[INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT]                        January 20, 2012

   Name-Surname EkkasitNakpukdee
       Student ID. 54261532
      Group Name KID-WA COMPANY
                   Kittipong, Nattakan, Tussanee, Nuttreewan,
 Engineering Team
                   Pornchanida, Wijak, Kittapas, jindarat ,chaiyapat,
         Members
                   Kamon, Amontep, Ekkasit, Nobpadon
   Product Design
                  P’Tong, P’Joy, P’Kong, P’Aru
   Team Members


Weekly Progress

 This weekjob overall: I was assigned to the work at design using visual Basic, write screen and a
 display work. The application program used to control the operation. It works through Rs232 port
 of the microcontroller. By pulling data from a microcontroller go to the display. And to understand
 the principles and events that happen. The screen at write the program to all four function keys
 are: 1. Search all items in the fridge. 2. Expiration date. 3. Examination the calories. 4. Clean screen
 .The application of knowledge learned. Be attributed almost entirely to work. I used to work at this
 time.




             Figure 1.Operation screen




                                                                    Figure 2.Block diagram

Engineering Analysis
Strong Point
The connection between Microcontrollers with visual Basic program,so can access each other.

Week Point
Screen does not work with microcontroller


Next Week Job
Next week: Screen to work withmicrocontroller.




                                      Department of Control System and Instrumentation Engineering
                                         KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI

More Related Content

Viewers also liked (8)

Schablone Mütze.pdf
Schablone Mütze.pdfSchablone Mütze.pdf
Schablone Mütze.pdf
 
Gracias
GraciasGracias
Gracias
 
Hoy
HoyHoy
Hoy
 
Settimana lettura
Settimana letturaSettimana lettura
Settimana lettura
 
French Manicure
French ManicureFrench Manicure
French Manicure
 
Der fünfte kontinent
Der fünfte kontinentDer fünfte kontinent
Der fünfte kontinent
 
Calendario laboral trelleborg 2012
Calendario laboral trelleborg 2012Calendario laboral trelleborg 2012
Calendario laboral trelleborg 2012
 
ARM Parkinsons
ARM ParkinsonsARM Parkinsons
ARM Parkinsons
 

Similar to Weekly report template bell

Weekly report template bell
Weekly report template bellWeekly report template bell
Weekly report template bellUmbell Maetha
 
Weekly report template belll
Weekly report template belllWeekly report template belll
Weekly report template belllUmbell Maetha
 
นายวิจักษณ์ พรสุขวิทูร 53211827
นายวิจักษณ์ พรสุขวิทูร 53211827นายวิจักษณ์ พรสุขวิทูร 53211827
นายวิจักษณ์ พรสุขวิทูร 53211827nackkyboy
 
นายวิจักษณ์ พรสุขวิทูร 53211827
นายวิจักษณ์ พรสุขวิทูร 53211827นายวิจักษณ์ พรสุขวิทูร 53211827
นายวิจักษณ์ พรสุขวิทูร 53211827nackkyboy
 
Weekly report template (4)
Weekly report template (4)Weekly report template (4)
Weekly report template (4)M Maxcup Max
 
Weekly report template (5)
Weekly report template (5)Weekly report template (5)
Weekly report template (5)M Maxcup Max
 
ContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docxContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docxbobbywlane695641
 
Weekly report template
Weekly report templateWeekly report template
Weekly report templateUmbell Maetha
 

Similar to Weekly report template bell (20)

Weekly report template bell
Weekly report template bellWeekly report template bell
Weekly report template bell
 
Weekly report template belll
Weekly report template belllWeekly report template belll
Weekly report template belll
 
Weekly report template
Weekly report templateWeekly report template
Weekly report template
 
Weekly report template
Weekly report templateWeekly report template
Weekly report template
 
54261517
5426151754261517
54261517
 
Weekly report template
Weekly report templateWeekly report template
Weekly report template
 
54261517
5426151754261517
54261517
 
54261517_2
54261517_254261517_2
54261517_2
 
54261517_2
54261517_254261517_2
54261517_2
 
54261517_2
54261517_254261517_2
54261517_2
 
Weekly report template
Weekly report templateWeekly report template
Weekly report template
 
นายวิจักษณ์ พรสุขวิทูร 53211827
นายวิจักษณ์ พรสุขวิทูร 53211827นายวิจักษณ์ พรสุขวิทูร 53211827
นายวิจักษณ์ พรสุขวิทูร 53211827
 
นายวิจักษณ์ พรสุขวิทูร 53211827
นายวิจักษณ์ พรสุขวิทูร 53211827นายวิจักษณ์ พรสุขวิทูร 53211827
นายวิจักษณ์ พรสุขวิทูร 53211827
 
Weekly report template (4)
Weekly report template (4)Weekly report template (4)
Weekly report template (4)
 
Weekly report template (5)
Weekly report template (5)Weekly report template (5)
Weekly report template (5)
 
Weekly report template (3)
Weekly report template (3)Weekly report template (3)
Weekly report template (3)
 
ContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docxContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docx
 
54261507 281
54261507 28154261507 281
54261507 281
 
Weekly report template
Weekly report templateWeekly report template
Weekly report template
 
Weekly report template5
Weekly report template5Weekly report template5
Weekly report template5
 

More from Umbell Maetha

Weekly report template (1)
Weekly report template (1)Weekly report template (1)
Weekly report template (1)Umbell Maetha
 
Weekly report template (1)
Weekly report template (1)Weekly report template (1)
Weekly report template (1)Umbell Maetha
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนนUmbell Maetha
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนนUmbell Maetha
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนนUmbell Maetha
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนนUmbell Maetha
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนนUmbell Maetha
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนนUmbell Maetha
 

More from Umbell Maetha (9)

Weekly report template (1)
Weekly report template (1)Weekly report template (1)
Weekly report template (1)
 
Weekly report template (1)
Weekly report template (1)Weekly report template (1)
Weekly report template (1)
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนน
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนน
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนน
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนน
 
report
reportreport
report
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนน
 
งานนนนนนนน
งานนนนนนนนงานนนนนนนน
งานนนนนนนน
 

Recently uploaded

Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsAndrey Dotsenko
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 

Recently uploaded (20)

Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 

Weekly report template bell

  • 1. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] January 20, 2012 Name-Surname EkkasitNakpukdee Student ID. 54261532 Group Name KID-WA COMPANY Kittipong, Nattakan, Tussanee, Nuttreewan, Engineering Team Pornchanida, Wijak, Kittapas, jindarat ,chaiyapat, Members Kamon, Amontep, Ekkasit, Nobpadon Product Design P’Tong, P’Joy, P’Kong, P’Aru Team Members Weekly Progress This weekjob overall: I was assigned to the work at design using visual Basic, write screen and a display work. The application program used to control the operation. It works through Rs232 port of the microcontroller. By pulling data from a microcontroller go to the display. And to understand the principles and events that happen. The screen at write the program to all four function keys are: 1. Search all items in the fridge. 2. Expiration date. 3. Examination the calories. 4. Clean screen .The application of knowledge learned. Be attributed almost entirely to work. I used to work at this time. Figure 1.Operation screen Figure 2.Block diagram Engineering Analysis Strong Point The connection between Microcontrollers with visual Basic program,so can access each other. Week Point Screen does not work with microcontroller Next Week Job Next week: Screen to work withmicrocontroller. Department of Control System and Instrumentation Engineering KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI