SlideShare a Scribd company logo
1
Deleni Wind Farm
46,2 MW
CONSTANTA COUNTY
ROMANIA
November 2014
2
46,2 MW Deleni Wind Farm
Location
3
46,2 MW Deleni Wind Farm
Aeolian map of Romania and project location
46,2 MW Deleni Wind Farm
 The climate is mild-continental with main winds coming from NE. The proximity to the
continental Russia generates strong winds during the winter (Crivatul) and constant winds
during the summer time. 4
5
46,2 MW Deleni Wind Farm
Google view
46,2 MW Deleni Wind Farm
 The Wind Park is located in the
southern part of Dobrogea Region,
well known for many wind farms
already constructed in this area.
 Dobrogea region is considered one of
the best areas in Romania for
developing Wind Energy Projects due
to the constant winds and proximity
to the Black Sea.
 A big advantage of Deleni Wind
Farm is the proximity to Constanta
Port – abt.45 km and to highway A2 -
20km, direct and easy access from
National Road DJ307 and close to
110kV line;
6
7
46,2 MW Deleni Wind Farm
Zonal Plan & Connection to the Grid
8
46,2 MW Deleni Wind Farm
9
46,2 MW Deleni Wind Farm
10
46,2 MW Deleni Wind Farm
WIND
 Wind Resource in Constanta Area has been analyzed by using a Mesoscale
Meteorological Modeling (MASS) COUPLED WITH A Microscale Wind
Resource Modeling (Wind Map)
 The wind data presented in this proposal is a correlation of five
measurement points of Dobrogea Region over de past years.
 The average wind speed is around 7,2 m/s at 80 m hub high.
 Wind Load = 2.873 h (conservative result)
 Wind measurements started in May 2011.
 Own Mast of 86 meter height, on park location.
 The Company owns 7,34 ha of land necessary for 14 turbines positions as
well as the 46,2 MW Wind Farm Project authorizations.
 The owner wants to sell the entire package (company + land + project) by
means of SPA.
 Ownership land documentation is checked and complete, registered in the
Land Registry (CF).
11
46,2 MW Deleni Wind Farm
12
46,2 MW Deleni Wind Farm
ROMANIAN NATIONAL ELECTRICAL GRID
13
46,2 MW Deleni Wind Farm
The project has obtained ALL THE AUTHORIZATIONS requested by both phases
PUZ (zonal plan) & DTAC/AC (building permit), through the relative Urban Certificates,
permits issued by competent local & national authorities, including Aeronautical
Authority, Intern Affairs Ministry, Transgaz, Ministry of Defense, Transelectrica,
Bridges & Roads National Authority & many others.
The project has completed ALL THE ENVIRONMENTAL PROCEDURE, obtaining
Final Approval from the National Authority for Environmental Protection.
The Environmental Monitoring is still continuing, according to the law.
Deleni Wind Park SOLUTION STUDY has been made by Tractebel (GDF Suez),
providing connection to the 110 KW Grid owned by ENEL and the Wind Park Micro
sitting has been approved by Transelectrica (National Electric Grid Owner) & Enel.
The PROJECT IS READY TO BUILD - Construction Authorization / Building Permit
no. 17/24.04.2013. – copy below.
14
46,2 MW Deleni Wind Farm
DETAILS & RECAP:
 Location: DELENI, Constanta County - Romania
 Access: National Road DN3, 20 km from Highway A2
 Total surface in property: 7,34 ha, covering 14 WTG, platforms and access.
 Land documentation: ready and complete, registrated in the Land Register (CF)
 Distance to the grid connection: abt. 7,5 km
 Electrical connection type: LEA 110 kV
 Project documentation complete: Urban Certification for both PUZ & AC,,
Environment, technical sheets obtained for water supply, communication, telephony,
electric supply, gas, human health, Ministry of Intern Affaires, Ministry of Defence,
Translectrica, Transgaz, Geotechnical study, lifting surveying, Romanian Civil
Aeronautical Authority.
 Ready to build.
 Electrical Project will be adjusted with the Wind Tower Generators chosen by the Final
Investor. This aspect will include a Solution Study update and a new Grid Connection
Permit.
15
46,2 MW Deleni Wind Farm
Legal Due Diligence effected & completed on July 19, 2013,
by Boscolo&Partners ,Buchares, member of Morison International Group.

More Related Content

Similar to Wind Farm 42 MW Deleni November 2014

RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE
 
News 20111130 rules
News 20111130 rulesNews 20111130 rules
News 20111130 rules
Paul Keisch
 
EMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneTEMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneT
Dutch Power
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
Wind Power Romania
Wind Power RomaniaWind Power Romania
Wind Power RomaniaEnel S.p.A.
 
Datasheet with info about Gemini
Datasheet with info about GeminiDatasheet with info about Gemini
Datasheet with info about GeminiGemini Windpark
 
Detailed project report.pptx
Detailed project report.pptxDetailed project report.pptx
Detailed project report.pptx
GYANENDRASATAPATHY
 
The impact of integration of solar farms on the power losses, voltage profile...
The impact of integration of solar farms on the power losses, voltage profile...The impact of integration of solar farms on the power losses, voltage profile...
The impact of integration of solar farms on the power losses, voltage profile...
journalBEEI
 
RWF PR90
RWF PR90RWF PR90
RWF PR90
Paul Keisch
 
CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -abdallah chamekh
 
Middelgrunden Offshore Wind Farm
Middelgrunden Offshore Wind FarmMiddelgrunden Offshore Wind Farm
Middelgrunden Offshore Wind FarmPost-Oil cities
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTRenato Borra
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTRenato Borra
 
Chornobyl Solar
Chornobyl SolarChornobyl Solar
Chornobyl Solar
EasyBusiness
 

Similar to Wind Farm 42 MW Deleni November 2014 (20)

RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
 
News 20111130 rules
News 20111130 rulesNews 20111130 rules
News 20111130 rules
 
Moh'd Gaweish_CV
Moh'd Gaweish_CVMoh'd Gaweish_CV
Moh'd Gaweish_CV
 
CURRICULUM VITAE FOR MOHAMMAD A
CURRICULUM VITAE FOR MOHAMMAD   ACURRICULUM VITAE FOR MOHAMMAD   A
CURRICULUM VITAE FOR MOHAMMAD A
 
Ashraf Suleiman.
Ashraf Suleiman.Ashraf Suleiman.
Ashraf Suleiman.
 
EMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneTEMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneT
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
Wind Power Romania
Wind Power RomaniaWind Power Romania
Wind Power Romania
 
Datasheet with info about Gemini
Datasheet with info about GeminiDatasheet with info about Gemini
Datasheet with info about Gemini
 
Detailed project report.pptx
Detailed project report.pptxDetailed project report.pptx
Detailed project report.pptx
 
The impact of integration of solar farms on the power losses, voltage profile...
The impact of integration of solar farms on the power losses, voltage profile...The impact of integration of solar farms on the power losses, voltage profile...
The impact of integration of solar farms on the power losses, voltage profile...
 
RWF PR90
RWF PR90RWF PR90
RWF PR90
 
CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -
 
Middelgrunden Offshore Wind Farm
Middelgrunden Offshore Wind FarmMiddelgrunden Offshore Wind Farm
Middelgrunden Offshore Wind Farm
 
CV - RAMADAN 2016
CV - RAMADAN 2016CV - RAMADAN 2016
CV - RAMADAN 2016
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANT
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANT
 
Chornobyl Solar
Chornobyl SolarChornobyl Solar
Chornobyl Solar
 

Wind Farm 42 MW Deleni November 2014

  • 1. 1 Deleni Wind Farm 46,2 MW CONSTANTA COUNTY ROMANIA November 2014
  • 2. 2 46,2 MW Deleni Wind Farm Location
  • 3. 3 46,2 MW Deleni Wind Farm Aeolian map of Romania and project location
  • 4. 46,2 MW Deleni Wind Farm  The climate is mild-continental with main winds coming from NE. The proximity to the continental Russia generates strong winds during the winter (Crivatul) and constant winds during the summer time. 4
  • 5. 5 46,2 MW Deleni Wind Farm Google view
  • 6. 46,2 MW Deleni Wind Farm  The Wind Park is located in the southern part of Dobrogea Region, well known for many wind farms already constructed in this area.  Dobrogea region is considered one of the best areas in Romania for developing Wind Energy Projects due to the constant winds and proximity to the Black Sea.  A big advantage of Deleni Wind Farm is the proximity to Constanta Port – abt.45 km and to highway A2 - 20km, direct and easy access from National Road DJ307 and close to 110kV line; 6
  • 7. 7 46,2 MW Deleni Wind Farm Zonal Plan & Connection to the Grid
  • 8. 8 46,2 MW Deleni Wind Farm
  • 9. 9 46,2 MW Deleni Wind Farm
  • 10. 10 46,2 MW Deleni Wind Farm WIND  Wind Resource in Constanta Area has been analyzed by using a Mesoscale Meteorological Modeling (MASS) COUPLED WITH A Microscale Wind Resource Modeling (Wind Map)  The wind data presented in this proposal is a correlation of five measurement points of Dobrogea Region over de past years.  The average wind speed is around 7,2 m/s at 80 m hub high.  Wind Load = 2.873 h (conservative result)  Wind measurements started in May 2011.  Own Mast of 86 meter height, on park location.  The Company owns 7,34 ha of land necessary for 14 turbines positions as well as the 46,2 MW Wind Farm Project authorizations.  The owner wants to sell the entire package (company + land + project) by means of SPA.  Ownership land documentation is checked and complete, registered in the Land Registry (CF).
  • 11. 11 46,2 MW Deleni Wind Farm
  • 12. 12 46,2 MW Deleni Wind Farm ROMANIAN NATIONAL ELECTRICAL GRID
  • 13. 13 46,2 MW Deleni Wind Farm The project has obtained ALL THE AUTHORIZATIONS requested by both phases PUZ (zonal plan) & DTAC/AC (building permit), through the relative Urban Certificates, permits issued by competent local & national authorities, including Aeronautical Authority, Intern Affairs Ministry, Transgaz, Ministry of Defense, Transelectrica, Bridges & Roads National Authority & many others. The project has completed ALL THE ENVIRONMENTAL PROCEDURE, obtaining Final Approval from the National Authority for Environmental Protection. The Environmental Monitoring is still continuing, according to the law. Deleni Wind Park SOLUTION STUDY has been made by Tractebel (GDF Suez), providing connection to the 110 KW Grid owned by ENEL and the Wind Park Micro sitting has been approved by Transelectrica (National Electric Grid Owner) & Enel. The PROJECT IS READY TO BUILD - Construction Authorization / Building Permit no. 17/24.04.2013. – copy below.
  • 14. 14 46,2 MW Deleni Wind Farm DETAILS & RECAP:  Location: DELENI, Constanta County - Romania  Access: National Road DN3, 20 km from Highway A2  Total surface in property: 7,34 ha, covering 14 WTG, platforms and access.  Land documentation: ready and complete, registrated in the Land Register (CF)  Distance to the grid connection: abt. 7,5 km  Electrical connection type: LEA 110 kV  Project documentation complete: Urban Certification for both PUZ & AC,, Environment, technical sheets obtained for water supply, communication, telephony, electric supply, gas, human health, Ministry of Intern Affaires, Ministry of Defence, Translectrica, Transgaz, Geotechnical study, lifting surveying, Romanian Civil Aeronautical Authority.  Ready to build.  Electrical Project will be adjusted with the Wind Tower Generators chosen by the Final Investor. This aspect will include a Solution Study update and a new Grid Connection Permit.
  • 15. 15 46,2 MW Deleni Wind Farm Legal Due Diligence effected & completed on July 19, 2013, by Boscolo&Partners ,Buchares, member of Morison International Group.