Back in the 1920s, Mr. Murdoch and his crew surveyed the entire city of Saint John with great precision. The original sheets were scanned, which were black and white, and were made available on the Saint John open source website. Unfortunately these were not registered and individual sheets. These survey sheets would be very useful for City employees and interesting for the public.
After georeferencing each sheet to its correct location and scale, they were reference to the city property lines, with the help of ortho photos and city streets. Then each sheet was cropped to remove the border and surrounding text, using the Image Analysis window clip tool, and added to a mosaic dataset. The areas of overlap were clipped in the same way so that the areas of more detail was visible. This dataset was the input for the Copy Raster tool, which created one tiff file for all the sheets in 1 bit. The final mosaic was cleaned with the Raster Painting Tool to remove any redundant street names. This cleaned mosaic would then be uploaded to the online interactive City of Saint John Map as a layer for the public to see.
In conjunction with City of Saint John.
9953330565 Low Rate Call Girls In Rohini Delhi NCR
The Processing of the 1920's Survey Sheets of the City of Saint John, NB for Online Map
1. Processing of 1920’s Saint John
Survey Sheets for Online Map
BY SAM ZALUSKI
MAY 24, 2016
2. Overview
Background on
Survey Project
Survey Sheets
Index
Georeference
Crop
Default Symbol
Mosaic
Mosaic Clean up
Raster Painter
3. • May 18 1920 Common Council
• Under the direction of City Engineer
• Mr. Murdoch, Deputy Land Surveyor, was hired to make
detailed surveys and prepare plans for the City of Saint
John
• Original Estimate - $25,000 ($283,800 in 2016)
• Original Completion Date – Jan.1, 1923
• Dec 13 1922 Common Council Resolution
• Project review
• Original Budget was not accepted
• Not to exceed $3000 ($41,800 in 2016) for the full
completion
• Dec 15 1922
• Mr. Murdoch accepted
Survey Project
4. • Oct 25 1925
• City Engineer wrote to the mayor
• Justified the over budget and original estimate
• Field work was finished
• Used 320 note books and research going back 55
years.
• Compared the cost of $600,000 and time of 10 years
for the Island of Montreal
• Suggested budget of more than $37,000 ($521,700 in
2016)
Survey Project
5. • Jul 4 1927
• City Engineer wrote to the mayor
• Mr. Murdock didn’t not complete the work by 1925
• Due to lack of explanation, he was not paid to finish the
project.
• Finally cost 40,485 dollars – ($570,800 in 2016)
Survey Project
6. • Total of 106 Sheets
• 33 sheets had no Date
• Earliest Date :
Dec13,1922
• Latest Date :
Jan1,1926
• Duration: 3 years & 20
days
• Index Date: Jan1,1963
11. Crop
1. Change default
Symbol
Properties from the
Drawing Drop down
menu
2. Draw polygon around
the Sheet
Removing the Title, scale
and legend
Removed border and
less detailed overlap
12. Crop
1. Used the Clip tool on the
Image Analysis Window
With the polygon selected
22. Mosaic Clean up
1. Copied a version outside of Geodatabase
1. Setting the Processing Extant to the display
2. Create Polyline Shapefile
23. Mosaic Clean up
4. Symbolize Raster with Unique Values
5. Edit Tool Bar
Start Editing
6. ArcScan Tool Bar
Start Raster Clean up
7. Raster Painter Tool Bar
Draw Polygons around duplicate Street Names
26. Data Sources
Background Information and Data provided by the City of
Saint John.
Acknowledgments
Yves Leger & John Ellefsen, City of Saint John
COGS Instructors Dave MacLean & Rob Hodder & Mark
Herbert
Editor's Notes
On May 18 1920, The common council agreed that under the direction of City Engineer, Mr Murdoch would not exceed a cost of 25 thousand and be finished by Jan 1 1923.
On Dec 13 1922, there was a review of the project and a resolution was …Inasmush as $25000 for making surveys and preparing plans for the City of Saint John was found insufficient for the completion of the work and not to exceed 3000 for the full completion
On Dec 15 1922, Mr. Murdoch accepted the Resolution of City Survey from the day before.
Five years later on Oct 25 1925, the city engeneer wrote to the mayer justifying the over budget and Original Estimate- more than $37,000
On May 18 1920, The common council agreed that under the direction of City Engineer, Mr Murdoch would not exceed a cost of 25 thousand and be finished by Jan 1 1923.
On Dec 13 1922, there was a review of the project and a resolution was …Inasmush as $25000 for making surveys and preparing plans for the City of Saint John was found insufficient for the completion of the work and not to exceed 3000 for the full completion
On Dec 15 1922, Mr. Murdoch accepted the Resolution of City Survey from the day before.
Five years later on Oct 25 1925, the city engeneer wrote to the mayer justifying the over budget and Original Estimate- more than $37,000
On May 18 1920, The common council agreed that under the direction of City Engineer, Mr Murdoch would not exceed a cost of 25 thousand and be finished by Jan 1 1923.
On Dec 13 1922, there was a review of the project and a resolution was …Inasmush as $25000 for making surveys and preparing plans for the City of Saint John was found insufficient for the completion of the work and not to exceed 3000 for the full completion
On Dec 15 1922, Mr. Murdoch accepted the Resolution of City Survey from the day before.
Five years later on Oct 25 1925, the city engeneer wrote to the mayer justifying the over budget and Original Estimate- more than $37,000
Most had 4 to 6 links
The r in name for registered