FAQ: TotEM Total Enterprise Modelling
Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved.
What is TotEM and where is it used?
Overbeck Analitica's vision has been shaped by years of experience in analytics. As we have
watched the industry grow we have seen the capability of predictive analytic components grow
at a faster pace than organisations can implement and derive value from them.
Software suppliers have also underestimated the organisational and cultural challenges involved
in getting a predictive analytics project off the ground.
In response, Overbeck Analitica developed - a road map that placesTotal Enterprise Modelling
as much emphasis on creating the right organisational environment in which to use predictive
analytics, as it does on the enabling software.
The TotEMTM
roadmap works with your organisation as a whole to create a collaborative
environment across teams and departments by building consensus, connecting people, systems
and data to enable the predictive enterprise.
Water industry example
Let’s take an example from the water industry: flood prevention. Preventing floods depends on
having the right infrastructure assets (i.e. pipes), the right non-infrastructure assets (e.g. pumps)
and the right operations approach to deal with the media flowing down the pipes (e.g. regular
cleansing). All three need to work well to prevent floods: correctly specified and maintained
pipes and pumps and regular cleansing. The trouble is that there are many, thousand miles of
pipes, thousands of pumps to maintain and thousands of cleansing and unblocking activities to
be carried out every year.
In this example, the head of the pumps department was getting hassle because the pumps
needed very frequent unblocking. He said he suspected that there was nothing wrong with the
pumps, the problem was that there was insufficient money being allocated to cleansing and so
FAQ: TotEM Total Enterprise Modelling
Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved.
the media was becoming worse and blocking up the pumps. This all has huge financial and
emotional implications and raises numerous questions. Where do you best direct many millions
of pounds to prevent flooding of people’s property and beaches? Do you put it into more
cleansing or into different pumps or something else? What is the connection between cleansing
activity, media quality and pump unblocking? How do you even formulate the right business
question before you begin to enable the modelling of the data for these thousands of pumps
and miles of pipes?
This is where TotEMTM
comes in. CRISP-DM is used to tackle the modelling part of this problem
but it rarely challenges the business sufficiently to pinpoint the correct question to be asked.
What is involved with TotEM?
The TotEMTM
process begins with the experienced team at OA conducting a series of structured
interviews with senior execs. We know what’s really needed in order to begin a good CRISP-DM
modelling cycle and that is what we work towards through a series of interviews and
workshops. We then create recommendations that contain one or more carefully formed,
critical business questions. Each structured question enables a CRISP-DM modelling cycle to be
undertaken with questions that address very significant, previously untapped novel business
value. This approach ensures that we, together with our customer stakeholders, get the right
answer to the right question.
When is TotEMTM
not used?
TotEMTM
is extremely effective in situations where a complex business problem needs to be
tackled by several different departments and is used a lot with sophisticated data techniques
such as predictive analytics. It is not applicable where a defined set of information needs to be
delivered or structured for easier navigation, so we wouldn’t use it to deliver a dashboard or
develop a data warehouse for instance.
FAQ: TotEM Total Enterprise Modelling
Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved.
What can go wrong when a framework like TotEM is not used?
As an example of how costly modelling can be when a framework like TotEMTM
is not used,
consider what happened to a major international subscription media company. They had been
an early innovator in a rapidly growing market which then matured. They realised they were
losing customers to competitors who had entered the market later and they needed to do
something about it. Being a switched-on company they wanted to use their customer
behaviour data to help them decide what to do, so they formulated as their business question,
“How do we retain customers?”
With the aim of retaining customers, the company applied CRISP-DM and developed a
propensity model to apply differential treatments to different customers depending on their
different characteristics. At a practical level, they translated that into a set of different ways for
the customer service team to respond to different customers who rang up to cancel their
subscription. The campaign was very successful in that many customers were saved from
leaving. However, despite successful customer retention, the company’s profitability declined
sharply. The problem was that they were getting the right answer to the wrong question.
Why TotEM is more effective than a modelling methodology such as CRISP-DM
TotEMTM
asks more fundamental business questions before diving into data modelling. The
business issue for this company was not just to retain customers, but also to retain the right
customers and to help the others leave. Some customers are not profitable, but it can be hard
to spot them when you have millions of customers – hence the value of modelling.
Finding the right business question.
In this case the right business question derived from TotEMTM
turned out to be, “What is the
propensity of a customer to be saved?” This business question was identified through the
business-level engagement of TotEMTM
and it completely changed the subsequent modelling
approach. The right answer was now being sought to the right question.
The subsequent modelling using our enhanced form of CRISP-DM unearthed a significant group
of customers who were repeatedly threatening to leave and being given incentives to stay. This
was what made them unprofitable: they were freeloaders. The new model took this behaviour
into account and identified customers whose behaviour needed to be changed or else they
should be encouraged to leave. This is how TotEMTM
differs from using a pure modelling
approach such as CRISP-DM. Modelling frameworks ensures the right answer is achieved and
TotEMTM
additionally ensures it is the right answer to the right business question.
FAQ: TotEM Total Enterprise Modelling
Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved.
What is the TotEM staged delivery methodology?
Considering a TotEMTM
approach on Predictive Asset Management as an example, our staged
delivery methodology guarantees successful solution deployment. Starting with initial Proof of
Concept (Vision & Scope Study) to full solution roll out (Operate & Evolve Service) enabling asset
intensive organisations such as water, energy and manufacturing to shift their business
processes and maintenance systems from fail-and-fix to predict-and-prevent economic
maintenance regime.
Predictive Asset Management
… using …
Reliable, fit-for-purpose data
… from …
Optimised business processes
… delivering …
Reduced combined maintenance cost
and risk control preventing outages, loss and pollutions
… avoiding …
Business ‘Silo Effect’ constraints
FAQ: TotEM Total Enterprise Modelling
Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved.
What is TotEM weekly progress/status reporting?
A single point of contact, usually your appointed engagement or project manager overlooking all
TotEMTM
deliverables is publishing a two page summary weekly progress update report, tracking
the project from kick off to successfully steering the project to agreed deliverables on time and
on budget.
Our TotEMTM
data driven implementations are transparent and fully auditable receiving industry
wide recognition.

More Related Content

Similar to TotEM and CRISP-DM FAQ V6

2015 Guide to the “CMO Technology Blueprint for Midsize B2B Companies” Infogr...
2015 Guide to the “CMO Technology Blueprint for Midsize B2B Companies” Infogr...2015 Guide to the “CMO Technology Blueprint for Midsize B2B Companies” Infogr...
2015 Guide to the “CMO Technology Blueprint for Midsize B2B Companies” Infogr...
Gleanster Research
 
A talk on cloud computing
A talk on cloud computingA talk on cloud computing
A talk on cloud computing
Team Saral
 
The Strategic Route To E Procurement Success 2001
The Strategic Route To E Procurement Success 2001The Strategic Route To E Procurement Success 2001
The Strategic Route To E Procurement Success 2001
Julian Curtiss
 
The Data-To-Business bridge model for business development organizations
The Data-To-Business bridge model for business development organizationsThe Data-To-Business bridge model for business development organizations
The Data-To-Business bridge model for business development organizations
Mathieu Rioult
 
Modern EPM Solution and Why Businesses Must Adopt It_.pdf
Modern EPM Solution and Why Businesses Must Adopt It_.pdfModern EPM Solution and Why Businesses Must Adopt It_.pdf
Modern EPM Solution and Why Businesses Must Adopt It_.pdf
Anil
 
08 May07 The Role Of Bpm Within Large Enterprises &
08 May07 The Role Of Bpm Within Large Enterprises &08 May07 The Role Of Bpm Within Large Enterprises &
08 May07 The Role Of Bpm Within Large Enterprises &
MBA & Associates PL
 
Channel Marketing Automation – Key Risks IT Partners Must Manage To Succeed I...
Channel Marketing Automation – Key Risks IT Partners Must Manage To Succeed I...Channel Marketing Automation – Key Risks IT Partners Must Manage To Succeed I...
Channel Marketing Automation – Key Risks IT Partners Must Manage To Succeed I...
ZINFI Technologies, Inc.
 
Lean Management Journal Tata Business Excellence Model
Lean Management Journal Tata Business Excellence ModelLean Management Journal Tata Business Excellence Model
Lean Management Journal Tata Business Excellence Model
Fraser Wilkinson
 
Creating Optimized Business Relationships - Article #1
Creating Optimized Business Relationships - Article #1Creating Optimized Business Relationships - Article #1
Creating Optimized Business Relationships - Article #1
Lawrence Dillon
 
Pereira diamond benefits management model - Q&A
Pereira diamond benefits management model - Q&APereira diamond benefits management model - Q&A
Pereira diamond benefits management model - Q&A
Association for Project Management
 
Storm Topaz case study
Storm Topaz case studyStorm Topaz case study
Storm Topaz case study
Craig Ellis
 
Is It Time to Replace Your E/CTRM?
Is It Time to Replace Your E/CTRM?Is It Time to Replace Your E/CTRM?
Is It Time to Replace Your E/CTRM?
CTRM Center
 
Open it sm solutions final
Open it sm solutions   finalOpen it sm solutions   final
Open it sm solutions final
Rick Lemieux
 
CIO Applications Magazine Names Bardess One of the Top 25 ML Solution Providers
CIO Applications Magazine Names Bardess One of the Top 25 ML Solution ProvidersCIO Applications Magazine Names Bardess One of the Top 25 ML Solution Providers
CIO Applications Magazine Names Bardess One of the Top 25 ML Solution Providers
chrishems1
 
The Future Of CTMS - Survey Results - April 2013
The Future Of CTMS - Survey Results - April 2013The Future Of CTMS - Survey Results - April 2013
The Future Of CTMS - Survey Results - April 2013
Triumph Consultancy Services
 
Proactive Customer Service
Proactive Customer ServiceProactive Customer Service
Proactive Customer Service
RightNow Technologies
 
Customer Relationship Management Presented ByShan Gu Cris.docx
Customer Relationship Management Presented ByShan Gu Cris.docxCustomer Relationship Management Presented ByShan Gu Cris.docx
Customer Relationship Management Presented ByShan Gu Cris.docx
dorishigh
 
La trame business vccm english
La trame business vccm englishLa trame business vccm english
La trame business vccm english
René MANDEL
 
IT Strategic Planning (Case Studies)
IT Strategic Planning (Case Studies)IT Strategic Planning (Case Studies)
IT Strategic Planning (Case Studies)
Nurhazman Abdul Aziz
 
Top Ten Part 1
Top Ten Part 1Top Ten Part 1
Top Ten Part 1
mluisi
 

Similar to TotEM and CRISP-DM FAQ V6 (20)

2015 Guide to the “CMO Technology Blueprint for Midsize B2B Companies” Infogr...
2015 Guide to the “CMO Technology Blueprint for Midsize B2B Companies” Infogr...2015 Guide to the “CMO Technology Blueprint for Midsize B2B Companies” Infogr...
2015 Guide to the “CMO Technology Blueprint for Midsize B2B Companies” Infogr...
 
A talk on cloud computing
A talk on cloud computingA talk on cloud computing
A talk on cloud computing
 
The Strategic Route To E Procurement Success 2001
The Strategic Route To E Procurement Success 2001The Strategic Route To E Procurement Success 2001
The Strategic Route To E Procurement Success 2001
 
The Data-To-Business bridge model for business development organizations
The Data-To-Business bridge model for business development organizationsThe Data-To-Business bridge model for business development organizations
The Data-To-Business bridge model for business development organizations
 
Modern EPM Solution and Why Businesses Must Adopt It_.pdf
Modern EPM Solution and Why Businesses Must Adopt It_.pdfModern EPM Solution and Why Businesses Must Adopt It_.pdf
Modern EPM Solution and Why Businesses Must Adopt It_.pdf
 
08 May07 The Role Of Bpm Within Large Enterprises &
08 May07 The Role Of Bpm Within Large Enterprises &08 May07 The Role Of Bpm Within Large Enterprises &
08 May07 The Role Of Bpm Within Large Enterprises &
 
Channel Marketing Automation – Key Risks IT Partners Must Manage To Succeed I...
Channel Marketing Automation – Key Risks IT Partners Must Manage To Succeed I...Channel Marketing Automation – Key Risks IT Partners Must Manage To Succeed I...
Channel Marketing Automation – Key Risks IT Partners Must Manage To Succeed I...
 
Lean Management Journal Tata Business Excellence Model
Lean Management Journal Tata Business Excellence ModelLean Management Journal Tata Business Excellence Model
Lean Management Journal Tata Business Excellence Model
 
Creating Optimized Business Relationships - Article #1
Creating Optimized Business Relationships - Article #1Creating Optimized Business Relationships - Article #1
Creating Optimized Business Relationships - Article #1
 
Pereira diamond benefits management model - Q&A
Pereira diamond benefits management model - Q&APereira diamond benefits management model - Q&A
Pereira diamond benefits management model - Q&A
 
Storm Topaz case study
Storm Topaz case studyStorm Topaz case study
Storm Topaz case study
 
Is It Time to Replace Your E/CTRM?
Is It Time to Replace Your E/CTRM?Is It Time to Replace Your E/CTRM?
Is It Time to Replace Your E/CTRM?
 
Open it sm solutions final
Open it sm solutions   finalOpen it sm solutions   final
Open it sm solutions final
 
CIO Applications Magazine Names Bardess One of the Top 25 ML Solution Providers
CIO Applications Magazine Names Bardess One of the Top 25 ML Solution ProvidersCIO Applications Magazine Names Bardess One of the Top 25 ML Solution Providers
CIO Applications Magazine Names Bardess One of the Top 25 ML Solution Providers
 
The Future Of CTMS - Survey Results - April 2013
The Future Of CTMS - Survey Results - April 2013The Future Of CTMS - Survey Results - April 2013
The Future Of CTMS - Survey Results - April 2013
 
Proactive Customer Service
Proactive Customer ServiceProactive Customer Service
Proactive Customer Service
 
Customer Relationship Management Presented ByShan Gu Cris.docx
Customer Relationship Management Presented ByShan Gu Cris.docxCustomer Relationship Management Presented ByShan Gu Cris.docx
Customer Relationship Management Presented ByShan Gu Cris.docx
 
La trame business vccm english
La trame business vccm englishLa trame business vccm english
La trame business vccm english
 
IT Strategic Planning (Case Studies)
IT Strategic Planning (Case Studies)IT Strategic Planning (Case Studies)
IT Strategic Planning (Case Studies)
 
Top Ten Part 1
Top Ten Part 1Top Ten Part 1
Top Ten Part 1
 

More from Ralph Overbeck

OA real time personalisation and recommendations engine strategy
OA real time personalisation and recommendations engine strategyOA real time personalisation and recommendations engine strategy
OA real time personalisation and recommendations engine strategy
Ralph Overbeck
 
OA predicta net week data360 predictive analytics ralph overbeck published
OA predicta net week data360 predictive analytics ralph overbeck publishedOA predicta net week data360 predictive analytics ralph overbeck published
OA predicta net week data360 predictive analytics ralph overbeck published
Ralph Overbeck
 
oa predictive asset management executive briefing v20
oa predictive asset management executive briefing v20oa predictive asset management executive briefing v20
oa predictive asset management executive briefing v20
Ralph Overbeck
 
oa aodghub predictive analytics on demand brochure v1
oa aodghub predictive analytics on demand brochure v1oa aodghub predictive analytics on demand brochure v1
oa aodghub predictive analytics on demand brochure v1
Ralph Overbeck
 
Predictive asset management summary italian v1
Predictive asset management summary italian v1Predictive asset management summary italian v1
Predictive asset management summary italian v1
Ralph Overbeck
 
PAM Case Study 3 - Flooding Risk V1
 PAM Case Study 3 - Flooding Risk V1 PAM Case Study 3 - Flooding Risk V1
PAM Case Study 3 - Flooding Risk V1
Ralph Overbeck
 
PAM Case Study 2 Revenue Protection V1
PAM Case Study 2 Revenue Protection V1PAM Case Study 2 Revenue Protection V1
PAM Case Study 2 Revenue Protection V1
Ralph Overbeck
 
PAM Case Study 1 - Predictive Maintenance V1
PAM Case Study 1 - Predictive Maintenance V1PAM Case Study 1 - Predictive Maintenance V1
PAM Case Study 1 - Predictive Maintenance V1
Ralph Overbeck
 
PAM software guide V12
PAM software guide V12PAM software guide V12
PAM software guide V12
Ralph Overbeck
 
Tm forum live2016 - getting smart about city assets - published
Tm forum live2016 - getting smart about city assets - publishedTm forum live2016 - getting smart about city assets - published
Tm forum live2016 - getting smart about city assets - published
Ralph Overbeck
 
PAM solution architecture with example use cases v8
PAM solution architecture with example use cases v8PAM solution architecture with example use cases v8
PAM solution architecture with example use cases v8
Ralph Overbeck
 

More from Ralph Overbeck (11)

OA real time personalisation and recommendations engine strategy
OA real time personalisation and recommendations engine strategyOA real time personalisation and recommendations engine strategy
OA real time personalisation and recommendations engine strategy
 
OA predicta net week data360 predictive analytics ralph overbeck published
OA predicta net week data360 predictive analytics ralph overbeck publishedOA predicta net week data360 predictive analytics ralph overbeck published
OA predicta net week data360 predictive analytics ralph overbeck published
 
oa predictive asset management executive briefing v20
oa predictive asset management executive briefing v20oa predictive asset management executive briefing v20
oa predictive asset management executive briefing v20
 
oa aodghub predictive analytics on demand brochure v1
oa aodghub predictive analytics on demand brochure v1oa aodghub predictive analytics on demand brochure v1
oa aodghub predictive analytics on demand brochure v1
 
Predictive asset management summary italian v1
Predictive asset management summary italian v1Predictive asset management summary italian v1
Predictive asset management summary italian v1
 
PAM Case Study 3 - Flooding Risk V1
 PAM Case Study 3 - Flooding Risk V1 PAM Case Study 3 - Flooding Risk V1
PAM Case Study 3 - Flooding Risk V1
 
PAM Case Study 2 Revenue Protection V1
PAM Case Study 2 Revenue Protection V1PAM Case Study 2 Revenue Protection V1
PAM Case Study 2 Revenue Protection V1
 
PAM Case Study 1 - Predictive Maintenance V1
PAM Case Study 1 - Predictive Maintenance V1PAM Case Study 1 - Predictive Maintenance V1
PAM Case Study 1 - Predictive Maintenance V1
 
PAM software guide V12
PAM software guide V12PAM software guide V12
PAM software guide V12
 
Tm forum live2016 - getting smart about city assets - published
Tm forum live2016 - getting smart about city assets - publishedTm forum live2016 - getting smart about city assets - published
Tm forum live2016 - getting smart about city assets - published
 
PAM solution architecture with example use cases v8
PAM solution architecture with example use cases v8PAM solution architecture with example use cases v8
PAM solution architecture with example use cases v8
 

Recently uploaded

一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
xclpvhuk
 
Jio cinema Retention & Engagement Strategy.pdf
Jio cinema Retention & Engagement Strategy.pdfJio cinema Retention & Engagement Strategy.pdf
Jio cinema Retention & Engagement Strategy.pdf
inaya7568
 
一比一原版爱尔兰都柏林大学毕业证(本硕)ucd学位证书如何办理
一比一原版爱尔兰都柏林大学毕业证(本硕)ucd学位证书如何办理一比一原版爱尔兰都柏林大学毕业证(本硕)ucd学位证书如何办理
一比一原版爱尔兰都柏林大学毕业证(本硕)ucd学位证书如何办理
hqfek
 
[VCOSA] Monthly Report - Cotton & Yarn Statistics March 2024
[VCOSA] Monthly Report - Cotton & Yarn Statistics March 2024[VCOSA] Monthly Report - Cotton & Yarn Statistics March 2024
[VCOSA] Monthly Report - Cotton & Yarn Statistics March 2024
Vietnam Cotton & Spinning Association
 
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
hyfjgavov
 
一比一原版(曼大毕业证书)曼尼托巴大学毕业证如何办理
一比一原版(曼大毕业证书)曼尼托巴大学毕业证如何办理一比一原版(曼大毕业证书)曼尼托巴大学毕业证如何办理
一比一原版(曼大毕业证书)曼尼托巴大学毕业证如何办理
ytypuem
 
一比一原版南十字星大学毕业证(SCU毕业证书)学历如何办理
一比一原版南十字星大学毕业证(SCU毕业证书)学历如何办理一比一原版南十字星大学毕业证(SCU毕业证书)学历如何办理
一比一原版南十字星大学毕业证(SCU毕业证书)学历如何办理
slg6lamcq
 
一比一原版澳洲西澳大学毕业证(uwa毕业证书)如何办理
一比一原版澳洲西澳大学毕业证(uwa毕业证书)如何办理一比一原版澳洲西澳大学毕业证(uwa毕业证书)如何办理
一比一原版澳洲西澳大学毕业证(uwa毕业证书)如何办理
aguty
 
一比一原版美国帕森斯设计学院毕业证(parsons毕业证书)如何办理
一比一原版美国帕森斯设计学院毕业证(parsons毕业证书)如何办理一比一原版美国帕森斯设计学院毕业证(parsons毕业证书)如何办理
一比一原版美国帕森斯设计学院毕业证(parsons毕业证书)如何办理
asyed10
 
The Ipsos - AI - Monitor 2024 Report.pdf
The  Ipsos - AI - Monitor 2024 Report.pdfThe  Ipsos - AI - Monitor 2024 Report.pdf
The Ipsos - AI - Monitor 2024 Report.pdf
Social Samosa
 
Sample Devops SRE Product Companies .pdf
Sample Devops SRE  Product Companies .pdfSample Devops SRE  Product Companies .pdf
Sample Devops SRE Product Companies .pdf
Vineet
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
bmucuha
 
社内勉強会資料_Hallucination of LLMs               .
社内勉強会資料_Hallucination of LLMs               .社内勉強会資料_Hallucination of LLMs               .
社内勉強会資料_Hallucination of LLMs               .
NABLAS株式会社
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
ihavuls
 
UofT毕业证如何办理
UofT毕业证如何办理UofT毕业证如何办理
UofT毕业证如何办理
exukyp
 
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
nyfuhyz
 
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docxDATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
SaffaIbrahim1
 
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
mkkikqvo
 
DSSML24_tspann_CodelessGenerativeAIPipelines
DSSML24_tspann_CodelessGenerativeAIPipelinesDSSML24_tspann_CodelessGenerativeAIPipelines
DSSML24_tspann_CodelessGenerativeAIPipelines
Timothy Spann
 
Template xxxxxxxx ssssssssssss Sertifikat.pptx
Template xxxxxxxx ssssssssssss Sertifikat.pptxTemplate xxxxxxxx ssssssssssss Sertifikat.pptx
Template xxxxxxxx ssssssssssss Sertifikat.pptx
TeukuEriSyahputra
 

Recently uploaded (20)

一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
 
Jio cinema Retention & Engagement Strategy.pdf
Jio cinema Retention & Engagement Strategy.pdfJio cinema Retention & Engagement Strategy.pdf
Jio cinema Retention & Engagement Strategy.pdf
 
一比一原版爱尔兰都柏林大学毕业证(本硕)ucd学位证书如何办理
一比一原版爱尔兰都柏林大学毕业证(本硕)ucd学位证书如何办理一比一原版爱尔兰都柏林大学毕业证(本硕)ucd学位证书如何办理
一比一原版爱尔兰都柏林大学毕业证(本硕)ucd学位证书如何办理
 
[VCOSA] Monthly Report - Cotton & Yarn Statistics March 2024
[VCOSA] Monthly Report - Cotton & Yarn Statistics March 2024[VCOSA] Monthly Report - Cotton & Yarn Statistics March 2024
[VCOSA] Monthly Report - Cotton & Yarn Statistics March 2024
 
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
 
一比一原版(曼大毕业证书)曼尼托巴大学毕业证如何办理
一比一原版(曼大毕业证书)曼尼托巴大学毕业证如何办理一比一原版(曼大毕业证书)曼尼托巴大学毕业证如何办理
一比一原版(曼大毕业证书)曼尼托巴大学毕业证如何办理
 
一比一原版南十字星大学毕业证(SCU毕业证书)学历如何办理
一比一原版南十字星大学毕业证(SCU毕业证书)学历如何办理一比一原版南十字星大学毕业证(SCU毕业证书)学历如何办理
一比一原版南十字星大学毕业证(SCU毕业证书)学历如何办理
 
一比一原版澳洲西澳大学毕业证(uwa毕业证书)如何办理
一比一原版澳洲西澳大学毕业证(uwa毕业证书)如何办理一比一原版澳洲西澳大学毕业证(uwa毕业证书)如何办理
一比一原版澳洲西澳大学毕业证(uwa毕业证书)如何办理
 
一比一原版美国帕森斯设计学院毕业证(parsons毕业证书)如何办理
一比一原版美国帕森斯设计学院毕业证(parsons毕业证书)如何办理一比一原版美国帕森斯设计学院毕业证(parsons毕业证书)如何办理
一比一原版美国帕森斯设计学院毕业证(parsons毕业证书)如何办理
 
The Ipsos - AI - Monitor 2024 Report.pdf
The  Ipsos - AI - Monitor 2024 Report.pdfThe  Ipsos - AI - Monitor 2024 Report.pdf
The Ipsos - AI - Monitor 2024 Report.pdf
 
Sample Devops SRE Product Companies .pdf
Sample Devops SRE  Product Companies .pdfSample Devops SRE  Product Companies .pdf
Sample Devops SRE Product Companies .pdf
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
 
社内勉強会資料_Hallucination of LLMs               .
社内勉強会資料_Hallucination of LLMs               .社内勉強会資料_Hallucination of LLMs               .
社内勉強会資料_Hallucination of LLMs               .
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
UofT毕业证如何办理
UofT毕业证如何办理UofT毕业证如何办理
UofT毕业证如何办理
 
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
 
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docxDATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
 
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
 
DSSML24_tspann_CodelessGenerativeAIPipelines
DSSML24_tspann_CodelessGenerativeAIPipelinesDSSML24_tspann_CodelessGenerativeAIPipelines
DSSML24_tspann_CodelessGenerativeAIPipelines
 
Template xxxxxxxx ssssssssssss Sertifikat.pptx
Template xxxxxxxx ssssssssssss Sertifikat.pptxTemplate xxxxxxxx ssssssssssss Sertifikat.pptx
Template xxxxxxxx ssssssssssss Sertifikat.pptx
 

TotEM and CRISP-DM FAQ V6

  • 1. FAQ: TotEM Total Enterprise Modelling Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved. What is TotEM and where is it used? Overbeck Analitica's vision has been shaped by years of experience in analytics. As we have watched the industry grow we have seen the capability of predictive analytic components grow at a faster pace than organisations can implement and derive value from them. Software suppliers have also underestimated the organisational and cultural challenges involved in getting a predictive analytics project off the ground. In response, Overbeck Analitica developed - a road map that placesTotal Enterprise Modelling as much emphasis on creating the right organisational environment in which to use predictive analytics, as it does on the enabling software. The TotEMTM roadmap works with your organisation as a whole to create a collaborative environment across teams and departments by building consensus, connecting people, systems and data to enable the predictive enterprise. Water industry example Let’s take an example from the water industry: flood prevention. Preventing floods depends on having the right infrastructure assets (i.e. pipes), the right non-infrastructure assets (e.g. pumps) and the right operations approach to deal with the media flowing down the pipes (e.g. regular cleansing). All three need to work well to prevent floods: correctly specified and maintained pipes and pumps and regular cleansing. The trouble is that there are many, thousand miles of pipes, thousands of pumps to maintain and thousands of cleansing and unblocking activities to be carried out every year. In this example, the head of the pumps department was getting hassle because the pumps needed very frequent unblocking. He said he suspected that there was nothing wrong with the pumps, the problem was that there was insufficient money being allocated to cleansing and so
  • 2. FAQ: TotEM Total Enterprise Modelling Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved. the media was becoming worse and blocking up the pumps. This all has huge financial and emotional implications and raises numerous questions. Where do you best direct many millions of pounds to prevent flooding of people’s property and beaches? Do you put it into more cleansing or into different pumps or something else? What is the connection between cleansing activity, media quality and pump unblocking? How do you even formulate the right business question before you begin to enable the modelling of the data for these thousands of pumps and miles of pipes? This is where TotEMTM comes in. CRISP-DM is used to tackle the modelling part of this problem but it rarely challenges the business sufficiently to pinpoint the correct question to be asked. What is involved with TotEM? The TotEMTM process begins with the experienced team at OA conducting a series of structured interviews with senior execs. We know what’s really needed in order to begin a good CRISP-DM modelling cycle and that is what we work towards through a series of interviews and workshops. We then create recommendations that contain one or more carefully formed, critical business questions. Each structured question enables a CRISP-DM modelling cycle to be undertaken with questions that address very significant, previously untapped novel business value. This approach ensures that we, together with our customer stakeholders, get the right answer to the right question. When is TotEMTM not used? TotEMTM is extremely effective in situations where a complex business problem needs to be tackled by several different departments and is used a lot with sophisticated data techniques such as predictive analytics. It is not applicable where a defined set of information needs to be delivered or structured for easier navigation, so we wouldn’t use it to deliver a dashboard or develop a data warehouse for instance.
  • 3. FAQ: TotEM Total Enterprise Modelling Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved. What can go wrong when a framework like TotEM is not used? As an example of how costly modelling can be when a framework like TotEMTM is not used, consider what happened to a major international subscription media company. They had been an early innovator in a rapidly growing market which then matured. They realised they were losing customers to competitors who had entered the market later and they needed to do something about it. Being a switched-on company they wanted to use their customer behaviour data to help them decide what to do, so they formulated as their business question, “How do we retain customers?” With the aim of retaining customers, the company applied CRISP-DM and developed a propensity model to apply differential treatments to different customers depending on their different characteristics. At a practical level, they translated that into a set of different ways for the customer service team to respond to different customers who rang up to cancel their subscription. The campaign was very successful in that many customers were saved from leaving. However, despite successful customer retention, the company’s profitability declined sharply. The problem was that they were getting the right answer to the wrong question. Why TotEM is more effective than a modelling methodology such as CRISP-DM TotEMTM asks more fundamental business questions before diving into data modelling. The business issue for this company was not just to retain customers, but also to retain the right customers and to help the others leave. Some customers are not profitable, but it can be hard to spot them when you have millions of customers – hence the value of modelling. Finding the right business question. In this case the right business question derived from TotEMTM turned out to be, “What is the propensity of a customer to be saved?” This business question was identified through the business-level engagement of TotEMTM and it completely changed the subsequent modelling approach. The right answer was now being sought to the right question. The subsequent modelling using our enhanced form of CRISP-DM unearthed a significant group of customers who were repeatedly threatening to leave and being given incentives to stay. This was what made them unprofitable: they were freeloaders. The new model took this behaviour into account and identified customers whose behaviour needed to be changed or else they should be encouraged to leave. This is how TotEMTM differs from using a pure modelling approach such as CRISP-DM. Modelling frameworks ensures the right answer is achieved and TotEMTM additionally ensures it is the right answer to the right business question.
  • 4. FAQ: TotEM Total Enterprise Modelling Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved. What is the TotEM staged delivery methodology? Considering a TotEMTM approach on Predictive Asset Management as an example, our staged delivery methodology guarantees successful solution deployment. Starting with initial Proof of Concept (Vision & Scope Study) to full solution roll out (Operate & Evolve Service) enabling asset intensive organisations such as water, energy and manufacturing to shift their business processes and maintenance systems from fail-and-fix to predict-and-prevent economic maintenance regime. Predictive Asset Management … using … Reliable, fit-for-purpose data … from … Optimised business processes … delivering … Reduced combined maintenance cost and risk control preventing outages, loss and pollutions … avoiding … Business ‘Silo Effect’ constraints
  • 5. FAQ: TotEM Total Enterprise Modelling Confidential. Copyright © 2015 Overbeck Analitica, All Rights Reserved. What is TotEM weekly progress/status reporting? A single point of contact, usually your appointed engagement or project manager overlooking all TotEMTM deliverables is publishing a two page summary weekly progress update report, tracking the project from kick off to successfully steering the project to agreed deliverables on time and on budget. Our TotEMTM data driven implementations are transparent and fully auditable receiving industry wide recognition.