DEVELOPING YOUR
BRAND IN THE
INTERNET ERA
EXPLOITING NEW
TOOLS TO STAND
OUT
Kevin M. Folta, Horticultural
Sciences Department, University
of Florida, Gainesville, FL. USA
Here’s what I do:
Funding and Reimbursement: www.kevinfolta.com/transparency
Slides: www.slideshare.net/kevinfolta
Department Chair to 57
faculty in 7 locations
Integrate with County Agents
Department Specialties-
Teaching-Research-Extension
Plant breeding
Postharvest technology
Space biology
Cell and molecular biology
Organic crop production
Horticultural crop production
Biochemistry
Crop plant physiology
Farm to schools
Here’s what we do:
Funding and Reimbursement: www.kevinfolta.com/transparency
Slides: www.slideshare.net/kevinfolta
Here’s what we do: OUTREACH and SCICOMM
Funding and Reimbursement: www.kevinfolta.com/transparency
Slides: www.slideshare.net/kevinfolta
Veg-a-sketch.com
mysciencegarden.com
talkingbiotechpodcast.com
talkingbiotech.com
I do over 100
presentations a year,
over 30 articles, etc for
non-scientific audiences.
A CHALLENGING TIME
Universities are in a buyer’s market
Startup packages are scary low
Lower funding rates
Higher bar for publication
Higher costs of student support
Older students and postdocs
Low-hanging fruits are few and far between
Increasingly difficult to find your research niche
WHAT THE MARKET LOOKS LIKE
HOW DO YOU DIFFERENTIATE YOURSELF IN A TOUGH
TOUGH FIELD?
Surprisingly easy – Do something.
Everyone must have publications,
has trained students, maybe
taught a course, maybe has
written/received grants.
It is not about hiring good
scientists, it is about hiring good
people
** Your role at this point in your
career needs to identify low
life/time impact, but have high
visibility and contribute to your
scientific brand
WHY TALK ABOUT BRANDING?
THIS IS SCIENCE, NOT BUSINESS.
Like it or not, in the age of
the internet, you are brand.
You cannot separate your
personal and professional
self as easily.
People are using the internet
to learn more about you,
make decisions about you.
How can you leverage that to
present a powerful, positive
projection?
WHY TALK ABOUT BRANDING?
THIS IS SCIENCE, NOT BUSINESS.
You are not just a potential employee.
You are a motivated, visible, multi-
faceted contributor
You generate interest
You interact and reach out to atypical
communities
You’ve demonstrated a commitment to
public understanding of science
You’ve shown persistent production of
a quality product
What does it say about your
values?
MANDATORY PROFESSIONAL
PRESENCE
YOU MUST BE VISIBLE IN WEB SPACE
• You must have complete and updated
profiles on:
Research Gate
Linked in
Facebook (professional website)
DEVELOP YOUR PROGRAM
SEEK NATIONAL AND INTERNATIONAL DISTINCTION
DISTINCTION EARLY
• Set it up
• Do an amazing job
• Use social media to promote
the work before it happens, and
then use it to show how
successful it was.
• Build professional profiles, use
them to amplify content
• Confidence vs. Cocky-ness
TELL THEM YOU
ARE GOING TO DO
IT
TELL THEM YOU
ARE DOING IT
TELL THEM WHAT
YOU DID
WHAT TO INCLUDE?
WHAT SOME BASIC INFO SAYS ABOUT YOU.
All professional activities!
Service to schools
Volunteering- In the discipline
Science writing
Distillations for public audiences
Hosted events, organized speakers
SERVICE TO SCHOOLS
BECOMING THE TRUSTED SOURCE THAT ALWAYS
ALWAYS BRINGS IT.
Science Fairs
Science days
In-Class demonstrations
Better-than-a-substitute
Online modules
College level- Can you prepare online course
content?
Let the university know– develop media around
the events
GRANTS/FELLOWSHIPS
DEVELOP EVIDENCE OF ENGAGEMENT BEFORE THE
BEFORE THE APPLICATION
Don’t wait for a competitive
grant/fellowship/scholarship opportunity to
propose to do something clever
Do it now, then use
grants/fellowship/scholarship applications as a
way to obtain resources to take it to a new
level.
Amplification through professional web
presence
FUNDING THE OUTREACH
WORK
You don’t ask, you don’t get.
Ask state, federal program leaders.
Deans, Department Chairs, etc, may be willing to
support the outreach work.
Oftentimes local businesses will provide some support.
Invest in equipment that has departmental role, but
could be important for outreach.
Costs are generally low
BUILD WIN-WINS
Organize Science Cafés, Science on Tap, Science
Keg
Most places are happy to host this on an off
night
Sometimes become enormously popular events
Sponsors might donate food/drinks
EXPLOITING NEW MEDIA
Major media have lost their
science editors
Science is more complex and
specialized
Don’t complain about the
media- become the media
Get out of your echo chamber.
Talk to the public, not just to
other scientists
Reach Out Beyond Our Tribe
How do we stop just talking to each
other and reach others that want to
know what we do?
CONTENT AMPLIFICATION
Write something
and share with
1000 people
Share something
you like with
1000 people
CONTENT
Blogging: create content about what you do,
and why you do it.
Write articles for Medium.com, other sites
that are forums for articles.
Distill others’ work for a new tribe.
Received several
email inquiries with
specific questions.
Circulation = 1 million subscribers
Develop Media: Use Social Media to
Reach New Tribes with Crossover Topics
Over 900,000 downloads
>120 Episodes
Coffee episode, dog
domestication, cancer
immunotherapies, are
great content to
introduce to broader
audiences.
Currently 6,000 /week
AMPLIFICATION
The Power of Amplification and Networks
Pre-Internet Now
10 k contacts
Expert
Expert
The Power of Amplification via Networks
AMPLIFICATION
You MUST be present in social media – Twitter,
Facebook (professional page), LinkedIn, Instagram,
etc.
Develop networks with consistent quality posts
Promote good information into your networks
Amplify messages from trusted experts.
Jennie Schmidt
Brian Scott
Sarah Schultz
Amplify messages from trusted experts.
EXPLOITING NEW MEDIA
BE AVAILABLE.
Universities need go-to
people.
Get media training
Practice for when it
happens
Never turn down an
opportunity, even if it
means adjusting your
schedule.
EXPLOITING NEW MEDIA
Blogging
 One blog a week is 52 a year
 Free space at blogspot.com, wordpress, others
 University blog space
YouTube
World’s largest search engine
People go to video first
Record protocols you use
Record a synthesis of a journal club discussion
Break down a hot news item in your discipline for a
public audience
OUR RETRO JOURNAL CLUB
EXPLOITING NEW MEDIA
The Internet is Starving for Good Science
Media
 Non-refereed places to post
 Medium, etc
 Work in these spaces gets noticed, other opportunities arise –
PAID ONES!
 Non-refereed, but by invitation
 Science 2.0
 Huffington Post Blogs
 Forbes
 Medium
 The Conversation
 Genetic Literacy Project
ACADEMIC FREEDUMB?
Academic Freedom is the concept that scholars
should have the free range to express or
critically evaluate a concept as long as it is
within their field of expertise.
You need to be the expert in specific tribes.
What you say will be a permanent part of your
record.
THE INTERNETS LAST A LONG
TIME
Don’t lose your cool
Hug your haters
Comments sections, Facebook discussions,
Twitter threads, are a spectator sport
Understand who is watching and listening
Google yourself regularly
DO IT FOR THEM. DO IT FOR
YOU.
HOW OFTEN DO YOU GET SUCH
OPPORTUNITIES?
Be a presence in social media, explaining science,
participating in discussions!
Always offer to answer questions by email, leave a
legitimate email address
Always use your real name Buy your
www.yourname.com.
Get your e-real estate, now.
 Twitter
 PROFESSIONAL Facebook page
 Reddit account
 LinkedIn
 Research Gate
 CROSS PROMOTE YOUR WORK
BALANCE
Your activities must enhance the broader
impact of your research
They must be in addition to, not instead of
Make sure your advisor knows your work
APPLICATIONS
You need to have your advisor, or some other
trusted mentor, go through your application
materials.
Never submit ‘generic’ materials. Craft each
one to each position.
INTERVIEWING
Understand the philosophy of the interview –
this is you as a professional scientist sharing
science, not a desperate plea for a position.
Be the person they want as a colleague
Be the scientist they want as a collaborator
Be the friend they want to take to lunch
JOB TALKS
KNOW YOUR AUDIENCE!
Practice at least a month in advance with other
faculty
Recruit the strongest criticisms
Make sure you communicate, not just baffle
them with new information. The one that lands
the job is the one that communicates it clearly.
MY TEN COMMANDMENTS
OR MY STRONGLY ADVISABLE RECOMMENDATIONS
If it’s stupid, and it works, it’s not stupid
Write everyday
If you don’t ask, you don’t get
Measure twice, cut once
It is better to have it and not need it, then to need it and not
have it
You are the captain of your own ship
Second place is the first loser
Don’t sacrifice good enough for better
Never spend, always invest
Crisis and opportunity are intertwined
Luck is the residue of proper design and hard work
Surround yourself with people that like you and know CPR
EXCEED EXPECTATIONS.
THOSE ARE MY TWO CENTS.
THOUGHTS OR QUESTIONS?
KFOLTA@UFL.EDU
WEBSITE: WWW.KEVINFOLTA.COM
BLOG: WWW.KEVINFOLTABLOG.COM
TWITTER: @KEVINFOLTA
FACEBOOK: FACEBOOK.COM/KMFOLTA
PODCAST:
WWW.TALKINGBIOTECHPODCAST.COM

Texas Postdocc Mentoring Conference

  • 1.
    DEVELOPING YOUR BRAND INTHE INTERNET ERA EXPLOITING NEW TOOLS TO STAND OUT Kevin M. Folta, Horticultural Sciences Department, University of Florida, Gainesville, FL. USA
  • 2.
    Here’s what Ido: Funding and Reimbursement: www.kevinfolta.com/transparency Slides: www.slideshare.net/kevinfolta Department Chair to 57 faculty in 7 locations Integrate with County Agents Department Specialties- Teaching-Research-Extension Plant breeding Postharvest technology Space biology Cell and molecular biology Organic crop production Horticultural crop production Biochemistry Crop plant physiology Farm to schools
  • 3.
    Here’s what wedo: Funding and Reimbursement: www.kevinfolta.com/transparency Slides: www.slideshare.net/kevinfolta
  • 4.
    Here’s what wedo: OUTREACH and SCICOMM Funding and Reimbursement: www.kevinfolta.com/transparency Slides: www.slideshare.net/kevinfolta Veg-a-sketch.com mysciencegarden.com talkingbiotechpodcast.com talkingbiotech.com I do over 100 presentations a year, over 30 articles, etc for non-scientific audiences.
  • 5.
    A CHALLENGING TIME Universitiesare in a buyer’s market Startup packages are scary low Lower funding rates Higher bar for publication Higher costs of student support Older students and postdocs Low-hanging fruits are few and far between Increasingly difficult to find your research niche
  • 6.
    WHAT THE MARKETLOOKS LIKE HOW DO YOU DIFFERENTIATE YOURSELF IN A TOUGH TOUGH FIELD? Surprisingly easy – Do something. Everyone must have publications, has trained students, maybe taught a course, maybe has written/received grants. It is not about hiring good scientists, it is about hiring good people ** Your role at this point in your career needs to identify low life/time impact, but have high visibility and contribute to your scientific brand
  • 7.
    WHY TALK ABOUTBRANDING? THIS IS SCIENCE, NOT BUSINESS. Like it or not, in the age of the internet, you are brand. You cannot separate your personal and professional self as easily. People are using the internet to learn more about you, make decisions about you. How can you leverage that to present a powerful, positive projection?
  • 8.
    WHY TALK ABOUTBRANDING? THIS IS SCIENCE, NOT BUSINESS. You are not just a potential employee. You are a motivated, visible, multi- faceted contributor You generate interest You interact and reach out to atypical communities You’ve demonstrated a commitment to public understanding of science You’ve shown persistent production of a quality product What does it say about your values?
  • 9.
    MANDATORY PROFESSIONAL PRESENCE YOU MUSTBE VISIBLE IN WEB SPACE • You must have complete and updated profiles on: Research Gate Linked in Facebook (professional website)
  • 10.
    DEVELOP YOUR PROGRAM SEEKNATIONAL AND INTERNATIONAL DISTINCTION DISTINCTION EARLY • Set it up • Do an amazing job • Use social media to promote the work before it happens, and then use it to show how successful it was. • Build professional profiles, use them to amplify content • Confidence vs. Cocky-ness TELL THEM YOU ARE GOING TO DO IT TELL THEM YOU ARE DOING IT TELL THEM WHAT YOU DID
  • 11.
    WHAT TO INCLUDE? WHATSOME BASIC INFO SAYS ABOUT YOU. All professional activities! Service to schools Volunteering- In the discipline Science writing Distillations for public audiences Hosted events, organized speakers
  • 12.
    SERVICE TO SCHOOLS BECOMINGTHE TRUSTED SOURCE THAT ALWAYS ALWAYS BRINGS IT. Science Fairs Science days In-Class demonstrations Better-than-a-substitute Online modules College level- Can you prepare online course content? Let the university know– develop media around the events
  • 13.
    GRANTS/FELLOWSHIPS DEVELOP EVIDENCE OFENGAGEMENT BEFORE THE BEFORE THE APPLICATION Don’t wait for a competitive grant/fellowship/scholarship opportunity to propose to do something clever Do it now, then use grants/fellowship/scholarship applications as a way to obtain resources to take it to a new level. Amplification through professional web presence
  • 14.
    FUNDING THE OUTREACH WORK Youdon’t ask, you don’t get. Ask state, federal program leaders. Deans, Department Chairs, etc, may be willing to support the outreach work. Oftentimes local businesses will provide some support. Invest in equipment that has departmental role, but could be important for outreach. Costs are generally low
  • 15.
    BUILD WIN-WINS Organize ScienceCafés, Science on Tap, Science Keg Most places are happy to host this on an off night Sometimes become enormously popular events Sponsors might donate food/drinks
  • 16.
    EXPLOITING NEW MEDIA Majormedia have lost their science editors Science is more complex and specialized Don’t complain about the media- become the media Get out of your echo chamber. Talk to the public, not just to other scientists
  • 17.
    Reach Out BeyondOur Tribe How do we stop just talking to each other and reach others that want to know what we do?
  • 18.
    CONTENT AMPLIFICATION Write something andshare with 1000 people Share something you like with 1000 people
  • 19.
    CONTENT Blogging: create contentabout what you do, and why you do it. Write articles for Medium.com, other sites that are forums for articles. Distill others’ work for a new tribe.
  • 21.
    Received several email inquirieswith specific questions.
  • 22.
    Circulation = 1million subscribers
  • 23.
    Develop Media: UseSocial Media to Reach New Tribes with Crossover Topics Over 900,000 downloads >120 Episodes Coffee episode, dog domestication, cancer immunotherapies, are great content to introduce to broader audiences. Currently 6,000 /week
  • 24.
  • 25.
    The Power ofAmplification and Networks Pre-Internet Now 10 k contacts Expert Expert
  • 26.
    The Power ofAmplification via Networks
  • 27.
    AMPLIFICATION You MUST bepresent in social media – Twitter, Facebook (professional page), LinkedIn, Instagram, etc. Develop networks with consistent quality posts Promote good information into your networks
  • 28.
    Amplify messages fromtrusted experts. Jennie Schmidt Brian Scott Sarah Schultz
  • 29.
    Amplify messages fromtrusted experts.
  • 30.
    EXPLOITING NEW MEDIA BEAVAILABLE. Universities need go-to people. Get media training Practice for when it happens Never turn down an opportunity, even if it means adjusting your schedule.
  • 31.
    EXPLOITING NEW MEDIA Blogging One blog a week is 52 a year  Free space at blogspot.com, wordpress, others  University blog space YouTube World’s largest search engine People go to video first Record protocols you use Record a synthesis of a journal club discussion Break down a hot news item in your discipline for a public audience
  • 32.
  • 33.
    EXPLOITING NEW MEDIA TheInternet is Starving for Good Science Media  Non-refereed places to post  Medium, etc  Work in these spaces gets noticed, other opportunities arise – PAID ONES!  Non-refereed, but by invitation  Science 2.0  Huffington Post Blogs  Forbes  Medium  The Conversation  Genetic Literacy Project
  • 34.
    ACADEMIC FREEDUMB? Academic Freedomis the concept that scholars should have the free range to express or critically evaluate a concept as long as it is within their field of expertise. You need to be the expert in specific tribes. What you say will be a permanent part of your record.
  • 35.
    THE INTERNETS LASTA LONG TIME Don’t lose your cool Hug your haters Comments sections, Facebook discussions, Twitter threads, are a spectator sport Understand who is watching and listening Google yourself regularly
  • 36.
    DO IT FORTHEM. DO IT FOR YOU. HOW OFTEN DO YOU GET SUCH OPPORTUNITIES? Be a presence in social media, explaining science, participating in discussions! Always offer to answer questions by email, leave a legitimate email address Always use your real name Buy your www.yourname.com. Get your e-real estate, now.  Twitter  PROFESSIONAL Facebook page  Reddit account  LinkedIn  Research Gate  CROSS PROMOTE YOUR WORK
  • 37.
    BALANCE Your activities mustenhance the broader impact of your research They must be in addition to, not instead of Make sure your advisor knows your work
  • 38.
    APPLICATIONS You need tohave your advisor, or some other trusted mentor, go through your application materials. Never submit ‘generic’ materials. Craft each one to each position.
  • 39.
    INTERVIEWING Understand the philosophyof the interview – this is you as a professional scientist sharing science, not a desperate plea for a position. Be the person they want as a colleague Be the scientist they want as a collaborator Be the friend they want to take to lunch
  • 40.
    JOB TALKS KNOW YOURAUDIENCE! Practice at least a month in advance with other faculty Recruit the strongest criticisms Make sure you communicate, not just baffle them with new information. The one that lands the job is the one that communicates it clearly.
  • 41.
    MY TEN COMMANDMENTS ORMY STRONGLY ADVISABLE RECOMMENDATIONS If it’s stupid, and it works, it’s not stupid Write everyday If you don’t ask, you don’t get Measure twice, cut once It is better to have it and not need it, then to need it and not have it You are the captain of your own ship Second place is the first loser Don’t sacrifice good enough for better Never spend, always invest Crisis and opportunity are intertwined Luck is the residue of proper design and hard work Surround yourself with people that like you and know CPR
  • 42.
  • 43.
    THOSE ARE MYTWO CENTS. THOUGHTS OR QUESTIONS? KFOLTA@UFL.EDU WEBSITE: WWW.KEVINFOLTA.COM BLOG: WWW.KEVINFOLTABLOG.COM TWITTER: @KEVINFOLTA FACEBOOK: FACEBOOK.COM/KMFOLTA PODCAST: WWW.TALKINGBIOTECHPODCAST.COM