Để xem full tài liệu Xin vui long liên hệ page để được hỗ trợ
: https://www.facebook.com/thuvienluanvan01
HOẶC
https://www.facebook.com/garmentspace/
https://www.facebook.com/thuvienluanvan01
https://www.facebook.com/thuvienluanvan01
tai lieu tong hop, thu vien luan van, luan van tong hop, do an chuyen nganh
Để xem full tài liệu Xin vui long liên hệ page để được hỗ trợ
: https://www.facebook.com/thuvienluanvan01
HOẶC
https://www.facebook.com/garmentspace/
https://www.facebook.com/thuvienluanvan01
https://www.facebook.com/thuvienluanvan01
tai lieu tong hop, thu vien luan van, luan van tong hop, do an chuyen nganh
Để xem full tài liệu Xin vui long liên hệ page để được hỗ trợ
: https://www.facebook.com/thuvienluanvan01
HOẶC
https://www.facebook.com/garmentspace/
https://www.facebook.com/thuvienluanvan01
https://www.facebook.com/thuvienluanvan01
tai lieu tong hop, thu vien luan van, luan van tong hop, do an chuyen nganh
Để xem full tài liệu Xin vui long liên hệ page để được hỗ trợ
: https://www.facebook.com/thuvienluanvan01
HOẶC
https://www.facebook.com/garmentspace/
https://www.facebook.com/thuvienluanvan01
https://www.facebook.com/thuvienluanvan01
tai lieu tong hop, thu vien luan van, luan van tong hop, do an chuyen nganh
ĐẢNG CỘNG SẢN VIỆT NAM giải quyết xung đột với Pháp sau CMT8 trước Toàn quốc ...Ho Quang Thanh
Tải bản Powerpoint tại: http://megaurl.in/bcqukaTu
Tải bản Word tại: http://megaurl.in/XNEc4K
Đề bài: LÀM RÕ QUÁ TRÌNH ĐẢNG TỪNG BƯỚC GIẢI QUYẾT XUNG ĐỘT VỚI PHÁP SAU CMT8/1945 ĐẾN TRƯỚC KHI QUYẾT ĐỊNH PHÁT ĐỘNG TOÀN QUỐC KHÁNG CHIẾN 12/1946
"Đừng tin, Hãy nhìn và lắng nghe"
Nhận viết luận văn Đại học , thạc sĩ - Zalo: 0917.193.864
Tham khảo bảng giá dịch vụ viết bài tại: vietbaocaothuctap.net
Download luận văn đồ án tốt nghiệp với đề tài: Thiết kế hộp giảm tốc bánh răng côn dùng cho băng tải, cho các bạn làm luận văn tham khảo
Nhận viết luận văn đại học, thạc sĩ trọn gói, chất lượng, LH ZALO=>0909232620
Tham khảo dịch vụ, bảng giá tại: https://baocaothuctap.net
Download luận văn tóm tắt ngành kĩ thuật xây dựng với đề tài: Nghiên cứu xây dựng quy trình lắp dựng kết cấu thép nhà cao tầng, cho các bạn làm luận văn tham khảo
Giáo trình Máy Xây Dựng - Nguyễn Phước Bình - ĐHBK Đà Nẵngshare-connect Blog
Download tại
http://share-connect.blogspot.com/2014/12/giao-trinh-may-xay-dung-nguyen-phuoc-binh.html
Tên Ebook: Giáo trình Máy Xây Dựng. Tác giả: Nguyễn Phước Bình - ĐHBK Đà Nẵng. Định dạng: PDF. Số trang: 88. Nhà xuất bản: . Năm phát hành: 2004
Câu 1:
Dầm AD có liên kết gối di động tại B và gối cố định tại D,chịu lực như hình vẽ.Hãy tính phản lực liên kết tại B và D.
Câu 2:
Hai dầm AB và BC liên kết với nhau nhờ bản lề B. Hãy tính phản lực tại A,B,C
Bài 3/ Cho dầm kép 3 nhịp có liên kết ngàm tại 1,liên kết con lăn tại B và C,liên kết khớp bản lề tại D và E.Hãy xác định phản lực tại các liên lết này.
Bài 4/ Dầm kép 3 nhịp có liên kết ngàm tại A,liên kết gối cố định tại B và bản lề tại C và D.Hãy xác định các phản lực tại các liên kếy này (đơn vị của lực là pound (lb),còn của độ dài là foot (ft)
Bài 5 : Xác định độ lớn nhỏ nhất và góc của lực P cần thiết để kéo ống 50 kg vượt qua bậc thềm nhẵn bóng. Lấy g=9,81(m/s2)
Bài 6 :
a/Một vật nặng 30 kg được treo tại A bởi hệ thống gồm 5 sợi dây không dản.Hãy xác định lực căng trong các sợi dây khi cân bằng,lấy g=9,81(m/s2)
b/Nếu mỗi sợi chỉ chịu được lực căng lớn nhất là 500N,hỏi khối lượng vật lớn nhất khi treo là bao nhiêu?
Bài 7 :Hãy xác định phản lực tại A,B,C
Bài 8 :
Một người có trọng lượng W,đứng tại trọng tâm của tấm ván phẳng dài L,độ dày bỏ qua.Nếu chổ tiếp xúc tại A và B là nhẵn bóng,hãy xác định lực căng trong dây theo W và
Bài 9 :
Một dầm ghép 2 nhịp (nối nhau tại khớp bản lề D) có liên kết bằng khớp bản lề tại B và liên kết con lăn tại A và C.Hãy xác định phản lực tại các liên kết này.
ĐẢNG CỘNG SẢN VIỆT NAM giải quyết xung đột với Pháp sau CMT8 trước Toàn quốc ...Ho Quang Thanh
Tải bản Powerpoint tại: http://megaurl.in/bcqukaTu
Tải bản Word tại: http://megaurl.in/XNEc4K
Đề bài: LÀM RÕ QUÁ TRÌNH ĐẢNG TỪNG BƯỚC GIẢI QUYẾT XUNG ĐỘT VỚI PHÁP SAU CMT8/1945 ĐẾN TRƯỚC KHI QUYẾT ĐỊNH PHÁT ĐỘNG TOÀN QUỐC KHÁNG CHIẾN 12/1946
"Đừng tin, Hãy nhìn và lắng nghe"
Nhận viết luận văn Đại học , thạc sĩ - Zalo: 0917.193.864
Tham khảo bảng giá dịch vụ viết bài tại: vietbaocaothuctap.net
Download luận văn đồ án tốt nghiệp với đề tài: Thiết kế hộp giảm tốc bánh răng côn dùng cho băng tải, cho các bạn làm luận văn tham khảo
Nhận viết luận văn đại học, thạc sĩ trọn gói, chất lượng, LH ZALO=>0909232620
Tham khảo dịch vụ, bảng giá tại: https://baocaothuctap.net
Download luận văn tóm tắt ngành kĩ thuật xây dựng với đề tài: Nghiên cứu xây dựng quy trình lắp dựng kết cấu thép nhà cao tầng, cho các bạn làm luận văn tham khảo
Giáo trình Máy Xây Dựng - Nguyễn Phước Bình - ĐHBK Đà Nẵngshare-connect Blog
Download tại
http://share-connect.blogspot.com/2014/12/giao-trinh-may-xay-dung-nguyen-phuoc-binh.html
Tên Ebook: Giáo trình Máy Xây Dựng. Tác giả: Nguyễn Phước Bình - ĐHBK Đà Nẵng. Định dạng: PDF. Số trang: 88. Nhà xuất bản: . Năm phát hành: 2004
Câu 1:
Dầm AD có liên kết gối di động tại B và gối cố định tại D,chịu lực như hình vẽ.Hãy tính phản lực liên kết tại B và D.
Câu 2:
Hai dầm AB và BC liên kết với nhau nhờ bản lề B. Hãy tính phản lực tại A,B,C
Bài 3/ Cho dầm kép 3 nhịp có liên kết ngàm tại 1,liên kết con lăn tại B và C,liên kết khớp bản lề tại D và E.Hãy xác định phản lực tại các liên lết này.
Bài 4/ Dầm kép 3 nhịp có liên kết ngàm tại A,liên kết gối cố định tại B và bản lề tại C và D.Hãy xác định các phản lực tại các liên kếy này (đơn vị của lực là pound (lb),còn của độ dài là foot (ft)
Bài 5 : Xác định độ lớn nhỏ nhất và góc của lực P cần thiết để kéo ống 50 kg vượt qua bậc thềm nhẵn bóng. Lấy g=9,81(m/s2)
Bài 6 :
a/Một vật nặng 30 kg được treo tại A bởi hệ thống gồm 5 sợi dây không dản.Hãy xác định lực căng trong các sợi dây khi cân bằng,lấy g=9,81(m/s2)
b/Nếu mỗi sợi chỉ chịu được lực căng lớn nhất là 500N,hỏi khối lượng vật lớn nhất khi treo là bao nhiêu?
Bài 7 :Hãy xác định phản lực tại A,B,C
Bài 8 :
Một người có trọng lượng W,đứng tại trọng tâm của tấm ván phẳng dài L,độ dày bỏ qua.Nếu chổ tiếp xúc tại A và B là nhẵn bóng,hãy xác định lực căng trong dây theo W và
Bài 9 :
Một dầm ghép 2 nhịp (nối nhau tại khớp bản lề D) có liên kết bằng khớp bản lề tại B và liên kết con lăn tại A và C.Hãy xác định phản lực tại các liên kết này.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Volvo dd112 hf asphalt compactor service repair manual
1. Service Information
Document Title: Function Group: Information Type: Date:
Frame, description 711 Service Information 2015/11/5
Profile:
COA, DD112HF, DD118HF, DD118HA [GB]
Frame, description
The machine consists of a front and rear frame which are connected by a vertical articulation pin and a horizontal
articulation pin. The front frame includes a seat and control console, water tank system and fuel tank. The rear frame
includes a water tank system, engine, battery compartment and the hydraulic oil tank.
Figure 1
Frame and components
1.
2.
3.
4.
Drum assembly
Drum assembly
Front frame
Rear frame
3. Service Information
Document Title: Function Group: Information Type: Date:
Drum, description 777 Service Information 2015/11/5
Profile:
COA, DD112HF, DD118HF, DD118HA [GB]
Drum, description
To meet varying job requirements, the operator can manually select individual drum amplitude plus dual drum, front drum
or rear drum vibration. The DD112HF is equipped with a high/low amplitude selector switch. The DD118 compactor series of
models has 8 amplitude settings which are manually set via an adjusting wheel on each drum.
Vibration is achieved with an eccentric weight that rotates inside each drum. There is a direct 1:1 relationship between the
eccentric shaft speed and the speed of vibration: one eccentric shaft rotation equals one impact. Eccentric(s) direction of
rotation can be controlled automatically or manually. Eccentric speed is automatically controlled dependent upon amplitude
setting.
Drum vibration is started by pressing the vibration ON/OFF switch on the hydrostatic control forward-stop-reverse lever.
Vibration starts immediately when in the manual mode. When the auto vibration mode is selected, vibration is enabled with
the push button on the forward-stop-reverse control lever, but will not start until the compactor reaches a pre-set speed. In
order for the vibration system to operate, the engine must be at high idle, as selected by the engine idle speed switch and
the travel speed must be set for compaction by the travel speed switch.
5. Service Information
Document Title: Function Group: Information Type: Date:
Drum eccentric, description 777 Service Information 2015/11/5
Profile:
COA, DD112HF, DD118HF, DD118HA [GB]
Drum eccentric, description
The drums are each equipped with an eccentric, mounted internally which acts in a centrafugal manner. The purpose of the
eccentric is to provide vibration to the drum, which aids in the compaction of the asphalt. The eccentric can be activated by
a switch in the operator's platform and has 8 amplitude settings (2 amplitude settings on the DD112HF). These amplitude
settings are manually set via an adjusting wheel on each drum.
8. Service Information
Document Title: Function Group: Information Type: Date:
Eccentric shaft coupling,
replacing
777 Service Information 2015/11/5
Profile:
COA, DD112HF, DD118HFA, DD118HF, DD118HA [GB]
Eccentric shaft coupling, replacing
Op nbr 777-010
Suitable container
Removing
1. Place the machine in the Service Position. Refer to .
191 Service position
2. NOTICE
Always handle oils and other environmentally hazardous fluids in an environmentally safe manner.
Place a suitable container underneath the vibration motor to catch any oil that may leak from the motor upon
removal.
3. Remove the two hexagon screws at the vibration motor on the left side of the drum. Remove the vibration motor
away from the machine.
4. Remove the coupling and shaft from the eccentric weight.
Figure 1
Eccentric coupling and shaft
1.
2.
3.
Shaft
Coupling
Vibration motor
Installing
5. Lubricate the new shaft and coupling. Insert the shaft into the eccentric weight.
6. Lightly coat the coupling with an approved lubricant. Install the coupling onto the splined shaft of the vibration
motor.
7. Before re-installing the vibration motor, inspect the O-ring on the mounting flange and replace, if necessary.
9. 8. Lift the vibration motor into position at the machine.
9. Re-install the hexagon screws at the vibration motor. Use a thread locking compound and torque the hexagon
screws to specification. Refer to .
030 Tightening torque, specifications
10. Repeat the above steps for the other drum.
11. Place the machine back in service.
10. Service Information
Document Title: Function Group: Information Type: Date:
Drum, removing 777 Service Information 2015/11/5
Profile:
COA, DD112HF, DD118HFA, DD118HF, DD118HA [GB]
Drum, removing
Op nbr 777-001
Lifting device
Lifting strap, 2m
Support stands
Wooden blocks
Container
1. Place the machine in the Service Position. Refer to .
191 Service position
2. Lift the frame using a suitable lifting device to take the weight off the shock mounts.
Figure 1
Lifting device and support stand underneath the drum frame
3. Place suitable support stands underneath the back of the frame.
4. Repeat steps 2 and 3 for the other side of the drum.
5. NOTE!
Be sure that the water tank has been drained before removal.
Remove the wiring harness cover at the inside of the frame. Disconnect the wiring harnesses for the water pumps
and lights.
6. Remove the hexagon screws that retain the water tank and front beam to the drum frame.
NOTE!
Identify and retain the shims for re-installation.
7. WARNING
Only use lifting devices with adequate capacity.
Attach a suitable lifting device at the water tank and front beam assembly. Carefully and safely, lift the water tank
and front beam assembly out and away from the machine. Weight of water tank and front beam assembly 425
kg (937 lbs)
11. NOTE!
Do not let the water tank and front beam assembly rest on the scraper bar when placing the assembly on the floor.
Figure 2
Water tank and front beam assembly on blocks of wood
8. Remove the hexagon screws at the drum lights. Lay the drum lights off to one side and out of the way.
Figure 3
Drum lights on the inside of the drum
9. Place a suitable container underneath the vibration motor to catch any oil that may escape. Remove the hexagon
screws that retain the vibration motor to the drum. Lay the vibration motor and hydraulic hoses off to the side.
10. At the drum drive side of the machine, disconnect the clamps and the wiring harness at the hand wheel for the
amplitude speed sensor. Pull the wiring harness through the speed sensor support shaft. Lay the wiring harness off
to one side and out of the way.
12. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
13. Figure 4
Clamps and amplitude speed sensor
1.
2.
Clamp
Amplitude speed sensor
11. Remove the amplitude speed sensor bracket at the hand wheel.
12. Remove the hexagon screws at the speed sensor support shaft and remove the shaft from the machine.
Figure 5
Hexagon screws at the speed sensor support shaft
13. Disconnect the wiring harness for the drum drive motor.
14. NOTE!
Identify the hydraulic hoses before disconnecting them.
Place a suitable container underneath the drum drive motor to catch any oil that may escape. Disconnect the
hydraulic hoses at the drum drive motor. Plug and cap the hoses immediately to prevent contamination of the
hydraulic system.
15. Remove the hexagon screws that retain the drum to the frame.
Figure 6
Hexagon screws that retain the drum to the frame
NOTE!
Identify and retain the shims for re-installation.
16. Carefully and safely, roll the drum out and away from the drum frame.
NOTE!
Use suitable wedges or chocks to secure the drum in a fixed position.
17. Repeat the above steps for the other drum.
14. Service Information
Document Title: Function Group: Information Type: Date:
Drum, installing 777 Service Information 2015/11/5
Profile:
COA, DD112HF, DD118HFA, DD118HF, DD118HA [GB]
Drum, installing
Op nbr 777-002
Hand pump
Container
1. Remove the shock mounts from the old drum and install them at the new drum.
2. Fill the drum with clean oil. Refer to and .
173 Drum eccentric, changing oil 173 Drum carrier, changing oil
3. Carefully and safely, roll the drum into position at the drum frame.
4. Install a suitable hand pump at the drum drive motor to manually release the brake in order to line up the holes on
the torque hub with the frame.
NOTE!
Do not exceed 24 bar (350 psi). Excessive pressure may result in seal damage.
5. Re-install the hexagon screws and shims that retain the drum to the frame. Do not tighten the hexagon screws at
this point.
Figure 1
Hexagon screws that retain the drum to the frame
6. WARNING
Only use lifting devices with adequate capacity.
Carefully and safely, lift the water tank and front beam assembly into place at the drum. Weight of water tank and
front beam assembly 425 kg (937 lbs)
7. Re-install the shims and hexagon screws that retain the water tank and front beam assembly to the drum frame. Do
not tighten the hexagon screws at this point.
8. Using a suitable locking compound, torque tighten the hexagon screws that retain the drum to the frame. Refer to
.
030 Critical mounting torques
9. Using a suitable locking compound, torque tighten the hexagon screws that retain the water tank and front beam
15. assembly to the frame. Refer to .
030 Tightening torque, specifications
10. Re-install the hydraulic hoses at the drum drive motor.
11. Connect the wiring harness for the drum drive motor.
12. Re-install the speed sensor support shaft. Retain the shaft with the hexagon screws.
Figure 2
Hexagon screws at the speed sensor support shaft
13. NOTE!
Feed the speed sensor wiring harness through the speed sensor support shaft before re-installing the amplitude
speed sensor bracket.
Re-install the amplitude speed sensor bracket at the hand wheel.
14. Re-install the clamps and the wiring harness at the hand wheel for the amplitude speed sensor.
NOTE!
Be sure that the speed sensor and the magnet on the indicator are positioned so that they meet when the drum
turns.
Figure 3
Clamps and amplitude speed sensor
1.
2.
Clamp
Amplitude speed sensor
15. Re-install the vibration motor to the drum. Using a suitable thread locking compound, torque the hexagon screws