Why a campus re-design?Updated landscaping is more than just pretty…IMPROVED SAFETY:  New busing set up with a more direct line to the school entranceImproved bus unloading and loadingIMPROVED UTILIZATION:  New spaces for outdoor classes New spaces for social eventsIMPROVED VALUE:  Our school is a reflection of our communityImproved design will increase usageIncreased usage will improve the value of the community and the homes in it.And we’re due… only funding in 12 years was for the new roof!
We are among the BEST… but do we look the part? .
Deteriorating School Sign
Picket Fence Destroyed by VandalismWhat message are we sending to prospective home buyers?
.
…but the impact of the redesigned campus will go beyond the obvious.
A better environment for our students of course, but also a better center for our community too…
Better 4th of July…
Better Venue for Scouts, Sports, Theater and family events…
Better Super Games…
Better Design!The Proposed Campus Re-Design 2011 At a Glance
Design GoalsIMPROVED SAFETY:  New busing set up with a more direct line to the school entranceImproved bus unloading and loadingIMPROVED UTILIZATION:  New spaces for outdoor classes New spaces for social eventsIMPROVED VALUE:  Our school is a reflection of our communityImproved design will increase usageIncreased usage will improve the value of the community and the homes in it.
Improved SafetyPrimary Safety Concerns:Bus Loading Area, Traffic Patterns
Neglected Wetlands
VandalismImproved SafetySafety-busing policy“Vehicles or gas-powered equipment, with the exception of vehicles used by the school for student transportation, shall NOT idle near outside air intakes, building ENTRANCES or exits or where students are loading and unloading.”Grounds and Building Exterior ChecklistCurrently the children walk past a line of running cars to get from the buses into the school every day.
Improved SafetyNew Drop-Off Starting Fall 2011Buses park (and turn engines off) right in frontParent picking up/dropping off line up along Candlewood (where the buses used to line up)New crosswalk and lighting
Improved UtilizationNew Gathering Places,  Planting OpportunitiesLow walls/benches will provide gathering places for teachers to hold class outside.Raised beds will provide areas for the seasonal plantings for teachers to use.
Improved UtilizationNew Gathering PlacesBenches/picnic tables in back for outdoor classrooms and community “playground”
Improved UtilizationOutdoor Land LabLand lab announces that this is school property, and brings learning to life…
Improved UtilizationAdditional Playing Fields, Updated Ball Diamond
Improved Utilization13 More Parking Spaces
Improved UtilizationWhat a first impression!Front Entrance
How much will it cost?All questions regarding cost will be filtered through the PTA executive board.  The community has an open invitation to come to every meeting.   Bond money is already slated for certain aspects of our design like capital improvements.
When will all of this happen?  Timing and phasing to be determined.
We can do as much or as little at a time depending on interest level and/or budget.Let’s shoot from a different angle for the 2011-2012 Yearbook…

Thinking outside the box 5 25-11

  • 2.
    Why a campusre-design?Updated landscaping is more than just pretty…IMPROVED SAFETY: New busing set up with a more direct line to the school entranceImproved bus unloading and loadingIMPROVED UTILIZATION: New spaces for outdoor classes New spaces for social eventsIMPROVED VALUE: Our school is a reflection of our communityImproved design will increase usageIncreased usage will improve the value of the community and the homes in it.And we’re due… only funding in 12 years was for the new roof!
  • 3.
    We are amongthe BEST… but do we look the part? .
  • 4.
  • 5.
    Picket Fence Destroyedby VandalismWhat message are we sending to prospective home buyers?
  • 6.
  • 7.
    …but the impactof the redesigned campus will go beyond the obvious.
  • 8.
    A better environmentfor our students of course, but also a better center for our community too…
  • 9.
  • 10.
    Better Venue forScouts, Sports, Theater and family events…
  • 11.
  • 12.
    Better Design!The ProposedCampus Re-Design 2011 At a Glance
  • 13.
    Design GoalsIMPROVED SAFETY: New busing set up with a more direct line to the school entranceImproved bus unloading and loadingIMPROVED UTILIZATION: New spaces for outdoor classes New spaces for social eventsIMPROVED VALUE: Our school is a reflection of our communityImproved design will increase usageIncreased usage will improve the value of the community and the homes in it.
  • 14.
    Improved SafetyPrimary SafetyConcerns:Bus Loading Area, Traffic Patterns
  • 15.
  • 16.
    VandalismImproved SafetySafety-busing policy“Vehiclesor gas-powered equipment, with the exception of vehicles used by the school for student transportation, shall NOT idle near outside air intakes, building ENTRANCES or exits or where students are loading and unloading.”Grounds and Building Exterior ChecklistCurrently the children walk past a line of running cars to get from the buses into the school every day.
  • 17.
    Improved SafetyNew Drop-OffStarting Fall 2011Buses park (and turn engines off) right in frontParent picking up/dropping off line up along Candlewood (where the buses used to line up)New crosswalk and lighting
  • 18.
    Improved UtilizationNew GatheringPlaces, Planting OpportunitiesLow walls/benches will provide gathering places for teachers to hold class outside.Raised beds will provide areas for the seasonal plantings for teachers to use.
  • 19.
    Improved UtilizationNew GatheringPlacesBenches/picnic tables in back for outdoor classrooms and community “playground”
  • 20.
    Improved UtilizationOutdoor LandLabLand lab announces that this is school property, and brings learning to life…
  • 21.
    Improved UtilizationAdditional PlayingFields, Updated Ball Diamond
  • 22.
  • 23.
    Improved UtilizationWhat afirst impression!Front Entrance
  • 25.
    How much willit cost?All questions regarding cost will be filtered through the PTA executive board. The community has an open invitation to come to every meeting. Bond money is already slated for certain aspects of our design like capital improvements.
  • 26.
    When will allof this happen? Timing and phasing to be determined.
  • 27.
    We can doas much or as little at a time depending on interest level and/or budget.Let’s shoot from a different angle for the 2011-2012 Yearbook…