8/2/2018
1
James Robertson, PhD, PE
Lee Engineering
San Antonio, Texas
8/2/2018
2
Bryan
≈ 81,000
Residents
College Station
≈ 104,000
Residents
Bryan
≈ 81,000
Residents
8/2/2018
3
Texas A&M University
• ≈ 66,000 students
• 102,733 person
stadium (Kyle Field)
• ≈ 800 TTI employees
Texas A&M University
• ≈ 66,000 students
• 102,733 person
stadium (Kyle Field)
• ≈ 800 TTI employees
With ≈75,000 people:
4th Largest
Downtown in Texas!
8/2/2018
4
Texas A&M University
• ≈ 66,000 students
• 102,733 person
stadium (Kyle Field)
• ≈ 800 TTI employees
With ≈75,000 people:
4th Largest
Downtown in Texas!
Northgate
College Station’s
Downtown
8/2/2018
5
TAMU
Campus
TAMU
Campus
TAMU
Student
Housing
8/2/2018
6
Northgate
TAMU
Campus
TAMU
Student
Housing
Northgate
TAMU
Campus
TAMU
Student
Housing
Abandoned
Hotel
8/2/2018
7
Northgate
TAMU
Campus
TAMU
Student
Housing
Abandoned
Hotel
Bar District
Merchant Request:
• Lighting
• Parking
• Pedestrian Safety
8/2/2018
8
University Drive Concept Plan:
• Wider Sidewalks
• Narrower Lanes
• Medians
• Signal Upgrades
Merchant Request:
• Lighting
• Parking
• Pedestrian Safety
Meanwhile…
8/2/2018
9
Meanwhile…
Growth!
8/2/2018
10
And…
And… Funding!
8/2/2018
11
And… Funding!
Voters Approve Bond for:
• Wider Sidewalks
• Narrower Lanes
• Medians
• Signal Upgrades
And… Funding!
Voters Approve Bond for:
• Wider Sidewalks
• Narrower Lanes
• Medians
• Signal Upgrades
Project 1
8/2/2018
12
Project 1
Project 2
And… Funding!
Voters Approve Bond for:
• Wider Sidewalks
• Narrower Lanes
• Medians
• Signal Upgrades
During Design…
8/2/2018
13
And?
Project 1
8/2/2018
14
And? Resistance…
Project 1
And? Resistance…
Plan Calls for:
• No Parking on University Drive
• Closing College Main
• Medians
Project 1
8/2/2018
15
And? Resistance…
Plan Calls for:
• No Parking on University Drive
• Closing College Main
• Medians
Project 1
College Main
And? Resistance…
Plan Calls for:
• No Parking on University Drive
• Closing College Main
• Medians
Project 1
College Main
Parking Removal
8/2/2018
16
And? Resistance…
Plan Calls for:
• No Parking on University Drive
• Closing College Main
• Medians
Project 1
College Main
Parking Removal
Close to Traffic
8/2/2018
17
“Loading” Zone
8/2/2018
18
Pedestrian/Bicycle Mall
“Loading” Zone
Parking Removed “Loading” Zone
Pedestrian/Bicycle Mall
8/2/2018
19
Parking Removed
Barrier Wall
“Loading” Zone
Pedestrian/Bicycle Mall
Meanwhile…
8/2/2018
20
And…
8/2/2018
21
Project 2? Delays…
8/2/2018
22
Project 2? Delays…
Project 2
“Technical” Challenges:
• Relocating signal from private access to public street.
• Coordination with on-going development.
• Counter flow bicycle lanes.
• Other design choices…
8/2/2018
23
Project 2
Non-Technical Challenges:
• Leftover resistance from Project 1
• Staff turnover
• Agreement between 3 agencies:
• City, TxDOT, & TAMU
• Desire to do more.
Project 2
Non-Technical Challenges:
• Leftover resistance from Project 1
• Staff turnover
• Agreement between 3 agencies:
• City, TxDOT, & TAMU
• Desire to do more.
Can we do more?... Yes, at a cost.
8/2/2018
24
Project 2
Non-Technical Challenges:
• Leftover resistance from Project 1
• Staff turnover
• Agreement between 3 agencies:
• City, TxDOT, & TAMU
• Desire to do more.
Can we do more?... Yes, at a cost.
 University Drive through Northgate is now a
downtown street.
8/2/2018
25
 University Drive through Northgate is now a
downtown street.
Prove it!
 University Drive through Northgate is now a
downtown street.
8/2/2018
26
 University Drive through Northgate is now a
downtown street.
Date Range
 University Drive through Northgate is now a
downtown street.
Wait time
Date Range
8/2/2018
27
 University Drive through Northgate is now a
downtown street.
Wait time
Number
of Calls
Date Range
 University Drive through Northgate is now a
downtown street.
7 AM
8/2/2018
28
 University Drive through Northgate is now a
downtown street.
7 AM Midnight
 University Drive through Northgate is now a
downtown street.
7 AM Midnight
Between 7 am and midnight 87 %
of the cycles had a pedestrian call.
8/2/2018
29
This was at 9:20 am
This was at 9:20 am
There are 37 people
walking in this image.
8/2/2018
30
 Implement pedestrian only phase.
◦ Requires No Right-Turn on Red.
 Implement pedestrian only phase.
◦ Requires No Right-Turn on Red.
 Implement protected only left turns.
◦ For University Drive.
8/2/2018
31
 Implement pedestrian only phase.
◦ Requires No Right-Turn on Red.
 Implement protected only left turns.
◦ For University Drive.
 Benefit:
◦ A potential 73 % reduction in expected number of
crashes.
 Implement pedestrian only phase.
◦ Requires No Right-Turn on Red.
 Implement protected only left turns.
◦ For University Drive.
 Benefit:
◦ A potential 73 % reduction in expected number of
crashes.
 Cost:
◦ Increased travel time.
◦ From 1 to 3 minutes to 2 to 4 minutes.
8/2/2018
32
WITHOUT
Protected
Only Phasing
8/2/2018
33
WITHOUT
Protected
Only Phasing
WITHOUT
Protected
Only Phasing
8/2/2018
34
WITHOUT
Protected
Only Phasing
WITH
Protected
Only Phasing
8/2/2018
35
WITH
Protected
Only Phasing
WITH
Protected
Only Phasing
8/2/2018
36
WITH
Protected
Only Phasing
WITH
Protected
Only Phasing
8/2/2018
37
The Real Ask!
8/2/2018
38
TAMU TAMU
Northgate Century
Square
TAMU TAMU
Northgate Century
Square
8/2/2018
39
8/2/2018
40
TAMU TAMU
Northgate Century
Square
TAMU TAMU
Northgate Century
Square
8/2/2018
41
TAMU TAMU
Northgate Century
Square
TAMU TAMU
Northgate Century
Square
8/2/2018
42
TAMU TAMU
Northgate Century
Square
TAMU TAMU
Northgate Century
Square
8/2/2018
43
James Robertson, PhD, PE
Lee Engineering, San Antonio
jrobertson@lee-eng.com
(210) 561-5411
Opening Nov/Dec 2018!

When Your Urban Core Arrives