 25% of the region's total industrial products STEEL INDUSTRY: 12 large and medium-sized enterprises ENGINEERING: aviation, mine hydraulics, special electric drives CHEMICAL AND PROCESSING INDUSTRY: rare gases production, battery production LIGHT INDUSTRY: high quality sewing, food industry FOOD INDUSTRY: sunflower oil AEROSPACE: Serial production, the most environmentally friendly rocket carriers in the world Telecommunication and remote sensing satellites Participation in projects of ANTARES RN, Alcántara High-end devices and systems IT OUTSOURCING: 7000 EMPLOYED, TOP-3 IT COMPANIES IN UKRAINE DNIPRO AT A GLANCE 16
  • 16. Consulate General of Germany Honorary Consulate of the Republic of Lithuania Honorary Consulate of the Republic of Austria Honorary Consulate of Czech Republic POWERFUL INDUSTRIAL POTENTIAL Іndustrial enterprises produce 4,5% of all industrial products of Ukraine The basis of the cityʼs industry is the metallurgy (12 large and middle enterprises). The metallurgical complex produces 6,9% of the total production volume of the ferrous metallurgy of Ukraine The cityʼs machine-building and metal-processing industries produce 10,5% of the national production volume of the machine-building complex 7 enterprises of the cityʼs chemical industry produce 7,5% of the total production volume of chemical and petrochemical industry of Ukraine The cityʼs light, food and processing industries produce foodstuffs in volume of 5,6% of the total production of Ukraine The cityʼs building complex is on the second place in Ukraine: 150 building organizations, 56 design companies, 540 small-scale building companies FOREIGN TRADE The city has foreign economic activity almost with 130 countries of the world. The volume of export-import operations is over 7% of the external turnover of Ukraine TWIN CITIES AGREEMENTS CONSULATES The volume of export in 2016 is 1,3 USD billion The volume of import in 2016 is 1,9 USD billion Vilnius Herzliya Dalian Xian Zilina Kutaisi Zugdidi Durham Saloniki Tashkent Szczecin Szolnok Bern Lithuania Israel China China Slovakia Georgia Georgia Canada Greece Uzbekistan Poland Hungary Switzerland ECONOMY DNIPROTODAY 17
  • 17. Dnipro is a major educational centre in Ukraine and is home to two of Ukraine's top-ten universities. 10 UNIVERSITIES 203 PRESCHOOL EDUCATIONAL ESTABLISHMENTS NUMEROUS OUT-OF-SCHOOL INSTITUTIONS SUCH AS YOUTH CLUBS AND CENTERS 181 EDUCATIONAL INSTITUTIONS AMONG THEM SCHOOLS, GYMNASIUMS AND BOARDING SCHOOLS 18 EDUCATION
  • 18. HIGHER EDUCATION One of Dnipro cityʼs points of pride is its higher education. It has a long and rich history. Its students, graduates and academics have long been known and appreciated worldwide, especially in the following areas: space programme, creation of energy-saving and environmentally friendly technologies in mining, metallurgy, chemical industry, construction, agriculture. Currently, there are 87 thousand students in all higher education establishments of Dnipro. In 2017 Ukraineʼs Higher Education system was ranked as the top in Eastern Europe by Universitas 21, ahead of Czech Republic, Poland, Slovenia, Russia and Slovakia. The research group sited high Education spending as a proportion of GDP compared to other nations as a likely cause of Ukraine having the best post secondary system in East Europe. THE MOST RENOWNED UNIVERSITIES OF DNIPRO: NATIONAL MINING UNIVERSITY OF UKRAINE NATIONAL UNIVERSITY OF RAILWAY TRANSPORT ALFRED NOBEL UNIVERSITY OLES HONCHAR NATIONAL UNIVERSITY NATIONAL METALLURGICAL ACADEMY OF UKRAINE DNIPROTODAY 19 HIGHER EDUCATION
  • 19. Art Center «Kvartira» One-man show "The Scream" Dnipro Theater Opera and Ballet Dnipro House of Organ and Chamber Music Picture Gallery «TELEGA» Art Gallery ”Artsvit” Black Lizard Gallery-book store Art center «I Gallery» Art Museum Dnipro Philharmonic named after L. Kogan Dnipro Theater of Drama and Musical Comedy Theatre of Ukrainian Drama named after Taras Shevchenko 20 CULTURE & TOURISM DNIPRO IS RENOWNED FOR RICH AND ACTIVE CULTURAL LIFE HAVING 8 THEATERS, 4 MUSEUMS, 3 CONCERT HALLS, 86 LIBRARIES, 9 MOVIE HALLS, 16 CLUBS, 67 HOTELS
  • 20. Technical museum RetroAuto The museum of ukrainian painting Dnipro region Antiterrorist operation museum Dnipro National Historical Museum named after D. Yavornitsky Dnipro Museum of D. Yavornitsky Museum centre of O. Blavatska and her family Dnipro Planetarium Museum “Jewish Memory and Holocaust in Ukraine”The museum “Literary Dnipro” DNIPROTODAY 21
  • 21. Dnipro is a place of considerable touristic charm. Located on the banks of the Dnipro River in a region rich in natural beauty and steeped in Ukrainian Cossack tradition, todayʼs Dnipro offers a range of recreation and leisure activities that make it a fun city break destination. This chic boulevard is a relatively new and fresh arrival to the Dnipro downtown architectural ensemble. It is one of the cityʼs most popular eating out and retail focuses. The district includes a range of fountains and other funky design elements such as overhead decorations. In the long and sultry summer months, it plays host to a series of terraces and streetside cafes that attract Dniproʼs beautiful people. EKATERINOSLAVSKIY BOULEVARD 22 TOP DNIPRO TOURIST ATTRACTIONS
  • 22. MONASTERY ISLAND This downtown natural treasure is a wonderful place for family strolls and romantic interludes all year round. Connected to the city via a pedestrian bridge, it forms part of Dniproʼs largest park complex – Shevchenko Park. Monastery Island is home to one of Ukraineʼs largest Shevchenko monuments and boasts some of the cityʼs best beaches. Weekenders can also enjoy a zoo, pony riding club, and various cafes. The island abounds in greenery and is a great place to chill out if you are looking to get away from the big city bustle without travelling out of town. Known to many as "Ukrainian House" or "The House of Khrennikov", this local landmark is a classic example of Ukrainian modernist architecture. Built in 1912 by prominent businessman Vladimir Khrennikov, this four-story building has won plaudits as the architectural embodiment of Ukrainian national traditions. Ukrainian ethnographer and historian Dmytro Yavornytsky played a key role in the development of the architectural plans behind the building and helped to add elements of authenticity. With its tower topped by wrought iron spikes, tiled roof and white walls, the building is reminiscent of architectural styles common during the era of the Zaporizhia Sich and the heyday of the Ukrainian Cossacks. The buildingʼs ornate and detailed decorations include the Coat of Arms of the Zaporizhia Army – a Cossack with a musket and a sword. This monument to Ukrainian architectural heritage miraculously survived the destruction of WWII and serves today as one of the cityʼs top hotels. Dnipro is home to Ukraineʼs largest aquatic sports complex, the Sentosa Cable Park. The park is popular for wakeboarding and water skiing. It has already gained a reputation beyond Ukraine as a venue for international competitions. Sentosa Cable Park boasts state-of-the-art facilities and offers a dose of adrenaline close to the city center. This is an extremely popular hangout during the summer season and is a great place to improve your waterski skills with the help of qualified instructors. GRAND HOTEL "UKRAINE" UKRAINEʼS EXTREME WATERSPORTS CAPITAL DNIPROTODAY 23 TOP ATTRACTIONS
  • 23. SAMAR DNIPRO FEST This festival offers a window into Ukrainian history and incorporates authentic elements from across a range of different eras including everything from the Middle Ages to the present day. The festivities are diverse and dynamic, with arts and crafts alongside literature and period performances. There is also an accent on contemporary Ukrainian music, giving the event a traditional festival feel. The Samar Dnipro Fest is hosted at a cultural heritage site that occupies an important place in national folklore – Stara Samar Fortress, which dates back to the Ukrainian Cossack period. RELIGIOUSLY DIVERSE DNIPRO Throughout its history, Dnipro has always been home to a wide variety of different religious communities. This cosmopolitan heritage is reflected in the presence of numerous houses of worship that continue to coexist and function in the city. For example, visitors will find a range of different Ukrainian Orthodox, Catholic, and Protestant churches to explore. The cityʼs diverse religious traditions have helped to create a culture of tolerance while providing a welcoming environment for people of all faiths. DNIPROʼS ICONIC STONE WOMEN The Dnipro History Museum is home to one of the worldʼs largest collections of ancient steppe sculptures. A number of fascinating female statues stand outside the museum, offering an echo of a long-forgotten era when nomadic peoples dominated the surrounding region. Known to locals as Dniproʼs “Stone Women”, these iconic figures serve as a reminder of the many different cultures to leave their mark on Ukraine over the centuries. Similar stone statues dot the landscape throughout todayʼs Ukraine, with many looking out across the countryʼs seemingly endless southern steppe lands. Female figures tend to dominate this genre of stone sculpture, hinting at ancient associations with fertility. 24 TOP ATTRACTIONS
  • 24. ROCKET PARK IN A ROCKET CITY SENSATIONAL SUMMER SAILING DNIPROTODAY 25 Dniproʼs status as the capital of the Soviet Unionʼs rocket program earned it the twentieth century nickname "Rocket City". You can catch a flavor of this locally produced ballistic brilliance by visiting Dniproʼs dedicated Rocket Park complex, which boasts a number of giant exhibits guaranteed to thrill fans of Cold War relics. The park serves as a reminder that Dnipro remains the capital of Ukraineʼs space industry and a significant player in the international rocket and missile industry. It is also home to the Alexander Makarov Aerospace Museum – Ukraineʼs only museum dedicated to rocket and space technologies. Who needs the seaside when you have one of the worldʼs biggest and most beautiful rivers running right through the middle of town? The Dnipro River serves as a giant playground for the entire city and is an endless source of entertainment. Sailing is a popular pastime and visitors in the spring and summer months will see dozens of pleasure boats cruising up and down the river. TOP ATTRACTIONS
  • 25.
  • 27. DNIPRO VISION OBJECTIVES MEGAPOLIS Increase population in the city and region by 15% NEW JOBS Create 100K new jobs ADVANCED INDUSTRIES Create technological and science parks with 20K employees INVESTMENTS Attract USD 10 billion over the next 10 years LIVEABILITY Achieve cleaner environment Advance urban agriculture Improve recreation industry BRAND Create the new image of the city as a cosmopolitan, spacious, and innovative place 28 CITY DEVELOPMENT STRATEGY
  • 28. 19TH CENTURY TECHNOLOGIES INDUSTRIAL PLANTS 20TH CENTURY TECHNOLOGIES INDUSTRY 4.0 STRATEGY 29 NEW INDUSTRIAL PARKS & ZONES OF ECONOMIC DEVELOPMENT Industry 4.0
  • 29. 30 DNIPRO IT COMMUNITY KEY FACTS & VALUE PROPOSITION LOCATION VALUE PROPOSITION IT CLUSTER ADVANTAGES 7000 IT LABOR POOL 7 UNIVERSITIES WITH 1000 IT GRADUATES/YEAR 170+ COMPANIES IN THE IT SECTOR Strong math, science & engineering education Scalable & mature IT market High level of competences, commitment, communication skills, cultural proximity to European countries is very suitable for R&D tasks Low operating costs IT CLUSTER MISSION: Create a balanced IT ecosystem in the region for IT business development IT CLUSTER GOALS: Regional IT industry representatives consolidation for IT industry promotion IT business development and support of related activities Creation of attractive investment climate in Dnipro and Ukraine in general Support the development of socially important industries – education, law, infrastructure, promotion Excellent location in terms of number of innovation and R&D centers, product companies and startups 8+ years in the local IT market for 20+ IT companies Very affordable senior management talents which are full professional Almost 80% of teams use agile development methodologies 40%+ of IT specialists are senior software engineers Average years of experience for Senior level close to Western Europe standards IT CLUSTER KEY IT SERVICE PARTNERS
  • 30. STRATEGY 31 THEME PARKS ONE OF THE MAIN PILLARS OF DNIPRO CITY DEVELOPMENT STRATEGY IS THE CREATION OF A MULTITUDE OF THEME PARKS. THEY WILL INCREASE CITYʼS COMFORT OF LIVING AND ATTRACT LOCAL AND INBOUND TOURISTS USING HUGE RECREATIONAL POTENTIAL OF OUR CITY ENTERTAINMENT PARK EXTREME PARK WATER SPORTS PARK SPACE PARK STARA SAMAR TOURIST & RECREATION PARK
  • 31. In the Monitoring, based on the indicators recommended by the International Energy Agency, the estimated energy efficiency level in Ukraine in 2017 was 60% of the EU level. Two thirds of the energy saving potential falls on the industry and the residential sector According to the Action Plan for sustainable energy development in the city of Dnipro for the period from 2015 to 2025, Dnipro undertakes to increase energy efficiency and increase the use of alternative and renewable sources of energy The "Covenant of Mayors" obliges Dnipro to reduce its CO2 emissions by at least 30% by 2030 by implementing energy-saving technologies and renewable energy sources. Therefore, huge investment possibilities are open to companies investing in enegy efficiency projects in the industry and real estate COMPREHENSIVE PROGRAM OF ECOLOGICAL SAFETY AND INTRODUCTION OF SUSTAINABLE ECOLOGICAL LOW CARBON DEVELOPMENT OF THE CITY OF DNIPRO FOR 2016-2020 HAS SEVERAL PRIORITES: Introduction of technologies of utilization of industrial wastes with the purpose of maximum level of the involvement of waste in the technological processes of production improvement of the system of collection, transportation, utilization and processing of solid domestic wastes development of the environmental monitoring system improvement of technological processes of production, introduction of the best available technologies for minimization of technogenic influence on the environment ENERGY SAVING ECOLOGY AND WASTE CITY TRANSPORT DEVELOPMENT KEY STRATEGEIC POINTS: development of transport infrastructure by means construction of passenger terminals, rolling stock upgrade; priority development of environmentally friendly modes of transport (tram, trolleybus, metro, etc.); improving the investment climate by creation of favorable conditions for attractiveness of the transport industry; Improvement of payment system in urban transport. DEVELOPMENT OF TRANSPORT 32
  • 33. INDUSTRIAL PARK COMPONENTS Road/transport and engineering infrastructure, office premises, pre-school facilities, vocational school Industrial production sites Regional multi-purpose exhibition center R&D, experimental production, business incubator COMMERCIAL SITES FOR: office premises for IT community apartments for IT-cluster and industrial park employees City center distance - 4,6 km International airport DNK, class 4С, distance - 21,2 km River port Navigation: Mar-Dec Throughput: 5,7 mln tons 3 cargo terminals 16 piers Draught – up to 4 m distance - 3,8 km Railway station "Nizhnodniprovsk – Junction Station" Customs terminal, cargo processing terminals for 3 t, 5 t 20 and 40-feet containers (distance - 3,1 km) INDUSTRIAL PARK 61,4 ha INDUSTRIAL ZONE 50,4 ha RESIDENTIAL COMPLEX 5,45 ha PUBLIС COMPLEX 5,5 ha PROJECT DESCRIPTION TOTAL INVESTMENTS REQUIRED – USD 158 MLN PROJECT PARAMETERS 34 INDUSTRIAL PARK INDUSTRIAL PARK LOCATION:
  • 34. PREFERENCES FOR RESIDENTS OF THE INDUSTRIAL PARK FROM THE STATE According to the Law of Ukraine "On Industrial Parks": Zero-Interest loans Special purpose grants for the development of the industrial park Preferences in the Law of Ukraine "On amendments to the Tax Code": real-estate tax exemption land tax exemption land rent payment exemption exemption from profit tax (to be enacted) extension of import VAT payment (to be enacted) Preferences stated in the Law of Ukraine "On amendments to Customs Code": import duties exemptions preferences on import duties FROM THE CITY Roads and transport infrastructure Engineering networks Vocational school Land plots ready for rent Land plots ready for connection to engineering networks Exemption from shared funding of the development of municipal infrastructure in case of construction within the industrial park (10-15% of the estimated cost of the facility) Preferential local taxes Other preferences from the city Public transportation, regional station, cableway station (planned) Synergy effect from close allied production sites location FROM THE OPERATOR COMPANY Land plots at the territory of the industrial park ready for design and construction works Individual approach to land plot selection Up-to-date topographic and geodesic information Geological research "Turn-key" design and construction services Legal assistance Centralized connection to municipal engineering networks PR services Security Maintenance and logistic Internal transport Food courts, auxiliary services, recreational areas PROJECTS 35 IT-PARK: 1. Office premises 2. Apartments for lT-park and industrial park employees 3. Pre-school facilities INDUSTRIAL ZONE: 4. Industrial production sites 5. Exhibition center 6. Business incubator, R&D, Experimental production ADDITIONAL SERVICES: 7. Hotel 8. Park, green areas 9. Trade and catering facilities 10. Medical complex 11. Sports complex AREA 61,4 ha 614000 m2
  • 35. IT-park offices, and residential area buildings are planned to be build on the territory of the industrial park. This area will accommodate IT-park, Business incubator and Industrial area specialists, as well as the visitors of the exhibition hall. General area of office accommodation - 50 000 m2 Effective area of office accommodation - 40 000 m2 Total area of residential accommodation – 25 000 m2 Capital expenditure – USD 52,5 mln (including design works) Payback period – 10 years IT PARK OFFICES & RESIDENTIAL AREA 36 PROJECT DESCRIPTION PROJECT PARAMETERS:
  • 36. PROJECT COST - USD 14 MILLION It is planned to build a regional exhibition center on the territory of the industrial park at Slobozhansky Highway. The territory of the exhibition complex is 4.2 hectares. INDUSTRIAL EXHIBITION: I stage: 6 000 m2 II stage: 8 000 m2 Parking space: 15 000 m2 PROJECT COST - USD 80 MILLION THE TERRITORY OF THE EXHIBITION COMPLEX IS 16 HECTARES EXHIBITION AREA 50 000 M2 According to the decisions of the Project Master Plan, Part of the Quay is transferred from the industrial lands to the territory of residential and public use. Reconstruction of Railway Square provides creation of transitions and concourses from the station to the embankment. The attraction of this place is its proximity to the city center, transport links and location on the banks of the Dnipro River. PROJECTS 37 PROJECT DESCRIPTION PROJECT DESCRIPTION EXPOCENTERS
  • 37. SCIENCE AND TECHNOLOGY PARK Science and technology park is the part of innovation and business ecosystem in Dnipro. Science and technology park is a strategically planned, purpose built work environment designed to locate in close physical proximity university, government and private research bodies involved in a particular field of endeavour. There the knowledge can be shared, innovation promoted and research outcomes progressed to viable commercial products. MOVABLE PRE-INCUBATOR "SPACE LIFT" S&T PARK STAGE 1: INNOVATION AND BUSINESS PARK Apartments 25 000 m2 all-together, incl: for S&T Park 10 000 m2 for IT - cluster 15 000 m2 Innovation & business, R&D zone 35 000 m2 all-together, incl. 10 000 m2 already existing buildings (to be renovated), 25 000 m2 new buildings: for S&T Park 10 000 m2 for IT- cluster 15 000 m2 STAGE 2: STAGE 1 INCLUDING UNIVERSITIES Includes major universities of Dnipro city: Dnipro State University, Dnipro Polytechnika, Transport institute STAGE 3: SERENDIPITY POLIS OF DNIPRO Creative industry and business industrial zone: InnoCampus (Marketing & Advertisement innovations) 10 additional business & industrial park STAGE 4: UKRAINE - SERENDIPITY STATE All-Ukrainian application PROJECT COST: Stage 1: USD 750 000 Multi-functional Mobile pre-incubator allows for the incubator's team to be closer to innovators, startups for more accessible and faster incubation. PROJECT DESCRIPTION PROJECT PARAMETERS: 38
  • 38. PROJECT DESCRIPTION PROJECT PARAMETRS Description of the project: the creation of science and technology park in Dnipro City Location of the project: Dnipro National University, Dnipro National University of Railway Transport Total cost of the project: USD 20 mln Project duration: 3 years Payback period: 6 years PROJECT PRODUCT 1500 new jobs 300 residents in the technological park 20 new innovative companies annually USD 20 mln / year annual increase in innovative products 1000 annual increase in new jobs Involvement of international investments into the region PROJECT ADVANTAGES Assistance from the municipal authorities Dnipro is the center of space, IT and agrarian branches of Ukraine Synergy of Science, Business and Municipal Authority Very attractive campus area with sports facility and the park FORMS OF COOPERATION Investor's share participation PROJECT INITIATOR Dnipro Development Agency www.dda.dp.ua info@dda.dp.ua ENGINEERING INFRASTRUCTURE Distance from the nearest routes Water, gas, electricity 2 km - Route H08 In sufficient quantity Soborna SquarSoborna Squar Gagarin ave Gagarin ave 3 km3 km Kazakova str Kazakova str PROJECTS 39 "ACADEMIA" SCIENCE & TECHNOLOGY PARK
  • 39. CHARACTERISTICS OF PRODUCTION PLOT Area Purpose of land plot Kind of ownership 40 ha Industrial land Municipal land ENGINEERING INFRASTRUCTURE Distance from the nearest roads Water, gas, electricity Access road - 100 m Distance from the railway - 100 m Water supply: distance - 50 m, Gas – none. The power line substations: on site, 10kV Description of the project: construction and commissioning of a plant for the production of sheet float glass Location of the project: the site for the future facility may be allocated at the territory of industrial park of the city of Dnipro or on other available locations Resources of the initiator (municipalities) for the project: Land plot of 40 hectares Description and economic feasibility of the project for the construction and commissioning of a float glass plant Total cost of the project: USD 150 - 300 mln (depends on the chosen technology) Term of the project: 1,5-2 years – the period of design and construction Payback period: 6-7 years PROJECT PRODUCT The product is sheet float glass for windows PROJECT ADVANTAGES Assistance from the authorities in obtaining technical specifications, permits, licenses, certificates for construction and operation of the plant. Directed to 100% of import substitution. Sites for production placement prepared. FORMS OF COOPERATION Credit, project finance, foreign direct investment PROJECT INITIATOR Dnipro Development Agency 40 FLOAT GLASS FACTORY PROJECT DESCRIPTION PROJECT PARAMETRS
  • 40. PROJECTS 41 THE PROJECT CONSISTS OF THE CONSTRUCTION OF THREE STAGES: First stage – completion of construction of the existing subway line and depot Second stage - construction of three new stations (Teatralna, Central, Historical Museum) Third stage - construction of additional sites (civil defence and dual-purpose sites) located both on the existing subway area and at the site under construction (second launch complex) Construction period - 5 years, completion is scheduled for 2021 The project is financed by credit facilities for agreements between the Ministry of Finance of Ukraine and the European Bank for Reconstruction and Development co-financed by the European Investment Bank, totaling EUR 224 mln The project envisages the construction of a trolleybus line of 3,8 km, the modernization of one traction substation and the construction of one dispatching center Approximate cost of the project is USD 1,2 mln The project envisages construction of a trolleybus line of 2,8 km, construction of one dispatching center, modernization of one traction substation, installation of 62 contact sysyem masts The cost of the project is USD 1 mln The project envisages: construction of a trolleybus line of 19 km, construction of three traction substations and two dispatching stations, modernization of two traction substations The estimated cost of the project is USD 9,2 mln Purchase of 50 trolleybus machines financed by the European Bank for Reconstruction and Development, amounting to USD 12,3 mln and leasing of 13 Belarusian trolley buses manufactured by OJSC "Belkommunmash" COMPLETION OF "DNIPRO METRO LINE" CONSTRUCTION OF THE TROLLEYBUS LINE IN THE SOKIL RESIDENTIAL AREA CONSTRUCTION OF THE TROLLEYBUS LINE IN THE SONYACHNY DISTRICT CONSTRUCTION OF THE TROLLEYBUS LINE IN THE RESIDENTIAL AREA OF PRIDNIPROVSK PURCHASE AND LEASING OF TROLLEYBUS VEHICLES MODERNIZATION OF TRANSPORT SYSTEM
  • 41. 42 To solve the problem of transit cargo transport along the central streets of Dnipro, improve traffic flow conditions, develop transport infrastructure and improve the ecological condition of the city, is planned the construction of a main road Project implementation period – 68 months THE TOTAL ESTIMATED COST OF THE PROJECT IS USD 120,8 MLN, including: construction works – USD 94,0 mln equipment – USD 0,3 mln other expenses – USD 26,5 mln Construction of a traffic junction at two levels (a tunnel overpass on the Donetsk highway under Berezynska Street) will enable the transit transport, in particular the cargo, to cross Berezynska street at high speed, that avoid delays at the intersection, congestion and traffic jams at the intersection of the Donetsk highway and adjacent streets and improve environmental load. THE TOTAL ESTIMATED COST OF THE PROJECT IS USD 11,7 MLN INCLUDING: construction works – USD 9,15 mln equipment – USD 0,14 mln other expenses – USD 2,39 mln Duration of construction - 23 months NEW HIGHWAYS CONSTRUCTION OF A ROAD CROSSING AT THE INTERSECTION OF DONETSK HIGHWAY AND BEREZINSKA STREET IN THE CITY OF DNIPRO FROM KAYDATSKIY SHLYAH STREET TO "KYIV – LUGANSK – IZVARINO" HIGHWAY PROJECT DESCRIPTION PROJECT DESCRIPTION PROJECT PARAMETRS PROJECT PARAMETRS
  • 42. PROJECTS 43 CHARACTERISTICS OF THE ROPEWAY Total length Ownership Max passenger traffic on branches 7200 m 3000 p/hour State, municipal, Concession-based public-private partnership ENGINEERING INFRASTRUCTURE Number of stations, including engines 5 / 2 Electricity and city electric network Power lines substations - 10kV Project description: Construction of the first two branches of the ropeway in Dnipro Project Location: Levoberezhnii district, Central District Initiator's Resources (municipalities) for the project: Description and feasibility of the project of the ropeway in Dnipro city Total project cost: USD 100 mln (Phase 1 – USD 40,3 mln) Project duration: 2 years – the period of design and construction Payback period: 13-15 years (depending on technical solutions) PROJECT PRODUCT Ropeway (5 stations), with a capacity of 3000 people / hour and 7,2 km long PROJECT ADVANTAGES Assistance from the authorities in obtaining technical specifications, permits, licenses, support and assistance of relevant departments of the city Reducing CO2 by 10%, unloading lots of traffic towards the new bridge by 30% Connecting remote districts and the city center FORMS OF COOPERATION PPP, loan, project finance, foreign direct investment, the investor determined in collaboration with Dnipro Development Agency ROPEWAY POSSIBLE ROUTE KharkivDonetsk Dnipro River DniproRiver 1 2 3 The current station Construction site Projected site _Heroes of Maidan Square_ _Sagaydak Park_ _Industrial Park Kalynova_ _Basil Sukhomlynsky ROPEWAYMETRO 1 2 3 4 5 ROPEWAY PROJECT DESCRIPTION PROJECT PARAMETRS
  • 43. NEW INTERNATIONAL PASSENGER TERMINAL Construction of a new runway (3260x60 m) Repair of the existing runway (2850x44 m) and existing taxiways, reconstruction of the apron, light-signal and radio navigation systems The new facility, located to the south-west of the operating terminal, will significantly expand the airport's capabilities. It will be built in 2 levels with a division into the arrival and departure areas of passengers. The capacity of the new terminal will be about 1000 people per hour. At the same time, the existing terminal will serve exclusively domestic flights in the future. The total throughput of two terminals will exceed 1500 passengers hourly. PASSENGER TURNOVER (PER YEAR) 3 MLN COST OF CONSTRUCTION AND RECONSTRUCTION USD 165 MLN 44 DNIPRO INTERNATIONAL AIRPORT AERODROME INFRASTRUCTURE: Construction of a new runway (3260x60 m) Repair of the existing runway (2850x44 m) and existing taxiways, reconstruction of the apron, light-signal and radio navigation systems The new runway will be longer and wider than the existing one, located parallel to the existing strip 150 meters from it (towards the passenger terminals). Reconstruction and repair of the apron, taxiways – will be implemented with increasing coverage and increasing their bearing capacity. The apron will be significantly expanded, its area will increase by 75%, additional parking will be built for medium and long-haul aircraft, the total number of aircraft stops will increase. AIRPORT Dnipro International Airport serves Dnipro City and the region with the population of 7 mln people Located: 5 km southeast of Dnipro City Type: civil Passenger turnover (year): 450 thousand Airlines Austrian Airlines, Dniproavia, Windrose Airlines, International Airlines of Ukraine, Air Baltic, Georgian Airlines, Lufthansa PROJECT DESCRIPTION
  • 44. PROJECTS 45 PROJECT TECHNICAL PARAMETERS LAND PLOT CHARACTERISTICS: area: 20,9 ha intended purpose of the use: air transport service cadastral number: issued leaseholder: ATC "Yuzmashavia" ENGINEERING INFRASTRUCTURE: electricity, water and gas supply: available (it does not require additional investments) COMPANY RESOURCES: land plot with an area of 20,9 ha, territorv for parking and reception of planes, all types of energy supply, existing buildings/premises (including store), automobile transport, cargo aircraft TRANSPORT INFRASTRUCTURE: distance from the nearest transport corridor: 1 km distance to Dnipro: 5 krn Iuggage custom registration TRANSPORTATION SERVICES: navigational support aircraft engineering servicing customs terminal take-off runway, highways and railway lines PROJECT GOALS The construction of modern business terminal for provision of services to VlP passengers in the territory of acting aviation platform ATC "Yuzhmashavia" in the international airport "Dnipro". Servicing, receipt of charter flight parking for private planes. BUSINESS TERMINAL PASSENGER SERVICE WILL INCLUDE: meeting/boarding a passenger with personal assistant delivery of a passenger from / to a plane by a separate transport organization of the procedure for registration of air tickets and Iuggage individual passing of aviation security, customs and passport control wi-fi, international calls, fax, printer luggage wrap visiting a bar with one person comfortable waiting rooms parking for passengers' cars PROJECT PARAMETERS Project cost: USD 7 mln Net Present Value - NPV Internal Rate of Return - lRR Payback Period - PP Profitability index - PI EBlDA USD 1,8 mln 126% 5 years 18% USD 14,6 mln BUSINESS AVIATION TERMINAL PROJECT DESCRIPTION
  • 45. Construction of the modern logistic terminal for cargo handling on aviation and other transport in the territory of ATC "Yuzmashavia" in the lnternational Airport "Dnipropetrovsk". PROJECT INITIATOR PROJECT GOALS Reception and dispatch of cargo by regular flights from the international Airport "Dnipropetrovsk" Handling of charter flights on the equipped parking stands Arrangement of cargo transits through the lnternational Airport anipropetrovskn Cargo storage Customs broker services Reception and sending of cargo by automobile transport Aviation Transport Company "Yuzmashavia" SE "PA UMZ named after A.Makarov" www.yuzmashair.com.ua PROJECT DURATION Building of terminal for cargo handling - 12 months Project cost: USD 2 mln PROJECT PARAMETRS Net Present Value - NPV Internal Rate of Return - lRR Payback Period - PP Profitability index - PI EBlDA USD 0,6 mln 127% 5 years 18% USD 3,8 mln AIR CARGO TERMINAL & HUB 46 PROJECT DESCRIPTION
  • 46. Increase energy efficiency in municupal institutions by means of attracting extrabudgetary funds with the use of "performance-contracting" the mechanism. Reduction of energy consumption in budgetary institutions, budget allocations for energy costs and creation comfortable conditions for people. PROJECTS 47 THERMODERNIZATION OF MUNICIPAL BUILDINGS Cost of the project: EUR 10 000 000 Borrower - municipal ESCO company Term of credit - up to 10 years Grace period - 36 months. The European Bank for Reconstruction and Development loan - Euro 10 mln. Non-repayment grant of E5P agency - Euro 2,5 mln. One-time fee - 1,20% of the loan amount (120 thousand euros) Redemption fee - 0,5% pa Margin - 5,25% pa + EURIBOR PROJECT READINESS STAGE: The second stage of the tender is held. An analysis of tender offers and selection of the Contractor is conducted. METHOD OF GUARANTEEING BORROWED RESOURCES: Dnipro City Council municipal guarantee (the volumes and conditions are agreed with the Ministry of Finance of Ukraine). The payback period of the project is 20 years. PROJECT DESCRIPTION PROJECT PARAMETRS
  • 47. INTEGRATED THERMO-MODERNIZATION OF MUNCIPAL BUILDINGS 48 Thermo-modernization of 150 municipal buildings (schools, kindergartens, hospitals, administrative buildings) in order to reduce energy consumption, reduce CO2 emissions to the atmosphere, save budget funds Project cost: USD 71,1 mln (incl. municipal funds - USD 0,3 mln for energy monitoring, energy audit, energy management) Necessary investments: USD 70,8 mln ESTABLISHMENT OF THE SYSTEM OF ENERGY MONITORING: Carrying out energy audit – USD 0,13 mln Development of design and estimate documentation – USD 2,83 mln Carrying out works on thermo-modernization – USD 67,92 mln Implementation of the energy management system is – USD 0,1 mln Annual energy consumption before thermo- modernization: 133 717 MWh Annual energy consumption after thermo-modernization: 93 602 MWh Reduced power consumption per year: 40 115 MWh Annual savings: USD 2,94 mln Reduction of CO2 emissions: 8729 tons per year Financial resources: External investments, financial leasing, credit, grant Project readiness stage: Business plan Method of guaranteeing borrowed resources: municipal quarantee, insurance Payback period - 10 years PROJECT PARAMETERSPROJECT DESCRIPTION
  • 48. PROJECTS 49 The waste recycling facility within the framework of PPP implementation is an integral property complex created by the joint activity of the parties of the public-private partnership, the functional purpose of which is the implementation of any technological operations related to the change in the physical, chemical or biological properties of waste with the purpose of preparing them for environmentally safe processing, use, storage, transportation, utilization or disposal. This project envisages the creation of a material and technical base that will, in the long run, minimize the costs of utilization (recycling) of wastes and generate revenues from the products that will be formed during the processing. STRUCTURE OF THE WASTE RECYCLING COMPLEX Resevoir of solid waste Sorting line Recycling of organic waste (AD), anaerobic reactor Heat and power plant Processing plastic into liquid fuel Chipper for construction waste Administrative buildings The capacity of processing of solid waste - 225 000 t / year Depth of processing of solid waste - up to 70% Building area - 20 hectares Investments: USD 59 MUSD Operating profit: USD 11,5 MUSD per year The payback period is 10 years WASTE-TO-ENERGY PROCESSING COMPLEX PROJECT DESCRIPTION PROJECT PARAMETRS
  • 49. Agricultural products cultivation with environmental protection using combined heat and power system (CHP), which supplies its electricity at premium prices to the energy market. CHP by-products (heat and CO2) serve as a nutrient environment for greenhouses. Agropark includes biomass processing unit (BML), which reduces the impact on the environment of domestic and industrial waste in the region. TYPE OF PROJECT: Construction. Area under construction - 60 hectares The volume of solid waste - 350 000 t / year Project cost: USD 275 mln Own funds: Public-private partnership Necessary investments: USD 275 mln Brief description of operating income flows per project (per year): USD 117,4 mln Summary of capital and operational costs of the project (per year): USD 30,1 mln Method of attraction of resources: External investments Stage of project readiness: Business plan Guarantee: Insurance Payback period of the project: 10 years Net present value of the project (NPV): USD 404,8 mln AGROPARK 50 PROJECT DESCRIPTION PROJECT PARAMETRS
  • 50. PROJECTS 51 FRUIT AND VEGETABLE STORAGE & SORTING FACILITY Construction of the refrigerator with a controlled atmosphere, which is designed for high-quality storage of fruits and vegetables, followed by sorting, packing, delivery to consumers. Project implementation is expected in the operating space of farming enterprise Vidrodzhennia, which is placed near existing garden. Total complex capacity will be 5 000 tonnes Market outlets: wholesale markets, trading networks of Ukraine. PROJECT INITIATOR PROJECT GOALS The construction of complex for storage of fruit and vegetable products and its sorting provides the opportunity to comply with requirements for entering to the outlet chain, namely: annual product delivery, high volumes, lot homogeneity The capacity of sorting line is 40 tonnes of the products per shift. lt is supposed the everyday shipment of production to the trade networks during 11 months It is planned to access to international markets of fruits and vegetables. The opportunity of project scale expansion: in the long term it is expected the extension of space for gardens and small fruit acreage up to 135 ha and for vegetables up to 40 ha Farming enterprise Vidrodzhennia. www.eko-sad.com PROJECT DURATION Construction of the refrigerator with a controlled atmosphere - 11 months PROJECT PARAMETERS Total project cost: USD 7,6 mln Initiator contribution to the project implementation: USD 2,1 mln Required investment capital: USD 5,5 mln Net Present Value - NPV Internal Rate of Return - lRR Payback Period - PP Profitability index - PI EBITDA USD 1,1 mln 120% 5,3 years 16% USD 10,8 mln PROJECT DESCRIPTION
  • 51. Project cost: USD 8 mln (depends on the selected project) PROJECT PARAMETERS Net present value NPV Profitability index Pl Internal rate of return IRR Payback period PP EBIDA USD 2,1 mln 126% 18% 5 years USD 16,8 mln 52 PROJECT INITIATOR PROJECT GOALS Construction of a Leisure Centre on the land plot, which is free of buildings and located along the road. The possibility of designing and building a playing area in Petrykivka urban type settlement, taking into account a diverse local landscape (forests, lakes, ravines). PROJECT DURATION Construction of a Leisure Centre «GOLF RESORT» - 12 months Dnipropetrovsk Regional Investment Agency www.dia.dp.gov.ua Diversification of the entertainment industry of such cities as Dnipro, Kamianske as well as Dnipro and Petrykivka districts and promoting golf as a sport Carrying out of professional competitions, sports, recreation, cultural and entertainment events THE POSSIBILITY OF PLACING: golf academy for children and adults tennis courts cycle routes conference and business meeting room cottages, houses for living hotels and restaurants LEISURE CENTRE "GOLF RESORT" PROJECT DESCRIPTION
  • 52. PROJECTS 53 PROJECT GOALS Creation of logistics center for storage and transportation of agricultural products "Green market" for collection, storage, package, primarv processing of agricultural products, goods delivery during the year, expansion of export potential of the region. Sales markets/clients: wholesale markets, Ukraine trade networks, foreign markets. Project cost: USD 8 mln Net Present Value - NPV Profitability index - PI Internal Rate of Return - IRR EBlDA Payback period - PP USD 3,3 mln 142% 22% USD 19 mln 5 years Reduction of production costs and turnover costs Create new modern warehouses and storage premises, reduce product expenses and turnover expenses Receipt of additional funds to the local budgets Expand share of domestic products on the domestic agricultural market lncrease the economic effectiveness of distributive network by means of traffic flow optimization Reduced prices on agricultural products for the population Expansion of export potential of the region TECHNICAL PARAMETERS OF THE PROJECT MECHANISMS FOR COOPERATION LAND PLOT CHARACTERISTICS: area: 97 ha intended purpose of the use: agricultural lands cadastral number: issued ENGINEERING INFRASTRUCTURE: needs engineering and design it is possible to connect to the gas, electricity, water TRANSPORT INFRASTRUCTURE: near the highways P 52 and T 0414 railwav station - 15 km distance to lnternational Airport "Dnipropetrovsk" - 60 km 5% - proprietary funds 95% - potential investor LOGISTICS CENTER "GREEN MARKET" PROJECT PARAMETERS PROJECT DESCRIPTION
  • 53. PROJECT PARAMETERS Net Present Value - NPV Internal Rate of Return - lRR Payback Period - PP Profitability index - PI EBlDA USD 2,3 mln 26% 5 years 156% USD 10,4 mln 54 POLYMER MATERIALS SHEETS PRODUCTION Creation of a new enterprise for the production of polymer plastic sheets of polyethvlene, polypropylene and other polymer materials. PROJECT INITIATOR Ukrkhimzakhyst Ltd PROJECT DURATION Estimated implementation schedule - 8 years Project cost: USD 4,3 mln INITIATOR'S RESOURCES FOR THE PROJECT IMPLEMENTATION: machinery, office equipment - USD 30 K experience in relevant projects implementation and project solutions PROJECT DESCRIPTION
  • 54. PROJECTS 55 PROJECT DESCRIPTION The line of Polymer Coating on galvanized steel sheet. The design capacity is 55 K tons of steel per year The galvanized sheet steel with polymer coating is a primary product for production of facade and roofing materials including sandwich panels and metal shingles The equipment production, facility preparation and installation will take about 12 months ln the 3rd year of the project the planned volume of production and sales will be 50 K tons PROJECT INITIATOR Elvas trading house, Ltd www.elvas.com.ua PROJECT GOALS The saturation of Ukrainian market with polymer coating galvanized sheet steel. Today there is no modern producer in this sphere in Ukraine Wholesale and retail trade with different coating types, production of roofing and facade materials (metal shingles, profiled flooring, siding), metal packaging production The equipment will allow to produce in small lots the wide range of products both in the color and pattern range and with various mechanical properties PROJECT DURATION PROJECT PARAMETERS Net Present Value - NPV Internal Rate of Return - lRR Payback Period - PP Profitability index - PI EBlDA USD 4,5 mln 35% 6 years 27% USD 16 mln USD 9 MLN USD 6,8 MLN USD 1,1 MLN USD 1,1 MLN REQUIRED INVESTMENTS LINE COST COST OF CONSTRUCTION OF WAREHOUSES AND PRODUCTION FACILITIES PART OF THE REQUIRED FLOATING CAPITAL PRODUCTION OF POLYMER COATINGS ON GALVANIZED STEEL OR ALUMINUM SHEETS
  • 55. PROJECT PARAMETERS Net Present Value - NPV Internal Rate of Return - lRR Payback Period - PP Profitability index - PI EBlDA USD 6 mln 112% 5,7 years 14% USD 6 mln 56 PRODUCTION OF BIO FUEL PELLETS PROJECT DESCRIPTION Creation of an enterprise for the production of bio fuel pellets with production capacity of 40 000 tons per year Estimated implementation schedule: 1 year PROJECT INITIATOR "VelLCV" Ltd PROJECT DURATION USD 2,63 mln 6 ha land engineering infrastructure INITIATOR'S RESOURCES FOR THE PROJECT IMPLEMENTATION: Required investment capital: USD 2,63 mln Project cost: USD 5,26 mln
  • 56. PROJECTS 57 PRODUCTION OF TANKS FROM POLYMERIC MATERIALS PROJECT DESCRIPTION Creation of an enterprise for the design and construction of tanks from polymer materials (polypropylene, polyethylene, teflon, etc.), as well as technological equipment based on them. PROJECT INITIATOR INITIATOR'S RESOURCES FOR THE PROJECT IMPLEMENTATION: Machinery, office equipment - USD 30 thousd Experience in the relevant projects implementation and project solutions Ukrkhimzakhyst Ltd PROJECT DURATION Estimated implementation schedule - 5 years PROJECT PARAMETERS Net Present Value - NPV Internal Rate of Return - lRR Payback Period - PP Profitability index - PI EBlDA USD 10 mln 206% 5 years 150% USD 1,3 mln Project cost: USD 1,1 mln
  • 57. 58 ATMOSPHERIC AIR MONITORING SYSTEM Financial resources: External investments Stage of project readiness: Project proposal Way of guaranteeing borrowed resources: Availability of pledged property Acquisition and maintenance of mobile and stationary stations of automatic continuous monitoring of atmospheric air. The main goal of the establishment of automatic continuous monitoring stations is the monitoring of environmental indicators of air pollution and informing the population about the quality of atmospheric air. Mobile environmental laboratories are designed to control environmental pollution and damage to the environment at a given point of the territory. The modern environmental laboratory (laboratory of control) allows to assess the sanitary-hygienic pollution of the air (or air of the working zone), water, soil in the areas of industrial enterprises. It is used in carrying out of natural and instrumental surveys of sources of pollutant emissions into the atmosphere in order to develop standards for maximum allowable emissions, and simply for the purpose of state or departmental control. The proposed system will allow to make operational decisions in crisis environmental situations and inform the population about the probable negative impact of the ecological situation on different groups of the population. This is the first such project in Ukraine that will attract the attention of the whole society to environmental problems, increase awareness and investment attractiveness of the city. USD 1,91 mln USD 0,146 mln USD 1,76 mln Project cost: City funds: Necessary investments: PROJECT PARAMETERSPROJECT DESCRIPTION
  • 58. PROJECTS 59 STARYY KODAK Staryy Kodak is a fortress in the neighborhood of the city of Dnipro that was built in 1635. This fortress appeared on the European maps right after it had been built. Its value was in the fact that it was constructed before the first rapid of the river Dnipro and that it allowed to control the strategic way from Zaporizhian Sich to well-settled Ukrainian lands. For the time being the larger part of it was destroyed by a granite quarry that was in operation during Soviet Union time. A part of Kodak was saved however. Itʼs about earthen berms, ditch and two bastions. The project point is to reconstruct the external view of the fortress by creation of a 3D model and access points of so-called "complemented reality" on remains of the construction. It will convert Kodak into an important tourist object which will be interesting both for the Ukrainian tourists and for people from Poland, Lithuania, France, as representatives of these nations have a direct relation to history of the fortress. STARA SAMAR Stara Samar is a settlement that appeared in the first fourth of the XVI century for maintenance of the trade ferry across the river Samara. It was used for transit trading and this fact is confirmed by Polish, Hansa, Dutch, Russian, Tatar and Turkish coins, product seals, things etc. A lot of accommodations, an inn and a church have been already discovered by archaeologists. The remains of the powerful fortress, that was built by hetman Ivan Mazepa here in 1688 and which was reconstructed in 1730 – years, have been saved to our time. Since 2015 the government of the city has been actively developing this territory. Such events as festivals of traditional culture, The Day of the City take place here. The historic & cultural park will be created on this territory. The remains of accommodations, coins, and weapons have been found here. In order to make all this legacy available to tourists, it is supposed to create 3D models and expose them in the Internet as well as in special information kiosks on the territory of the fortress. Project cost: USD 3 mln PROJECT DESCRIPTION PROJECT DESCRIPTION PROJECT PARAMETRS Project cost: USD 2 mln PROJECT PARAMETRS
  • 59. Currently, the city of Dnipro does not have its own city history museum. Available expositions of the city in other museums often continue to show the city as a part of Russian history or Soviet Union history ignoring its Ukrainian basis and its powerful national minorities, which participated and still participate in creation of history of the city of Dnipro. That is why the Museum of History of the city of Dnipro will be important point for conducting of educational work with representatives of the city community, as well as a place to present the city to tourists. Conceptually, the Museum will differ from existing ones because it will bring a person living in the city and a person visiting the museum into focus. The exposition will tell about "a person in city space", "a person in society", "a person in productive activities" and will use interactivity and multimedia allowing a participant to feel empathy and to equate himself with inhabitants of the city of Dnipro from previous ages. The Museum of History of the city of Dnipro will be created in two stages. The first stage is to create mini-museum in the historical building under the name "The Governorʼs House" with parallel preparation of a large exposition. The second stage is to create the full-scale museum of the city of Dnipro. 60 THE MUSEUM OF HISTORY OF THE CITY OF DNIPRO PROJECT PARAMETERS Project cost (1st stage): USD 20 K Project cost (2nd stage): USD 1,5 mln