The Urban Grocery Store
Moderator Steven M. Duffy – Cuhaci & Peterson
MEP Engineering Joe Keene - Cuhaci & Peterson
Urban Planner Geoff Fitzgerald – BL Companies
Construction Joseph Venie – cm&b
Store Environments Chris Studach – KRS
StevenDuffy
Moderator
VPGrocery
Cuhaci&Peterson
JoeKeene
MEPEngineering
VPEngineering
Cuhaci&Peterson
Our Panel
GeoffFitzgerald
UrbanPlanning
Principal
BLCompanies
Chris Studach
Store Environments
creativedirector
KRS
Joseph Venie
ConstructionManagement
Sr.VicePresident
cm&b
Addresses the complexity of store format, design, construction and regulatory trends
With the advent of increased urbanization of our downtowns, retail grocers and developers have
responded to the opportunity with “the urban grocery store.” This session will review the challenges
and opportunities of downtown store environments, including entitlements, planning, engineering,
construction, parking and operational needs. Downtown markets are expanding in number, and are
increasingly more complex – and more expensive. We will feature mixed use tenancy of residential,
retail, commercial and parking. The project design and approval process is complex and protracted,
requiring an adept team to deploy and construct these projects. Join us for an insightful discussion
on urban grocery and get a realistic understanding of the necessary resources to successfully
deploy this type of store.
The Urban Grocery Store Tuesday, September 29, 2015
 Develop a realistic understanding of resources necessary to
successfully deploy this project type.
 Discuss the project complexities and regulatory hurdles to overcome.
 Consider project scheduling and entitlement process.
 Project benefits & incentives.
 Understand the construction cost drivers
Learning Objectives
Who’s on your team ?
Developer
 RE team / Legal / Special Land Use / Special consultants
 Urban Planner / Civil / Expeditors / Traffic / Noise / Environmental Impact reporting
 Project Designer / AOR – Architecture / Shell
 CM – overall Project Management to develop shell and coordinate TI
City – Public
 Development / Planning / Boards / Building / Health … Public Buy-in
Grocer
 Real Estate / Legal / Executive Leadership
 Store Planning / Procurement EQ
 Merchandising
 Operations / Safety / IT
 Facilities
 Grocer Architect of Record TI (AOR)
 PM / CM – TI
 Store Environments + Branding – Décor / Marketing / Signage
Typology 1
Low Rise – small downtown
 Primary Sales Area – Ground floor
 Parking – Ground / Roof top
 Loading / service areas– Shielded from street
 Support spaces – Mezzanine or below grade
Building Section
Typology 2
 Occupied floors above grocery -
residential above cause a “plumbing
intensive zone above Grocery ”.
Multi-Story
Residential above
Grocery Store Retail Spaces
Ground floor
Residential
Spaces above
Apartments
Grocery
MEP Zone
Building Section
Typology 3
Structure conversion to a
grocery store
Above the grocery are
parking deck levels and above
that are Residential units
BOH
Receiving Area’s
MEP Mezzanine – (Free air)
Residential units
DWV Piping
Residential
Units
Kitchen
Exhaust
Systems
Refrigeration House
Mezzanine Area
Parking Deck
Levels
Structure conversion
to main grocery sales floor
Parking Deck
Elevators
Residential
Elevators
New Lower Level Sales Area
Building Section
“Urban” Store Planning – Geoffrey Fitzgerald, BL Companies
DRAFT IMAGES
Some Urban Grocery Developments are More “Urban” than Others
DRAFT IMAGES
Some are a little less “Urban”
DRAFT IS
Some combine elements of both: Suburban typology in an Urban location
DRAFT IS
56k SF Supermarket with
Parking for 200 cars
Former Industrial/mfg
site requires rezoning
to allow retail/grocery
Significant Environmental
cleanup required
Green Infrastructure
investment can help advance
entitlement process
True Urban Grocery Stores retrofit nicely into former Department Store Space
DRAFT IS
Former Filenes
Now Roche Bros.
Photo credit: www.bostonherald.com
Appropriate Scale and Massing of Building assists in Place Making
Site Planning Considerations in the Pedestrian Realm
Broad Sidewalks
Pedestrian-scale
lighting
Active Building Facade
Windows & Awnings
Passive
Accessibility
Bicycle Racks
Grab n Go
Outdoor Seating
Site Planning Considerations (cont’d)
Bus Stop
Street Trees
Vertical Landscape
Elements – Maintains
Street Line
Outparcel Development –
Maintains Street Line
Pedestrian-scale Lighting
for Safety
Scale and Massing: Corner Outparcel Building
PLACEMAKING: Small buildings can be HUGE in helping define the urban street edge and screen parking.
• Amenities (benches, transit waiting areas, etc.) are comfortable and conveniently located.
Parking Considerations:
 This is America – People Drive Cars!
DRAFT IMAGES
 In Urban context, emphasis is on pedestrians, not cars
Parking Considerations
 Alternative Parking solutions:
DRAFT IMAGES
Rooftop Parking
Structured Parking
Parking Considerations
 Alternative Parking solutions:
DRAFT IMAGES
West Hartford, CT
Parking Level Below Store
Planning Considerations
 Average Ground Floor Area’s 18K – 30K
 Footprints are without exception non-prototypical & may not be rectangular
 Limited ground sales floor require additional sales area on separate floor or mezzanine
 Many locations feature mezzanines (sales + seating + support) or below grade support area’s
 Floor to ceiling heights are critical allowing for sufficient clearances / coordination of S/MEP
 Occupied floors above grocery – many cases these are residential that are “plumbing intensive”.
 Cost to build in a downtown environment are much higher – Labor / materials transit…
3Square (Urban Grocery of the Near Future)
3Square (Urban Grocery of the Near Future)
3Square (Urban Grocery of the Near Future)
3Square (Urban Grocery of the Near Future)
Green Zebra
Green Zebra
Green Zebra
Green Zebra
Capital Strategy - Ukraine
Capital Strategy - Ukraine
Capital Strategy - Ukraine
Role of the Construction Manager
 Understands the unique complexities of food store
construction
 Prepares detailed project development schedules
 Provides responsible budgeting
 Anticipates potential roadblocks
 Minimizes exposures/surprises/risks
 Manages owner’s expectations & tests them
against budget
Effective Pre-Construction Planning
 Cumbersome and multi-faceted
permitting/approval processes
 Long lead time items
 Environmental remediation & testing
 Special inspections (EPA & DEP)
 City-wide holiday impact (Gridlock Alerts &
material/equipment delivery)
 Off-hours construction
 Working around existing building tenants
Scheduling Impacts
Urban Grocery Building Types
Logistical Challenges
Interior Fit-Out Construction
Site Challenges
Ground-Up Construction
Limited Staging Area
Congestion/Site Accessibility
Site Perimeter Safety/Compliance
Working in Occupied Buildings
Specialized Foundation Construction
Environmental/Soils Remediation
Site Perimeter Safety/Compliance
Seismic Monitoring
Urban Logistical Challenges:
Compliance/Approvals
 Dept. of Buildings (DOB)
 New York City Dept. of Transportation (NYDOT)
 Building Enforcement Safety Team (BEST Squad)
 FDNY
 Use of a Qualified Expeditor
 Use of TCO for Occupancy
 Need for shanties for individual trades
 Vertical Transportation Operation
 Work hours
 PLA (Project Labor Agreement)
Urban Logistical Challenges:
Labor Relations
 Limited staging/lay down/receiving area & off-hour
deliveries
 Working within occupied buildings
 Limited work area
 Debris storage
Urban Logistical Challenges:
Congestion
Site Challenges:
Site Accessibility
 Sidewalk enclosures
 Material delivery
 Hoisting
 Rooftop Equipment Rigging
 Zero lot line constructability
Site Challenges:
Site Safety & Protection
 Vibration monitoring of adjacent buildings
• Daily seismic monitoring
• Monthly survey points for building
settlement
 Site safety compliance
• Signage
• Lighting
• Security Guards
 Specialized foundation construction
 Management of potential site hazards
 Soils remediation
 Soil disposal/management of unsuitable soils
 Dewatering
Site Challenges:
Urban Fill
Major Cost Drivers
Unique Foundation Construction
Debris Removal
Off-Hours Work
Vertical Transportation – Elevator Operator
Security
Union Labor Force
Sustainability (LEED)
Site Remediation
MEPR Overview
• HVAC - hood exhaust/make up,
ventilation, dehumidification
• Plumbing – sanitary, grease
(interceptor), venting, water pressure,
natural gas, case condensate
• Electrical – voltage, service
size/location, generator
• Refrigeration – system type, location
• Other Issues – Many …
Bottom Line = Heavy coordination required
Urban Shell Before & After Fit-up
HVAC Systems
Hood Exhaust / Makeup Air
• Pollution Control Unit
• Space Requirements
• Exterior Louver
• Maintenance
• Exhaust to Roof
• Shaft size and location
• NFPA Clearance
25’
PCU
9’
PCU WITH
MAINTENANCE AREA
PCU IN FLOOR PLAN
PCU IN SECTION
CEILING
GARAGE LEVEL
GROUND FLOOR
MEZZANINE
EXHAUST SHAFT
Typical
clearance
dimensions
Maintenance Area
KITCHEN HOOD
HVAC Systems
Dehumidification
• Rooftop Units – hot
gas bypass, dual path
air flow system,
desiccant system
• Split Systems –
controls, reheat:
electric coil, hot
water coil, natural
gas
• Chilled Water –
controls, reheat:
electric coil, hot
water coil
• Water Source Heat
Pump, integral
AHU with DX coil and natural
gas duct furnace Water source heat pump with
integral dehumidification
Plumbing Systems
• Sanitary invert
• Grease invert
• Water -
size/location/pressure
• Natural gas – location,
pressure
• Venting – local
requirements
• Other – trap primers,
trap guards, AAV,
separate case drainage
system, drain pans for
sanitary pipes of
tenants above
Local code requires each
fixture to be separately
vented. AAV’s not allowed.
Each fixture to have Bow
Vent
Exposed sanitary piping from
tenants above, require drain
pans
Electrical Systems
• Service size/voltage – 208 volt or
480 volt. 480 volt service requires
a transformer.
• Electric room space –
approximately 200 ft2 in store or
mezzanine with department
electric panels
• Distance to service entrance
effects wire, conduit size, and
number of runs
• Generator – location (roof or
mezzanine), serves Emergency
Systems, issues: size, noise,
consider generator connection in
lieu of generator.
• Local code – more stringent
restrictions than NEC
Typical Grocery Store
Electrical Layout
Main MDP in
electric room
Tenant MDP
on mezzanine
Sales Floor
and Mezzanine
Urban Grocery Store
Electrical Layout
Electric/Refrigeration
Mezzanine Transformer
Generator
Full building
generator tap box
Refrigeration – Machine Room Space, Roof Space
• DX System – Base system: Circuit Piping, Loop Piping,
machine room space, air cooled condenser roof space,
least cost
• Distributed DX System – multiple smaller
compressor/condenser units requires more space than
base system and additional costs
• Secondary System – Glycol; addition of circulating pump
and heat exchanger (maybe more than one) requires
more space than base system and additional cost
• Secondary CO2 System – multiple systems; LT, MT
requires more space and additional cost
• Cascade CO2 DX system – multiple systems, requires
more space and additional cost
• Ammonia Primary System – Expensive, safety concerns
Rooftop unit, condenser
rack, exhaust fansTypology 1 Roof
Typology 2 Roof
Rooftop unit, ductwork,
exhaust fans, condensing
units, roof appurtenances
10’
Other Issues
• Local code requirements
• Real Estate – as in space available
• Type of urban setting, (typology) clearance to other buildings
• Construction issues
• Foundation – grade beam, garage, basement
• Clear height of space, mezzanine
• Construction coordination between landlord contractor and tenant contractor
• Scope of Work – Landlord vs. Tenant Improvement
• What is landlord responsible for, what is tenant responsible for
• Method of document delivery – shell/TI, below grade/above grade
responsibility
18’ – 6” floor to floor height
- 6” slab thickness
- 11’ – 11” top of mezz floor
6’ – 1” Mezzanine Height
Thank you !
 Develop a realistic understanding of resources necessary to successfully deploy this project type.
 Discuss the project complexities and regulatory hurdles to overcome.
 Consider project scheduling and entitlement process.
 Project benefits & incentives.
 Understand the construction cost drivers
Learning Objectives
We hope you’ve put a check in each of the boxes

More Related Content

Viewers also liked

VDIS10015 Design Management Skills - Lecture 4
VDIS10015 Design Management Skills - Lecture 4VDIS10015 Design Management Skills - Lecture 4
VDIS10015 Design Management Skills - Lecture 4
Virtu Institute
 
VDIS10006 Restoration Interiors 1 Lecture 8 Colour & Materials
VDIS10006 Restoration Interiors 1  Lecture 8   Colour & MaterialsVDIS10006 Restoration Interiors 1  Lecture 8   Colour & Materials
VDIS10006 Restoration Interiors 1 Lecture 8 Colour & Materials
Virtu Institute
 
Gallery 15 final
Gallery 15 finalGallery 15 final
Gallery 15 final
Juliarta Ebody
 
Examples of function of management
Examples of function of managementExamples of function of management
Examples of function of management
babyreid1
 
Stores management
Stores managementStores management
Stores management
kavya ravali
 
Stores Management
Stores  ManagementStores  Management
Stores Management
thombremahesh
 
Store management
Store managementStore management
Store management
Abhinav singh
 

Viewers also liked (7)

VDIS10015 Design Management Skills - Lecture 4
VDIS10015 Design Management Skills - Lecture 4VDIS10015 Design Management Skills - Lecture 4
VDIS10015 Design Management Skills - Lecture 4
 
VDIS10006 Restoration Interiors 1 Lecture 8 Colour & Materials
VDIS10006 Restoration Interiors 1  Lecture 8   Colour & MaterialsVDIS10006 Restoration Interiors 1  Lecture 8   Colour & Materials
VDIS10006 Restoration Interiors 1 Lecture 8 Colour & Materials
 
Gallery 15 final
Gallery 15 finalGallery 15 final
Gallery 15 final
 
Examples of function of management
Examples of function of managementExamples of function of management
Examples of function of management
 
Stores management
Stores managementStores management
Stores management
 
Stores Management
Stores  ManagementStores  Management
Stores Management
 
Store management
Store managementStore management
Store management
 

Similar to The Urban Grocery FMI E.sd 2015 conference

WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
us2unionsquare
 
Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one ieca
Lisa Nisenson
 
G4 Land Use Policy & Economic Development
G4 Land Use Policy & Economic DevelopmentG4 Land Use Policy & Economic Development
G4 Land Use Policy & Economic Development
Southern New England American Planning Association
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station Presentation
CirculateSD
 
Terranova Real Estate Design Construction Services
Terranova Real Estate Design Construction ServicesTerranova Real Estate Design Construction Services
Terranova Real Estate Design Construction Services
TerranovaLLC
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKee
dignagni
 
2009 DREAM Construction Issues
2009 DREAM Construction Issues2009 DREAM Construction Issues
2009 DREAM Construction Issues
Stephanie Lindley
 
Sebastopol SDAT Presentation
Sebastopol SDAT PresentationSebastopol SDAT Presentation
Sebastopol SDAT Presentation
American Institute of Architects
 
Reynolds Clark Development
Reynolds Clark DevelopmentReynolds Clark Development
Reynolds Clark Development
hurtvahokie
 
Broadway 360 Opening Presentation
Broadway 360 Opening PresentationBroadway 360 Opening Presentation
Broadway 360 Opening Presentation
Gordon Holtslander
 
2014 Existing Building Conditions Assessment
2014 Existing Building Conditions Assessment2014 Existing Building Conditions Assessment
2014 Existing Building Conditions Assessment
Walter Bone, RLA ASLA
 
FBC Advisory Committee Kickoff Meeting 091912
FBC Advisory Committee Kickoff Meeting 091912FBC Advisory Committee Kickoff Meeting 091912
FBC Advisory Committee Kickoff Meeting 091912
City of Beaufort Planning Department
 
IDDSG
IDDSGIDDSG
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
Scott Campbell
 
Pdiiia lec 9 26.02.13
Pdiiia lec 9  26.02.13Pdiiia lec 9  26.02.13
Pdiiia lec 9 26.02.13
Tebogo Molepo
 
Marine park design
Marine park designMarine park design
Marine park design
Nilanjana Pal
 
Planning for Dense Infill and Development
Planning for Dense Infill and DevelopmentPlanning for Dense Infill and Development
Planning for Dense Infill and Development
Lisa Nisenson
 
Public and Private Applications for LEED-ND
Public and Private Applications for LEED-NDPublic and Private Applications for LEED-ND
Public and Private Applications for LEED-ND
American Planning Association - Massachusetts Chapter
 
The District at Leander Overview 8/3/17
The District at Leander Overview 8/3/17The District at Leander Overview 8/3/17
The District at Leander Overview 8/3/17
City of Leander
 
Real estate basics - India
Real estate basics - IndiaReal estate basics - India
Real estate basics - India
Jay Datta
 

Similar to The Urban Grocery FMI E.sd 2015 conference (20)

WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
 
Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one ieca
 
G4 Land Use Policy & Economic Development
G4 Land Use Policy & Economic DevelopmentG4 Land Use Policy & Economic Development
G4 Land Use Policy & Economic Development
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station Presentation
 
Terranova Real Estate Design Construction Services
Terranova Real Estate Design Construction ServicesTerranova Real Estate Design Construction Services
Terranova Real Estate Design Construction Services
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKee
 
2009 DREAM Construction Issues
2009 DREAM Construction Issues2009 DREAM Construction Issues
2009 DREAM Construction Issues
 
Sebastopol SDAT Presentation
Sebastopol SDAT PresentationSebastopol SDAT Presentation
Sebastopol SDAT Presentation
 
Reynolds Clark Development
Reynolds Clark DevelopmentReynolds Clark Development
Reynolds Clark Development
 
Broadway 360 Opening Presentation
Broadway 360 Opening PresentationBroadway 360 Opening Presentation
Broadway 360 Opening Presentation
 
2014 Existing Building Conditions Assessment
2014 Existing Building Conditions Assessment2014 Existing Building Conditions Assessment
2014 Existing Building Conditions Assessment
 
FBC Advisory Committee Kickoff Meeting 091912
FBC Advisory Committee Kickoff Meeting 091912FBC Advisory Committee Kickoff Meeting 091912
FBC Advisory Committee Kickoff Meeting 091912
 
IDDSG
IDDSGIDDSG
IDDSG
 
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
 
Pdiiia lec 9 26.02.13
Pdiiia lec 9  26.02.13Pdiiia lec 9  26.02.13
Pdiiia lec 9 26.02.13
 
Marine park design
Marine park designMarine park design
Marine park design
 
Planning for Dense Infill and Development
Planning for Dense Infill and DevelopmentPlanning for Dense Infill and Development
Planning for Dense Infill and Development
 
Public and Private Applications for LEED-ND
Public and Private Applications for LEED-NDPublic and Private Applications for LEED-ND
Public and Private Applications for LEED-ND
 
The District at Leander Overview 8/3/17
The District at Leander Overview 8/3/17The District at Leander Overview 8/3/17
The District at Leander Overview 8/3/17
 
Real estate basics - India
Real estate basics - IndiaReal estate basics - India
Real estate basics - India
 

Recently uploaded

一比一原版(Sheffield毕业证书)谢菲尔德大学毕业证如何办理
一比一原版(Sheffield毕业证书)谢菲尔德大学毕业证如何办理一比一原版(Sheffield毕业证书)谢菲尔德大学毕业证如何办理
一比一原版(Sheffield毕业证书)谢菲尔德大学毕业证如何办理
i990go7o
 
IDF 2024 dairy conference. Brochure.pdf
IDF 2024 dairy conference.  Brochure.pdfIDF 2024 dairy conference.  Brochure.pdf
IDF 2024 dairy conference. Brochure.pdf
prasadp100
 
FOOD OBESITY IN NORTH AMERICA ( NEW).pptx
FOOD OBESITY IN NORTH AMERICA ( NEW).pptxFOOD OBESITY IN NORTH AMERICA ( NEW).pptx
FOOD OBESITY IN NORTH AMERICA ( NEW).pptx
kevinfrancis63
 
NANOTECHNOLOGY IN FOOD PACKAGING (FOOD TECHNOLOGY)
NANOTECHNOLOGY IN FOOD PACKAGING (FOOD TECHNOLOGY)NANOTECHNOLOGY IN FOOD PACKAGING (FOOD TECHNOLOGY)
NANOTECHNOLOGY IN FOOD PACKAGING (FOOD TECHNOLOGY)
Addu25809
 
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
7sl9gbvd
 
快速办理(Adelaide毕业证书)阿德莱德大学毕业证文凭证书一模一样
快速办理(Adelaide毕业证书)阿德莱德大学毕业证文凭证书一模一样快速办理(Adelaide毕业证书)阿德莱德大学毕业证文凭证书一模一样
快速办理(Adelaide毕业证书)阿德莱德大学毕业证文凭证书一模一样
mmmnvxcc
 
Heritage Conservation.Strategies and Options for Preserving India Heritage
Heritage Conservation.Strategies and Options for Preserving India HeritageHeritage Conservation.Strategies and Options for Preserving India Heritage
Heritage Conservation.Strategies and Options for Preserving India Heritage
JIT KUMAR GUPTA
 

Recently uploaded (7)

一比一原版(Sheffield毕业证书)谢菲尔德大学毕业证如何办理
一比一原版(Sheffield毕业证书)谢菲尔德大学毕业证如何办理一比一原版(Sheffield毕业证书)谢菲尔德大学毕业证如何办理
一比一原版(Sheffield毕业证书)谢菲尔德大学毕业证如何办理
 
IDF 2024 dairy conference. Brochure.pdf
IDF 2024 dairy conference.  Brochure.pdfIDF 2024 dairy conference.  Brochure.pdf
IDF 2024 dairy conference. Brochure.pdf
 
FOOD OBESITY IN NORTH AMERICA ( NEW).pptx
FOOD OBESITY IN NORTH AMERICA ( NEW).pptxFOOD OBESITY IN NORTH AMERICA ( NEW).pptx
FOOD OBESITY IN NORTH AMERICA ( NEW).pptx
 
NANOTECHNOLOGY IN FOOD PACKAGING (FOOD TECHNOLOGY)
NANOTECHNOLOGY IN FOOD PACKAGING (FOOD TECHNOLOGY)NANOTECHNOLOGY IN FOOD PACKAGING (FOOD TECHNOLOGY)
NANOTECHNOLOGY IN FOOD PACKAGING (FOOD TECHNOLOGY)
 
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
 
快速办理(Adelaide毕业证书)阿德莱德大学毕业证文凭证书一模一样
快速办理(Adelaide毕业证书)阿德莱德大学毕业证文凭证书一模一样快速办理(Adelaide毕业证书)阿德莱德大学毕业证文凭证书一模一样
快速办理(Adelaide毕业证书)阿德莱德大学毕业证文凭证书一模一样
 
Heritage Conservation.Strategies and Options for Preserving India Heritage
Heritage Conservation.Strategies and Options for Preserving India HeritageHeritage Conservation.Strategies and Options for Preserving India Heritage
Heritage Conservation.Strategies and Options for Preserving India Heritage
 

The Urban Grocery FMI E.sd 2015 conference

  • 1. The Urban Grocery Store Moderator Steven M. Duffy – Cuhaci & Peterson MEP Engineering Joe Keene - Cuhaci & Peterson Urban Planner Geoff Fitzgerald – BL Companies Construction Joseph Venie – cm&b Store Environments Chris Studach – KRS
  • 2. StevenDuffy Moderator VPGrocery Cuhaci&Peterson JoeKeene MEPEngineering VPEngineering Cuhaci&Peterson Our Panel GeoffFitzgerald UrbanPlanning Principal BLCompanies Chris Studach Store Environments creativedirector KRS Joseph Venie ConstructionManagement Sr.VicePresident cm&b Addresses the complexity of store format, design, construction and regulatory trends
  • 3. With the advent of increased urbanization of our downtowns, retail grocers and developers have responded to the opportunity with “the urban grocery store.” This session will review the challenges and opportunities of downtown store environments, including entitlements, planning, engineering, construction, parking and operational needs. Downtown markets are expanding in number, and are increasingly more complex – and more expensive. We will feature mixed use tenancy of residential, retail, commercial and parking. The project design and approval process is complex and protracted, requiring an adept team to deploy and construct these projects. Join us for an insightful discussion on urban grocery and get a realistic understanding of the necessary resources to successfully deploy this type of store. The Urban Grocery Store Tuesday, September 29, 2015
  • 4.  Develop a realistic understanding of resources necessary to successfully deploy this project type.  Discuss the project complexities and regulatory hurdles to overcome.  Consider project scheduling and entitlement process.  Project benefits & incentives.  Understand the construction cost drivers Learning Objectives
  • 5. Who’s on your team ? Developer  RE team / Legal / Special Land Use / Special consultants  Urban Planner / Civil / Expeditors / Traffic / Noise / Environmental Impact reporting  Project Designer / AOR – Architecture / Shell  CM – overall Project Management to develop shell and coordinate TI City – Public  Development / Planning / Boards / Building / Health … Public Buy-in Grocer  Real Estate / Legal / Executive Leadership  Store Planning / Procurement EQ  Merchandising  Operations / Safety / IT  Facilities  Grocer Architect of Record TI (AOR)  PM / CM – TI  Store Environments + Branding – Décor / Marketing / Signage
  • 6. Typology 1 Low Rise – small downtown  Primary Sales Area – Ground floor  Parking – Ground / Roof top  Loading / service areas– Shielded from street  Support spaces – Mezzanine or below grade Building Section
  • 7. Typology 2  Occupied floors above grocery - residential above cause a “plumbing intensive zone above Grocery ”. Multi-Story Residential above Grocery Store Retail Spaces Ground floor Residential Spaces above Apartments Grocery MEP Zone Building Section
  • 8. Typology 3 Structure conversion to a grocery store Above the grocery are parking deck levels and above that are Residential units BOH Receiving Area’s MEP Mezzanine – (Free air) Residential units DWV Piping Residential Units Kitchen Exhaust Systems Refrigeration House Mezzanine Area Parking Deck Levels Structure conversion to main grocery sales floor Parking Deck Elevators Residential Elevators New Lower Level Sales Area Building Section
  • 9. “Urban” Store Planning – Geoffrey Fitzgerald, BL Companies DRAFT IMAGES
  • 10. Some Urban Grocery Developments are More “Urban” than Others DRAFT IMAGES
  • 11. Some are a little less “Urban” DRAFT IS
  • 12. Some combine elements of both: Suburban typology in an Urban location DRAFT IS 56k SF Supermarket with Parking for 200 cars Former Industrial/mfg site requires rezoning to allow retail/grocery Significant Environmental cleanup required Green Infrastructure investment can help advance entitlement process
  • 13. True Urban Grocery Stores retrofit nicely into former Department Store Space DRAFT IS Former Filenes Now Roche Bros. Photo credit: www.bostonherald.com
  • 14. Appropriate Scale and Massing of Building assists in Place Making
  • 15. Site Planning Considerations in the Pedestrian Realm Broad Sidewalks Pedestrian-scale lighting Active Building Facade Windows & Awnings Passive Accessibility Bicycle Racks Grab n Go Outdoor Seating
  • 16. Site Planning Considerations (cont’d) Bus Stop Street Trees Vertical Landscape Elements – Maintains Street Line Outparcel Development – Maintains Street Line Pedestrian-scale Lighting for Safety
  • 17. Scale and Massing: Corner Outparcel Building PLACEMAKING: Small buildings can be HUGE in helping define the urban street edge and screen parking. • Amenities (benches, transit waiting areas, etc.) are comfortable and conveniently located.
  • 18. Parking Considerations:  This is America – People Drive Cars! DRAFT IMAGES  In Urban context, emphasis is on pedestrians, not cars
  • 19. Parking Considerations  Alternative Parking solutions: DRAFT IMAGES Rooftop Parking Structured Parking
  • 20. Parking Considerations  Alternative Parking solutions: DRAFT IMAGES West Hartford, CT Parking Level Below Store
  • 21. Planning Considerations  Average Ground Floor Area’s 18K – 30K  Footprints are without exception non-prototypical & may not be rectangular  Limited ground sales floor require additional sales area on separate floor or mezzanine  Many locations feature mezzanines (sales + seating + support) or below grade support area’s  Floor to ceiling heights are critical allowing for sufficient clearances / coordination of S/MEP  Occupied floors above grocery – many cases these are residential that are “plumbing intensive”.  Cost to build in a downtown environment are much higher – Labor / materials transit…
  • 22. 3Square (Urban Grocery of the Near Future)
  • 23. 3Square (Urban Grocery of the Near Future)
  • 24. 3Square (Urban Grocery of the Near Future)
  • 25. 3Square (Urban Grocery of the Near Future)
  • 33. Role of the Construction Manager  Understands the unique complexities of food store construction  Prepares detailed project development schedules  Provides responsible budgeting  Anticipates potential roadblocks  Minimizes exposures/surprises/risks  Manages owner’s expectations & tests them against budget
  • 35.  Cumbersome and multi-faceted permitting/approval processes  Long lead time items  Environmental remediation & testing  Special inspections (EPA & DEP)  City-wide holiday impact (Gridlock Alerts & material/equipment delivery)  Off-hours construction  Working around existing building tenants Scheduling Impacts
  • 36. Urban Grocery Building Types Logistical Challenges Interior Fit-Out Construction Site Challenges Ground-Up Construction Limited Staging Area Congestion/Site Accessibility Site Perimeter Safety/Compliance Working in Occupied Buildings Specialized Foundation Construction Environmental/Soils Remediation Site Perimeter Safety/Compliance Seismic Monitoring
  • 37. Urban Logistical Challenges: Compliance/Approvals  Dept. of Buildings (DOB)  New York City Dept. of Transportation (NYDOT)  Building Enforcement Safety Team (BEST Squad)  FDNY  Use of a Qualified Expeditor  Use of TCO for Occupancy
  • 38.  Need for shanties for individual trades  Vertical Transportation Operation  Work hours  PLA (Project Labor Agreement) Urban Logistical Challenges: Labor Relations
  • 39.  Limited staging/lay down/receiving area & off-hour deliveries  Working within occupied buildings  Limited work area  Debris storage Urban Logistical Challenges: Congestion
  • 40. Site Challenges: Site Accessibility  Sidewalk enclosures  Material delivery  Hoisting  Rooftop Equipment Rigging  Zero lot line constructability
  • 41. Site Challenges: Site Safety & Protection  Vibration monitoring of adjacent buildings • Daily seismic monitoring • Monthly survey points for building settlement  Site safety compliance • Signage • Lighting • Security Guards
  • 42.  Specialized foundation construction  Management of potential site hazards  Soils remediation  Soil disposal/management of unsuitable soils  Dewatering Site Challenges: Urban Fill
  • 43. Major Cost Drivers Unique Foundation Construction Debris Removal Off-Hours Work Vertical Transportation – Elevator Operator Security Union Labor Force Sustainability (LEED) Site Remediation
  • 44. MEPR Overview • HVAC - hood exhaust/make up, ventilation, dehumidification • Plumbing – sanitary, grease (interceptor), venting, water pressure, natural gas, case condensate • Electrical – voltage, service size/location, generator • Refrigeration – system type, location • Other Issues – Many … Bottom Line = Heavy coordination required Urban Shell Before & After Fit-up
  • 45. HVAC Systems Hood Exhaust / Makeup Air • Pollution Control Unit • Space Requirements • Exterior Louver • Maintenance • Exhaust to Roof • Shaft size and location • NFPA Clearance 25’ PCU 9’ PCU WITH MAINTENANCE AREA PCU IN FLOOR PLAN PCU IN SECTION CEILING GARAGE LEVEL GROUND FLOOR MEZZANINE EXHAUST SHAFT Typical clearance dimensions Maintenance Area KITCHEN HOOD
  • 46. HVAC Systems Dehumidification • Rooftop Units – hot gas bypass, dual path air flow system, desiccant system • Split Systems – controls, reheat: electric coil, hot water coil, natural gas • Chilled Water – controls, reheat: electric coil, hot water coil • Water Source Heat Pump, integral AHU with DX coil and natural gas duct furnace Water source heat pump with integral dehumidification
  • 47. Plumbing Systems • Sanitary invert • Grease invert • Water - size/location/pressure • Natural gas – location, pressure • Venting – local requirements • Other – trap primers, trap guards, AAV, separate case drainage system, drain pans for sanitary pipes of tenants above Local code requires each fixture to be separately vented. AAV’s not allowed. Each fixture to have Bow Vent Exposed sanitary piping from tenants above, require drain pans
  • 48. Electrical Systems • Service size/voltage – 208 volt or 480 volt. 480 volt service requires a transformer. • Electric room space – approximately 200 ft2 in store or mezzanine with department electric panels • Distance to service entrance effects wire, conduit size, and number of runs • Generator – location (roof or mezzanine), serves Emergency Systems, issues: size, noise, consider generator connection in lieu of generator. • Local code – more stringent restrictions than NEC Typical Grocery Store Electrical Layout Main MDP in electric room Tenant MDP on mezzanine Sales Floor and Mezzanine Urban Grocery Store Electrical Layout Electric/Refrigeration Mezzanine Transformer Generator Full building generator tap box
  • 49. Refrigeration – Machine Room Space, Roof Space • DX System – Base system: Circuit Piping, Loop Piping, machine room space, air cooled condenser roof space, least cost • Distributed DX System – multiple smaller compressor/condenser units requires more space than base system and additional costs • Secondary System – Glycol; addition of circulating pump and heat exchanger (maybe more than one) requires more space than base system and additional cost • Secondary CO2 System – multiple systems; LT, MT requires more space and additional cost • Cascade CO2 DX system – multiple systems, requires more space and additional cost • Ammonia Primary System – Expensive, safety concerns Rooftop unit, condenser rack, exhaust fansTypology 1 Roof Typology 2 Roof Rooftop unit, ductwork, exhaust fans, condensing units, roof appurtenances
  • 50. 10’ Other Issues • Local code requirements • Real Estate – as in space available • Type of urban setting, (typology) clearance to other buildings • Construction issues • Foundation – grade beam, garage, basement • Clear height of space, mezzanine • Construction coordination between landlord contractor and tenant contractor • Scope of Work – Landlord vs. Tenant Improvement • What is landlord responsible for, what is tenant responsible for • Method of document delivery – shell/TI, below grade/above grade responsibility 18’ – 6” floor to floor height - 6” slab thickness - 11’ – 11” top of mezz floor 6’ – 1” Mezzanine Height
  • 51. Thank you !  Develop a realistic understanding of resources necessary to successfully deploy this project type.  Discuss the project complexities and regulatory hurdles to overcome.  Consider project scheduling and entitlement process.  Project benefits & incentives.  Understand the construction cost drivers Learning Objectives We hope you’ve put a check in each of the boxes