This to me has possibilities which are endless when it comes to teaching measurement, geometry, time....etc., etc., etc. Think about all of your academic areas. I'll bet you can think of endless possibilities as well. My third graders are going to LOVE it! I think it's pretty amazing as well.
Recently completed Project from australia to india for Door to Door Basis covering Total Scope of Dismantling , Packing , Transportation and Shipping and delivering the Same to Customer Door step in india .
This to me has possibilities which are endless when it comes to teaching measurement, geometry, time....etc., etc., etc. Think about all of your academic areas. I'll bet you can think of endless possibilities as well. My third graders are going to LOVE it! I think it's pretty amazing as well.
Recently completed Project from australia to india for Door to Door Basis covering Total Scope of Dismantling , Packing , Transportation and Shipping and delivering the Same to Customer Door step in india .
4. … built by Krupp, a German company, on its way to an open coal mine.
5.
6.
7.
8.
9. Specifications: ~ H = 95m, L = 215m (2.5 football field) ~ 45,500 tons ~ 100 millions $ ~ 5 years to design ~ 5 years to assemble ~ a crew of 5 to operate ~ the bucket wheel diameter = 21m with 20 buckets of 15m ³ ca ~ A 6ft (1m83) man could stand up in one of the bucket ~ 12 crawlers for moving the whole thing, 8 in front & 4 aft (each 3.6m wide, 2.4m high & 14m long) ~ Max speed : ~ 0.6 km/h (10 m/min.) ~ Can move over 76500m ³ overburden / day