THIS ARTICLE DISCUSSES SOME IMPORTANT ASPECTS OF OZONE
TECHNOLOGYTHAT NEED TO BE CONSIDERED WHILE TENDERING AN
OZONE SYSTEM.
By Shreyas B
Ozonation is relatively a
new technology. Ozone is
being proposed regularly
in most water and waste
water treatment to meet
the very stringent
environmental controls.
Architects, water and
wastewater consultants, MEP consultants, chief
engineers, project heads of governmental bodies
- all require various inputs to come out with a
correct and optimum tender specifications that
will allow the user to chose the best, the most
economical and the most reliable and efficient
system. Often, the exercise is one of a cut and
paste mode that probably compromises critical
technical specs so importantly required for that
project. Often, more importance is given to details
that may not even be of any importance to the
project, escalating the costs of the project. Mostly
this substandard tendering of an ozone system is
due to ignorance and hesitance of the consultant
to seek technical support and most of the time by
willful wrong guidance from irresponsible
manufacturers with vested interests. The result,
cost escalation, compromised engineering, with
end users ending up with unreliable systems and
facing the probability of failures. This probably is
true for all technologies, but when the options are
few, risks are greater. www.otsil.net
TENDERING AN OZONE
SYSTEM - WHAT SHOULD BE
CONSIDERED?
Most Critical Aspects of Ozone
that Need to be Considered While
Tendering
 QualificationCriteria:Withmushrooming
of ozone manufacturers in the country,
this is very important. Many companies do
not have expertise in some applications.
Deciding the qualification criteria, it is very
important to ensure that the client gets
the better and more experienced vendor.
Restriction of vendor should be based on
experience of the company, reference base,
service availability, financial strengths and
reliability. Care is to be taken not to restrict
vendors in such a way that the tender
provides undue advantage to a particular
vendor. All such criteria should be removed
to make the tender more competitive. The
qualification criteria should place on even
keel all the prospective vendors who have
similar capabilities, financial strengths and
experiences. This gives a relatively large
prospect for the project to succeed in the
long run.
 Know Your Application: How important
this is, you will understand from the fact
that out of 10 large projects (ozone above
250 grams), there is a likely hood of more
failures than application successes. Ask any
client that you know of, who has used this
technology, he will vouch for this.There is no
point concluding that ozone is in efficient,
ozone is a failure etc, the main reason is
there is an application flaw. Look away from
India, than this percentage is almost 100
percent. So, for ozone work, you need only
that, to get the right person who can help
you out with correct application techniques.
Do not leave the selection of the ozone dose
with the vendor, as this will unnecessarily
raise controversies and make it difficult for
you to decide. Do all your home work before
you decide on the tender specifications.
• Know what ozone is expected to do for
you. Work out the doses, concentration,
the mass transfer devices only based on
this. Decide where you want to locate
the ozone injection.
• Have a flow sheet of the process ready
in detail. Cross verify the process details
with more ozone manufacturers. Ask as
many questions you want and access
the authenticity of the answers based
on your experience, work out your
process specifications based on these
information on process. Not considering
these will have severe repercussions on
the performance of ozone.
INDUSTRY SPOTLIGHT
53
Activated Carbon, RO Systems, Cooling Towers,
Chlorinators, Ozonators & UV Systems, Booster Pumps & Systems
www.eawater.com/eMagazine EverythingAboutWater | SEPTEMBER 2016
• Simultaneously have some details
on alternate technologies available.
Sometimes it may be better to combine
ozone with classical technologies to
better the performance and at the same
time reduce the cost of applications
 Know More About the Ozone System:
Being ignorant on what an ozone system
is all about, could put you in lot of trouble.
Simple knowledge on the working of an
ozone system can save you lots of hassles
later on. You can economize the application
costs by spending little time on this.
• In deciding the spare capacity, you
will realize that sometimes if reliability
is proven, you do not even have to
consider a spare ozone system. Imagine
the savings you can bring about. If the
manufacturer can provide you a service
network, and guarantee high ozone
availability, you do not need spare. There
are Indian examples that even in process
industries running 24x7, no ozone
spares have been considered and risk
has been minimized by increasing the
reliability factor.
• Modular systems often do not provide
high ozone availability as claimed by
many manufacturers. It is the reliability
of the entire system that often counts.
When a process requires 12 kg ozone,
having a modular system, to provide a 2
kg spare is not a viable proposition. The
risk of multiple modules failing is as great
as one failing. The more common spare
design for ozone capacities around the
world is normally 100% X 2, or 25%
X 5 or 50% X 3. A 10% X 11 spare
design have a higher risk factor, higher
maintenance costs, higher footprint and
higher operation costs than a 2 x 100%
design. Spare designs are not decided
on capabilities of the manufacture to
provide single large systems.
• Knowing about ozone system can most
of the times enable you to access the
total operation costs of the system. A
judicial choice of ozone concentration
can bring about a total reduction of
CAPEX, OPEX and application ease.
Most of the ozone mass transfer choice
is selected based on these attributes.
• Do not waste too much time on ozone
hard ware specifications. You will notice
that most of the ozone generators have
different hardware specifications and
no ozone generator is the same. So by
going too much on the construction
of the hardware like transformers,
converters, and dielectrics would be
a total waste of time. What that is
essentially required is to judge how the
individual components would affect the
performance of the ozone generator
and the operations costs and compare
them with other manufacturers. If you
specify the construction of an ozone
generator, than you are limiting your
choice as no one will be able to match
this. Matching construction details need
not be necessarily the best for the client.
 Know Well Who Your Prospective
Vendors Could be: Obviously this is
the best way to judge and evaluate the
prospective vendor. How do you evaluate
the process, the ozone system and the
vendor?
• Vendor Profile: Build a database
of the vendor. The more number of
years the vendor is in business the
more experience he is likely to have
on ozone. Small time players are not
fit enough for large projects since they
would lack the experience. Knowing
about ozone does not mean enough
experience. Experience in ozone means
the references the manufacture has.
The more references he has the more
experience he would be having. The
more experience the vendor has on
different ozone applications the more
knowledgeable he would be. Often
repeat customers are an indication of a
good vendor.
• Experience in One Application Does
Not Mean Experience in Another:
Different application, this is a common
mistake made by many clients. Ozone
experience in one application does not
mean the vendor has experience in
another application. All parameters are
different from application to application,
ozone chemistry changes and so does
application methodology.
• Very Often Clients Check Up
and Seem to prefer on Local
Experiences of Supplier: For ozone
projects, this is often a stumbling block
for a better and more experienced
vendor. Forexample, a sewage treatment
in India is similar to a sewage treatment
Inside an Ozone Generator
54
Activated Carbon, RO Systems, Cooling Towers,
Chlorinators, Ozonators & UV Systems, Booster Pumps & SystemsINDUSTRY SPOTLIGHT
EverythingAboutWater | SEPTEMBER 2016 www.eawater.com/eMagazine
About the Author
Shreyas B is one of the Directors of a Chennai
based Ozone company OTSIL. Shreyas joined
OTSIL after his basic engineering and chemistry
degree from BITS Pilani. Shreyas is also an
Alumni of IIM Ahemadabad. He had his training
from his father Mr. V.Baratharaj, who has 25 years
of ozone experience and is one of few ozone
specialists in India.
Ozone Technologies and Systems Indian
Pvt Limited is more popularly known in the
Industry circle as OTSIL. It is one of the leading
ozone companies in India with more than 1000
applications all over India. OTSIL manufactures
its own ozone generators INDIZONE fully backed
up with an excellent service Team. OTSIL has
varied application expertise in ozone, including
Paper and Pulp, ozonolysis, AOP methods of
utilizing ozone, apart from water and waste water
treatment.
To know more about the author, you can write to
us.Your feedback is welcome and should be sent
at: mayur@eawater.com.
anywhere around the world. Chemistry
is the same and so application is similar.
So, not having application references
locally is not a disqualification. What
that should bother the client is reliability
of the equipment, experience in similar
operating environment for example
(hot and humid conditions differ from
cold and snowy conditions), operation
and maintenance costs, availability of
service network and most importantly
the credibility of the manufacturer.
• Consider Total Costs: Operating
and maintenance costs play a very
crucial role in any ozone project. While
providing basis of evaluation in a tender
it is very important that the total costs
are considered to decide on the vendor.
For example, an ozone system total
cost includes cost of ozone generator,
costs of oxygen plant, costs of chiller
plant, power costs for ozone production,
power costs for oxygen production, the
power costs for ozone injection, cost of
annual maintenance of the ozone and
oxygen system, costs of replacement
of dielectrics, cost of spare parts of the
ozone system. If the project vendor is
decided only based on the cost of the
equipment, there is all likely hoods that
the client is likely to spend enormous
money of operation and maintenance
costs. A good technical bid will comprise
of evaluating the whole ozone system
in its totality, including all accessories,
spares and annual maintenance costs.
This is important since once a vendor is
selected for ozone, it is a marriage for life
and there can be no divorce.
Caution
Do Not Cut and Paste Specifications: Often
tender specifications are available over internet
and in some companies’ websites. Specifications
are available in past tenders. Tender specifications
need to be precise, in tune with the requirement
of the project and cutting and pasting available
informationonspecificationswouldresultinwrong
design, increased costs and may be application
failures. Overall costs could make the project non-
viable. During engineering client can experience
demands for changes due to wrong specification
and design and this would be responsible for
delays, cost overruns etc. Clients’ best bet will be
to approach knowledgeable ozone experts and
seek advice and directions to proceed, obtain the
right design, equipment specifications. This will
also hold good while preparing a DPR.
Spare Design
Spare design could increase overall costs
multifold. A prudent detailed project report should
provide engineering standards that provide limited
risks of shutdown of the process. No projects can
be economically designed for 100 percent risk of
breakdown. In that case all equipments must have
100 percent spare capacity. 100 percent spare
capacity is normally recommended in equipments
that have moving parts and if the equipment
is crucial for continuous performances. Often
100 percent spare design can be avoided by
recommending reliable equipments and vendors.
Spare design can be optimized if the equipments
are easy to service, if the service network of the
vendor is proven and spare parts are available
locally. Pay a little extra for a reliable equipment
and vendor is much better than increasing the
reliability by providing 100 percent spare capacity.
Recommending modular ozone system does not
ensure 100 percent reliability as if one modular
can fail, many can also fail. It is the overall
reliability that needs to be keeping in mind. That
is why knowing the vendor, availability of local
service network and spares can all go to lower
the CAPEX. Visiting the manufacturing premises
of the prospective vendors, discussion with the
engineering team, personal visits to installed
projects of the vendor, talking to the end user,
conducting a due diligence on the vendor and
their operations, all provide vital information that
makes decision making easier and more accurate.
Ozone would then become comparable to other
technologies in terms of CAPEX and OPEX and
would find wider uses.
Ozone Generator with an Oxygen Plant and Chiller System

More Related Content

What's hot

PVC-UPVC solvent Cement Manufacture
 PVC-UPVC solvent Cement Manufacture PVC-UPVC solvent Cement Manufacture
PVC-UPVC solvent Cement Manufacture
NEOSEAL ADHESIVE PVT. LTD.
 
Liquid Silicone Rubber (LSR) Processing Capabilities English
Liquid Silicone Rubber (LSR) Processing Capabilities EnglishLiquid Silicone Rubber (LSR) Processing Capabilities English
Liquid Silicone Rubber (LSR) Processing Capabilities English
Trelleborg Sealing Solutions
 
13 Insider Secrets to Purchase and Application of Polyurea
13 Insider Secrets to Purchase and Application of Polyurea13 Insider Secrets to Purchase and Application of Polyurea
13 Insider Secrets to Purchase and Application of PolyureaJohn Becker
 
System Seals Inc Company Overview Brochure
System Seals Inc Company Overview BrochureSystem Seals Inc Company Overview Brochure
System Seals Inc Company Overview BrochureJulian Webster-Gigg
 
BCP What is Polyurea Presentation
BCP What is Polyurea PresentationBCP What is Polyurea Presentation
BCP What is Polyurea Presentation
Steve Wilson
 
Henkel_MRO_Manufacturing_Best_Practices_Brochure_Proofed_6-8-15_by_Martha_Dav...
Henkel_MRO_Manufacturing_Best_Practices_Brochure_Proofed_6-8-15_by_Martha_Dav...Henkel_MRO_Manufacturing_Best_Practices_Brochure_Proofed_6-8-15_by_Martha_Dav...
Henkel_MRO_Manufacturing_Best_Practices_Brochure_Proofed_6-8-15_by_Martha_Dav...Martha Davidson
 
Effective design and management of LEV systems
Effective design and management of LEV systemsEffective design and management of LEV systems
Effective design and management of LEV systems
Mike Slater
 
Track 2
Track 2Track 2
Esco Green Ductless Fume Hood Guide
Esco Green Ductless Fume Hood GuideEsco Green Ductless Fume Hood Guide
Esco Green Ductless Fume Hood Guide
Esco Group
 
System Seals Inc Mining Brochure
System Seals Inc Mining BrochureSystem Seals Inc Mining Brochure
System Seals Inc Mining BrochureJulian Webster-Gigg
 
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes FittingsIdol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
IndiaMART InterMESH Limited
 
Enhancing the performance of key composite applications through new glass rei...
Enhancing the performance of key composite applications through new glass rei...Enhancing the performance of key composite applications through new glass rei...
Enhancing the performance of key composite applications through new glass rei...
Owens Corning Composites Solution Business
 
Lead training and compliance summary
Lead training and compliance summaryLead training and compliance summary
Lead training and compliance summary
Joseph Burley
 
Water Treatment Solutions By Aztek Private Limited, New Delhi
Water Treatment Solutions By Aztek Private Limited, New DelhiWater Treatment Solutions By Aztek Private Limited, New Delhi
Water Treatment Solutions By Aztek Private Limited, New Delhi
IndiaMART InterMESH Limited
 

What's hot (18)

PVC-UPVC solvent Cement Manufacture
 PVC-UPVC solvent Cement Manufacture PVC-UPVC solvent Cement Manufacture
PVC-UPVC solvent Cement Manufacture
 
Softener
SoftenerSoftener
Softener
 
Liquid Silicone Rubber (LSR) Processing Capabilities English
Liquid Silicone Rubber (LSR) Processing Capabilities EnglishLiquid Silicone Rubber (LSR) Processing Capabilities English
Liquid Silicone Rubber (LSR) Processing Capabilities English
 
13 Insider Secrets to Purchase and Application of Polyurea
13 Insider Secrets to Purchase and Application of Polyurea13 Insider Secrets to Purchase and Application of Polyurea
13 Insider Secrets to Purchase and Application of Polyurea
 
System Seals Inc Mining Brochure
System Seals Inc Mining BrochureSystem Seals Inc Mining Brochure
System Seals Inc Mining Brochure
 
SSI Forging Brochure
SSI Forging BrochureSSI Forging Brochure
SSI Forging Brochure
 
System Seals Inc Company Overview Brochure
System Seals Inc Company Overview BrochureSystem Seals Inc Company Overview Brochure
System Seals Inc Company Overview Brochure
 
BCP What is Polyurea Presentation
BCP What is Polyurea PresentationBCP What is Polyurea Presentation
BCP What is Polyurea Presentation
 
Henkel_MRO_Manufacturing_Best_Practices_Brochure_Proofed_6-8-15_by_Martha_Dav...
Henkel_MRO_Manufacturing_Best_Practices_Brochure_Proofed_6-8-15_by_Martha_Dav...Henkel_MRO_Manufacturing_Best_Practices_Brochure_Proofed_6-8-15_by_Martha_Dav...
Henkel_MRO_Manufacturing_Best_Practices_Brochure_Proofed_6-8-15_by_Martha_Dav...
 
Effective design and management of LEV systems
Effective design and management of LEV systemsEffective design and management of LEV systems
Effective design and management of LEV systems
 
Track 2
Track 2Track 2
Track 2
 
Esco Green Ductless Fume Hood Guide
Esco Green Ductless Fume Hood GuideEsco Green Ductless Fume Hood Guide
Esco Green Ductless Fume Hood Guide
 
System Seals Inc Mining Brochure
System Seals Inc Mining BrochureSystem Seals Inc Mining Brochure
System Seals Inc Mining Brochure
 
(1) SWC brochure 2015
(1) SWC brochure 2015(1) SWC brochure 2015
(1) SWC brochure 2015
 
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes FittingsIdol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
 
Enhancing the performance of key composite applications through new glass rei...
Enhancing the performance of key composite applications through new glass rei...Enhancing the performance of key composite applications through new glass rei...
Enhancing the performance of key composite applications through new glass rei...
 
Lead training and compliance summary
Lead training and compliance summaryLead training and compliance summary
Lead training and compliance summary
 
Water Treatment Solutions By Aztek Private Limited, New Delhi
Water Treatment Solutions By Aztek Private Limited, New DelhiWater Treatment Solutions By Aztek Private Limited, New Delhi
Water Treatment Solutions By Aztek Private Limited, New Delhi
 

Similar to TENDERING AN OZONE SYSTEM

A Guide to Instrumentation for Ethanol Fuel Production
A Guide to Instrumentation for Ethanol Fuel ProductionA Guide to Instrumentation for Ethanol Fuel Production
A Guide to Instrumentation for Ethanol Fuel Production
Mead O'Brien, Inc.
 
0601040 identification and assessment of acoustic barriers
0601040 identification and assessment of acoustic barriers 0601040 identification and assessment of acoustic barriers
0601040 identification and assessment of acoustic barriers
Supa Buoy
 
A Fluid Situation - EMDT (Nov/Dec 2011)
A Fluid Situation - EMDT (Nov/Dec 2011)A Fluid Situation - EMDT (Nov/Dec 2011)
A Fluid Situation - EMDT (Nov/Dec 2011)
Team Consulting Ltd
 
Loctite® Maintenance Workshops - Henkel Adhesives
Loctite® Maintenance Workshops - Henkel AdhesivesLoctite® Maintenance Workshops - Henkel Adhesives
Loctite® Maintenance Workshops - Henkel Adhesives
Henkel Adhesives Australia
 
An automated cleaning process that continuously protects against combustible ...
An automated cleaning process that continuously protects against combustible ...An automated cleaning process that continuously protects against combustible ...
An automated cleaning process that continuously protects against combustible ...
Milling and Grain magazine
 
Commercial Marijuana Cultivation - Best Practices
Commercial Marijuana Cultivation - Best PracticesCommercial Marijuana Cultivation - Best Practices
Commercial Marijuana Cultivation - Best Practices
Marijuana Connections
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives
Matt Whitteker
 
Wettask upgrade sales presentation
Wettask upgrade sales presentationWettask upgrade sales presentation
Wettask upgrade sales presentation
Axel Jacquemein
 
Open erp presentation business model_11 octobre 2012-2
Open erp presentation business model_11 octobre 2012-2Open erp presentation business model_11 octobre 2012-2
Open erp presentation business model_11 octobre 2012-2Paris Open Source Summit
 
The importance of iso cleanliness codes
The importance of iso cleanliness codesThe importance of iso cleanliness codes
The importance of iso cleanliness codesfiltermag
 
Metso - Lower Your Cost of Ownership
Metso - Lower Your Cost of OwnershipMetso - Lower Your Cost of Ownership
Metso - Lower Your Cost of Ownership
Scott Adams
 
Ozone Precautions In Swimming Pools
Ozone Precautions In Swimming PoolsOzone Precautions In Swimming Pools
Ozone Precautions In Swimming Pools
OTSIL | Ozone technologies & systems (India) Pvt.Ltd
 
OZONE PRECAUTIONS IN SWIMMING POOLS
OZONE PRECAUTIONS IN SWIMMING POOLSOZONE PRECAUTIONS IN SWIMMING POOLS
OZONE PRECAUTIONS IN SWIMMING POOLS
OTSIL | Ozone technologies & systems (India) Pvt.Ltd
 
Pipeline_Patterns_R7.pdf
Pipeline_Patterns_R7.pdfPipeline_Patterns_R7.pdf
Pipeline_Patterns_R7.pdf
Srinivas Kannan
 
LEV Installations
LEV InstallationsLEV Installations
LEV Installations
Adrian Sims
 
ChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian ElsethChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian ElsethIan Elseth
 
Kanomax FMT - LNS Model 9310 Brochure
Kanomax FMT - LNS Model 9310 Brochure Kanomax FMT - LNS Model 9310 Brochure
Kanomax FMT - LNS Model 9310 Brochure
kanomaxfmt
 
Operation research ppt
Operation research pptOperation research ppt
Operation research ppt
LakshmiPriyaM6
 
Vitoria and Larry poster
Vitoria and Larry posterVitoria and Larry poster
Vitoria and Larry posterLarry Adigun
 

Similar to TENDERING AN OZONE SYSTEM (20)

A Guide to Instrumentation for Ethanol Fuel Production
A Guide to Instrumentation for Ethanol Fuel ProductionA Guide to Instrumentation for Ethanol Fuel Production
A Guide to Instrumentation for Ethanol Fuel Production
 
0601040 identification and assessment of acoustic barriers
0601040 identification and assessment of acoustic barriers 0601040 identification and assessment of acoustic barriers
0601040 identification and assessment of acoustic barriers
 
A Fluid Situation - EMDT (Nov/Dec 2011)
A Fluid Situation - EMDT (Nov/Dec 2011)A Fluid Situation - EMDT (Nov/Dec 2011)
A Fluid Situation - EMDT (Nov/Dec 2011)
 
Loctite® Maintenance Workshops - Henkel Adhesives
Loctite® Maintenance Workshops - Henkel AdhesivesLoctite® Maintenance Workshops - Henkel Adhesives
Loctite® Maintenance Workshops - Henkel Adhesives
 
An automated cleaning process that continuously protects against combustible ...
An automated cleaning process that continuously protects against combustible ...An automated cleaning process that continuously protects against combustible ...
An automated cleaning process that continuously protects against combustible ...
 
Commercial Marijuana Cultivation - Best Practices
Commercial Marijuana Cultivation - Best PracticesCommercial Marijuana Cultivation - Best Practices
Commercial Marijuana Cultivation - Best Practices
 
OSTS_White_Paper
OSTS_White_PaperOSTS_White_Paper
OSTS_White_Paper
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives
 
Wettask upgrade sales presentation
Wettask upgrade sales presentationWettask upgrade sales presentation
Wettask upgrade sales presentation
 
Open erp presentation business model_11 octobre 2012-2
Open erp presentation business model_11 octobre 2012-2Open erp presentation business model_11 octobre 2012-2
Open erp presentation business model_11 octobre 2012-2
 
The importance of iso cleanliness codes
The importance of iso cleanliness codesThe importance of iso cleanliness codes
The importance of iso cleanliness codes
 
Metso - Lower Your Cost of Ownership
Metso - Lower Your Cost of OwnershipMetso - Lower Your Cost of Ownership
Metso - Lower Your Cost of Ownership
 
Ozone Precautions In Swimming Pools
Ozone Precautions In Swimming PoolsOzone Precautions In Swimming Pools
Ozone Precautions In Swimming Pools
 
OZONE PRECAUTIONS IN SWIMMING POOLS
OZONE PRECAUTIONS IN SWIMMING POOLSOZONE PRECAUTIONS IN SWIMMING POOLS
OZONE PRECAUTIONS IN SWIMMING POOLS
 
Pipeline_Patterns_R7.pdf
Pipeline_Patterns_R7.pdfPipeline_Patterns_R7.pdf
Pipeline_Patterns_R7.pdf
 
LEV Installations
LEV InstallationsLEV Installations
LEV Installations
 
ChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian ElsethChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian Elseth
 
Kanomax FMT - LNS Model 9310 Brochure
Kanomax FMT - LNS Model 9310 Brochure Kanomax FMT - LNS Model 9310 Brochure
Kanomax FMT - LNS Model 9310 Brochure
 
Operation research ppt
Operation research pptOperation research ppt
Operation research ppt
 
Vitoria and Larry poster
Vitoria and Larry posterVitoria and Larry poster
Vitoria and Larry poster
 

Recently uploaded

April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop.com LTD
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 

Recently uploaded (20)

April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 

TENDERING AN OZONE SYSTEM

  • 1. 52 Activated Carbon, RO Systems, Cooling Towers, Chlorinators, Ozonators & UV Systems, Booster Pumps & SystemsINDUSTRY SPOTLIGHT EverythingAboutWater | SEPTEMBER 2016 www.eawater.com/eMagazine THIS ARTICLE DISCUSSES SOME IMPORTANT ASPECTS OF OZONE TECHNOLOGYTHAT NEED TO BE CONSIDERED WHILE TENDERING AN OZONE SYSTEM. By Shreyas B Ozonation is relatively a new technology. Ozone is being proposed regularly in most water and waste water treatment to meet the very stringent environmental controls. Architects, water and wastewater consultants, MEP consultants, chief engineers, project heads of governmental bodies - all require various inputs to come out with a correct and optimum tender specifications that will allow the user to chose the best, the most economical and the most reliable and efficient system. Often, the exercise is one of a cut and paste mode that probably compromises critical technical specs so importantly required for that project. Often, more importance is given to details that may not even be of any importance to the project, escalating the costs of the project. Mostly this substandard tendering of an ozone system is due to ignorance and hesitance of the consultant to seek technical support and most of the time by willful wrong guidance from irresponsible manufacturers with vested interests. The result, cost escalation, compromised engineering, with end users ending up with unreliable systems and facing the probability of failures. This probably is true for all technologies, but when the options are few, risks are greater. www.otsil.net TENDERING AN OZONE SYSTEM - WHAT SHOULD BE CONSIDERED? Most Critical Aspects of Ozone that Need to be Considered While Tendering  QualificationCriteria:Withmushrooming of ozone manufacturers in the country, this is very important. Many companies do not have expertise in some applications. Deciding the qualification criteria, it is very important to ensure that the client gets the better and more experienced vendor. Restriction of vendor should be based on experience of the company, reference base, service availability, financial strengths and reliability. Care is to be taken not to restrict vendors in such a way that the tender provides undue advantage to a particular vendor. All such criteria should be removed to make the tender more competitive. The qualification criteria should place on even keel all the prospective vendors who have similar capabilities, financial strengths and experiences. This gives a relatively large prospect for the project to succeed in the long run.  Know Your Application: How important this is, you will understand from the fact that out of 10 large projects (ozone above 250 grams), there is a likely hood of more failures than application successes. Ask any client that you know of, who has used this technology, he will vouch for this.There is no point concluding that ozone is in efficient, ozone is a failure etc, the main reason is there is an application flaw. Look away from India, than this percentage is almost 100 percent. So, for ozone work, you need only that, to get the right person who can help you out with correct application techniques. Do not leave the selection of the ozone dose with the vendor, as this will unnecessarily raise controversies and make it difficult for you to decide. Do all your home work before you decide on the tender specifications. • Know what ozone is expected to do for you. Work out the doses, concentration, the mass transfer devices only based on this. Decide where you want to locate the ozone injection. • Have a flow sheet of the process ready in detail. Cross verify the process details with more ozone manufacturers. Ask as many questions you want and access the authenticity of the answers based on your experience, work out your process specifications based on these information on process. Not considering these will have severe repercussions on the performance of ozone.
  • 2. INDUSTRY SPOTLIGHT 53 Activated Carbon, RO Systems, Cooling Towers, Chlorinators, Ozonators & UV Systems, Booster Pumps & Systems www.eawater.com/eMagazine EverythingAboutWater | SEPTEMBER 2016 • Simultaneously have some details on alternate technologies available. Sometimes it may be better to combine ozone with classical technologies to better the performance and at the same time reduce the cost of applications  Know More About the Ozone System: Being ignorant on what an ozone system is all about, could put you in lot of trouble. Simple knowledge on the working of an ozone system can save you lots of hassles later on. You can economize the application costs by spending little time on this. • In deciding the spare capacity, you will realize that sometimes if reliability is proven, you do not even have to consider a spare ozone system. Imagine the savings you can bring about. If the manufacturer can provide you a service network, and guarantee high ozone availability, you do not need spare. There are Indian examples that even in process industries running 24x7, no ozone spares have been considered and risk has been minimized by increasing the reliability factor. • Modular systems often do not provide high ozone availability as claimed by many manufacturers. It is the reliability of the entire system that often counts. When a process requires 12 kg ozone, having a modular system, to provide a 2 kg spare is not a viable proposition. The risk of multiple modules failing is as great as one failing. The more common spare design for ozone capacities around the world is normally 100% X 2, or 25% X 5 or 50% X 3. A 10% X 11 spare design have a higher risk factor, higher maintenance costs, higher footprint and higher operation costs than a 2 x 100% design. Spare designs are not decided on capabilities of the manufacture to provide single large systems. • Knowing about ozone system can most of the times enable you to access the total operation costs of the system. A judicial choice of ozone concentration can bring about a total reduction of CAPEX, OPEX and application ease. Most of the ozone mass transfer choice is selected based on these attributes. • Do not waste too much time on ozone hard ware specifications. You will notice that most of the ozone generators have different hardware specifications and no ozone generator is the same. So by going too much on the construction of the hardware like transformers, converters, and dielectrics would be a total waste of time. What that is essentially required is to judge how the individual components would affect the performance of the ozone generator and the operations costs and compare them with other manufacturers. If you specify the construction of an ozone generator, than you are limiting your choice as no one will be able to match this. Matching construction details need not be necessarily the best for the client.  Know Well Who Your Prospective Vendors Could be: Obviously this is the best way to judge and evaluate the prospective vendor. How do you evaluate the process, the ozone system and the vendor? • Vendor Profile: Build a database of the vendor. The more number of years the vendor is in business the more experience he is likely to have on ozone. Small time players are not fit enough for large projects since they would lack the experience. Knowing about ozone does not mean enough experience. Experience in ozone means the references the manufacture has. The more references he has the more experience he would be having. The more experience the vendor has on different ozone applications the more knowledgeable he would be. Often repeat customers are an indication of a good vendor. • Experience in One Application Does Not Mean Experience in Another: Different application, this is a common mistake made by many clients. Ozone experience in one application does not mean the vendor has experience in another application. All parameters are different from application to application, ozone chemistry changes and so does application methodology. • Very Often Clients Check Up and Seem to prefer on Local Experiences of Supplier: For ozone projects, this is often a stumbling block for a better and more experienced vendor. Forexample, a sewage treatment in India is similar to a sewage treatment Inside an Ozone Generator
  • 3. 54 Activated Carbon, RO Systems, Cooling Towers, Chlorinators, Ozonators & UV Systems, Booster Pumps & SystemsINDUSTRY SPOTLIGHT EverythingAboutWater | SEPTEMBER 2016 www.eawater.com/eMagazine About the Author Shreyas B is one of the Directors of a Chennai based Ozone company OTSIL. Shreyas joined OTSIL after his basic engineering and chemistry degree from BITS Pilani. Shreyas is also an Alumni of IIM Ahemadabad. He had his training from his father Mr. V.Baratharaj, who has 25 years of ozone experience and is one of few ozone specialists in India. Ozone Technologies and Systems Indian Pvt Limited is more popularly known in the Industry circle as OTSIL. It is one of the leading ozone companies in India with more than 1000 applications all over India. OTSIL manufactures its own ozone generators INDIZONE fully backed up with an excellent service Team. OTSIL has varied application expertise in ozone, including Paper and Pulp, ozonolysis, AOP methods of utilizing ozone, apart from water and waste water treatment. To know more about the author, you can write to us.Your feedback is welcome and should be sent at: mayur@eawater.com. anywhere around the world. Chemistry is the same and so application is similar. So, not having application references locally is not a disqualification. What that should bother the client is reliability of the equipment, experience in similar operating environment for example (hot and humid conditions differ from cold and snowy conditions), operation and maintenance costs, availability of service network and most importantly the credibility of the manufacturer. • Consider Total Costs: Operating and maintenance costs play a very crucial role in any ozone project. While providing basis of evaluation in a tender it is very important that the total costs are considered to decide on the vendor. For example, an ozone system total cost includes cost of ozone generator, costs of oxygen plant, costs of chiller plant, power costs for ozone production, power costs for oxygen production, the power costs for ozone injection, cost of annual maintenance of the ozone and oxygen system, costs of replacement of dielectrics, cost of spare parts of the ozone system. If the project vendor is decided only based on the cost of the equipment, there is all likely hoods that the client is likely to spend enormous money of operation and maintenance costs. A good technical bid will comprise of evaluating the whole ozone system in its totality, including all accessories, spares and annual maintenance costs. This is important since once a vendor is selected for ozone, it is a marriage for life and there can be no divorce. Caution Do Not Cut and Paste Specifications: Often tender specifications are available over internet and in some companies’ websites. Specifications are available in past tenders. Tender specifications need to be precise, in tune with the requirement of the project and cutting and pasting available informationonspecificationswouldresultinwrong design, increased costs and may be application failures. Overall costs could make the project non- viable. During engineering client can experience demands for changes due to wrong specification and design and this would be responsible for delays, cost overruns etc. Clients’ best bet will be to approach knowledgeable ozone experts and seek advice and directions to proceed, obtain the right design, equipment specifications. This will also hold good while preparing a DPR. Spare Design Spare design could increase overall costs multifold. A prudent detailed project report should provide engineering standards that provide limited risks of shutdown of the process. No projects can be economically designed for 100 percent risk of breakdown. In that case all equipments must have 100 percent spare capacity. 100 percent spare capacity is normally recommended in equipments that have moving parts and if the equipment is crucial for continuous performances. Often 100 percent spare design can be avoided by recommending reliable equipments and vendors. Spare design can be optimized if the equipments are easy to service, if the service network of the vendor is proven and spare parts are available locally. Pay a little extra for a reliable equipment and vendor is much better than increasing the reliability by providing 100 percent spare capacity. Recommending modular ozone system does not ensure 100 percent reliability as if one modular can fail, many can also fail. It is the overall reliability that needs to be keeping in mind. That is why knowing the vendor, availability of local service network and spares can all go to lower the CAPEX. Visiting the manufacturing premises of the prospective vendors, discussion with the engineering team, personal visits to installed projects of the vendor, talking to the end user, conducting a due diligence on the vendor and their operations, all provide vital information that makes decision making easier and more accurate. Ozone would then become comparable to other technologies in terms of CAPEX and OPEX and would find wider uses. Ozone Generator with an Oxygen Plant and Chiller System