Institutional
Assessment
NEWLY WEDS
TRAINER: KEVIN S. MANSON
TRAINEE: PATRICIA ANNE P. PAEZ
Company Profile
CIAO EVENTS
Contact Information
GLOBE : 0991-234-
fl678 SMART: 0998-
76fl-4321
Email:
ciaoevents@gmail.co
m
Company Address: Orchid. St. Maria
Cristina Village, San Isidro, Nueva Ecija
History
Founded in 2016 by Patricia Anne Paez,
Ciao Events Services has rapidly grown
into a premier firm specializing in
bespoke event planning and
execution. With a focus on creativity
and client satisfaction, Ciao Events
Management Company has
established itself as a trusted partner in
crafting memorable and impactful
events tailored to meet diverse client
needs and preferences.
Company Profile
CIAO EVENTS
Vision
“Our vision at Ciao Events is to
become a leading global
authority in event
management, renowned for
our innovation, meticulous
planning, and unmatched
client satisfaction. We aim to
elevate every event we touch,
setting new standards in
creativity and excellence."
Mission
"At Ciao Events, our mission is to
deliver unparalleled event
management services, focusing
on quality, creativity, and
attention to detail. We are
dedicated to exceeding client
expectations by crafting
exceptional events that inspire
and leave lasting impressions."
Company Profile
CIAO EVENTS
Wedding Events:
• Wedding planning and
coordination
• Engagement parties
• Bridal showers and
bachelor/bachelorette parties
• Ceremony and reception
management
• Destination weddings
Social Events:
• Anniversaries
• Family reunions
• Holiday parties
• Graduation celebrations
• Retirement parties
Services Offered
Company Profile
CIAO EVENTS
Public Events:
• Festivals and fairs
• Fundraising events
• Community events
• Cultural and arts events
• Sporting events
Consultation and Budgeting:
• Event concept development
• Budget creation and
management
• Vendor selection and
management
• Timeline and logistics planning
• On-site coordination
Services Offered
Company Profile
CIAO EVENTS
Entertainment Activities
• Live Bands and DJs
• Performers (Magicians, Dancers,
etc.)
• Interactive Activities
• Photo Booths
• Team Building Exercises
Post-Event Services
• Event Evaluation and Feedback
• Post-Event Analysis
• Follow-up Services
• Thank You Notes and Gifts
• Event Cleanup
Services Offered
CLIENT PROFILE RACHELLE I. SAN PEDRO
BRIDE/CLIENT
09153370858
COORDINATOR’S PROFILE
PRINCE RONALD I. SAN PEDRO
Event Director
Prince Events Management Services
0916-777-7777princeevents@gmail.com
EVENT NAME "Passport to Love: Alexis & Rachelle’s Destination Wedding
EVENT OBJECTIVE To create a truly unforgettable wedding day for the couple
EVENT THEME Traditional Filipino Style
EVENT MOTIF BARONG TAGALOG/FILIPINIANA
DAY/DATE/TIME Friday/December 12, 2024/ 5:00 pm – 9:00 pm
TARGET AUDIENCE COUPLE , FAMILY OF THE COUPLE , RELATIVES, FRIENDS
ESTIMATED NUMBER OF GUEST 250 GUESTS
PROPOSED EVENT VENUE
PROPOSED BUDGET ALLOCATION
SPECIAL REQUEST
EVENT PROGRAM
FLOW
TIME ACTIVITY PERSON’S INVOLVED
5:00 PM- 5:30 Guest Arrival
5:30 - 5:45 Entourage, Primary and Secondary sponsor
entrance
5:45- 5:55 Bride and groom entrance and dance
5:55- 6:20 Formal dances
6:20- 6:45 Speeches of parents
645 - 6:-50 Cake cutting
6:50-7:00 Games trivias about the couple
7:00- 7:10 Bouquet and garter toss
7:10 - 7:40 picture taking per table
7:40 8:20 dinner service
8:20- 8:40 SDE video viewing
8:40 PM- 8:55 Final Toasts and Thank You Speeches
8:55 to 9:00 Guests departure
ITEMS SUPPLIERS (ADDRESS AND CONTACT #) INCLUSIONS AMOUNT
VENUE La Victoria hotel
Address: Sta. Cruz corner, Road, Gapan
City, Nueva Ecija
Phone: 0917 145 0051
• Wi-Fi
• Parking for 100 vehicles
• 1 Swimming Pool
• 1 kiddie pool
• Wide Garden Area
• Stage
P75,000
CATERING Dina’s catering
Imelda Avenue, Kapitan Pepe
Subdivision, Cabanatuan City,
Philippines
0917 566 5687
dinascateringph@gmail.com
FULL COURSE DINNER BUFFET 250
PAX*700
P175,000
PICA-PICA charcuterie buffet P15,000
MOBILE BAR Hysteria Mobile Bar
Cabanatuan City, Philippines
0905 850 2890
reyanneramos55@yahoo.com.ph
faebook.com/bysteriamobilehar
• Lighted Bar set up
• Bartenders
• Free Flowing Drinks
• Ice supply
• 15-20 kinds of drinks
• Bar Games
• Service of Clients’s liquor
P15,000
ITEMS SUPPLIERS INCLUSIONS AMOUNT
STYLING
La Estilo
Aliaga, Nueva Ecija,
Cabanatuan City, Philippines
Stage design, floral
backdrop, couch for newly
weds, chairs and tables,
centerpieces,
Bride and bridesmaid
bouquets, corsage,
buttonnaires,
P120,000
FLORIST P20,000
ACCOMMODATI
ON
La Victoria Hotel
Address: Sta. Cruz corner,
Road, Gapan City, Nueva
Ecija
Phone: 0917 145 0051
3 air-conditioned rooms
good for 3 to 4 pax
P36,000
LIGHTS AND
SOUND
PAUL AUDIO SOUNDS AND
LIGHTS
Purok 5, 264 Balante-Sta. Cruz
Rd, Gapan City, 3105 Nueva
Ecija
Speakers, microphones,
amplifiers, ambient lighting,
stage lightning, fog
machines, bubble
machines, projection
system, fairy lights
P4,500
LED WALL 9ft x 28 ft LED WALL P30,000
ITEMS SUPPLIERS INCLUSIONS AMOUNT
PHOTO
VIDEO
CG Creatives Photography
0975 023 4864
photographycgcreatives@g
mail.com
SDE video
Printed enhanced photos
2 photographers
2 videographers
Soft copy of all photos both raw
and enhanced in 64gb flashdrive
Prenup photograpy
Prenup video with cinematography
P70,000
PHOTO
BOOTH
Background
3 ring lights
Props
Monitor
1 photographer
1 assistant
P60,000
SOUVENIRS Capiz lamp P125,000
ITEMS SUPPLIERS INCLUSIONS AMOUNT
CAKE Tricia’s Treats
Malapit, San Isidro, Nueva Ecija
09270459828
6 tier wedding cake
All edible
P30,000
HMUp Makeup By Jasmine Patiño
Bacoor,Cavite, Bacoor, Philippines
0928 451 6425
Makeupbyjasminepatino@gmail.co
m
Bride, Groom, Mother of the
bride and groom
HD airbrush make up for the
bride, 3D human hair lashes,
Natural Contact lenses, 3
hairstyles
Unlimited retouches for the
bride, conventional make up for
the groom, formal hairstyle,
P40,000
INVITATI
ON
Almers Advertising and Printing
Supplies
163 Camino Street, San Nicolas
almersadvertising@yahoo.com
Embossed style P15,000
GOWNS
,JEWERL
Y
Edgar Lising Gowns
Gapan, Nueva Ecija
09058967402
Basal gown, necklace, earrings,
bracelets, hairpieces
P60,000
ITEMS SUPPLIERS INCLUSIONS AMOUNT
GAMES,PRIZE 1000 pesos cash P5,000
PERFORMERS Johnoy Danao 3 song performance P300,000
EMCEE Bright Events by Team
Host Oli
Sto. Niño Gapan City,
Gapan, Philippines
0955 958 4422
2 professional masters
of ceremony
Entertainment
management
Assisting staffs
Guest management
P20,000
CHURCH FEES P6,000
ITEMS SUPPLIERS INCLUSIONS AMOUNT
OFFICIATING MINISTER P5,000
CREW MEAL Before the event
4 coordinators
3 photographers
2 videographers
3 event stylist
1 florist
3 HMUp stylists
2 barista
2 security personnel
5 assistant staffs
After the event
4 coordinators
3 photographers
2 videographers
3 event stylist
1 florist
3 HMUp stylists
2 barista
2 security personnel
5 assistant staffs
25 PAX * 240
P6000
SUB-TOTAL P1,232,500
COORDINATOR’S FEE 10%-20% P246,500
CONTINGENCY FUND FLEXIBLE P21,000
GRAND TOTAL P1,500,000
Backstage / Dressing Room
LED Wall
Couple’s Table
Cake
Table
Souvenir Table Gift Table
RED CARPET
Dance Floor
Registration Area IATF Protocol
Sound System
VIP TABLE
VIP TABLE
Buffet
1
Buffet
2
Risk Solutions
Fire Risks
Unexpected faulty wirings
• Have a floor plan of the building wheres
there are fire exits
• Have fire extinguishers
Health and Safety Risks
Accidents or injuries during physical activities.
• Conduct a thorough risk assessment
before the event.
• Ensure that activities are suitable for all
fitness levels.
• Have first aid kits and trained personnel
on-site.
• Communicate safety guidelines clearly
to all participants.
Risk Solutions
Cultural and Sensitivity
Risks
Activities that might offend or exclude
some team members.
• Choose inclusive activities that respect
cultural and personal differences.
• Avoid activities that might be
controversial or uncomfortable for some
participants.
• Seek feedback from diverse team
members during the planning stage.
Logistical Risks
Delays in transportation
• Arrange reliable transportation and
have backup plans.
• Inspect venues in advance and ensure
they meet requirements.
• Monitor weather forecasts and have
contingency plans for outdoor events.
• Communicate detailed itineraries and
logistical information to all participants.
Risk Solutions
Unorganized Parking
Space
• Parking Attendants: Employ parking
attendants to manage the parking area
efficiently, guiding drivers to available spots
and optimizing space usage.
• Digital Signage: Use digital signage to direct
participants to available parking areas or
alternative options.
• Live Parking Updates: Provide real-time
updates on parking availability through a
dedicated event app or social media
channels.
• Nearby Lots: Arrange for additional parking
spaces in nearby lots, such as schools,
businesses, or public parking areas.
• Parking Instructions: Send detailed parking
instructions to participants in advance,
including maps and alternative parking

Wedding New in Event Management Powerpoint

  • 1.
    Institutional Assessment NEWLY WEDS TRAINER: KEVINS. MANSON TRAINEE: PATRICIA ANNE P. PAEZ
  • 2.
    Company Profile CIAO EVENTS ContactInformation GLOBE : 0991-234- fl678 SMART: 0998- 76fl-4321 Email: ciaoevents@gmail.co m Company Address: Orchid. St. Maria Cristina Village, San Isidro, Nueva Ecija History Founded in 2016 by Patricia Anne Paez, Ciao Events Services has rapidly grown into a premier firm specializing in bespoke event planning and execution. With a focus on creativity and client satisfaction, Ciao Events Management Company has established itself as a trusted partner in crafting memorable and impactful events tailored to meet diverse client needs and preferences.
  • 3.
    Company Profile CIAO EVENTS Vision “Ourvision at Ciao Events is to become a leading global authority in event management, renowned for our innovation, meticulous planning, and unmatched client satisfaction. We aim to elevate every event we touch, setting new standards in creativity and excellence." Mission "At Ciao Events, our mission is to deliver unparalleled event management services, focusing on quality, creativity, and attention to detail. We are dedicated to exceeding client expectations by crafting exceptional events that inspire and leave lasting impressions."
  • 4.
    Company Profile CIAO EVENTS WeddingEvents: • Wedding planning and coordination • Engagement parties • Bridal showers and bachelor/bachelorette parties • Ceremony and reception management • Destination weddings Social Events: • Anniversaries • Family reunions • Holiday parties • Graduation celebrations • Retirement parties Services Offered
  • 5.
    Company Profile CIAO EVENTS PublicEvents: • Festivals and fairs • Fundraising events • Community events • Cultural and arts events • Sporting events Consultation and Budgeting: • Event concept development • Budget creation and management • Vendor selection and management • Timeline and logistics planning • On-site coordination Services Offered
  • 6.
    Company Profile CIAO EVENTS EntertainmentActivities • Live Bands and DJs • Performers (Magicians, Dancers, etc.) • Interactive Activities • Photo Booths • Team Building Exercises Post-Event Services • Event Evaluation and Feedback • Post-Event Analysis • Follow-up Services • Thank You Notes and Gifts • Event Cleanup Services Offered
  • 8.
    CLIENT PROFILE RACHELLEI. SAN PEDRO BRIDE/CLIENT 09153370858 COORDINATOR’S PROFILE PRINCE RONALD I. SAN PEDRO Event Director Prince Events Management Services 0916-777-7777princeevents@gmail.com EVENT NAME "Passport to Love: Alexis & Rachelle’s Destination Wedding EVENT OBJECTIVE To create a truly unforgettable wedding day for the couple EVENT THEME Traditional Filipino Style EVENT MOTIF BARONG TAGALOG/FILIPINIANA DAY/DATE/TIME Friday/December 12, 2024/ 5:00 pm – 9:00 pm TARGET AUDIENCE COUPLE , FAMILY OF THE COUPLE , RELATIVES, FRIENDS ESTIMATED NUMBER OF GUEST 250 GUESTS PROPOSED EVENT VENUE PROPOSED BUDGET ALLOCATION SPECIAL REQUEST
  • 9.
    EVENT PROGRAM FLOW TIME ACTIVITYPERSON’S INVOLVED 5:00 PM- 5:30 Guest Arrival 5:30 - 5:45 Entourage, Primary and Secondary sponsor entrance 5:45- 5:55 Bride and groom entrance and dance 5:55- 6:20 Formal dances 6:20- 6:45 Speeches of parents 645 - 6:-50 Cake cutting 6:50-7:00 Games trivias about the couple 7:00- 7:10 Bouquet and garter toss 7:10 - 7:40 picture taking per table 7:40 8:20 dinner service 8:20- 8:40 SDE video viewing 8:40 PM- 8:55 Final Toasts and Thank You Speeches 8:55 to 9:00 Guests departure
  • 10.
    ITEMS SUPPLIERS (ADDRESSAND CONTACT #) INCLUSIONS AMOUNT VENUE La Victoria hotel Address: Sta. Cruz corner, Road, Gapan City, Nueva Ecija Phone: 0917 145 0051 • Wi-Fi • Parking for 100 vehicles • 1 Swimming Pool • 1 kiddie pool • Wide Garden Area • Stage P75,000 CATERING Dina’s catering Imelda Avenue, Kapitan Pepe Subdivision, Cabanatuan City, Philippines 0917 566 5687 dinascateringph@gmail.com FULL COURSE DINNER BUFFET 250 PAX*700 P175,000 PICA-PICA charcuterie buffet P15,000 MOBILE BAR Hysteria Mobile Bar Cabanatuan City, Philippines 0905 850 2890 reyanneramos55@yahoo.com.ph faebook.com/bysteriamobilehar • Lighted Bar set up • Bartenders • Free Flowing Drinks • Ice supply • 15-20 kinds of drinks • Bar Games • Service of Clients’s liquor P15,000
  • 11.
    ITEMS SUPPLIERS INCLUSIONSAMOUNT STYLING La Estilo Aliaga, Nueva Ecija, Cabanatuan City, Philippines Stage design, floral backdrop, couch for newly weds, chairs and tables, centerpieces, Bride and bridesmaid bouquets, corsage, buttonnaires, P120,000 FLORIST P20,000 ACCOMMODATI ON La Victoria Hotel Address: Sta. Cruz corner, Road, Gapan City, Nueva Ecija Phone: 0917 145 0051 3 air-conditioned rooms good for 3 to 4 pax P36,000 LIGHTS AND SOUND PAUL AUDIO SOUNDS AND LIGHTS Purok 5, 264 Balante-Sta. Cruz Rd, Gapan City, 3105 Nueva Ecija Speakers, microphones, amplifiers, ambient lighting, stage lightning, fog machines, bubble machines, projection system, fairy lights P4,500 LED WALL 9ft x 28 ft LED WALL P30,000
  • 12.
    ITEMS SUPPLIERS INCLUSIONSAMOUNT PHOTO VIDEO CG Creatives Photography 0975 023 4864 photographycgcreatives@g mail.com SDE video Printed enhanced photos 2 photographers 2 videographers Soft copy of all photos both raw and enhanced in 64gb flashdrive Prenup photograpy Prenup video with cinematography P70,000 PHOTO BOOTH Background 3 ring lights Props Monitor 1 photographer 1 assistant P60,000 SOUVENIRS Capiz lamp P125,000
  • 13.
    ITEMS SUPPLIERS INCLUSIONSAMOUNT CAKE Tricia’s Treats Malapit, San Isidro, Nueva Ecija 09270459828 6 tier wedding cake All edible P30,000 HMUp Makeup By Jasmine Patiño Bacoor,Cavite, Bacoor, Philippines 0928 451 6425 Makeupbyjasminepatino@gmail.co m Bride, Groom, Mother of the bride and groom HD airbrush make up for the bride, 3D human hair lashes, Natural Contact lenses, 3 hairstyles Unlimited retouches for the bride, conventional make up for the groom, formal hairstyle, P40,000 INVITATI ON Almers Advertising and Printing Supplies 163 Camino Street, San Nicolas almersadvertising@yahoo.com Embossed style P15,000 GOWNS ,JEWERL Y Edgar Lising Gowns Gapan, Nueva Ecija 09058967402 Basal gown, necklace, earrings, bracelets, hairpieces P60,000
  • 14.
    ITEMS SUPPLIERS INCLUSIONSAMOUNT GAMES,PRIZE 1000 pesos cash P5,000 PERFORMERS Johnoy Danao 3 song performance P300,000 EMCEE Bright Events by Team Host Oli Sto. Niño Gapan City, Gapan, Philippines 0955 958 4422 2 professional masters of ceremony Entertainment management Assisting staffs Guest management P20,000 CHURCH FEES P6,000
  • 15.
    ITEMS SUPPLIERS INCLUSIONSAMOUNT OFFICIATING MINISTER P5,000 CREW MEAL Before the event 4 coordinators 3 photographers 2 videographers 3 event stylist 1 florist 3 HMUp stylists 2 barista 2 security personnel 5 assistant staffs After the event 4 coordinators 3 photographers 2 videographers 3 event stylist 1 florist 3 HMUp stylists 2 barista 2 security personnel 5 assistant staffs 25 PAX * 240 P6000
  • 16.
    SUB-TOTAL P1,232,500 COORDINATOR’S FEE10%-20% P246,500 CONTINGENCY FUND FLEXIBLE P21,000 GRAND TOTAL P1,500,000
  • 17.
    Backstage / DressingRoom LED Wall Couple’s Table Cake Table Souvenir Table Gift Table RED CARPET Dance Floor Registration Area IATF Protocol Sound System VIP TABLE VIP TABLE Buffet 1 Buffet 2
  • 18.
    Risk Solutions Fire Risks Unexpectedfaulty wirings • Have a floor plan of the building wheres there are fire exits • Have fire extinguishers Health and Safety Risks Accidents or injuries during physical activities. • Conduct a thorough risk assessment before the event. • Ensure that activities are suitable for all fitness levels. • Have first aid kits and trained personnel on-site. • Communicate safety guidelines clearly to all participants.
  • 19.
    Risk Solutions Cultural andSensitivity Risks Activities that might offend or exclude some team members. • Choose inclusive activities that respect cultural and personal differences. • Avoid activities that might be controversial or uncomfortable for some participants. • Seek feedback from diverse team members during the planning stage. Logistical Risks Delays in transportation • Arrange reliable transportation and have backup plans. • Inspect venues in advance and ensure they meet requirements. • Monitor weather forecasts and have contingency plans for outdoor events. • Communicate detailed itineraries and logistical information to all participants.
  • 20.
    Risk Solutions Unorganized Parking Space •Parking Attendants: Employ parking attendants to manage the parking area efficiently, guiding drivers to available spots and optimizing space usage. • Digital Signage: Use digital signage to direct participants to available parking areas or alternative options. • Live Parking Updates: Provide real-time updates on parking availability through a dedicated event app or social media channels. • Nearby Lots: Arrange for additional parking spaces in nearby lots, such as schools, businesses, or public parking areas. • Parking Instructions: Send detailed parking instructions to participants in advance, including maps and alternative parking