SlideShare a Scribd company logo
1 of 13
Download to read offline
Michael Maiss
20/05/2014
BPM in einem Technologieunternehmen
am Beispiel Alstom Power
BPM Symposium, ZHAW, Winterthur
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 2
2014.
Vortragsagenda
1. Unternehmen Alstom &
einige Randbedingungen für BPM
2. Die «klassischen» BPM Bausteine
3. Prozesssteuerung -
Gate-gesteuerte Standardprozesse
4. Neue BPM Ansätze - Reifegradmodell
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 3
2014.
(1) Alstom Power – Fakten & Daten
Produkte...
Turbinen
Windturbine
Dampferzeuger
Generator
Umwelttechnik
Leittechnik
Anlagen...
Gaskraftwerk
Wasserkraftwerk
Alstom Power = 32 Produktlinien, 52 Technikzentren, 34 Fabriken,
200 Servicestützpunkte = 55.000 Mitarbeiter in 70 Ländern
Technologien...
Gas
Solarthermie
Wind
Kohle
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 4
2014.
(1) Anlagenbaugeschäft & BPM
Angebots-
Prozess
Auftragsabwicklung
Kundenorientiert
Merkmale:
• Konfiguration von komplexen Produkten und Teilen zu Anlagen
• Produktentwicklung (Systems Engineering) + Prozesse (BPM) =
Arbeitspakete in einem Projektmanagement (PM)
• Dynamische „human centric“ Prozesse
- In F&E gegen den Markteintrittstermin
- In der Auftragsabwicklung gegen den vertraglich fixierten Liefertermin
• Teil-automatisierte Prozesse nur bei Unterstützungsprozessen
Service- &
Betriebsgeschäft
Gewähr-
leistung
Technologie-
Entwicklung
Produkt-
Entwicklung
Marktorientiert
Dienstleistungen Dienstleistungen
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 5
2014.
(1) „Change Program du Jour“
Ständige Veränderungsinitiativen oder Reorganisationen
beeinflussen einen nachhaltigen BPM Ansatz
“Engineering
Shaping Up”
Peak of inflated
Expectations
Valley of
Disillusionment
Slope of
Enlightenment
Plateau of Sustainability
Time
Knowledge Management
Project
Management
“Engineering Sharing
Network”
Change
program
“du jour”
New
Initiatives Coming-Out
Dead Initiatives
Graveyard
Risk-
Management
“Golden Rules” BPM?
Takeover
by GE or
Siemens
LEAN Outage
Program
Product
Platforms
“Dedicated to
Excellence”
(D2E)
Six Sigma
LEAN Training for
all Level 1-4
Managers
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 6
2014.
(2) Klassische BPM Bausteine…
• Aufnahme der IST-Prozesse
• Dokumentationsformen • Anzahl & Alter der Dokumente / Produktlinie
• Prozesslandschaften der SOLL-Prozesse
Parts Delivery Process, Level 3
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 7
2014.
(2) … eingeführt durch BPM-Programme*
1. Beziehung aufbauen & BPM erklären
7. Jährlichen Entwicklungsplan vereinbaren
5. BPM-Governance System einrichten
10. Prozesse laufend verbessern, Befähiger entwickeln, Erfolge nachweisen, Reifegrad erhöhen
2. IST-Zustand aufnehmen, Quick-Wins einleiten
4. CPO und POs benennen und ausbilden
3. Prozesslandkarten erstellen
8. Prozess-Roadmap erstellen
7. Wertschöpfende Prozesse messen
(Stimmen der Kunden & Stakeholder)
9. Program-Management installieren
CEO
Wie
geht BPM?
6. BPM-Strategie im Business verankern
*) kein Standard, abhängig von verantwortlicher Person und Funktion
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 8
2014.
(3) Prozess-Steuerung durch «Gates»
Motivation:
• Standardprozesse werden nicht befolgt / fehlende Transparenz
• Synchronisation interner/externer Teilprozesse
• Anbindung an Risiko- und Änderungsmanagement
Business Process
QG Cycle
• Cycle preparation
• Agree responsibilities &
due dates
• Project specific
extensions of the key
deliverables master
Gate Review
• Assessing the fulfillment
of key deliverables
acceptance criteria
• Issue corrective actions
• Final completeness
review
• Pass/no-pass decision
Preparation Stage Preview Stage Review Stage Follow-up
• Actions from
Gatereview will
be closed
QGn
QGn+1
RP1 Pk
Start-up
Meeting
Supplier/
Customer
Meeting
S/C S-u
Launch
Meeting
L
Preview(s)
. . .
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 9
2014.
(3) Prozess-Steuerung und -Synchronisation
ProjectExecutionQualityProcess(PEQ),
Level2-3
Individual gates as per project needs
Tender Process
12
Order Execution Process (PEQ)
Commissioning
Civil
Procurement
Construction
Sales Process
Commissioning
Manufacturing
Construction Processes
Civil Processes
Manufacturing Processes
Procurement & Logistics
Engineering ProcessesEngineering
Project Management Processes
Technology Development Process (TDQ) Product Development Process (PDQ)
6 6
R&DProcesses
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 10
2014.
 Wo steht eine Geschäftseinheit bezüglich ihrer Prozess-Orientierung?
Was wäre eine „Baseline“ und ein „Zustand in 3 Jahren“?
 Wie erkläre ich „BPM“ dem Management?
 Wie schaffe ich ein einheitliches Verständnis von Prozessmanagement?
 Wie ermittle ich nachvollziehbar Schwächen und Stärken einer zu
untersuchenden Geschäftseinheit?
 Was sollte man als Nächstes tun, für ein erfolgreicheres BPM?
 Wie kann ich Unternehmensbereiche mit verschiedener Änderungs-
bereitschaft, Ressourceneinsatz und „Kultur“ in ein Programm integrieren?
 Wie vergleiche ich verschiedene Organisationen (Benchmarking)?
(4) Erwartungen an ein BPM-Reifegradmodell
Motivation:
• Ersatz der Veränderungsinitiativen durch ein nachhaltiges BPM-Programm
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 11
2014.
(4) Bausteine des Reifegradkonzeptes
• 9 Dimensionen
• Analyse für 3 Zeithorizonte • Positionierungsmatrix
• Katalog mit 150 Kriterien x 6 Reifegrade
2014
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 18/05/2014 – P 12
2014.
Zusammenfassung:
Was Ingenieure über BPM denken...
BPM ist (noch) überwiegend ein Dokumentationskonzept, (noch) nicht
BPMN 2.0-konform, mit Ansätzen, die Prozesssteuerung zu verbessern
Danke für Ihre Aufmerksamkeit!
(Michael Maiss, office@maiss.ch, Tel. 079 654 2509)

More Related Content

Similar to BPM in einem Technologieunternehmen am Beispiel Alstom Power

Basem Zidan
Basem ZidanBasem Zidan
Basem Zidan
bzidan
 
Npi with bpm webinar
Npi with bpm webinarNpi with bpm webinar
Npi with bpm webinar
Aisurya Puhan
 

Similar to BPM in einem Technologieunternehmen am Beispiel Alstom Power (20)

Best Practices: Leadecs Digitization
Best Practices: Leadecs DigitizationBest Practices: Leadecs Digitization
Best Practices: Leadecs Digitization
 
Basem zidan
Basem zidanBasem zidan
Basem zidan
 
IT CMF Patterns
IT CMF Patterns  IT CMF Patterns
IT CMF Patterns
 
Kathy Biggerstaff Resume 2018
Kathy Biggerstaff Resume 2018Kathy Biggerstaff Resume 2018
Kathy Biggerstaff Resume 2018
 
S C P004 Morris 091807
S C P004  Morris 091807S C P004  Morris 091807
S C P004 Morris 091807
 
How Morgan Stanley is Using Apps to Transform the Workplace
How Morgan Stanley is Using Apps to Transform the WorkplaceHow Morgan Stanley is Using Apps to Transform the Workplace
How Morgan Stanley is Using Apps to Transform the Workplace
 
Basem Zidan
Basem ZidanBasem Zidan
Basem Zidan
 
HRIS and cloud
HRIS and cloudHRIS and cloud
HRIS and cloud
 
Community Cloud : réinventez votre engagement client
Community Cloud : réinventez votre engagement clientCommunity Cloud : réinventez votre engagement client
Community Cloud : réinventez votre engagement client
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
 
Massimo Scalzo Professional Engagement & Background
Massimo Scalzo Professional Engagement & BackgroundMassimo Scalzo Professional Engagement & Background
Massimo Scalzo Professional Engagement & Background
 
PMO and Value Conference - Ray Mead, London, 25 October 2016
PMO and Value Conference - Ray Mead, London, 25 October 2016PMO and Value Conference - Ray Mead, London, 25 October 2016
PMO and Value Conference - Ray Mead, London, 25 October 2016
 
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_contentSaphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
 
Albemarle Intrigo Webinar Presentation
Albemarle Intrigo Webinar PresentationAlbemarle Intrigo Webinar Presentation
Albemarle Intrigo Webinar Presentation
 
System Engineering ISO 15288 Supported by PLM
System Engineering ISO 15288 Supported by PLMSystem Engineering ISO 15288 Supported by PLM
System Engineering ISO 15288 Supported by PLM
 
Platform session 1 Innovation on the salesforce platform - speed vs control
Platform session 1 Innovation on the salesforce platform - speed vs controlPlatform session 1 Innovation on the salesforce platform - speed vs control
Platform session 1 Innovation on the salesforce platform - speed vs control
 
III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...
III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...
III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...
 
SAP Project Intelligence Network for Construction
SAP Project Intelligence Network for ConstructionSAP Project Intelligence Network for Construction
SAP Project Intelligence Network for Construction
 
Brighttalk - Role of Change Management in the Service Introduction process
Brighttalk - Role of Change Management in the Service Introduction processBrighttalk - Role of Change Management in the Service Introduction process
Brighttalk - Role of Change Management in the Service Introduction process
 
Npi with bpm webinar
Npi with bpm webinarNpi with bpm webinar
Npi with bpm webinar
 

More from sonjareyem

VERIT Immobilien
VERIT ImmobilienVERIT Immobilien
VERIT Immobilien
sonjareyem
 
Produkt versus Prozess
Produkt versus ProzessProdukt versus Prozess
Produkt versus Prozess
sonjareyem
 
BPM 2014 - Status quo und Zukunft
BPM 2014 - Status quo und ZukunftBPM 2014 - Status quo und Zukunft
BPM 2014 - Status quo und Zukunft
sonjareyem
 
Effizienter Workflow – automatische Kreditorenverarbeitung
Effizienter Workflow – automatische KreditorenverarbeitungEffizienter Workflow – automatische Kreditorenverarbeitung
Effizienter Workflow – automatische Kreditorenverarbeitung
sonjareyem
 
Geschäftsprozessmanagement @ SBB Immobilien
Geschäftsprozessmanagement @ SBB ImmobilienGeschäftsprozessmanagement @ SBB Immobilien
Geschäftsprozessmanagement @ SBB Immobilien
sonjareyem
 
Towards WoT aware business processes modeling
Towards WoT aware business processes modelingTowards WoT aware business processes modeling
Towards WoT aware business processes modeling
sonjareyem
 

More from sonjareyem (6)

VERIT Immobilien
VERIT ImmobilienVERIT Immobilien
VERIT Immobilien
 
Produkt versus Prozess
Produkt versus ProzessProdukt versus Prozess
Produkt versus Prozess
 
BPM 2014 - Status quo und Zukunft
BPM 2014 - Status quo und ZukunftBPM 2014 - Status quo und Zukunft
BPM 2014 - Status quo und Zukunft
 
Effizienter Workflow – automatische Kreditorenverarbeitung
Effizienter Workflow – automatische KreditorenverarbeitungEffizienter Workflow – automatische Kreditorenverarbeitung
Effizienter Workflow – automatische Kreditorenverarbeitung
 
Geschäftsprozessmanagement @ SBB Immobilien
Geschäftsprozessmanagement @ SBB ImmobilienGeschäftsprozessmanagement @ SBB Immobilien
Geschäftsprozessmanagement @ SBB Immobilien
 
Towards WoT aware business processes modeling
Towards WoT aware business processes modelingTowards WoT aware business processes modeling
Towards WoT aware business processes modeling
 

Recently uploaded

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 

Recently uploaded (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 

BPM in einem Technologieunternehmen am Beispiel Alstom Power

  • 1. Michael Maiss 20/05/2014 BPM in einem Technologieunternehmen am Beispiel Alstom Power BPM Symposium, ZHAW, Winterthur
  • 2. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 2 2014. Vortragsagenda 1. Unternehmen Alstom & einige Randbedingungen für BPM 2. Die «klassischen» BPM Bausteine 3. Prozesssteuerung - Gate-gesteuerte Standardprozesse 4. Neue BPM Ansätze - Reifegradmodell
  • 3. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 3 2014. (1) Alstom Power – Fakten & Daten Produkte... Turbinen Windturbine Dampferzeuger Generator Umwelttechnik Leittechnik Anlagen... Gaskraftwerk Wasserkraftwerk Alstom Power = 32 Produktlinien, 52 Technikzentren, 34 Fabriken, 200 Servicestützpunkte = 55.000 Mitarbeiter in 70 Ländern Technologien... Gas Solarthermie Wind Kohle
  • 4. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 4 2014. (1) Anlagenbaugeschäft & BPM Angebots- Prozess Auftragsabwicklung Kundenorientiert Merkmale: • Konfiguration von komplexen Produkten und Teilen zu Anlagen • Produktentwicklung (Systems Engineering) + Prozesse (BPM) = Arbeitspakete in einem Projektmanagement (PM) • Dynamische „human centric“ Prozesse - In F&E gegen den Markteintrittstermin - In der Auftragsabwicklung gegen den vertraglich fixierten Liefertermin • Teil-automatisierte Prozesse nur bei Unterstützungsprozessen Service- & Betriebsgeschäft Gewähr- leistung Technologie- Entwicklung Produkt- Entwicklung Marktorientiert Dienstleistungen Dienstleistungen
  • 5. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 5 2014. (1) „Change Program du Jour“ Ständige Veränderungsinitiativen oder Reorganisationen beeinflussen einen nachhaltigen BPM Ansatz “Engineering Shaping Up” Peak of inflated Expectations Valley of Disillusionment Slope of Enlightenment Plateau of Sustainability Time Knowledge Management Project Management “Engineering Sharing Network” Change program “du jour” New Initiatives Coming-Out Dead Initiatives Graveyard Risk- Management “Golden Rules” BPM? Takeover by GE or Siemens LEAN Outage Program Product Platforms “Dedicated to Excellence” (D2E) Six Sigma LEAN Training for all Level 1-4 Managers
  • 6. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 6 2014. (2) Klassische BPM Bausteine… • Aufnahme der IST-Prozesse • Dokumentationsformen • Anzahl & Alter der Dokumente / Produktlinie • Prozesslandschaften der SOLL-Prozesse Parts Delivery Process, Level 3
  • 7. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 7 2014. (2) … eingeführt durch BPM-Programme* 1. Beziehung aufbauen & BPM erklären 7. Jährlichen Entwicklungsplan vereinbaren 5. BPM-Governance System einrichten 10. Prozesse laufend verbessern, Befähiger entwickeln, Erfolge nachweisen, Reifegrad erhöhen 2. IST-Zustand aufnehmen, Quick-Wins einleiten 4. CPO und POs benennen und ausbilden 3. Prozesslandkarten erstellen 8. Prozess-Roadmap erstellen 7. Wertschöpfende Prozesse messen (Stimmen der Kunden & Stakeholder) 9. Program-Management installieren CEO Wie geht BPM? 6. BPM-Strategie im Business verankern *) kein Standard, abhängig von verantwortlicher Person und Funktion
  • 8. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 8 2014. (3) Prozess-Steuerung durch «Gates» Motivation: • Standardprozesse werden nicht befolgt / fehlende Transparenz • Synchronisation interner/externer Teilprozesse • Anbindung an Risiko- und Änderungsmanagement Business Process QG Cycle • Cycle preparation • Agree responsibilities & due dates • Project specific extensions of the key deliverables master Gate Review • Assessing the fulfillment of key deliverables acceptance criteria • Issue corrective actions • Final completeness review • Pass/no-pass decision Preparation Stage Preview Stage Review Stage Follow-up • Actions from Gatereview will be closed QGn QGn+1 RP1 Pk Start-up Meeting Supplier/ Customer Meeting S/C S-u Launch Meeting L Preview(s) . . .
  • 9. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 9 2014. (3) Prozess-Steuerung und -Synchronisation ProjectExecutionQualityProcess(PEQ), Level2-3 Individual gates as per project needs Tender Process 12 Order Execution Process (PEQ) Commissioning Civil Procurement Construction Sales Process Commissioning Manufacturing Construction Processes Civil Processes Manufacturing Processes Procurement & Logistics Engineering ProcessesEngineering Project Management Processes Technology Development Process (TDQ) Product Development Process (PDQ) 6 6 R&DProcesses
  • 10. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 10 2014.  Wo steht eine Geschäftseinheit bezüglich ihrer Prozess-Orientierung? Was wäre eine „Baseline“ und ein „Zustand in 3 Jahren“?  Wie erkläre ich „BPM“ dem Management?  Wie schaffe ich ein einheitliches Verständnis von Prozessmanagement?  Wie ermittle ich nachvollziehbar Schwächen und Stärken einer zu untersuchenden Geschäftseinheit?  Was sollte man als Nächstes tun, für ein erfolgreicheres BPM?  Wie kann ich Unternehmensbereiche mit verschiedener Änderungs- bereitschaft, Ressourceneinsatz und „Kultur“ in ein Programm integrieren?  Wie vergleiche ich verschiedene Organisationen (Benchmarking)? (4) Erwartungen an ein BPM-Reifegradmodell Motivation: • Ersatz der Veränderungsinitiativen durch ein nachhaltiges BPM-Programm
  • 11. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 11 2014. (4) Bausteine des Reifegradkonzeptes • 9 Dimensionen • Analyse für 3 Zeithorizonte • Positionierungsmatrix • Katalog mit 150 Kriterien x 6 Reifegrade 2014
  • 12. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 18/05/2014 – P 12 2014. Zusammenfassung: Was Ingenieure über BPM denken... BPM ist (noch) überwiegend ein Dokumentationskonzept, (noch) nicht BPMN 2.0-konform, mit Ansätzen, die Prozesssteuerung zu verbessern
  • 13. Danke für Ihre Aufmerksamkeit! (Michael Maiss, office@maiss.ch, Tel. 079 654 2509)