1. Personal credentials
Surname Scheepers
Full name Zain John Stephanus
South African I.D number 9105085019089
Date of birth 8 may 1991
Residential address 29 Umdoni Grove, Amanzimtoti 4126
Postal address 165 Park Rynie 4182
Email zain.scheepers@yahoo.com
Telephone number 0783309198
Marital status Single
Dependants None
Home language English
Other language Afrikaans
Drivers license Code 08
Transportation Yes (car)
Criminal offences None
State of health Excellent
Educational history
School attended Port Shepstone High School
Standard passed 8
Subjects passed Mathematics, English, Afrikaans, Science,
Technical Drawing, Accounting, Life Orientation
Tertiary education
College attended Esayidi FET College
Standard passed NQF Level 4
Subjects passed English, Life Orientation, Mathematics, Electrical
Principals and Practice, Electrical Workmanship,
Electronic Control and Digital Electronics,
Electrical Systems and Construction
Duration of studies 2006 - 2009
2. College attended TALA Training Academy
Standard passed Trade Test
Duration of studies 4 Years (Whilst working full time)
Employment history
Currently
Name of firm Des-ign international and global networking
Contact number 0319143120
Position held Electrician
Duration of employment 2010 – current
Responsibilities
Single and three phase wiring, installation, faultfinding and commissioning
PLC Panel wiring with Siemens, Toyopuc, Mitsubishi and Beckhoff plc units
Pneumatic pressured systems i.e. air pressured cylinders installation and repairs
Fabrication using steel, aluminum, Perspex etc.
Forklift driver
Problem solving
Computer literacy
Installation of automated production lines
Installation of robotic cells
Housekeeping/ Stock control
General maintenance
First aider
Team Leader/ Project Leader
Safety procedures
Working at heights
I have also travelled locally as well as abroad for my company to various automotive companies
in order to install production lines
Germany for a month with the production of assembly fixtures for Mercedes
Pretoria for ten months with the ford ranger production line build
Thailand for three months with the ford SUV production line build
Currently I spend extensive time in Toyota Prospecton in the assembly of production lines,
robotic cells along with multiple upgrades to their automotive lines along with plc and networking
systems. I have had the advantage of being a team/project leader to many of these projects
3. taking on various responsibilities including time management, liaising with the customer to what
their expectations are, managing a team of workers, floor layouts, inventory of stock to be used,
ordering of specialized parts or equipment along with providing feedback/reports regarding
project progress