ДУГУЙТ АЧИГЧИЙН ОПЕРАТОРЫНСИМУЛЯТОРЫН СУРГАЛТЫН ПРОГРАМ
27
Start of session: 16/06/2009 9:52:42
End of session: 16/06/2009 11:05:34
Session duration: 01:12:52
Trial Summary Count
Trials started 53
Trials completed 52
Trials restarted 1
Performance Indicator Average Minimum Maximum
Execution time 01:12 01:03 01:27
Time spent with bucket in digging zone 00:25.5 00:20.3 00:34.0
Articulation angle when first entering digging zone (deg) 5.0 1.4 8.7
Bucket orientation when first entering digging zone (deg) 3.6 0.8 7.7
Bucket attack angle when first entering digging zone (deg) -0.1 -1.0 0.9
Bucket height when first entering digging zone (m) 0.33 0.29 0.40
Time spent with bucket in dumping zone 00:12.4 00:7.83 00:14.3
Average articulation angle when entering dumping zone (deg) 4.1 0.8 9.5
Average bucket height when entering dumping zone (m) 1.42 0.95 1.92
Mass of material dumped into dumping zone (t) 18.78 13.35 22.45
Time spent between digging and dumping zones 00:34.1 00:30.1 00:44.5
Maximum bucket height between digging and dumping zones (m) 2.91 2.14 3.68
Average bucket height between digging and dumping zones (m) 1.13 0.85 1.29
Mass of material spilled between digging and dumping zones (t) 1.41 0.00 8.90
Slams of articulation hydraulics 0.35 0 2
Slams of lift arm hydraulics 0.13 0 1
Slams of bucket hydraulics 2.63 2 4
Time spent with wheels slipping 00:1.42 00:0.0 00:2.84
Bucket curl engagements before raising lift arm 0.23 0 1
Productivity (t/h) 989.67 691.29 1145.95
Bucket collisions with ground 3.63 1 8
ДУГУЙТ АЧИГЧИЙН ОПЕРАТОРЫНСИМУЛЯТОРЫН СУРГАЛТЫН ПРОГРАМ
31
Дугуйт ачигчийн шанага ухалтын цэг рүү (энэ нь заасан зөвлөсөн үйл ажиллагаа
биш) ороход өргөх гарыг өргөхийн өмнө оператор шанагыг хөдөлгөсөн хугацаа
(налуулах хяналт)
Бүтээмж
Ухалтын цэгээс овоолгын цэг рүү зөөсөн материалын нийт масс. Гүйцэтгэлийн
хугацаанд нь хуваана.
Шанаганы газартай мөргөлдсөн байдал
Дугуйт ачигчийг шанага газартай мөргөлдсөн нийт тоо (“газар” гэдэг ойлголтонд
хад чулуу, хад чулууны цаана байх хадан хясаа, газар зэрэг зүйлсийг хэлнэ)
Шанаганы ачаанч машинтай мөргөлдсөн байдал
Дугуйт ачаигчийн шанага ба ачааны машины хоорондох мөргөлтийн тоо
Өргөх гар ачааны машинтай мөргөлдсөн байдал
Дугуйт ачигчийн өргөх гар ба ачааны машины хоорондох мөргөлтийн тоо
Дугуйт ачигчийн бусад хэсэг ачааны машинтай хүрсэн, мөргөлдсөн байдал
Дугуйт ачигчийн бусад хэсгүүд (дугуй, арын рам гэх мэт хэсгүүд) болон ачааны
машины хоорондох мөргөлтийн тоо
Sample Results File
Wheel Loader Personal Simulator
Truck Loading
Start of session: 16/06/2009 11:46:43
End of session: 16/06/2009 13:23:22
Session duration: 01:36:39
Trial Summary Count
Trials started 20
Trials completed 20
Trials restarted 0
Performance Indicator Average Minimum Maximum
Execution time 04:21 02:49 05:18
Time spent with bucket in digging zone 01:19 00:44.0 01:46
Articulation angle when first entering digging zone (deg) 2.7 1.1 3.9
Bucket orientation when first entering digging zone (deg) 2.8 0.9 6.6
Bucket attack angle when first entering digging zone (deg) 0.6 -0.8 1.9
Bucket height when first entering digging zone (m) 0.33 0.30 0.44
Time spent with bucket over truck body 00:32.5 00:17.7 00:46.1
Average articulation angle when going over truck body (deg) 1.2 0.1 2.6
32.
ДУГУЙТ АЧИГЧИЙН ОПЕРАТОРЫНСИМУЛЯТОРЫН СУРГАЛТЫН ПРОГРАМ
32
Average bucket orientation when going over truck body (deg) 3.1 0.5 6.6
Average bucket height when going over truck body (m) 5.34 4.74 6.61
Mass of material dumped into truck (t) 81.39 78.65 83.40
Time spent between digging and dumping zones 02:29 01:47 03:20
Maximum bucket height between digging and dumping zones (m) 6.80 6.40 6.93
Average bucket height between digging and dumping zones (m) 2.16 1.35 2.94
Mass of material spilled between digging and dumping zones (t) 5.47 4.35 15.65
Slams of articulation hydraulics 1.67 0 5
Slams of lift arm hydraulics 2.20 1 5
Slams of bucket hydraulics 6.00 4 10
Time spent with wheels slipping 00:4.9 00:1.16 00:5.94
Bucket curl engagements before raising lift arm 3.40 2 5
Productivity (t/h) 1196.51 935.12 1669.37
Bucket collisions with ground 16.80 10 48
Bucket collisions with truck 0.60 0 2
Lift arm collisions with truck 0.15 0 1
Other wheel loader collisions with truck 0.00 0 0
МОДУЛЬ 6. Ачих ба зөөх ажиллагаа
Энэ модуль нь хоорондоо нэлээд хол зайтай байгаа ухалтын цэг ба овоолгын цэгүүдийг
ашиглан овоолгын ажлыг үргэлжлүүлэн гүйцэтгэх ажил юм. Энэ байдлар бид ачаатай
болон ачаагүй шанагатайгаар дугуйт ачигчийг дээш доош уруудуулж сурна.
ДУГУЙТ АЧИГЧИЙН ОПЕРАТОРЫНСИМУЛЯТОРЫН СУРГАЛТЫН ПРОГРАМ
36
Sample Results File
Wheel Loader Personal Simulator
Load and Carry
Start of session: 16/06/2009 13:49:23
End of session: 16/06/2009 15:35:09
Session duration: 01:45:46
Trial Summary Count
Trials started 47
Trials completed 47
Trials restarted 0
Performance Indicator Average Minimum Maximum
Execution time 02:00 01:46 02:15
Time spent with bucket in digging zone 00:12.1 00:9.88 00:15.8
Articulation angle when first entering digging zone (deg) 5.2 0.3 9.8
Bucket orientation when first entering digging zone (deg) 8.0 1.9 16.7
Bucket attack angle when first entering digging zone (deg) 2.1 -0.4 5.9
Bucket height when first entering digging zone (m) 0.32 0.28 0.44
Time spent with bucket in dumping zone 00:9.11 00:6.19 00:14.9
Average articulation angle when entering dumping zone (deg) 3.3 0.4 9.4
Average bucket height when entering dumping zone (m) 1.49 0.82 2.21
Mass of material dumped into dumping zone (t) 19.57 16.95 20.85
Time spent between digging and dumping zones 01:39 01:25 01:59
Maximum bucket height between digging and dumping zones (m) 3.23 2.98 3.57
Average bucket height between digging and dumping zones (m) 1.16 0.86 1.61
Mass of material spilled between digging and dumping zones (t) 1.42 0.00 4.35
Slams of articulation hydraulics 0.36 0 2
Slams of lift arm hydraulics 1.40 1 2
Slams of bucket hydraulics 2.33 1 4
Time spent with wheels slipping 00:1.82 00:0.0 00:5.13
Bucket curl engagements before raising lift arm 0.36 0 1
Productivity (t/h) 466.10 349.67 727.19
Bucket collisions with ground 3.92 2 6
ДУГУЙТ АЧИГЧИЙН ОПЕРАТОРЫНСИМУЛЯТОРЫН СУРГАЛТЫН ПРОГРАМ
41
Бүтээмж
Ухалтын цэгээс овоолгын цэг рүү зөөсөн материалын нийт масс. Гүйцэтгэлийн
хугацаанд нь хуваана.
Шанаганы газартай мөргөлдсөн байдал
Дугуйт ачигчийг шанага газартай мөргөлдсөн нийт тоо (“газар” гэдэг ойлголтонд
хад чулуу, хад чулууны цаана байх хадан хясаа, газар зэрэг зүйлсийг хэлнэ)
Шанаганы ачааны машинтай мөргөлдсөн байдал
Дугуйт ачаигчийн шанага ба ачааны машины хоорондох мөргөлтийн тоо
Өргөх гар ачааны машинтай мөргөлдсөн байдал
Дугуйт ачигчийн өргөх гар ба ачааны машины хоорондох мөргөлтийн тоо
Дугуйт ачигчийн бусад хэсэг ачааны машинтай хүрсэн, мөргөлдсөн байдал
Дугуйт ачигчийн бусад хэсгүүд (дугуй, арын рам гэх мэт хэсгүүд) болон ачааны
машины хоорондох мөргөлтийн тоо
Sample Results File
Wheel Loader Personal Simulator
Truck Loading with Spotting
Start of session: 17/06/2009 09:35:54
End of session: 17/06/2009 11:00:59
Session duration: 01:25:05
Trial Summary Count
Trials started 17
Trials completed 16
Trials restarted 1
Trials with truck-spot horn signal too early 1
Trials with truck-spot horn signal too late 3
Trials with truck-full horn signal too early 0
Performance Indicator Average Minimum Maximum
Execution time 04:47 04:08 05:40
Time spent with bucket in digging zone 01:18 00:46.5 02:30
Articulation angle when first entering digging zone (deg) 3.1 0.0 7.9
Bucket orientation when first entering digging zone (deg) 2.2 0.4 3.8
Bucket attack angle when first entering digging zone (deg) 1.0 -0.3 2.8
Bucket height when first entering digging zone (m) 0.30 0.30 0.31
Time spent with bucket over truck body 00:33.2 00:17.9 01:24
42.
ДУГУЙТ АЧИГЧИЙН ОПЕРАТОРЫНСИМУЛЯТОРЫН СУРГАЛТЫН ПРОГРАМ
42
Average articulation angle when going over truck body (deg) 2.5 0.2 5.0
Average bucket orientation when going over truck body (deg) 2.9 0.5 6.5
Average bucket height when going over truck body (m) 6.42 5.95 6.86
Mass of material dumped into truck (t) 89.18 82.20 98.40
Time spent between digging and dumping zones 02:55 01:45 03:34
Maximum bucket height between digging and dumping zones (m) 6.87 6.69 6.95
Average bucket height between digging and dumping zones (m) 3.02 2.60 3.38
Mass of material spilled between digging and dumping zones (t) 8.78 5.40 10.80
Time to spot truck 00:40.3 00:28.6 01:31
Time after loading until truck-full horn signal 00:7.19 00:4.56 00:9.84
Slams of articulation hydraulics 1.47 0 4
Slams of lift arm hydraulics 4.63 3 8
Slams of bucket hydraulics 6.25 5 12
Time spent with wheels slipping 00:3.34 00:0.67 00:7.22
Bucket curl engagements before raising lift arm 2.00 1 3
Productivity (t/h) 1430.65 1131.37 1620.20
Bucket collisions with ground 18.50 11 25
Bucket collisions with truck 0.34 0 4
Lift arm collisions with truck 0.09 0 1
Other wheel loader collisions with truck 0.03 0 1
СИМУЛЯТОРЫН ПРОГРАМЫН ГАР УДИРДЛАГЫН ХЭРЭГСЭЛ
Logitech G 27 – бүхий удирдлагын хэрэгсэл
Дугуйт ачигчийн симуляторын програмын гар удирдлагын хэрэгсэл нь удирдлагын рычаг,
Logitech G27 жолооны хүрд гэсэн гурван бүрэлдэхүүн хэсгээс бүрдэнэ.
Анхаарах зүйл:
Logitech G27 уралдааны машины бүрэлдэхүүн хэсгүүдийг дугуйт ачигчийн загварчлалд
ашиглахын өмнө Logitech G27-ийн драйвэр дискийг уншуулж суулгах, Logitech G27-ийг
зөв тохируулга хийх шаардлагатай. Logitech G27 –ийн Installation guide (суурилуулах
зааварчилгаа)-ийг мөрдөн ажиллаж болно ажиллахгүй байсан ч болно. Logitech G27 зөв
хэвийн ажиллахгүй байж болно.
Бодит байдалд дугуйт ачигчийн хөл удирдлага хяналт нь boom (сум), шанаганы гар
удирдлага дээрх товчнуудаар явагддаг. Эдгээр удирдлагын хэрэгслүүдэд ийм удирдлага