AFRICA RAIL 2015
COUNTRY SPOTLIGHT - UGANDA
Implementation of the Standard
Gauge Railway in Uganda –
Challenges and Opportunities
Charles A Kateeba
Uganda Railways Corporation
June 2015
7/2/2015
Accelerating socio-economic
transformation 1
LOCATION
7/2/2015
Accelerating socio-economic
transformation 2
THE PROBLEM
 LANDLOCKED COUNTRY
 1000 KMS FROM NEAREST
SEA PORT
 POORLY DEVELOPED ROAD
NETWORK
 WEAK AIR SERVICE NETWORK
 OUTDATED DILAPIDATED AND
UNDER FUNDED RAILWAY
NETWORK
7/2/2015
Accelerating socio-economic
transformation 3
CHALLENGES
 SMALL AND FRAGMENTED
NATIONAL ECONOMY LARGELY
FINANCED BY EXTERNAL
SOURCES
 UNDEVELOPED NATIONAL AND
FINANCIAL MARKETS
 NEGATIVE INTERNATIONAL
IMAGE DUE TO NATIONAL AND
REGIONAL SECURITY
 SMALL AND INCREMENTAL
DEVELOPMENT MENTALITY
7/2/2015
Accelerating socio-economic
transformation 4
CURRENT STATUS OF
EXISTING RAILWAY
 NEARLY 120 YEARS OLD
 DILAPIDATED AND OUTDATED
TECHNOLOGY
 UNRELIABLE SERVICES, UNSAFE,
INEFFICIENT AND VERY COSTLY
 ONLY 20% (250KM) OF EXISTING
RAILWAY SYSTEM OPERATIONAL
 INTERNATIONAL FREIGHT
MARKET SHARE 5% OF 14.5 M
(2014), DOWN FROM 15% IN 2004
7/2/2015
Accelerating socio-economic
transformation 5
EXISTING DIRE
SITUATION
7/2/2015
Accelerating socio-economic
transformation 6
CURRENT OPERATIONAL
SITUATION
 AVERAGE TRANSIT TIME FROM
MOMBASA TO KAMPALA 6-10
DAYS (2014)
 AVERAGE SPEED 15-25 KPH
 MAX PAYLOAD 40 TEUS/TRAIN
 DESIGN AXLE LOADING 18
TONNE/AXLE
7/2/2015
Accelerating socio-economic
transformation 7
CURRENT OPERATIONAL
SITUATION
 ROAD FREIGHT COST 16 USD
CENTS PER TONNE-KM I.E. 5
TIMES WORLD AVERAGE
 RAIL FREIGHT COST 10 USD
CENTS PER TONNE-KM (RVR)
COMPARED TO WORLD AVERAGE
3-5 US CENTS
 LOSS TO ECONOMY OVER USD
1.2 BILLION PER YEAR IN
TRANSPORT COSTS
7/2/2015
Accelerating socio-economic
transformation 8
CHOICES TO MAKE
 REHABILITATE/ UPGRADE EXISTING
LINE TO EXISTING STANDARDS
 STEPPED UPGRADE AND CHANGE
OF GAUGE TO UNIFIED STANDARD
GAUGE
 ADOPT APROPRIATE DEVELOPMENT
STRATEGY
 FIND DEVELOPMENT/FINANCING
PARTNERS
 ADOPT APROPRIATE
PROCUREMENT AND PROJECT
DEVELOPMENT METHOD
7/2/2015
Accelerating socio-economic
transformation 9
7/2/2015
Accelerating socio-economic
transformation 10
CHOICE OF GAUGE
IMPLEMENTATION
STRATEGY
 REGIONAL APPROACH
 DEVELOPMENT PROJECT
RATHER THAN COMMERCIAL
PROJECT
 STATE (PUBLIC) FINANCED WITH
PRIVATE CAPITAL BLENDING
(PPP)
 SEAMLESS OPERATION
 TRANSIT ORIENTED
DEVELOPMENT(SPATIAL
DEVELOPMENT CORRIDOR)
7/2/2015
Accelerating socio-economic
transformation 11
SUMMIT DECISIONS
 SEAMLESS RAILWAY TRANSPORT
SYSTEM IN ALL FOUR NCIP
COUNTRIES (KENYA, UGANDA,
RWANDA AND SOUTH SUDAN)
 HIGH CAPACITY, MODERN, SAFE,
RELIABLE
 CONCESSIONAL DEVELOPMENT
FINANCING FROM CHINA AND
ELSEWHERE
 EPC/ TURNKEY (Method of
Procurement)
7/2/2015
Accelerating socio-economic
transformation 12
SGR PROTOCOL
 SIGNED ON MAY 11, 2014 IN NAIROBI
 COMMITMENT BY PARTNER STATES
TO SGR
 SIMILAR RAILWAY STANDARDS AND
SPECIFICATIONS
 JOINT PLANNING, DEVELOPMENT AND
OPERATION
 JOINT MOBILIZATION OF FINANCIAL
RESOURCES
 INTEGRATED INSTITUTIONAL
FRAMEWORK FOR DECISION MAKING
 JOINT HUMAN RESOURCE
DEVELOPMENT
7/2/2015
Accelerating socio-economic
transformation 13
REGIONAL COMMITMENT
7/2/2015
Accelerating socio-economic
transformation 14
Map of SGR
7/2/2015
Accelerating socio-economic
transformation 15
PROPOSED SGR
SYSTEM
 TOTAL ROUTE LENGTH IN
UGANDA 1,614 KM
 TRACK GAUGE “STANDARD”
1.435M
 TRAILING LOAD 4,000 GROSS
TONNES
 FREIGHT PAYLOAD 216 TEUS
 PASSENGER CAPACITY 960
PAX
7/2/2015 celerating socio-economic transformation 16
TECHNICAL
SPECIFICATIONS
 GRADIENT MAXIMUM 1.2%
 HORIZONTAL CURVATURE
MINIMUM 800 TO 1200M
 SPEED 120 KPH
 AXLE LOAD 25 TONNE
 LOADING GAUGE FOR DOUBLE
STACKED CONTAINERS
7/2/2015
Accelerating socio-economic
transformation 17
TECHNICAL
SPECIFICATIONS
 LINE CAPACITY OVER 40
TRAINS/DAY
 PRE-STRESSED CONCRETE
SLEEPERS
 LEVEL CROSSINGS-MINOR
ROADS
 ELECTRIC TRACTION – (25KV,
AC-DC-AC)
7/2/2015
Accelerating socio-economic
transformation 18
TYPICAL TRACK SECTION
Category Thickness
ballast(uppe
r layer)
30cm
ballast(lowe
r layer)
20cm
Base 60cm
Sub-base 190cm
Base course variable
770cm
7/2/2015
Accelerating socio-economic
transformation 19
BENEFITS TO THE
ECONOMY
 REDUCED TRANSPORT COSTS FROM
CURRENT 16 US CENTS (ROAD) TO
BELOW 5 US CENTS (RAIL) PER
TONNE-KM
 REDUCED RAIL TRANSIT TIMES
FROM MOMBASA TO KAMPALA
FROM CURRENT 10 DAYS TO 1 DAY
 REDUCED ROAD WEAR & TEAR
 REDUCED TRANSPORTATION
ENERGY (FUEL) CONSUMPTION BY
80%
 REDUCED ROAD ACCIDENTS
 REDUCED MOTOR VEHICLE
EMISSIONS BY 72%
7/2/2015
Accelerating socio-economic
transformation 20
BENEFITS TO THE
ECONOMY (CONT’D)
 IMPROVED SAFETY
 REDUCED ECONOMIC DRAG
 INCREASED ECONOMIC
ACTIVITY
 ENHANCED REGIONAL
INTEGRATION AND
INTERNATIONAL TRADE
 INTEGRATION OF UGANDA
INTO WORLD MARKET AND
TRADE
7/2/2015
Accelerating socio-economic
transformation 21
ECONOMIC BENEFITS
 BENEFITS TO ECONOMY BY 2040 USD $118
BN
 TRANSPORT COST SAVINGS USD $2 BN P.A
7/2/2015
Accelerating socio-economic
transformation 22
Phasing of the Project
 Phase 1:
I. MALABA-KAMPALA (EASTERN
ROUTE) - 258KM
II. TORORO-GULU-NIMULE WITH
BRANCH FROM GULU -
PAKWACH (NORTHERN ROUTE)
760KM
 Phase 2:
I. KAMPALA-BIHANGA-MIRAMA
HILLS (SOUTHERN ROUTE) -
294KM
II. BIHANGA-KASESE-MPONDWE
(WESTERN ROUTE)– 377KM
7/2/2015
Accelerating socio-economic
transformation 23
CURRENT STATUS
 EPC/TURNKEY CONTRACT SIGNED ON
30TH MARCH 2015 FOR EASTERN AND
NORTHERN SGR ROUTES
 PRELIMINARY WORKS COMMENCED
JUNE 2015
 PRELIMINARY ENGINEERING DESIGNS
UNDERWAY ON THE WESTERN ROUTE
 MOU SIGNED WITH CONTRACTOR MAY
JUNE 2015
 CONSTRUCTION PERIOD ESTIMATED
36 MONTHS
 CONSTRUCTION PERIOD ESTIMATED
36 MONTHS
7/2/2015
Accelerating socio-economic
transformation 24
7/2/2015
Accelerating socio-economic
transformation 25
MAJOR COST AREAS
 TOTAL LAND ESTIMATE 17,720
HECTARES
 SUPER LARGE BRIDGES: TWO
ACROSS RIVER NILE IN UGANDA
I.E. JINJA (875M SPAN) AND
PAKWACH (250M SPAN)
 VIADUCTS AND SMALL
BRIDGES: 33.8 KM IN UGANDA
 TUNNELS: 7.6 KM IN UGANDA
7/2/2015
Accelerating socio-economic
transformation 26
TYPICAL TRACK SECTION
Category Thickness
ballast(uppe
r layer)
30cm
ballast(lowe
r layer)
20cm
Base 60cm
Sub-base 190cm
Base course variable
770cm
7/2/2015
Accelerating socio-economic
transformation 27
7/2/2015
Accelerating socio-economic
transformation 28
7/2/2015
Accelerating socio-economic
transformation 29
EARTHWORK SLOPE
PROTECTION
7/2/2015
Accelerating socio-economic
transformation 30
MAJOR COST
AREAS
 SUPER LARGE BRIDGES: TWO
ACROSS RIVER NILE IN
UGANDA I.E. JINJA (875M
SPAN) AND PAKWACH (250M
SPAN)
 VIADUCTS AND SMALL
BRIDGES: 33.8 KM
 TUNNELS: 7.6 KM
7/2/2015
Accelerating socio-economic
transformation 31
 PROPOSED NEW SGR HQ
COMPLEX IN KAMPALA
7/2/2015
Accelerating socio-economic
transformation 32
PROGRESS IN KENYA-
VIADUCT (BRIDGE)PIERS
7/2/2015
Accelerating socio-economic
transformation 33
PROGRESS IN KENYA-
CONCRETE SLEEPERS
7/2/2015
Accelerating socio-economic
transformation 34
KENYA PROGRESS-FABRICATING A
BRIDGE BEAM/GIRDER
7/2/2015
Accelerating socio-economic
transformation 35
KENYA PROGRESS -
DEMONSTRATION SECTION
7/2/2015
Accelerating socio-economic
transformation 36
BUSINESS & DEVELOPMENT
OPPORTUNITIES
 ROLLING STOCK LEASING
 OPERATIONS AND
MAINTENANCE
 INDUSTRIAL, BUSINESS AND
LEISURE PARKS
 MINING AND MINERAL
PROCESSING
 PLANNED ACCOMMODATION
7/2/2015
Accelerating socio-economic
transformation 37
BUSINESS & DEVELOPMENT
OPPORTUNITIES
 COMMERCIAL AGRICULTURE
AND AGRO-PROCESSING HUBS
 TOURISM, HOTELS AND
ENTERTAINMENT
 SOCIAL ECONOMIC
DEVELOPMENT
 FEEDER TRANSPORT
SYSTEMS (AIR WATER AND
ROAD).
7/2/2015
Accelerating socio-economic
transformation 38
End
Thank You
7/2/2015
Accelerating socio-economic
transformation 39

More Related Content

Similar to Uganda rail

Department of Transport update on transport corridors
Department of Transport update on transport corridorsDepartment of Transport update on transport corridors
Department of Transport update on transport corridorsTristan Wiggill
 
#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-PFMINigeria
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory AdministrationTransformNG
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...Nigeria Centenary
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...FMINigeria
 
Arusha | Jun-14 | Appropriate technologies for sustainable energy in off-grid...
Arusha | Jun-14 | Appropriate technologies for sustainable energy in off-grid...Arusha | Jun-14 | Appropriate technologies for sustainable energy in off-grid...
Arusha | Jun-14 | Appropriate technologies for sustainable energy in off-grid...Smart Villages
 
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Micheal Le Havre
 
Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport ReportTransformNG
 
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar #MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar FMINigeria
 
Apett Presidential Lecture The National Network Of Highway Projects And The...
Apett Presidential Lecture   The National Network Of Highway Projects And The...Apett Presidential Lecture   The National Network Of Highway Projects And The...
Apett Presidential Lecture The National Network Of Highway Projects And The...ceal2005
 
Ppp case study in nigeria second niger bridge (world bank ppp mooc final pr...
Ppp case study in nigeria   second niger bridge (world bank ppp mooc final pr...Ppp case study in nigeria   second niger bridge (world bank ppp mooc final pr...
Ppp case study in nigeria second niger bridge (world bank ppp mooc final pr...toju_philip
 
Uganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperationUganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperationPolycarp Otieno Onyango
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Oswar Mungkasa
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)shrdcinfo
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Kachinga-Wankunda Phiri
 

Similar to Uganda rail (20)

Department of Transport update on transport corridors
Department of Transport update on transport corridorsDepartment of Transport update on transport corridors
Department of Transport update on transport corridors
 
#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory Administration
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
 
Arusha | Jun-14 | Appropriate technologies for sustainable energy in off-grid...
Arusha | Jun-14 | Appropriate technologies for sustainable energy in off-grid...Arusha | Jun-14 | Appropriate technologies for sustainable energy in off-grid...
Arusha | Jun-14 | Appropriate technologies for sustainable energy in off-grid...
 
CV - Hassan Ssentamu
CV - Hassan SsentamuCV - Hassan Ssentamu
CV - Hassan Ssentamu
 
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
 
Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport Report
 
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar #MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
 
Apett Presidential Lecture The National Network Of Highway Projects And The...
Apett Presidential Lecture   The National Network Of Highway Projects And The...Apett Presidential Lecture   The National Network Of Highway Projects And The...
Apett Presidential Lecture The National Network Of Highway Projects And The...
 
Smart city-Ahmedabad, Bhopal & Kakinada
Smart city-Ahmedabad, Bhopal & KakinadaSmart city-Ahmedabad, Bhopal & Kakinada
Smart city-Ahmedabad, Bhopal & Kakinada
 
Ppp case study in nigeria second niger bridge (world bank ppp mooc final pr...
Ppp case study in nigeria   second niger bridge (world bank ppp mooc final pr...Ppp case study in nigeria   second niger bridge (world bank ppp mooc final pr...
Ppp case study in nigeria second niger bridge (world bank ppp mooc final pr...
 
Uganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperationUganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperation
 
Roads
RoadsRoads
Roads
 
PMGSY
PMGSYPMGSY
PMGSY
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
 

More from Tristan Wiggill

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfTristan Wiggill
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfTristan Wiggill
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfTristan Wiggill
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfTristan Wiggill
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfTristan Wiggill
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfTristan Wiggill
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfTristan Wiggill
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?Tristan Wiggill
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority updateTristan Wiggill
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South AfricaTristan Wiggill
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Tristan Wiggill
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?Tristan Wiggill
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveTristan Wiggill
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentTristan Wiggill
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengTristan Wiggill
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTristan Wiggill
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel priceTristan Wiggill
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...Tristan Wiggill
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Tristan Wiggill
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Tristan Wiggill
 

More from Tristan Wiggill (20)

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdf
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdf
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdf
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdf
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdf
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdf
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdf
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority update
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South Africa
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspective
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in Gauteng
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangers
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel price
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC
 

Recently uploaded

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 

Recently uploaded (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 

Uganda rail

  • 1. AFRICA RAIL 2015 COUNTRY SPOTLIGHT - UGANDA Implementation of the Standard Gauge Railway in Uganda – Challenges and Opportunities Charles A Kateeba Uganda Railways Corporation June 2015 7/2/2015 Accelerating socio-economic transformation 1
  • 3. THE PROBLEM  LANDLOCKED COUNTRY  1000 KMS FROM NEAREST SEA PORT  POORLY DEVELOPED ROAD NETWORK  WEAK AIR SERVICE NETWORK  OUTDATED DILAPIDATED AND UNDER FUNDED RAILWAY NETWORK 7/2/2015 Accelerating socio-economic transformation 3
  • 4. CHALLENGES  SMALL AND FRAGMENTED NATIONAL ECONOMY LARGELY FINANCED BY EXTERNAL SOURCES  UNDEVELOPED NATIONAL AND FINANCIAL MARKETS  NEGATIVE INTERNATIONAL IMAGE DUE TO NATIONAL AND REGIONAL SECURITY  SMALL AND INCREMENTAL DEVELOPMENT MENTALITY 7/2/2015 Accelerating socio-economic transformation 4
  • 5. CURRENT STATUS OF EXISTING RAILWAY  NEARLY 120 YEARS OLD  DILAPIDATED AND OUTDATED TECHNOLOGY  UNRELIABLE SERVICES, UNSAFE, INEFFICIENT AND VERY COSTLY  ONLY 20% (250KM) OF EXISTING RAILWAY SYSTEM OPERATIONAL  INTERNATIONAL FREIGHT MARKET SHARE 5% OF 14.5 M (2014), DOWN FROM 15% IN 2004 7/2/2015 Accelerating socio-economic transformation 5
  • 7. CURRENT OPERATIONAL SITUATION  AVERAGE TRANSIT TIME FROM MOMBASA TO KAMPALA 6-10 DAYS (2014)  AVERAGE SPEED 15-25 KPH  MAX PAYLOAD 40 TEUS/TRAIN  DESIGN AXLE LOADING 18 TONNE/AXLE 7/2/2015 Accelerating socio-economic transformation 7
  • 8. CURRENT OPERATIONAL SITUATION  ROAD FREIGHT COST 16 USD CENTS PER TONNE-KM I.E. 5 TIMES WORLD AVERAGE  RAIL FREIGHT COST 10 USD CENTS PER TONNE-KM (RVR) COMPARED TO WORLD AVERAGE 3-5 US CENTS  LOSS TO ECONOMY OVER USD 1.2 BILLION PER YEAR IN TRANSPORT COSTS 7/2/2015 Accelerating socio-economic transformation 8
  • 9. CHOICES TO MAKE  REHABILITATE/ UPGRADE EXISTING LINE TO EXISTING STANDARDS  STEPPED UPGRADE AND CHANGE OF GAUGE TO UNIFIED STANDARD GAUGE  ADOPT APROPRIATE DEVELOPMENT STRATEGY  FIND DEVELOPMENT/FINANCING PARTNERS  ADOPT APROPRIATE PROCUREMENT AND PROJECT DEVELOPMENT METHOD 7/2/2015 Accelerating socio-economic transformation 9
  • 11. IMPLEMENTATION STRATEGY  REGIONAL APPROACH  DEVELOPMENT PROJECT RATHER THAN COMMERCIAL PROJECT  STATE (PUBLIC) FINANCED WITH PRIVATE CAPITAL BLENDING (PPP)  SEAMLESS OPERATION  TRANSIT ORIENTED DEVELOPMENT(SPATIAL DEVELOPMENT CORRIDOR) 7/2/2015 Accelerating socio-economic transformation 11
  • 12. SUMMIT DECISIONS  SEAMLESS RAILWAY TRANSPORT SYSTEM IN ALL FOUR NCIP COUNTRIES (KENYA, UGANDA, RWANDA AND SOUTH SUDAN)  HIGH CAPACITY, MODERN, SAFE, RELIABLE  CONCESSIONAL DEVELOPMENT FINANCING FROM CHINA AND ELSEWHERE  EPC/ TURNKEY (Method of Procurement) 7/2/2015 Accelerating socio-economic transformation 12
  • 13. SGR PROTOCOL  SIGNED ON MAY 11, 2014 IN NAIROBI  COMMITMENT BY PARTNER STATES TO SGR  SIMILAR RAILWAY STANDARDS AND SPECIFICATIONS  JOINT PLANNING, DEVELOPMENT AND OPERATION  JOINT MOBILIZATION OF FINANCIAL RESOURCES  INTEGRATED INSTITUTIONAL FRAMEWORK FOR DECISION MAKING  JOINT HUMAN RESOURCE DEVELOPMENT 7/2/2015 Accelerating socio-economic transformation 13
  • 15. Map of SGR 7/2/2015 Accelerating socio-economic transformation 15
  • 16. PROPOSED SGR SYSTEM  TOTAL ROUTE LENGTH IN UGANDA 1,614 KM  TRACK GAUGE “STANDARD” 1.435M  TRAILING LOAD 4,000 GROSS TONNES  FREIGHT PAYLOAD 216 TEUS  PASSENGER CAPACITY 960 PAX 7/2/2015 celerating socio-economic transformation 16
  • 17. TECHNICAL SPECIFICATIONS  GRADIENT MAXIMUM 1.2%  HORIZONTAL CURVATURE MINIMUM 800 TO 1200M  SPEED 120 KPH  AXLE LOAD 25 TONNE  LOADING GAUGE FOR DOUBLE STACKED CONTAINERS 7/2/2015 Accelerating socio-economic transformation 17
  • 18. TECHNICAL SPECIFICATIONS  LINE CAPACITY OVER 40 TRAINS/DAY  PRE-STRESSED CONCRETE SLEEPERS  LEVEL CROSSINGS-MINOR ROADS  ELECTRIC TRACTION – (25KV, AC-DC-AC) 7/2/2015 Accelerating socio-economic transformation 18
  • 19. TYPICAL TRACK SECTION Category Thickness ballast(uppe r layer) 30cm ballast(lowe r layer) 20cm Base 60cm Sub-base 190cm Base course variable 770cm 7/2/2015 Accelerating socio-economic transformation 19
  • 20. BENEFITS TO THE ECONOMY  REDUCED TRANSPORT COSTS FROM CURRENT 16 US CENTS (ROAD) TO BELOW 5 US CENTS (RAIL) PER TONNE-KM  REDUCED RAIL TRANSIT TIMES FROM MOMBASA TO KAMPALA FROM CURRENT 10 DAYS TO 1 DAY  REDUCED ROAD WEAR & TEAR  REDUCED TRANSPORTATION ENERGY (FUEL) CONSUMPTION BY 80%  REDUCED ROAD ACCIDENTS  REDUCED MOTOR VEHICLE EMISSIONS BY 72% 7/2/2015 Accelerating socio-economic transformation 20
  • 21. BENEFITS TO THE ECONOMY (CONT’D)  IMPROVED SAFETY  REDUCED ECONOMIC DRAG  INCREASED ECONOMIC ACTIVITY  ENHANCED REGIONAL INTEGRATION AND INTERNATIONAL TRADE  INTEGRATION OF UGANDA INTO WORLD MARKET AND TRADE 7/2/2015 Accelerating socio-economic transformation 21
  • 22. ECONOMIC BENEFITS  BENEFITS TO ECONOMY BY 2040 USD $118 BN  TRANSPORT COST SAVINGS USD $2 BN P.A 7/2/2015 Accelerating socio-economic transformation 22
  • 23. Phasing of the Project  Phase 1: I. MALABA-KAMPALA (EASTERN ROUTE) - 258KM II. TORORO-GULU-NIMULE WITH BRANCH FROM GULU - PAKWACH (NORTHERN ROUTE) 760KM  Phase 2: I. KAMPALA-BIHANGA-MIRAMA HILLS (SOUTHERN ROUTE) - 294KM II. BIHANGA-KASESE-MPONDWE (WESTERN ROUTE)– 377KM 7/2/2015 Accelerating socio-economic transformation 23
  • 24. CURRENT STATUS  EPC/TURNKEY CONTRACT SIGNED ON 30TH MARCH 2015 FOR EASTERN AND NORTHERN SGR ROUTES  PRELIMINARY WORKS COMMENCED JUNE 2015  PRELIMINARY ENGINEERING DESIGNS UNDERWAY ON THE WESTERN ROUTE  MOU SIGNED WITH CONTRACTOR MAY JUNE 2015  CONSTRUCTION PERIOD ESTIMATED 36 MONTHS  CONSTRUCTION PERIOD ESTIMATED 36 MONTHS 7/2/2015 Accelerating socio-economic transformation 24
  • 26. MAJOR COST AREAS  TOTAL LAND ESTIMATE 17,720 HECTARES  SUPER LARGE BRIDGES: TWO ACROSS RIVER NILE IN UGANDA I.E. JINJA (875M SPAN) AND PAKWACH (250M SPAN)  VIADUCTS AND SMALL BRIDGES: 33.8 KM IN UGANDA  TUNNELS: 7.6 KM IN UGANDA 7/2/2015 Accelerating socio-economic transformation 26
  • 27. TYPICAL TRACK SECTION Category Thickness ballast(uppe r layer) 30cm ballast(lowe r layer) 20cm Base 60cm Sub-base 190cm Base course variable 770cm 7/2/2015 Accelerating socio-economic transformation 27
  • 31. MAJOR COST AREAS  SUPER LARGE BRIDGES: TWO ACROSS RIVER NILE IN UGANDA I.E. JINJA (875M SPAN) AND PAKWACH (250M SPAN)  VIADUCTS AND SMALL BRIDGES: 33.8 KM  TUNNELS: 7.6 KM 7/2/2015 Accelerating socio-economic transformation 31
  • 32.  PROPOSED NEW SGR HQ COMPLEX IN KAMPALA 7/2/2015 Accelerating socio-economic transformation 32
  • 33. PROGRESS IN KENYA- VIADUCT (BRIDGE)PIERS 7/2/2015 Accelerating socio-economic transformation 33
  • 34. PROGRESS IN KENYA- CONCRETE SLEEPERS 7/2/2015 Accelerating socio-economic transformation 34
  • 35. KENYA PROGRESS-FABRICATING A BRIDGE BEAM/GIRDER 7/2/2015 Accelerating socio-economic transformation 35
  • 36. KENYA PROGRESS - DEMONSTRATION SECTION 7/2/2015 Accelerating socio-economic transformation 36
  • 37. BUSINESS & DEVELOPMENT OPPORTUNITIES  ROLLING STOCK LEASING  OPERATIONS AND MAINTENANCE  INDUSTRIAL, BUSINESS AND LEISURE PARKS  MINING AND MINERAL PROCESSING  PLANNED ACCOMMODATION 7/2/2015 Accelerating socio-economic transformation 37