Hot Dip Galvanizing and
Steel Fabrication Plant
Largest Power Sector Engineering Organization in Sri Lanka
engaged in the Electrical, Mechanical and Civil engineering
fields.
LTL Galvanizers (Pvt) Ltd.
Corrosion Never Sleeps… Get it Galvanized…
than 3000 customer base.
• LTL Galvanizers (Pvt) Ltd. has Established in year 1991 by
Sri Lanka’s renowned and leading Engineering
Organization, LTL Holdings (Pvt) Ltd to complement their
construction activities.
• Today this subsidiary of LTL Holdings, owns and operates
ultra modern facilities for galvanizing, designing and
fabrication of steel towers and structures and serves all
major industries in Sri Lanka.
• Currently LTL Galvanizers (Pvt) Ltd. operates with a more
than 3000 customer base.
LTL Galvanizers (Pvt) Ltd.
LTL Galvanizers (Pvt) Ltd.
LTL
Galvanizers
(Pvt) Ltd.
Steel
Fabrication
Hot Dip
Galvanizing &
Metallizing
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Our Products
Transmission
line towers
Telecom
towers
Substation
structures
Cross arms &
Line hardware
Nuts & Bolts Steel Buildings
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Our Products
Hand Rails Highway Structures Pipes & Pipe Racks
Bridges Gas Conveyers Transformer Tanks
Corrosion Never Sleeps… Get it Galvanized…
• Designing of Power Transmission Towers –
According to the ASCE-1097 standard
• Designing of Telecom Towers – According to
the EIA-222-G Structural standard
• Designing of Substations and other steel
structures. (Bridges, Steel Buildings, etc…)
Furnished Fabrication drawings are developed
utilizing state of the art computer software.
• PLS CAD – For Profile Designs
• PLS Tower – For Tower Designs
• MS Tower – For Tower Designs
• STADD Pro – For steel structures
Designs
Well trained Sri Lankan Design Engineers &
Draughtsman for all the design works.
• Designing of Power Transmission Towers –
According to the ASCE-1097 standard
• Designing of Telecom Towers – According to
the EIA-222-G Structural standard
• Designing of Substations and other steel
structures. (Bridges, Steel Buildings, etc…)
Furnished Fabrication drawings are developed
utilizing state of the art computer software.
• PLS CAD – For Profile Designs
• PLS Tower – For Tower Designs
• MS Tower – For Tower Designs
• STADD Pro – For steel structures
Designs
Well trained Sri Lankan Design Engineers &
Draughtsman for all the design works.
LTL Galvanizers (Pvt) Ltd.
In-house Design Capabilities
Tower Testing
Corrosion Never Sleeps… Get it Galvanized…
• Length: 7.0 m
• Width: 1.3 m
• Depth: 2.1 m
Bath Dimensions
• 5,000 kg/hr
Bath Capacity
• 13.5 m
Maximum length
can dip
Hot Dip Galvanizing Plant
Steel Bath
LTL Galvanizers (Pvt) Ltd.
The Hot Dip Galvanizing Plant is equipped with state of the art
German machinery and technology.
Corrosion Never Sleeps… Get it Galvanized…
• Length: 3.0 m
• Width: 0.8 m
• Depth: 1.2 m
Bath Dimensions
• 1,200 kg/hr
Bath Capacity
• 4600 C – 5600 C
Operating
Temperature
Range
Hot Dip Galvanizing Plant
Ceramic Bath (Centrifuge bath)
LTL Galvanizers (Pvt) Ltd.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Why Hot Dip Galvanizing?
• The U.S. Federal Highway Administration (FHWA) released a break-through 2-
year study in 2002 on the direct costs associated with metallic corrosion in US
incorporation with NACE international.
• It was found that the total Direct cost of corrosion in US was B$276 / year that
is 3.1% of US GDP in 1998. Indirect costs were very much higher than this.
• The best solution for corrosion protection is Hot Dip Galvanizing because it
gives 03 types of protection to steel, Cathodic, Barrier and Zinc Patina.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
LTL Galvanizers (Pvt) Ltd, incorporation with University of Peradeniya is planning to
conduct a corrosion cost study in Sri Lanka with the support of NACE International.
Cost of Corrosion Study – Sri Lanka
Corrosion Never Sleeps… Get it Galvanized…
Galvanizing Process
Weighing Incoming Inspection Unloading Loading to frames
Pickling
(Surface cleaning by Hydrochloric
Acid)
Rinsing with water Fluxing – Zinc Ammonium Chloride
(Temporary protection until dipping)
LTL Galvanizers (Pvt) Ltd.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Galvanizing Process
Quality Inspection Dispatch
Drying – by excess heat
(To remove moisture)
Dipping
(Dipping in molten Zinc –
450oC)
Quenching & Passivation
(passivation for prevent white rust)
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Gamma
Delta
Zeta
75% Zinc
25% Iron
90% Zinc
10% Iron
Eta 100% Zinc
94% Zinc
6% Iron
The Gamma, Delta and Zeta layers are actually
harder than the base steel.
steel
Metallurgical Bond
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Packing & Delivery
• All fabricated and galvanized products are checked for quality
conformance and packed according to the customer’s standards /
requirements.
• The items are placed on pallets, keeping some room to avoid moisture
trappings and tightened by coated metal strapping, to ensure the safe
arrival of the products at the final destinations. Each package is
numbered and packing lists ate prepared before delivery or shipping.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Packing & Delivery
Corrosion Never Sleeps… Get it Galvanized…
Fabrication Plant
LTL Galvanizers (Pvt) Ltd.
• 2,000 MT per Month
Total Capacity of the Plant
Corrosion Never Sleeps… Get it Galvanized…
Quality Management System
LTL Galvanizers (Pvt) Ltd.
ISO 9001:2015 Quality Management
System
• LTL Galvanizers (Pvt) Ltd has certified with
the latest ISO 9001:2015 for its compliance
with the standard requirements.
• The certification was awarded for design,
fabrication and Hot Dip Galvanizing of steel
structures for power transmission lines,
Electrical substations, telecommunication
towers, steel buildings and customer
supplied steel articles;
AND
• Thermal spray metallizing and painting of
storage tanks and steel structures.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
ISO 14001:2015 Environmental
Management System
• LTL Galvanizers (Pvt) Ltd has certified with
the latest ISO 14001:2015 for its
compliance with the standard
requirements.
• We have taken all the necessary steps to
minimize the Environmental impact that
can be happened due to the plant
operational activities and also to reduce
the carbon foot print.
• We are doing a sustainable business that
“meets the needs of the present world
without compromising the ability of the
future generations to meet their own
needs.”
Environmental Management System
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
OHSAS 18001:2007 Occupational Health
& Safety Management System
• LTL Galvanizers (Pvt) Ltd has certified with
the ISO 18001:2007 for its compliance with
the standard requirements.
• We do all the necessities to assure the
work place safety of our employees.
• Frequent training programs , Work safety
instructions and all the required safety
gear have been provided to all the
employees.
• Recently we have awarded with the ‘Best
Workplace Safety & Health Risk
Management’ award at South asian
Partnership Summit (SAPS) event, Dhaka.
Health & Safety Management System
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Member of American Galvanizers Association
• We have a strong
technical collaboration
agreement with the
American Galvanizers
Association (AGA).
• Also LTL Galvanizers
(Pt) Ltd. Is a member
of AGA
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
International Awards
Award for Best Workplace Safety
& Health Risk Management at
South Asian Partnership Summit
& Business Awards held in Dhaka,
Bangladesh - 2017
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
International Awards
Only award given by American Galvanizers Association outside the USA & Canada in 2018
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
International Awards
Only award given by American Galvanizers Association outside the USA & Canada in 2019
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
National Awards
Excellence in Engineering – Merit Award - 2018
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
For Past 20 years, more than 90 % of the
transmission line towers installed in Sri
Lanka have been Fabricated and Galvanized
by LTL Galvanizers
Corrosion Never Sleeps… Get it Galvanized…
Local Projects Completed
Name of Contract Employer Project Scope Year
1
Kukule Ganga Hydropower
Project, Lot-5
Energie GmbH &
Co.KG, Germany 27km of 132kV, ACSR Lynx D/C
Transmission Line
Dec 2000
–
Dec 2003
2
Transmission Substation
Development Project - 2, Lot-
B (TSDTP-2)
Betonmast Energie
AS
35.3km of 132kV, ACSR Zebra D/C
Transmission Line from Balangoda -
Ratnapura, Kelanitissa - Kolonnawa,
Oruwala - Athurigiriya
June 2001
–
Jan 2003
3
Heladhanavi 100MW Thermal
Power Plant in Puttalam, Sri
Lanka
Lakdhanavi Limited 4.5 km of 132kV, ACSR Zebra D/C
Transmission Line from Puttalam SS to
100MW Heladanavi Power plant
Nov 2003
–
June 2004
4
Horana - Paragastota
Transmission Development
Project Lot-B
Lanaka
Transformers Ltd
20 km of 132kV, ACSR Zebra D/C
Transmission Line from Horana New
Substation to Paragastota T-off
Mar 2003
–
Jan 2005
5 Kelaniya - Kolonnawa
Transmission Line Project
Ceylon Electricity
Board
7.0 km of 132kV, ACSR Zebra D/C
Transmission Line from Kelaniya –
Kolonnawa
Apr 2004
–
July 2004
6
Power Sector Development
Transmission Project. PSDTP
Lot-B
Ceylon Electricity
Board
43km of 132kV, ACSR Zebra D/C
Transmission Line
Jan 2006
–
May 2008
Transmission Lines
LTL Galvanizers (Pvt) Ltd.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
For Past 20 years, more than 90 % of the Grid
Substations installed in Sri Lanka have been
Fabricated and Galvanized by LTL Galvanizers
Corrosion Never Sleeps… Get it Galvanized…
Local Projects Completed
Name of Contract
Employer/
Main Contactor
Project Scope Year
1 4 MW Asupiniella Mini Hydro Project
Nividu (Pvt)
Limited
Construction of 2 Nos. of 33kV
Outdoor Line Bays
Aril 2003
–
Oct 2005
2 40 MW Lakdhanavi IV Emergency
Power Plant Project Lakdhanavi
Limited
Construction of 0.4/33kV,
44x1.25MVA Generation
Substation
March
2005
–
June 2005
3
80 MW Emergency Power Plant
Project, Mwanza, Tanzania
Lakdhanavi
Limited
Construction of 0.4/33kV,
25x3.5MVA Generation
Substation
Nov 2006
–
Feb 2007
4
Yugadhanavi 300MW Thermal Power
Plant in Kerawalapitiya
Lakdhanavi
Limited
Construction of 220/14.5kV,
2x130MVA, 1x140MVA
Generation Substation
June 2007
–
Oct 2008
5 Vavuniya Grid Substation
Augmentation Project
CEB/LTL Holdings
(Pvt) Limited
Supply, Installation and
Commissioning of 132/33kV,
1x31.5MVA Transformer and
Commissioning of the
Transformer Bay
July 2009
–
Oct 2009
Grid Substations
LTL Galvanizers (Pvt) Ltd.
Corrosion Never Sleeps… Get it Galvanized…
Name
Employer/
Main Contactor
Project Scope Year
Kittanpahuwa Bridge
(Cable Projects)
Ceylon Electricity
Board
Colombo city Electricity Distribution
Development project package –B
supply & Installation of 132kV U.G.
cable system
2010
Dematagoda Bridge
Ceylon Electricity
Board
Colombo city Electricity Distribution
Development project package –B
supply & Installation of 132kV U.G.
cable system
2010
Local Projects Completed
Bridges
LTL Galvanizers (Pvt) Ltd.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Recently Completed Local Projects
132 kV Transmission Line – Ukuwela - Pallekale
220 kV Transmission Line – Upper Kothmale
132 kV Transmission Line – Galle - Matara 132 kV Transmission Line – Puttlam - Maho
33 kV Transmission Line –
Hambanthota
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Recently Completed Local Projects
Project Name Employer Project Scope Tower Qty.
Total
Weight
(MT)
Clean Energy Network Efficiency
Improvement Project – ( Mannar –
Vavuniya – Anuradhapura)
Ceylon
Electricity
Board
220 kV Transmission Lines - 121.6
km
372 4700 MT
Clean Energy Network Efficiency
Improvement Project – ( Thulhiriya –
Molagoda/ Polpitiya – New Polpitiya /
Athurugiriya - Padukka)
Ceylon
Electricity
Board
220 kV Transmission - 34.1 km 124 1374 MT
Supply and Delivery of 33 kV Double
Circuit Towers Tender No:
DD3/P&D/ICB/2015/029/B
Ceylon
Electricity
Board
33 kV Double Circuit - 37.1 km 106 460 MT
Supply and Delivery of 33 kVTower
Structures
Tender No: DD1/P&D/ICB/2014/081/D
Ceylon
Electricity
Board
33 kV Double Circuit Towers- 18.9
km
54 187 MT
ADB- Clean Energy and Access
Improvement Project, Part 2: Puttlam-
Maho – Ukuwella Pallekele, Galle-Matara
Ceylon
Electricity
Board
132kV Transmission Lines
95.7 km
310
2632 MT
ADB-Clean Energy Access Improvement
Project , Part – 7: Habarana -
Walachchenei
Ceylon
Electricity
Board
132kV Transmission System in the
eastern Province
100km
320
2718 MT
Transmission Lines
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Name of Project Employer
Project Scope Total Weight
(MT)
CEB grid substation in Katunayake,
Ambalangoda , Aniyakanda
CEB/TCP/DGM/CBAAKGS/2014/12
Ceylon
Electricity
Board
Construction of New 132/33kV GS 55 MT
Clean Energy and Access
Improvement Project, Part 6:
Network Capacity Augmentation for
Renewable Energy Project
Ceylon
Electricity
Board
Augmentation of Existing 132/33kV GS at
Badulla, Balangoda, Nuwaraeliya,
Seethawaka, & Construction of New
132/33kV GS at Mahiyanganaya
255 MT
Augmentation of Grid Substations
for Absorption of Renewable Energy
Project- (AGSAREP) Phase I- Lot A
Ceylon
Electricity
Board
Augmentation of GS at Ratmalana, Ratnapura
& Wimalasurendra Power Station
85 MT
Recently Completed Local Projects
132 kV
Gantry -
Kilinochchi
Grid Substations
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Recently Completed Local Projects
Power Plants
300 MW Combined Cycle Power Plant - Kerawalapitiya
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Recently Completed Local Projects
Power Plants
Steel structures of 300 MW Combined Cycle Power Plant - Kerawalapitiya
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Recently Completed Local Projects
Power Plants
24 MW Power Plant for CEB – Jaffna (Northern Province)
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Steel structures of 24 MW Power Plant - Jaffna
Recently Completed Local Projects
Power Plants
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Recently Completed Local Projects
Other Steel Buildings
Work shop building – Sri Lanka Railways
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Recently Completed Local Projects
Other Steel Buildings
Central Storage Building – 300 MW CCPP Kerawalapitiya
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Recently Completed Local Projects
Other Steel Buildings
Spherical structure made for Chandra Engineers
Verele Japanese
Restaurant at
Anantara Peace
Haven – Tangalle
Resort
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Place : Hambanthota
Height: 60m
Weight : 14.71 MT
Established Year : 2005
Place : Malvana
Height: 40m
Weight : 8.12 MT
Established Year : 2004
Telecom Tower Projects for Mobitel
Place :Beliatta
Height: 70m
Weight : 24.68 MT
Established Year : 2005
Place :Morranthuduwa
Height: 60m
Weight : 14.71 MT
Established Year : 2004
Total No. of Mobitel towers Completed = 150
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Galvanized Exports
• Galvanizing of Gas conveyers for
world’s largest Gas conveyer
manufacturer, Kosan Krisplant. These
conveyers are exported all over the
word including European countries.
• This is a continuing business.
• Galvanizing of Fences and solar panel
mounting structures for MIC Lanka. All
the fences are exported to Japan.
• This is also a continuing business.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Overseas Projects
33 kV Transmission Line – Uganda
Corrosion Never Sleeps… Get it Galvanized…
Overseas Projects
Name of Contract Employer
Total
Weight
(MT)
Uganda- In relation to the Construction of Government Priority
Rural electrification projects in Lawala, Kaberamaido, Kobolubulu,
Amolatar & Kelle Port , Lawala- Otuboi, acinip and Lawala, Dokolo
The Government of the
Republic of Uganda
420 MT
Uganda- In relation to the Construction of Government Priority
Rural electrification projects in Kitgum, Palabek amd Lira, Apala,
Aloi
The Government of the
Republic of Uganda
Uganda- In relation to the Construction of Government Priority
Rural electrification schemes in Busia, Manafwa and Mbale
districts
The Government of the
Republic of Uganda
Uganda- In relation to the Construction of Government Priority
Rural electrification schemes in Soroti, Pallisa,Bukedia and Tororo
Districts
The Government of the
Republic of Uganda
Bangladesh - Komila Power Plant Project Lakdhanavi-Bangla
Power Limited
100 MT
Bangladesh - Rajshahi Power Plant Project Raj Lanka Power
Company Limited
100 MT
LTL Galvanizers (Pvt) Ltd.
Corrosion Never Sleeps… Get it Galvanized…
Overseas Projects
Project Tonnage
(MT)
Tanzania Transmission Line Project LOT 20 327.359
Tanzania Transmission Line Project LOT 21 248.218
Uganda – West Nile Transmission Line Project LOT 01 168.152
Uganda – West Nile Transmission Line Project LOT 02 12.028
Uganda Transmission Line Project LOT 03 7.91
LTL Galvanizers (Pvt) Ltd.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Overseas Projects
HE the Prime Minister of Bangladesh at opening ceremony of power plant
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Power Plant Projects in Bangladesh
Overseas Projects
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Special Jobs Done
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Special Jobs Done
‘Verele’ Japanese Restaurant for
Anantara Peace Haven Tangalle
Resort
Reefer Access Gantry Structures for
Hambantota Port
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Monopole communication Tower for Ivory coast
03 Pieces and the Base
Maximum diameter = 1145 mm
Total Height of the Tower = 30 m
Total Weight of the Tower = 9435 kg
Special Jobs Done
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd. LTL Galvanizers (Pvt) Ltd
THERMAL SPRAYING (Metallizing)
The most effective and resilient coating for protecting steel
structures, such as bridges, available today.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Electric Arc Wire Spray Metallizing
A thermal spray process in which, an arc is struck between two
consumable electrodes of a coating material. Compressed gas is
used to atomize and propel the material to the substrate.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Abrasive Blasting
Zn/Zn-Al Spraying
Application of Primer
Application of top Paint Coats
Metallizing Process
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Why Metallizing?
1. Best alternative for re-painting of already fixed structures.
2. Life cycle cost is lower than that of painting.
3. There is no limit for the shape and size of the structure as in Hot
Dip Galvanizing.
4. Higher bond strength when comparing with painting.
5. Higher service life comparing with painting.
6. No limit of coating thickness as in Hot Dip Galvanizing.
7. The most versatile and effective coating for protecting steel
structures, such as bridges, available today.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Some ongoing and Completed Projects
Pipe bridge for
National water supply
& drainage board.
Location - Kalpitiya
Metallizing
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Some ongoing and Completed Projects
Steel girder at CGR Work Shop
Metallized and
painted
condensate
storage tank –
Yugadanavi
Power Plant
Kerawalapitiya
Sample Metallizing at Aluthgama
Railway bridge
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
• Thermal Spraying of Zn and Zn/Al alloy will be done in accordance with the ISO
2063:2017 standard.
• Metallized coating thickness will be greater than the minimum coating thickness as
mentioned in TableC.1 of ISO 2063:2017-1.
• Metallized coating thickness and thickness of sealer coats can be customized according
to the requirement of the customer and according to the Environmental conditions
where item is installed.
• Adhesions tests of coating can be done if requested by the customer.
• Painting over metallized surface will be done under the guidance of a certified paint
specialist and in accordance with the table A.8 of ISO 12944-5:2007.
• Pre-Preparation, metallizing, painting and testing will also done in accordance with the
applicable NACE and SSPC standard requirements.
Quality Assurance
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Future Strategies
• Manufacturing of Galvanized monopole towers in Sri Lanka
There is a potential market in Asian countries
for Power Transmission Hexagonal monopole
towers
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
• Manufacturing of Galvanized solar panel mounting structures and provide
complete solution with installation.
Future Strategies
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
• Acquiring/putting up a new fabrication plant in India
Future Strategies
If we have a steel fabrication facility in India, we may be able to fabricate towers for a
much lower cost than in Sri Lanka.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Future Strategies
• Putting up a new Hot Dip Galvanizing plant in Hambanthota
This will help in catering the future industrial development in
Hambanthota area,.
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
Sustainable Manufacturing
• Using Resources Efficiently
– Zero direct Discharge of
process water
» Use rinsing water
to prepare fresh
acid baths
» Use quenching
water to prepare
rinsing water baths
– Use waste heat for
drying furnace without
using electricity or gas
burners
– 100% cut down
electricity usage for flux
heating by using non-
heating flux
– Reduce HCl consumption
& Lime consumption by
improving acid
preparation
methodology
• Minimizing Pollution
– Zero discharge of effluent
water to the Environment
» Use proper Effluent
Treatment Process
– New Experiments to
reduce pollution
» Get support of
Department of
Agriculture to find
the possibility of
using solid sludge
generated as an
ingredient of
coconut fertilizer.
– Periodic monitoring of
Stack emissions, Ambient
Air Quality, noise levels
and Treated water quality
and do necessary process
adjustments.
Corrosion Never Sleeps… Get it Galvanized…
Contractor for Turnkey Construction Projects
• LTLG is capable of handling turnkey construction projects.
• Our professional and highly qualified team will ensure
every phase of a project; Design, Fabrication, Galvanizing
and Installation, completed on time exceeding customer’s
expectations.
• We will earn customer’s vote of confidence and patronage
with our design competence, timely performance,
and competitive bid for the actual work.
LTL Galvanizers (Pvt) Ltd.
Blocks 03 & 04, LINDEL,
Sapugaskanda, Sri Lanka
Corrosion Never Sleeps… Get it Galvanized…
LTL Galvanizers (Pvt) Ltd.
THANK YOU !

More Related Content

Similar to LTL Galvanizers - Brief Description.pdf

Corporate Presentation - Karamtara Engineering.pdf
Corporate Presentation - Karamtara Engineering.pdfCorporate Presentation - Karamtara Engineering.pdf
Corporate Presentation - Karamtara Engineering.pdfSOURAVKUMAR52625
 
Lefebvre presentation-2017
Lefebvre   presentation-2017Lefebvre   presentation-2017
Lefebvre presentation-2017SHRAVAN KUMAR
 
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.Anirudh Singhar
 
Cast Fab Foundry Overview 2
Cast Fab Foundry Overview 2Cast Fab Foundry Overview 2
Cast Fab Foundry Overview 2jbrewer15
 
Zhong wang presentation
Zhong wang presentationZhong wang presentation
Zhong wang presentationAlan Gao
 
CamtechEngineering
CamtechEngineeringCamtechEngineering
CamtechEngineeringHusain A
 
INTERDUCTION LETTOR ( Guj)
INTERDUCTION LETTOR ( Guj)INTERDUCTION LETTOR ( Guj)
INTERDUCTION LETTOR ( Guj)Mrs. Amina Medin
 
Cast Fab Foundry Overview
Cast Fab Foundry OverviewCast Fab Foundry Overview
Cast Fab Foundry Overviewtcaldwell3
 
Cast Fab Foundry Overview 3
Cast Fab Foundry Overview 3Cast Fab Foundry Overview 3
Cast Fab Foundry Overview 3gpowerscastfab
 
American cladding technologies overview
American cladding technologies overviewAmerican cladding technologies overview
American cladding technologies overviewTeknokraft
 

Similar to LTL Galvanizers - Brief Description.pdf (20)

Arcraft plasma equipments (i) pvt
Arcraft plasma equipments (i) pvtArcraft plasma equipments (i) pvt
Arcraft plasma equipments (i) pvt
 
Corporate Presentation - Karamtara Engineering.pdf
Corporate Presentation - Karamtara Engineering.pdfCorporate Presentation - Karamtara Engineering.pdf
Corporate Presentation - Karamtara Engineering.pdf
 
Arcraft Plasma Equipments (i) Pvt
Arcraft Plasma Equipments (i) PvtArcraft Plasma Equipments (i) Pvt
Arcraft Plasma Equipments (i) Pvt
 
Arcraft plasma equipments (i) pvt. ltd.
Arcraft plasma equipments (i) pvt. ltd.Arcraft plasma equipments (i) pvt. ltd.
Arcraft plasma equipments (i) pvt. ltd.
 
Union industries-product-catalog
Union industries-product-catalog Union industries-product-catalog
Union industries-product-catalog
 
Lefebvre presentation-2017
Lefebvre   presentation-2017Lefebvre   presentation-2017
Lefebvre presentation-2017
 
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
 
Cast Fab Foundry Overview 2
Cast Fab Foundry Overview 2Cast Fab Foundry Overview 2
Cast Fab Foundry Overview 2
 
Sbpil
SbpilSbpil
Sbpil
 
Zhong wang presentation
Zhong wang presentationZhong wang presentation
Zhong wang presentation
 
CamtechEngineering
CamtechEngineeringCamtechEngineering
CamtechEngineering
 
INTERDUCTION LETTOR ( Guj)
INTERDUCTION LETTOR ( Guj)INTERDUCTION LETTOR ( Guj)
INTERDUCTION LETTOR ( Guj)
 
INTERDUCTION LETTOR-
INTERDUCTION LETTOR-INTERDUCTION LETTOR-
INTERDUCTION LETTOR-
 
Cast Fab Foundry Overview
Cast Fab Foundry OverviewCast Fab Foundry Overview
Cast Fab Foundry Overview
 
Cast Fab Foundry Overview 3
Cast Fab Foundry Overview 3Cast Fab Foundry Overview 3
Cast Fab Foundry Overview 3
 
Mpil roofing solutions
Mpil roofing solutionsMpil roofing solutions
Mpil roofing solutions
 
American cladding technologies overview
American cladding technologies overviewAmerican cladding technologies overview
American cladding technologies overview
 
R k-alloys
R k-alloysR k-alloys
R k-alloys
 
Imperial compny profile .
Imperial compny profile .Imperial compny profile .
Imperial compny profile .
 
Presentation sap
Presentation sapPresentation sap
Presentation sap
 

Recently uploaded

Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 

Recently uploaded (20)

Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 

LTL Galvanizers - Brief Description.pdf

  • 1. Hot Dip Galvanizing and Steel Fabrication Plant Largest Power Sector Engineering Organization in Sri Lanka engaged in the Electrical, Mechanical and Civil engineering fields. LTL Galvanizers (Pvt) Ltd.
  • 2. Corrosion Never Sleeps… Get it Galvanized… than 3000 customer base. • LTL Galvanizers (Pvt) Ltd. has Established in year 1991 by Sri Lanka’s renowned and leading Engineering Organization, LTL Holdings (Pvt) Ltd to complement their construction activities. • Today this subsidiary of LTL Holdings, owns and operates ultra modern facilities for galvanizing, designing and fabrication of steel towers and structures and serves all major industries in Sri Lanka. • Currently LTL Galvanizers (Pvt) Ltd. operates with a more than 3000 customer base. LTL Galvanizers (Pvt) Ltd. LTL Galvanizers (Pvt) Ltd. LTL Galvanizers (Pvt) Ltd. Steel Fabrication Hot Dip Galvanizing & Metallizing
  • 3. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Our Products Transmission line towers Telecom towers Substation structures Cross arms & Line hardware Nuts & Bolts Steel Buildings
  • 4. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Our Products Hand Rails Highway Structures Pipes & Pipe Racks Bridges Gas Conveyers Transformer Tanks
  • 5. Corrosion Never Sleeps… Get it Galvanized… • Designing of Power Transmission Towers – According to the ASCE-1097 standard • Designing of Telecom Towers – According to the EIA-222-G Structural standard • Designing of Substations and other steel structures. (Bridges, Steel Buildings, etc…) Furnished Fabrication drawings are developed utilizing state of the art computer software. • PLS CAD – For Profile Designs • PLS Tower – For Tower Designs • MS Tower – For Tower Designs • STADD Pro – For steel structures Designs Well trained Sri Lankan Design Engineers & Draughtsman for all the design works. • Designing of Power Transmission Towers – According to the ASCE-1097 standard • Designing of Telecom Towers – According to the EIA-222-G Structural standard • Designing of Substations and other steel structures. (Bridges, Steel Buildings, etc…) Furnished Fabrication drawings are developed utilizing state of the art computer software. • PLS CAD – For Profile Designs • PLS Tower – For Tower Designs • MS Tower – For Tower Designs • STADD Pro – For steel structures Designs Well trained Sri Lankan Design Engineers & Draughtsman for all the design works. LTL Galvanizers (Pvt) Ltd. In-house Design Capabilities Tower Testing
  • 6. Corrosion Never Sleeps… Get it Galvanized… • Length: 7.0 m • Width: 1.3 m • Depth: 2.1 m Bath Dimensions • 5,000 kg/hr Bath Capacity • 13.5 m Maximum length can dip Hot Dip Galvanizing Plant Steel Bath LTL Galvanizers (Pvt) Ltd. The Hot Dip Galvanizing Plant is equipped with state of the art German machinery and technology.
  • 7. Corrosion Never Sleeps… Get it Galvanized… • Length: 3.0 m • Width: 0.8 m • Depth: 1.2 m Bath Dimensions • 1,200 kg/hr Bath Capacity • 4600 C – 5600 C Operating Temperature Range Hot Dip Galvanizing Plant Ceramic Bath (Centrifuge bath) LTL Galvanizers (Pvt) Ltd.
  • 8. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Why Hot Dip Galvanizing? • The U.S. Federal Highway Administration (FHWA) released a break-through 2- year study in 2002 on the direct costs associated with metallic corrosion in US incorporation with NACE international. • It was found that the total Direct cost of corrosion in US was B$276 / year that is 3.1% of US GDP in 1998. Indirect costs were very much higher than this. • The best solution for corrosion protection is Hot Dip Galvanizing because it gives 03 types of protection to steel, Cathodic, Barrier and Zinc Patina.
  • 9. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. LTL Galvanizers (Pvt) Ltd, incorporation with University of Peradeniya is planning to conduct a corrosion cost study in Sri Lanka with the support of NACE International. Cost of Corrosion Study – Sri Lanka
  • 10. Corrosion Never Sleeps… Get it Galvanized… Galvanizing Process Weighing Incoming Inspection Unloading Loading to frames Pickling (Surface cleaning by Hydrochloric Acid) Rinsing with water Fluxing – Zinc Ammonium Chloride (Temporary protection until dipping) LTL Galvanizers (Pvt) Ltd.
  • 11. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Galvanizing Process Quality Inspection Dispatch Drying – by excess heat (To remove moisture) Dipping (Dipping in molten Zinc – 450oC) Quenching & Passivation (passivation for prevent white rust)
  • 12. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Gamma Delta Zeta 75% Zinc 25% Iron 90% Zinc 10% Iron Eta 100% Zinc 94% Zinc 6% Iron The Gamma, Delta and Zeta layers are actually harder than the base steel. steel Metallurgical Bond
  • 13. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Packing & Delivery • All fabricated and galvanized products are checked for quality conformance and packed according to the customer’s standards / requirements. • The items are placed on pallets, keeping some room to avoid moisture trappings and tightened by coated metal strapping, to ensure the safe arrival of the products at the final destinations. Each package is numbered and packing lists ate prepared before delivery or shipping.
  • 14. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Packing & Delivery
  • 15. Corrosion Never Sleeps… Get it Galvanized… Fabrication Plant LTL Galvanizers (Pvt) Ltd. • 2,000 MT per Month Total Capacity of the Plant
  • 16. Corrosion Never Sleeps… Get it Galvanized… Quality Management System LTL Galvanizers (Pvt) Ltd. ISO 9001:2015 Quality Management System • LTL Galvanizers (Pvt) Ltd has certified with the latest ISO 9001:2015 for its compliance with the standard requirements. • The certification was awarded for design, fabrication and Hot Dip Galvanizing of steel structures for power transmission lines, Electrical substations, telecommunication towers, steel buildings and customer supplied steel articles; AND • Thermal spray metallizing and painting of storage tanks and steel structures.
  • 17. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. ISO 14001:2015 Environmental Management System • LTL Galvanizers (Pvt) Ltd has certified with the latest ISO 14001:2015 for its compliance with the standard requirements. • We have taken all the necessary steps to minimize the Environmental impact that can be happened due to the plant operational activities and also to reduce the carbon foot print. • We are doing a sustainable business that “meets the needs of the present world without compromising the ability of the future generations to meet their own needs.” Environmental Management System
  • 18. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. OHSAS 18001:2007 Occupational Health & Safety Management System • LTL Galvanizers (Pvt) Ltd has certified with the ISO 18001:2007 for its compliance with the standard requirements. • We do all the necessities to assure the work place safety of our employees. • Frequent training programs , Work safety instructions and all the required safety gear have been provided to all the employees. • Recently we have awarded with the ‘Best Workplace Safety & Health Risk Management’ award at South asian Partnership Summit (SAPS) event, Dhaka. Health & Safety Management System
  • 19. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Member of American Galvanizers Association • We have a strong technical collaboration agreement with the American Galvanizers Association (AGA). • Also LTL Galvanizers (Pt) Ltd. Is a member of AGA
  • 20. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. International Awards Award for Best Workplace Safety & Health Risk Management at South Asian Partnership Summit & Business Awards held in Dhaka, Bangladesh - 2017
  • 21. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. International Awards Only award given by American Galvanizers Association outside the USA & Canada in 2018
  • 22. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. International Awards Only award given by American Galvanizers Association outside the USA & Canada in 2019
  • 23. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. National Awards Excellence in Engineering – Merit Award - 2018
  • 24. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. For Past 20 years, more than 90 % of the transmission line towers installed in Sri Lanka have been Fabricated and Galvanized by LTL Galvanizers
  • 25. Corrosion Never Sleeps… Get it Galvanized… Local Projects Completed Name of Contract Employer Project Scope Year 1 Kukule Ganga Hydropower Project, Lot-5 Energie GmbH & Co.KG, Germany 27km of 132kV, ACSR Lynx D/C Transmission Line Dec 2000 – Dec 2003 2 Transmission Substation Development Project - 2, Lot- B (TSDTP-2) Betonmast Energie AS 35.3km of 132kV, ACSR Zebra D/C Transmission Line from Balangoda - Ratnapura, Kelanitissa - Kolonnawa, Oruwala - Athurigiriya June 2001 – Jan 2003 3 Heladhanavi 100MW Thermal Power Plant in Puttalam, Sri Lanka Lakdhanavi Limited 4.5 km of 132kV, ACSR Zebra D/C Transmission Line from Puttalam SS to 100MW Heladanavi Power plant Nov 2003 – June 2004 4 Horana - Paragastota Transmission Development Project Lot-B Lanaka Transformers Ltd 20 km of 132kV, ACSR Zebra D/C Transmission Line from Horana New Substation to Paragastota T-off Mar 2003 – Jan 2005 5 Kelaniya - Kolonnawa Transmission Line Project Ceylon Electricity Board 7.0 km of 132kV, ACSR Zebra D/C Transmission Line from Kelaniya – Kolonnawa Apr 2004 – July 2004 6 Power Sector Development Transmission Project. PSDTP Lot-B Ceylon Electricity Board 43km of 132kV, ACSR Zebra D/C Transmission Line Jan 2006 – May 2008 Transmission Lines LTL Galvanizers (Pvt) Ltd.
  • 26. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. For Past 20 years, more than 90 % of the Grid Substations installed in Sri Lanka have been Fabricated and Galvanized by LTL Galvanizers
  • 27. Corrosion Never Sleeps… Get it Galvanized… Local Projects Completed Name of Contract Employer/ Main Contactor Project Scope Year 1 4 MW Asupiniella Mini Hydro Project Nividu (Pvt) Limited Construction of 2 Nos. of 33kV Outdoor Line Bays Aril 2003 – Oct 2005 2 40 MW Lakdhanavi IV Emergency Power Plant Project Lakdhanavi Limited Construction of 0.4/33kV, 44x1.25MVA Generation Substation March 2005 – June 2005 3 80 MW Emergency Power Plant Project, Mwanza, Tanzania Lakdhanavi Limited Construction of 0.4/33kV, 25x3.5MVA Generation Substation Nov 2006 – Feb 2007 4 Yugadhanavi 300MW Thermal Power Plant in Kerawalapitiya Lakdhanavi Limited Construction of 220/14.5kV, 2x130MVA, 1x140MVA Generation Substation June 2007 – Oct 2008 5 Vavuniya Grid Substation Augmentation Project CEB/LTL Holdings (Pvt) Limited Supply, Installation and Commissioning of 132/33kV, 1x31.5MVA Transformer and Commissioning of the Transformer Bay July 2009 – Oct 2009 Grid Substations LTL Galvanizers (Pvt) Ltd.
  • 28. Corrosion Never Sleeps… Get it Galvanized… Name Employer/ Main Contactor Project Scope Year Kittanpahuwa Bridge (Cable Projects) Ceylon Electricity Board Colombo city Electricity Distribution Development project package –B supply & Installation of 132kV U.G. cable system 2010 Dematagoda Bridge Ceylon Electricity Board Colombo city Electricity Distribution Development project package –B supply & Installation of 132kV U.G. cable system 2010 Local Projects Completed Bridges LTL Galvanizers (Pvt) Ltd.
  • 29. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Recently Completed Local Projects 132 kV Transmission Line – Ukuwela - Pallekale 220 kV Transmission Line – Upper Kothmale 132 kV Transmission Line – Galle - Matara 132 kV Transmission Line – Puttlam - Maho 33 kV Transmission Line – Hambanthota
  • 30. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Recently Completed Local Projects Project Name Employer Project Scope Tower Qty. Total Weight (MT) Clean Energy Network Efficiency Improvement Project – ( Mannar – Vavuniya – Anuradhapura) Ceylon Electricity Board 220 kV Transmission Lines - 121.6 km 372 4700 MT Clean Energy Network Efficiency Improvement Project – ( Thulhiriya – Molagoda/ Polpitiya – New Polpitiya / Athurugiriya - Padukka) Ceylon Electricity Board 220 kV Transmission - 34.1 km 124 1374 MT Supply and Delivery of 33 kV Double Circuit Towers Tender No: DD3/P&D/ICB/2015/029/B Ceylon Electricity Board 33 kV Double Circuit - 37.1 km 106 460 MT Supply and Delivery of 33 kVTower Structures Tender No: DD1/P&D/ICB/2014/081/D Ceylon Electricity Board 33 kV Double Circuit Towers- 18.9 km 54 187 MT ADB- Clean Energy and Access Improvement Project, Part 2: Puttlam- Maho – Ukuwella Pallekele, Galle-Matara Ceylon Electricity Board 132kV Transmission Lines 95.7 km 310 2632 MT ADB-Clean Energy Access Improvement Project , Part – 7: Habarana - Walachchenei Ceylon Electricity Board 132kV Transmission System in the eastern Province 100km 320 2718 MT Transmission Lines
  • 31. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Name of Project Employer Project Scope Total Weight (MT) CEB grid substation in Katunayake, Ambalangoda , Aniyakanda CEB/TCP/DGM/CBAAKGS/2014/12 Ceylon Electricity Board Construction of New 132/33kV GS 55 MT Clean Energy and Access Improvement Project, Part 6: Network Capacity Augmentation for Renewable Energy Project Ceylon Electricity Board Augmentation of Existing 132/33kV GS at Badulla, Balangoda, Nuwaraeliya, Seethawaka, & Construction of New 132/33kV GS at Mahiyanganaya 255 MT Augmentation of Grid Substations for Absorption of Renewable Energy Project- (AGSAREP) Phase I- Lot A Ceylon Electricity Board Augmentation of GS at Ratmalana, Ratnapura & Wimalasurendra Power Station 85 MT Recently Completed Local Projects 132 kV Gantry - Kilinochchi Grid Substations
  • 32. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Recently Completed Local Projects Power Plants 300 MW Combined Cycle Power Plant - Kerawalapitiya
  • 33. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Recently Completed Local Projects Power Plants Steel structures of 300 MW Combined Cycle Power Plant - Kerawalapitiya
  • 34. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Recently Completed Local Projects Power Plants 24 MW Power Plant for CEB – Jaffna (Northern Province)
  • 35. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Steel structures of 24 MW Power Plant - Jaffna Recently Completed Local Projects Power Plants
  • 36. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Recently Completed Local Projects Other Steel Buildings Work shop building – Sri Lanka Railways
  • 37. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Recently Completed Local Projects Other Steel Buildings Central Storage Building – 300 MW CCPP Kerawalapitiya
  • 38. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Recently Completed Local Projects Other Steel Buildings Spherical structure made for Chandra Engineers Verele Japanese Restaurant at Anantara Peace Haven – Tangalle Resort
  • 39. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Place : Hambanthota Height: 60m Weight : 14.71 MT Established Year : 2005 Place : Malvana Height: 40m Weight : 8.12 MT Established Year : 2004 Telecom Tower Projects for Mobitel Place :Beliatta Height: 70m Weight : 24.68 MT Established Year : 2005 Place :Morranthuduwa Height: 60m Weight : 14.71 MT Established Year : 2004 Total No. of Mobitel towers Completed = 150
  • 40. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Galvanized Exports • Galvanizing of Gas conveyers for world’s largest Gas conveyer manufacturer, Kosan Krisplant. These conveyers are exported all over the word including European countries. • This is a continuing business. • Galvanizing of Fences and solar panel mounting structures for MIC Lanka. All the fences are exported to Japan. • This is also a continuing business.
  • 41. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Overseas Projects 33 kV Transmission Line – Uganda
  • 42. Corrosion Never Sleeps… Get it Galvanized… Overseas Projects Name of Contract Employer Total Weight (MT) Uganda- In relation to the Construction of Government Priority Rural electrification projects in Lawala, Kaberamaido, Kobolubulu, Amolatar & Kelle Port , Lawala- Otuboi, acinip and Lawala, Dokolo The Government of the Republic of Uganda 420 MT Uganda- In relation to the Construction of Government Priority Rural electrification projects in Kitgum, Palabek amd Lira, Apala, Aloi The Government of the Republic of Uganda Uganda- In relation to the Construction of Government Priority Rural electrification schemes in Busia, Manafwa and Mbale districts The Government of the Republic of Uganda Uganda- In relation to the Construction of Government Priority Rural electrification schemes in Soroti, Pallisa,Bukedia and Tororo Districts The Government of the Republic of Uganda Bangladesh - Komila Power Plant Project Lakdhanavi-Bangla Power Limited 100 MT Bangladesh - Rajshahi Power Plant Project Raj Lanka Power Company Limited 100 MT LTL Galvanizers (Pvt) Ltd.
  • 43. Corrosion Never Sleeps… Get it Galvanized… Overseas Projects Project Tonnage (MT) Tanzania Transmission Line Project LOT 20 327.359 Tanzania Transmission Line Project LOT 21 248.218 Uganda – West Nile Transmission Line Project LOT 01 168.152 Uganda – West Nile Transmission Line Project LOT 02 12.028 Uganda Transmission Line Project LOT 03 7.91 LTL Galvanizers (Pvt) Ltd.
  • 44. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Overseas Projects HE the Prime Minister of Bangladesh at opening ceremony of power plant
  • 45. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Power Plant Projects in Bangladesh Overseas Projects
  • 46. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Special Jobs Done
  • 47. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Special Jobs Done ‘Verele’ Japanese Restaurant for Anantara Peace Haven Tangalle Resort Reefer Access Gantry Structures for Hambantota Port
  • 48. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Monopole communication Tower for Ivory coast 03 Pieces and the Base Maximum diameter = 1145 mm Total Height of the Tower = 30 m Total Weight of the Tower = 9435 kg Special Jobs Done
  • 49. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. LTL Galvanizers (Pvt) Ltd THERMAL SPRAYING (Metallizing) The most effective and resilient coating for protecting steel structures, such as bridges, available today.
  • 50. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Electric Arc Wire Spray Metallizing A thermal spray process in which, an arc is struck between two consumable electrodes of a coating material. Compressed gas is used to atomize and propel the material to the substrate.
  • 51. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Abrasive Blasting Zn/Zn-Al Spraying Application of Primer Application of top Paint Coats Metallizing Process
  • 52. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Why Metallizing? 1. Best alternative for re-painting of already fixed structures. 2. Life cycle cost is lower than that of painting. 3. There is no limit for the shape and size of the structure as in Hot Dip Galvanizing. 4. Higher bond strength when comparing with painting. 5. Higher service life comparing with painting. 6. No limit of coating thickness as in Hot Dip Galvanizing. 7. The most versatile and effective coating for protecting steel structures, such as bridges, available today.
  • 53. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Some ongoing and Completed Projects Pipe bridge for National water supply & drainage board. Location - Kalpitiya Metallizing
  • 54. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Some ongoing and Completed Projects Steel girder at CGR Work Shop Metallized and painted condensate storage tank – Yugadanavi Power Plant Kerawalapitiya Sample Metallizing at Aluthgama Railway bridge
  • 55. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. • Thermal Spraying of Zn and Zn/Al alloy will be done in accordance with the ISO 2063:2017 standard. • Metallized coating thickness will be greater than the minimum coating thickness as mentioned in TableC.1 of ISO 2063:2017-1. • Metallized coating thickness and thickness of sealer coats can be customized according to the requirement of the customer and according to the Environmental conditions where item is installed. • Adhesions tests of coating can be done if requested by the customer. • Painting over metallized surface will be done under the guidance of a certified paint specialist and in accordance with the table A.8 of ISO 12944-5:2007. • Pre-Preparation, metallizing, painting and testing will also done in accordance with the applicable NACE and SSPC standard requirements. Quality Assurance
  • 56. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Future Strategies • Manufacturing of Galvanized monopole towers in Sri Lanka There is a potential market in Asian countries for Power Transmission Hexagonal monopole towers
  • 57. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. • Manufacturing of Galvanized solar panel mounting structures and provide complete solution with installation. Future Strategies
  • 58. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. • Acquiring/putting up a new fabrication plant in India Future Strategies If we have a steel fabrication facility in India, we may be able to fabricate towers for a much lower cost than in Sri Lanka.
  • 59. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Future Strategies • Putting up a new Hot Dip Galvanizing plant in Hambanthota This will help in catering the future industrial development in Hambanthota area,.
  • 60. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. Sustainable Manufacturing • Using Resources Efficiently – Zero direct Discharge of process water » Use rinsing water to prepare fresh acid baths » Use quenching water to prepare rinsing water baths – Use waste heat for drying furnace without using electricity or gas burners – 100% cut down electricity usage for flux heating by using non- heating flux – Reduce HCl consumption & Lime consumption by improving acid preparation methodology • Minimizing Pollution – Zero discharge of effluent water to the Environment » Use proper Effluent Treatment Process – New Experiments to reduce pollution » Get support of Department of Agriculture to find the possibility of using solid sludge generated as an ingredient of coconut fertilizer. – Periodic monitoring of Stack emissions, Ambient Air Quality, noise levels and Treated water quality and do necessary process adjustments.
  • 61. Corrosion Never Sleeps… Get it Galvanized… Contractor for Turnkey Construction Projects • LTLG is capable of handling turnkey construction projects. • Our professional and highly qualified team will ensure every phase of a project; Design, Fabrication, Galvanizing and Installation, completed on time exceeding customer’s expectations. • We will earn customer’s vote of confidence and patronage with our design competence, timely performance, and competitive bid for the actual work. LTL Galvanizers (Pvt) Ltd. Blocks 03 & 04, LINDEL, Sapugaskanda, Sri Lanka
  • 62. Corrosion Never Sleeps… Get it Galvanized… LTL Galvanizers (Pvt) Ltd. THANK YOU !