SlideShare a Scribd company logo
1 of 25
”Aristokit”
                  Process driven Design



© 2008 AB Volvo
- Presentation -



                                                       Finance, strategy and
                                                       business development,
                                              Mikael Bratt, Senior Vice President & CFO


710, Corporate Strategy &    450, Corporate Audit     440, Financial Reporting,            420, Business Control   410, Corporate Finance
Business Development                                  Mikael Hagström,Vice President




                              442, Group Accunting     441, Master Coordinator         447, Internal Control
                                                            Finance, Helen Kylstad




     AB Volvo
     441, Master Coordinator Finance
     © 2008 AB Volvo
- Presentation -
                                             VGHQ, Master coordinator Finance

                                                        Volvo Group SAP Solutions
                                                       Within Business administration


                                                                                                 Global
                                                                                                  BW




                                                                                                 Global
                                  Master      CAPS         Credit                  MIC
                                  Finance                  Portal      HR                        Portal




                                                     System/Solution Owner
                              Mc Finance assignment is to govern Volvo Group SAP solutions by securing that
                              support, maintenance and development are in line with Volvo Group Business
                              requirements.


                                                     Anders Jarenfors
                                                      Responsible for;
                                                         •Common structures, methods and tools
                                                         •Common Support and Maintenance
                                                         •Project Owner, Aristokit
                                                         •Master Finance Implementation
                                                                •Nissan Diesel
                                                                •Volvo in Russia



AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Volvo Group -

                                                           AB Volvo
Business Areas



    Mack          Renault         Volvo      BA Asia                  Construction   Volvo   Volvo   Financial
                                               Incl.         Buses
   Trucks         Trucks          Trucks   Nissan Diesel
                                                                       Equipment     Penta    Aero   Services


Business Units

                                      Volvo 3P

                                     Volvo Powertrain

                                     Volvo Parts

                                     Volvo Logistics

                                     Volvo Information Technology & Others




AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Size is not everything, but it matters -


              Number of Companies
                                            Number of Employees
               within Volvo Group

                          400                     100.000

             Number of Companies
                                        Number of Master Finance users
             running Master Finance

                           130                    6.500


               Turn over covered in          FTE’s working with
                  Master Finance               Master Finance

                      75-80%                         7


AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
Finance Challenge
- Vision – Financial Reporting -


     World class quality and efficiency in financial
  reporting to facilitate planning, follow-up and control

  A standardized* record-to-report process shared by all Volvo group companies running Master Finance
  A non-event closing
  One set of key controls
  Transparency and Quality
  Master Finance coverage
     – 250 Companies plus acquisitions


* The Record-to-Report process is the same within Volvo for the same type of companies, i.e. sales companies, holding
companies, industrial companies, but not necessarily identical for all companies.




  AB Volvo
  441, Master Coordinator Finance
  © 2008 AB Volvo
- Transition to common Finance platform -




                                                                   One Finance
                                                                    Platform
                                                                   several systems

                                                      SEM-BCS
                                                  <
                                  R/3 FI/CO
                              ”Master Finance”

     Diversified
     Accounting
      Solutions
                                      1999                  2006

AB Volvo                                         AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
8
- Conceptual overview, Mc Finance Solutions -
Other AB Volvo Common solutions
                                                                                                               F0R
BA systems                                                                    Master Finance System            001
Non FI/CO systems
Etc.                                         Master Development
   CRM, VFS                                                                         FT5         FA5            F05
                                                                                    FT6         FA6            F06
    GCD             GCA          GCP         FMD            FMA                     FTC         FAC            F0C
   R/3, VIT
                                              900            900                    FT4         FA4            F04
                                                                                    FT3         FA3            F13
    VRD             VRA          VRP

   CRM, VIT                                                                         FT2            FA2         F02

    VCD             VCA          VCP
                                             Solution Manager                                      ZA4         Z04
   MOM, VCE
    EVT             EVA          EVP     (     SMD              SMP
                                                                      )                                        FE1
                                                                                                            700/710/720
                                                                                                            800/810/820
   R/3, 3P
    PSD             PSA          PSP                                                CAPS, AB Volvo
                                                                                        S5D         S5A       S5P
   R/3, Logistics
    VLD             VLA          VLP                                                SOX/MIC, Finance
                                                                                        MID         MIA       MIP
   R/3, Bus
    BSD             BSA          BSP                                                Credit Mgmt, AB Volvo
                                                                                        CMD        CMA        CMP
   CRM, Bus
    BTD             BTA          BTP
                                             XI                                     HR, AB Volvo

   -Korea VCE
   -Canada, Graders VCE
                                        (     VXD               VXP
                                                                      )                 HRT         HRA       VCP


   -Canada, Prevost VBC                                           BW-systems excluded

     AB Volvo
     441, Master Coordinator Finance
    © 2008 AB Volvo
Solution - Aristokit
- Aristokit -


                    Business
                     Community                                       Refrence content
                           Aha!
                                           What information
                                           is required?

                                                                                   System provider;
                                                                                   -FI/CO
                                                                                   -SolMan
                                                                                   -ECC
                           How shall we do this?                                   -Netweaver
                                                                                   -SEM
     What’s Master Finance?                                                        -BW
                                                                                   -...
                                       Common Communication Platform
                            ”SOx processes”
                                                                                                Support
  Master Documentation               Master Finance Kit
  Framework                                               Financial Solution(s);
                                                          -Master Finance              Enahancement
                                                          -CAPS                Maintenance
                                  Financial Policies      -Credit Portal                        Operations
                                  and Procedures          -MIC
                                                          -HR
                                                                               Development
                                     Information Model




AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Aristokit – Master Finance Core
                             - Aristokit -
            Model


                                  Process driven design to
                                  describe the content in Master
                                  Finance, including
                                  documentation, Education,
                                  rules and guidelines for
                                  Development, Maintenance
                                  and Implementations




AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Aristokit – Define, Maintain, Implement, Communicate & Educate -


                                  Master Finance Design Board




                                                   Governance




                                   Communication




                                                                 Maint./Dev
                                                                              Template/maint

                                                                                   Core
                                                                                   model




             Training                                 Design
                                                                                                  Global
                                                                                                 Road Map
                                                                 Core model
                                                                                                                Road map
                                                                enhancements                     Assignment   enhancements




                                                                                                                   Roll-Out
                                                                                                 Company
                                                                                               Implementation




AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Aristokit – Areas -

        Process            The framework of structures which guides and controls the implementation and
      Organization         maintenance of the Volvo Master Finance Concept.


                           The information which creates a Master Finance solution fit to drive in accordance with
        Solution           decided Financial Policies and Procedures. Hence, design and documentation,
                           including the information and procedures which translates Volvo’s financial policies into
                           practical instructions and steering Master data


                           The detailed set of actions and instructions which accomplish a Master Finance
       Road Map
                           implementation project from order to delivery.



    Infrastructures        The Master Finance technical architecture and the tools which support an
         Tools             implementation of Master Finance.




        Change             The tools, information and procedures which enable an implementation and facilitates
      Management           the company’s compliance to accounting and reporting standards in the Volvo Master
                           Finance Concept.




AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Master Finance Model -

                                                              Master Finance Core:
                                                                 Designed and communicated.
                       DEzz        GBxx                          Functionality available for all
              DExx                            GBzz               Deliverable in Master Finance implementations
                     DE                  GB
  SEzz
                                                     FRzz

         SE                                          FR
SExx                                                      FRyy
                     Master Finance                                 Master Finance Country settings:
                     Master Finance                                   Country settings
                         Core
                          Core                                        Country specific scripts
ZZ04
                                                          USzz        Reflected legal requirements
       ZZ                                        US
  ZZ05
                                                     USxx
            XX01     XX              JP
                                              JPzz
                       XX02
                                                            Master Finance Local settings and Configuration:
                                  JPyy
                                                             Settings to make core operational
                                                             Approved local functionality
                                                             Gap analysis



AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Aristokit – Process Architecture -




                                                                 Synchronized
                                                                                Solution Manager




AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Aristokit – ARIS                     Solution Manager -
                             Business / SAP Process Hierarchy                          SAP Solution Manager



                                      Definition Copy




                                                                                                              BPR Download
                                             3




                                                                                                                Project for
          Assignment              4                                  2                          1
ARIS DB




                                                                                            Selection of




                                                                 Download
           Modify Def.Copy




                                       Definition Copy                                         BPR
                                                                                           (Processes &
                                                                                          Process steps)
                                       Definition Copy




                                                                   5




                                                                 Synchronization




                                                                                                               Template
                                                                                                                Project
                                                                                           Volvo Standard
                                                                                             Processes




          AB Volvo
          441, Master Coordinator Finance
          © 2008 AB Volvo
- Aristokit – Publication -
                                  - Aristokit Process Web -


                                         Master Finance Core functionality
                                         described from Volvo Group ”Mega
                                         Processes” to actual SAP
                                         transactions...




...and communicated on
the intranet



AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Aristokit -

                             Violin                          ARIS                            Solution Manager                            Solution Manager
                    Aristokit Process Web               Solution Design                   Solution template project           Master Finance Roll out project Road map
Global Template




                                                                           Synchronize
                                              Publish




                                                                                                                      Knowledge
                                                            Copy                               Copy                   Warehouse             Assign
                                                                          Reconciliation
                                                                             Report
Local Project




                                                                            Synchronize




                  AB Volvo
                  441, Master Coordinator Finance
              © 2008 AB Volvo
- Volvo Project Method -




AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Project method – detailed and in SolMan -



                                                     2   ”Freeze” the Road map
                                                         ”Freeze” the Road map
                                                         and upload into SolMan
                                                         and upload into SolMan
     Road Map facts...
     9 Project phases
         1 During Aristokit project,
           During Aristokit project,
     110 WorkRoad Map was
              the Packages
             the Road Map was
            developed in ”Excel”
            developed in ”Excel”
     330 Activities
     • RECI included
     • Project track classification
     24 Milestones
     700 Accelerators


AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Project method – detailed and in SolMan -




                                                        Each activity have a
                                                        Instruction assigned




                        Road Map in tree              Most Activities have one
                       structure, assigned            or several Accelerators
                           to a Project

AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Summary -
                                  Master Finance Design Board




                                                   Governance




                                   Communication




                                                                 Maint./Dev
                                                                              Template/maint

                                                                                   Core
                                                                                   model




             Training                                 Design
                                                                                                  Global
                                                                                                 Road Map
                                                                 Core model
                                                                                                                Road map
                                                                enhancements                     Assignment   enhancements




                                                                                                                   Roll-Out
                                                                                                 Company
                                                                                               Implementation




AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Summary -
                                                   Communication and Design

           Design in ARIS and publication on the intranet. emphasize a Business driven understanding propelled with
           documentation.
           With the connection between ARIS and Solution Manager we have been able to retreive and use SAP Standard
           content when designing Master Finance
           Some documentation still under construction


                                                              Training

         Possible to ”jump” from published models into a SAP training environment.
         Learning maps per Business Scenario for existing companies and new Roll outs under construction


                                                           Mehodology

         The Implementation Road map and entire methodology is based on the Process driven design and synchronization
         with Solution Manager, stored in one place. This limit number of supporting systems and duplications of templates.
         Test scenarios and some documentation is still under construction


                                                     Standardize and Re-use

         Having the core model in ARIS as template and synchronizing this in SolMan template project lead times will be
         substantially improved and all will be re-usable for next implementation
         Pilot start in May

AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo
- Lessons... -

                                                                 Buy in

           Business has been overall positive – But want to see Business case realized

           Partly overlooked compexity of IT organisation and that ”freedom” is seen as less

           New role for Shared Service Center



                                                                Change

           The Master Finance Concept based on the Solution Manager and ARIS tools mean change
                        - Don’t underestimate the need to communicate and explain
                                      - Time and Cost



                                                           Size does matter

           Master Finance Solution scope is Volvo Group – many aspects to consider in Design and Documentation

           Project size both in terms of activities and people add complexity
                         - Cultural aspects
                         - Time zone
                         -Availability

           Project scope in a ”closed” system mean many interfaces and high demand on coordination



AB Volvo
441, Master Coordinator Finance
© 2008 AB Volvo

More Related Content

What's hot

SCM system of Automobile Industry
SCM system of Automobile IndustrySCM system of Automobile Industry
SCM system of Automobile IndustryHasan-hjh
 
Project on toyota central motors ppt
Project on toyota central motors pptProject on toyota central motors ppt
Project on toyota central motors pptbilal khan
 
Branding Strategy- Hero motorcorp
Branding Strategy- Hero motorcorpBranding Strategy- Hero motorcorp
Branding Strategy- Hero motorcorpkarthik prasad
 
Volvo Eicher Joint Venture
Volvo Eicher Joint VentureVolvo Eicher Joint Venture
Volvo Eicher Joint VentureAnant Lodha
 
Harley Davidson Final
Harley Davidson FinalHarley Davidson Final
Harley Davidson Finalpaddy123
 
Ewm training ppt
Ewm training pptEwm training ppt
Ewm training pptbabloo6
 
Hero motocorp
Hero motocorpHero motocorp
Hero motocorp3-7-92
 
Suzuki Motor Corp
Suzuki Motor CorpSuzuki Motor Corp
Suzuki Motor CorpRJETHANI
 
Sap logistics and order fulfillment strategy
Sap logistics and order fulfillment strategySap logistics and order fulfillment strategy
Sap logistics and order fulfillment strategyAvi Shacham
 
Ford motor final presentation
Ford motor final presentationFord motor final presentation
Ford motor final presentationadithya_msridhar
 
People Process Technology PowerPoint Presentation Slides
People Process Technology PowerPoint Presentation SlidesPeople Process Technology PowerPoint Presentation Slides
People Process Technology PowerPoint Presentation SlidesSlideTeam
 
Sap EWM free online Tutorial | SAP EWM 9.1 Training
Sap EWM free online Tutorial | SAP EWM 9.1 Training Sap EWM free online Tutorial | SAP EWM 9.1 Training
Sap EWM free online Tutorial | SAP EWM 9.1 Training Sravanthi Sapsolutions
 
Sensors and Data Management for Autonomous Vehicles report 2015 by Yole Devel...
Sensors and Data Management for Autonomous Vehicles report 2015 by Yole Devel...Sensors and Data Management for Autonomous Vehicles report 2015 by Yole Devel...
Sensors and Data Management for Autonomous Vehicles report 2015 by Yole Devel...Yole Developpement
 
Dealer management system on sap cloud platform
Dealer management system on sap cloud platformDealer management system on sap cloud platform
Dealer management system on sap cloud platformVirendra Rai, PMP
 
Sales Reports PowerPoint Presentation Slides
Sales Reports PowerPoint Presentation Slides Sales Reports PowerPoint Presentation Slides
Sales Reports PowerPoint Presentation Slides SlideTeam
 

What's hot (20)

SCM system of Automobile Industry
SCM system of Automobile IndustrySCM system of Automobile Industry
SCM system of Automobile Industry
 
Project on toyota central motors ppt
Project on toyota central motors pptProject on toyota central motors ppt
Project on toyota central motors ppt
 
Tata Project
Tata ProjectTata Project
Tata Project
 
Branding Strategy- Hero motorcorp
Branding Strategy- Hero motorcorpBranding Strategy- Hero motorcorp
Branding Strategy- Hero motorcorp
 
Volvo Eicher Joint Venture
Volvo Eicher Joint VentureVolvo Eicher Joint Venture
Volvo Eicher Joint Venture
 
Harley Davidson Final
Harley Davidson FinalHarley Davidson Final
Harley Davidson Final
 
Ewm training ppt
Ewm training pptEwm training ppt
Ewm training ppt
 
Hero motocorp
Hero motocorpHero motocorp
Hero motocorp
 
hibridos-prius.pdf
hibridos-prius.pdfhibridos-prius.pdf
hibridos-prius.pdf
 
Suzuki Motor Corp
Suzuki Motor CorpSuzuki Motor Corp
Suzuki Motor Corp
 
Braking performance 4
Braking  performance 4Braking  performance 4
Braking performance 4
 
Sap logistics and order fulfillment strategy
Sap logistics and order fulfillment strategySap logistics and order fulfillment strategy
Sap logistics and order fulfillment strategy
 
Ford motor final presentation
Ford motor final presentationFord motor final presentation
Ford motor final presentation
 
People Process Technology PowerPoint Presentation Slides
People Process Technology PowerPoint Presentation SlidesPeople Process Technology PowerPoint Presentation Slides
People Process Technology PowerPoint Presentation Slides
 
1558343
15583431558343
1558343
 
Sap EWM free online Tutorial | SAP EWM 9.1 Training
Sap EWM free online Tutorial | SAP EWM 9.1 Training Sap EWM free online Tutorial | SAP EWM 9.1 Training
Sap EWM free online Tutorial | SAP EWM 9.1 Training
 
Body in White
Body in WhiteBody in White
Body in White
 
Sensors and Data Management for Autonomous Vehicles report 2015 by Yole Devel...
Sensors and Data Management for Autonomous Vehicles report 2015 by Yole Devel...Sensors and Data Management for Autonomous Vehicles report 2015 by Yole Devel...
Sensors and Data Management for Autonomous Vehicles report 2015 by Yole Devel...
 
Dealer management system on sap cloud platform
Dealer management system on sap cloud platformDealer management system on sap cloud platform
Dealer management system on sap cloud platform
 
Sales Reports PowerPoint Presentation Slides
Sales Reports PowerPoint Presentation Slides Sales Reports PowerPoint Presentation Slides
Sales Reports PowerPoint Presentation Slides
 

Similar to Volvo: Process Driven Design

Transforming Volvo: Creating a Single Source for the Enterprise Portfolio
Transforming Volvo: Creating a Single Source for the Enterprise PortfolioTransforming Volvo: Creating a Single Source for the Enterprise Portfolio
Transforming Volvo: Creating a Single Source for the Enterprise PortfolioPlanview
 
Braithwaite Communications Capabilities
Braithwaite Communications CapabilitiesBraithwaite Communications Capabilities
Braithwaite Communications Capabilitiescassoryl
 
Valor Corporate presentation
Valor Corporate presentationValor Corporate presentation
Valor Corporate presentationvalorbv
 
Corporate prestation Valor
Corporate prestation ValorCorporate prestation Valor
Corporate prestation Valorjohnhoog
 
Euroweb - NOAH12 San Francisco
Euroweb - NOAH12 San FranciscoEuroweb - NOAH12 San Francisco
Euroweb - NOAH12 San FranciscoNOAH Advisors
 
Contribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARGContribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARGAmol Vidwans
 
Ozone profile general presentation 1
Ozone profile general presentation 1Ozone profile general presentation 1
Ozone profile general presentation 1Natalliamaroz
 
TIBCO RTView and Monitoring the Enterprise
TIBCO RTView and Monitoring the EnterpriseTIBCO RTView and Monitoring the Enterprise
TIBCO RTView and Monitoring the EnterpriseSL Corporation
 
TIBCO RTView and Monitoring the Enterprise
TIBCO RTView and Monitoring the EnterpriseTIBCO RTView and Monitoring the Enterprise
TIBCO RTView and Monitoring the EnterpriseSL Corporation
 
SAP_S4HANA_Compliance_and_Security_Webinar.pdf
SAP_S4HANA_Compliance_and_Security_Webinar.pdfSAP_S4HANA_Compliance_and_Security_Webinar.pdf
SAP_S4HANA_Compliance_and_Security_Webinar.pdfanandkumar558548
 
CFO Dashboards_Bekaert
CFO Dashboards_BekaertCFO Dashboards_Bekaert
CFO Dashboards_BekaertSabyasachi Sen
 
Camp digital marstrand_wirelesscar
Camp digital marstrand_wirelesscarCamp digital marstrand_wirelesscar
Camp digital marstrand_wirelesscarSigma IT Management
 
Saudi emc today presentation
Saudi emc today presentationSaudi emc today presentation
Saudi emc today presentationadityapuri
 
Cv Ushakov A 20090813 Eng
Cv Ushakov A 20090813 EngCv Ushakov A 20090813 Eng
Cv Ushakov A 20090813 Engushakovanton
 
Fábio Fialho English Resume
Fábio Fialho English ResumeFábio Fialho English Resume
Fábio Fialho English ResumeFabio Fialho
 
Laia.Oliver Cv
Laia.Oliver CvLaia.Oliver Cv
Laia.Oliver Cvlaiaoliver
 
Adyen - NOAH12 San Francisco
Adyen - NOAH12 San FranciscoAdyen - NOAH12 San Francisco
Adyen - NOAH12 San FranciscoNOAH Advisors
 

Similar to Volvo: Process Driven Design (20)

Transforming Volvo: Creating a Single Source for the Enterprise Portfolio
Transforming Volvo: Creating a Single Source for the Enterprise PortfolioTransforming Volvo: Creating a Single Source for the Enterprise Portfolio
Transforming Volvo: Creating a Single Source for the Enterprise Portfolio
 
Braithwaite Communications Capabilities
Braithwaite Communications CapabilitiesBraithwaite Communications Capabilities
Braithwaite Communications Capabilities
 
Vanbrabant Peter 04_2016
Vanbrabant Peter 04_2016Vanbrabant Peter 04_2016
Vanbrabant Peter 04_2016
 
Valor Corporate presentation
Valor Corporate presentationValor Corporate presentation
Valor Corporate presentation
 
Corporate prestation Valor
Corporate prestation ValorCorporate prestation Valor
Corporate prestation Valor
 
SAP Curriculum
SAP CurriculumSAP Curriculum
SAP Curriculum
 
Euroweb - NOAH12 San Francisco
Euroweb - NOAH12 San FranciscoEuroweb - NOAH12 San Francisco
Euroweb - NOAH12 San Francisco
 
Contribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARGContribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARG
 
Ozone profile general presentation 1
Ozone profile general presentation 1Ozone profile general presentation 1
Ozone profile general presentation 1
 
TIBCO RTView and Monitoring the Enterprise
TIBCO RTView and Monitoring the EnterpriseTIBCO RTView and Monitoring the Enterprise
TIBCO RTView and Monitoring the Enterprise
 
TIBCO RTView and Monitoring the Enterprise
TIBCO RTView and Monitoring the EnterpriseTIBCO RTView and Monitoring the Enterprise
TIBCO RTView and Monitoring the Enterprise
 
Badiceanu Radu
Badiceanu RaduBadiceanu Radu
Badiceanu Radu
 
SAP_S4HANA_Compliance_and_Security_Webinar.pdf
SAP_S4HANA_Compliance_and_Security_Webinar.pdfSAP_S4HANA_Compliance_and_Security_Webinar.pdf
SAP_S4HANA_Compliance_and_Security_Webinar.pdf
 
CFO Dashboards_Bekaert
CFO Dashboards_BekaertCFO Dashboards_Bekaert
CFO Dashboards_Bekaert
 
Camp digital marstrand_wirelesscar
Camp digital marstrand_wirelesscarCamp digital marstrand_wirelesscar
Camp digital marstrand_wirelesscar
 
Saudi emc today presentation
Saudi emc today presentationSaudi emc today presentation
Saudi emc today presentation
 
Cv Ushakov A 20090813 Eng
Cv Ushakov A 20090813 EngCv Ushakov A 20090813 Eng
Cv Ushakov A 20090813 Eng
 
Fábio Fialho English Resume
Fábio Fialho English ResumeFábio Fialho English Resume
Fábio Fialho English Resume
 
Laia.Oliver Cv
Laia.Oliver CvLaia.Oliver Cv
Laia.Oliver Cv
 
Adyen - NOAH12 San Francisco
Adyen - NOAH12 San FranciscoAdyen - NOAH12 San Francisco
Adyen - NOAH12 San Francisco
 

Recently uploaded

GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 

Recently uploaded (20)

GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 

Volvo: Process Driven Design

  • 1. ”Aristokit” Process driven Design © 2008 AB Volvo
  • 2. - Presentation - Finance, strategy and business development, Mikael Bratt, Senior Vice President & CFO 710, Corporate Strategy & 450, Corporate Audit 440, Financial Reporting, 420, Business Control 410, Corporate Finance Business Development Mikael Hagström,Vice President 442, Group Accunting 441, Master Coordinator 447, Internal Control Finance, Helen Kylstad AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 3. - Presentation - VGHQ, Master coordinator Finance Volvo Group SAP Solutions Within Business administration Global BW Global Master CAPS Credit MIC Finance Portal HR Portal System/Solution Owner Mc Finance assignment is to govern Volvo Group SAP solutions by securing that support, maintenance and development are in line with Volvo Group Business requirements. Anders Jarenfors Responsible for; •Common structures, methods and tools •Common Support and Maintenance •Project Owner, Aristokit •Master Finance Implementation •Nissan Diesel •Volvo in Russia AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 4. - Volvo Group - AB Volvo Business Areas Mack Renault Volvo BA Asia Construction Volvo Volvo Financial Incl. Buses Trucks Trucks Trucks Nissan Diesel Equipment Penta Aero Services Business Units Volvo 3P Volvo Powertrain Volvo Parts Volvo Logistics Volvo Information Technology & Others AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 5. - Size is not everything, but it matters - Number of Companies Number of Employees within Volvo Group 400 100.000 Number of Companies Number of Master Finance users running Master Finance 130 6.500 Turn over covered in FTE’s working with Master Finance Master Finance 75-80% 7 AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 7. - Vision – Financial Reporting - World class quality and efficiency in financial reporting to facilitate planning, follow-up and control A standardized* record-to-report process shared by all Volvo group companies running Master Finance A non-event closing One set of key controls Transparency and Quality Master Finance coverage – 250 Companies plus acquisitions * The Record-to-Report process is the same within Volvo for the same type of companies, i.e. sales companies, holding companies, industrial companies, but not necessarily identical for all companies. AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 8. - Transition to common Finance platform - One Finance Platform several systems SEM-BCS < R/3 FI/CO ”Master Finance” Diversified Accounting Solutions 1999 2006 AB Volvo AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo 8
  • 9. - Conceptual overview, Mc Finance Solutions - Other AB Volvo Common solutions F0R BA systems Master Finance System 001 Non FI/CO systems Etc. Master Development CRM, VFS FT5 FA5 F05 FT6 FA6 F06 GCD GCA GCP FMD FMA FTC FAC F0C R/3, VIT 900 900 FT4 FA4 F04 FT3 FA3 F13 VRD VRA VRP CRM, VIT FT2 FA2 F02 VCD VCA VCP Solution Manager ZA4 Z04 MOM, VCE EVT EVA EVP ( SMD SMP ) FE1 700/710/720 800/810/820 R/3, 3P PSD PSA PSP CAPS, AB Volvo S5D S5A S5P R/3, Logistics VLD VLA VLP SOX/MIC, Finance MID MIA MIP R/3, Bus BSD BSA BSP Credit Mgmt, AB Volvo CMD CMA CMP CRM, Bus BTD BTA BTP XI HR, AB Volvo -Korea VCE -Canada, Graders VCE ( VXD VXP ) HRT HRA VCP -Canada, Prevost VBC BW-systems excluded AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 11. - Aristokit - Business Community Refrence content Aha! What information is required? System provider; -FI/CO -SolMan -ECC How shall we do this? -Netweaver -SEM What’s Master Finance? -BW -... Common Communication Platform ”SOx processes” Support Master Documentation Master Finance Kit Framework Financial Solution(s); -Master Finance Enahancement -CAPS Maintenance Financial Policies -Credit Portal Operations and Procedures -MIC -HR Development Information Model AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 12. - Aristokit – Master Finance Core - Aristokit - Model Process driven design to describe the content in Master Finance, including documentation, Education, rules and guidelines for Development, Maintenance and Implementations AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 13. - Aristokit – Define, Maintain, Implement, Communicate & Educate - Master Finance Design Board Governance Communication Maint./Dev Template/maint Core model Training Design Global Road Map Core model Road map enhancements Assignment enhancements Roll-Out Company Implementation AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 14. - Aristokit – Areas - Process The framework of structures which guides and controls the implementation and Organization maintenance of the Volvo Master Finance Concept. The information which creates a Master Finance solution fit to drive in accordance with Solution decided Financial Policies and Procedures. Hence, design and documentation, including the information and procedures which translates Volvo’s financial policies into practical instructions and steering Master data The detailed set of actions and instructions which accomplish a Master Finance Road Map implementation project from order to delivery. Infrastructures The Master Finance technical architecture and the tools which support an Tools implementation of Master Finance. Change The tools, information and procedures which enable an implementation and facilitates Management the company’s compliance to accounting and reporting standards in the Volvo Master Finance Concept. AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 15. - Master Finance Model - Master Finance Core: Designed and communicated. DEzz GBxx Functionality available for all DExx GBzz Deliverable in Master Finance implementations DE GB SEzz FRzz SE FR SExx FRyy Master Finance Master Finance Country settings: Master Finance Country settings Core Core Country specific scripts ZZ04 USzz Reflected legal requirements ZZ US ZZ05 USxx XX01 XX JP JPzz XX02 Master Finance Local settings and Configuration: JPyy Settings to make core operational Approved local functionality Gap analysis AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 16. - Aristokit – Process Architecture - Synchronized Solution Manager AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 17. - Aristokit – ARIS Solution Manager - Business / SAP Process Hierarchy SAP Solution Manager Definition Copy BPR Download 3 Project for Assignment 4 2 1 ARIS DB Selection of Download Modify Def.Copy Definition Copy BPR (Processes & Process steps) Definition Copy 5 Synchronization Template Project Volvo Standard Processes AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 18. - Aristokit – Publication - - Aristokit Process Web - Master Finance Core functionality described from Volvo Group ”Mega Processes” to actual SAP transactions... ...and communicated on the intranet AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 19. - Aristokit - Violin ARIS Solution Manager Solution Manager Aristokit Process Web Solution Design Solution template project Master Finance Roll out project Road map Global Template Synchronize Publish Knowledge Copy Copy Warehouse Assign Reconciliation Report Local Project Synchronize AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 20. - Volvo Project Method - AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 21. - Project method – detailed and in SolMan - 2 ”Freeze” the Road map ”Freeze” the Road map and upload into SolMan and upload into SolMan Road Map facts... 9 Project phases 1 During Aristokit project, During Aristokit project, 110 WorkRoad Map was the Packages the Road Map was developed in ”Excel” developed in ”Excel” 330 Activities • RECI included • Project track classification 24 Milestones 700 Accelerators AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 22. - Project method – detailed and in SolMan - Each activity have a Instruction assigned Road Map in tree Most Activities have one structure, assigned or several Accelerators to a Project AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 23. - Summary - Master Finance Design Board Governance Communication Maint./Dev Template/maint Core model Training Design Global Road Map Core model Road map enhancements Assignment enhancements Roll-Out Company Implementation AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 24. - Summary - Communication and Design Design in ARIS and publication on the intranet. emphasize a Business driven understanding propelled with documentation. With the connection between ARIS and Solution Manager we have been able to retreive and use SAP Standard content when designing Master Finance Some documentation still under construction Training Possible to ”jump” from published models into a SAP training environment. Learning maps per Business Scenario for existing companies and new Roll outs under construction Mehodology The Implementation Road map and entire methodology is based on the Process driven design and synchronization with Solution Manager, stored in one place. This limit number of supporting systems and duplications of templates. Test scenarios and some documentation is still under construction Standardize and Re-use Having the core model in ARIS as template and synchronizing this in SolMan template project lead times will be substantially improved and all will be re-usable for next implementation Pilot start in May AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo
  • 25. - Lessons... - Buy in Business has been overall positive – But want to see Business case realized Partly overlooked compexity of IT organisation and that ”freedom” is seen as less New role for Shared Service Center Change The Master Finance Concept based on the Solution Manager and ARIS tools mean change - Don’t underestimate the need to communicate and explain - Time and Cost Size does matter Master Finance Solution scope is Volvo Group – many aspects to consider in Design and Documentation Project size both in terms of activities and people add complexity - Cultural aspects - Time zone -Availability Project scope in a ”closed” system mean many interfaces and high demand on coordination AB Volvo 441, Master Coordinator Finance © 2008 AB Volvo