Global Conferencing & Communication Solutions



AV & Conferencing Solutions:
Verrex Capabilities Overview




New York | Boston | Houston | Toronto | London | Mumbai | Singapore | Hong Kong | Shanghai | Tokyo | Sydney
Company Profile
Founded in 1947, Verrex is a global design-build integrator and managed services provider of advanced conferencing,
collaboration and presentation technologies. Specializing in benchmark enterprise-level corporate solutions, clients
engage Verrex to help them communicate, collaborate and articulate locally and globally through videoconferencing,
audio conferencing, digital signage, presentation systems and other audiovisual technologies.

Superior performance is Verrex’s hallmark offering clients the industry’s highest level of execution, broadest global
footprint, universal standards and a sophisticated portfolio of comprehensive services. Verrex expertise includes
strategic planning and consulting, systems design, systems engineering, project management, procurement,
fabrication, control systems programming, installation, service and preventive maintenance programs, on site
staffing, managed conferencing and VNOC services.

The Verrex approach draws from a proprietary quality management process that documents each stage in a
successful design, system and service deployment. Refined over six decades, the Verrex Process ensures consistent
best-in-quality standards regardless of project, challenge or geography. In its ongoing commitment to professional
excellence, technical education is paramount at Verrex. The company’s technical staffs are required to hold InfoComm
Certified Technical Specialist designations allowing Verrex to achieve the highest industry certification, InfoComm’s
Diamond level Audiovisual Solutions Provider (AVSP) status.


                        “   Verrex has a long history of performance, innovation and professionalism
                                                                 that is reflected in the work they do.
                                                                                                                 ”
Evolving its resources, expertise and presence inline with the needs of its clients has long been a focus of Verrex.
In the 1950s the company supplied and serviced distributed background music systems. In the 1960s the company
expanded into two-way radio, school intercom, sound and CCTV systems. During the 1970s the company focused
predominantly on large venue sound systems. In the 1980s and 1990s Verrex broadened its offerings to include
corporate audiovisual and conferencing systems design, integration and service. Verrex continues to grow its
expertise with GMS™, global managed services, designed to simplify the usage and management of conferencing
technologies.

Verrex has been family owned for three generations promoting a unique corporate culture that values camaraderie
and peer mentoring. The company has also been recognized by Systems Contractor News as a Top 50 Systems
Integrator each year since the program’s inception in 1994. In 2009, Verrex added the “Excellence in Business -
Growth Strategies” award from the National Association of Systems Contractors, recognizing the company’s
visionary strategy for executing a successful global business model. In 2011, Verrex President & CEO, Thomas
Berry Jr., was elected to InfoComm’s Board of Directors, further establishing the company as a thought leader in
the AV and conferencing space.

With principle offices in North America, Europe and Asia, Verrex has strategically positioned its presence to serve
corporate hubs around the globe. A network of over 200 service partners rounds out coverage globally. For a complete
list of Verrex offices worldwide, or for more information about our partner alliances, please visit www.verrex.com.


(Cover Photo: The Nielsen Company Executive Boardroom; Photo Right: State Street Executive Conference Room)
Capabilities
Global Perspective Matched by Localized Capabilities:
The evolution of Verrex capabilities is in direct response to client needs for superior, end-to-end audiovisual standards throughout offices at any
location on the globe. From design to installation through to managed services, clients rely on Verrex as a proven, single source for all their AV
applications worldwide, regardless of project size, challenges or geography.

Design Development                                                                   Rack Fabrication
At the earliest stage, the Verrex Design team conceptualizes the integration of      In-house rack fabrication allows Verrex to closely monitor quality factors such as
AV into the space. Verrex innovative system designs are guided by client need,       proper assembly, wiring and cable identification as equipment is placed in racks.
application, room layout, acoustics, infrastructure and other factors that can       Fabrication Technicians are trained to read and translate AV system diagrams
affect performance and user experience. Proper and precise design translates         and to follow strict industry standards as part of Verrex’s multiple Quality
into fewer change orders, fewer missed details and fewer corresponding budget        Assurance checks.
overages. Our certified Designers focus solely on the design process including
needs analysis, coordination with architect and interior design agendas, initial     Control System Programming
budgeting, preliminary equipment selection and defining system requirements.         Verrex certified Control System Programmers have considerable experience
Most beneficial to clients, Verrex Design develops comprehensive drawing             with leading control system products including Crestron and AMX. Programmers
packages inline with architectural phases, schedules and requirements.               coordinate closely with clients and Verrex Design to develop intuitive, user-
                                                                                     friendly interfaces to control AV systems and environmental devices such as
Project Management                                                                   lighting.
Verrex Project Managers are a disciplined, highly focused group who ensure
projects are kept on course. A Project Manager is assigned to every installation     Quality Assurance
and is the single point of contact for resources, milestones and deliverables.       All systems are staged in-house and undergo thorough Quality Assurance
Project Managers attend scheduled on-site meetings, supply project timeliness,       checks prior to leaving the Verrex facility for installation. Certified QA Technicians
submit project status reports, coordinate subcontractors and, ultimately, lead the   stage and test system components to confirm proper functionality, confirm the
execution process.                                                                   systems intended design and to make adjustments as required.

Project Engineering                                                                  Installation
Project Engineering is a methodical process of ensuring system integrity. Verrex     The responsibility of providing a complete working system, using the highest
Project Engineers conduct extensive equipment research, determine equipment          industry standards and quality workmanship, falls to the Verrex Installation team.
viability and verify components will work together to achieve desired results. An    InfoComm certified, our Installers perform detail-critical work including structural
in-house AutoCAD team provides drafting support, depicting AV schematics and         support for screens, projectors and displays; cable riser management; custom
architectural details in comprehensive system diagrams.                              AV terminations; and component networking. Once all components are in place
                                                                                     the team makes final adjustments to optimize system performance.
Procurement
Verrex Purchasing maintains strong relationships with over 250 of the industry’s     GMSTM (Global Managed Services)
best-in-class manufacturers. Leveraging these relationships, the group is            Verrex GMS is a comprehensive suite of services designed to increase usage
responsible for obtaining the highest quality, application-specific equipment at     and decrease the operational complexity of business-critical audiovisual systems.
the most competitive cost.                                                           GMS features Professional Services, VNOC Services, Preventive Maintenance,
                                                                                     Service and Onsite Staffing & Training.
Credentials
         Industry Certification
         Verrex is a Diamond Level AudioVisual Solutions Provider (AVSP), as designated by InfoComm International, the global association for the professional
         AV industry. Diamond AVSP is the highest level of certification achievable in education and training. This certification signifies Verrex sales, design,
         engineering, installation and managed services staffs have earned AV specialist credentials, awarded solely to those professionals who have
         demonstrated thorough comprehension of AV science and technology by passing InfoComm administered courses and exams. InfoComm certification is
         internationally recognized and supported by the professional AV industry.

         All three levels of AV specialist are part of the Verrex team:
         CTS-D (Certified Technology Specialist - Design), CTS-I (Certified Technology Specialist - Installation), CTS (Certified Technology Specialist - General)

        Solution Certifications. Verrex solution certifications ensure the highest level of expertise for business-critical applications:

        Videoconferencing/Audioconferencing
        » Cisco Registered Partner: Cisco Select Certified Partner
        » Cisco ATP (Authorized Technology Provider): Cisco TelePresence Video Advanced Partner
                 » Cisco TelePresence Video Advanced: Field Engineer, Systems Engineer, Account Manager (North America + Asia Pacific)
                 » Cisco TelePresence Video Express: Field Engineer, Systems Engineer, Account Manager (EMEA)
        » Polycom Certified Professional Designer, Certified Professional Installer
        » Polycom Certified Videoconferencing Engineer (CVE)
        » Polycom ATX Design & Implementation Certified
        » Polycom Installed Voice Certified
        » Polycom Infrastructure Certified
        » Polycom Video Certified
        » ClearOne Certified Professional Designer, Certified Professional Installer, Certified Technical Specialist
        » LifeSize Pro-Partner, Certified Sales Professionals
        » BiAmp Audia Certified

        Control Systems
        » Crestron Certified Masters Programmer, Certified Commercial Systems Designer, Certified Professional Installer
        » AMX Certified Programmer (ACE), Certified Designer, Certified Installer
        » Lutron ProAV Certified, Commercial AV Certified, Commercial Lighting Design Certified
        » Extron Certified Advanced AV Technician, Certified AV Associate
        » Extron Configurable Control Systems Certified

        Video
        » Crestron Digital Media: Digital Media Certified - Designer, Digital Media Certified - Engineer, Digital Media Certified - Technician
        » Christie Digital MicroTiles: Installer Certified
        » ISF Commercial Calibration Training

        Audio/Sound System
        » BiAmp Audia and AudiaFlex Certified         » ClearOne Certified
        » BSS SoundWeb Certified                      » Synergetic Audio Concepts (Syn-Aud-Con) Sound System Design
        » Peavey MediaMatrix Certified                » Polycom Installed Voice Certified

        Engineering
        » National Institute for Certification in Engineering Technologies (NICET)
GMSTM (Global Managed Services)
Verrex GMS (Global Managed Services) is a comprehensive suite of solutions designed to increase usage and simplify the operation and management of
business critical audiovisual and conferencing systems. Now management, support and maintenance of all collaboration, conferencing and presentation
technologies – the complete range of visual communication systems and components – can be centralized providing a single-source umbrella for:

                                      Professional Services                                               Preventive Maintenance & Repair
                                      Analysis and recommendations to improve                             Preventive maintenance and critical care
                                      AV infrastructure.                                                  service options.


                                      VNOC Services                                                       Onsite Staffing & Training
                                      End-to-end concierge management of audio                            Human capital to provide immediate support,
                                      and video conferences.                                              operation and training services.



Professional Services                                                                        Onsite Staffing & Training
A collaborative dialog with Verrex GMS will help identify and anticipate an organization’s   Choose from dedicated onsite staffing or staff augmentation to provide live meeting
evolving AV communication needs. Professional Services provides a critical road map,         support, room checks, set up and trouble-shooting. A comprehensive training and
assessing options, operations, infrastructure, service gaps and business requirements        certification program is required for all Verrex placed technicians and can be made
to arrive at the best, most strategic decision for the enterprise.                           available to an organization as part of their own training process.

Preventive Maintenance & Repair                                                              VNOC Services
A comprehensive suite of service and support offerings to maximize uptime and ROI:           Solutions designed to monitor and manage video and audio conferencing environments
24/7 global help desk, preventive maintenance, service agreements, equipment repair,         ensuring trouble-free, effective and consistent communication across single or multiple
loaner & rental systems, critical spares, asset management and on-call Service Desk.         time zones. Verrex VNOC services include: device and network monitoring; device
Customization puts cost control in the user’s hands, selecting only those options that       management; bridging services; conference scheduling and reservation management;
match a specific budget and need.                                                            conference management; and problem management.
Envir
Environmental Responsibility
       Promoting smart choices for our clients, our employees and the environment.
       V
       Verrex takes a proactive role in promoting the understanding and acceptance of environmentally-conscious communication solutions. Through technology
       and training, the firm teaches organizations to see videoconferencing as a way to lessen their carbon footprint, reducing the need for travel and the fuel
       consumption, pollution and congestion associated with it. Verrex strives to ensure clients are aware of the positive impact adopting green-friendly
       consu
       communication practices can have on the environment.
       comm

       BEST PRACTICES IN GREEN AV                                             RESPONSIBLE CORPORATE CULTURE
       For each project, Verrex indentifies areas where a client can          Verrex is also committed to making responsibility and sustainability an integral part
       contribute to environmental responsibility and a sustainable future,   of its own corporate environmental goals and policy:
       including:
                                                                              Business Travel. All Verrex employees are required to use videoconferencing
       Identify efficiency-based equipment during the design phase            whenever possible to minimize travel.

       Incorporate recycled products and use fewer virgin materials,          Telecommuting. Verrex provides for telecommuting opportunities that preserve a
       including reuse of owner furnished equipment where feasible            high level of performance while reducing emissions caused by commuting. Verrex
                                                                              enables employees to utilize desktop and PC-based video to visually telecommute,
       Participate in manufacturer recycling programs, including lamp         based on particular job requirements.
       recycling programs for expended projector bulbs
                                                                              Operations. Through Verrex’s proprietary Quality Management System (QMS), the
       Work with vendors who build products striving to improve energy        company strives to reduce energy consumption and its carbon footprint in rack
       consumption                                                            fabrication and testing. Verrex complies with environmental legislation, including the
                                                                              EU’s directives on RoHS.
       Ensure proper ventilation so least amount of energy is used for
       cooling                                                                Energy Consumption. Verrex offices are encouraged to implement plans to reduce
                                                                              energy consumption by addressing the use of heating/cooling systems, lighting and
       Select FSC (Forest Stewardship Council) furniture, promoting           electronics. This includes occupancy sensors to turn ceiling lights on only when
       responsible management of forests                                      sensing body heat.

       Integrate control systems for AV, lighting and shades, as well as a    Office Supplies & Materials. Verrex encourages all offices to purchase
       central part of building management systems                            environmentally friendly products. Digital marketing materials are preferred, keeping
                                                                              print runs to a minimum.
       Integrate digital signage to reduce use of non-recyclable materials
                                                                              Recycling. Verrex offices, where available, participate in programs to recycle cans,
                                                                              bottles, mixed paper and cardboard.

                                                                              Shipping. Verrex reduces the amount of materials used in shipping, sourcing
                                                                              reusable packing containers where feasible and consolidating shipments from core
                                                                              vendors.
Case Study
                                                          Benefits of Global AV Standards
                                                          Audiovisual systems and services integrated consistently worldwide accelerates adoption of
                                                          State Street’s global vision for conferencing, collaboration and presentation technologies.

                                                          From their US-based headquarters in the 36-story signature gateway of Boston’s financial district, to the 2009-constructed
                                                          London HQ at Canary Wharf, to locations around the globe, State Street sought commonality between offices for their
                                                          ambitious AV design, installation and managed services needs. As the multinational organization’s reliance on AV has grown,
                                                          Verrex has evolved in-line with their requirements, irrespective of geographic borders, size of projects or challenges.




                                  AV Archetype Provided Cost Containment                                       Managed Services Improved ROI on AV Assets
Needs Addressed
Global Standardization            State Street sought cost effective roll out of video and audio systems       State Street’s economic and operational mandates to avoid unplanned
Single-source Accountability      across numerous, global offices. Specific to State Street criteria,          service costs and ensure peak systems’ performance required longterm,
                                  Verrex custom designed templates for common State Street room                post installation support throughout North America and Europe. Verrex
Services Featured                 types that allowed the firm to grow its unique AV infrastructure globally,   implemented a comprehensive suite of managed services providing
Design, Installation & Service
                                  without each office having to do the groundwork on their own.                State Street with protection for their AV investments at fixed annual
Key Project Locations             Locations including Boston, Kansas City, Dublin and Milan selected           costs. Under the multi-year program, State Street received unlimited
Alameda, CA                       an established room or system model to be deployed. Proven                   service visits, priority service response, preventive maintenance, 24/7
Austin, TX                        processes for design, engineering, project management, fabrication           on-call ServiceDesk support, remote device management and systems
Boston, MA                        and installation further streamlined integration and cut costs.              training.
Cambridge, MA
Chicago, IL
Jacksonville, FL                  Interface Standards Optimized Productivity                                   On-Site Staffing Decreased Operational Strain
Kansas City, MO                   Rather than “cookie cutter” solutions, Verrex created standards              Resource realities – finding, training and managing AV personnel –
Malvern, PA                       exclusive to State Street’s enterprise needs. Control system                 prompted State Street to seek to optimize staffing costs and operational
New York, NY                      functionality and touchpanel layouts were designed to ensure user            efficiencies. Verrex deployed fully integrated, Verrex-managed AV
Princeton, NJ
                                  interfaces were familiar, intuitive and State Street-branded, regardless     workforces at key State Street locations worldwide, responsible for
Sacramento, CA
San Francisco, CA                 of location. Such standards increased productivity and alleviated            supplementing in-house staff. Sites such as Boston, Toronto and
Winston-Salem, NC                 training needs, allowing a Vice President from the Princeton office to       London utilized this on-site staffing segment of Verrex managed
Montreal, Canada                  walk into the Frankfurt office and conduct a videoconference without         services to provide live meeting production support, room checks and
Toronto, Canada                   support or downtime.                                                         setup and Tier 1 troubleshooting.
Brussels, Belgium
Dublin, Ireland
Frankfurt, Germany                Accountability Evolved In-Line with Objectives                               Global Perspective Addressed Diversity
Krakow, Poland                    Sprawling projects such as the build-out of State Street headquarters        Although a degree of commonality exists between all offices,
London, United Kingdom            in Boston and London required management of multiple teams and               acknowledging the diversity between State Street’s multi-country
Luxembourg                        commissioning of dozens of systems concurrently. To meet State               locations was crucial. Adapting to how one office differed culturally from
Milan, Italy
                                  Street’s objectives of time-critical deployment and completion within        another meant, first and foremost, respecting that culture. Verrex utilized
Bangalore, India
                                  budget, Verrex assigned dedicated project managers, ensuring                 a network of local experts to ensure teams were aware of proper
                                  accountability and clearly-defined leadership at all project stages.         practices and procedures at all times.


(Photo: State Street Lafayette Conference Center, Boston, MA)
Project Profile
Project Briefs
Asia Pacific




Bain Capital Asia LLC                                                                         Deutsche Bank
Kishimoto Building, Tokyo, Japan                                                              International Commerce Centre, Kowloon, Hong Kong
Project management, systems engineering, control systems programming, CAD,
fabrication and field installation services for upgrade of a large conference room to         Corporate Meeting Spaces:
improve videoconference, audio conference and presentation capabilities. This included        Systems design, project management, systems engineering, control systems
coordination of millwork contractor, equipment upgrades to higher industry standards          programming, CAD, fabrication and field installation services for integration of
including HD videoconference system and RF-shielded microphones.                              audiovisual and videoconference systems in two corporate meeting spaces. Integrated
                                                                                              systems included 70” and 46” LCDs, high-definition videoconference system, multiple
China Light and Power Hong Kong Limited                                                       rack-mounted sources, boundary microphones, audio conference system and table-
Shamshuipo Centre Kowloon, Hong Kong                                                          top touch panels.
Systems design, project management, systems engineering, control systems
programming, CAD, fabrication and field installation services for upgrades to multiple        Sky Lobby Media Wall:
executive style board and conference rooms to integrate videoconference capabilities.         Project management, systems engineering, control systems programming, CAD,
Integration included incorporation of high-definition displays, audio conferencing, high-     fabrication and field installation services for integration of Christie MicroTiles video wall.
definition videoconferencing and room automation including auto-shutdown and                  The media wall consists of a 30-tile wide by 5-tile high display, 150 rear-projection color
remote system control (eControl). Integration further incorporated a standard template        video tiles in total seamlessly interlocked. The video wall processor allows up to 16 DVI
for equipment with variations on display technologies and microphones dependant               or RGBHV and 16 different SDI, HDSDI, 3GSDI, component, S-Video and composite
on room conditions.                                                                           video formats. The processor was configured to allow various display options including:
                                                                                              a single video image with a resolution of 16200 x 2040 AND up to 32 multiple video
Jefferies International                                                                       images of varying resolutions and tile sizes to make one tiled image with a resolution
Cheung Kong Centre, Central, Hong Kong                                                        of 16200 x 2040.
Systems design including architectural design drawings, project management, systems
engineering, control systems programming, CAD, fabrication and field installation             Onsite Staffing: Project Management:
services for integration of audiovisual and videoconference systems in divisible conference   Verrex provided a dedicated, full-time onsite Project Manager for a six-month contract.
room and multiple trading floor displays. Integrated systems included dual 52” displays,      The Project Manager reported to a designated Deutsche Bank representative and
high-definition videoconference system, multiple rack-mounted sources and wireless            worked out of the company’s Cheung Kong Centre office in Kowloon, Hong Kong. The
touch panels.                                                                                 Project Manager was responsible for managing the integration of Deutsche Bank’s
                                                                                              International Commerce Centre office including the Auditoriumand media wall projects.

(Photo: Deutsche Bank - International Conference Center, Hong Kong Sky Lobby Media Wall)
Project Profile
State Street Bank and Trust Company
EMEA Headquarters, Canary Wharf
London, UK

State Street, one of the world’s leading providers of financial services to institutional   PROJECT HIGHLIGHTS
investors, selected Verrex to integrate conferencing, collaboration and presentation        Among the various systems specified, State Street required a sophisticated, multi-
technologies throughout the company’s new EMEA headquarters, sited prominently              purpose meeting space for a broad range of applications. Verrex worked closely with
at Canary Wharf. The multi-floor, multi-room fit out consisted of over 50 bespoke AV-       the client and designer to integrate a versatile solution to meet the presentation,
centric and enhanced spaces including incident management and control rooms,                videoconferencing, recording and building-wide broadcast capabilities. A key highlight
training and breakout rooms, reception, waiting areas, videoconferencing, standard          of the space is the flexibility in its operation.
and divisible meeting rooms, IT monitoring rooms, trading area, employee cafe, multi-
configurable large meeting space and a building-wide TV distribution system.                The corporate meeting space is a multi-divisible room, capable of three unique
                                                                                            configurations: a large singular space, a dual space or three independent spaces.
CHALLENGES                                                                                                              There are three 16:9 27mm (108") motorized projection
State Street undertook a major reorganization and                                                                       screens, each with integrated videoconference camera,
investment in its London operations, migrating services                                                                 and three DLP projectors in each area that display high-
and approximately 2,500 staff personnel from locations                                                                  quality video and presentation materials independently or,
at Canada Square, Royal Exchange, Bank Street and                                                                       when the space is combined, all together. Sources include
Cannon Street into the new Canary Wharf site. During                                                                    computer, HD codec, HD DVD, cable television receiver
integration Verrex teams worked within the constraints                                                                  and facility-wide television distribution system. The system
of an occupied, in-flux office space as furniture, equip-                                                               is also capable of broadcasting live to the building-wide
ment and staff were moved in from other offices. This                                                                   network, which allows events to be aired simultaneously
project exemplified Verrex’s ability to turn over multiple                                                              across the facility. Events in the space can be recorded,
rooms concurrently on time, in budget, under strict                                                                     edited via an on-site production suite and made available
deadlines and schedule changes, with no disruption to                                                                   for multicasting over the client network.
the client’s operations.
                                                                                                                          IP-based HD videoconferencing capabilities are available
SOLUTIONS                                                                                                                 in each of the three spaces, or any combination of the
Demonstrating the proper training and credentials,                                                                        spaces, within the room. All incoming video appears on
Verrex personnel met the rigorous pre-qualification and vetting standards                   one, or all, of the projection screens, depending on room configuration. Three fixed
implemented by Canary Wharf’s business district.To ensure shifting turn-over and            HD cameras capture images of the main stage and lectern while three additional
training dates were met, while staying within budget, required dedicated project            cameras, built into the projection screens’ housings, capture the seated audience.
management with a clear point of accountability. Equipment deliveries, on-site quality
assurance, installation, coordination of trade teams, progress reports and scheduling       It was crucial to State Street that the system offer a high level of versatility for its
were all the responsibility of the Project Manager assigned solely to the fit out.          presenters. Presenters have the ability to run presentations and control basic functions
                                                                                            on their own from wireless touchpanels in the space. The presenter can also elect
                                                                                            to have their session handled completely by AV technicians located in the room’s
                                                                                            control booth, equipped with LCD displays and touchpanels for monitoring the event
                                                                                            and controlling audio, video, sources and environmental conditions such as lighting.




(Center Photo: State Street London Headquarters Multi-Configurable Large Meeting Space)
Project Profile
KPMG LLP
Executive Boardroom
New York, NY


 “   I am pleased to provide my highest recommendation for Verrex’s audiovisual services. After five years of working side-by-side
     with them, we have only the highest regard for their experience, professionalism and ability to make the right things happen.
                                                                                                                                    - AV Services Manager, KPMG LLP
                                                                                                                                                                              ”
Creating a space that encourages collaboration, provides for optimum communication,          the custom-built Boardroom table is equipped with twelve 17" flat panel LCD monitors.
maximizes the impact of high-definition presentations and aesthetically represents the       Each monitor resides in a motorized lift-housing that rises up out of the table when
firm’s prestigious reputation, was the criteria in the design and integration of audio-      needed, and recesses under the table when not in use. Positioned between two
visual systems for KPMG’s Executive Boardroom. KPMG, provider of assurance, tax,             seated meeting participants, the monitor shows the same image displayed on the
legal, consulting and financial advisory services to                                                                    main projection screen. Program audio for the presentation
clients around the globe, selected Verrex for this key,                                                                 sources is routed through a digital surround processor
AV-enhanced executive space.                                                                                            and distributed to four, high-quality wall-mounted loud-
                                                                                                                        speakers at the front and rear of the room.
CHALLENGES
Incorporate extensive audiovisual technology into the                                                                    At each of the 26 seated table positions, unique audio
Executive Boardroom without overwhelming meeting                                                                         conference equipment is embedded into the millwork and
participants or impacting the room’s refined style.                                                                      virtually concealed when not in use. All table positions
Display and audioconference components would need                                                                        include a low profile microphone in a flip top, capacitive
to be integrated into the custom, marble-inlay table.                                                                    microphone mute switch with green LED to indicate
                                                                                                                         active state, headset port and an individual loudspeaker.
SOLUTIONS                                                                                                                Incoming audio from conference calls is routed to each
During the design phase, Verrex provided documen-                                                                        loudspeaker providing optimum volume per participant
tation and direction for build-out and infrastructure                                                                    station. In addition, all embedded microphones have a
requirements to the architect and contractors. This                                                                      dedicated echo canceling processor to eliminate noise
ensured system functionality and performance needs                                                                       and echo during an audioconference.
would be met while keeping the integrity of the interior design intact. Plans for address-
ing environmental factors, such as lighting and shade control, were also a focus during      The Boardroom’s audiovisual systems can be controlled from a dedicated operator’s
the design phase. Verrex Design, Project Management and Field Engineers worked               station within the room or from the equipment rack station located outside. Each
closely with the millwork contractor to seamlessly embed AV components into the              control station is equipped with identical 15" LCD touchscreen controllers with
custom table.                                                                                custom menus and graphics.

The Boardroom presentation system allows for the display of high-definition video            GLOBAL MANAGED SERVICES
sources and computer graphics onto a large projection screen via a ceiling-mounted           KPMG selected a Verrex Preventive Maintenance contract to keep the AV systems in
projector, which is recessed in the soffit. The projected image is formatted for high-       this key, executive space at peak performance and to have unexpected issues
definition, wide-screen technology. In addition to the main projection display system,       addressed quickly.




(Center Photo: KPMG New York Executive Boardroom)
Project Profile
Alcatel-Lucent
HD Videoconferencing Executive Boardroom
Murray Hill, NJ



“   From putting together the best team to design, manage and integrate our projects to following up with our service needs,
    Verrex understands the importance of delivering quality each and every time.    - IT Executive Support Manager, Alcatel-Lucent


N e w l y f o r m e d t e l e c o m m u n i c a t i o n s l e a d e r, A l c a t e l - L u c e n t , r e q u i r e d a
                                                                                                                                            ”
                                                                                                                         and custom mirror assembly are housed in the renovated projection room. Verrex
videoconferencing solution unlike any other - high-definition that would utilize the                                     specified the Polycom HDX 9004 conferencing codec to deliver high-definition voice,
company’s own network and allow executives, from various points on the globe,                                            video and content sharing. Ceiling-mounted loudspeakers provide high quality audio.
to interact as if they were all in the boardroom together. Alcatel-Lucent selected
Verrex as the designer and integrator of this industry                                                                   A 12" tabletop multimedia touchpanel and 8" wireless lectern touchpanel control
first project.                                                                                                                                      all audiovisual and specially designed lighting in the
                                                                                                                                                    room. The tabletop touchpanel features both “user” and
CHALLENGES                                                                                                                                          “tech” modes. User mode, with a simple and intuitive
Dismantle the existing 11-year old system and                                                                                                       interface, allows executives to conduct presentations and
design, build and install one of the first true HD                                                                                                  videoconferencing and features speed and one-touch
videoconferencing solutions in its place. Architectural                                                                                             dialing. The tech mode allows AV and IT support staff to
modifications would be required to adapt the room                                                                                                   manage all system components. The control system was
and ensure an authentic collaborative experience. The                                                                                               also custom programmed to create unique, visual lighting
innovative system would have to be as intuitive as                                                                                                  cues; lights illuminate on the active participants and
possible for high-level executives to use unaided at all                                                                                            darken in the galley seating area.
hours. A demanding deadline of just six weeks would
require flawless coordination.                                                                                                                      Two distinct room details provide additional visual cues:
                                                                                                                                                    microphone status collars translate mic state into colors
SOLUTIONS                                                                                                                                           (green for a live mic, red when muted and yellow during
With Verrex Sales advanced in design, unique details                                                                                                system warm-up) and a multi time zone digital clock is
and equipment were specified prior to moving to the                                                                                                 mounted in the soffit.
engineering stage. The Verrex Design team provided the project architect with
drawings for reconstruction to ensure the room suited the new technology. In order to                                    SYSTEM HIGHLIGHTS
meet the strict timeline, Verrex Project Management was tasked with driving the                                          Integrated controller, wireless and tabletop touchpanels, universal signal processors,
entire schedule and coordinated all trades including architects, lighting and                                            matrix switcher, video processors, HD DVD player, multisystem VCR, HD cable TV
construction.                                                                                                            tuner, HD videoconferencing codec, HD camera, HD LCD projector, rack and lectern-
                                                                                                                         mounted HD LCD monitors, 46" LCD displays, custom mirror assembly, rear-
All components were designed with an infrastructure to support 1080p. This three-                                        projection screen, ceiling loudspeakers, audio matrix mixers, amplifier, gooseneck
display boardroom features a 60" x 107" 16:9 rear-projection screen flanked by two                                       lectern microphone, push-to-talk tabletop microphones, microphone status collars
46" LCD displays, all capable of displaying a variety of sources. An HD LCD projector                                    and multi-zone digital clock.




(Center Photo: Alcatel-Lucent High-Definition Executive Boardroom)
Project Profile
Arnold Worldwide
Presentation and Screening Room
Boston, MA


 “   As Director of AV Services for a major Advertising Agency, it’s my job to keep up with technology in our conference rooms. Our work is our product. If it
     doesn’t look great, we don’t get noticed. With the help of Verrex and our architects, they truly created a showpiece. Open concept, clean lines, an amazing
     screen, and environmentally friendly. Employees are stepping over each other to book this room. I’ve worked with many companies over my career, and
     Verrex is the best. They are well worth the price of admission. Piece of mind, great project management, as well as a superior product and staff. Would
     recommend to all businesses.       - Director of AV Services, Arnold

                                        ”
Arnold, the leading ad agency responsible for energizing brands such as Volvo,
Carnival Cruise Lines and Jack Daniels, sought to convey an unmistakable message
                                                                                             correct 16:9 aspect ratio; or two images, one on either side. Presentation sources
                                                                                             include high-definition and standard DVD, laptop, two game consoles, satellite radio
to clients and staff about their world-class creativity, energy and insight. Arnold          and DVR. The system features a sophisticated, multi-window image processor with
selected Verrex to help deliver this message, loud and clear, via the agency’s AV-           edge-blending capabilities.
enhanced Presentation & Screening Room, featuring an eye-catching 190" x 60"
rear projection display. The result - immediate and                                                                     Verrex recognized audio would play a critical role in
powerful reactions from clients and staff the moment                                                                    energizing presentations. To achieve an immersive effect
they enter the room.                                                                                                    – making the audience feel as if they are in the presen-
                                                                                                                        tation, not just watching it – audio from the various
CHALLENGES                                                                                                              sources is broadcast through a powerful, 7.1 surround
The room’s intended use, to review and present                                                                          sound system. Six full-range program speakers in the
campaigns to clients and staff, demanded an exciting,                                                                   ceiling and a front-firing subwoofer incorporated into the
flexible solution. Visual impact was foremost with a                                                                    front wall deliver robust sound throughout the room.
display that would fill the entire front wall, capable of
multi-configurations. A powerful audio solution would                                                                   A custom programmed, 6" touchpanel at the main table,
be needed to fuel presentations. Environmentally-                                                                       which can be run wireless or wired, permits non-technical
conscious Arnold requested the project be “green-                                                                       users to easily hold and conduct meetings through the
friendly”, including reuse of existing equipment when                                                                   use of intuitive menus. To further enhance the audience
possible.                                                                                                               experience, Verrex also incorporated control of environ-
                                                                                                                        mental devices such as lighting and shades. Arnold staff
SOLUTIONS                                                                                                               can easily direct presentations, adjust audio, recall
To provide Arnold with a complete solution, Verrex coordinated with the project                                         lighting scenes and set the right mood, all from the
architect, MEP engineer, furniture supplier and general contractor. This included a                                     integrated touchpanel.
thorough needs analysis to initiate design direction and AV architectural drawing            GREEN AV
development. Verrex worked in parallel with the architect’s development of interiors         Several green, best-practices were featured in the project. An e-control system was
and environmental considerations to ensure all client specifications would be met. To        integrated for remote monitoring of system status. Programmed to shut down when
achieve the client’s desired effect, the room required specific interior build-out as well   not in use or at the end of the business day, remote monitoring helps preserve the
as acoustical, lighting and window treatments.                                               life of projection lamps and cuts down on energy consumption. At Arnold’s request,
                                                                                             Verrex also utilized any existing client-owned equipment that could fulfill the
The Presentation Room features a single, glass rear projection screen with 16:9 HD           requirements of room functionality. Part of its Quality Assurance Program, Verrex
aspect ratio. Three projectors allow for multiple display configurations: a single 190" x    thoroughly tested each reused component at its own facility to ensure compatibility
60" continuous image that fills the entire wall; a centered 107" x 60" single image with     and stability before on-site installation

(Center Photo: Arnold Presentation & Screening Room)
© Copyright Verrex Corporation. All Rights Reserved.
  Copy gh
   opyri
     y          ex          on A Rights
                             n                 r e




Norwalk, Connecticut
The Nielsen Company - Conference Room
© Copyright Verrex Corporation. All Rights Reserved.
  C pyri h V rr
     yr             orporat on Al Rights eserved.




 Houston, Texas
 KPMG - Energy Institute Lobby
© Copyright Verrex Corporation. All Rights Reserved.
  C p righ Verr x orporatio A Righ           serv d




 New York, New York
 United Hospital Fund - Boardroom
© Copyright Verrex Corporation. All Rights Res
  C yrigh V re
        g             pora on Al i ht eserved.
                             n                 d.




 Trenton, New Jersey
 Pfizer Aviation - Operations Room
© Copyright Verrex Corporation. All Rights Reserved.
  Copyright V rrex orporation A R ghts eserved.
      ri h           rpo ati                 ser




 Kowloon, Hong Kong
 Deutsche Bank - Sky Lobby Media Wall
© Copyright Verrex Corporation. All Rights Reserved.
  C pyr gh V rex Corpora on Al R g s Reserved.
                    o ration. All            s




Norwalk, Connecticut
IMS Health - Conference Room
Expertise                                                                         Systems                                                           Applications
Design/Build                                                                      Videoconferencing                                                 Boardrooms
Architectural Coordination                                                        Audio/Video                                                       Conference Centers
Systems Engineering                                                               Digital Signage                                                   Conference Rooms
Project Management                                                                Presentation                                                      Corporate Auditoriums
Subcontractor Coordination                                                        Audio Conferencing                                                Divisible Spaces
Control Systems Programming                                                       Sound Masking                                                     Executive Offices
Rack Fabrication                                                                  Sound Reinforcement                                               Interview Rooms
Installation                                                                                                                                        Lobby & Reception
GMS™ (Global Managed Services)                                                                                                                      Meeting Spaces
   - Professional Services                                                                                                                          Office Amenities
   - VNOC Services                                                                                                                                  Presentation Rooms
   - Preventive Maintenance & Repair                                                                                                                Trading Floors
   - Onsite Staffing & Training                                                                                                                     Training Facilities
                                                                                                                                                    Video Walls




About Verrex
Founded in 1947, Verrex is a global design-build integrator and managed services provider of advanced conferencing, collaboration and presentation technologies.
Specializing in benchmark enterprise-level corporate solutions, clients engage Verrex to communicate, collaborate and articulate locally and globally through
videoconferencing, audio conferencing, digital signage, presentation and other audiovisual systems. Superior performance is Verrex’s hallmark offering clients the
industry’s highest level of execution, broadest global footprint, universal standards and a sophisticated services portfolio. With principle offices in North America, Europe
and Asia, Verrex has strategically positioned its presence to serve corporate hubs around the globe. For more information, visit verrex.com.




                                                                               Americas Headquarters                         EMEA Headquarters                         Asia Pacific Headquarters
                                                                                 Verrex Corporation                              Verrex Limited                            Verrex Asia Limited
                                                                                Mountainside, NJ USA                         Herts, United Kingdom                      Kowloon Bay, Hong Kong
Global Conferencing & Communication Solutions                                     +1 908 232 7000                            +44 (0) 1992 667 000                           +852 3713 4200

                                                                                                                             www.verrex.com
© 2012 Verrex and/or its affiliates. All rights reserved. Verrex, the Verrex   New York | Boston | Houston | Toronto | London | Mumbai | Singapore | Hong Kong | Shanghai | Tokyo | Sydney
Logo and GMS are registered trademarks of Verrex Corporation and/or
its affiliates in the U.S. and other countries.                                       Please visit www.verrex.com for a complete list of Verrex global addresses, phone numbers and registrations.

Verrex Global Portfolio

  • 1.
    Global Conferencing &Communication Solutions AV & Conferencing Solutions: Verrex Capabilities Overview New York | Boston | Houston | Toronto | London | Mumbai | Singapore | Hong Kong | Shanghai | Tokyo | Sydney
  • 2.
    Company Profile Founded in1947, Verrex is a global design-build integrator and managed services provider of advanced conferencing, collaboration and presentation technologies. Specializing in benchmark enterprise-level corporate solutions, clients engage Verrex to help them communicate, collaborate and articulate locally and globally through videoconferencing, audio conferencing, digital signage, presentation systems and other audiovisual technologies. Superior performance is Verrex’s hallmark offering clients the industry’s highest level of execution, broadest global footprint, universal standards and a sophisticated portfolio of comprehensive services. Verrex expertise includes strategic planning and consulting, systems design, systems engineering, project management, procurement, fabrication, control systems programming, installation, service and preventive maintenance programs, on site staffing, managed conferencing and VNOC services. The Verrex approach draws from a proprietary quality management process that documents each stage in a successful design, system and service deployment. Refined over six decades, the Verrex Process ensures consistent best-in-quality standards regardless of project, challenge or geography. In its ongoing commitment to professional excellence, technical education is paramount at Verrex. The company’s technical staffs are required to hold InfoComm Certified Technical Specialist designations allowing Verrex to achieve the highest industry certification, InfoComm’s Diamond level Audiovisual Solutions Provider (AVSP) status. “ Verrex has a long history of performance, innovation and professionalism that is reflected in the work they do. ” Evolving its resources, expertise and presence inline with the needs of its clients has long been a focus of Verrex. In the 1950s the company supplied and serviced distributed background music systems. In the 1960s the company expanded into two-way radio, school intercom, sound and CCTV systems. During the 1970s the company focused predominantly on large venue sound systems. In the 1980s and 1990s Verrex broadened its offerings to include corporate audiovisual and conferencing systems design, integration and service. Verrex continues to grow its expertise with GMS™, global managed services, designed to simplify the usage and management of conferencing technologies. Verrex has been family owned for three generations promoting a unique corporate culture that values camaraderie and peer mentoring. The company has also been recognized by Systems Contractor News as a Top 50 Systems Integrator each year since the program’s inception in 1994. In 2009, Verrex added the “Excellence in Business - Growth Strategies” award from the National Association of Systems Contractors, recognizing the company’s visionary strategy for executing a successful global business model. In 2011, Verrex President & CEO, Thomas Berry Jr., was elected to InfoComm’s Board of Directors, further establishing the company as a thought leader in the AV and conferencing space. With principle offices in North America, Europe and Asia, Verrex has strategically positioned its presence to serve corporate hubs around the globe. A network of over 200 service partners rounds out coverage globally. For a complete list of Verrex offices worldwide, or for more information about our partner alliances, please visit www.verrex.com. (Cover Photo: The Nielsen Company Executive Boardroom; Photo Right: State Street Executive Conference Room)
  • 3.
    Capabilities Global Perspective Matchedby Localized Capabilities: The evolution of Verrex capabilities is in direct response to client needs for superior, end-to-end audiovisual standards throughout offices at any location on the globe. From design to installation through to managed services, clients rely on Verrex as a proven, single source for all their AV applications worldwide, regardless of project size, challenges or geography. Design Development Rack Fabrication At the earliest stage, the Verrex Design team conceptualizes the integration of In-house rack fabrication allows Verrex to closely monitor quality factors such as AV into the space. Verrex innovative system designs are guided by client need, proper assembly, wiring and cable identification as equipment is placed in racks. application, room layout, acoustics, infrastructure and other factors that can Fabrication Technicians are trained to read and translate AV system diagrams affect performance and user experience. Proper and precise design translates and to follow strict industry standards as part of Verrex’s multiple Quality into fewer change orders, fewer missed details and fewer corresponding budget Assurance checks. overages. Our certified Designers focus solely on the design process including needs analysis, coordination with architect and interior design agendas, initial Control System Programming budgeting, preliminary equipment selection and defining system requirements. Verrex certified Control System Programmers have considerable experience Most beneficial to clients, Verrex Design develops comprehensive drawing with leading control system products including Crestron and AMX. Programmers packages inline with architectural phases, schedules and requirements. coordinate closely with clients and Verrex Design to develop intuitive, user- friendly interfaces to control AV systems and environmental devices such as Project Management lighting. Verrex Project Managers are a disciplined, highly focused group who ensure projects are kept on course. A Project Manager is assigned to every installation Quality Assurance and is the single point of contact for resources, milestones and deliverables. All systems are staged in-house and undergo thorough Quality Assurance Project Managers attend scheduled on-site meetings, supply project timeliness, checks prior to leaving the Verrex facility for installation. Certified QA Technicians submit project status reports, coordinate subcontractors and, ultimately, lead the stage and test system components to confirm proper functionality, confirm the execution process. systems intended design and to make adjustments as required. Project Engineering Installation Project Engineering is a methodical process of ensuring system integrity. Verrex The responsibility of providing a complete working system, using the highest Project Engineers conduct extensive equipment research, determine equipment industry standards and quality workmanship, falls to the Verrex Installation team. viability and verify components will work together to achieve desired results. An InfoComm certified, our Installers perform detail-critical work including structural in-house AutoCAD team provides drafting support, depicting AV schematics and support for screens, projectors and displays; cable riser management; custom architectural details in comprehensive system diagrams. AV terminations; and component networking. Once all components are in place the team makes final adjustments to optimize system performance. Procurement Verrex Purchasing maintains strong relationships with over 250 of the industry’s GMSTM (Global Managed Services) best-in-class manufacturers. Leveraging these relationships, the group is Verrex GMS is a comprehensive suite of services designed to increase usage responsible for obtaining the highest quality, application-specific equipment at and decrease the operational complexity of business-critical audiovisual systems. the most competitive cost. GMS features Professional Services, VNOC Services, Preventive Maintenance, Service and Onsite Staffing & Training.
  • 4.
    Credentials Industry Certification Verrex is a Diamond Level AudioVisual Solutions Provider (AVSP), as designated by InfoComm International, the global association for the professional AV industry. Diamond AVSP is the highest level of certification achievable in education and training. This certification signifies Verrex sales, design, engineering, installation and managed services staffs have earned AV specialist credentials, awarded solely to those professionals who have demonstrated thorough comprehension of AV science and technology by passing InfoComm administered courses and exams. InfoComm certification is internationally recognized and supported by the professional AV industry. All three levels of AV specialist are part of the Verrex team: CTS-D (Certified Technology Specialist - Design), CTS-I (Certified Technology Specialist - Installation), CTS (Certified Technology Specialist - General) Solution Certifications. Verrex solution certifications ensure the highest level of expertise for business-critical applications: Videoconferencing/Audioconferencing » Cisco Registered Partner: Cisco Select Certified Partner » Cisco ATP (Authorized Technology Provider): Cisco TelePresence Video Advanced Partner » Cisco TelePresence Video Advanced: Field Engineer, Systems Engineer, Account Manager (North America + Asia Pacific) » Cisco TelePresence Video Express: Field Engineer, Systems Engineer, Account Manager (EMEA) » Polycom Certified Professional Designer, Certified Professional Installer » Polycom Certified Videoconferencing Engineer (CVE) » Polycom ATX Design & Implementation Certified » Polycom Installed Voice Certified » Polycom Infrastructure Certified » Polycom Video Certified » ClearOne Certified Professional Designer, Certified Professional Installer, Certified Technical Specialist » LifeSize Pro-Partner, Certified Sales Professionals » BiAmp Audia Certified Control Systems » Crestron Certified Masters Programmer, Certified Commercial Systems Designer, Certified Professional Installer » AMX Certified Programmer (ACE), Certified Designer, Certified Installer » Lutron ProAV Certified, Commercial AV Certified, Commercial Lighting Design Certified » Extron Certified Advanced AV Technician, Certified AV Associate » Extron Configurable Control Systems Certified Video » Crestron Digital Media: Digital Media Certified - Designer, Digital Media Certified - Engineer, Digital Media Certified - Technician » Christie Digital MicroTiles: Installer Certified » ISF Commercial Calibration Training Audio/Sound System » BiAmp Audia and AudiaFlex Certified » ClearOne Certified » BSS SoundWeb Certified » Synergetic Audio Concepts (Syn-Aud-Con) Sound System Design » Peavey MediaMatrix Certified » Polycom Installed Voice Certified Engineering » National Institute for Certification in Engineering Technologies (NICET)
  • 5.
    GMSTM (Global ManagedServices) Verrex GMS (Global Managed Services) is a comprehensive suite of solutions designed to increase usage and simplify the operation and management of business critical audiovisual and conferencing systems. Now management, support and maintenance of all collaboration, conferencing and presentation technologies – the complete range of visual communication systems and components – can be centralized providing a single-source umbrella for: Professional Services Preventive Maintenance & Repair Analysis and recommendations to improve Preventive maintenance and critical care AV infrastructure. service options. VNOC Services Onsite Staffing & Training End-to-end concierge management of audio Human capital to provide immediate support, and video conferences. operation and training services. Professional Services Onsite Staffing & Training A collaborative dialog with Verrex GMS will help identify and anticipate an organization’s Choose from dedicated onsite staffing or staff augmentation to provide live meeting evolving AV communication needs. Professional Services provides a critical road map, support, room checks, set up and trouble-shooting. A comprehensive training and assessing options, operations, infrastructure, service gaps and business requirements certification program is required for all Verrex placed technicians and can be made to arrive at the best, most strategic decision for the enterprise. available to an organization as part of their own training process. Preventive Maintenance & Repair VNOC Services A comprehensive suite of service and support offerings to maximize uptime and ROI: Solutions designed to monitor and manage video and audio conferencing environments 24/7 global help desk, preventive maintenance, service agreements, equipment repair, ensuring trouble-free, effective and consistent communication across single or multiple loaner & rental systems, critical spares, asset management and on-call Service Desk. time zones. Verrex VNOC services include: device and network monitoring; device Customization puts cost control in the user’s hands, selecting only those options that management; bridging services; conference scheduling and reservation management; match a specific budget and need. conference management; and problem management.
  • 6.
    Envir Environmental Responsibility Promoting smart choices for our clients, our employees and the environment. V Verrex takes a proactive role in promoting the understanding and acceptance of environmentally-conscious communication solutions. Through technology and training, the firm teaches organizations to see videoconferencing as a way to lessen their carbon footprint, reducing the need for travel and the fuel consumption, pollution and congestion associated with it. Verrex strives to ensure clients are aware of the positive impact adopting green-friendly consu communication practices can have on the environment. comm BEST PRACTICES IN GREEN AV RESPONSIBLE CORPORATE CULTURE For each project, Verrex indentifies areas where a client can Verrex is also committed to making responsibility and sustainability an integral part contribute to environmental responsibility and a sustainable future, of its own corporate environmental goals and policy: including: Business Travel. All Verrex employees are required to use videoconferencing Identify efficiency-based equipment during the design phase whenever possible to minimize travel. Incorporate recycled products and use fewer virgin materials, Telecommuting. Verrex provides for telecommuting opportunities that preserve a including reuse of owner furnished equipment where feasible high level of performance while reducing emissions caused by commuting. Verrex enables employees to utilize desktop and PC-based video to visually telecommute, Participate in manufacturer recycling programs, including lamp based on particular job requirements. recycling programs for expended projector bulbs Operations. Through Verrex’s proprietary Quality Management System (QMS), the Work with vendors who build products striving to improve energy company strives to reduce energy consumption and its carbon footprint in rack consumption fabrication and testing. Verrex complies with environmental legislation, including the EU’s directives on RoHS. Ensure proper ventilation so least amount of energy is used for cooling Energy Consumption. Verrex offices are encouraged to implement plans to reduce energy consumption by addressing the use of heating/cooling systems, lighting and Select FSC (Forest Stewardship Council) furniture, promoting electronics. This includes occupancy sensors to turn ceiling lights on only when responsible management of forests sensing body heat. Integrate control systems for AV, lighting and shades, as well as a Office Supplies & Materials. Verrex encourages all offices to purchase central part of building management systems environmentally friendly products. Digital marketing materials are preferred, keeping print runs to a minimum. Integrate digital signage to reduce use of non-recyclable materials Recycling. Verrex offices, where available, participate in programs to recycle cans, bottles, mixed paper and cardboard. Shipping. Verrex reduces the amount of materials used in shipping, sourcing reusable packing containers where feasible and consolidating shipments from core vendors.
  • 7.
    Case Study Benefits of Global AV Standards Audiovisual systems and services integrated consistently worldwide accelerates adoption of State Street’s global vision for conferencing, collaboration and presentation technologies. From their US-based headquarters in the 36-story signature gateway of Boston’s financial district, to the 2009-constructed London HQ at Canary Wharf, to locations around the globe, State Street sought commonality between offices for their ambitious AV design, installation and managed services needs. As the multinational organization’s reliance on AV has grown, Verrex has evolved in-line with their requirements, irrespective of geographic borders, size of projects or challenges. AV Archetype Provided Cost Containment Managed Services Improved ROI on AV Assets Needs Addressed Global Standardization State Street sought cost effective roll out of video and audio systems State Street’s economic and operational mandates to avoid unplanned Single-source Accountability across numerous, global offices. Specific to State Street criteria, service costs and ensure peak systems’ performance required longterm, Verrex custom designed templates for common State Street room post installation support throughout North America and Europe. Verrex Services Featured types that allowed the firm to grow its unique AV infrastructure globally, implemented a comprehensive suite of managed services providing Design, Installation & Service without each office having to do the groundwork on their own. State Street with protection for their AV investments at fixed annual Key Project Locations Locations including Boston, Kansas City, Dublin and Milan selected costs. Under the multi-year program, State Street received unlimited Alameda, CA an established room or system model to be deployed. Proven service visits, priority service response, preventive maintenance, 24/7 Austin, TX processes for design, engineering, project management, fabrication on-call ServiceDesk support, remote device management and systems Boston, MA and installation further streamlined integration and cut costs. training. Cambridge, MA Chicago, IL Jacksonville, FL Interface Standards Optimized Productivity On-Site Staffing Decreased Operational Strain Kansas City, MO Rather than “cookie cutter” solutions, Verrex created standards Resource realities – finding, training and managing AV personnel – Malvern, PA exclusive to State Street’s enterprise needs. Control system prompted State Street to seek to optimize staffing costs and operational New York, NY functionality and touchpanel layouts were designed to ensure user efficiencies. Verrex deployed fully integrated, Verrex-managed AV Princeton, NJ interfaces were familiar, intuitive and State Street-branded, regardless workforces at key State Street locations worldwide, responsible for Sacramento, CA San Francisco, CA of location. Such standards increased productivity and alleviated supplementing in-house staff. Sites such as Boston, Toronto and Winston-Salem, NC training needs, allowing a Vice President from the Princeton office to London utilized this on-site staffing segment of Verrex managed Montreal, Canada walk into the Frankfurt office and conduct a videoconference without services to provide live meeting production support, room checks and Toronto, Canada support or downtime. setup and Tier 1 troubleshooting. Brussels, Belgium Dublin, Ireland Frankfurt, Germany Accountability Evolved In-Line with Objectives Global Perspective Addressed Diversity Krakow, Poland Sprawling projects such as the build-out of State Street headquarters Although a degree of commonality exists between all offices, London, United Kingdom in Boston and London required management of multiple teams and acknowledging the diversity between State Street’s multi-country Luxembourg commissioning of dozens of systems concurrently. To meet State locations was crucial. Adapting to how one office differed culturally from Milan, Italy Street’s objectives of time-critical deployment and completion within another meant, first and foremost, respecting that culture. Verrex utilized Bangalore, India budget, Verrex assigned dedicated project managers, ensuring a network of local experts to ensure teams were aware of proper accountability and clearly-defined leadership at all project stages. practices and procedures at all times. (Photo: State Street Lafayette Conference Center, Boston, MA)
  • 8.
    Project Profile Project Briefs AsiaPacific Bain Capital Asia LLC Deutsche Bank Kishimoto Building, Tokyo, Japan International Commerce Centre, Kowloon, Hong Kong Project management, systems engineering, control systems programming, CAD, fabrication and field installation services for upgrade of a large conference room to Corporate Meeting Spaces: improve videoconference, audio conference and presentation capabilities. This included Systems design, project management, systems engineering, control systems coordination of millwork contractor, equipment upgrades to higher industry standards programming, CAD, fabrication and field installation services for integration of including HD videoconference system and RF-shielded microphones. audiovisual and videoconference systems in two corporate meeting spaces. Integrated systems included 70” and 46” LCDs, high-definition videoconference system, multiple China Light and Power Hong Kong Limited rack-mounted sources, boundary microphones, audio conference system and table- Shamshuipo Centre Kowloon, Hong Kong top touch panels. Systems design, project management, systems engineering, control systems programming, CAD, fabrication and field installation services for upgrades to multiple Sky Lobby Media Wall: executive style board and conference rooms to integrate videoconference capabilities. Project management, systems engineering, control systems programming, CAD, Integration included incorporation of high-definition displays, audio conferencing, high- fabrication and field installation services for integration of Christie MicroTiles video wall. definition videoconferencing and room automation including auto-shutdown and The media wall consists of a 30-tile wide by 5-tile high display, 150 rear-projection color remote system control (eControl). Integration further incorporated a standard template video tiles in total seamlessly interlocked. The video wall processor allows up to 16 DVI for equipment with variations on display technologies and microphones dependant or RGBHV and 16 different SDI, HDSDI, 3GSDI, component, S-Video and composite on room conditions. video formats. The processor was configured to allow various display options including: a single video image with a resolution of 16200 x 2040 AND up to 32 multiple video Jefferies International images of varying resolutions and tile sizes to make one tiled image with a resolution Cheung Kong Centre, Central, Hong Kong of 16200 x 2040. Systems design including architectural design drawings, project management, systems engineering, control systems programming, CAD, fabrication and field installation Onsite Staffing: Project Management: services for integration of audiovisual and videoconference systems in divisible conference Verrex provided a dedicated, full-time onsite Project Manager for a six-month contract. room and multiple trading floor displays. Integrated systems included dual 52” displays, The Project Manager reported to a designated Deutsche Bank representative and high-definition videoconference system, multiple rack-mounted sources and wireless worked out of the company’s Cheung Kong Centre office in Kowloon, Hong Kong. The touch panels. Project Manager was responsible for managing the integration of Deutsche Bank’s International Commerce Centre office including the Auditoriumand media wall projects. (Photo: Deutsche Bank - International Conference Center, Hong Kong Sky Lobby Media Wall)
  • 9.
    Project Profile State StreetBank and Trust Company EMEA Headquarters, Canary Wharf London, UK State Street, one of the world’s leading providers of financial services to institutional PROJECT HIGHLIGHTS investors, selected Verrex to integrate conferencing, collaboration and presentation Among the various systems specified, State Street required a sophisticated, multi- technologies throughout the company’s new EMEA headquarters, sited prominently purpose meeting space for a broad range of applications. Verrex worked closely with at Canary Wharf. The multi-floor, multi-room fit out consisted of over 50 bespoke AV- the client and designer to integrate a versatile solution to meet the presentation, centric and enhanced spaces including incident management and control rooms, videoconferencing, recording and building-wide broadcast capabilities. A key highlight training and breakout rooms, reception, waiting areas, videoconferencing, standard of the space is the flexibility in its operation. and divisible meeting rooms, IT monitoring rooms, trading area, employee cafe, multi- configurable large meeting space and a building-wide TV distribution system. The corporate meeting space is a multi-divisible room, capable of three unique configurations: a large singular space, a dual space or three independent spaces. CHALLENGES There are three 16:9 27mm (108") motorized projection State Street undertook a major reorganization and screens, each with integrated videoconference camera, investment in its London operations, migrating services and three DLP projectors in each area that display high- and approximately 2,500 staff personnel from locations quality video and presentation materials independently or, at Canada Square, Royal Exchange, Bank Street and when the space is combined, all together. Sources include Cannon Street into the new Canary Wharf site. During computer, HD codec, HD DVD, cable television receiver integration Verrex teams worked within the constraints and facility-wide television distribution system. The system of an occupied, in-flux office space as furniture, equip- is also capable of broadcasting live to the building-wide ment and staff were moved in from other offices. This network, which allows events to be aired simultaneously project exemplified Verrex’s ability to turn over multiple across the facility. Events in the space can be recorded, rooms concurrently on time, in budget, under strict edited via an on-site production suite and made available deadlines and schedule changes, with no disruption to for multicasting over the client network. the client’s operations. IP-based HD videoconferencing capabilities are available SOLUTIONS in each of the three spaces, or any combination of the Demonstrating the proper training and credentials, spaces, within the room. All incoming video appears on Verrex personnel met the rigorous pre-qualification and vetting standards one, or all, of the projection screens, depending on room configuration. Three fixed implemented by Canary Wharf’s business district.To ensure shifting turn-over and HD cameras capture images of the main stage and lectern while three additional training dates were met, while staying within budget, required dedicated project cameras, built into the projection screens’ housings, capture the seated audience. management with a clear point of accountability. Equipment deliveries, on-site quality assurance, installation, coordination of trade teams, progress reports and scheduling It was crucial to State Street that the system offer a high level of versatility for its were all the responsibility of the Project Manager assigned solely to the fit out. presenters. Presenters have the ability to run presentations and control basic functions on their own from wireless touchpanels in the space. The presenter can also elect to have their session handled completely by AV technicians located in the room’s control booth, equipped with LCD displays and touchpanels for monitoring the event and controlling audio, video, sources and environmental conditions such as lighting. (Center Photo: State Street London Headquarters Multi-Configurable Large Meeting Space)
  • 10.
    Project Profile KPMG LLP ExecutiveBoardroom New York, NY “ I am pleased to provide my highest recommendation for Verrex’s audiovisual services. After five years of working side-by-side with them, we have only the highest regard for their experience, professionalism and ability to make the right things happen. - AV Services Manager, KPMG LLP ” Creating a space that encourages collaboration, provides for optimum communication, the custom-built Boardroom table is equipped with twelve 17" flat panel LCD monitors. maximizes the impact of high-definition presentations and aesthetically represents the Each monitor resides in a motorized lift-housing that rises up out of the table when firm’s prestigious reputation, was the criteria in the design and integration of audio- needed, and recesses under the table when not in use. Positioned between two visual systems for KPMG’s Executive Boardroom. KPMG, provider of assurance, tax, seated meeting participants, the monitor shows the same image displayed on the legal, consulting and financial advisory services to main projection screen. Program audio for the presentation clients around the globe, selected Verrex for this key, sources is routed through a digital surround processor AV-enhanced executive space. and distributed to four, high-quality wall-mounted loud- speakers at the front and rear of the room. CHALLENGES Incorporate extensive audiovisual technology into the At each of the 26 seated table positions, unique audio Executive Boardroom without overwhelming meeting conference equipment is embedded into the millwork and participants or impacting the room’s refined style. virtually concealed when not in use. All table positions Display and audioconference components would need include a low profile microphone in a flip top, capacitive to be integrated into the custom, marble-inlay table. microphone mute switch with green LED to indicate active state, headset port and an individual loudspeaker. SOLUTIONS Incoming audio from conference calls is routed to each During the design phase, Verrex provided documen- loudspeaker providing optimum volume per participant tation and direction for build-out and infrastructure station. In addition, all embedded microphones have a requirements to the architect and contractors. This dedicated echo canceling processor to eliminate noise ensured system functionality and performance needs and echo during an audioconference. would be met while keeping the integrity of the interior design intact. Plans for address- ing environmental factors, such as lighting and shade control, were also a focus during The Boardroom’s audiovisual systems can be controlled from a dedicated operator’s the design phase. Verrex Design, Project Management and Field Engineers worked station within the room or from the equipment rack station located outside. Each closely with the millwork contractor to seamlessly embed AV components into the control station is equipped with identical 15" LCD touchscreen controllers with custom table. custom menus and graphics. The Boardroom presentation system allows for the display of high-definition video GLOBAL MANAGED SERVICES sources and computer graphics onto a large projection screen via a ceiling-mounted KPMG selected a Verrex Preventive Maintenance contract to keep the AV systems in projector, which is recessed in the soffit. The projected image is formatted for high- this key, executive space at peak performance and to have unexpected issues definition, wide-screen technology. In addition to the main projection display system, addressed quickly. (Center Photo: KPMG New York Executive Boardroom)
  • 11.
    Project Profile Alcatel-Lucent HD VideoconferencingExecutive Boardroom Murray Hill, NJ “ From putting together the best team to design, manage and integrate our projects to following up with our service needs, Verrex understands the importance of delivering quality each and every time. - IT Executive Support Manager, Alcatel-Lucent N e w l y f o r m e d t e l e c o m m u n i c a t i o n s l e a d e r, A l c a t e l - L u c e n t , r e q u i r e d a ” and custom mirror assembly are housed in the renovated projection room. Verrex videoconferencing solution unlike any other - high-definition that would utilize the specified the Polycom HDX 9004 conferencing codec to deliver high-definition voice, company’s own network and allow executives, from various points on the globe, video and content sharing. Ceiling-mounted loudspeakers provide high quality audio. to interact as if they were all in the boardroom together. Alcatel-Lucent selected Verrex as the designer and integrator of this industry A 12" tabletop multimedia touchpanel and 8" wireless lectern touchpanel control first project. all audiovisual and specially designed lighting in the room. The tabletop touchpanel features both “user” and CHALLENGES “tech” modes. User mode, with a simple and intuitive Dismantle the existing 11-year old system and interface, allows executives to conduct presentations and design, build and install one of the first true HD videoconferencing and features speed and one-touch videoconferencing solutions in its place. Architectural dialing. The tech mode allows AV and IT support staff to modifications would be required to adapt the room manage all system components. The control system was and ensure an authentic collaborative experience. The also custom programmed to create unique, visual lighting innovative system would have to be as intuitive as cues; lights illuminate on the active participants and possible for high-level executives to use unaided at all darken in the galley seating area. hours. A demanding deadline of just six weeks would require flawless coordination. Two distinct room details provide additional visual cues: microphone status collars translate mic state into colors SOLUTIONS (green for a live mic, red when muted and yellow during With Verrex Sales advanced in design, unique details system warm-up) and a multi time zone digital clock is and equipment were specified prior to moving to the mounted in the soffit. engineering stage. The Verrex Design team provided the project architect with drawings for reconstruction to ensure the room suited the new technology. In order to SYSTEM HIGHLIGHTS meet the strict timeline, Verrex Project Management was tasked with driving the Integrated controller, wireless and tabletop touchpanels, universal signal processors, entire schedule and coordinated all trades including architects, lighting and matrix switcher, video processors, HD DVD player, multisystem VCR, HD cable TV construction. tuner, HD videoconferencing codec, HD camera, HD LCD projector, rack and lectern- mounted HD LCD monitors, 46" LCD displays, custom mirror assembly, rear- All components were designed with an infrastructure to support 1080p. This three- projection screen, ceiling loudspeakers, audio matrix mixers, amplifier, gooseneck display boardroom features a 60" x 107" 16:9 rear-projection screen flanked by two lectern microphone, push-to-talk tabletop microphones, microphone status collars 46" LCD displays, all capable of displaying a variety of sources. An HD LCD projector and multi-zone digital clock. (Center Photo: Alcatel-Lucent High-Definition Executive Boardroom)
  • 12.
    Project Profile Arnold Worldwide Presentationand Screening Room Boston, MA “ As Director of AV Services for a major Advertising Agency, it’s my job to keep up with technology in our conference rooms. Our work is our product. If it doesn’t look great, we don’t get noticed. With the help of Verrex and our architects, they truly created a showpiece. Open concept, clean lines, an amazing screen, and environmentally friendly. Employees are stepping over each other to book this room. I’ve worked with many companies over my career, and Verrex is the best. They are well worth the price of admission. Piece of mind, great project management, as well as a superior product and staff. Would recommend to all businesses. - Director of AV Services, Arnold ” Arnold, the leading ad agency responsible for energizing brands such as Volvo, Carnival Cruise Lines and Jack Daniels, sought to convey an unmistakable message correct 16:9 aspect ratio; or two images, one on either side. Presentation sources include high-definition and standard DVD, laptop, two game consoles, satellite radio to clients and staff about their world-class creativity, energy and insight. Arnold and DVR. The system features a sophisticated, multi-window image processor with selected Verrex to help deliver this message, loud and clear, via the agency’s AV- edge-blending capabilities. enhanced Presentation & Screening Room, featuring an eye-catching 190" x 60" rear projection display. The result - immediate and Verrex recognized audio would play a critical role in powerful reactions from clients and staff the moment energizing presentations. To achieve an immersive effect they enter the room. – making the audience feel as if they are in the presen- tation, not just watching it – audio from the various CHALLENGES sources is broadcast through a powerful, 7.1 surround The room’s intended use, to review and present sound system. Six full-range program speakers in the campaigns to clients and staff, demanded an exciting, ceiling and a front-firing subwoofer incorporated into the flexible solution. Visual impact was foremost with a front wall deliver robust sound throughout the room. display that would fill the entire front wall, capable of multi-configurations. A powerful audio solution would A custom programmed, 6" touchpanel at the main table, be needed to fuel presentations. Environmentally- which can be run wireless or wired, permits non-technical conscious Arnold requested the project be “green- users to easily hold and conduct meetings through the friendly”, including reuse of existing equipment when use of intuitive menus. To further enhance the audience possible. experience, Verrex also incorporated control of environ- mental devices such as lighting and shades. Arnold staff SOLUTIONS can easily direct presentations, adjust audio, recall To provide Arnold with a complete solution, Verrex coordinated with the project lighting scenes and set the right mood, all from the architect, MEP engineer, furniture supplier and general contractor. This included a integrated touchpanel. thorough needs analysis to initiate design direction and AV architectural drawing GREEN AV development. Verrex worked in parallel with the architect’s development of interiors Several green, best-practices were featured in the project. An e-control system was and environmental considerations to ensure all client specifications would be met. To integrated for remote monitoring of system status. Programmed to shut down when achieve the client’s desired effect, the room required specific interior build-out as well not in use or at the end of the business day, remote monitoring helps preserve the as acoustical, lighting and window treatments. life of projection lamps and cuts down on energy consumption. At Arnold’s request, Verrex also utilized any existing client-owned equipment that could fulfill the The Presentation Room features a single, glass rear projection screen with 16:9 HD requirements of room functionality. Part of its Quality Assurance Program, Verrex aspect ratio. Three projectors allow for multiple display configurations: a single 190" x thoroughly tested each reused component at its own facility to ensure compatibility 60" continuous image that fills the entire wall; a centered 107" x 60" single image with and stability before on-site installation (Center Photo: Arnold Presentation & Screening Room)
  • 13.
    © Copyright VerrexCorporation. All Rights Reserved. Copy gh opyri y ex on A Rights n r e Norwalk, Connecticut The Nielsen Company - Conference Room
  • 14.
    © Copyright VerrexCorporation. All Rights Reserved. C pyri h V rr yr orporat on Al Rights eserved. Houston, Texas KPMG - Energy Institute Lobby
  • 15.
    © Copyright VerrexCorporation. All Rights Reserved. C p righ Verr x orporatio A Righ serv d New York, New York United Hospital Fund - Boardroom
  • 16.
    © Copyright VerrexCorporation. All Rights Res C yrigh V re g pora on Al i ht eserved. n d. Trenton, New Jersey Pfizer Aviation - Operations Room
  • 17.
    © Copyright VerrexCorporation. All Rights Reserved. Copyright V rrex orporation A R ghts eserved. ri h rpo ati ser Kowloon, Hong Kong Deutsche Bank - Sky Lobby Media Wall
  • 18.
    © Copyright VerrexCorporation. All Rights Reserved. C pyr gh V rex Corpora on Al R g s Reserved. o ration. All s Norwalk, Connecticut IMS Health - Conference Room
  • 19.
    Expertise Systems Applications Design/Build Videoconferencing Boardrooms Architectural Coordination Audio/Video Conference Centers Systems Engineering Digital Signage Conference Rooms Project Management Presentation Corporate Auditoriums Subcontractor Coordination Audio Conferencing Divisible Spaces Control Systems Programming Sound Masking Executive Offices Rack Fabrication Sound Reinforcement Interview Rooms Installation Lobby & Reception GMS™ (Global Managed Services) Meeting Spaces - Professional Services Office Amenities - VNOC Services Presentation Rooms - Preventive Maintenance & Repair Trading Floors - Onsite Staffing & Training Training Facilities Video Walls About Verrex Founded in 1947, Verrex is a global design-build integrator and managed services provider of advanced conferencing, collaboration and presentation technologies. Specializing in benchmark enterprise-level corporate solutions, clients engage Verrex to communicate, collaborate and articulate locally and globally through videoconferencing, audio conferencing, digital signage, presentation and other audiovisual systems. Superior performance is Verrex’s hallmark offering clients the industry’s highest level of execution, broadest global footprint, universal standards and a sophisticated services portfolio. With principle offices in North America, Europe and Asia, Verrex has strategically positioned its presence to serve corporate hubs around the globe. For more information, visit verrex.com. Americas Headquarters EMEA Headquarters Asia Pacific Headquarters Verrex Corporation Verrex Limited Verrex Asia Limited Mountainside, NJ USA Herts, United Kingdom Kowloon Bay, Hong Kong Global Conferencing & Communication Solutions +1 908 232 7000 +44 (0) 1992 667 000 +852 3713 4200 www.verrex.com © 2012 Verrex and/or its affiliates. All rights reserved. Verrex, the Verrex New York | Boston | Houston | Toronto | London | Mumbai | Singapore | Hong Kong | Shanghai | Tokyo | Sydney Logo and GMS are registered trademarks of Verrex Corporation and/or its affiliates in the U.S. and other countries. Please visit www.verrex.com for a complete list of Verrex global addresses, phone numbers and registrations.