This call sheet is for the first day of a 3 day shoot for the film "The Big Film". The crew call time is 9am at the Beacon School location. Two scenes will be shot inside the front room and kitchen involving characters discovering a ring and revealing the truth about the ring. The cast call times are all 9am for makeup and being on set. No stand-ins are needed and the weather is forecast to be sunny with a high of 7 degrees Celsius.