This document provides information about a proposed library project located in Atlanta, Georgia. The project aims to activate an unused area by establishing a new midtown branch library. The site is well positioned between local churches and commercial buildings. Floor plans show proposed spaces like offices, a courtyard, children's area, reading spaces, and a computer lab. Renderings and sections depict the design which incorporates both increased programming and consideration of the urban site context. The library aims to meet growing demands in the metro Atlanta area, where the last library expansion project occurred in the 1980s.
Бронхит (острый, хронический) — это заболевание, характеризующееся воспалением бронхов и проявляющееся преимущественно кашлем (сухим или с отделением мокроты).
В основе бронхита лежит воспаление слизистой оболочки бронхов.
Под воздействием различных раздражающих факторов (например, инфекционные, физические, химические) стенка бронха воспаляется, увеличивается выработка слизи, появляется мокрота, вызывающая кашель.
Если воспалительный процесс периодически повторяется (хронический бронхит), в него вовлекаются не только слизистая оболочка, но более глубокие слои, стенка бронха уплотняется, нарушается очистительная функция бронхов, что проявляется постоянным или периодически возникающим кашлем с отделением мокроты, а при поражении мелких бронхов – одышкой.
Pengaruh arus proteksi terhadap korosi baja tulangan betonMoch. Syaiful Anwar
Pengaruh aplikasi arus proteksi terhadap korosi baja tulangan beton di lingkungan air laut telah
disajikan pada tulisan ini. Anoda yang dipakai pada penelitian ini terbuat dari semen, pasir, serat karbon dan
MMO-Ti sebagai anoda primer. Arus proteksi yang digunakan adalah 100, 150, dan 200 mA/m2. 100 mV
potential decay digunakan sebagai uji dari proteksi katodik pada baja tulangan beton. Tafel polarisasi
merupakan uji kedua yang digunakan untuk monitoring apakah proteksi katodik sistem arus proteksi ini telah
berfungsi dengan baik setelah 24 jam. Hasil penelitian menunjukkan bahwa pada saat arus proteksi dihilangkan
selama 24 jam, benda uji yang telah dialiri arus proteksi 150 mA/m2 dapat menaikkan nilai potensial korosi
mulai dari -379 mV (resiko korosifitas tinggi) menjadi -154 mV (resiko korosifitas sedang) dan dapat
menurunkan nilai laju korosi mulai dari 2,33 μm/tahun menjadi 0,51 μm/tahun.
Бронхит (острый, хронический) — это заболевание, характеризующееся воспалением бронхов и проявляющееся преимущественно кашлем (сухим или с отделением мокроты).
В основе бронхита лежит воспаление слизистой оболочки бронхов.
Под воздействием различных раздражающих факторов (например, инфекционные, физические, химические) стенка бронха воспаляется, увеличивается выработка слизи, появляется мокрота, вызывающая кашель.
Если воспалительный процесс периодически повторяется (хронический бронхит), в него вовлекаются не только слизистая оболочка, но более глубокие слои, стенка бронха уплотняется, нарушается очистительная функция бронхов, что проявляется постоянным или периодически возникающим кашлем с отделением мокроты, а при поражении мелких бронхов – одышкой.
Pengaruh arus proteksi terhadap korosi baja tulangan betonMoch. Syaiful Anwar
Pengaruh aplikasi arus proteksi terhadap korosi baja tulangan beton di lingkungan air laut telah
disajikan pada tulisan ini. Anoda yang dipakai pada penelitian ini terbuat dari semen, pasir, serat karbon dan
MMO-Ti sebagai anoda primer. Arus proteksi yang digunakan adalah 100, 150, dan 200 mA/m2. 100 mV
potential decay digunakan sebagai uji dari proteksi katodik pada baja tulangan beton. Tafel polarisasi
merupakan uji kedua yang digunakan untuk monitoring apakah proteksi katodik sistem arus proteksi ini telah
berfungsi dengan baik setelah 24 jam. Hasil penelitian menunjukkan bahwa pada saat arus proteksi dihilangkan
selama 24 jam, benda uji yang telah dialiri arus proteksi 150 mA/m2 dapat menaikkan nilai potensial korosi
mulai dari -379 mV (resiko korosifitas tinggi) menjadi -154 mV (resiko korosifitas sedang) dan dapat
menurunkan nilai laju korosi mulai dari 2,33 μm/tahun menjadi 0,51 μm/tahun.
Hello everyone. Following my recent graduation from The Welsh School of Architecture, Cardiff University, I am currently looking for a new position as a Part 1 Architectural Assistant. My goal is to find a position that facilitates growth, allows me to demonstrate my proactive attitude, my enthusiasm for new responsibilities, and further enriches my knowledge and passion in the field of architecture.
I possess a strong technical understanding, exhibit a keen eye for detail, and strongly believe in environmentally responsible architecture. During my academic journey, I embraced challenges as opportunities and consistently applied a forward-thinking and proactive approach to my projects. With strong communication and interpersonal skills, I am deeply passionate about the transformative potential of effective collaboration. I thrive in collective settings that promote diversity and innovation, as here the greatest architectural solutions are generated.
I am proud to present a selection of my projects across my three years at the Welsh School of Architecture. If you are aware of any current employment openings, I would be grateful if you could contact me. I am happy to provide a copy of my CV. Thank you in advance.
Hello everyone. Following my recent graduation from The Welsh School of Architecture, Cardiff University, I am currently looking for a new position as a Part 1 Architectural Assistant. My goal is to find a position that facilitates growth, allows me to demonstrate my proactive attitude, my enthusiasm for new responsibilities, and further enriches my knowledge and passion in the field of architecture.
I possess a strong technical understanding, exhibit a keen eye for detail, and strongly believe in environmentally responsible architecture. During my academic journey, I embraced challenges as opportunities and consistently applied a forward-thinking and proactive approach to my projects. With strong communication and interpersonal skills, I am deeply passionate about the transformative potential of effective collaboration. I thrive in collective settings that promote diversity and innovation, as here the greatest architectural solutions are generated.
I am proud to present a selection of my projects across my three years at the Welsh School of Architecture, alongside my own paintings at the end of the portfolio. If you are aware of any current employment openings, I would be grateful if you could contact me. I am happy to provide a copy of my CV. Thank you in advance.
This is a senior interior design thesis project that combines art, community and living under a single roof in downtown Toronto. The project is designed to benefit all members of the community, but special design considerations were made to ensure its use by members of Toronto's disabled and aging communities.
3. Library on Peachtree
Activating an Unused Area
Spring 2014
749 Peachtree St.
Atlanta, Georgia
The metro area in Atlanta has had several periods in which
library expansion played an active role, however the last
project happened in Fulton county in the 1980’s. The current
midtown branch library would like to establish their own
building, but the funds for land purchase and construction
has impeded these plans.
2 3
4. UP
Floor Plan L0 Floor Plan L1
The site where the project is located has ample pedestrian and vehicular traffic and is well positioned to provide interaction within the
cultural components of the urban experience.The site is between two churches, St. Mark United Methodist Church and Lutheran Church of
the Redeemer, and across the street from a commercial building; these structures serve to transition the scale between the newer high rise
projects around it.
Offices
Courtyard
Children’s Area
Adult/Junior Area
Lobby
Computer
Lab
Cafe
Reading Space
4 5
UP
DOWN
DOWN
PeachtreeSt.
The Fox Theatre
Lutheran Church of
the Redeemer
St. Mark United
Methodist Church
4th St. NE
5th St. NE
Reading Space
5. The library is located in Atlanta’s midtown urban fabric and it incorporates both
an increased level of programmatic demands and site considerations.This
project was used as an aid in developing design methodology and increased
level of process rigor.
NE Section
SW Section
Peachtree St. Elevation
Courtyard View from 2nd Floor
Corner-Courtyard Entrance
6 7
6. Bridging the Gap
Promoting Intercultural Activity
Fall 2014
Parc Joan Miro
Barcelona, Spain
In the past 20 years Barcelona has experienced a growth in
touristic activity and a significant migration period. The
traditional methods of integration and accomodation of
diversity have evident problems, so a different approach,
called interculturality, has become a popular method. It
signifies the need to promote positive interaction, dialogue,
and mutual familiarity in order to face the complexities
posed by diversity. Interaction between citizens happens in
public spaces and facilities which has created a greater focus
on the physical construction of the city and its
transformation.
8 9
7. The project is a public facility that is able to host multiple
permanent and temporary activities for citizens of all ages acting
as a physical connection across Parc Joan Miro, and a catalyst
for interaction between citizens from diverse origins.
Circulation Diagram created by Austin Cajka.
The project is located in Parc Joan Miro, which lies between a residential and commercial area as seen on the map. This provides an
opportunity to connect the residents of the neighborhood with those who work in the area and the tourists that pass through.
The intercultural building would serve as a bridge in the park in order to activate the commercial corner of the block along with the library
on the other side of the park.
10 11
Circulation Diagram
Centro Comercial Arenas
CarrerdeTarragona
CarrerdelaDiputació
Plaça d'Espanya
Biblioteca Pública
Joan Miró
CarrerdeVilamarí
Carrerd'Aragó, Av. del Paraŀlel
9. Lorraine Hall
Center for the Arts
Spring 2015
699 N. Broad St.,
Philadelphia, PA
The Divine Lorraine Hotel was originally built in 1894
and designed by architectWillis G. Hale. It was one of
the first high-rise apartment buildings, and also the
first Philadelphia hotel to be racially integrated.
After being resold 3 times, the building was
abandoned in 2006. It is currently on the U.S. National
Register of Historic Places in Pennsylvania, making
only the interior available to renovate.
14 15
10. The design for the interior of this building will allow it to become off-campus housing forTemple University students within the
Center of the Arts. It will include students specializing in Art, Music, Dance,Theater, and Film. This facility will provide a
living-learning community for residents to collaborate with one another.
6
7
7
5
5
5
6
6
9
8
4
1
6
3
2
Legend
1 Lobby
2 Music Studio
3 Theater Studio
4 Recdording Studio
5 Apartment
6 Classroom, Study Room, Meeting Space
7 Dance Studio
8 Theater
9 Lounge
Existing campus facilities include Boyer Recording Studio, Conwell DanceTheater, Presser Hall, which includes a listening library, classrooms,
practice rooms, studios, a piano lab, and a student lounge, and Rock Hall, which includes an auditorium, practice rooms, computer labs, a
green room, and sound-proof rooms.
16 17
Level 2 Level 8 Level 10
NBroadSt.
Fairmont Ave.
Fairmont Station-
Subway
Temple University
Penn Square
RidgeAve.
11. Longitudinal Section 1”= 16’ Transverse Section 1”= 16’
View from 2nd Floor Exterior of Lorraine Hall
18 19
12. Inspirer, Apprendre, Appliquer
To Inspire,To Learn, andTo Apply
Cultural Center for the Performing
& Fine Arts
Spring 2014
Ourcq Jaurès, 2 bis rue de l'Ourcq
Paris, France
The Cultural Center is located in the 19th
arrondissement of
Paris, an area rich in culture and diversity.This is combined
with the arts, such as music, painting, and film, which are
the focal points in French culture.The Petite Ceinture
parallels the site and creates a tunneled entrance to the
building.
20 21
13. Horizontal Circulation
Site Circulation
Vertical Circulation
Level -1 Level 0
N
This building provides a place for those in the community and surrounding
neighborhoods to come and explore those talented in the arts and
experience the act of creating by observing and taking classes. This program
allows for the audience to become inspired by what they witness around
themselves, and it is meant to guide them in learning more about each
program, and then to apply it to their everyday life.
Noisy Areas
No Soundproofing
Areas that need sound-
proofing due to noise or
need for quiet.
Noise Diagram
22 23
15. Underground Building Wall Section
View from Petite Ceinture
Massing Model Final Model View from NE Corner
26 27
Level 1 & 2 South WallLevel 1 & 2 Courtyard Wall
17. 1/8” 1/8”7 3/4”
8”
eqeq
5”
Front Elevation
Shape of Purse
Wood:Trial 1.1 Wood:Trial 1.3 Wood:Trial 2.1
Wood:Trial 3.1
Foam:Trial 1.4
Mock Up: Chipboard Patterns Used
Pattern 1 Pattern 2
Final Product: Plywood
1/8”Plywood was used for the final product, but
it has issues that need to be fixed, such as, the
type of fabric used has too much of a stretch and
the ends of the clutch do not stay attached
because the joint is forced. I am continuing
research with this project and I am considering
using strip magnets for the closure and going
back to the joint used in the mock up. I am also
considering cloth for the ends of the clutch
instead of wood, to give the plywood a flexible
joint versus a fixed joint.
30 31