5 November 2014
Extracting Valuable Information from HV Circuit Breaker
Testing
Charles Sweetser - OMICRON
MIPSYCON 2014
FINEPOINT
2
Agenda Topics
• SF6 and Oil Breaker Types (Info)
• Timing and Travel
• Power Factor
• Contact Resistance (Static and Dynamic)
• Minimum Pick-Up
Circuit Breaker Testing Protocol
• Performance Characteristics
Timing and Travel
Command Coil Analysis
Motor Current Analysis
• Insulation Components
Gas, Oil, and Vacuum
• Contact Resistance
• Supplies and Battery System
• Bushings
• CTs
Performance Characteristics
• Timing and Travel
 O, C, TripFree CO, ReClose O-C, O-CO
• Command Coil Analysis
 Current Signature
 Minimum Pick-Up
• Motor Current Analysis
Failure Modes
• Major Problems May Include:
 Insulation Failure
 Failure to Operate
 Failure to Interrupt
 Catastrophic Failure
• Other Problems May Include:
 Slow Close
 Slow Open
Types of Breakers
 Oil
 SF6 Gas
 Air: Blast or Magnetic
 Vacuum
Common Components
 Contacts
 Mechanism
 Insulation
 Arc Mitigation
 Control Cabinet
© OMICRON
Circuit Breaker Types
9
Live Tank vs Dead Tank
11
Typical Breaker Components
• Mechanism
 Springs
 Hydraulic
 Pneumatic
 Magnetic Actuator
• Contacts
 Moving
 Stationary
© OMICRON
Principle of Operating Mechanisms
Principle of Operating Mechanisms
Spring Mechanism
• Close spring is bigger than
Open spring
• While closing open spring
must be fully charged
© OMICRON
Spring Mechanism
• Close spring is bigger than
Open spring
Hydraulic
Mechanism
Magnetic Actuator
© OMICRON
© OMICRON
MA – Field Prep
© OMICRON
1. Main Contact Timing (O, C, CO, O-C)
2. Contact Resistance
3. Monitoring (USP)
• Magnetic Actuator Function
• Storage Capacitor Function
• Capacitor Charger Function
MA Testing – Advanced Tests Recommended
© OMICRON
Actuator Current via OMICRON Current Probe
© OMICRON
Capacitor Connections
© OMICRON
Main Contact Connections
© OMICRON
Analyzing the Measurement
Circuit Breaker Summary
BREAKER TYPES MECHANISM TYPES
Dead Tank Breaker (OCB) Hydraulic
Dead Tank Breaker SF6 Pneumatic
Live Tank Air Blast Spring
Live Tank SF6 Magnetic Actuator
Vacuum Breakers INSULATION SYSTEMS
Air Magnetic Oil
Low Voltage Air Blast SF6
Reclosers Air
Circuit Switchers Vacuum
Sectionalizers
Spring Type Operating Mechanism
Close Coil
Open Coil
Close Spring
Open Spring
Open/Close Coil Principle
0
0.5
1
1.5
2
2.5
0 50 100
Coil
Current
[A]
Time [ms]
Coil
Magnetic Arm
Spring
Core
Source: ABB, [RUS07]
© OMICRON
29
Trip Command
Duration - 66.6 ms
Trip Command – US Typical
Trip Coil Close Coil Delay
OPEN (O) 66.6 ms (4 cycles)
CLOSE (C) 133.3 ms (8 cycles)
TRIPFREE (CO) Standing 133.3 ms (8 cycles) 8.3 ms (1/2 cycle)
RECLOSE (OC) 66.6 ms (4 cycles) Standing 300.0 ms
30
Close Command
Duration – 133.3 ms
Close Command – US Typical
Trip Coil Close Coil Delay
OPEN (O) 66.6 ms (4 cycles)
CLOSE (C) 133.3 ms (8 cycles)
TRIPFREE (CO) Standing 133.3 ms (8 cycles) 8.3 ms (1/2 cycle)
RECLOSE (OC) 66.6 ms (4 cycles) Standing 300.0 ms
© OMICRON
31
Close Command
Close Duration – 133.3 ms
TripFree – US Typical
Trip Command
Trip Duration – Standing
Delay – ½ Cycle or 8.3 ms
Delay
© OMICRON
32
Trip Command
Trip Duration – 66.6 ms
ReClose – US Typical
Close Command
Close Duration – Standing
Sometimes > 300 ms
Delay
© OMICRON
Circuit Breaker Timing and Travel
• Perform a Measurement
-Contacts, Coils, Mechanism, Aux Switches
• Interpret performance characteristics
• Consult manufacturers specifications (Pass or
Fail) ,unlike power factor testing
Timing and Travel
What Can be Measured ?
1. Displacement (Travel&Velocity)
2. Breaker State (O:R:C)
3. Coil Current
4. Battery Voltage Level
5. Auxiliary Contact State
Performance Characteristics
1. Main Contact Timing
2. Resistor Switch Timing
3. Delta Timing
4. Velocity
5. Total Travel
6. Over Travel
7. Rebound
8. Stroke
9. Contact Wipe
10. Dwell Time (TripFree CO)
11. Dead Time (ReClose OC)
Specification Example
Identification CB1
Control Circuit Open 70-140 VDC / 6.0 A
Control Circuit Close 90-140 VDC / 6.0 A
Opening Time 17-30 ms
Opening Velocity 3.8 m/s minimum
Pole Spread Open 2.7 ms
Closing Time 50-85 ms
Closing Velocity 1.7 to 2.3 m/s
Pole Spread Close 2.7 ms
Overtravel 4.0 mm maximum
Rebound 6.5 mm maximum
Stroke 113 mm maximum
Dwell Time 20-38 ms
Reclose Time (Dead Time) 300 ms minimum
Measured Values
Main Contact Timing
Resistor Switch Timing
Pole Spread (Delta)
Travel CLOSE
Contact Wipe
Contact Wipe: The distance the contacts move during a close
operation from first make to the final resting position. This is an
electrical measurement.
Insulation Components
• Overall Power Factor
-TLI Tank Loss Index (OCB)
• Insulation Resistance
• DGA and Oil Screen (OCB)
• SF6 – Moisture, Density, and SO2
OCBs vs Dead Tank SF6
OCB Test Procedure
Test
Insulatio
n Tested
Breaker
Position
HV IN A IN B Test Mode
1 C1G Open Bushing 1 - - GST
2 C2G Open Bushing 2 - - GST
3 C3G Open Bushing 3 - - GST
4 C4G Open Bushing 4 - - GST
5 C5G Open Bushing 5 - - GST
6 C6G Open Bushing 6 - - GST
7 C1G+C2G Closed Bushing 1&2 - - GST
8 C3G+C4G Closed Bushing 3&4 - - GST
9 C5G+C6G Closed Bushing 5&6 - - GST
NOTE: All unused bushing should be left floating
Tank Loss Index (TLI)
TLI = (closed breaker test in watts) – (sum of
open breaker losses in watts)
Negative TLI (-) Positive TLI
(+)
Lift Rod Guide Lift rod
Interrupter
Assembly
Oil
Tank Liner
Dead Tank SF6 Test Procedure
Test
Insulatio
n Tested
Breaker
Position
HV IN A IN B Test Mode
1 C1G Open Bushing 1 - - GST
2 C2G Open Bushing 2 - - GST
3 C3G Open Bushing 3 - - GST
4 C4G Open Bushing 4 - - GST
5 C5G Open Bushing 5 - - GST
6 C6G Open Bushing 6 - - GST
7 C12 Open Bushing 1 Bushing 2 - UST-A
8 C34 Open Bushing 3 Bushing 4 - UST-A
9 C56 Open Bushing 5 Bushing 6 - UST-A
10 C1G+C2G Closed Bushing 1&2 - - GST
11 C3G+C4G Closed Bushing 3&4 - - GST
12 C5G+C6G Closed Bushing 5&6 - - GST
NOTE: All unused bushing should be left floating
Power Factor
Power Factor
Contact Resistance
• Static Contact Resistance
IEEE C37.09 - DC test current of 100 A minimum and not exceeding rated
current
• Dynamic Contact Resistance
Closed position Arcing Open position
7 Stationary main contact
2 Stationary arcing contact
3 Moving arcing contact 8 Moving main contact
Current
Level
CB1
PHASE A PHASE B PHASE C
100 A 77.93 µ 78.39 µ 79.08 µ
200 A 77.93 µ 78.44 µ 79.15 µ
300 A 78.00 µ 78.43 µ 79.19 µ
400 A 78.00 µ 78.46 µ 79.19 µ
Dynamic Contact Resistance
Minimum Pick-Up
• Determine the command coil parameters and ratings, AC or DC, and
operating voltage.
• Determine a start and stop voltage for the command coil under test.
Example, 125 VDC command coil, Start [10 VDC] – Stop [125 VDC]
• Determine pulse time: the pulse time should be limited so the command coil
does not overheat, 300 ms is the default starting point.
• Determine dead time: this is the time that the command coil pauses
between pulses. The dead time should be long enough to assist is cooling
of the command coil. 2 seconds is a reasonable starting point.
• Determine the voltage step increment: This is the amount that the voltage is
increased between command coil pulses: 5 VDC is a reasonable starting
point.
Minimum Pick-Up
Other Terminology and Applications
1. First Trip
2. Slow Close
3. Minimum Pick-Up
4. Minimum Voltage
© OMICRON
© OMICRON
QUESTIONS ?

More Related Content

Similar to Omicron-HVCirciutBreakerTesting.pdf

Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Flame control products for industrial fluid operations
Flame control products for industrial fluid operationsFlame control products for industrial fluid operations
Flame control products for industrial fluid operationsCTi Controltech
 
Inertia dynamic wrap spring clutches & brakes_specsheet
Inertia dynamic wrap spring clutches & brakes_specsheetInertia dynamic wrap spring clutches & brakes_specsheet
Inertia dynamic wrap spring clutches & brakes_specsheetElectromate
 
K85000-0391 -- Releasing Module Flyer.pdf
K85000-0391 -- Releasing Module Flyer.pdfK85000-0391 -- Releasing Module Flyer.pdf
K85000-0391 -- Releasing Module Flyer.pdfSecorpSAS
 
Singapore Presentation 2015 new
Singapore Presentation 2015 newSingapore Presentation 2015 new
Singapore Presentation 2015 newTom Ray
 
Control Loop Foundation for Batch and Continuous Control
Control Loop Foundation for Batch and Continuous ControlControl Loop Foundation for Batch and Continuous Control
Control Loop Foundation for Batch and Continuous ControlJim Cahill
 
Ogura Industrial Products
Ogura Industrial ProductsOgura Industrial Products
Ogura Industrial ProductsJim Milbaugh
 
Kollmorgen nema 23 t specsheet
Kollmorgen  nema 23 t  specsheetKollmorgen  nema 23 t  specsheet
Kollmorgen nema 23 t specsheetElectromate
 
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Thorne & Derrick International
 
Iai 07 rc general_cj0203-2_a_p443-492_cleanroom
Iai 07 rc general_cj0203-2_a_p443-492_cleanroomIai 07 rc general_cj0203-2_a_p443-492_cleanroom
Iai 07 rc general_cj0203-2_a_p443-492_cleanroomElectromate
 
Kansai catalogkansainmnlflseries dienhathe.vn
Kansai catalogkansainmnlflseries dienhathe.vnKansai catalogkansainmnlflseries dienhathe.vn
Kansai catalogkansainmnlflseries dienhathe.vnDien Ha The
 
Iai rcp2 cr_sa7c_specsheet
Iai rcp2 cr_sa7c_specsheetIai rcp2 cr_sa7c_specsheet
Iai rcp2 cr_sa7c_specsheetElectromate
 
Three phase BLDC motor
Three phase BLDC motorThree phase BLDC motor
Three phase BLDC motorAnoop S
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankurAnkur Mishra
 

Similar to Omicron-HVCirciutBreakerTesting.pdf (20)

Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
OTS_Pumps-Compressors
OTS_Pumps-CompressorsOTS_Pumps-Compressors
OTS_Pumps-Compressors
 
Flame control products for industrial fluid operations
Flame control products for industrial fluid operationsFlame control products for industrial fluid operations
Flame control products for industrial fluid operations
 
Inertia dynamic wrap spring clutches & brakes_specsheet
Inertia dynamic wrap spring clutches & brakes_specsheetInertia dynamic wrap spring clutches & brakes_specsheet
Inertia dynamic wrap spring clutches & brakes_specsheet
 
HV CB testing.pdf
HV CB testing.pdfHV CB testing.pdf
HV CB testing.pdf
 
K85000-0391 -- Releasing Module Flyer.pdf
K85000-0391 -- Releasing Module Flyer.pdfK85000-0391 -- Releasing Module Flyer.pdf
K85000-0391 -- Releasing Module Flyer.pdf
 
Singapore Presentation 2015 new
Singapore Presentation 2015 newSingapore Presentation 2015 new
Singapore Presentation 2015 new
 
IEEE Blue Book
IEEE Blue BookIEEE Blue Book
IEEE Blue Book
 
Kurt Hydraulic Clamping
Kurt Hydraulic ClampingKurt Hydraulic Clamping
Kurt Hydraulic Clamping
 
Control Loop Foundation for Batch and Continuous Control
Control Loop Foundation for Batch and Continuous ControlControl Loop Foundation for Batch and Continuous Control
Control Loop Foundation for Batch and Continuous Control
 
Ogura Industrial Products
Ogura Industrial ProductsOgura Industrial Products
Ogura Industrial Products
 
Kollmorgen nema 23 t specsheet
Kollmorgen  nema 23 t  specsheetKollmorgen  nema 23 t  specsheet
Kollmorgen nema 23 t specsheet
 
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
Heat Shrink Cable Joints & Cable Terminations LV HV, 6.6kV 11kV 33kV - SPS Ca...
 
Iai 07 rc general_cj0203-2_a_p443-492_cleanroom
Iai 07 rc general_cj0203-2_a_p443-492_cleanroomIai 07 rc general_cj0203-2_a_p443-492_cleanroom
Iai 07 rc general_cj0203-2_a_p443-492_cleanroom
 
Kansai catalogkansainmnlflseries dienhathe.vn
Kansai catalogkansainmnlflseries dienhathe.vnKansai catalogkansainmnlflseries dienhathe.vn
Kansai catalogkansainmnlflseries dienhathe.vn
 
Iai rcp2 cr_sa7c_specsheet
Iai rcp2 cr_sa7c_specsheetIai rcp2 cr_sa7c_specsheet
Iai rcp2 cr_sa7c_specsheet
 
ME461 Final Presentation
ME461 Final PresentationME461 Final Presentation
ME461 Final Presentation
 
Three phase BLDC motor
Three phase BLDC motorThree phase BLDC motor
Three phase BLDC motor
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
18824156
1882415618824156
18824156
 

More from ssuser52ed331

Physical process of cavity discharge with the impacts of space charges
Physical process of cavity discharge with the impacts of space chargesPhysical process of cavity discharge with the impacts of space charges
Physical process of cavity discharge with the impacts of space chargesssuser52ed331
 
DISENO PRE-EXPERIMENTAL DE INVESTIGACIÓN.pptx
DISENO PRE-EXPERIMENTAL DE INVESTIGACIÓN.pptxDISENO PRE-EXPERIMENTAL DE INVESTIGACIÓN.pptx
DISENO PRE-EXPERIMENTAL DE INVESTIGACIÓN.pptxssuser52ed331
 
10.1049-iet-smt.2018.5597Figure2007440003.pptx
10.1049-iet-smt.2018.5597Figure2007440003.pptx10.1049-iet-smt.2018.5597Figure2007440003.pptx
10.1049-iet-smt.2018.5597Figure2007440003.pptxssuser52ed331
 
REFLECTOMETRIA EN EL DOMINIO DEL TIEMPO (TDR).pdf
REFLECTOMETRIA EN EL DOMINIO DEL TIEMPO (TDR).pdfREFLECTOMETRIA EN EL DOMINIO DEL TIEMPO (TDR).pdf
REFLECTOMETRIA EN EL DOMINIO DEL TIEMPO (TDR).pdfssuser52ed331
 
Programa - Congreso.pdf
Programa - Congreso.pdfPrograma - Congreso.pdf
Programa - Congreso.pdfssuser52ed331
 
462349184-CURSO-VLF.pdf
462349184-CURSO-VLF.pdf462349184-CURSO-VLF.pdf
462349184-CURSO-VLF.pdfssuser52ed331
 

More from ssuser52ed331 (6)

Physical process of cavity discharge with the impacts of space charges
Physical process of cavity discharge with the impacts of space chargesPhysical process of cavity discharge with the impacts of space charges
Physical process of cavity discharge with the impacts of space charges
 
DISENO PRE-EXPERIMENTAL DE INVESTIGACIÓN.pptx
DISENO PRE-EXPERIMENTAL DE INVESTIGACIÓN.pptxDISENO PRE-EXPERIMENTAL DE INVESTIGACIÓN.pptx
DISENO PRE-EXPERIMENTAL DE INVESTIGACIÓN.pptx
 
10.1049-iet-smt.2018.5597Figure2007440003.pptx
10.1049-iet-smt.2018.5597Figure2007440003.pptx10.1049-iet-smt.2018.5597Figure2007440003.pptx
10.1049-iet-smt.2018.5597Figure2007440003.pptx
 
REFLECTOMETRIA EN EL DOMINIO DEL TIEMPO (TDR).pdf
REFLECTOMETRIA EN EL DOMINIO DEL TIEMPO (TDR).pdfREFLECTOMETRIA EN EL DOMINIO DEL TIEMPO (TDR).pdf
REFLECTOMETRIA EN EL DOMINIO DEL TIEMPO (TDR).pdf
 
Programa - Congreso.pdf
Programa - Congreso.pdfPrograma - Congreso.pdf
Programa - Congreso.pdf
 
462349184-CURSO-VLF.pdf
462349184-CURSO-VLF.pdf462349184-CURSO-VLF.pdf
462349184-CURSO-VLF.pdf
 

Recently uploaded

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 

Omicron-HVCirciutBreakerTesting.pdf

  • 1. 5 November 2014 Extracting Valuable Information from HV Circuit Breaker Testing Charles Sweetser - OMICRON MIPSYCON 2014
  • 3. Agenda Topics • SF6 and Oil Breaker Types (Info) • Timing and Travel • Power Factor • Contact Resistance (Static and Dynamic) • Minimum Pick-Up
  • 4. Circuit Breaker Testing Protocol • Performance Characteristics Timing and Travel Command Coil Analysis Motor Current Analysis • Insulation Components Gas, Oil, and Vacuum • Contact Resistance • Supplies and Battery System • Bushings • CTs
  • 5. Performance Characteristics • Timing and Travel  O, C, TripFree CO, ReClose O-C, O-CO • Command Coil Analysis  Current Signature  Minimum Pick-Up • Motor Current Analysis
  • 6. Failure Modes • Major Problems May Include:  Insulation Failure  Failure to Operate  Failure to Interrupt  Catastrophic Failure • Other Problems May Include:  Slow Close  Slow Open
  • 7. Types of Breakers  Oil  SF6 Gas  Air: Blast or Magnetic  Vacuum Common Components  Contacts  Mechanism  Insulation  Arc Mitigation  Control Cabinet © OMICRON
  • 9. 9
  • 10. Live Tank vs Dead Tank
  • 11. 11
  • 12.
  • 13.
  • 14. Typical Breaker Components • Mechanism  Springs  Hydraulic  Pneumatic  Magnetic Actuator • Contacts  Moving  Stationary © OMICRON
  • 17. Spring Mechanism • Close spring is bigger than Open spring • While closing open spring must be fully charged © OMICRON
  • 18. Spring Mechanism • Close spring is bigger than Open spring
  • 21. © OMICRON MA – Field Prep
  • 22. © OMICRON 1. Main Contact Timing (O, C, CO, O-C) 2. Contact Resistance 3. Monitoring (USP) • Magnetic Actuator Function • Storage Capacitor Function • Capacitor Charger Function MA Testing – Advanced Tests Recommended
  • 23. © OMICRON Actuator Current via OMICRON Current Probe
  • 25. © OMICRON Main Contact Connections
  • 27. Circuit Breaker Summary BREAKER TYPES MECHANISM TYPES Dead Tank Breaker (OCB) Hydraulic Dead Tank Breaker SF6 Pneumatic Live Tank Air Blast Spring Live Tank SF6 Magnetic Actuator Vacuum Breakers INSULATION SYSTEMS Air Magnetic Oil Low Voltage Air Blast SF6 Reclosers Air Circuit Switchers Vacuum Sectionalizers
  • 28. Spring Type Operating Mechanism Close Coil Open Coil Close Spring Open Spring Open/Close Coil Principle 0 0.5 1 1.5 2 2.5 0 50 100 Coil Current [A] Time [ms] Coil Magnetic Arm Spring Core Source: ABB, [RUS07] © OMICRON
  • 29. 29 Trip Command Duration - 66.6 ms Trip Command – US Typical Trip Coil Close Coil Delay OPEN (O) 66.6 ms (4 cycles) CLOSE (C) 133.3 ms (8 cycles) TRIPFREE (CO) Standing 133.3 ms (8 cycles) 8.3 ms (1/2 cycle) RECLOSE (OC) 66.6 ms (4 cycles) Standing 300.0 ms
  • 30. 30 Close Command Duration – 133.3 ms Close Command – US Typical Trip Coil Close Coil Delay OPEN (O) 66.6 ms (4 cycles) CLOSE (C) 133.3 ms (8 cycles) TRIPFREE (CO) Standing 133.3 ms (8 cycles) 8.3 ms (1/2 cycle) RECLOSE (OC) 66.6 ms (4 cycles) Standing 300.0 ms © OMICRON
  • 31. 31 Close Command Close Duration – 133.3 ms TripFree – US Typical Trip Command Trip Duration – Standing Delay – ½ Cycle or 8.3 ms Delay © OMICRON
  • 32. 32 Trip Command Trip Duration – 66.6 ms ReClose – US Typical Close Command Close Duration – Standing Sometimes > 300 ms Delay © OMICRON
  • 33. Circuit Breaker Timing and Travel • Perform a Measurement -Contacts, Coils, Mechanism, Aux Switches • Interpret performance characteristics • Consult manufacturers specifications (Pass or Fail) ,unlike power factor testing
  • 34. Timing and Travel What Can be Measured ? 1. Displacement (Travel&Velocity) 2. Breaker State (O:R:C) 3. Coil Current 4. Battery Voltage Level 5. Auxiliary Contact State
  • 35. Performance Characteristics 1. Main Contact Timing 2. Resistor Switch Timing 3. Delta Timing 4. Velocity 5. Total Travel 6. Over Travel 7. Rebound 8. Stroke 9. Contact Wipe 10. Dwell Time (TripFree CO) 11. Dead Time (ReClose OC)
  • 36. Specification Example Identification CB1 Control Circuit Open 70-140 VDC / 6.0 A Control Circuit Close 90-140 VDC / 6.0 A Opening Time 17-30 ms Opening Velocity 3.8 m/s minimum Pole Spread Open 2.7 ms Closing Time 50-85 ms Closing Velocity 1.7 to 2.3 m/s Pole Spread Close 2.7 ms Overtravel 4.0 mm maximum Rebound 6.5 mm maximum Stroke 113 mm maximum Dwell Time 20-38 ms Reclose Time (Dead Time) 300 ms minimum
  • 42. Contact Wipe Contact Wipe: The distance the contacts move during a close operation from first make to the final resting position. This is an electrical measurement.
  • 43. Insulation Components • Overall Power Factor -TLI Tank Loss Index (OCB) • Insulation Resistance • DGA and Oil Screen (OCB) • SF6 – Moisture, Density, and SO2
  • 44. OCBs vs Dead Tank SF6
  • 45. OCB Test Procedure Test Insulatio n Tested Breaker Position HV IN A IN B Test Mode 1 C1G Open Bushing 1 - - GST 2 C2G Open Bushing 2 - - GST 3 C3G Open Bushing 3 - - GST 4 C4G Open Bushing 4 - - GST 5 C5G Open Bushing 5 - - GST 6 C6G Open Bushing 6 - - GST 7 C1G+C2G Closed Bushing 1&2 - - GST 8 C3G+C4G Closed Bushing 3&4 - - GST 9 C5G+C6G Closed Bushing 5&6 - - GST NOTE: All unused bushing should be left floating
  • 46. Tank Loss Index (TLI) TLI = (closed breaker test in watts) – (sum of open breaker losses in watts) Negative TLI (-) Positive TLI (+) Lift Rod Guide Lift rod Interrupter Assembly Oil Tank Liner
  • 47. Dead Tank SF6 Test Procedure Test Insulatio n Tested Breaker Position HV IN A IN B Test Mode 1 C1G Open Bushing 1 - - GST 2 C2G Open Bushing 2 - - GST 3 C3G Open Bushing 3 - - GST 4 C4G Open Bushing 4 - - GST 5 C5G Open Bushing 5 - - GST 6 C6G Open Bushing 6 - - GST 7 C12 Open Bushing 1 Bushing 2 - UST-A 8 C34 Open Bushing 3 Bushing 4 - UST-A 9 C56 Open Bushing 5 Bushing 6 - UST-A 10 C1G+C2G Closed Bushing 1&2 - - GST 11 C3G+C4G Closed Bushing 3&4 - - GST 12 C5G+C6G Closed Bushing 5&6 - - GST NOTE: All unused bushing should be left floating
  • 50. Contact Resistance • Static Contact Resistance IEEE C37.09 - DC test current of 100 A minimum and not exceeding rated current • Dynamic Contact Resistance Closed position Arcing Open position 7 Stationary main contact 2 Stationary arcing contact 3 Moving arcing contact 8 Moving main contact Current Level CB1 PHASE A PHASE B PHASE C 100 A 77.93 µ 78.39 µ 79.08 µ 200 A 77.93 µ 78.44 µ 79.15 µ 300 A 78.00 µ 78.43 µ 79.19 µ 400 A 78.00 µ 78.46 µ 79.19 µ
  • 52. Minimum Pick-Up • Determine the command coil parameters and ratings, AC or DC, and operating voltage. • Determine a start and stop voltage for the command coil under test. Example, 125 VDC command coil, Start [10 VDC] – Stop [125 VDC] • Determine pulse time: the pulse time should be limited so the command coil does not overheat, 300 ms is the default starting point. • Determine dead time: this is the time that the command coil pauses between pulses. The dead time should be long enough to assist is cooling of the command coil. 2 seconds is a reasonable starting point. • Determine the voltage step increment: This is the amount that the voltage is increased between command coil pulses: 5 VDC is a reasonable starting point.
  • 54. Other Terminology and Applications 1. First Trip 2. Slow Close 3. Minimum Pick-Up 4. Minimum Voltage © OMICRON