2
2a
ALL TRW coils are required to show METRIC
WEIGHT and METRIC SIZE on the bottom
portion of the coil tag.
REL
12.15.15
GEN.SWI.045
WF/RC/JT
The following instruction details how to process TRW tagging. This instruction MUST be followed at all times unless deviation is granted by
Operations Manager or Quality Manager
Quality Standard Work Instruction
TRW SPECIAL TAGGING
Rev Level
Rev Date
Doc #
Author
Heidtman Steel-Butler Plant
ALL TRW coils are required to be packaged with a STICKER TAG on the OD
BAND at the 6 AND 12 O'CLOCK position. The COIL TAG BAG is to be
located at EITHER the 3 OR 9 O'CLOCK location
1
Verify that field 6-Actual Weight and field 9-Size are both in Metric
3
DO NOT write on the tag
bags or tags
4
Customer requires only ONE tag per bag.
Individually tag each coil on the skid

TRW SWI

  • 1.
    2 2a ALL TRW coilsare required to show METRIC WEIGHT and METRIC SIZE on the bottom portion of the coil tag. REL 12.15.15 GEN.SWI.045 WF/RC/JT The following instruction details how to process TRW tagging. This instruction MUST be followed at all times unless deviation is granted by Operations Manager or Quality Manager Quality Standard Work Instruction TRW SPECIAL TAGGING Rev Level Rev Date Doc # Author Heidtman Steel-Butler Plant ALL TRW coils are required to be packaged with a STICKER TAG on the OD BAND at the 6 AND 12 O'CLOCK position. The COIL TAG BAG is to be located at EITHER the 3 OR 9 O'CLOCK location 1 Verify that field 6-Actual Weight and field 9-Size are both in Metric 3 DO NOT write on the tag bags or tags 4 Customer requires only ONE tag per bag. Individually tag each coil on the skid