order online SHOP.ERIKS.CO.UK
call 0845 006 6000
CallLocal08450066000Issue15
Product & Service Know-How
0845 006 6000
Issue15
Your quick guide to our
PRODUCTS & SERVICES
Tools, Safety
& Maintenance
Flow
Control
Sealing &
Polymer
Fluid Power,
Transfer &
Control
Power
Transmission
Bearings
TechDirect
Your product journey
with ERIKS
ONE
CONVERSATION
to unlock
COUNTLESS
SOLUTIONS...
ERIKS’ understanding of the environment in
which a transmission system must work, the
stresses it has to handle, and the results it has
to produce, enables us to engineer a solution
you can rely on - for increased efficiency,
extended life, minimum maintenance and
maximum productivity.
Power
Transmission
Belt & Chain Drives | Motors |
Couplings | Gearboxes I Inverters
Pages 33-78
ERIKS offers you fast, cost-effective access
to an extensive range of world-leading brands.
Our exceptional product know-how, coupled
with our range of
in-house application engineers, means that
we are ideally positioned to provide solutions
based on a true understanding of your needs.
Fluid Power,
Transfer & Control
Pneumatics | Hydraulics |
Filtration | Industrial Hose
Pages 79-146
ERIKS Tools, Safety and Maintenance provide
brand leaders in all of its 3 main product
areas – Safety, Tooling and Consumables.
Choosing the right tools safety and
maintenance equipment is not just about
getting the job done more efficiently; it is also
about protecting employees from the risk of
injury.
Tools, Safety &
Maintenance
Tools | Spill Control | PPE |
Lubricants | Adhesives
Pages 201-248
ERIKS Flow Control have the know-how to
ensure your plant runs efficiently, keeping
expensive downtime to a minimum.
Whether you need a solution for Pumps or
Valves ERIKS have the engineering capability,
technical experience and supply chain you
can rely on, year in year out!
Flow Control
Pumps | Valves & Automation
Pages 171-200
Our Technology Centre has sealing all
wrapped up. With products, materials,
processes, application know-how and
resources all available 24/7 - ERIKS really
does offer a complete sealing solution
package.
Sealing & Polymer
Industrial Seals | Gaskets
Pages 147-170
Pages 1-32
ERIKS offers over £5 million of bearing stock
available the same day with a further £150
million of stock available next day.
As an authorised distributor for the key global
bearing brands, ERIKS has integrated logistic
links with all key manufacturers delivering the
most reliable supply service.
Bearings
Bearings | Fitting Tools |
Condition Monitoring
You only have to ask ERIKS, to get all the answers
you need. That’s because it only takes one con-
versation to unlock countless solutions, for all your
industrial product, service, supply and support
needs. In fact, there’s no simpler way to get things
done than talking to ERIKS.
Sealing &
Polymer
Our extensive
PRODUCT
RANGE has the
DEPTH and
BREADTH
you need
£22m of stock
with access to
over 1.3m
product lines
Tools, Safety &
Maintenance
Flow
Control
Fluid
Power, Transfer
& Control
Power
Transmission
Bearings &
Lubrication
For most ERIKS customers, that conversation starts with
products. And since ERIKS is the European market leader
for Industrial Products and Services, why wouldn’t it? The
company has over £23m of mechanical and electrical
engineering components in stock, all manufactured with
care to the highest quality. So one conversation with
ERIKS can unlock a huge range of product solutions,
across:
	 Bearings and lubrication
	 Power transmission
	 Fluid power, transfer and control
	 Sealing and polymer
	 Flow control
	 Tools, safety and maintenance
But products alone are only the start of what makes
ERIKS unique.
Our engineering know-how is decades of technical
experience
It’s engineers with real expertise gained and applied in
real-life situations, where minimising downtime, optimising
productivity and maximising safety are part and parcel of
any project. It’s also a deep understanding of customers’
industries and product applications, so that product issues
can be quickly and accurately identified, and effectively
solved, prevented or mitigated.
From
APPLICATION
toCUSTOMISED
andENGINEERED
solutions,wedo
what’sRIGHT
forYOU
ADD to that what
we CAN DO with
our unrivalled technical
KNOW-HOW
More TLC less
TCO with our
PRODUCT LIFE
CYCLE
management
PRODUCTS are
only the START, we
MONITOR, MAINTAIN,
REPAIR or UPGRADE
to keep your plant running
EFFICIENTLY
A thorough understanding of applications also makes it
easier for ERIKS to provide customised and engineered
solutions, where off-the-shelf won’t do. Unique problems
demand unique solutions, and ERIKS has the skills and
resources to engineer them.
However, ERIKS’ know-how doesn’t end with providing a
product solution, whether ready-made or custom-built. In
fact, that’s only the beginning.
Life-support for products
ERIKS understand that the most forward-looking
customers don’t judge a product’s performance on its
price tag. After all, any savings on the initial purchase
can soon be wiped out by the costs of excessive
maintenance, unforeseen repairs, or a shorter than
expected service life.
That’s why ERIKS promise to supply products which
provide long-term solutions and reliable, sustainable,
energy-efficient operation – for a longer, more cost-
effective life.
Every single product supplied by ERIKS is then supported
by ERIKS. This TLC for your products throughout
their lifecycle – including Condition Monitoring, Asset
Management and On-Site Maintenance – means a lower
TCO in the long-run. And the company can also commit
to repairing, upgrading, and replacing at the end of the
product’s service life, to ensure you maintain optimum
efficiency and productivity.
All of which helps to put into perspective investing a few
extra pennies on a price tag at the start.
People make Solutions
Whether they’re product specialists or van drivers,
switchboard operators or maintenance engineers, sales
staff or accountants, everyone at ERIKS works in customer
service. So ERIKS people make products into solutions, by
combining customer service that’s consistently great with
insight and solutions that deliver performance at the best
TCO.
ERIKS’ aim is to work with you in a true partnership. One
that makes it hard to tell where your team ends and ERIKS’
begins. By adding an extra layer of knowledge – without
adding an extra layer of complexity – working with ERIKS
is seamless, complementary, efficient and effective. Again,
the statistics speak for themselves: ERIKS can save your
engineers’ time, and already delivers a total of £2m every
month in signed-off cost-savings for customers.
That’s not just for now, but for the future too.
ERIKS invest heavily in internal training, continued
professional development and apprenticeship and graduate
schemes, to bring on board then develop new talent
ready to meet new challenges. The industrial engineering
workforce may be ageing and shrinking, but ERIKS is ready
to fill the gap.
It’s our GREAT
PEOPLE that
MAKE IT WORK
each and EVERY
DAY
Investing in SKILLS
for TODAY and
TOMORROW
ZERO
accident
policy
We can SAVE
10-15% of
your engineers
TIME
All backed up by a
ROBUST and
EFFICIENT
LOGISTICS
infrastructure
99.6%
on time
DELIVERY
RATE
ERIKS
WEBSHOP
purchasing power
at your
FINGERTIPS
Full STOCK
MANAGEMENT
through our
INTEGRATED
or ONSITE
solution
There for you
LOCALLY through
our network of HUBS
and SERVICE
CENTRES
Many businesses trust ERIKS to help them achieve their
KPIs and meet their SLAs. Others simply rely on them
to help keep their production running at its optimum, by
providing condition monitoring and predictive maintenance
solutions. Or timely repair, replace or upgrade advice. By
helping them keep up to date with new products, new
technology and new legislation. And of course, by providing
the right products at the right time.
For those customers who need ERIKS people on site, the
ERIKS Zero Accidents policy is highly reassuring. As a
health and safety goal, it makes the company safer to work
for and safer to work with. It also means that your own
safety record won’t be compromised by ERIKS’ engineers
or other teams, because you can be sure they’re as safety
conscious as you are.
Solutions at your fingertips
Even the best and most appropriate product solution is no
use to you unless it’s readily available and quickly, efficiently
and reliably delivered. So it’s reassuring to know that even
the largest companies, which depend absolutely on a
robust supply chain, depend absolutely on ERIKS.
As a major global business, ERIKS can guarantee continuity
of supply. And as a business, with long-term partnerships
with many manufacturers, they can also remove the risk of
inadvertently purchasing counterfeit products.
In fact, many products supplied by ERIKS have been
developed as a result of these partnerships. ERIKS’
application know-how has informed the manufacturer’s
design expertise, to produce a high-quality and highly
efficient end result.
Even ordering is made easier with ERIKS, thanks to the
availability of a sophisticated ecommerce solution which
can be integrated into your own ERP system. There’s also
a national network of ERIKS Service Centres and Regional
Hubs, ensuring products and expertise are always within
quick and easy reach. The statistics speak for themselves:
99.6% on-time delivery means less downtime and less lost
production.
Or if you want the products you need, exactly where you
need them, ERIKS’ stock management, integrated or on-
site solutions – taking ownership of your MRO supply chain
– mean stock is always on site and always on time.
Talk is cheap
It’s easy to talk about the great products, great services and
great people you’ll find at ERIKS. It’s harder to prove it’s all
true.
However, all it takes is one conversation to find out for
yourself.
Talk to ERIKS about your product requirements.
About a tricky application. About avoiding un-
planned maintenance. About saving energy. About
any one of the countless challenges you face every
day.
ERIKS...
making it
SIMPLE to
get things
DONE
With ERIKS, exceptional service isn’t something
you have to search for. It’s there when you
need it, wherever you are. From our high-level
Technology Centres, to our Regional Hubs in
your area, and our Integrated Service Centres
on your site, ERIKS exceptional service is at
your service.
Exceptional service
at every level
Parts warehouse
Carries a significant stock of
factory fresh key parts and
consumables profiles to the local
industry across the full ERIKS
product range, these parts, all
from leading brands are fully
traceable and are backed
by continuity of supply.
Product Customisation Cells
Able to produce customised
assemblies and solutions in moments,
these flexible cells respond to orders
within moments of receiving the
request. Located next to the
component parts stores, they can call
off, build and test assemblies and
systems faster than most companies
can acknowledge your enquiry.
Engineering
Covering both mechanical and electrical
(LV and HV) disciplines, the facilities have
initial inspection and cleaning areas, repair
bays staffed by time served specialists with
years of expertise supported by machining
cells able to produce hard to find or long
lead-time components and dedicated
equipment to aid the speed and quality of
repairs from burnout ovens and balancing
machines to winding machines
Demonstration and
Training
A live learning area designed
and equipped to help
maintenance and supply chain
professionals learn about the
latest best practice, techniques
and innovative products.
Technical Support
Our technical specialists can
help with everything from a
simple parts selection to a full
turnkey product and everything
between including customisation,
subassemblies and application
engineering across all nine of
our core product areas.
Maintenance Engineering
The ERIKS maintenance
engineering team cover both
workshop based facilities and
mobile customer site based
team as well as technical
support functions.
Site Services
The ERIKS site services team
are on hand to support you install,
commission and maintain many
parts of your plant, trained to the
highest standard and with the
latest tools and technologies to
keep your equipment performing
as you need.
Technology Centre
Home of a Product Business Unit (the new name to replace Core
Competence Centre or CCC) undertaking product design,
innovation and development often in conjunction with key brands
and supply partners, building and managing supplier agreements
and relationships, engineering turnkey solutions for large projects,
developing line side supply for volume manufacturers, supporting
and developing technical knowhow for all ERIKS operations.
Regional Hubs
Strengthens ERIKS local knowhow operating as a complete and
comprehensive business unit supporting local service centres,
integrated and onsites along with their own customers with
engineering capability, parts customisation, commercial
knowhow, application engineering and logistics across the
complete ERIKS core product and service offering.
Technical Service Centres
Service centres with additional areas of capability such as
engineering/repair or customisation in specific product areas
such as gasket cutting or hose assembly with the supporting
application engineering anchor points. These sites will be located
in areas with high demand for specific capabilities required by
local industry.
Service Centres
Support and service the ERIKS broad customer base calling on
specific support from Regional Hubs or Technical service centres
as and when required, these teams have the strongest
relationship with our customers helping them achieve their
specific goals and objectives.
Onsite Service Centre
Located on a customer’s site to support the selection and
specification of core products with support from technical
specialists and the logistics operations of ERIKS.
Integrated Service Centre
Located on a customer’s site owning some or all of the indirect
supply chain; from specification, purchasing, stores, asset
management and technical/application support directly
integrated with the customers systems and procedures.
Customer Service
The customer service team
make sure you are up to date
with all activity on the go, from
checking a price and availability to
a progress report on a new build,
repair or requesting a site visit
by one of the ERIKS site
engineering service crew.
BEARING
Technology
Quick reference
ERIKS offers over £5 million of bearing
stock available the same day with a
further £150 million of stock available
next day.
As an authorised distributor for the key global
bearing brands, ERIKS has integrated logistic
links with all key manufacturers delivering the
most reliable supply service.
1
Spherical Roller Bearings 	 4-5
Deep Groove Ball Bearings	 6
Y-Bearings	7
Linear Motion and Actuation	 8
Split Roller Bearings	 9
Radial Ball Bearings	 10
SNT Split Plummer Blocks	 11
Housed Units	 12-13
Tapered Roller Bearings	 14
Linear Bearings	 16
Rotary Bearings	 17
Cylindrical Roller Bearings	 18
Super Precision Bearings	 19-21
Self-Lube®
Bearings	 22
Housings	23
Ball Busings	 24
Needle Roller Bearings	 25
Lubricators	26
Condition monitoring	 27-28, 32
Bearing Fitting Tools	 29
Test and Measurement Tools	 29-31
Quick Product Reference
4-8, 28-29 9-14 15-18 19-23
2524 26 30-31
smart technologies
Visit us at www.eriks.co.uk
Bearings
SUPERIOR Performance
BEARING Solutions
Authorised Distributors for all the top global brands. Stock
and logistics excellence with 5 million of stock available
same day and 150 million next day. Real bearing know-how
from our Application, Project and Design Engineers.
ERIKS are not just a supplier; we are a leader in condition based monitoring
(CM), bearing fitting and gearbox repairs. Our bearing engineering
‘know-how’ can produce significant reductions in downtime and
maintenance costs while helping you increase productivity. We can help you
to positively impact the total cost of your bearings.
2
WHY USE AN AUTHORISED
DISTRIBUTOR?
Short answer, total peace of mind with
full manufacture back up, warranty and
guaranteed genuine products.
n	 Full traceability
n	 Avoid fake bearings
n	Availability
n	 Full technical support
n	 Access to the latest technologies
Product Range
n	 Ball and Roller Bearings
n	 Bearing Housings, Units and Split Bearings
n	 Plain Bearings, Bushes and Rod Ends
n	 Linear Bearings
n	 Linear Actuators
n	 Bearing Tools
n	 Lubricants and Lubricators
Services
n	 Fitting
n	 Sealing
n	 Lubrication Selection and dDelivery
n	 Preventative Maintenance
n	 Repair and Refurbishment
n	 Sub-assembly
n	 Kitting
n	 Bespoke Bearing and Housing Design	
INNOVATIVE NEW
PRODUCTS
n	 SKF Explorer Upgrade
n	 NSK Molded Oil
n	 Timken Blue Brute
Specialist Technical Centres
Know-How
TOTAL FAN SOLUTIONS
Industrial fans play a key backstage role
in a variety of operations, from delivering
process gases to extracting dangerous
fumes. But their ‘behind the scenes’ nature
means they are often ignored.
So understanding the most common issues
they suffer – and how to overcome them –
can help you minimise unplanned downtime
and maximise equipment productivity.
n	 Premature failure
n	 Excessive noise
n	 Excessive vibration
n	 High temperatures
n	 Poor access, poor maintenance
To discover how
we can help you
improve reliability
and efficiency of
these crucial -
often overlooked
assets - request
a copy of our
latest Fan
Solutions
brochure.
BEARING TECHNOLOGY
10 POINT PLAN FOR GETTING THE MOST FROM
YOUR BEARINGS
Select the Correct Bearing
Choosing the right bearing at the design stage
is critical to the safe, consistent, efficient running
of your machine. Consider all the operating
parameters such as space, speed, load direction
as well as material, lubrication and shock-load.
Get What you Paid For
Counterfeit bearings are on the rise - and can
be difficult to spot - making it more important
than ever to deal with authorised sources in
the purchasing stage. The implications can be
extensive, resulting in catastrophic failure.
Store Bearings Correctly
Keep bearings in their original, unopened packaging
until mounting, to prevent corrosion and ingress
of contaminants. Beware of the shelf-life of pre-
greased bearings which can range from 3-5 years.
Prepare for Installation
Take care when removing existing bearings as
damage to components can significantly delay the
fitting and performance of the new ones. Check
you have the right equipment to hand and select
the correct fitting method, before you begin.
Fit and Align
16% of premature failures result from incorrect
fitting, damage from hammer blows can ruin the
bearings, before they even run. Adhere to correct
fitting practices and you can help extend the
bearing’s service life and reduce costs over time.
3
Correct Sealing Arrangement
The correct seal can reduce premature failures
by 14%. Even a tiny amount of contamination can
adversely affect the bearing operating life - which
is why adequate sealing arrangements are key.
Maintain Lubrication
Despite the availability of ‘sealed for life’ bearings,
36% of premature bearing failures occur as
a result of incorrect lubricant specification or
inadequate application.
Monitor Bearing Condition
Regular interval checks for bearings are ideal,
even if it’s just visual, temperature and noise
checks. Condition monitoring techniques such as
vibration analysis can be used to determine
bearing status, enabling companies to address
any issues early on and before any downtime
occurs.
Plan for Replacement
No matter how much you care for your bearings,
they will need to be replaced at some point,
condition monitoring can help you to plan for that
replacement. Ensuring you can plan for the right
people, components and tools to be available
when you need them.
Upgrade for Savings
When it comes to replacement, don’t just settle
for like-for-like; consider upgrades to sealing,
materials or different fittings - all of which can help
you improve performance further.
Visit us at www.eriks.co.uk
4
Specialist Technical Centres
Know-How
Bearings
Spherical Roller Bearings and Housings
Open bearing Sealed bearing
Competitor bearings
L10m SKF rating life
L10 Basic rating life
SKF Explorer
Bearing life
5
Visit us at www.eriks.co.uk
Bearings
SKF Explorer Spherical Roller Bearings
All SKF Explorer spherical roller bearings have
been upgraded to a new level of performance,
featuring a combination of high-quality steel and
an improved heat treatment process.
Combining the clean and homogenous high-
quality steel used in the original SKF Explorer
bearings with an improved heat treatment
process the upgraded bearings provide longer
service life, particularly under difficult operating
conditions where bearings are subjected to
contamination or poor lubrication.
SKF Spherical Roller Bearings for
Vibratory Applications
SKF Explorer spherical roller bearings for
vibrating screens (VA405) are proven to
last twice as long as other screen bearings
and operate at much cooler temperatures,
which helps:
nn Lower maintenance and repair costs
nn Reduce downtime
nn Improve safety
SKF Explorer spherical bearings (VA406) provide all the same
benefits as VA405 bearings, plus they feature a PTFE coated bore
which virtually eliminates fretting corrosion between the shaft and the
bearing bore. This helps:
nn Extend maintenance intervals
nn 	Reduce associated labour costs
The SKF Three-Barrier Solution
For highly contaminated environments, SKF
recommends the SKF Three-barrier solution, as
contaminants must pass through three barriers to
reach the bearing.
The SKF Three-barrier solution extends bearing
service life without the use of large quantities of
grease to purge contamination.
nn Sealed SKF Explorer spherical roller bearings
nn 	SKF split block housings
nn 	Standard SKF L or S-type seals for SNL housings
nn 	SKF LGGB2 biodegradable or LGEP2 as the barrier grease
11 22 33
SKF Housing Kits
Place a single SKF Housing Kit order and receive one package
containing a high-quality SKF Explorer bearing, housing and all of the
components needed to create a high performing bearing system.
Sealed SKF Explorer Spherical Roller Bearings
The sealed bearings can significantly increase
bearing service life in contaminated environments.
The bearings are pre-lubricated with a specially
formulated grease and sealed with highly effective
contact seals.
In many applications, these bearings can be
considered lubricated for the life of the bearing.
By eliminating or extending relubrication intervals,
these bearings can significantly reduce the
cost to purchase, apply and dispose of grease.
Reduced maintenance costs will, in many cases,
substantially reduce the total cost of ownership of
an application.
Half the friction, twice the speed with a new design that results in up
to 50% less seal friction, SKF’s small sealed spherical roller bearings
reduce operating temperatures by as much as 20 °C.
NEW
Part No 	 ID (mm)	OD (mm)	Length (mm)
22205E	25	 52	 18	
22210E	50	 90	 23
22215E	75	 130	 31
Part No 	 ID (mm)	OD (mm)	Length (mm)
BS2-2205-2RS/VT143	25	 52	 18	
BS2-2210-2RS/VT143	50	 90	 28
BS2-2215-2RS/VT143	75	 130	 38
Part No 	 ID (mm)	OD (mm)	Length (mm)
22310 E/VA405	 50	 110	 40	
22315 EJA/VA405	 75	 160	 55
22320 EJA/VA405	 100	 215	 73
Part No 	 ID (mm)	OD (mm)	Length (mm)
22310 E/VA405	 50	 110	 40	
22315 EJA/VA405	 75	 160	 55
22320 EJA/VA405	 100	 215	 73
Part No 	 Bearing	 Housing	 Seal
SE 22211 TA	 22211 E	 SE 211	 TSN 211 A	
SE 22511 TL/C3	 22211 EK/C3	 SE 511-609	 TSN 511 L
SE 22213 TA	 22213 E	 SE 213	 TSN 213 A
6
Specialist Technical Centres
Know-How
Bearings
Deep Groove Ball Bearings and Y-bearing units
Deep Groove Ball Bearings
These bearings are simple in design, non-separable, suitable for high and very high speeds and are robust in
operation, requiring little maintenance. Because deep groove ball bearings are the most widely used bearing type,
they are available from SKF in many designs, variants and sizes.
SKF Explorer Bearings
SKF Explorer deep groove ball bearings are designed to run cooler, smoother,
quieter and longer than standard design deep groove ball bearings
The performance of these bearings has been substantially improved by optimising
the internal geometry and surface finish of all contact surfaces, redesigning the
cage, combining the extremely clean and homogenous steel with a unique heat
treatment and improving the quality and uniformity of the balls.
SKF Energy Efficient Bearings
Shielded and sealed SKF E2 deep groove ball bearings cut
bearing friction losses by 30–50% compared to SKF Explorer
bearings.
Compared to bearings from other manufacturers, SKF E2
bearings can reduce friction losses even more. Installing these
bearings during your next round of repairs provides a valuable
opportunity to save energy.
Corrosion resistant bearings
These bearings are manufactured to
withstand tough application requirements
and to be the first choice when moisture,
corrosive or abrasive materials are
present. Applications include food and
beverage, pharmaceutical, chemical and
hydrocarbon processing or medical which
require components that can provide high operational reliability
and long service life.
Shielded E2 Bearings
INSOCOAT Bearings
These bearings have an electrically
insulating coating on the external
surfaces of the outer ring or the inner
ring. They are a very cost-effective
solution compared with other methods
of protecting bearings against damage
and eventual failure due to the passage of electric current through
their rolling contacts.
SKF Deep Groove Ball Bearings
and Y-Bearing Units
Part No 	 ID (mm)	 OD (mm)	 Width (mm)
6000	 10	 26	8
6001	 12	 28	8	
6002	 15	 32	9
6004	 20	 42	12
6005	 25	 47	12
Part No 	 ID (mm)	 OD (mm)	 Width (mm)
E2.625-2Z	5	 16	 5
E2.6000-2Z	10	 26	 8
E2.6004-2Z	20	 42	 12
Part No 	 ID (mm)	 OD (mm)	 Width (mm)
E2.626-2RSH	6	 19	 6
E2.6000-2RSH	10	 26	 8	
E2.6002-2RSH	15	 32	 9
Sealed E2 Bearings
Part No 	 ID (mm)	OD (mm)	Width (mm)
6314/C3VL0241	70	 150	 35
6216/C3VL0241	80	 140	 26
6220/C3VL0241	100	 180	 34
Part No 	 ID (mm)	OD (mm)	Width (mm)
W 605	 5	 14	 5
W 6000	 10	 26	 8
W 6002	 15	 32	 9
7
Visit us at www.eriks.co.uk
Bearings
SKF Y-Bearing Units
These are ready-to-mount and ready-to-use units equipped with a superior sealing
system. This system provides reliable protection against moisture and contaminants,
plus exceptional lubricant retention.
The assortment is extensive and includes a wide range of housing designs and
materials, and a variety of Y-bearings with locking mechanisms and seals suited to
different requirements. Housing types include Y-bearing plummer block units, flanged
Y-bearing units and Y-bearing take-up units. Housing materials include composite
material, grey cast iron, sheet steel and stainless steel.
SKF Energy Efficient Y-Bearing Units
Helping to reduce total cost of ownership, these lightweight, cost-
effective and ready-to-mount units are particularly well suited for
applications where high speeds, moderate loads,
reliability and minimal maintenance are all key
parameters. The units can be optimised
for specific applications and conditions,
helping customers reduce energy use
and total cost of ownership.
SKF Food Line Y-Bearing Units
These units offer a maintenance-free solution that enables
increased productivity, coupled with reduced costs. Once installed,
the units require no re-lubrication. They feature a maintenance-
free, stainless steel bearing
insert that is fitted with a
very efficient multiple-lip
seal and a rotating flinger
on both sides to keep the
lubricant in, and harsh
washdown solutions out,
even under high pressure
washing.
SKF Agricultural Y-Bearing Units
Developed specifically for agricultural
applications, these units are designed
to withstand the toughest operating
conditions, reduce downtime and
reduce environmental impact.
Suitable for normal and demanding
applications, they are re-lubrication-
free and feature a robust, five-lip seal
design, an advanced, truly concentric
locking method, and optional corrosion
protection.
SKF High Temperature Y-Bearing Units
These units incorporate graphite-based
lubricants that continuously lubricate the
bearing, eliminating the use of grease.
Ideal for industries such as metals and
food and beverage, these bearings
are designed for re-lubrication-free
operation at temperatures up to
350 °C.
Part No 	 ID (mm)	 Width (mm)
SY 15 TF	 15	 32	
SY 20 TF	 20	 32
SY 25 TF	 25	 36
Part No 	 ID (mm)	Width (mm)
SYK 20 FE	 20	 32
SYK 25 FE	 25	 32
SYK 30 FE	 30	 40
Part No 	 ID (mm)	Width (mm)
SYWK 20 YTH	 20	 32
SYWK 25 YTH	 25	 32
SYWK 30 YTH	 30	 40
Part No 	 ID (mm)	Width (mm)
YSPAG 205	 25	 52
YSPAG 206	 30	 62
YSPAG 207	 35	 72
Part No 	 ID (mm)	Width (mm)
SY 20 TF/VA201	 20	 32
SY 30 TF/VA201	 30	 40
SY 40 TF/VA201	 40	 48
8
Specialist Technical Centres
Know-How
Bearings
CAHB and CAT Actuators for Quick Delivery
Available for delivery in just five working days this initiative is
designed to help speed up machine build, modification and
repairs, while reducing
stockholding.
Typical applications
include medical, factory
automation, food and
beverage, and off-
highway.
SKF Roller Profile Rail Guide LLU Series
Specifically designed for machine tool applications where high
accuracy, high system rigidity, low heat generation and low noise
and vibration levels are prerequisites.
nn 	Full ISO interchangeability
nn 	High load rating at compact design
nn 	Outstanding running
smoothness
nn 	Longer service life
nn 	Reduced
maintenance
Linear Motion and Actuation
Linear Ball Bearings
Delivers advantages over competitor’s solutions, and is considered
a benchmark among linear guidance system users. SKF
technology innovations, product quality, wide range availability,
reliability and service life all contribute to efficient and cost-
effective solutions.
LBC D-series
nn Full ISO interchangeability
nn Self-aligning capability
nn Optimised cage design
nn Factory pre-lubrication
nn Corrosion-resistant design
nn Food grade lubrication option
CASM Electric Cylinders with Brushless DC
Motors
When compared to pneumatics, the investment cost will be paid
back in a short time period due to the tremendous energy savings.
Simply define the cylinder’s operating parameters by using SKF
Drive Assistant software
and benefit from variable
speed, high positioning
accuracy, high force and
a long lifetime.
NEW NEW
SKF Linear Motion and
Actuation Technology
Part No 	 ID (mm)	OD (mm)	Length (mm)
LBCR 12 D	 12	 22	 32
LBCR 16 D	 16	 26	 36
LBCR 20 D	 20	 32	 45
Without Seals
Part No 	 ID (mm)	OD (mm)	Length (mm)
LBCR 12 D-2LS	 12	 22	 32
LBCR 16 D-2LS	 16	 26	 36
LBCR 20 D-2LS	 20	 32	 45
With 2 Double Lip Seals
SKF Profile Rail Guide LLT Series
Available in a wide range of sizes, carriages and accessories as
well as in various preload and accuracy classes, which facilitates
the adaptation to individual application demands.
nn Improved service life and reliability
nn 	Ready-to-mount due to factory pre-lubrication
nn 	High flexibility in application design
nn 	Interchangeability
nn 	Simplified stock management
Part No 	 Rail Width (mm)
LLTHC 15 SA T0 P5	 15
LLTHC 20 SA T0 P5	 20
LLTHC 25 SA T0 P5	 25
Part No 	 Rail Width (mm)
LLUHS 25 A	 70
LLUHS 35 A	 100
LLUHS 45 A	 120
9
Visit us at www.eriks.co.uk
Bearings
TIMKEN Split Roller Bearings
Removable support caps
and housing halves
permit quick visual inspection
of bearing components during
scheduled maintenance.
Innovative cage clip
is fixed to the cage
and prevents loss
during assembly and
disassembly.
Machined brass cage
is standard to
accommodate
higher speeds and
temperatures.
Profiled rolling elements
reduce damaging edge
stress to increase bearing
life and reliability.
Eight seal styles,
including Kevlar®
packing seal and
aluminum triple labyrinth, handle
any operating environment.
ASTM 48A - Grade 40/BS
EN1561:1997 - Grade 250
cast iron
for strength and durability.
Spherical housing
outside diameter
allows for +/-
1.5 degrees
misalignment.
Engineered to perform
SPLIT CYLINDRICAL ROLLER BEARINGS
Revolvo Split Cylindrical Bearings are designed to help
increase operational life and reduce maintenance expense.
• Capable of handling higher speeds,
temperature and acceleration from a
highly engineered machined brass cage.
• Longer life due to a robust design
featuring double webs and thick
sections of high grade cast iron.
• Improved performance provided by profiled
rolling elements that reduce damaging
edge stress.
• Ability to closely match application load
requirements with engineered bearing
configurations.
• Able to handle a range of operating
environments with available selection
of eight seal designs.
• Available in application appropriate
housing styles.
© 2016 The Timken Company. Timken®
is a registered trademark of The Timken Company.
The Timken team applies their know-how to improve the reliability and performance of machinery in diverse
markets worldwide. The company designs, makes and markets high-performance mechanical components,
including bearings, belts, gears, chain and related mechanical power transmission products and services.
CALL ON TIMKEN
For your nearest Timken sales engineer,
visit www.timken.com
10
Specialist Technical Centres
Know-How
Bearings
Timken radial ball bearings consist of an inner and outer ring with
a cage containing a complement of precision balls.
The standard Conrad-type bearing has a deep groove
construction capable of handling radial and axial loads from either
direction in versatile designs that permit relatively high-speed
operation.
Series	 Base	 Open	 Open C3	 2 Rubber Seals	 2 Rubber Seals	 2 Metal Sheilds	 2 Metal Shields
					C3		2RS		2RS C3		ZZ		ZZ C3
6000 Series	 6000	 6000-TIMKEN	 6000C3-TIMKEN	 60002RS-TIMKEN	 60002RSC3-TIMKEN	 6000ZZ-TIMKEN	6000ZZC3-TIMKEN
	 6001	 6001-TIMKEN	 6001C3-TIMKEN	 60012RS-TIMKEN	 60012RSC3-TIMKEN	 6001ZZ-TIMKEN	6001ZZC3-TIMKEN
	 6002	 6002-TIMKEN	 6002C3-TIMKEN	 60022RS-TIMKEN	 60022RSC3-TIMKEN	 6002ZZ-TIMKEN	6002ZZC3-TIMKEN
	 6003	 6003-TIMKEN	 6003C3-TIMKEN	 60032RS-TIMKEN	 60032RSC3-TIMKEN	 6003ZZ-TIMKEN	6003ZZC3-TIMKEN
	 6004	 6004-TIMKEN	 6004C3-TIMKEN	 60042RS-TIMKEN	 60042RSC3-TIMKEN	 6004ZZ-TIMKEN	6004ZZC3-TIMKEN
	 6005	 6005-TIMKEN	 6005C3-TIMKEN	 60052RS-TIMKEN	 60052RSC3-TIMKEN	 6005ZZ-TIMKEN	6005ZZC3-TIMKEN
	 6006	 6006-TIMKEN	 6006C3-TIMKEN	 60062RS-TIMKEN	 60062RSC3-TIMKEN	 6006ZZ-TIMKEN	6006ZZC3-TIMKEN
	 6007	 6007-TIMKEN	 6007C3-TIMKEN	 60072RS-TIMKEN	 60072RSC3-TIMKEN	 6007ZZ-TIMKEN	6007ZZC3-TIMKEN
	 6008	 6008-TIMKEN	 6008C3-TIMKEN	 60082RS-TIMKEN	 60082RSC3-TIMKEN	 6008ZZ-TIMKEN	6008ZZC3-TIMKEN
	 6009	 6009-TIMKEN	 6009C3-TIMKEN	 60092RS-TIMKEN	 60092RSC3-TIMKEN	 6009ZZ-TIMKEN	6009ZZC3-TIMKEN
	 6010	 6010-TIMKEN	 6010C3-TIMKEN	 60102RS-TIMKEN	 60102RSC3-TIMKEN	 6010ZZ-TIMKEN	6010ZZC3-TIMKEN
	 6011	 6011-TIMKEN	 6011C3-TIMKEN	 60112RS-TIMKEN	 60112RSC3-TIMKEN	 6011ZZ-TIMKEN	6011ZZC3-TIMKEN
	 6012	 6012-TIMKEN	 6012C3-TIMKEN	 60122RS-TIMKEN	 60122RSC3-TIMKEN	 6012ZZ-TIMKEN	6012ZZC3-TIMKEN
	 6013	 -	 -	 60132RS-TIMKEN	 60132RSC3-TIMKEN	 -	 -
	 6014	 -	 -	 60142RS-TIMKEN	 60142RSC3-TIMKEN	 -	 -
	 6015	 -	 -	 60152RS-TIMKEN	 60152RSC3-TIMKEN	 -	 -
	 6016	 -	 -	 60162RS-TIMKEN	 60162RSC3-TIMKEN	 -	 -
	 6017	 -	 -	 -	 60172RSC3-TIMKEN	 -	 -
6200 Series	 6200	 6200-TIMKEN	 6200C3-TIMKEN	 62002RS-TIMKEN	 62002RSC3-TIMKEN	 6200ZZ-TIMKEN	6200ZZC3-TIMKEN
	 6201	 6201-TIMKEN	 6201C3-TIMKEN	 62012RS-TIMKEN	 -	 6201ZZ-TIMKEN	 6201ZZC3-TIMKEN
	 6202	 6202-TIMKEN	 6202C3-TIMKEN	 62022RS-TIMKEN	 62022RSC3-TIMKEN	 6202ZZ-TIMKEN	6202ZZC3-TIMKEN
	 6203	 6203-TIMKEN	 6203C3-TIMKEN	 62032RS-TIMKEN	 62032RSC3-TIMKEN	 6203ZZ-TIMKEN	6203ZZC3-TIMKEN
	 6204	 6204-TIMKEN	 6204C3-TIMKEN	 62042RS-TIMKEN	 62042RSC3-TIMKEN	 6204ZZ-TIMKEN	6204ZZC3-TIMKEN
	 6205	 6205-TIMKEN	 6205C3-TIMKEN	 62052RS-TIMKEN	 62052RSC3-TIMKEN	 6205ZZ-TIMKEN	6205ZZC3-TIMKEN
	 6206	 6206-TIMKEN	 6206C3-TIMKEN	 62062RS-TIMKEN	 62062RSC3-TIMKEN	 6206ZZ-TIMKEN	6206ZZC3-TIMKEN
	 6207	 6207-TIMKEN	 6207C3-TIMKEN	 62072RS-TIMKEN	 62072RSC3-TIMKEN	 6207ZZ-TIMKEN	6207ZZC3-TIMKEN
	 6208	 6208-TIMKEN	 6208C3-TIMKEN	 62082RS-TIMKEN	 62082RSC3-TIMKEN	 6208ZZ-TIMKEN	6208ZZC3-TIMKEN
	 6209	 6209-TIMKEN	 6209C3-TIMKEN	 62092RS-TIMKEN	 62092RSC3-TIMKEN	 6209ZZ-TIMKEN	6209ZZC3-TIMKEN
	 6210	 6210-TIMKEN	 6210C3-TIMKEN	 62102RS-TIMKEN	 62102RSC3-TIMKEN	 6210ZZ-TIMKEN	6210ZZC3-TIMKEN
	 6211	 6211-TIMKEN	 6211C3-TIMKEN	 62112RS-TIMKEN	 62112RSC3-TIMKEN	 6211ZZ-TIMKEN	6211ZZC3-TIMKEN
	 6212	 6212-TIMKEN	 6212C3-TIMKEN	 62122RS-TIMKEN	 62122RSC3-TIMKEN	 6212ZZ-TIMKEN	6212ZZC3-TIMKEN
	 6213	 -	 -	 62132RS-TIMKEN	 62132RSC3-TIMKEN	 -	 -
6300 Series	 6300	 6300-TIMKEN	 6300C3-TIMKEN	 63002RS-TIMKEN	 63002RSC3-TIMKEN	 6300ZZ-TIMKEN	6300ZZC3-TIMKEN
	 6301	 6301-TIMKEN	 6301C3-TIMKEN	 63012RS-TIMKEN	 63012RSC3-TIMKEN	 6301ZZ-TIMKEN	6301ZZC3-TIMKEN
	 6302	 6302-TIMKEN	 6302C3-TIMKEN	 63022RS-TIMKEN	 63022RSC3-TIMKEN	 6302ZZ-TIMKEN	6302ZZC3-TIMKEN
	 6303	 6303-TIMKEN	 6303C3-TIMKEN	 63032RS-TIMKEN	 63032RSC3-TIMKEN	 6303ZZ-TIMKEN	6303ZZC3-TIMKEN
	 6304	 6304-TIMKEN	 6304C3-TIMKEN	 63042RS-TIMKEN	 63042RSC3-TIMKEN	 6304ZZ-TIMKEN	6304ZZC3-TIMKEN
	 6305	 6305-TIMKEN	 6305C3-TIMKEN	 63052RS-TIMKEN	 63052RSC3-TIMKEN	 6305ZZ-TIMKEN	6305ZZC3-TIMKEN
	 6306	 6306-TIMKEN	 6306C3-TIMKEN	 63062RS-TIMKEN	 63062RSC3-TIMKEN	 6306ZZ-TIMKEN	6306ZZC3-TIMKEN
	 6307	 6307-TIMKEN	 6307C3-TIMKEN	 63072RS-TIMKEN	 63072RSC3-TIMKEN	 6307ZZ-TIMKEN	6307ZZC3-TIMKEN
	 6308	 6308-TIMKEN	 6308C3-TIMKEN	 63082RS-TIMKEN	 63082RSC3-TIMKEN	 6308ZZ-TIMKEN	6308ZZC3-TIMKEN
	 6309	 6309-TIMKEN	 6309C3-TIMKEN	 63092RS-TIMKEN	 63092RSC3-TIMKEN	 6309ZZ-TIMKEN	6309ZZC3-TIMKEN
	 6310	 6310-TIMKEN	 6310C3-TIMKEN	 63102RS-TIMKEN	 63102RSC3-TIMKEN	 6310ZZ-TIMKEN	6310ZZC3-TIMKEN
	 6311	 6311-TIMKEN	 6311C3-TIMKEN	 63112RS-TIMKEN	 63112RSC3-TIMKEN	 6311ZZ-TIMKEN	6311ZZC3-TIMKEN
	 6312	 6312-TIMKEN	 6312C3-TIMKEN	 63122RS-TIMKEN	 63122RSC3-TIMKEN	 6312ZZ-TIMKEN	6312ZZC3-TIMKEN
Miniature	 607	 -	 -	 6072RS-TIMKEN	 6072RSC3-TIMKEN	 607ZZ-TIMKEN	 607ZZC3-TIMKEN
	 608	 608-TIMKEN	 -	 6082RS-TIMKEN	 6082RSC3-TIMKEN	 608ZZ-TIMKEN	 608ZZC3-TIMKEN
	 609	 -	 -	 6092RS-TIMKEN	 6092RSC3-TIMKEN	 609ZZ-TIMKEN	 609ZZC3-TIMKEN
	 626	 626-TIMKEN	 -	 6262RS-TIMKEN	 6262RSC3-TIMKEN	 626ZZ-TIMKEN	 626ZZC3-TIMKEN
	 627	 627-TIMKEN	 -	 6272RS-TIMKEN	 6272RSC3-TIMKEN	 627ZZ-TIMKEN	 -
	 628	 -	 -	 -	 -	 628ZZ-TIMKEN	 -
	 629	 629-TIMKEN	 -	 6292RS-TIMKEN	 6292RSC3-TIMKEN	 629ZZ-TIMKEN	 -
Radial Ball Bearings
Radial Ball Bearings and Plummer Blocks
11
Visit us at www.eriks.co.uk
Bearings
SNT Split Plummer Blocks
Features
nn Split construction for convenient assembly and disassembly.
nn Units include pry-tool slots for quick and easy installation.
nn Centre marks to simplify alignment and dimples for positioning
pins and four-bolt mounting.
nn Seal grooves allow for various sealing options.
nn The design allows for simplified bearing inspection, service and
replacement.
Applications
nn Conveyors
nn Ball Millls
Design and Construction
Timken offers split plummer block housings that can be built
with either tapered bore bearings with adapters for mounting
on straight shafts or cylindrical bore bearings for assembly on
shouldered shafts.
Timken uses a system of dowelling caps and bases together
at an early stage of manufacturing, so that they remain a single
unit during machining. They are not interchangeable as separate
parts and become precisely mated components, helping to
ensure a precise fit. Timken supplies plummer block housings
for mounting with two or four bolts.
Split-block housings
Provide proper support with precision-fit
matched cap-and-base with dowel pins.
Simplifies alignment and installation of heavy
housings. Convenient pry-tool slots for easy
cap removal speeds bearing inspection and
replacement.
Timken®
spherical roller
bearings
Increase reliability with a high-
performance bearing that runs cooler
for longer bearing life.
Locating rings
Provide flexibility to fix or float
the bearing.
Optional end caps
Avoid damage to bearing and
housing. Easy to install and
remove.
Cast-iron
Rugged cast-iron is well-suited for
harsh industrial applications. Available
in steel or ductile iron.
Seal options
Protect the bearing with
double-lip, labyrinth, V-ring
and taconite sealing options.
Tapered adapter
For straight bore mounting secure
each bearing onto the shaft.
Standard metric mounting
dimensions
Ease installation with same
dimensions as industry norms for
bolt holes, centre heights and shaft
diameters. Conforms to
ISO 113:1999.
Sizes
nn 20–400mm shafts
nn Casters
nn Rolling mills
nn Heavy movable structures
Timken’s capabilities in engineering and manufacturing heavy-duty plummer blocks help ensure high performance
from their products
12
Specialist Technical Centres
Know-How
Bearings
Housed Units
Spherical Roller Bearing
Steel Cage (EJ)
Size Range
25mm bore up to 400mm
outside diameter
Design
•	 Internal geometry
and surface finishes
optimised to maximise
bearing performance
and lower running
temperature
Industries & Applications
•	 Continuous casters
•	 Gear drives
•	 Cement
•	 Aggregate
•	 Mining and construction
•	 Oil and gas
•	 Pumps and compressors
•	 Air handling units
•	 Cranes, lifts and hoists
SNT Plummer BlocksSpherical Roller Bearing
Brass Cage (EM, EMB)
Size Range
30mm to 1500mm bore size
Design
•	 EM type feature precision-
machined, roller-riding
brass cages and are
designed for harsh
industrial environments
•	 EMB type feature
precision-machined land-
riding one-piece brass
cages, and are designed
for applications requiring a
larger bore size
Industries & Applications
EM
•	 Continuous casters
•	 Vibratory screens
•	 Gear drives
EMB
•	 Continuous casters
•	 Gear drives
•	 Cement and aggregate
•	 Mining & construction
•	 Oil & gas
•	 Pumps & Compressors
Size Range
20mm to 380mm bore size
Design
•	 Durable cast-iron
housing and robust
sealing options to
keep lubrication in and
contamination out
•	 Separate, matched
caps and bases ease
installation
•	 Simply remove the cap
using a pry-tool slot
for bearing inspection,
service and replacement
Industries & Applications
•	 Gear drives
•	 Cement
•	 Aggregate
•	 Mining and construction
•	 Oil and gas
•	 Pumping and
compressors
•	 Air handling units
Size Range
Available in sizes up to
900mm
Design
•	 Adapter sleeves are
used with a nut and
locking device to simplify
mounting a tapered bore
bearing on a straight
shaft using a pull-type fit
•	 Withdrawal sleeves
feature a push-type
mounting arrangement
and a locking device to
secure a bearing to a
shaft
Industries & Applications
•	 Continuous casters
•	 Gear drives
•	 Cement
•	 Aggregate
•	 Mining and construction
•	 Oil and gas
•	 Air handling units
Spherical Roller Bearing
Accessories
Designed for the toughest conditions
Tough bearings for tough jobs from Timken...
13
Visit us at www.eriks.co.uk
Bearings
Size Range
1.3/8 to 11.13/16 11" with
special shaft sizes available up
to 39.3/8" and beyond
Design
•	 Rugged cast-iron or
cast-steel housings with
high capacity spherical
roller bearings to meet
the toughest demands of
heavy industry
•	 Split construction allows
for easy assembly and
disassembly
•	 Multiple sealing
options protect against
contamination
Industries & Applications
•	 Conveyors
•	 Mining applications
•	 Pulp and paper mills
•	 Rolling mills
SAF Pillow Blocks Spherical Roller Bearing
Solid-Block Housed Units
Size Range
Shafts from 35 to 400mm
(1.7/16" to 15.3/4")
Design
•	 Made with cast-steel
housings and Timken high-
performance spherical
roller bearings, these are
the only spherical roller
bearing housed units to
offer steel solid-block
housings as standard
•	 Can run on misaligned
shafts up to ±1.5°
without a reduction in life
expectancy
Industries & Applications
•	 Metal mills
•	 Aggregate and cement
•	 Mining
•	 Power generation
•	 Pulp and paper
•	 Material conveying
•	 Sugar mills
•	 Agriculture
•	 Waste management
•	 Waste waste treatment
•	 HVAC, fans & blowers
•	 Cranes, Lifts and hoists
Type E Tapered Roller
Bearing Housed Units
Revolvo Split Roller
Bearing
Size Range
Shafts from 35 to 125mm
bore size
Design
•	 Timken Type E tapered
roller bearing housed
units feature industry-
leading premium tapered
roller bearings, high-
performance seals,
e-coated housings and
powerful locking collars
•	 Available as: Pillow
blocks, Flange units,
Take-up units
Industries & Applications
•	 Material-handling
•	 Processing equipment
•	 Air-handling equipment
•	 Mixers
•	 Washers
•	 Shredders
•	 Mills
•	 Vibrating equipment
•	 Ovens and furnaces
Size Range
35mm to 600mm (Larger in
special design)
Design
•	 Split-to-the-shaft design
enables the bearing to be
fitted without requiring
access to the shaft ends,
can be built around the
shaft. Huge savings in
unnecessary downtime
as there is no need
to remove other drive
components
Industries & Applications
•	 Metal mills
•	 Aggregate and cement
•	 Mining
•	 Power generation
•	 Pulp and paper
•	 Material conveying
•	 Sugar mills
•	 Agriculture
•	 Waste management
•	 Waste waste treatment
•	 HVAC, fans & blowers
•	 Cranes, Lifts and hoists
Formally QM Blue-Brute
14
Specialist Technical Centres
Know-How
Bearings
Tapered Roller Bearings
Timken offers the most extensive line of tapered roller bearings available
anywhere in the world.
Tapered roller bearings are uniquely designed to manage both thrust and radial loads on
rotating shafts and in housings.
Available in single-, double- and four-row configurations, customised geometries and
engineered surfaces can be applied to these bearings to further enhance performance in
demanding applications.
Single-Row Tapered Roller Bearings
The most basic and widely used tapered
bearing, usually fitted as one of an
opposing pair.
Double-Row Tapered Roller
Bearings
With double cups and two single cones,
these are available in a variety of
configurations.
Four-Row Tapered Roller Bearings
Combine the inherent high-load, radial/
thrust capacity and direct/indirect
mounting variables of tapered roller
bearings into assemblies of maximum load
rating in minimum space.
Part No	 Inside	 Outside
	 Diameter	Diameter	Width
30202-TIMKEN	15mm	 35mm	 11.75mm
30203-TIMKEN	17mm	 40mm	 13.25mm
30204-TIMKEN	20mm	 47mm	 15.25mm
30205-TIMKEN	25mm	 52mm	 16.25mm
30206-TIMKEN	30mm	 62mm	 17.25mm
30207-TIMKEN	35mm	 72mm	 18.25mm
30208-TIMKEN	40mm	 80mm	 19.75mm
30209-TIMKEN	45mm	 85mm	 20.75mm
30210-TIMKEN	50mm	 90mm	 21.75mm
30211-TIMKEN	55mm	 100mm	 22.75mm
30212-TIMKEN	60mm	 110mm	 23.75mm
30213-TIMKEN	65mm	 120mm	 24.75mm
30214-TIMKEN	70mm	 125mm	 26.25mm
Part No	 Inside	 Outside
	 Diameter	Diameter	 Width
30218-TIMKEN	90mm	 160mm	 32.5mm
30302-TIMKEN	15mm	 42mm	 14.25mm
30303-TIMKEN	17mm	 47mm	 15.25mm
30304-TIMKEN	20mm	 52mm	 16.25mm
30305-TIMKEN	25mm	 62mm	 18.25mm
30306-TIMKEN	30mm	 72mm	 20.75mm
30307-TIMKEN	35mm	 80mm	 22.75mm
30308-TIMKEN	40mm	 90mm	 25.25mm
31305-TIMKEN	25mm	 62mm	 18.25mm
31308-TIMKEN	40mm	 90mm	 25.25mm
31310-TIMKEN	50mm	 110mm	 29.25mm
31311-TIMKEN	55mm	 120mm	 31.5mm
31313-TIMKEN	65mm	 140mm	 36mm
Part No	 Inside	 Outside
	 Diameter	Diameter	Width
32004-TIMKEN	20mm	 42mm	 15mm
32005-TIMKEN	25mm	 47mm	 15mm
32006-TIMKEN	30mm	 55mm	 17mm
32007-TIMKEN	35mm	 62mm	 18mm
32008-TIMKEN	40mm	 68mm	 19mm
32009-TIMKEN	45mm	 75mm	 20mm
32010-TIMKEN	50mm	 80mm	 20mm
32011-TIMKEN	55mm	 90mm	 23mm
32012-TIMKEN	60mm	 95mm	 23mm
32013-TIMKEN	65mm	 100mm	 23mm
32014-TIMKEN	70mm	 110mm	 25mm
32024-TIMKEN	120mm	 180mm	 38mm
Here’s just
our best sellers.
Don’t forget we
have 100s of
other sizes –
call us with your
needs!
Tapered Roller Bearings
Thousands of
products available
to order on
ERIKS
WEBSHOP
SHOP.ERIKS.CO.UK
SHOP.ERIKS
.CO.UKSHOP
.ERIKS.CO.UK
15
Visit us at www.eriks.co.uk
Bearings
Mobility for
Tomorrow
Future trends are clear - increasingly intelligent bearings
and mechatronics systems require the Products and
Maintenance Management solutions of Tomorrow.
Yet Schaeffler provides those revolutionary solutions Today ...
Products which are ever-more efficient, safer and quieter;
keeping pace with the demands of heavy industry,
renewable energy, automotive and rail transport applications.
And Condition Monitoring which remotely evaluates
real-load data to extend maintenance intervals safely
leading to greater cost savings.
Mobility for Tomorrow ... it’s here today
16
Specialist Technical Centres
Know-How
Bearings
Linear Bearings
nn Compact Series (KH..) Ø6 to Ø50
nn Light Series (KN..) Ø12 to Ø50
nn Machined Series (KB..) Ø12 to Ø50
nn Permaglide® Plain Series (PAB..) Ø12 to Ø50
nn Shafts have metric dimensions and are 	
manufactured to tolerance class h6
nn Made from quenched and tempered steel with a
surface hardness of 59 to 65 HRC
nn Corrosion-resistant version available
nn Can be machined to customer specification
nn Shafts have metric dimensions and are
manufactured to tolerance class h6 or h7
depending on size
nn Made from quenched and tempered steel with
a surface hardness of 59 to 65 HRC
nn Corrosion-resistant version available
nn Can be machined to customer specification
nn Hollow section carriage made from anodized,
profiled aluminium
nn Comprises carriage plate, four bolts, four
track rollers, two end covers and eight T-nuts
nn Preset clearance, no adjustment required
nn LFS guideways supplied single piece or multi piece
nn Can be installed in any combination with all
guideways LFS
nn Other carriages available (LFL.., LFDL.., LFKL.. etc)
nn Four-row linear recirculating ball bearing and
guideway assembly
nn Wide range of carriage types
nn For applications with long unlimited stroke lengths
nn Moderate and high loads, moderate and high rigidity
nn Guideways supplied in single or multi piece lengths
nn High speed version (10m/s) also available
nn Wide range of accessories available
nn Also available in 6 row design KUSE
Part No	 Height (mm)	Width (mm)	Length (mm)
LFCL25	30.5	 80	 110
LFCL42	38.1	 116	 150
LFCL86	48.4	 190	 335
Part No	 Rail Width (mm)
KUVE15B-INA 	 15
KUVE20B-INA	20
KUVE25B-INA	25
KUVE30B-INA	30
KUVE35B-INA	35
KUVE45B-INA	45
KUVE55B-INA	55
		 Max Single Piece
Part No	 OD (mm) 	 Length (mm)
SHAFT-4MM	4	 2500	
SHAFT-5MM	5	 3600	
SHAFT-6MM	6	 4000	
SHAFT-8MM	8	 4000	
SHAFT-10MM	10	 6000	
SHAFT-12MM	12	 6000	
SHAFT-14MM	14	 6000
SHAFT-15MM	15	 6000
SHAFT-16MM	16	 6000
SHAFT-18MM	18	 6000
		 Max Single Piece
Part No	 OD (mm)	 Length (mm)
SHAFT-20MM	20	 6000
SHAFT-24MM	24	 6000
SHAFT-25MM	25	 6000
SHAFT-30MM	30	 6000
SHAFT-32MM	32	 6000	
SHAFT-40MM	40	 6000
SHAFT-50MM	50	 6000
SHAFT-60MM	60	 6000
SHAFT-80MM	80	 6000	
			Max Single Piece
Part No	 ID (mm)	OD (mm)	 Length (mm)
WH12-INA	4	 12	 6000
WH16-INA	7	 16	 6000
WH20-INA	14	 20	 6000
WH25-INA	15.5	 25	 6000
WH30-INA	18.2	 30	 6000
WH40-INA	27	 40	 6000
WH50-INA	29	 50	 6000
WH60-INA	36	 60	 6000
WH60-INA	56	 80	 6000
Hollow Shafts
Other Series
nn Segmented design with high load capacity
nn Compensation of misalignment up to ±40 angular minutes
nn Available with gap seals: series KS, KSO
nn Available with contact seals: series KS..PP, KSO..PP
nn Available with open outer ring: series KSO, KSO..PP
nn Available with housings
nn Available in corrosion-resistant version
KS Series
Part No	 ID (mm)	OD (mm)	Length
KN12B-INA	12	 22	 32
KN16B-INA	16	 26	 36
KN20B-INA	20	 32	 45
KN25B-INA	25	 40	 58
KN30B-INA	30	 47	 68
KN40B-INA	40	 62	 80
KN50B-INA	50	 75	 100
Part No	 ID (mm)	OD (mm)	Length (mm)
KS12-INA	12	 22	 32
KS16-INA	16	 26	 36
KS20-INA	20	 32	 45
KS25-INA	25	 40	 58
KS30-INA	30	 47	 68
KS40-INA	40	 62	 80
KS50-INA	50	 75	 100
Solid Shafts
Track Roller Guidance Systems (LFCL)
Ball Monorail Guidance Systems (KUVE)
Shaft Guidance Systems
Linear Bearings
17
Visit us at www.eriks.co.uk
Bearings
Rotary Bearings
Drawn Cup Needle Roller Bearings (HK)
Cylindrical Roller Bearings – Full Complement (SL)
nn Thin walled caged needle roller bearing assembly
nn Produced to DIN 618-1 / ISO 3 245
nn Size range 3 to 60 mm bore
nn Can be used with INA IR or LR inner rings
nn Press fit in housing, no further axial location required
nn Can be combined with axial needle roller bearings of series AXW….
nn Can be supplied with: integral seals, special lubricants, anti-corrosion protection, and closed end
nn Machined series needle roller bearings, light range
nn Available sizes 5mm to 100mm
nn Sizes > 7mm supplied with oil hole and lubrication groove
nn Can be supplied with Corrotect® anti-corrosion coating
nn Can be supplied with special bearing greases
nn Other ground series bearings include: NA 48.. (DIN 617/ISO 1 206) 110mm to 380mm,
NA 49.. (DIN 617/ISO 1 206) 10mm to 140mm, NKIS.. 15mm to 65mm, NA.. RS single sealed 10mm to 50mm,
NA.. 2RS double sealed 10mm to 50mm, NAO without ribs 6mm to 90mm
nn Cylindrical roller bearing – double row full complement
nn Highest dynamic and static basic load ratings due to the maximum number of rolling elements
nn Support radial forces as well as limited axial forces in both directions
nn Outer ring axially split and held together with retaining clips
nn Dimension series according to DIN 5 412-9
nn Other designs include: SL18 48.. dimension series according to DIN 5 412-9, non locating series SL02..
semi locating series SL18 50.., single row semi locating series SL18 18.., SL18 22.., SL18 29.., SL18 30..,
SL19 23... single row semi locating with spacing elements ZSL19 23.., single row semi locating with
disc cage LSL19 23..,
Part No	 ID (mm)	OD (mm)	Width (mm)
HK0408-INA	4	 8	 8
HK0609-INA	6	 10	 9
HK0810-INA	8	 12	 10
HK1010-INA	10	 14	 10
HK1012-INA	10	 14	 12
HK1210-INA	12	 16	 10
HK1212-INA	12	 18	 12
Part No	 ID (mm)	OD (mm)	Width (mm)
HK1612-INA	16	 22	 12
HK1622-INA	16	 22	 22
HK2020-INA	20	 26	 20
HK2030-INA	20	 26	 30
HK2210-INA	22	 28	 10
HK2520-INA	25	 32	 20
HK3026-INA	30	 37	 26
Part No	 ID (mm)	OD (mm)	Width (mm)
HK3520-INA	35	 42	 20
HK4012-INA	40	 47	 12
HK4020-INA	40	 47	 20
HK4516-INA	45	 52	 16
HK5020-INA	50	 58	 20
HK5025-INA	50	 58	 25
Part No	 ID (mm)	OD (mm)	Width (mm)
NKI5/12-INA 	 5	 15	 12
NKI7/12-INA 	 7	 17	 12
NKI10/16-INA	10	 22	 16
NKI12/16-INA	12	 24	 16
NKI15/16-INA	15	 27	 16
NKI17/20-INA	17	 29	 20
NKI20/16-INA	20	 32	 16
Part No	 ID (mm)	OD (mm)	Width (mm)
NKI20/20-INA	20	 32	 20
NKI22/16-INA 	 22	 34	 16
NKI22/20-INA	22	 34	 20
NKI25/20-INA	25	 38	 20
NKI25/30-INA	25	 38	 30
NKI28/30-INA	28	 42	 30
NKI30/20-INA	30	 45	 20
Part No	 ID (mm)	OD (mm)	Width (mm)
NKI35/20-INA 	 35	 50	 20
NKI40/30-INA	40	 55	 30
NKI45/35-INA	45	 62	 35
NKI50/35-INA	50	 68	 35
NKI60/35-INA	60	 82	 35
NKI75/25-INA	75	 105	 25
Part No	 ID (mm)	OD (mm)	Width (mm)
SL014912-INA 	 60	 85	 25
SL014914-INA 	 70	 100	 30
SL014916-INA	80	 110	 30
SL014918-INA	90	 125	 35
SL014920-INA	100	 140	 40
SL014922-INA	110	 150	 40
SL014924-INA	120	 165	 45
Part No	 ID (mm)	OD (mm)	Width (mm)
SL014926-INA	130	 180	 50
SL014928-INA 	 140	 190	 50
SL014930-INA	150	 210	 60
SL014932-INA	160	 220	 60
SL014934-INA	170	 230	 60
SL014936-INA	180	 250	 69
SL014940-INA	200	 280	 80
Part No	 ID (mm)	OD (mm)	Width (mm)
SL014944-INA 	 220	 300	 80
SL014952-INA	260	 360	 100
SL014960-INA	300	 420	 118
SL014964-INA	320	 440	 118
SL014972-INA	360	 480	 118
SL014980-INA	400	 540	 140
Machined Needle Roller Bearings With Inner Ring (NKI)
Rotary Bearings
18
Specialist Technical Centres
Know-How
Bearings
FAG Bearings
FAG Cylindrical Roller Bearing with non-locating polyamide cage
nn N and NU prefixes
nn Supports radial forces only
nn Size range 15mm up to 148mm bore
nn Brass cage version available
nn Cages can be supplied in other materials, available
on application
nn Available in C3 and C4 clearances
nn Support axial and radial forces
nn Handles angular misalignment
nn Size range 20mm up to 900mm
nn Available in steel, brass and polyamide cages
nn Available in tapered bore – suffix K
nn Can be supplied sealed and greased, available
on application
nn Supports high axial forces in one direction and radial
loads
nn Size range 10mm up to 170mm bore
nn Contact angle of 40°
nn Available in sealed version - suffix 2RS
nn Universally matched bearings - please request the
amount of sets you require not the number of single
bearings
FAG Cylindrical Roller Bearing with semi-locating polyamide cage
nn NJ and NUP prefixes
nn Supports high radial force and axial force in one
direction
nn Guides shaft in one direction
nn Size range 15mm up to 140mm bore
nn Brass cage available from 120mm bore
nn Cages can be supplied in other materials, available
on application
nn Available in C3 and C4 clearance
Part No		 Bore	 OD 	 Width
		 (mm)	(mm)	 (mm)
N 202-E-XL-TVP2-FAG 	 15 	 35 	 11
N 203-E-XL-TVP2-FAG 	 17 	 40 	 12
N 204-E-XL-TVP2-FAG 	 20 	 47 	 14
NU 202-E-XL-TVP2-FAG 	 15 	 35 	 11
NU 203-E-XL-TVP2-FAG 	 17 	 40 	 12
NU 204-E-XL-TVP2-FAG 	 20 	 47 	 14
Part No		 Bore	 OD 	 Width
		 (mm)	(mm)	 (mm)
22205-E1-XL-FAG 		 25 	 52 	 18
22206-E1-XL-FAG 		 30 	 62 	 20
22207-E1-XL-FAG 		 35 	 72 	 23
Part No		 Bore	 OD 	 Width
		 (mm)	(mm)	 (mm)
7200-B-XL-TVP-FAG 		 10 	 30 	 9
7201-B-XL-TVP-FAG 		 12 	 32 	 10
7202-B-XL-TVP-FAG 		 15 	 35 	 11
Part No		 Bore	 OD 	 Width
		 (mm)	(mm)	 (mm)
NJ 202-E-XL-TVP2-FAG 	 15 	 35 	 11
NJ 203-E-XL-TVP2-FAG 	 17 	 40 	 12
NJ 204-E-XL-TVP2-FAG 	 20 	 47 	 14
NUP 203-E-XL-TVP2-FAG 	 17 	 40 	 12
NUP 204-E-XL-TVP2-FAG 	 20 	 47 	 14
FAG Cylindrical Roller Bearings with Cage
FAG Spherical Roller Bearings
FAG Angular Contact Ball Bearings – Single Row
Cylindrical Bearings
Varying modifications available:
S 	 With lubrication groove and hole;
E1	 Increased capacity design;
T41A 	 For oscillating load with restricted diameter
	 tolerances C4;
T41D 	 T41A with layer of chromium on bore;
TVPB 	 Solid window cage made from glass fibre
	 and reinforced polyamide etc.
19
Visit us at www.eriks.co.uk
Bearings
NSK AIP Programme
NSK sets many things in motion – for example in the industrial gearbox
industry. As a leading global manufacturer of rolling bearings, NSK
combines 100 years of success and a total quality approach.
THREE LETTERS.
TOTAL QUALITY.
www.nskeurope.com
NSK_Ad_Image_IndustrialGearboxes_180x232_E.indd 1 16.05.17 11:18
20
Specialist Technical Centres
Know-How
Bearings
Super Precision Ball Bearings
NSK is the world leader in the manufacture of deep groove ball bearings,
with manufacturing plants globally and in particular Europe. NSK invests
heavily into continued research and development to ensure the needs of our
customers are adhered to now and in the future.
Suitable for a wide variety of applications including gearbox’s, washing machines,
vacuum cleaners, electric motors, pumps, compressors, computers, conveyors and
even skate boards.
NSK’s deep groove ball bearings offer the following:-
Deep Groove
Ball Bearings
nn Made from Z Steel which increases the
bearing life by up to 80%
nn Precision steel balls, coined cage
pockets and both raceways super
finished delivering ultra-quiet operation
nn Superior quality grade lubricants in a
variety of different temperature ranges
resulting in low starting torque and
extended service life
nn A range of radial internal clearance
grades including the unique CM
(standard clearance to electric motor
specification) and the popular C3
nn Available in bore sizes from 1mm up to
800mm
nn Available in a variety of enclosures,
including the patented labyrinth DDU
rubber seal offering superb sealed for
life features, DDW light-contact seals,
VV non-contact and ZZ metal shields
seals as shown below:-
NSK Seals and shields
DU Seal (Full Contact)
nn Maximum Sealing Protection
V Seal (Non-Contact)
nn Low Torque
nn High Speed Limit
nn Contaminant Protection
Z Shield (Metal Shield)
nn Low Torque
nn High Temperature Limit
nn High Speed Limit
DW Seal (Light Contact)
nn Excellent Contaminant Protection
nn 1/3 Less Drag than Full Contact
Seal
21
Visit us at www.eriks.co.uk
Bearings
NSK Cylindrical Roller Bearings are available with a patented high strength
cage design in pressed steel, machined brass or polyamide.
Cylindrical Roller Bearings
nn NSK offers a complete range in both
metric and imperial sizes ranging from
½” to 1320mm bore sizes
nn Cage material in pressed steel,
machined brass and polyamide
throughout the range
nn EM series combines the strength and
technology of previous brass cage
design into a one piece brass roller-
guided cage resulting in a higher load
carrying capacity, improved oil flow and
quieter operation
nn EW series with the press steel cage
enables higher limiting speeds, low
noise and superior cage strength
nn Available in a variety of configurations,
enabling users to customise for specific
applications as shown right:-
For more arduous applications, they can also be supplied in a range of advanced
special materials. These bearings offer low noise and heat generation, and - by virtue of
the line contact between rolling elements and raceways, have high radial load capacity
and are suited for high-speed applications.
REQUEST A
COPY
NSK and ERIKS have been
partners for many years. By dealing
with ERIKS, an Authorised NSK
Distribution Partner, you get access
to full NSK technical back-up
and excellent stock availability
delivered via ERIKS’ 60+ nationwide
Distribution and Engineering Service
Centres.
For more information request your
copy of the dual branded ERIKS
and NSK brochure on Super
Precision Bearings.
22
Specialist Technical Centres
Know-How
Bearings
Self-Lube®
Bearings
RHP Self-Lube®
housed bearing units offer flexibility, with the capability of accommodating moderate misalignment
and can be adapted to a huge number of applications using a range of inserts, housings, sealing and lubrication
solutions as shown below.
Self Lube®
Bearings
Sealing Arrangements
Moulded nitrile lip bonded to strong seal pressing secured in the
bearing outer ring.
Suitable for a large range of applications.
Example part number is 1020-20G
The flinger seal has a nitrile moulded lip bonded to a steel former, which
is pressed onto the bearing inner ring.
Extra seal gives added protection compared to standard seal to extend the
bearing life in arduous conditions without any loss in speed capability.
Example part number is 1020-20GFS
Triple lip seal consists of a one piece nitrile moulding with three sealing
lips bonded to a steel pressing.
Recommended where there is a high degree of contamination with a
restriction in speed rating
Example part number is T1020-20G
Locking Types
Locking arrangements consists of two knurled-cup point set screws fitted
in the extended inner ring which can be tightened down onto the shaft.
This simple locking system is suitable for most applications except where
vibration is an issue.
Example part number is SF25
Consists of an eccentric diameter formed on the extended inner ring
of the bearing which engages an eccentric diameter in the bore of the
separate collar. This collar is then locked into position on the shaft with a
knurled-cup point set screw.
Often used when vibration is an issue.
Example part number is SF25EC or SF25DEC
Locking arrangement consists of a standard taper adaptor sleeve, locknut
and lock washer.
Recommend where a positive concentric lock is required, heavy vibration
and/or shock load is present
Example part number is MSF10205-25K
Grease Types
nn Standard - High quality mineral oil based grease suitable for high load, medium
speed applications. Temperature range: -20° to +110°C
nn HLT - high quality grease with temperature resistant silicone seals suitable for
high and low ranges. Temperature range -40°C to +180°C
nn Silver-Lube - approved for food grade grease to NSF H1 standard.
Temperature range: -20°C to +90°C
nn Molded-Oil­™ - Optimum lubrication held in a solid polyolefin matrix and sealed
for life. Temperature range: -15°C to +80°C
23
Visit us at www.eriks.co.uk
Bearings
Housings
Housings
Standard Housings - Cast Iron
Features Benefits
High grade cast iron Elimination of housing defects and
premature failures
Designed for exceptional strength High strength in all mounting orientations
Extensive range of housing types
available
Offering comprehensive solutions for a
variety of applications
Well established and proven design Provides end user with confidence in
critical applications
Special Housings - Silver-Lube®
Corrosion Resistant Housings
Features Benefits
Housings manufactured in PBT
thermoplastic resin
Smooth surface resists fungicidal growth
and aggregation of food particles
Stainless steel grease nipple and bolt
hole liners
Corrosion resistant, ideal for frequent
washdowns
Plastic end covers available Additional protection for the bearing and
an aid to safety requirements
Stainless steel inserts have aluminium
complex, high temperature, approved
food grade grease as standard
Suitable for food applications
Available in PNP, PSF, PSFT and PST style
housings from 20mm to 40mm bore sizes
Housing types available are the most
used styles in this industry
Special Housings - Life-Lube®
Bearing Units
Features Benefits
Housings manufactured in PBT
thermoplastic resin
Smooth surface resists fungicidal growth
and aggregation of food particles
Fully interchangeable with RHP Self-
Lube®
units
Corrosion resistant and resistant to
chemical attach
Molded-Oil­™
insert manufactured in
Martensitic stainless steel with solid
lubrication
Lubrication will not wash out during
frequent washdowns
Molded-Oil­™
inserts available from 20mm
to 50mm bore sizes
No need to re-lubricate and easy to
retrofit
24
Specialist Technical Centres
Know-How
Bearings
Thomson Imperial Precision Steel Linear Ball Bushing
Bearings
nn All steel construction for maximum system rigidity
nn Available in 14 bore sizes and 9 configurations
nn Steady state travel speeds of up to 10ft/s and accelerations of up to 450ft/s2
without
the use of derating factors
nn Operating temperature of up to 600°F
nn Available in self-aligning pillow block housing for ease of installation and use
nn Coefficient of friction as low as 0.001
Part No	 ID	 OD	 Length
A4812-THO	1/4	 1/2	3/4
A81014-THO	3/8	 5/8	 7/8
A81420-THO	 1/2	 7/8	 1. 1/4
A101824-THO	 5/8	 1. 1/8	 1. 1/2
A122026-THO	 3/4	 1. 1/4	 1. 5/8
A162536-THO	 1	 1. 9/16	 2. 1/4
A203242-THO	 1. 1/4	 2	 2. 5/8
A243848-THO	 1. 1/2	 2. 3/8	 3
A324864-THO	2	 3	 4
A406080-THO	 2. 1/2	 3. 3/4	 5
A487296-THO	 3	 4. 1/2	 6
A6496128-THO	4	 6	 8
Thomson Imperial Super Ball Bushing Linear Bearings
nn Self aligning capability of up to 0.5 degrees compensating for inaccuracies in base
flatness or carriage machining
nn Travel speeds of up to 10ft/s without a reduction in load capacity
nn Lightweight, wear resistant, engineered-polymer retainers and outer sleeves that
reduce inertia and noise
nn Radially floating bearing plates. When installed in an adjustable housing the Super
Ball bushing bearing may be adjusted to a specific diametrical fit-up for accurate and
repeatable movement
nn Coefficient of friction as low as 0.001
Part No	 ID	 OD	 Length
SUPER4-THO	1/4	 1/2	 3/4
SUPER10-THO	 5/8	 1. 1/8	 1. 1/2
SUPER12-THO	 3/4	 1. 1/4	 1. 5/8
SUPER20-THO	 1. 1/4	 2	 2. 5/8
SUPER24-THO	 1. 1/2	 2. 3/8	 3
Closed Type without seals for End Supported Applications
Closed Type without seals for End Supported Applications
Ball Bushings
Ball Bushings
25
Visit us at www.eriks.co.uk
Bearings
Needle Roller Bearings
Part No	 Shaft
Diameter
MJ36-1-KOYO	3/16"
MJ65-1-KOYO	3/8"
MJ1210-1-KOYO	3/4"
MJ2412-1-KOYO	1.1/2"
MJ2812-1-KOYO	1.3/4"
MJ3216-1-KOYO	2"
HK SERIES – Caged-Open ends
B SERIES – Full Complement-Open ends
KR Series – Caged Stud Type – Metric
M SERIES – Full Complement-Closed end
BK SERIES – Caged-Closed end
HK.RS SERIES – Caged-Single Seal
J SERIES – Caged-Open ends
MJ SERIES – Caged-Closed end
HK.2RS SERIES – Caged-Double Seal
DL SERIES – Full Complement-Open ends
JT SERIES – Caged-Single seal
JTT SERIES – Caged-Double Seal
Part No	 Shaft Diameter
HK0408-KOYO	4mm
HK1010-KOYO	10mm
HK1522-KOYO	15mm
HK3016-KOYO	30mm
HK4020-KOYO	40mm
HK4520-KOYO	45mm
Part No	 Shaft Diameter
S24-KOYO	1/8"
S66-KOYO	3/8"
S85-KOYO	1/2"
S1210-KOYO	3/4"
S328-KOYO	2"
S5612-KOYO	3.1/2"
Crowned outer	 Cylindrical outer	 Outside Diameter
Standard	 Sealed	 Standard	Sealed
KR16-KOYO	 KR16PP-KOYO	 KR16X-KOYO	 KR16PPX-KOYO	16mm
KR19-KOYO	 KR19PP-KOYO	 KR19X-KOYO	 KR19PPX-KOYO	19mm
KR22-KOYO	 KR22PP-KOYO	 KR22X-KOYO	 KR22PPX-KOYO	22mm
KR26-KOYO	 KR26PP-KOYO	 KR26X-KOYO	 KR26PPX-KOYO	26mm
KR30-KOYO	 KR30PP-KOYO	 KR30X-KOYO	 KR30PPX-KOYO	20mm
KR32-KOYO	 KR32PP-KOYO	 KR32X-KOYO	 KR32PPX-KOYO	30mm
Part No	 Shaft Diameter
M85-1-KOYO	1/2"
M146-1-KOYO	7/8"
M167-1-KOYO	1"
M208-1-KOYO	1.1/4"
M328-1-KOYO	2"
M4420-1-KOYO	2.3/4"
Part No	 Shaft Diameter
BK0408-KOYO	4mm
BK1010-KOYO	10mm
BK1522-KOYO	15mm
BK3016-KOYO	30mm
BK4020-KOYO	40mm
BK4520-KOYO	45mm
Part No	 Shaft Diameter
HK0810RS-KOYO	8mm
HK1414RS-KOYO	14mm
HK2018RS-KOYO	20mm
HK2414RS-KOYO	24mm
HK3518RS-KOYO	35mm
HK5022RS-KOYO	50mm
Part No	 Shaft Diameter
SCE36-KOYO	3/16"
SCE68-KOYO	3/8"
SCE126-KOYO	3/4"
SCE2412-KOYO	1.1/2"
SCE3216-KOYO	2"
SCE4412-KOYO	2.3/4"
Part No	 Shaft Diameter
HK12162RS-KOYO	12mm
HK14162RS-KOYO	14mm
HK20202RS-KOYO	20mm
HK25162RS-KOYO	25mm
HK35202RS-KOYO	35mm
HK50242RS-KOYO	50mm
Part No	 Shaft Diameter
DL610-KOYO	6mm
DL1210-KOYO	12mm
DL2016-KOYO	20mm
DL3520-KOYO	35mm
DL5012-KOYO	50mm
DL5520-KOYO	55mm
Part No	 Shaft Diameter
SCE56P-KOYO	5/16"
SCE109P-KOYO	5/8"
SCE1613P-KOYO	1"
SCE2421P-KOYO	1.1/2"
Part No	 Shaft Diameter
SCE57PP-KOYO	5/16"
SCE1010PP-KOYO	5/8"
SCE1614PP-KOYO	1"
SCE2018PP-KOYO	1.1/4"
Part No	 Shaft Diameter
DLF610-KOYO	6mm
DLF1210-KOYO	12mm
DLF2016-KOYO	20mm
DLF3520-KOYO	35mm
DLF5012-KOYO	50mm
DLF5520-KOYO	55mm
Koyo Metric Drawn Cup Needle Roller Bearings
Koyo Inch Drawn Cup Needle Roller Bearings
Koyo Cam Follower – Stud type – Metric
DLF SERIES – Full Complement-Closed end
Needle Roller Bearings
26
Specialist Technical Centres
Know-How
Bearings
Automatic Lubricators, Bearing Tools and Ball Bushings
Part No
SIMAFT33
Part No	
SIMABP61
Part No
SIMASP50
Single-point automatic lubricator
Simalube is a gas powered single point automatic lubricator filled with 30, 60, 125 or 250 ml
of grease or oil. The patented hydrogen producing dry cells drive a piston to dispense lubricant
at a consistent rate of between 1 and 12 months, which is adjustable in operation. Gas
production is initiated by turning the adjustment disk on the top with a Hex key or Allen key.
nn 1 to 12 month dispense time
nn Infinitely adjustable during operation
nn Patented gas producing dry cell
technology means no liquid or
dangerous chemicals, no toxic waste
nn ATEX approval to Zone 2
nn Works in any orientation even
upside down
nn Grease or oil filled (oil filled units
have a non-return valve)
nn Suitable for the lubrication of rotary
bearings, linear bearings, chain, open
gears, sprockets etc
Part No	 Description	 Size	 Temp range	 Base oil	 Thickener/	 DIN 51502
					Soap
SIMASL24-125 	 Multi purpose grease with EP, NLGI 2 	 125 	 –30°C to +140°C 	 Mineral oil 	Li/Comp. 	 KP2N-30
SIMASL10-125 	 Food industry grease, NSF H1 approved, NLGI 2 	 125 	 –30°C to +140°C 	 Synthetic 	 Al/Comp. 	 KPHC2N-30
SIMASL01-125 	 Water resistant grease, NLGI 2 	 125 	 –30°C to +120°C 	 Mineral oil 	Li/Ca 	 KP2K-30
SIMASL14-125 	Chain oil 	 125 	 –10°C to +90°C 	 Mineral oil 		CGLP68
SIMASL15-125 	High temperature chain oil 	 125 	 –30°C to +250°C 	 Synthetic 		CGLPE220-320
SIMASL18-125 	 Food industry oil, NSF H1 approved 	 125 	 –15°C to +150°C 	 Synthetic 		CLPHC220
For other sizes change suffix 125 to relevant size. i.e.. SIMASL10-125 becomes SIMASL10-60
Simatool Kits
Bearing
Puller BP 61
Seal Puller SP 50
Perfect for installing and removing bearings and seals!
Available individually as well as accessories or spare parts, these high-quality tool components
are supplied in a compact case with liner, allowing all tool components to be neatly stored.
A comprehensive user manual, containing data tables and illustrations is also provided.
Part No	
SIMAIH025-VOLCANO/115V 	
SIMAIH025-VOLCANO/230V 	
Simatherm IH 025 Volcano
The Simatherm IH 025 Volcano marks the start of a new era in the field of
portable induction heaters. The patented technology enables outstanding
heating performance from an extremely light structure. You can use it to
heat roller bearings with an inner diameter as small as 20mm up to an outer
diameter of 160mm and a weight of up to 10kg. To do this, simply place the
work piece onto the Volcano’s cone shaped heating surface.
nn Portable, compact and very light (3.5kg)
nn A bearing weighing 5kg can be heated to 110°C in under four minutes
nn Silent in operation
nn No support yoke required – simply place the work piece on the device
nn Predictive temperature control (PTC) for automatic temperature monitoring
Bearing
Fitting Tool
FT 33
27
Visit us at www.eriks.co.uk
Bearings
CALL: 0845 006 6000
to contact your local workshop
IS YOUR CONDITION MONITORING
MONITORED?
ENGINEERING &
SITE SERVICES
STEPS TO SUCCESS
n Step 1 Consultation
n Step 2 Recommendation
n Step 3 Supply, installation & commissioning
n Step 4 Reporting and training
n Step 5 On-going support
Condition Monitoring is only as good as the data
it collects. Ensuring maximum plant uptime
demands permanent data monitoring.
ERIKS’ cloud-hosted solution uses the latest
telemetary coupled with site diagnostic solutions
ensuring that equipment status is available at
your fingertips:
n View machine performance online with
Machine WebWatch
n Receive SMS or email alerts of triggered
alarms for faster reaction, and less downtime
n Analyse or alter configurations without going
on-site – save time and money
n Cloud-based database of maintenance
routines, information, inspection routes
28
Specialist Technical Centres
Know-How
Bearings
SKF Bearing Life Cycle
29
Visit us at www.eriks.co.uk
Bearings
Bearing Tools and Condition Monitoring
SKF Drive-up Method
This fitting method is unique to SKF
and delivers accurate axial drive-up of
spherical roller and CARB bearings
mounted on tapered seatings.
Incorporates the use of an SKF HMV
..E hydraulic nut fitted with a dial
indicator, and a high accuracy digital
pressure gauge mounted on the
selected pump.
The SKF QuickCollect sensor is an easy to use, bluetooth enabled, handheld sensor that connects to apps on your smart phone
or tablet. Combining vibration and temperature sensing, overall data can be viewed on the spot in real time or pushed to the cloud
for future analysis. The sensor is ideal for service, reliability, operations, or maintenance personnel as part of a walk around data
collection program.
Hydraulic Nuts HMV ..E series
Mounting bearings on tapered seatings
can be a difficult and time-consuming job.
Using a hydraulic nut facilitates easy and
quick application of the high drive-up forces
required. The time taken to dismount bearings
mounted on either adapter or withdrawal
sleeves is also greatly reduced.
Hydraulic puller sets TMMA ..H /SET series
Set consists of a hydraulically assisted SKF
EasyPull together with a tri-section pulling
plate, TMMS series, and a puller protection
blanket facilitate an easy, safe and
virtually damage-free dismounting.
The set is especially suitable for
dismounting roller bearings, and
other components such as pulleys
and flywheels.
SKF Oil Injection Set THKI series
The THKI is used for the mounting and dismounting
of pressure joints of all sizes and applications such
as rolling bearings, couplings and gears. The
set consists of a stand-mounted oil
injector complete with a high
pressure pipe, pressure gauge
and a range of connection
nipples.
SKF Hydraulic Techniques for
Mounting and Dismounting
Bearings
SKF QuickCollect Sensor
Machine monitoring made easy
Benefits
nn Gets you started quickly
nn Can be used with minimum training and experience
nn Identify developing rotating machinery issues before they
become problems
SKF designation
CMDT 390-K-SL
nn Connect directly to expert advice when you need it
nn Expand functionality via apps to grow and compliment your
existing maintenance program
nn Suitable for use in hazardous environments (ATEX Zone 1,
Class 1, Div 1)
Measurement displays
Measurements taken by the sensor are
shown on your mobile device, which
displays velocity, acceleration, and
temperature. Each reading displays a
current overall measurement, including
alarm status, minimum and maximum
values, and alert and danger thresholds.
NEW
30
Specialist Technical Centres
Know-How
Bearings
Test, Measurement and E-Series
Illuminated voltage
detection
Versatile
moisture meter
Easily manoeuvrable
videoscope
The new FLIR Test and
Measurement Range
FLIR Systems has broadened the scope of its product range, applying its hallmark quality
design and build to a brand new range of test and measurement tools.
Three electrical meters all feature large and clear LCD displays and bright dual-LED work lights to
illuminate dimly lit work areas. They include Bluetooth®
connectivity to Android™ mobile devices running
the latest FLIR Tools Mobile®
app. They can be connected wirelessly to Meterlink®
enabled FLIR
thermal imaging cameras so that electrical readings can be embedded into IR images in real-time.
Streamlined VFD
troubleshooting
Simplify power and
VFD analysis
Multifunctional
clamp meter
The FLIR DM93 is
a rugged digital
multimeter with
advanced variable
frequency drive
(VFD) filtering that allows accurate
analysis of non-sinusoidal waveforms and
noisy signals found in VFD-controlled
equipment. A special mode to eliminate
ghost readings and automatic data
recording to detect intermittent glitches
are also standard features.
The FLIR CM83 is an
industrial-grade power
clamp meter with power
analysis and advanced
VFD filtering for testing
three-phase systems
and VFD-controlled
equipment. Other
features include a
harmonics mode to find noise
from different electrical sources; ‘phase
rotation’ to confirm phase orientation of
three-phase systems and ‘inrush current’ to
detect start-up transients.
Combining the
capabilities of a true
RMS multimeter and
clamp meter with
a non-contact IR
thermometer and
Type K thermocouple
is the new FLIR CM78. Ideal for use
on industrial equipment and complex
machinery, this new instrument enables
users to capture accurate AC/DC
readings up to 1000A or 1000V.
The FLIR VP52, is a compact, non-
contact voltage detector with a
powerful LED work light and dual-LED
convenience light at the probe tip. Other
features include vibration feedback and
multi-coloured LED alarms. High/low
sensitivity modes for testing industrial
equipment low voltage systems and
tamper-proof outlets are also standard.
The FLIR MR77
moisture meter
features a pinless
sensor and an
external pin probe
that capture
moisture readings
up to 19mm below
the surface of various building
materials. This rugged instrument also
includes a field-replaceable temperature/
humidity sensor, spot IR thermometer and
laser pointer.
The FLIR VS70, videoscope is designed
for industrial environments. It features
intuitive handset controls that enable the
user to guide the probe into tight areas to
deliver clear video images to a large 5.7"
colour LCD display. It provides 180° and
90° camera views and SD card storage
of video, image and audio files. Voice
comments can also be captured via the
product’s headset.
31
Visit us at www.eriks.co.uk
Bearings
FLIR E-Series
Lightweight design, heavyweight performers
The FLIR E-Series are small and lightweight thermal imaging cameras
designed for those needing higher resolution and more features and
for whom documentation of findings are important.
The cameras are ideal for predictive maintenance and planned
inspections of electrical and mechanical systems to ensure they operate
at maximum efficiency and safety with minimal energy consumption.
n	Up to 320 x 240 pixels resolution
n	Compact and lightweight
n	Extremely rugged
n	High quality visual camera
n	Thumbnail image gallery
n	±2% accuracy
n	LCD touchscreen
n	Built-in LED light
n	Long-life battery
n	Laser Pointer
n	Picture-in-Picture (PiP)
n	Thermal fusion*
n	Instant reports*
n	Text and voice annotations*
n	 Interchangeable lenses
* Features dependant on camera model, please
check technical specifications for more details.
ERIKS_catalogue.indd 1 4/5/13 3:02 PM
Mechanical check-up of an electrical motor using the FLIR E-Series
ERIKS_catalogue.indd 1 4/5/13 3:02 PM
Motor bearing problem
ERIKS_catalogue.indd 1 4/5/13 3:02 PM
Inspecting a transformer using the Fusion Picture-in-Picture function
Large 3.5 touchscreen
Connect to smartphone or tablet via Wi-Fi, using the FLIR
Tools mobile app (Apple iOS and Android) for processing
and sharing results as well as for remote control.
Images used are for illustration purposes only
For further details contact your local ERIKS Service Centre
on 0845 006 6000 or visit eriks.co.uk
nn Advice about the correct
maintenance strategy and
camera selection is available
from the ERIKS Condition
Monitoring Business Unit
nn Training is essential and
available from ERIKS
TO HELP...
32
CALL: 0845 006 6000
to contact your local workshop
CONDITION
MONITORING
Condition Monitoring is only as
good as the data taken and it takes
a skilled engineer to interpret the
results accurately.
ERIKS is proud of its team of
condition monitoring experts across
the UK who specialise in analysis of
electromechanical machinery.
ENGINEERING 
SITE SERVICES
FUNCTIONS:
n Experts in electromechanical machines/rotating
equipment
n Accurate analysis of machine data
in a form you can understand
n Heat energy surveys with cost
saving information
n Flexible local staff to fit with your schedules
n Machine protection by:
– Periodic portable monitoring
– Linking to PLC/SCADA or internet
WHY ERIKS:
n ISO 18436 certified personnel
n Certified maintenance partner of SKF
n Improved uptime of client’s plant
n Reduced energy consumption
n Safer working environment
POWER
TRANSMISSION
Quick reference
ERIKS’ understanding of the environment in
which a transmission system must work, the
stresses it has to handle, and the results it has to
produce, enables us to engineer a solution you
can rely on - for increased efficiency, extended
life, minimum maintenance and maximum
productivity.
33
Quick reference
Classic Vee Belts 	 36
High Performance Wedge Belts	 37
Emergency Belts	 38-39
Wedge Belts	 40-41
Ribbed Belts	 42
Tensioners	43
Timing Belts	 44-45, 48
Pulleys	46-47
Shaft Fixings	 49-51
Couplings 	 52-55
Roller Chain and Sprockets	 56-57
Adapter Chain	 58
Performance Special Chain	 60-63
Chain Accessories	 64
Electric Motors	 65, 68-69
Drives and Rollers	 66-67
Total Cost of Ownership	 70
Inverters	71-73
Speed Reducer	 74
Gearboxes	75-77
Vibration Solutions	 78
Quick Product Reference
RIALEVOLUTION
forenergysavings
dlongerchainlife
68
36-47, 49-53, 56-58, 69-77
54-55, 59
54 48
66-67
66
65
60-64
78
Visit us at www.eriks.co.uk
Power Transmission
SUPERIOR Performance
POWER TRANSMISSION
True reliability is more than simply continuous
operation. It’s a continuous level of
performance, minimal energy consumption and
a predictable life span.
We understand the environment in which a transmission
system must work, the stresses it has to handle and the
results it has to produce, but above all we understand
how each part of your drive system is intrinsically linked.
34
POWER TRANSMISSION
Technology
Whatever the dilemma you face,
the chances are we can provide
you an alternative solution to
increase efficiency, and extend
product life.
70% of belts
are fitted to worn
pulleys, which
can waste up to
10% of the
energy input
Power Transmissions
n	 Friction belts and pulleys
n	 Synchronous belts and pulleys
n	 Chain and sprockets
n	 Conveyor chain
n	 Couplings
n	 Shaft fixings
n	 Materials handling chain  belts
Drives
n	 Gearboxes, new and repair
n	 Geared motors
n	 Electric motors, new and repair
n	 Inverters
n	 Starters and controllers
n	 Automation
Specialist Technical Centres
Know-How
IMPROVING YOUR TOTAL
COST OF OWNERSHIP
Our knowledge and passion for
technology make us more than simply
a supplier of drives and transmission
products, ERIKS has the Power
Transmission know-how when and where
you need it.
n	 Unmatched know-how and experience
from our in-house technical experts
n	 Solutions and advice for both MRO
and OEM requirements
n	 Complete project management from
initial drive selection through to
installation and commissioning
n	 Failure diagnosis, offering advice
so you don’t risk the same failure
repeating itself
n	 Rapid gearbox assembly, built to order
from stock across the Fenner range
n	 Product customisation
n	 Total cost of ownership advice,
ensuring you get the best
POWER TRANSMISSION
DRIVE DESIGN AND
UPGRADE
When a drive fails or is coming to the end
of its working life a number of choices can
be made.
A repair or like-for-like replacement is
not always feasible or the best solution
so when you need options for improving
your process and extending the life of your
machinery ERIKS can work with you to
upgrade or re-design you drive system.
n	 Upgrade to modern technology
n	 3D CAD modelling capability
n	 Fabrication and re-engineering
services
n	 Whole drive train packaged solutions
n	 Drop-in replacements
n	 Extended warranty options
n	 Turnkey solutions
Benefits
n	 Minimal down time to your application
n	 Extraction, installation and
commissioning services
n	 Optimised total cost of ownership
n	 Lower running costs
n	 Extended lifecycle
n	 Full product lifecycle support
CONDITION
MONITORING
Unexpected downtime and costly repairs
can have a negative impact on your
bottom line.
Most Condition Monitoring reports
only give you a diagnosis. But the
comprehensive capabilities and holistic
point of view of ERIKS mean a Condition
Monitoring report gives you the cure too.
The Condition Monitoring Team collects,
stores, compares and analyses key
variables from your machines, enabling
you to assess their health. Then - if failures
or deviations from the norm are detected
- ERIKS’ know-how comes into play, to
diagnose the cause and prescribe the cure.
Services Include:
n	 Vibration Analysis
n	 Thermographic analysis
n	 Oil debris and condition analysis
n	 Endoscope inspection
n	 Internet based asset monitoring 		
	 protection device
35
Visit us at www.eriks.co.uk
36
Specialist Technical Centres
Know-How
Power
Transmission
High Strength Wedge Belts
Belt
Section
Pitch Length
(mm)
Fenner
Brand
SPB 2240 -FENSections: SPZ, SPA, SPB, SPC, 8V
Length: 487–12500mm
Relative power 100%
Vee Belts offer a versatile and economical low maintenance drive which is standardised
throughout the world and Fenner Classic Vee Belts are fully approved to all international
standards allowing for optimised drives for compact size and economy.
Increased Performance, More Power, Longer Life
But did you know that a simple upgrade to the Fenner range of Ultra PLUS
wrapped wedge belts will transmit significantly more power than the classical vee
product and run in the same pulleys!
Fenner Ultra PLUS wedge belts are available in a large range of lengths, and conform to
all the relevant ISO, BS, DIN and RMA standards.
So why not upgrade your drives today to wedge belts – increase your drives
capacity and efficiency.
Classic Vee Belts...
Ever Considered Trading Up?
For any belt drive, the pulleys can be adjusted
closer together to allow removal or installation
of the belt. Equally, the pulleys can be adjusted
further apart to allow the belt to be tensioned
correctly. These two adjustments are referred to
as “Installation Allowance”, and “Take Up
Allowance”.
For Example
You may be looking for a SPZ1 012 belt, the
standard size available is SPZ 1010, so what next?
You will see from the table below that there is
20mm installation allowance and a 20mm take-
up allowance.
So in Conclusion...
The 2mm difference in belt size will make no
difference whatsoever, and a standard off-the-
shelf product will do the job perfectly, and you
won’t be paying a premium.
Size Matters...
What Size Wedge Belts are You Buying?
Wedge Belt
Lengths
mm
Sections
Available
Installation
Allowance
SPZ
Installation
Allowance
SPA
Installation
Allowance
SPB
Installation
Allowance
SPC
Take up
Allowance
Upto 630 SPZ 20mm 5mm
630 - 800 SPZ/SPA 20mm 25mm 10mm
800 - 1000 SPZ/SPA 20mm 25mm 15mm
1000 - 1250 SPZ/SPA 20mm 25mm 20mm
1250 - 1600 SPZ/SPA/SPB 20mm 25mm 30mm 25mm
1600 - 2000 SPZ/SPA/SPB 20mm 25mm 30mm 30mm
2000 - 2500 SPZ/SPA/SPB/SPC 20mm 25mm 30mm 50mm 40mm
2500 - 3150 SPZ/SPA/SPB/SPC 20mm 25mm 30mm 50mm 50mm
3150 - 4000 SPZ/SPA/SPB/SPC 20mm 25mm 30mm 50mm 60mm
4000 - 5000 SPA/SPB/SPC 25mm 30mm 50mm 70mm
5000 - 6300 SPB/SPC 30mm 50mm 85mm
6300 - 8000 SPB/SPC 30mm 50mm 105mm
8000 - 10000 SPB/SPC 30mm 50mm 140mm
10000 - 12500 SPC 50mm 175mm
Installation and Take Up Allowances for Fenner Wedge Belts
How many times have you asked for an “odd” sized belt that we just don’t have in stock? But
are you aware that there is a solution just sitting on the shelf.
37
Visit us at www.eriks.co.uk
Power
Transmission
Ultra PLUS 150 Wedge Belts
nn Greater reliability and working life
nn Increased power ratings potentially reducing the number of belts
required and grooves on a pulley
nn Increased durability in harsh environments due to the
asymmetric weave jacket
nn Length stability, minimal stretch and elongation
Fenner Ultra PLUS 150 drive belts are specifically designed for
applications where rugged durability is paramount, combining
the highest level of performance with the longest possible
service life.
www.fptgroup.com
nn Waste compactors
nn Shredders
nn Crushers
nn Heavy duty conveyors
nn Bucket elevators
Ideal for heavy duty applications
nn 50% more power - High tensile aramid cords transmit more
power than standard wrapped wedge belts
nn Unsurpassed strength - Fibre reinforced polychloroprene
rubber supports the cords and ensures unsurpassed rigidity
nn 96% energy efficient - asymmetrical weave outer jacket
produces belt length stability second to none, guaranteeing
unbeatable efficiency.
Why use Fenner Ultra PLUS 150?
nn Woodworking machinery
nn Quarry plant
nn Saw mills
nn Compressors
nn Calendars
Sections: USPB, USPC
Length: 1600–12500mm
Relative power 150%
Belt Section Pitch Length (mm) Belt Type Fenner Brand
SPC 7500 ULTRA150 -FEN
Downtime Crushed
with Ultra PLUS 150
A large quarry based in the Midlands
was experiencing problems with regular
failures of vee belts belts on their crusher
drives.
The belts were subjected to very high
impact and shock loads, and as a
consequence the belts were stretching
unevenly resulting in belt slippage and
premature failures.
The Fenner Ultra PLUS 150 belts was
the perfect solution, due to the high
tensile aramid cords and the robust
rubber construction which ensured there
was virtually no stretch, whilst delivering a
significantly high power rating.
The quarry has since decided to
standardise on Fenner Ultra PLUS 150
across the plant where possible, helping
reduce inventory costs and keeping
downtime costs to a minimum.
38
Specialist Technical Centres
Know-How
Power
Transmission
Emergency Belting
Fenner Drive
Alignment Laser
Product Ref: FEN/A/230L0000
Belt Efficiency Kit
Product Ref:
FEN_BELT_MAINT_KIT
70% of belt drives are estimated to be operating inefficiently
and are in imminent danger of failing.
By taking a proactive stance to belt drive maintenance and looking at the condition of the
belt and pulley set then you can bring both peace of mind and productivity improvements.
It’s as easy as 1, 2, 3.
1 Check Pulley Condition
The drive stands or falls by the accuracy of its installation, so don’t forget to check the
condition of your pulleys – 50% of new belts are fitted to worn pulleys, which can waste
up to 10% of your energy input.
The Fenner groove gauge can quickly help you assess the health of your pulleys.
2 Select the Correct Drive Solution
3 Simple Steps to Increase
Productivity
Pulley Condition Worn Belt
New Belt
Ultra PLUS
Upgrade
Quattro PLUS
Upgrade
Ultra PLUS 150
Worn pulley Imminent Failure  1 year  1½ years  2 years
New Pulley Premature Failure  3 years  3½ years  4 years
3 Install Correctly
Correct installation once you have carefully selected your belt drive components is
paramount to the longevity and efficiency of your belt drive. We are able to offer you a range
of installation tools to help you maximise productivity and uptime.
Worn
Pulley
New
Pulley
Have you seen...
Our Fenner belt efficiency kit?
Get the most from your wedge belt drives with the Fenner Belt
Efficiency Kit.
The kit contains all the tools necessary to help achieve optimum performance:
nn Belt tension indicator
nn Pulley groove gauge
nn Guide to wedge belt efficiency
Product Code: 230K0000
39
Visit us at www.eriks.co.uk
Power
Transmission
Fenner QuickFix
The Fenner QuickFix belt is incredibly versatile,
featuring a dual groove profile so that one belt fits
both V and wedge belts profiles.
nn Quick and simple to install
nn Available in four different width profiles; SPZ, SPA,
SPB  SPC
nn Comes five metre roll enabling the maintenance
teams to cut it to the desired length
Fenner QuickFix enables you to reduce stock
inventory considerably, requiring just two five metres
boxes of each section size, to cover all eventualities
for both new and old systems and for both wedge belt
and V belt profiles – saving both time and money.
www.fptgroup.com
nn Hospitals
nn Airports
nn Facilities Management Companies
nn Universities
nn Shopping malls and retail parks
nn Distribution Centres
nn Anyone with a large number of belt
drives
Perfect for use in the following:
nn Dual groove profile - means one belt fits both Vee and
wedge belts
nn Jointed belting - ensures minimum strip down when installing
nn Any length - Can be made to any length within minutes
nn Reduces potential downtime - quick and simple to install
keeping downtime to an absolute minimum
Why use Fenner QuickFix Belts?
A Quick Fix for
Breakdowns
A well-known Facilities Management company
were experiencing call out difficulties from
customers who were experiencing breakdowns
on their HVAC units.
Engineers would arrive on-site, only to find
they could not complete the task due to the
lack of belts being stocked.
The Fenner QuickFix emergency belt was
the ideal solution. Available in four profiles:
SPZ, SPA, SPB  SPC in 5 metre boxes
meant any size belt could be accommodated
and fitted without the need of strip down of
machinery.
In addition this gave the engineer time to
reorder the Fenner rubber belts which could
be fitted once they arrived.
Service levels for the FM company increased
significantly following a relatively low
investment the Fenner QuickFix belt range
- which is now carried by all the engineers -
with the confidence that any breakdown calls
can be quickly fixed.
Part Number:
SPZ - 283Z1111
SPA - 283A1111
SPB - 283B1111
SPC - 283C1111
Thousands of
products available
to order on
ERIKS
WEBSHOP
SHOP.ERIKS.CO.UK
SHOP.ERIKS
.CO.UKSHOP
.ERIKS.CO.UK
40
Specialist Technical Centres
Know-How
Power
Transmission
Wedge Belts
Quattro PLUS Wedge Belts
nn ‘One Shot’ tensioning with no matching
nn Meets industry standards for static conductivity and non-ignition
properties
nn Highest efficiency drive for low running costs
nn Working temperature range –40°C to 80°C
This CRE belt transmits up to 4 times the power of
conventional Vee belts. The increase in cross sectional rigidity
provided by the fibre-reinforced polychloroprene contributes
significantly to the performance advantages.
www.fptgroup.com
nn HVAC
nn Waste compactors
nn Shredders
nn Crushers
nn Heavy duty conveyors
Ideal for all applications
Why use Fenner Quattro PLUS?
nn Bucket elevators
nn Woodworking machinery
nn Quarry plant
nn Saw mills
nn Compressors
Sections: QXPZ, QXPA, QXPB, QXPC
Length: 630–5000mm
Relative power 130%
Airport Efficiency
Increased
ERIKS were contacted by a local airport
were interested in improving efficiency
throughout the airport, and in particular
on their air handling units. The existing
belts and pulleys were badly worn and not
performing the their optimum efficiency.
The Power Transmission Engineers
suggested redesigning the drive, with
the introduction of Fenner Quattro PLUS
wedge belts combined with new pulleys,
which would provide a drive that operated
at 96% efficiency.
Fenner Quattro PLUS CRE wedge
belts can significantly reduce energy
consumption when used in conjunction with
variable speed drives. They can also vastly
improve production and process speeds in
their own right, by reducing slip and giving
increased performance from the driven
machine.
Six months down the line the airport has
confirmed that the new drive has increased
efficiency by 10% and are now looking
at similar solutions on other applications
around the airport.
Belt
Section
Pitch Length
(mm)
Belt Type Fenner
Brand
SPA 1400 FOZ-Q -FEN
nn 4 times the power - Transmits for times the power of
conventional vee belts, allowing for a more compact drive
envelope
nn Absorbs greater shock loadings - providing a more robust
drive solution
nn Superior anti-static - to ISO 1813, heat and oil resistant
nn Greater length stability - minimal stretch and elongation
41
Visit us at www.eriks.co.uk
Power
Transmission
Fenner Ultra Plus Wedge belts are precision built ( ) allowing extended
life, offering superior anti-static, heat and oil resistant properties.
nn Ideal for use in single or multi-belt drives
nn One shot tensioning for fit and forget applications
nn Will not self-ignite under severe slip/stall conditions
Ultra PLUS Wedge Belts
Belt
Section
Pitch Length
(mm)
Fenner
Brand
SPB 2240 -FEN
Sections: SPZ, SPA, SPB, SPC, 8V
Length: 487–12500mm
Relative power 100%
The Fenner Ultra PLUS wedge belt has
stood the test of time, and once again
proved its mettle when ERIKS were
contacted by a large university.
The local ERIKS Application Engineer
was asked to do a feasibility study on a
set of Air Handling Units (AHU’s).
Fenner Cogged Raw Edge (CRE) Wedge Belts excel in high ratio compact
applications by combining flexibility with structural stability. They offer all
the advantages of Fenner Power PLUS including:
nn Special compounds improve flexibility and strength
nn Higher running efficiency than wrapped belts
nn Precision built ( ) allowing excellent length matching
CRE Wedge Belts
Sections: XPZ, XPA, XPB, XPC,
Length: 630–5000mm
Relative power 110%
Belt
Section
Pitch Length
(mm)
Belt Type Fenner
Brand
SPA 1400 CRE -FEN
ERIKS were tasked to devise a plan to
upgrade 12 AHU drives which supplied
air into the canteens, lecture rooms etc.
The incumbent drives were old and
inefficient - some consisting of classical
vee belts, along with a with a variety
different makes - and pulleys that had
not been changed for over 10 years.
The AHU’s were fitted with Fenner
Ultra PLUS wedge belts and new
pulleys, which helped improve the drive
efficiency, reduced running costs, and
provided a reliable solution for the
university.
University Upgrade with Ultra PLUS
42
Specialist Technical Centres
Know-How
Power
Transmission
Ribbed Belts and Tensioners
Width Profile
 Pitch
Fenner Brand
16 T5- 1500 -FEN
Belt Length
Length Pitch Fenner
Brand
695 PL 8 -FE N
1765 PL 8 -FE N
No of
Ribs
Imperial
Metric
Fenner PolyDrive PLUS ribbed belts are an ideal solution for
compact drives in household appliances and heavy machinery.
The ribbed belts enable economic solutions even under difficult drive conditions, such as
large transmission ratios, high belt speeds, small pulley diameters and back idler pulleys.
n 	High belt speeds up to 60m/s
n 	Designed for high transmission ratios
n 	High power output
n 	Low vibration, efficient belt
n 	Long service life
n 	Fully approved to all international standards
n 	Static conductivity to ISO 1813
PolyDrive PLUS Ribbed Belts
Why use Fenner PowerFlex PU Belting?
Manufactured in thermoplastic polyurethane, that gives
superior wear and abrasion resistance
nn High Power Transmission
nn The Steel Cord gives good running characteristics and high traction loads.
nn Low noise running
nn Free Maintenance
nn Low pretension
nn Constant length
TThe Fenner PowerFlex metric timing belt is manufactured from a high-
grade polyurethane material, reinforced with helically wound zinc coated
steel tension member, allowing high breaking load and extremely low
elongation.
With excellent dimensional stability, consistent length and thickness, it makes it
ideal for use in processing and packaging industries along with any clean areas
where contamination would be an issue.
nn Also available in OPEN LENGTHS
nn Non-standard widths cut from stocked sleeves
nn Steel Cord winding in S and Z profile allow high breaking load and extremely
low elongation.
nn Ozone and temperature resistance (-25 °C / +80 °C)
nn Oil, grease and gasoline resistance
PowerFlex PU Belting
43
Visit us at www.eriks.co.uk
Power
Transmission
Tensioners
The new range of Fenner tensioners have been
designed to help maximise drive efficiency
whilst extending your drive lifecycle.
Range includes Tension Arms in Cast iron  Stainless Steel –
Standard  Front Mount – with a Boomerang version.
Fixtures include Simplex, Duplex  Triplex idler sprockets, Chain
Riders  Rollers, with supporting brackets to complement the range.
Why Choose Fenner Tensioners?
nn Increases chain and belt life
nn Noise and vibration damping
nn Absorbs shock loads
nn Maintenance free
nn Safe in operation
nn Self-adjusting
nn Progressive spring characteristics
nn Operating angle -30° to 30°
nn Resistant to temperature -40° to 80°C
www.fptgroup.com
Tensioner Simplex Duplex Triplex
Pitch No Teeth Size Standard Tensioner Idler Sprocket Idler Sprocket Idler Sprocket
3/8” 15 FT2 186B0002 186S1001 186D2001 186T3001
3/8” 15 FT3 186B0003 186S1001 186D2001 186T3001
1/2” 15 FT4 186B0004 186S1002 186D2002 186T3002
5/8” 15 FT5 186B0005 186S1003 186D2003 186T3003
5/8” 15 FT5 186B0005 - - 186T3004
3/4” 15 FT5 186B0005 186S1004 186D2004 -
3/4” 15 FT6 186B0006 186S1005 186D2005 186T3005
1” 13 FT6 186B0006 186S1006 186D2006 186T3006
1.1/4” 13 FT7 186B0007 186S1007 186D2007 186T3007
1.1/4” 13 FT8 186B0008 186S1007 186D2007 186T3007
1.1/2” 11 FT7 186B0007 186S1008 186D2008 186T3008
1.1/2” 11 FT8 186B0008 186S1008 186D2008 186T3008
44
Specialist Technical Centres
Know-How
Power
Transmission
Timing Belts
Upgrade form Chain Drives to
Fenner Torque Drive PLUS 3
It’s as easy as 1, 2, Free!
www.fptgroup.com
Torque Drive PLUS 3
The state-of-the-art Torque Drive PLUS
3 works with standard HTD pulleys tp
provide the ultimate combination of
power capacity, low noise and high
accuracy in a belt drive.
nn The highest power rating in the range
nn Enhanced compounding and glass
fibre cord excel in highly dynamic
applications
nn Ultra compact and cost effective
nn Quiet operation even at high speeds
nn Replaces HTD belts to extend life
and increase load capability
Widths: 20–170mm
Pitches: 8, 14mm
Relative power 150%
Pitch
(mm)
Length
(mm)
Width
(mm)
Fenner
Brand
14MXP- 3150- 55 -FEN
Determine your drive requirements to replace existing chain, or
determine requirements for new Fenner Torque Drive PLUS 3
synchronous belt drive.
Use the Fenner Drive Design Selector:
http://selectors.fptgroup.com
nn Free from the noise associated with chain drives
nn Free from maintenance; no wear elongation, no need
for regular adjustment
nn Free from lubrication costs and oil contamination of
machine or product
nn Free from the space limitations associated with
traditional synchronous belt drives
nn Free extended service life, Fenner TDP3 synchronous
belts offer up to twice the normal service life compared
to roller chain drives
5,000
10,000
15,000
20,000
25,000
Chain Drive* Fenner TDP3
WorkingLifeinHours
Approx.
9420 hours
Approx.
20,000 hours
Typical operating life, chain drive versus
synchronous drive
*Chain drive:
2.2kW 3:1 reduc-
tion chain drive
using 122 pitches
½” BS chain using
19 tooth driver
and 57 tooth
driven sprockets
at 510mm centre
distance.
Fenner Torque Drive PLUS 3 Drive
versus Chain Drive
nn Same size, and space envelope
nn Lighter and quieter
nn Greater power rating
nn Up to twice the service life
45
Visit us at www.eriks.co.uk
Power
Transmission
Fenner HTD belts have a curvilinear tooth form giving a more uniform distribution of shear
stresses within the teeth. This also provides a more uniform transition of tooth loads to the
tensile members in the belt which significantly improves upon classical timing belts.
nn Ultra compact and cost-effective drives
nn Runs optimally on standard HTD pulleys
nn Minimum backlash for precise positioning
nn Non-standard widths cut to size from stock sleeve
nn ISO 13050 (International Standards Organisation)
HTD Timing Belts
Widths: 9–170mm
Pitches: 3, 5, 8, 14mm
Relative power 100%
Can’t Find The Right Size...
Try Our Belt Cutting Service
In-House Belt Cutting Service
If you can’t find the correct size belt, give your local ERIKS
Service Centre a ring and they will be able to call upon our
in-house belt cutting service, based at the Power Transmission
Technology Centre in Dudley.
We stock a wide range of Timing Belts and Multi Vee Belts in
sleeve from which can be cut to any width required.
Profiles include:-
nn Classic Timing Belt 	 XL, L , H  XH
nn HTD Timing		 5mm, 8mm  14mm
nn Torque Drive PLUS 3 5mm, 8mm  14mm
nn PU metric		 5, AT5. T10  AT10
nn Multi V rib		 PM, PL, PJ  PK
Length
(mm)
Pitch
(mm)
Width
(mm)
Fenner
Brand
1040 -8M 30 -FEN
46
Specialist Technical Centres
Know-How
Power
Transmission
Vee, Wedge and Timing Pulleys
Belt
Section
Pitch Dia.
(mm)
No. of
Grooves
Fenner
Brand
S P A 5 0 0 X 5 - F E N
Available in:
Z, SPZ, XPZ, QXPZ from 56–630mm pitch dia.
A, SPA, XPA, QXPA from 80–800mm pitch dia.
B, SPB, XPB, QXPB, USPB from 112–1000mm dia.
C, SPC, XPC, QXPC, USPC from 200–1250mm pitch dia.
Vee and Wedge Taper Lock®
Pulleys
Statically balanced to grade G6.3 for
high accuracy
www.fptgroup.com
Why Choose Fenner
Friction Pulleys
Available with pilot bore fixings or
using Taper Lock® shaft fixings system
for ultimate versatility.
nn Manufactured to ISO standards
nn Surface treated to reduce corrosion
nn Specials available
Superior material specification and design allows guaranteed
Superior performance at rim speeds up to 40m/s. Designed for
use with both Vee and Wedge section belts.
nn Dual duty grooves to ISO 4183, dual duty pulleys accept
both wedge and vee belts
nn High grade cast iron used for construction
nn All pulleys are statically balanced
nn Rim speeds to a maximum of 40m/s
nn Special designs available
Save Energy, Improve Efficiency...
Your belt drive stands or falls by the accuracy of its installation, so don’t forget to check
the condition of your pulleys. 50% of new belts are fitted to worn pulleys, which can
waste up to 10% of your energy input.
n Worn pulleys waste up to 10% of energy input
n Check yours now with the Fenner pulley groove gauge
Request your free pulley groove gauge today!
http://knowhow.eriks.co.uk/fenner-groove-gauge-request Worn Pulley New Pulley
47
Visit us at www.eriks.co.uk
Power
Transmission
Fenner timing pulleys are manufactured from steel and high grade cast iron (GG25),
tolerate shock loadings and can achieve rim speeds of up to 40m/s.
nn Available in both Classical Timing and HTD profiles
nn Meet ISO 13050 and ISO 5296 standards
nn High grade cast iron used for construction
nn Precision machined grooves protect and maximise belt life while reducing
noise emissions
nn Special designs and sizes are available
nn Maximum rim speed up to 40m/s
nn Available with standard Taper Lock®
fitting
Timing Pulleys
Have you seen...
Our On-Line Drive Design Assistants
Boost your drive efficiency
Optimising your drive at the design stage
can contribute significantly to the operating
life, reliability and overall efficiency of your
application.
With this in mind, we developed easy-to-use Fenner Select®
on-line drive design assistants, providing engineers with a
structured, detailed approach to achieving optimum drive
performance.
The family of on-line drive design assistants include:
nn Friction belt drives
nn Synchronous belt drives
nn Chain drives
No of
Teeth
Pitch Size
(mm)
Belt Width
(mm)
Fenner
Brand
4 0 - 8 M 2 0 - F E N
Visit http://selectors.fptgroup.com
and check out this invaluable, FREE resource!
48
Specialist Technical Centres
Know-How
Power
Transmission
Timing Belts and Shaft Fixings
CONTI®
Synchrochain Carbon
Heavy Duty Timing Belt
Conti®
Synchrochain Carbon utilises state-of-the-art materials
with unparalleled smart production techniques which result in
one of the most versatile and technically outstanding products
on the market today. Whether your key driver is maximum
production out, minimum drive size or total cost of ownership –
Conti®
Synchrochain Carbon is the solution!
nn Higher power capacity
nn Almost zero tension loss (initial)
nn Excellent length stability
nn Reduced belt width
nn Reduced noise
nn Increased service life
nn Reduced system costs and drive envelope
Specially treated fabric
Polyurethane teeth
Tension member
Aramide cord with
S/Z twists wound
in pairs
Polyurethane
backing
Conti®
Synchrochain
Heavy Duty Timing Belt
The newly developed CTD profile ensures faultless meshing and
hence smooth running at high speeds. At the same time it prevents
a jump-over at high torques.
So the Conti Synchrochain is well able to cope with a wide range
of requirements. It is suitable for new drive designs and at the
same time also compatible for use in existing systems. Available in
pitches CTD8M and CTD14M. Details of pitch, lengths and widths
can be obtained on request.
Properties:
nn Temperature range, depending on application, from –40°C to +80°C
nn Suitable for tropical climates
nn Resistant to aging and ozone
nn Withstands reverse flexing
nn Resistant to oils, grease and fuel
nn Conditionally resistant to acid and lye
nn Raw materials and production are silicone free
Timing Belts from CONTI®
Conti®
SilentSync
Self-tracking Timing Belt
Conti SilentSync is a self-tracking timing belt made for very quiet
and reduced vibration operation, making it an excellent choice for
horizontal drives
Properties:
nn Temperature range from –40°C to +85°C
nn Electrically conductive to ISO 9563
nn Very low noise
nn Low vibration
nn Resistant to ageing and ozone
nn Conditionally oil-resistant
nn Maintenance-free
Synthetic rubber
backing
Specially treated fabric
Synthetic rubber feet
Aramide tension
member
49
Visit us at www.eriks.co.uk
Power
Transmission
Fenner Taper Lock®
Bushes
Exclusively for use with Taper Lock bored
pulleys, sprockets and couplings, easy to
install, off-the-shelf solution.
Offering a full range of both metric and
imperial sizes as well as a full range of
weld-on hubs, bolt-on hubs and hub
adaptors.
Available for shafts 9 to 125mm
diameter - up to 7,400Nm
transmission
n	 Quick and easy to install or remove
n	 Unique 4-hole design to reduce
vibration for balanced assemblies
n	 Removes the need for re-boring with a
full range of both metric and imperial
bores
n	 Manufactured from high grade, close-
grain grey iron or steel
FenLock™ Cone
Clamping Elements
Fenner Trantorque
GTR
Fast and accurate, single fastener shaft
locking. Ideal for quick change parts or
assemblies.
It offers a mechanical shrink-fit eliminating
the problems of fretting corrosion, backlash
and key wallowing.
Trantorque Mini available for 5
to 16mm shafts (up to 50Nm
transmission). Trantorque GTR
available for 15 to 75mm shafts (up
to 2000Nm transmission)
n	 Precise radial and axial adjustments on
shafts
n	 Self-centering, requires no location
diameter to retain concentricity
n	 Offers a mechanical shrink-fit
eliminating backlash
n	 Can be used directly over empty
keyways to repair a worn or damaged
connection
Extreme duty, high torque transmission
shaft fixing. The ultimate solution for
arduous equipment where reliability is
essential.
Offering simple installation, increased shaft
strength and high torque transmission
capacity.
Available for shaft sizes 6 to 900mm
diameter - transmission of up to
1,650kNm
n	 Accommodates infinite axial and radial
positioning
n	 Can be installed and removed multiple
times
n	 Enclosed design eliminates ingress of
contaminants
n	 Offers high torque transmission
capacity
Which Shaft Fixing is Right for
your Application?
Simplepage 50
Standard
page 51
Solutionspage 51
50
Specialist Technical Centres
Know-How
Power
Transmission
Taper Lock Bushes, Trantorque Bushes and FenLock Cone Clamping Elements
Bolt-on
Hub
B F 2 5 - F E N
Bush Size Keyway
KM for Metric
PM for Plain
Fenner BrandConstant
2517 KM -ADAPTOR -FEN WH 25 HUBS -FEN
Adaptors
n 	For use with parallel bore
eliminating the cost of drilling,
tapping and taper boring
n 	Keyed version also available for
heavy duty applications
n 	Taper bored to receive 4-hole Taper Lock®
bush sizes 1008 to 4040
Bolt-on hubs
n 	A convenient means to secure fan rotors,
steel pulleys, plate sprockets, impellers
etc to a shaft
n 	Welding not necessary
n 	Taper bored to receive 4-hole Taper Lock®
bush sizes 1210 to 3040
Weld-on hubs
n 	Manufactured from steel to provide
convenient means to secure fan rotors,
steel pulleys, plate sprockets, impellers
etc to a shaft
n 	Shouldered outer diameter allows for easy
location
n	 Taper bored to receive 4-hole Taper Lock®
bush sizes 1210 to 5040
Bush Size
(1st
 2nd
digits of bush
size)
Fenner Brand Weld-on
Hub
Bush Size
(1st
 2nd
digits of bush
size)
Fenner BrandConstant
Taper Lock®
Bushes
Easy on, easy off - the simplest and
quickest shaft fixing
www.fptgroup.com
Machined to exacting tolerances in cast iron and steel, the Fenner
Taper Lock® four hole bush has been tried and tested in over 40
million applications. It is the most successful shaft fixing in the
market place today with a full range of both metric and imperial
sizes as well as a full range of weld-on hubs, bolt-on hubs and hub
adaptors.
nn No costly re-boring
nn High grade, close grain grey iron (GG25) material
nn Tolerates shock loading
nn Accommodates wide shaft diameter limits +0.05mm (0.002”)
to 0.125mm (0.005”)
nn Perfect for use with V-pulleys, timing and HTD pulleys,
sprockets, shaft couplings, hubs and adaptors
Metric Range: 1008–5050 Bore Diameter 16mm–125mm
Imperial Range: 1008–5050 Bore Diameter 3/8–5
Bush Size Bore Size Fenner Brand
1 6 1 0 X 3 8 - F E N
2 5 1 7 X1.5/8 - F E N
Metric
Imperial
Simple
51
Visit us at www.eriks.co.uk
Power
Transmission
n Eliminate Keys, Keyways, Setscrews
Eliminate costly matching with inexpensive
Trantorque GTR mounts. They grip like a shrink-fit
on shaft and bore, and resist shocks and torque
reversals better than keyways. Single-nut design,
self-centres accurately, locks or unlocks with the
twist of a wrench.
n Infinite, Precise Radial Adjustment
The positive lock and release action permits
exact initial positioning with easy readjustment
at a later date.
n Use Smaller Shafts
Eliminate the weak spot in shafts and hubs caused
by machining keyways. This, plus the rigidising
effect, permits smaller and less expensive shafts
and bearings with equal strength and stiffness.
n Retrofit and Repair
Can be used directly over empty keyways to
repair a worn or damaged connection. Both
metric and imperial units are available.
n Mount Hubless Devices
Trantorque GTR mounts are unique in their
ability to mount thin hubless devices. They
need not be completely within the bore.
This permits mounting plate sprockets, hubless
gears, disc brakes, etc. – often at substantial
savings to the user or OEM.
FenLock™ cone clamping elements provide a wide and versatile
range of keyless shaft/hub assemblies.
n Simple installation/dissembly
n Resistance to alternating torques
n Increased shaft strength
n High torque transmission capacity
n No backlash
n Axial and angular adjustment capability
n No fretting corrosion
To Help...
When ordering shaft fixings, consider the following:
nn Shaft dimension
nn Keyway details
nn Transmitted torque
nn Hub details (diameter, length, material)
TranTorque GTR Bushes  FenLock
Cone Clamping Elements
Standard
Solutions
FLK 200	 Medium High Torque, non self-centering
FLK110	 Medium/High Torque, self centering, fewer screws
FLK130	 High torque, self-centering
FLK131	 High torque, self-centering larger dia. location collar
FLK603	 Medium/high torque, self centering, shrink disc device
Conatct your local ERIKS service centre for details on the full
range available.
52
Specialist Technical Centres
Know-How
Power
Transmission
Fenaflex Tyre, Rigid, HRC and Jaw Couplings
Fenaflex Couplings
Less stress, more flexibility
These highly elastic lubrication-free couplings tolerate large
amounts of misalignment in all planes as well as offering simple
installation and inspection without disrupting the drive.
The Fenaflex®
coupling also has excellent shock absorbing
properties while reducing vibration and torsional oscillations.
nn Accepts misalignment simultaneously in all planes
nn Highly resilient to absorb shock loads
nn Lubrication-free
nn Sample visual inspection to aid maintenance
nn ATEX approved variant
nn Simple installation without moving coupled machines
nn Taper Lock®
and pilot bore flanges
nn Pump spacer and flywheel fixing variants
Rigid Couplings
Taper Lock®
Rigid couplings provide a convenient method of rigidly connecting shafts.
Taper Lock®
bushes permit easier and quicker fixing to the shafts with the firmness of a
shrunk-on fit.
nn Peripheral speeds of up to 33m/s available
nn Vertical assemblies possible in FF design
nn Taper Lock® fixing as standard
nn 8 sizes in the range
Couplings
Available in Taper Lock® or pilot bore
flanges. Taper Lock® have a massive
torque capacity and are available with a fire
resistant, anti-static tyre.
Pump Spacer Variant
Spacer variant available for pump drives
to allow disassembly of pump shaft
without disturbing the prime mover,
minimising downtime.
Flywheel Variant
Flywheel coupling version available for
standard SAE flywheel fixings and elements
available in different dynamic stiffness’s to
accommodate a wide range of engine and
driven machine parameters.
53
Visit us at www.eriks.co.uk
Power
Transmission
Why Choose HRC...
When looking for a value for money
coupling, OEMs have specified the
HRC since its launch in the 1970s.
HRC Couplings
Exceptional performance,
exceptional value
Permitting quick and easy installation by means of Taper Lock®
bushes, and offering quick alignment, the semi-elastic general
purpose HRC coupling is ideal for use with electric motors.
nn Offers the simplest, most straightforward fitting available
nn Ease of alignment and fitting using straight edge and
machined outside diameters
nn Fail-safe design due to interacting dog design
nn Accommodates incidental misalignment
nn Exceptional performance at low cost
nn Power ratings are matched to standard motor sizes
nn Standard and FRAS elements available
nn Flywheel fixing variant available
nn Pilot bore design also available
Jaw Couplings
A low-cost general purpose solution to absorb incidental misalignment, shockloads and
small amplitude vibrations.
nn Ease of alignment
nn Fail-safe shaft connection
nn Range of element materials available including; nitrile, urethane and hytrel
nn Pump spacer variant available
nn Design powers up to 42.2kW available at 1440rpm
Much copied, the original Fenner HRC product
outlasts its competitors due to subtle design
differences such as, higher levels of surface
finish on the drive dogs and having flexible
elements manufactured in the UK to extremely
high specifications.
Its high grade rugged cast iron construction
is a must for heavy duty industries such
as mining and quarrying so it’s no surprise
this coupling is the crusher and screen
manufacturers choice every time.
54
Specialist Technical Centres
Know-How
Power
Transmission
Rexnord and Falk Couplings
Disc CouplingsCouplings
Rexnord®
• Ov
• Up
• Up
• Sp
• All
rep
• Fe
an
• Me
sp
• AT
Rexnord A
• 13
• Up
• Up
• Hi
cu
• Up
• Co
ele
ow
• Pa
de
eli
• Sh
Lubricated Couplings
Falk®
Stee
• 25
• 11
fly
• Up
• Up
• Up
• Fiv
wi
Falk Lifelig
• 28
• 13
an
• Up
• Up
• La
ap
• Th
Disc CouplingsCouplings
Rexnord®
Th
• Over
• Up to
• Up to
• Spee
• Allow
repla
• Featu
and e
• Meet
speci
• ATEX
Rexnord Add
• 13 siz
• Up to
• Up to
• High-
custo
• Up to
• Corro
elem
owne
• Paten
degre
elimin
• Ships
Lubricated Couplings
Falk®
Steelfle
• 25 siz
• 11 m
flywh
• Up to
• Up to
• Up to
• Five-
with L
Falk Lifelign®
• 28 siz
• 13 m
and h
• Up to
• Up to
• Large
appli
• Three
Disc CouplingsCouplings
Rexnord®
Thom
• Over 20
• Up to 43
• Up to 28
• Speed ra
• Allows fo
replacem
• Features
and elec
• Meets A
specified
• ATEX ce
Rexnord Addax
• 13 sizes
• Up to 13
• Up to 4,0
• High-per
custom s
• Up to 50
• Corrosio
element
ownersh
• Patented
degree o
eliminate
• Ships in
Lubricated Couplings
Falk®
Steelflex®
• 25 sizes
• 11 mode
flywheel
• Up to 50
• Up to 93
• Up to 10
• Five-yea
with Lon
Falk Lifelign®
G
• 28 sizes
• 13 mode
and high
• Up to 1,0
• Up to 8,1
• Large fle
applicati
• Three-ye
Disc Couplings
Lubricated Couplings
Rexnord®
Thomas®
XTSR Disc Couplings
nn Over 20 sizes
nn Up to 430 mm bore capacity
nn Up to 283,000 Nm torque capacity
nn Speed ratings up to 20,000 rpm
nn Allows for visual inspection and easy replacement of disc packs and center members
nn Features zero backlash, low-restoring forces, and electrically-insulated designs
nn Meets API 671 or API 610 specifications when specified
nn ATEX certified
Rexnord Addax®
Composite Disc Couplings
nn 13 sizes
nn Up to 130 mm bore capacity
nn Up to 4,090 Nm torque capacity
nn High-performance composite spacer with custom spacer lengths, up to 6,985 mm
nn Up to 500 hp
nn Corrosion-resistant center member, flex element, hub, and hardware lower the cost of
ownership and extend service life
nn Patented unitized flex elements provide 1 degree of misalignment per element and eliminate
fretting
nn Ships in less than 24 hours if required
Falk®
Steelflex®
Grid Couplings
nn 25 sizes
nn 11 models including high-speed, spacer, flywheel, brake and controlled torque
nn Up to 508 mm bore capacity
nn Up to 932,126 Nm torque capacity
nn Up to 10,000 rpm
nn Five-year heavy-duty warranty when lubricated with Long Term Grease (LTG)
Falk Lifelign®
Gear Couplings
nn 28 sizes
nn 13 models for general purpose, high-speed and high-torque applications
nn Up to 1,067 mm bore capacity
nn Up to 8,185,763 Nm torque capacity
nn Large flex hubs accommodate high-torque applications in space-limited installations
nn Three-year, heavy-duty warranty
55
Visit us at www.eriks.co.uk
Power
Transmission
Elastomeric Couplings
Falk Wrapflex®
Elastomeric Couplings
• 12 sizes
• Up to 184 mm bore capacity
• Up to 15,027 Nm torque capacity
• Up to 4,500 rpm
• Patented hub and flex element design ensure
long life
• Close-coupled and spacer designs available to
accommodate shaft spacing
• Polyurethane element has excellent wear
and chemical resistance and an operating
temperature range of -40°C to 95°C
• ATEX certified
Torque Management Products
Rexnord Autogard®
Torque Limiters
• Protect equipment from damaging torque spik
and inertias
• Instant and complete disengagement of the
drive when overloaded
• Adjustable, accurate, and repeatable torque
setting
• Reduced downtime due to quick and easy rese
• Rapid-reset, remote-reset, synchronous-reset
options
• Torque ranges from 1Nm to 1,000,000 Nm +
Couplings
Elastomeric Couplings
Falk Wrapflex®
Elastomeric Couplings
• 12 sizes
• Up to 184 mm bore capacity
• Up to 15,027 Nm torque capacity
• Up to 4,500 rpm
• Patented hub and flex element design ensure
long life
• Close-coupled and spacer designs available to
accommodate shaft spacing
• Polyurethane element has excellent wear
and chemical resistance and an operating
temperature range of -40°C to 95°C
• ATEX certified
Rexnord Viva®
Elastomeric Couplings
• 12 Viva sizes
• Up to 165 mm bore capacity
• Up to 6,270 Nm torque capacity
• Up to 4,300 rpm
• Split-in-half flex element design for efficient
installation and replacement
• Mounting hole patterns allow for a wide range
of shaft gaps: from 6 to 300 mm
• Non-lubricated and low-maintenance
• Viva model features patented “V” notch
design which provides uniform failure area for
overload protection
• ATEX certified
Torque Management Products
PT Drive Components
Elastomeric Couplings
Falk Wrapflex®
Elastomeric Couplings
• 12 sizes
• Up to 184 mm bore capacity
• Up to 15,027 Nm torque capacity
• Up to 4,500 rpm
• Patented hub and flex element design ensure
long life
• Close-coupled and spacer designs available to
accommodate shaft spacing
• Polyurethane element has excellent wear
and chemical resistance and an operating
temperature range of -40°C to 95°C
• ATEX certified
Torque Management Products
Rexnord Autogard®
Torque Limiters
• Protect equipment from damaging torque spikes
and inertias
• Instant and complete disengagement of the
drive when overloaded
• Adjustable, accurate, and repeatable torque
setting
• Reduced downtime due to quick and easy reset
• Rapid-reset, remote-reset, synchronous-reset
options
• Torque ranges from 1Nm to 1,000,000 Nm +
Elastomeric Couplings
Torque Limiters
Falk Wrapflex®
Elastomeric Couplings
nn 12 sizes
nn Up to 184 mm bore capacity
nn Up to 15,027 Nm torque capacity
nn Up to 4,500 rpm
nn Patented hub and flex element design ensure long life
nn Close-coupled and spacer designs available to accommodate shaft spacing
nn Polyurethane element has excellent wear and chemical resistance and an operating
temperature range of -40°C to 95°C
nn ATEX certified
Rexnord Viva®
Elastomeric Couplings
nn 12 Viva sizes
nn Up to 165 mm bore capacity
nn Up to 6,270 Nm torque capacity
nn Up to 4,300 rpm
nn Split-in-half flex element design for efficient installation and replacement
nn Mounting hole patterns allow for a wide range of shaft gaps: from 6 to 300 mm
nn Non-lubricated and low-maintenance
nn Viva model features patented “V” notch design which provides uniform failure area for overload
protection
nn ATEX certified
Rexnord Autogard®
Torque Limiters
nn Protect equipment from damaging torque spikes and inertias
nn Instant and complete disengagement of the drive when overloaded
nn Adjustable, accurate, and repeatable torque setting
nn Reduced downtime due to quick and easy reset
nn Rapid-reset, remote-reset, synchronous-reset options
nn Torque ranges from 1Nm to 1,000,000 Nm +
nn PT Drive Components
56
Specialist Technical Centres
Know-How
Power
Transmission
Sprockets
Fenner sprockets are available with either Taper Lock or pilot bored fixings and are
precision manufactured from fine grade steel. Sprockets are available in simplex, duplex
and triplex forms for sizes 05B to 20B.
nn Surface treated to reduce corrosion
nn Short-reach bushes on selected sizes - compact hubs
nn Hardened teeth on Taper Lock sprockets
Roller Chain and Sprockets
Fenner PLUS Roller Chain
High Performance Chain
Fenner PLUS chain has been designed to provide the optimum
combination of tensile strength, wear resistance and fatigue life.
Increased fatigue resistance
nn Shot peening of roller and side plates gives increased
fatigue resistance
nn Ball swaged side plate holes improve finish and combat
fatigue failure
nn Deep waisted side plates increase effective cross section
lowering fatigue
Fit and forget reliability
nn Preloaded to bed in all component parts
nn Final 100% quality check enabling you to simply fit and
forget
OKS Chain
and Drive
Spray
Product Ref:
OKS3751-
500ML
Also available
Sprocket Reworking Service
The ERIKS Power Transmission Technology Centre is pleased
to offer you a new in-house sprocket reworking service.
nn Stocking 3/8” to 3/4” pitch
simplex in preferred tooth
numbers**
nn Bored to H7 tolerance
nn B.S. keyway/grubscrew
nn Can be machined to drawing
Number
of teeth
Pitch
(Inches)
FixingForm Fenner Brand
5/8 D- 27T- TL -FEN
57
Visit us at www.eriks.co.uk
Power
Transmission
Lubrication Free Chain
The Greener Cleaner Option
Fenner PLUS Lubrication-Free roller chain utilises
sintered bush chain technology which negates the need
to pre-lubricate the chain for storage or running.
The porous bush is lightly impregnated with oil which gives the same
performance characteristics as lubricated chain without the need for
periodical applications of lubricant whilst the chain is in use.
This reduces risk to personnel as they don’t have to climb into
machines to lubricate product and reduces waste oil products
having to be recycled safely and legally.
Fenner PLUS lubrication-free roller chain is an ideal solution for
situations where lubrication is difficult or contamination and fire
are serious potential problems.
nn Built-in lubrication – Fenner PLUS lubrication-free chain
has been specially manufactured to exacting standards and
features its own built-in lubrication
nn Using sintered bushes impregnated with oil, Fenner
lubrication-free chain can operate at up to 2.5m/sec, which
is more than twice that of composite bush chains
Dramatically Reduced Downtime
ERIKS were contacted by a large
pet food manufacturer, as they
were experiencing problems with
the roller chains on their pet food
conveyors.
The chains were failing after just
six months of use, and were also
contaminated with debris attracted by
excess oil which had been applied to
the products. Following a site visit and
after a lengthy technical discussion it
was recommended that Fenner PLUS
lubrication-free roller chain would be the
best solution. Not only would this negate
the need for costly and time consuming
maintenance procedures, it would save the
customer the expense of recycling the oil
based lubricant after use.
100 metres were subsequently trialled,
and a year later are still performing! The
end user is delighted not only with the
enhanced performance, but also with
the lube-free benefits using this product
resulting in an environmentally friendly
factory. All conveyor lines have been and
will continue to be fitted with Fenner
PLUS lubrication-free roller chain.
58
Specialist Technical Centres
Know-How
Power
Transmission
Adapted Chain
EXTENDED PINS
K1 K2 M1 M2
163 164 563 564
Circlip Type Plain Duplex Pin
Fenner PLUS Adapted Chain
Fenner PLUS adapted chain builds on the heritage and engineering
experience of the Fenner product range by optimising the benefits
of performance enhancing features which work together to give
Fenner PLUS chain the optimum combination of tensile strength,
wear resistance and fatigue life.
nn Enhanced performance in hostile environments
nn Solid rollers manufactured to achieve high surface hardness
nn Shot peened plates for increased fatigue resistance and
extended chain life
3 Simple Steps to an Adapted Solution
Determine your adapted chain requirement using our simple adapted chain enquiry form and pass to your
ERIKS representative
Our engineering team will assess and quote for your requirements
We will assemble and deliver your adapted chain swiftly and efficiently so that you can enjoy the market
leading benefits of Fenner PLUS adapted chain3
Everything You Need
nn Carbon and stainless steel variants
nn British (BS) and American (ANSI) standard
specification
nn Simplex and duplex
nn K and M attachments
nn Extended pin variants
nn Hollow pin variants
nn Matched lengths available
48 HourAdapted Chain
Service
59
Visit us at www.eriks.co.uk
Power
Transmission
When the Industry Moves, Rexnord is the Preferred Choice.
www.rexnord.com
When it comes to providing highly engineered products that improve productivity and efficiency
for industrial applications worldwide, Rexnord is the most reliable in the industry.
From durable products like plastic bottles, to a more delicate product like a bag of chips, Rexnord
works to ensure the sustainability of your product through production and distribution.
Our commitment to customer satisfaction and superior value extends to every area of our business.
60
Specialist Technical Centres
Know-How
Power
Transmission
Renold Performance Chain
www.renold.com/synergy
To find out how Renold Synergy can
enhance your productivity, call us on;
Tel: +44 (0)161 498 4600
Email: synergy@renold.com
• Unbeatable wear
and fatigue resistance
• Withstands shock
loadings better than any
other standard chain
• Reduced initial wear
• Productivity improves
with Renold Synergy
Renold Synergy is the only high performance transmission chain on the market
LASTS 3 TIMES
LONGER IN WEAR THAN
YOUR CURRENT CHAIN OR
YOUR NEXT CHAIN IS FREE
3XXXX Renold Synergy Ad 210x280 v1_Layout 1 25/07/2012 10:43 Page 1
www.renold.com/attachmentchain
Contact ERIKS, your Renold
authorised distributor
on 0845 006 6000
Attachment Chain from Renold.
Attachment chain requires excellent
service; prompt quoting, rapid
availability and quick delivery.
39269 Renold ERIKS A4 ATTACHMENT Advert.indd 1 30/04/2013 09:56
61
Visit us at www.eriks.co.uk
Power
Transmission
Synergy Chain
If lubrication’s a problem – here’s the solution! Designed around unique Renold
technology, these chains set a new benchmark for chain performance with little or no
lubrication. Offering real improvements in working life, thanks to outstanding wear and
fatigue resistance, the range covers both small and large pitch sizes and is dimensionally
interchangeable with standard chains. Using food industry-approved lubricant within
the sintered bush, they have an ISO standard pin diameter, and therefore standard
attachments on the outer links.
nn Large and small pitch sizes
nn No lubrication normally required
nn Totally dry to the touch
nn Nickel-plated plates
nn Excellent corrosion resistance
nn Unique food industry-approved
roller coating
nn Dimensionally interchangeable
with standard chain
nn ISO standard pin diameter
Part No	 ISO Ref	 Pitch (inch)	 Box Qty (ft)
110438-10FT-REN	06B-1	 3/8	 10
110446-10FT-REN	08B-1	 1/2	 10
110456-10FT-REN	10B-1	 5/8	 10
110466-10FT-REN	12B-1	 3/4	 10
110488-10FT-REN	16B-1	 1	 10
Syno Chain
The only true high performance roller chain on the market! This isn’t our verdict, but that
of engineers around the world, who consistently report that these superb products offer
excellent wear and fatigue resistance, and exceptional working life.
Its performance which results from years of research and development to deliver
a product which is quite simply the most reliable of its kind.
nn Backed by the Synergy Wear Life Guarantee
nn Unbeatable wear resistance delivers maximum productivity
nn Special platinum-coloured connecting link for easy
identification and fast disconnect
nn Unique end-softened pins for quick and easy cutting
to length – without damaging the rest of the chain
nn High resistance to shock loading
Part No	 ISO Ref	 Pitch (inch)	 Box Qty (ft)
110038-25FT-REN	06B-1	 3/8	 25
110046-25FT-REN	08B-1	 1/2	 25
110056-25FT-REN	10B-1	 5/8	 25
110066-25FT-REN	12B-1	 3/4	 25
110088-10FT-REN	16B-1	 1	 10
110106-10FT-REN	20B-1	 1.1/4	 10
110127-10FT-REN	24B-1	 1.1/2	 10
114038-25FT-REN	06B-2	 3/8	 25
114046-25FT-REN	08B-2	 1/2	 25
114056-25FT-REN	10B-2	 5/8	 25
114066-25FT-REN	12B-2	 3/4	 25
114088-10FT-REN	16B-2	 1	 10
114106-10FT-REN	20B-2	 1.1/4	 10
114127-10FT-REN	24B-2	 1.1/2	 10
116038-25FT-REN	06B-3	 3/8	 25
116046-25FT-REN	08B-3	 1/2	 25
116056-25FT-REN	10B-3	 5/8	 25
116066-25FT-REN	12B-3	 3/4	 25
116088-10FT-REN	16B-3	 1	 10
116106-10FT-REN	20B-3	 1.1/4	 10
116127-10FT-REN	24B-3	 1.1/2	 10
The biggest
single innovation in
power transmission
technology since
Renold invented
the bush roller
chain
Wear
resistance and
performance
without
equal
62
Specialist Technical Centres
Know-How
Power
Transmission
Renold Special Chain
www.renold.com/attachmentchain
Contact ERIKS, your Renold
authorised distributor
on 0845 006 6000
Attachment Chain from Renold.
Attachment chain requires excellent
service; prompt quoting, rapid
availability and quick delivery.
39269 Renold ERIKS A4 ATTACHMENT Advert.indd 1 30/04/2013 09:56
www.renold.com/attachmentchain
Contact ERIKS, your Renold
authorised distributor
on 0845 006 6000
Attachment Chain from Renold.
Attachment chain requires excellent
service; prompt quoting, rapid
availability and quick delivery.
39269 Renold ERIKS A4 ATTACHMENT Advert.indd 1 30/04/2013 09:56
63
Visit us at www.eriks.co.uk
Power
Transmission
Renold Hydro-Service chain delivers superior corrosion resistance,
lasting as much as 30 times longer than standard carbon steel in
applications that have to deal with water or salt spray.
Renold Stainless Steel chain should be slected when resistance to
chemical action is critical. Ideal for use in food processing.
Renold Sovereign
Renold Stainless Steel
Renold Hydro-Service
Part No	 ISO Ref	 Pitch (inch)	 Box Qty (ft)
110846-25FT-REN	08B-1	 1/2	 25
110856-25FT-REN	10B-1	 5/8	 25
110866-25FT-REN	12B-1	 3/4	 25
110888-10FT-REN	16B-1	 1	 10
Part No	 ISO Ref	 Pitch (inch)	 Box Qty (ft)
185118-10FT-REN	05B-1	 5/16	 10
185302-10FT-REN	06B-1	 3/8	 10
181707-10FT-REN	08B-1	 1/2	 10
180280-10FT-REN	10B-1	 5/8	 10
185634-10FT-REN	12B-1	 3/4	 10
187900-10FT-REN	16B-1	 1	 10
Part No	 ISO Ref	 Pitch (inch)	 Box Qty (ft)
	530038-10FT-REN	 06B-1	 3/8	 10
	530046-10FT-REN	 08B-1	 1/2	 10
	530056-10FT-REN	 10B-1	 5/8	 10
	530066-10FT-REN	 12B-1	 3/4	 10
	530088-10FT-REN	 16B-1	 1	 10
	530106-10FT-REN	 20B-1	 1.1/4	 10
	530127-10FT-REN	 24B-1	 1.1/2	 10
Part No	 ISO Ref	 Pitch (inch)	 Box Qty (ft)
114846-25FT-REN	08B-2	 1/2	 25
114856-25FT-REN	10B-2	 5/8	 25
114866-25FT-REN	12B-2	 3/4	 25
114888-10FT-REN	16B-2	 1	 10
Part No	 ISO Ref	 Pitch (inch)	 Box Qty (ft)
185122-10FT-REN	06B-2	 3/8	 10
185125-10FT-REN	08B-2	 1/2	 10
185126-10FT-REN	10B-2	 5/8	 10
185127-10FT-REN	12B-2	 3/4	 10
185128-10FT-REN	16B-2	 1	 10
Part No	 ISO Ref	 Pitch (inch)	 Box Qty (ft)
	534038-10FT-REN	 06B-2	 3/8	 10
	534046-10FT-REN	 08B-2	 1/2	 10
	534056-10FT-REN	 10B-2	 5/8	 10
	534066-10FT-REN	 12B-2	 3/4	 10
	534088-10FT-REN	 16B-2	 1	 10
	534106-10FT-REN	 20B-2	 1.1/4	 10
	534127-10FT-REN	 24B-2	 1.1/2	 10
Renold Sovereign is the perfect solution for abrasive environments where dirt and dust
ingress is commonplace. Renold Sovereign offers up to 4 times longer wear life, reduces
pin wear, and is suitable for high speed or heavy load applications.
64
Specialist Technical Centres
Know-How
Power
Transmission
Accessories, Drives and Rollers
Chain Pin Extractor
Do you have to grind chain to cut it? Renold
makes cutting chain easy. Using the Renold
Chain Pin Extractor cutting chain is effortless, it
takes just seconds and there’s no mess.
Chain Wear Guide
You can use a simple wear guide to identify when your chain
has reached the point when it needs to be replaced. Running
a worn chain will reduce efficiency, accelerate the wearing
of sprocket teeth and increase operational noise. The Renold
Chain Wear Guide helps you to measure chain extension and
improve maintenance.
www.chainwearguide.com
Chain Pin Extractor
Do you have to grind chain to cut it? Renold makes cutting chain easy. Using
it takes just seconds and there’s no mess.
www.renoldpinextractor.com
Renold Chain Selector
The new Chain Selector from Renold has been launched, making it even eas
to specify the right transmission chain for the job. You can quickly and easil
generate a selection, alter parameters to include environmental factors like
corrosion or lubrication and even allow for applications with shock loads.
www.renoldchainselector.com
Chain Wear Guide
You can use a simple wear guide to identify when
your chain has reached the point when it needs
to be replaced. Running a worn chain will reduce
efficiency, accelerate the wearing of sprocket teeth
and increase operational noise. The Renold Chain
Wear Guide helps you to measure chain extension
and improve maintenance.
ar Guide
ple wear guide to identify when your chain
oint when it needs to be replaced. Running
reduce efficiency, accelerate the wearing
and increase operational noise. The Renold
helps you to measure chain extension and
ance.
earguide.com
Extractor
nd chain to cut it? Renold makes cutting chain easy. Using the Renold Chain Pin Extractor cutting chain is effortless,
ds and there’s no mess.
inextractor.com
hain Selector
ector from Renold has been launched, making it even easier
t transmission chain for the job. You can quickly and easily
on, alter parameters to include environmental factors like
ation and even allow for applications with shock loads.
hainselector.com
Renold Klik-Top polymer
block chain
Renold Klik-Top polymer block chain is a modern alternative
to conventional polymer block chain. If you need to remove
a Klik-Top block it’s easy, no need to disassemble the chain.
Renold: making life easier!
www.kliktopchain.com
ndd 1 30/04/2013 09:53
Renold Chain
Selector
The new Chain Selector from Renold has been
launched, making it even easier to specify the right
transmission chain for the job. You can quickly
and easily generate a selection, alter parameters
to include environmental factors like corrosion or
lubrication and even allow for applications with
shock loads. www.renoldchainselector.com
r Guide
e wear guide to identify when your chain
nt when it needs to be replaced. Running
duce efficiency, accelerate the wearing
d increase operational noise. The Renold
elps you to measure chain extension and
ce.
rguide.com
xtractor
d chain to cut it? Renold makes cutting chain easy. Using the Renold Chain Pin Extractor cutting chain is effortless,
and there’s no mess.
extractor.com
Renold Klik-Top polymer
block chain
Renold Klik-Top polymer block chain is a modern alternative
to conventional polymer block chain. If you need to remove
a Klik-Top block it’s easy, no need to disassemble the chain.
Renold: making life easier!
www.kliktopchain.com
Renold Klik-Top
Polymer Block Chain
You can use a simple wear guide to identify when
your chain has reached the point when it needs
to be replaced. Running a worn chain will reduce
efficiency, accelerate the wearing of sprocket teeth
and increase operational noise. The Renold Chain
Wear Guide helps you to measure chain extension
and improve maintenance.
65
Visit us at www.eriks.co.uk
Power
Transmission
Premiun efficiency IE3 and Super
Premium efficiency IE4
Lower total operational costs
Energy saving
Versatile, robust design
Reduced noise
W22 IE3 Premium Efficiency
and IE4 Super Premium
Efficiency- Cast Iron Range
High efficiency and low cost of ownership
throughout the entire motor lifetime have
been the basis for the W22 development.
Available with outputs from 0.12 to 500kW
in either 2, 4, 6 and 8 pole speeds.
W21 - Aluminium Range
Offering improved thermal dissipation
with a lower overall weight than cast iron,
the aluminium frame is suitable for most
industrial environments.
Available with outputs from 0.12 to 11kW
in either 2, 4, 6 and 8 pole speeds.
High efficiency IE2 and Premium
Efficiency IE3
Multi-mounting
Class F insulation system
IP55 protection
Suitable for inverter duty applications
W22X IE3 Premium Efficiency
and IE4 Super Premium
Efficiency - Flameproof Range
Although not yet included within the EU
MEPS, the W22X is available at both IE3
Premium efficiency and IE4 Super Premium
efficiency rating
Available with outputs from 0.12 to 1,600
kW in either 2, 4, 6 and 8 pole speeds.
Premium efficiency IE3 and Super
Premium efficiency IE4
Low total operational costs
EXd rated for explosive atmospheres
Suitable for Zones 1 and 2 ; Zone 21
and 22 certified
IIC group certified
WEG IE3 and IE4: equipping you to meet
tomorrow’s industrial challenges
With changing statutory standards and rising energy costs, efficient motor performance will be one of your
biggest priorities. As a world-leader in the design and manufacture of industrial motors, our focus is not only on
helping you to meet new IE3 standards, but to exceed them, with our new W22 IE4 range, giving greater savings
with WEG quality.
66
Specialist Technical Centres
Know-How
Power
Transmission
86
POWER
TRANSMISSION
Drives and Rollers
Workshops offering repair or replacement
Attention
T H E H E A R T O F C O N V E Y O R T E C H N O L O G Y
D R I V E S A N D R O L L E R S
The Interroll Group is one of the world's leading
manufacturers of key products for unit load
handling systems, internal logistics and
automation.
Interroll UK has recently strengthened its position
to offer customers an all embracing drive solution
that includes professional consulting services, a
product portfolio for drum drive technology and
conveying components, with the assurance of a
dedicated repair and servicing department
geared to promptly respond to your needs.
• Motorised Drums 80mm - 217mm Dia.
• Synchronous Drum Motors 82mm -113mm Dia
• Drives for all makes of modular belts
• Zone Controlled RollerDrives
• Gravity Rollers
• Fixed  Friction Drive Rollers
• 50mm Dia Magnetic Speed Controller
• Tapered Rollers
• Conveyor Wheels
• Omniwheels  Ball Transfer Units
• Roller Tracks
• Pallet Drives / Rollers
Interroll Drives and Rollers
67
Visit us at www.eriks.co.uk
Power
Transmission
86
POWER
TRANSMISSION
Drives and Rollers
Workshops offering repair or replacement
Attention
T H E H E A R T O F C O N V E Y O R T E C H N O L O G Y
D R I V E S A N D R O L L E R S
The Interroll Group is one of the world's leading
manufacturers of key products for unit load
handling systems, internal logistics and
automation.
Interroll UK has recently strengthened its position
to offer customers an all embracing drive solution
that includes professional consulting services, a
product portfolio for drum drive technology and
conveying components, with the assurance of a
dedicated repair and servicing department
geared to promptly respond to your needs.
• Motorised Drums 80mm - 217mm Dia.
• Synchronous Drum Motors 82mm -113mm Dia
• Drives for all makes of modular belts
• Zone Controlled RollerDrives
• Gravity Rollers
• Fixed  Friction Drive Rollers
• 50mm Dia Magnetic Speed Controller
• Tapered Rollers
• Conveyor Wheels
• Omniwheels  Ball Transfer Units
• Roller Tracks
• Pallet Drives / Rollers
DRIVE FOR THE NEXT GENERATION_Layout 1 26/05/2017 11:14 Page 1
Interroll Drum Motors
Drive for the next generation
The new generation of Drum Motors with fully modular synchronous and
asynchronous design are engineered for high performance and longevity,
and to meet stringent hygiene requirements.
nn Modular platform strategy available with an 80-mm diameter
nn Easier to plan and implement user-specific material-handling solutions
nn Stronger shafts and ball bearings guarantee a long service life
nn Robust planetary gears make it possible to transfer high levels of torque to conveyor
belts efficiently and quietly
nn A greater speed range achieve throughput requirements precisely
nn Short and reliable delivery times
nn Offer high energy efficiencies compared to alternative drive systems, cutting
operating costs further
Ultra-hygienic belt drive
nn New generation Drum Motors with protection class IP69K, meet the highest
hygiene requirements
nn Makes cleaning the facility much faster and easier
nn Reducs the risk of product contamination in the food processing area
nn The PTFE-sealing allows a high pressure cleaning with chemicals according to
ECOLAB Specifications
Pioneering drive solutions
In pioneering drive solutions for modular plastic belt conveyors Interroll utilises a range
of purpose designed, food quality FDA approved profiled rubber and PU lagging,
and stainless steel or polymeric sprockets. To provide maximum flexibility of speed
and control, all Interroll Drum Motors can be connected with most types of frequency
inverters.
Continuous Development  Growth
An important element of Interroll’s Group strategy is its commitment to
developing and refining intelligent products that allow our customers to
save space, energy and delivers a fast return on investment.
nn Magnetic Speed Controller MSC 50 - the new patented Interroll MSC 50
provides the optimal technical solution for controlling descending product speeds
on gravity conveyors with materials weighing from 0.5 kg to a maximum of 35 kg.
nn Interroll RollerDrive - a 24 VDC brushless motor integrated in a
conveyor roller provides the most energy efficient all-purpose drive employed
with controllers in automated conveyor technology.
Interroll Drum Motors are available with a wide range of voltages, powers,
speeds, high torque motors, accessories and many other options.
68
Specialist Technical Centres
Know-How
Power
Transmission
W Flameproof Range
Brook Crompton’s flameproof motors are designated
Ex db (eb) flameproof and are designed for operation in
Zone 1 hazardous areas. They comply with all relevant national
and international standards. They are of a rugged cast iron
construction to withstand an internal explosion.
Outputs range from 0.37kW to 200kW with smaller
or larger outputs on request.
Standard motors are suitable for applications classified T4, in
addition, T5 and T6 can be supplied, although this may involve
reduced outputs.
Special build options:
nn Ex db eb IIB or IIC
nn Group I mining
nn Special shaft dimensions
nn Special voltage
nn Low starting torque
nn Offshore
nn Roller bearing
nn plus many more
Special build options:
nn Multi-speed
nn Encoder
nn Force ventilated (IC416)
nn Brake/brake kit friendly
(aluminium range, frames
63-132 only)
nn Special shaft/special flange
dimensions
nn Special paint
nn Special voltage
nn Roller bearing
nn Low starting torque
nn Marine
nn Hoist/crane duty
nn Fumex (smoke extraction)
nn plus many more
W Range
The Brook Crompton W motor range is a high quality, high variant
product with outputs from 0.07kW to 400kW in frame sizes 80
to 355L (for cast iron range) and WU-DA63S to WU-DA180L
(aluminium range). They are suitable for use within a diverse
range of applications from food and drink, china clay production
to water and sewage.
From roller table drives to refrigeration. Many applications often
have adverse operating conditions including repeated starting
and occasional overloading; the ‘W’ range is well suited to these
situations. A virtual “go anywhere” motor that has a full three year
guarantee.
Some of the benefits of aluminium over cast iron, include, high
resistance to corrosion and atmospheric attack (except chlorine,
salt-laden or sulphuric acid) and the fact that aluminium is
approximately one third the weight of cast iron.
The clear choice for the UK
Multi-Mount...
By simply changing the position of the feet, the user is able to
obtain right, left or top mounted terminal box positions and by
removing the standard endshield you can change it for a flange
or face version.
Brook Crompton Motors
69
Visit us at www.eriks.co.uk
Power
Transmission
FM:3 Series Motors
Premium Efficiency (IE3) Motors
Built to exacting standards the FM:3 range offers a
rugged, feature packed design delivering an energy
efficient, robust solution.
Designed to give the user both operational excellence and a lower
Total Cost of Ownership throughout its life cycle.
nn 60 to 315 frame all multi-mount design
nn All motors fitted with thermistors terminated in the terminal box
nn High quality 63 series bearings from major European
manufacturers
nn Re-greaseable bearings on 180 frame and above with
button type grease nipple
nn Drive end bearings fixed
nn Two external earth fixings on all frames
nn Spring lip seals standard on both drive end and none drive end
nn B14 and B5 flanges are fitted with lip seals for use on wet
gearboxes
nn Large Terminal box with two cable entries
nn Symmetrical design allowing the terminal box to be moved
towards the fan cowl
nn Two lifting eye bolts that are moveable
Options Available
nn Electro-mechanical Brake Kits
nn Encoders for speed and positional feedback
nn Force Ventilation Fan kits for wide speed range operation
with inverter control
nn Rain Canopies for vertical, shaft down mounting
nn Bearing changes to suit different applications and moutning
arrangements
Efficiency Built-In as Standard
A large building products
manufacturer recognised the demand
electric motors put on their electrical
energy consumption and set about
taking steps to tackle the issue.
Total cost of ownership has now become
the deciding factor for their choice of
electric motors and the Fenner FM:3 IE3
range ticks all the boxes when it comes
to energy efficiency and TCO.
On a 37kW motor installation that had failed
it was calculated that the existing EFF2
machine would consume over 1.84 million
kW hours over a 10 year period which
equated to 988 tonnes of CO2
emissions.
The same application fitted with a Fenner
IE3 motor would use 1.76 million kW
hours, a saving of 80,000 kW hours and
therefore a significant reduction in running
cost over it’s life cycle with the Fenner IE3
motor also reducing CO2
emissions by 43
tonnes to 945.
With the added benefit of qualification
for the UK Enhanced Capital Allowance
scheme and the realization of the scrap
value of the existing motor the payback
period for choosing Fenner IE3 over lower
efficiency options was less than 6 months.
IEC 60034-30
International
Efficiency Code
EFF1
EFF2
EFF3
IE4
IE3
IE2
IE1
0.75 - 375kW 1000v
2, 4  6 pole
Efficiency Standards
Electric Motors
70
Specialist Technical Centres
Know-How
Power
Transmission
CALL: 0845 006 6000
to contact your local workshop
VISIT: ERIKS.CO.UK
REPAIR OR REPLACE?
CALCULATING THE COST
When a motor fails, the priority is to
get production back online – and that
is always ERIKS’ priority too.
But either at the time of failure or
later, ERIKS know-how and the
ERIKS Total Cost of Ownership (TCO)
online calculator can help you decide
whether you have more options for a
longer-term, added value solution
TOTAL COST OF
OWNERSHIP
The calculator uses basic data about
your current motor and application:
n Existing motor efficiency grade
n Motor power and speed
n Annual operation hours
n Motor running load
n Type of failure
From this the Total Cost of Ownership
tool calculates a number of factors
including:
n Annual running cost
n Carbon footprint (CO2 tonnes/annum)
n Energy usage (kWh)
It then extrapolates these figures to
provide the cost – over any term from
one year to twenty – of repairing and
running the existing motor, and of
replacing it with a minimum efficiency,
or premium efficiency motor.
The calculation even takes into account
the Enhanced Capital Allowance claim
value and the end-of-life scrap value,
to give you a set of figures to help you
make a fully-informed repair, replace or
upgrade decision.
71
Visit us at www.eriks.co.uk
Power
Transmission
Inverters
Optional LED or
OLED (IP55  IP66)
DIN Rail Mount
(IP20)
Cable
Management
High Quality
Long-life Fans
Convenient
Help Card
Pluggable
Terminals
+
QD:Neo Inverters
Constant Torque 0.75kW - 200kW
Fenner QD:Neo offers the perfect
combination of high performance
and ease of use, providing a
solid solution for even the most
demanding applications.
Fenner QD:Neo is suitable for use with
both standard induction and permanent
magnet motors.
High Performance
nn Sensorless Vector Control:
nn Up to 200% torque from 0 speed
ensures reliable starting and accurate
speed control
nn PM Motor Control future proof:
nn Can be upgraded to the latest high
efficiency permanent magnet motors
nn I/O  Communications: Fenner
QD:Neo supports a wide range of
machine control systems interfaces
Key Features
nn Just 14 basic parameters
nn Pluggable control terminals
nn Internal RFI filter complies with the
latest EMC standards
nn Up to 32kHz Output Switching
Frequency gives ultra quiet motor
operation
nn Integral Brake Transistor
nn Modbus and CANopen as standard
nn IP20, IP55  IP66 enclosures
nn Bluetooth compatible Q-Stick for fast,
accurate repeat programming
Applications
nn Cranes
nn Compressors
nn Winding
nn Mixers
nn Packaging
nn Conveyors
nn Hoists
nn Extruders
nn Crushers
nn Cutting
Safe Torque Off Function
The Fenner QD:Neo features a safe
torque off function, as standard,
to allow simple integration into
machine critical safety circuits.
nn Faster shut down and reset procedures
reduce system maintenance time
nn Better safety standard compared to
mechanical solution
nn Better motor connection, single cable with 	
no interruption
72
Specialist Technical Centres
Know-How
Power
Transmission
72 Inverters
Optional LED or
OLED (IP55  IP66)
Spin Start Hand Auto
Belt Break
Detection
Bluetooth Q:Stick
Programming
+
High Quality
Long-life Fans
QD:Flow Inverters
Variable Torque 0.75kW - 200kW
The Fenner QD:Flow sets a new
standard for dedicated fan and
pump control whilst retaining the
ease of use you come to expect
from Fenner inverters.
Fenner QD:Flow has an innovative design,
combined with robust performance to
provide powerful flow control and reliability
in a compact drive.
Designed for HVAC
nn Energy optimisation
nn Energy monitoring
nn Built in pump cascade control
nn Multiple fan operation
nn Resonance avoidance
Key Features
nn 14 basic parameters
nn Internal RFI filter
nn Belt brake detection
nn Anti-ragging function
nn Fire-mode
nn Spin start
nn Bypass mode
nn BACnet and Modbus RTU as
standard
nn Maintenance interval timer
nn Multi-language OLED display
nn Intelligent standby
Dedicated to optimising efficiency
The Fenner QD:Flow has been
designed to optimise efficiency in
pumping and HVAC systems.
nn Multiple fan operation
nn Fire override mode
nn Stairwell pressurisation
nn PID Control
Applications
nn Industrial
nn Domestic
nn Airports
nn Hospitals
nn Kitchens
nn Offices
nn Hotels
nn Conference
Centres
nn Swimming
Pools
nn Additional
Buildings
73
Visit us at www.eriks.co.uk
Power
Transmission
QD:Evo Inverters
Easy to Use 0.37kW - 11.0kW
The Fenner QD:Evo is a value
packed basic drive ideally suited for
low power applications that require
“best in class” purchase value.
Operating from a small space-saving
envelope the QD:Evo is fast to set up,
simple to use and suitable for most
applications.
High Performance
nn Easy to install
nn Simple keypad control
nn 50°C ambient rating for hot, tough
applications
nn Free lifetime technical support
nn Energy optimisng function
Key Features
nn Simple commissioning, 12 basic
parameter settings, default settings
suitable for most applications
nn Internal RFI filter for full EMC
compliance
nn Modbus RTU allows easy integration
with your control and monitoring
systems
nn Compact enclosures help minimise
your space requirements
nn Brake chopper on sizes 2  3,
dynamic and compact options with
heatsink mounted resistor.
nn High overload capacity, 150%
overload for 60 seconds and 170%
overload for 2 seconds
Applications
nn Cranes
nn Compressors
nn Winding
nn Mixers
nn Packaging
nn Conveyors
nn Hoists
nn Extruders
nn Crushers
nn Cutting
Q-Stick for fast programming
For fast,
accurate repeat
programming.
nn Upload/download buttons allow for fast
copying of parameters between drives
nn Infra-red and bluetooth communications
capability provides remote control
convenience
nn Can be programmed by PDA/smart phone
Q:Stick
Programming
DIN Rail Mount
(IP20)
Optional Braking
Resistor
EMC  Varistor
Disconnect
Convenient
Help Card
Need Sah to check
74
Specialist Technical Centres
Know-How
Power
Transmission
Taper-Grip
™
Bushes
The unique Taper-Grip bush locking
system allows Fenner SMSRs to
be secured to the driven shaft
overcoming the difficulties that can
be experienced with other methods
of mounting – particularly in corrosive
environments.
Transmits 300% more torque and
accommodates shaft tolerance to h11.
nn Resistant to fretting corrosion
nn Allows easy removal of gear unit
nn Wide selection of metric and
imperial bush sizes available
nn Requires no key
SMSR PowerPLUS
Shaft Mounted Speed Reducer
Precision gearing with increased face width allows the Power
PLUS range of SMSR units to operate within smaller gear cases
than many of its rivals. The modular cases design allows the unit
to be mounted in a number of ways.
nn Compact design – reduced gear case size
nn Modular case design, variety of mounting options
nn Easy-fit, up-rated Taper-Grip bush option
nn Easy fit backstops available
nn Comprehensive output speeds available with a simple
Fenner belt drive.
nn Extended manufacturer’s warranty
nn Quick and simple upgrade
nn New extra sizes in the range
nn Quicker installation and removal, no keyways
nn Flange mounting holes machined on both faces as standard
nn Full mounting flexibility for any application
Available in
nn Power ratings up to 250kW/ 44,000Nm
nn Ratio range; 5:1, 13:1 and 25:1
The Fenner SMSR excels in harsh environments such as
quarries and as such is used extensively across a wide range of
applications in arduous environments worldwide.
The UK’s leading shaft mounted drive gives you
a 50% increase in power-to-weight ratio for a
compact drive solution.
50% Better, 100% Fenner
Speed Reducers and Gearboxes
75
Visit us at www.eriks.co.uk
Power
Transmission
Fenner Cyclo
Basic dimensions (All dimensions are in mm)
Size	 Shaft ø	 Shaft length	 Footprint	 Shaft height
606	 14 (k6)	 30	 60 x 120	 80
607	 20 (k6)	 40	 60 x 120	 80
608	 25 (k6)	 50	 75 x 120	 90
609	 25 (k6)	 50	 90 x 150	 100
610	 30 (k6)	 60	 90 x 150	 100
611	 35 (k6)	 70	 90 x 150	 120
612	 35 (k6)	 70	 115 x 190	 120
613	 50 (k6)	 100	 145 x 290	 150
614	 50 (k6)	 100	 145 x 290	 150
616	 60 (h6)	 90	 150 x 370	 160
614	 70 (h6)	 90	 275 x 380	 200
618	 80 (h6)	 110	 320 x 420	 220
619	 95 (h6)	 135	 380 x 480	 250
Fenner Series W
Basic dimensions (All dimensions are in mm)
Size	Centres	 Standard	 Base to	 Footprint	 Flange
		 bore	centre		 options
740	 25	 11	 35	 34 x 45	 75
741	 30 	 14 	 40 	 44 x 54 	 80
742	 40 	 18 	 50 	 60 x 70 	 110
742	 40 	 18 	 50 	 60 x 70 	 120
742	 40 	 18 	 50 	 60 x 70 	 140
743 	 50 	 25 	 60 	 70 x 80 	 125
743 	 50 	 25 	 60 	 70 x 80 	 145
743 	 50 	 25 	 60 	 70 x 80 	 160
744 	 63 	 25 	 72 	 85 x 100 	 160
744 	 63 	 25 	 72 	 85 x 100 	 180
744 	 63 	 25 	 72 	 85 x 100 	 200
745 	 75 	 28 	 86 	 90 x 120 	 160
745 	 75 	 28 	 86 	 90 x 120 	 200
746 	 90 	 35 	 103 	 100 x 140 	 200
746 	 90 	 35 	 103 	 100 x 140 	 210
746 	 90 	 35 	 103 	 100 x 140 	 250
747 	 105 	 42 	 127.5 	 115 x 170 	 280
749 	 130 	 45 	 147.5 	 120 x 200 	 320
A modern modular designed aluminium worm box available in a
vast range of sizes and ratios for cost-effective solutions.
nn Dimensionally interchangeable with the market leaders
nn Versatile mounting
nn Excellent mechanical strength whilst being especially
lightweight
nn Accepts standard IEC electric motors
The revolutionary design of the Cyclo discs offers smooth and
silent operation and excellent resistance to overloads. Extremely high
ratios can be achieved within a very small envelope offering high
efficiency in a very compact package.
nn High overload capacity up to 500% and high efficiency, even at
high reduction ratios
nn Compact size and reduced noise level
nn High reliability with 2 years warranty
nn Exceptional life compared to other types of gearing
Cyclo
Cyclodial Gearbox
Series W
Worm Gearbox
Fenner Gearboxes
76
Specialist Technical Centres
Know-How
Power
Transmission
76
Fenner Series M
Basic dimensions (All dimensions are in mm)
Size	 Shaft ø	 Shaft length	 Footprint	 Shaft height
860	 20 (k6) 	 40	 110 x 110	 75
801	 25 (k6) 	 50	 130 x 110	 90
861	 25 (k6) 	 50	 130 x 110	 90
802	 30 (k6) 	 60	 165 x 135	 115
862	 35 (k6) 	 70	 165 x 135	 115
803	 35 (k6) 	 70	 195 x 150	 130
863	 40 (k6) 	 80	 205 x 170	 140
864	 50 (k6) 	 100	 260 x 215	 180
865	 60 (m6) 	 120	 310 x 250	 225
866	 70 (m6) 	 140	 370 x 290	 250
867	 90 (m6) 	 170	 410 x 340	 265
Fenner Series C
Basic dimensions (All dimensions are in mm)
Size	 Standard	Alternate	 Shaft	 Footprint*	 Flange
	 bore	 bore	height*		 ø
870 	 20 H7 	 NA 	 80 	 90 x 63 	 120/160
871 	 30 H7 	 25 H7 	 100 	 100 x 80 	 160
872 	 35 H7 	 30 H7 	 110 	 110 x 100 	 200
873 	 45 H7 	 40 H7 	 130 	 130 x 130	 200
874 	 60 H7 	 50 H7 	 180 	 150 x 100 	 250
875 	 70 H7 	 60 H7 	 225 	 200 x 120	 350
876 	 90 H7 	 70 H7 	 280 	 250 x 135 	 450
877 	 100 H7 	 80 H7 	 335 	 300 x 150 	 450
Modern design techniques and high quality components enable
the Fenner®
Series C helical worm gear unit to outperform any
other Gearbox in terms of lowest cost/Nm. The Series C right
angle range provides a highly efficient and compact solution to
meet most requirements.
nn Right angled
nn Up to 10,000Nm
nn 8:1 to 60,000:1 ratios
nn Foot, flange or shaft mounting
nn DryFit, sealed gear-head
nn Standard IEC motor connection
*These dimensions include additional mounting feet not supplied with the standard unit but
available as an accessory on sizes 870, 871, 872 and 873.
The innovative Fenner®
Series M Coaxial Gearbox is the culmination
of many years of expertise. Designed to be utilised in a wide variety
of situations it combines high load carrying capacity with high
efficiency and reliability and is manufactured using the highest
quality materials and components.
nn In-Line
nn Up to 11,000Nm
nn 5:1 to 16,200:1 ratios
nn Foot or flange mounting
nn DryFit, sealed gear-head
nn Standard IEC motor connection
Series M
Coaxial Gearbox
Series C
Helical Worm
Gearbox
Fenner Gearboxes
Gearboxes
77
Visit us at www.eriks.co.uk
Power
Transmission
Fenner Series K
Basic dimensions (All dimensions are in mm)
Size	 Shaft ø	 Shaft length	 Footprint	 Shaft height
890	 30	 180	 110 x 100	 100
891	 35	 200	 130 x 120	 112
892	 40	 250	 130 x 130	 132
893	 40	 250	 120 x 140	 140
894	 50	 300	 150 x 165	 180
895	 60	 350	 180 x 180	 212
896	 70	 450	 240 x 240	 265
897	 80	 450	 280 x 270	 315
898	 100	 450	 350 x 330	 375
Fenner Series F
Basic dimensions (All dimensions are in mm)
Size	 Bore ø	 Shaft*	 Off-set	 Torque	 Flange
				 restraint	options
780	 25	 –	 96	 ø15 – 140mm*	 160
781	 30	 25 x 47	 121	 ø15 – 158mm*	 160
782	 35	 30 x 56	 121	 ø15 – 170mm*	 160
783	 40	 35 x 66	 144	 ø15 – 198mm*	 250
784	 40	 40 x 76	 165	 ø15 – 218mm*	 250
785	 50	 50 x 95	 200	 ø24 – 278mm*	 300
786	 60	 60 x 114	 243	 ø24 – 346mm*	 350
787	 70	 70 x 135	 274	 ø27 – 395mm*	 450
788	 80	 90 x 172	 332	 ø27 – 485mm*	 450
789	 90	 90 x 170	 385	 ø26 – 485mm*	 550
790	 100	 110 x 210	 414	 ø33 – 550mm*	 650
The newly improved Fenner®
Series F range is primarily designed
as a shaft mounted unit incorporating an integral torque
reaction bracket. This compact range of parallel shaft mounted
geared motors and speed reducers offer high efficiency and
interchangeability with other leading brands.
nn Parallel off-set
nn Up to 16,500Nm
nn 4.5:1 to 5,700:1 ratios
nn Flange or shaft mounting
nn DryFit, sealed gear-head
nn Standard IEC motor connection
The Series K range incorporates all Fenner’s core design features
in a highly efficient yet flexible bevel helical drive. With high load
carrying capabilities and increased efficiency over worm units, the
right angled Series K range is proven to save energy
and reduce running costs.
nn Right angled
nn Up to 12,300Nm
nn 8:1 to 36,000:1 ratios
nn Foot, flange or shaft mounting
nn DryFit, sealed gear-head
nn Standard IEC motor connection
Series F
Helical Gearbox
Series K
Helical Bevel
Gearbox
* From centre
78
Specialist Technical Centres
Know-How
Power
Transmission
MVSS Stainless Steel
Electric Vibrator
MVCC DC Electric Vibrator
it lole in
 all neac Vibrator VHE5 Eternal Hydralic
Vibrator
 rbine neac Vibrator Vibrators wit in centres
to sit alternae aes
MVSI-R olised Alini
Electric Vibrator
 neac Vibrator
VIBRATECHNIQUES LTD
20 Cecil asley ay, Sorea Airport, Sorea by Sea, est Ssse. N43 5
elepone: 01274 430977 a: 01273 430978
Eail: sales@ibtec.co eb: www.ibtec.co
T U   
78 Vibration Solutions
FLUID POWER, TRANSFER
AND CONTROL
Why should you partner with ERIKS? One compelling
reason is that we offer you fast, cost-effective access to
an extensive range of world-leading brands. But this is
far from all.
Our exceptional product know-how, coupled with our range of
in-house application engineers, means that we are ideally
positioned to provide solutions based on a true understanding
of your needs. Solutions which make a real difference to your
business.
Pneumatics
Compact Cylinders	 83
Push-in Fittings	 84-85
Air Preparation	 86-87
Valves	88-91
Cylinders and Actuators	 93
Suction Cups	 95
Safety Valves	 96-97
Vacuum Pumps	 98
Hydraulics
Hydraulics Course	 100
Lifeguard Sleeves	 101
Self Assembly Starter Kits	 102
High Pressure Hoses and Couplings	 103-104
Hose Assemblies and Components	 105
Components and Fittings	 106-108
EMB Fittings	 108
Adaptors	109-110
Hydraulic Accessories	 111-112
Oil Transfer Units	 113
Ball Valves	 114
Bladder Accumulators	 115
Hydraulic Valves and Cylinders	 116-119
Repair, Replace Solutions	 120-122
Filtration
Fluid Filters	 124-125
Water Filters	 125-126
Panel and Bag Filter	 128-129
Fluid Level Gauges	 130-131
Filtration Solutions	 133
Industrial Hoses
Commodity Hose and Clips	 136-137
Metal Hose	 138-139
Camlocks and Bellows	 140-141
Rubber Hose	 142
Steam Hose	 143
Food and Beverage Hose	 144
Chemical and Pharmaceutical Hose	 145
Industrial Hose Reels and Cable Reels	 146
Quick Product Reference
126-127 89-9182-88 100-105, 108
130-131 113,124-125
95, 98
133 138-139, 142-144 146
92-94 115-119
106-107, 120 96-97 128-129
79
Quick reference
Visit us at eriks-techdirect.co.uk
80
FLUID POWER,
TRANSFER AND CONTROL
ERIKS technical expertise and product knowledge, together
with strong partnerships with the leading names in Fluid
Power, Transfer and Control means we can offer you the
right solution for your application, regardless of
manufacturer or brand.
We also take a holistic approach to your problems, which looks
beyond the products to the process, the application and the project
as a whole. The result is the most cost-effective, most reliable
solution.
Compressed Air
Savings Programme
A systematic approach
to compressed air
management could result
in significant cost savings -
up to 70%
„„ Compressed air audits
„„ Design, build and installation
„„ On-site oil sampling and analysis
„„ Commodity management
„„ Hydraulic repairs
„„ Hose assemblies
Specialist Technical Centres
Know-How
FLUID POWER,
TRANSFER AND CONTROL
81
PNEUMATICS
As the UK’s largest distributor of
pneumatic products, we stock a
comprehensive range, and real-time
visibility, from the world’s leading
manufacturers.
Our application know-how means we
can supply complete solutions, giving us
the ability to configure parts and provide
modular assembled products – enabling
cost effective customisation to your
requirements.
„„ Control valves and actuators
„„ Air preparation equipment
„„ Push-in and compression fittings
„„ Compression fittings
„„ Quick Release Couplings
HYDRAULICS
At ERIKS we have the skills and services
to help you ensure your hydraulic systems
and equipment are always running at
optimum efficiency.
Visit us at eriks-techdirect.co.uk
INDUSTRIAL HOSE
As one of the UK’s leading Industrial
Hose specialists, our technical Know-how
is relied upon to solve a wide range of
challenges that our customers face across
all industries.
Our team of in-house technical specialists
can provide you with support to help you
select the correct hose specification for
your application.
„„ Wide range of hoses from Metallic to
Silicone
„„ Bellows and fittings
„„ Pre-manufactured assemblies
„„ Hose testing and management
„„ Hose tagging
Whatever you’re looking for, from a single
product, through repair and refurbishment
services, to end-to-end system design,
build and commissioning, you’ll find our
ability to meet your needs is second to
none..
„„ Directional Control Valves, Compression
Fitting and Adaptors
„„ Hose, Couplings and Crimpers
„„ OE Kitting Solutions
„„ 2-3 Way Ball Valves
FILTRATION
Whether you need clean compressed air
to separate oil from water, or remove solid
particulate from a chemical or other fluid,
ERIKS has the solution. And if we don’t
we’ll design one.
„„ Hydraulic / Air / Process Filtration
„„ Dust and fume control
„„ Purifier equipment
„„ Monitoring equipment
YOUR
FLUID
POWER
SOLUTION
Call us today on: 0845 006 6000
www.eriks.co.uk/flexion
YOUR
FLUID POWER
SOLUTION FOR:
· HYDRAULICS
· PNEUMATICS
· CUSTOMISED SOLUTIONS
· ENGINEERED SYSTEMS
· CONTAMINATION MONITORING
FLEXION DELIVERS A
WIDE RANGE OF FLUID POWER
PRODUCTS AND SERVICES THAT OFFER
VALUE TO DESIGN AND MAINTENANCE
ENGINEERS, BOTH IN TERMS OF
PERFORMANCE AND COST
THE FLEXION RANGE GIVES YOU:
• Access to proven Fluid Power solutions and customisation
• Dedicated Fluid Power application and technical support
• Engineering products that exceed international standards
•	 Effective	product	development	through	shared	knowledge
•	 Proven	track	record	in	providing	Fluid	Power	solutions
Untitled-1 1 16/06/2015 12:07:18
Flexion
Visit us at eriks-techdirect.co.uk
FluidPower
83Compact Cylinders
Compact Cylinders
16mm Bore
Part No		 Stroke (mm)
EPC16-5CFDA-FX		 5
EPC16-10CFDA-FX		 10
EPC16-10CFDA-FX		 15
EPC16-20CFDA-FX		 20
EPC16-25CFDA-FX		 25
20mm Bore
Part No		 Stroke (mm)
EPC20-5CFDA-FX		 5
EPC20-10CFDA-FX		 10
EPC20-15CFDA-FX		 15
EPC20-20CFDA-FX		 20
EPC20-25CFDA-FX		 25
25mm Bore
Part No		 Stroke (mm)
EPC25-5CFDA-FX		 5
EPC25-10CFDA-FX		 10
EPC25-15CFDA-FX		 15
EPC25-20CFDA-FX		 20
EPC25-25CFDA-FX		 25
EPC25-30CFDA-FX		 30
EPC25-40CFDA-FX		 40
EPC25-50CFDA-FX		 50
32mm Bore
Part No		 Stroke (mm)
EPC32-10CFDA-FX		 10
EPC32-20CFDA-FX		 20
EPC32-25CFDA-FX		 25
EPC32-30CFDA-FX		 30
EPC32-40CFDA-FX		 40
EPC32-50CFDA-FX		 50
40mm Bore
Part No		 Stroke (mm)
EPC40-10CFDA-FX		 10
EPC40-20CFDA-FX		 20
EPC40-25CFDA-FX		 25
EPC40-30CFDA-FX		 30
EPC40-40CFDA-FX		 40
EPC40-50CFDA-FX		 50
50mm Bore
Part No		 Stroke (mm)
EPC50-10CFDA-FX		 10
EPC50-20CFDA-FX		 20
EPC50-25CFDA-FX		 25
EPC50-30CFDA-FX		 30
EPC50-40CFDA-FX		 40
EPC50-50CFDA-FX		 50
63mm Bore
Part No		 Stroke (mm)
EPC63-10CFDA-FX		 10
EPC63-20CFDA-FX		 20
EPC63-25CFDA-FX		 25
EPC63-30CFDA-FX		 30
EPC63-40CFDA-FX		 40
EPC63-50CFDA-FX		 50
80mm Bore
Part No		 Stroke (mm)
EPC80-10CFDA-FX		 10
EPC80-20CFDA-FX		 20
EPC80-25CFDA-FX		 25
EPC80-40CFDA-FX		 40
EPC80-50CFDA-FX		 50
EPC80-80CFDA-FX		 80
EPC80-100CFDA-FX		 100
100mm Bore
Part No		 Stroke (mm)
EPC100-10CFDA-FX		 10
EPC100-20CFDA-FX		 20
EPC100-25CFDA-FX		 25
EPC100-40CFDA-FX		 40
EPC100-50CFDA-FX		 50
EPC100-80CFDA-FX		 80
EPC100-100CFDA-FX		 100
Constant
ERIKS Pneumatic
Cylinder
Constant
C – Compact
F – Female Piston Rod Thread
DA – Double Acting
16, 20, 25, 32,
40, 50, 63, 80, 100
Bore Size (mm)
5, 10, 15, 20, 25, 30,
40, 50, 80, 100
Stroke (mm)
Max Stroke 100
FLEXION™ Compact cylinders conform to UNITOP
standards (16mm bore), or ISO 21287 (20mm–100mm).
The profile of the body is designed to use the same
sensors as the existing cylinders in the FLEXION™ range,
simplifying stock requirements.
32mm to 100mm bore cylinders have the same fixing
centres as the ISO 15552 range of cylinders, making the
cylinder mounting accessories interchangeable.
Equipped with elastomer cushions to increase cylinder
life and reduce noise levels, the FLEXION™ compact
cylinder is the ideal choice of actuator where space is
limited, with overall body lengths up to 60% shorter than
an ISO 15552 equivalent.
EPC CFDA FX- -
Constant Constant
Constant
FLEXION
Brand
FLEXION™ ISO 21287
COMPACT CYLINDERS
16-100MM BORE
Specialist Technical Centres
Know-How
FluidPower
84
FLEXION™ Stainless steel fittings are
manufactured to the highest quality
standards to ensure they provide
you with increased performance and
extended reliability when used in
aggressive environments or when in
contact with corrosive fluids.
Typical industry applications include:
chemical, food, printing, marine and
pharmaceutical industries.
Push-in Fittings
nn Simple and quick to install
nn Flexible space-saving design
nn Wide range to suit all applications
nn Compatible with all other leading
systems
nn Tubing can be freely rotated, even
after installation
nn All taper threads are pre-coated with
PTFE
Push-in Fittings
Male Stud
Taper
Code	 Tube OD	 Thread Size
SSPC4-M5-FX	4	 M5
SSPC4-G01-FX	4	 G1/8
SSPC6-G01-FX	6	 G1/8
SSPC6-G02-FX	6	 G1/4
SSPC8-G01-FX	 8	G1/8
SSPC8-G02-FX	 8	G1/4
SSPC10-G02-FX	 10	G1/4
SSPC10-G03-FX	 10	G3/8
	 	
Code	 Tube OD	 Thread Size
SSPC4-01-FX	4	 R1/8
SSPC4-02-FX	4	 R1/4
SSPC6-01-FX	6	 R1/8
SSPC6-02-FX	6	 R1/4
SSPC8-01-FX	 8	R1/8
SSPC8-02-FX	 8	R1/4
SSPC10-02-FX	 10	R1/4
SSPC10-03-FX	 10	R3/8
SSPC12-03-FX	12	 R3/8
SSPC12-04-FX	12	 R1/2	
Male Stud
Parallel
Technical Data	
Tube sizes	 4 - 12mm
Threads	 1/8” - 1/2”, BSPT
Max Pressure	 15 bar
Vacuum	 Up to 750mmHg
Temp Range	 -20°C to +150°C
Materials:	
Body: 	 Stainless Steel AISI 316
Seal: 	 Viton (FPM)
Grab Ring: 	 Stainless Steel Release
Release Collet: 	 Stainless Steel AISI 316
FLEXION™ STAINLESS
STEEL PUSH-IN FITTINGS
Thousands of
products available
to order on
ERIKS
WEBSHOP
SHOP.ERIKS.CO.UK
SHOP.ERIKS
.CO.UKSHOP
.ERIKS.CO.UK
Visit us at eriks-techdirect.co.uk
FluidPower
85
Male Swivel
Elbow Parallel
Code	 Tube OD	 Thread Size
SSPL4-M5-FX	4	 M5
SSPL4-G01-FX	4	 G1/8
SSPL6-G01-FX	6	 G1/8
SSPL6-G02-FX	6	 G1/4
SSPL8-G01-FX	8	 G1/8
SSPL8-G02-FX	8	 G1/4
SSPL10-G02-FX	10	 G1/4
SSPL10-G03-FX	10	 G3/8
Male Swivel
Elbow Taper
Code	 Tube OD	 Thread Size
SSPLN4-G01-FX	4	 G1/8
SSPLN6-G01-FX	6	 G1/8
SSPLN6-G02-FX	6	 G1/4
SSPLN8-G01-FX	8	 G1/8
SSPLN8-G02-FX	8	 G1/4
SSPLN10-G02-FX	10	 G1/4
Code	 Tube OD	 Thread Size
SSPL4-01-FX	4	 R1/8
SSPL6-01-FX	6	 R1/8
SSPL6-02-FX	6	 R1/4
SSPL8-01-FX	8	 R1/8
SSPL8-02-FX	8	 R1/4
SSPL10-02-FX	10	 R1/4
SSPL10-03-FX	10	 R3/8
SSPL12-03-FX	12	 R3/8
SSPL12-04-FX	12	 R1/2
SSPC12-04-FX	12	 R1/2
Male Tee
Parallel
Code	 Tube OD	 Thread Size
SSPB4-G01-FX	4	 G1/8
SSPB6-G01-FX	6	 G1/8
SSPB6-G02-FX	6	 G1/4
SSPB8-G01-FX	8	 G1/8
SSPB8-G02-FX	8	 G1/4
Male Elbow
Parallel
Male Tee
Taper
Code	 Tube OD	 Thread Size
SSPB4-01-FX	4	 R1/8
SSPB6-01-FX	6	 R1/8
SSPB6-02-FX	6	 R1/4
SSPB8-01-FX	8	 R1/8
SSPB8-02-FX	8	 R1/4
SSPB10-02-FX	10	 R1/4
SSPB10-03-FX	10	 R3/8
Elbow
Union
Code		 Tube OD
SSPU4-FX		4
SSPU6-FX		6
SSPU8-FX		8
SSPU10-FX		 10
SSPU12-FX		 12
Tee
Code	 Tube Size	
SSPE4-FX	4
SSPE6-FX	6
SSPE8-FX	8
SSPE10-FX	10
SSPE12-FX	12
Straight
Union
Code		 Tube OD
SSPV4-FX		 4
SSPV6-FX		 6
SSPV8-FX		 8
SSPV10-FX		 10
SSPV12-FX		 12
Bulkhead
Code	 Tube Size	
SSPM4-FX	4
SSPM6-FX	6
SSPM8-FX	8
SSPM10-FX	10
SSPM12-FX	12
Flow
Regulator
Code	 Tube OD	 Stem Size
SSPGJ6-4-FX	 4		 6
SSPGJ8-6-FX	 6		 8
SSPGJ10-8-FX	 8		 10
Code	 Tube OD	 Thread Size
SSL4-G01-FX	 4		 G1/8
SSL6-G01-FX	 6		 G1/8
SSL6-G02-FX	 6		 G1/4
SSL8-G01-FX	 8		 G1/8
SSL8-G02-FX	 8		 G1/4
SSL10-G02-FX	 10		 G1/4
SSL10-G03-FX	 10		 G3/8
SSL4-G01B-FX	 4		 G1/8
Stem
Reducer
Code	 Tube OD	 Thread Size
SSL6-G01B-FX	 6		 G1/8
SSL6-G02B-FX	 6		 G1/4
SSL8-G01B-FX	 8		 G1/8
SSL8-G02B-FX	 8		 G1/4
SSL10-G02B-FX	 10		 G1/4
SSL10-G03B-FX	 10		 G3/8
Specialist Technical Centres
Know-How
FluidPower
86
Air Preparation
Air Preparation
The FLEXION™ range of FRL equipment has been selected to give the optimum
price versus performance ratio.
With the bodies manufactured from technopolymers, these units are extremely
light, but still offer rugged, robust performance.
As standard, all the bowls have an outer protection, and the bowls themselves
are manufactured from polyamide, giving significantly better resistance to crazing
than the
more commonly used polycarbonate type.
The FLEXION™ ranges also have the automatic filling lubricator option, refilling
the lubricator quickly and easily “on-line” saving time and money.
FLEXION™ AIR PREPARATION
Code	 Bar	Description
EPA-R-1/2M-08-FX	 8 Bar	 Modular
Code	Description
EPA-L-1/2M-M-FX	 Modular, Standard Fill
EPA-L-1/2M-A-FX	 Modular, Automatic Fill
Code	 Bar	Description
EPA-F-1/2M-M-FX	 20µ Drain	 Modular, Manual Drain
EPA-F-1/2M-A-FX	 20µ Drain	 Modular, Auto Drain
Code	 Bar	Filtration	 Description
		Microns
EPA-FR-1/2M-M-FX	 8 Bar 	 20µ	 Modular, Manual Drain
EPA-FR-1/2M-A-FX	 8 Bar 	 20µ	 Modular, Auto Drain
Code	 Filtration	Description
	Microns
EPA-MF-1/2M-A-FX	 0.01µ	 Modular, Auto Drain
EPA-MF-1/2M-M-FX	 0.01µ	 Modular, Manual Drain
1/2” range
Regulator
1/2” range
Lubricator
1/2” range
Filter
1/2” range
Filter Regulator
1/2” range
Microfilter
Visit us at eriks-techdirect.co.uk
FluidPower
87
Code	 Bar	Description
EPA-SV-1/2M-FX	 Lockable, Modular
For suitable silencer use SLNCR-B-STD-1/4-FX
Code	Description
EPA-SS-1/2M	 Soft Start
Code	Description
EPA-MTGRING-1/2-RX	 Neck Mounting Ring
Code	Description
EPA-CK-1/2M-FX	 Modular Assembly Unit
Code	Description
EPA-TO-1/2M-FX	 Intermediate Take Off Block
Code	Description
EPA-SVE-1/2M-FX	Modular
EPA-SVE-SOL-24VDC-FX	 Solenoid Operator, 24V DC
EPA-SVE-SOL-110VAC-FX	 Solenoid Operator, 110V AC
EPA-SVE-SOL-230VAC-FX	 Solenoid Operator, 230V AC
For suitable silencer use SLNCR-B-STD-1/4-FX
1/2” range
Manual Shut Off
Valve
1/2” range
Soft Start
1/2” range
Neck Mounting
Ring
1/2” range
Modular
Assembly Unitt
1/2” range
Intermediate
Take-Off Block
1/2” range
Electrical Shut
Off Valve
Code	 Bar	Filtration	 Description
		Microns
EPA-FRL-1/2M-M-FX	 8 Bar 	 20µ	 Modular, Manual Drain
EPA-FRL-1/2M-A-FX	 8 Bar 	 20µ	 Modular, Auto Drain
Code	 Bar	Filtration	 Description
		Microns
EPA-FRL-1/2M-M-FX	 8 Bar 	 20µ	 Modular, Manual Drain
EPA-FRL-1/2M-A-FX	 8 Bar 	 20µ	 Modular, Auto Drain
For suitable silencer for shut off valve use SLNCR-B-STD-1/4-FX
1/2” range
Filter Regulator / Lubricator
1/2” range
Filter / Regulator / Lubricator with
Shut Off Valve
Specialist Technical Centres
Know-How
FluidPower
88
Product	 Part No	 Description	 Size	 Operator
EPVP-5/2-ISO1-SP	 W89A-50541	 Pneu Valve 5/2 Single Pilot ISO1	 ISO 1	 Pilot
EPVP-5/2-ISO1-DP	 W89A-50542	 Pneu Valve 5/2 Double Pilot ISO1	 ISO 1	 Pilot / Pilot
EPVP-5/3-ISO1-CC	 W89A-50543	 Pneu Valve 5/3 Pilot Centre Closed ISO1	 ISO 1	 Pilot / Pilot
EPVP-5/3-ISO1-CE	 W89A-50544	 Pneu Valve 5/3 Pilot Centre Exh ISO1	 ISO 1	 Pilot / Pilot
EPVP-5/3-ISO1-CP	 W89A-50549	 Pneu Valve 5/3 Pilot Centre Press ISO1	 ISO 1	 Pilot / Pilot
EPVS-5/2-ISO1-SS	 W89A-50550	 Pneu Valve 5/2 Single Sol ISO1	 ISO 1	 Solenoid
EPVS-5/2-ISO1-DS	 W89A-50551	 Pneu Valve 5/2 Double Sol ISO1	 ISO 1	 Solenoid / Solenoid
EPVS-5/3-ISO1-CC	 W89A-50552	 Pneu Valve 5/3 Sol Centre Closed ISO1	 ISO 1	 Solenoid / Solenoid
EPVS-5/3-ISO1-CE	 W89A-50553	 Pneu Valve 5/3 Sol Centre Exh ISO1	 ISO 1	 Solenoid / Solenoid
EPVS-5/3-ISO1-CP	 W89A-50556	 Pneu Valve 5/3 Sol Centre Press ISO1	 ISO 1	 Solenoid / Solenoid
EPVP-5/2-ISO2-SP	 W89A-50545	 Pneu Valve 5/2 Single Pilot ISO2	 ISO 2	 Pilot
EPVP-5/2-ISO2-DP	 W89A-50546	 Pneu Valve 5/2 Double Pilot ISO2	 ISO 2	 Pilot / Pilot
EPVP-5/3-ISO2-CC	 W89A-50547	 Pneu Valve 5/3 Pilot Centre Closed ISO2	 ISO 2	 Pilot / Pilot
EPVP-5/3-ISO2-CE	 W89A-50548	 Pneu Valve 5/3 Pilot Centre Exh ISO2	 ISO 2	 Pilot / Pilot
EPVS-5/2-ISO2-SS	 W89A-50555	 Pneu Valve 5/2 Single Sol ISO2	 ISO 2	 Solenoid
EPVP-5/3-ISO2-CP	 W89A-50554	 Pneu Valve 5/3 Pilot Centre Press ISO2	 ISO 2	 Solenoid / Solenoid
EPVS-5/2-ISO2-DS	 W89A-50557	 Pneu Valve 5/2 Double Sol ISO2	 ISO 2	 Solenoid / Solenoid
EPVS-5/3-ISO2-CC	 W89A-50558	 Pneu Valve 5/3 Sol Centre Closed ISO2	 ISO 2	 Solenoid / Solenoid
EPVS-5/3-ISO2-CE	 W89A-50559	 Pneu Valve 5/3 Sol Centre Exh ISO2	 ISO 2	 Solenoid / Solenoid
EPVS-5/3-ISO2-CP	 W89A-50560	 Pneu Valve 5/3 Sol Centre Press ISO2	 ISO 2	 Solenoid / Solenoid
Manifolds
Product	 Part No	 Description	 Size
EPV-SBA1S	 W89A-50575	 Pneu Valve Single sub-base ISO1	 ISO 1
EPV-SBA1C	 W89A-50568	 Pneu Valve Blank Manfld end plate ISO1	 ISO 1
EPV-SBA1T	 W89A-50573	 Pneu Valve Manfld blanking plate ISO1	 ISO 1
EPV-SBA2T	 W89A-50574	 Pneu Valve Manfld blanking plate ISO2	 ISO 1
EPV-SBA1M	 W89A-50566	 Pneu Valve Manfld sub-base ISO1	 ISO 1
EPV-SBA1A	 W89A-50569	 Pneu Valve Ported Manfld end plate ISO1	 ISO 1
EPV-SBA2S	 W89A-50576	 Pneu Valve Single sub-base ISO2	 ISO 2
EPV-SBA2C	 W89A-50570	 Pneu Valve Blank Manfld end plate ISO2	 ISO 2
EPV-SBA1A2	 W89A-50572	 Pneu Valve I/face sub-base ISO1 to ISO2	 ISO 2
EPV-SBA2M	 W89A-50567	 Pneu Valve Manfld sub-base ISO2	 ISO 2
EPV-SBA2A	 W89A-50571	 Pneu Valve Ported Manfld end plate ISO2	 ISO 2
Product	 Part No	 Description	 Size
EPV-C-30MM-24VDC	 W89A-50561	 Pneu Valve 24VDC Coil 30mm ISO	 24vdc
EPV-C-30MM-24VAC	 W89A-50562	 Pneu Valve 24VAC Coil 30mm ISO	 24vac
EPV-C-30MM-110VAC	 W89A-50563	 Pneu Valve 110VAC Coil 30mm ISO	 110vac
EPV-C-30MM-230VAC	 W89A-50564	 Pneu Valve 230VAC Coil 30mm ISO	 230vac
Product	 Part No	 Description	 Size
EPV-CSTD-30MM	 W89A-50565	 30mm Din Conn, standard	 12vdc - 240vac
EPV-CNL24V-30MM	 W89A-50577	 30mm Din Conn With LED+VDR, 24 V	 24vdc
EPV-CNL110V-30MM	 W89A-50578	 30mm Din Conn With LED+VDR, 115 V	 110-120vac
EPV-CNL230V-30MM	 W89A-50579	 30mm Din Conn With LED+VDR, 230 V	 220-240vac
ISO Valves
The range of FLEXION™ ISO valves conform to the ISO
5599/1 standard, with sizes 1 and 2, solenoid and air pilot
operation versions with 5/2 and 5/3 spools available. Fitted
with CNOMO standard interface for the solenoid versions,
this minimises installation space. They deliver high flow rates
and are have a pressure rating of 10bar. The 30mm coils
are rated at 2.5 watt for the DC option, and 2.5VA for the
AC voltages ensuring these maintain suitability for replacing
existing valves.
Valves
FLEXION™ ISO VALVES
Visit us at eriks-techdirect.co.uk
FluidPower
89Festo’s new robust “star” valve range
Core pneumatics blue star
products
Festo core product
range covers 80% of
your automation tasks
Worldwide: Always in stock
Superb: Festo quality at an attractive price
Fast: Next day delivery
Specialist Technical Centres
Know-How
FluidPower
90
Angled socket; screw terminal Type C, to fit 1/8 valve H 151687
Type B, to fot 1/4 valve H 34431
VUVS Individual Valve Range
Robust valves for challenging environments
Your first choice for simple, cost-effective pneumatic control
Individual valves VUVS – flexible, modern, robust and durable quality. For up to 100%
more flow with higher energy density. Proven technologies and materials. Comprehensive
range of accessories. Numerous mounting options and easy operation. That is what
today's valves should be!
New:
simplicity at an
attractive price
VUVS-LK...S
In-line individual valve; internal pilot air supply; manual override; operating voltage 24V DC
Port 2,4 Width (mm) 3/2-way valve; NC
pneumatic spring
5/2-way valve;
single solenoid
pneumatic spring
5/2-way valve;
double solenoid
5/3-way valve;
centre closed
1/8 20 H 8043213 H 8043214 H 8043215 H 575268
1/4 25 - - - H 575525
nn Attractive price
nn Robust design
nn Festo quality
nn High flow rate
nn 24 hour delivery
nn Pressure range up to 8 bar
nn IP65 rated with socket
nn Many more variants with additional
features available
Benefits
Festo Industrial Valves
Visit us at eriks-techdirect.co.uk
FluidPower
91
Plug cable with sheath to open end, 2.5m length to fit H 566660
M8 cable, 3 pin to open end, 2.5m length to fit H 541338
New:
essential
features at an
attractive
price
VUVG-LK...S
In-line individual valve; internal pilot air supply; manual override; operating voltage 24V DC
Port
2,4
Width
(mm)
2 x 3/2 way valve; NC
pneumatic spring
5/2 way valve; single solenoid;
pneumatic spring
5/2 way valve; 5/3 way valve
double solenoid
5/3 valve,
centrefeed
M5 10 H 8042538 H 8042542 H 8042539 H 8042543 H 8042540 H 8042544 H 577346
M7 10 H 8042546 H 8042550 H 8042547 H 8042551 H 8042548 H 8042552 H 574223
G1
/8 14 H 8042562 H 8042566 H 8042563 H 8042567 H 8042564 H 8042568 H 574231
VUVG Individual Valve Range
Compact valves for machine automation
Individual valves VUVG – for more power from a smaller design!
Price attractive, impressive and installed in a flash. Perfect for all high-speed applications
requiring a particularly high flow combined with a compact size, e.g. in small parts
assembly and electronics industry or in the food and packaging industry.
nn Attractive price
nn Compact design
nn Festo quality
nn High flow rate
nn 24 hour delivery
nn Pressure range up to 8 bar
nn IP65 rated (M8)
nn Many more variants with additional
features available
Benefits
Specialist Technical Centres
Know-How
FluidPower
92 IMI Precision Engineering
Engineering
GREAT Solutions
We help move
man’s most
marvellous
machines
Just imagine what else we could do for you…
Visit: www.mostmarvellousmachines.com
Actuators. Valves. Air Preparation. Fittings.
Open. Push. Swing. Twist. Lift. Close. We’re ideas makers.
Creators of motion. Applying our imagination to help you keep your
machines moving, in everything from industrial automation to rail.
Working with you, we help render your vision real. All the time keeping
our eyes on swift service and smart support.
Visit us at eriks-techdirect.co.uk
FluidPower
93Cylinders and Actuators
Introducing ISOLineTM
Comprehensive range for the utmost versatility
Cylinders and mountings that conform to ISO 15552
All sizes supplied magnetic as standard
Polyurethane seals ensure efficient low friction operation and long life
Introducing the IMI Norgren Adaptive Cushioning System (ACS)
Our cushioning system will automatically adapt to an application without the need for any adjustment of the cushion screw. This removes
the need for specialist knowledge for set-up and simplifies installation. Also, the ACS will adjust to any changes in the application, such as
varying loads, which may occur over a cylinder cycle, a working shift or the life of the machine.
This will help to ensure the application always runs efficiently and potentially extend the servicing period of the machine. For extreme
applications involving high speeds or heavy loads, a cushion screw is included for manual adjustment if required.
ISOLineTM
P-PRA/802000
nn Ø32 -125mm
nn Profile barrel
nn Clean appearance
nn Protection against ingress
nn Flush mounted reed and solid state switches available for
position sensing
ISOLineTM
R-RA/802000
nn Ø32 -125mm
nn Robust construction
nn Suitable for more aggressive environments
nn Reed and solid state switches available for position sensing
nn External tie rod construction
Benefits
nn Adaptive Cushioning System (ACS) - No cushioning setting required, cylinder auto-adapts to application - Fit  Forget
nn Improved performance - Operates at low pressures with very low leakage
nn Wide range of applications - Heavy industrial to clean food  beverage to rail and truck
nn Modern appearance - Looks great - Smooth end covers contoured to barrel for easy cleaning
nn Reduced weight - Lower overall weight of machine - Reduced transport costs
nn Additional switch mounting - Great flexibility for machine designers
135
Visit us at eriks-techdirect.co.uk
to find your local Service Centre
PNEUMATICS
H MOUNTINGS SWITCHES SIMPLE MODs AVAILABLE
Generally Ex Stock M/50 series
Ext’d piston rod (/IU),
different rod thread, end caps turned
Generally Ex Stock M/50 series plus bracket
Ext’d piston rod (/IU),
different rod thread, end caps turned
Generally Ex Stock M/50 series plus bracket
Ext’d piston rod (/IU),
different rod thread
Generally Ex Stock M/50 series plus bracket None
Generally Ex Stock M/50 series plus bracket None
Generally Ex Stock M/50 series plus bracket None
Generally Ex Stock M/50 series None
Generally Ex Stock M/50 series None
Specify at time of enquiry M/50 series (up to 4) None
Specify at time of enquiry N/A None
Generally Ex Stock N/A None
Generally Ex Stock M/50 series plus bracket None
Generally Ex Stock M/50 series plus bracket None
N/A N/A None
Reliable, Tried and Trusted Product Ranges
IMI Precision Engineering products have been proven over many years and in some of the most harshest and challenging environments.
All IMI Precision Engineering products are backed by an industry leading 2-year warranty.
Manufactured to the most exacting standards, the product ranges include names such as IMI Norgren, Pneufit, Enots, IMI Herion, Martonair,
IMI Buschjost, Lintra Plus, Excelon, Olympian Plus and Fleetfit.
Profile	 Tie Rod	 Description
PRA/802032/M/25	 RA/802032/M/25	 32mm diameter, 25mm stroke, ISO15552
PRA/802032/M/50	 RA/802032/M/50	 32mm diameter, 50mm stroke, ISO15552
PRA/802032/M/80	 RA/802032/M/80	 32mm diameter, 80mm stroke, ISO15552
PRA/802032/M/100	 RA/802032/M/100	 32mm diameter, 100mm stroke, ISO15552
PRA/802032/M/125	 RA/802032/M/125	 32mm diameter, 125mm stroke, ISO15552
PRA/802032/M/160	 RA/802032/M/160	 32mm diameter, 160mm stroke, ISO15552
PRA/802032/M/200	 RA/802032/M/200	 32mm diameter, 200mm stroke, ISO15552
PRA/802040/M/25	 RA/802040/M/25	 40mm diameter, 25mm stroke, ISO15552
PRA/802040/M/50	 RA/802040/M/50	 40mm diameter, 50mm stroke, ISO15552
PRA/802040/M/80	 RA/802040/M/80	 40mm diameter, 80mm stroke, ISO15552
PRA/802040/M/100	 RA/802040/M/100	 40mm diameter, 100mm stroke, ISO15552
PRA/802040/M/125	 RA/802040/M/125	 40mm diameter, 125mm stroke, ISO15552
PRA/802040/M/160	 RA/802040/M/160	 40mm diameter, 160mm stroke, ISO15552
PRA/802040/M/200	 RA/802040/M/200	 40mm diameter, 200mm stroke, ISO15552
PRA/802050/M/25	 RA/802050/M/25	 50mm diameter, 25mm stroke, ISO15552
PRA/802050/M/500	 RA/802050/M/50	 50mm diameter, 500mm stroke, ISO15552
PRA/802050/MX/60	 RA/802050/M/80	 50mm diameter, 50mm stroke, ISO15552
PRA/802050/M/100	 RA/802050/M/100	 50mm diameter, 100mm stroke, ISO15552
PRA/802050/M/125	 RA/802050/M/125	 50mm diameter, 125mm stroke, ISO15552
PRA/802050/M/160	 RA/802050/M/160	 50mm diameter, 160mm stroke, ISO15552
PRA/802050/M/200	 RA/802050/M/200	 50mm diameter, 200mm stroke, ISO15552
PRA/802063/M/25	 RA/802063/M/25	 63mm diameter, 25mm stroke, ISO15552
PRA/802063/M/50	 RA/802063/M/50	 63mm diameter, 50mm stroke, ISO15552
PRA/802063/M/80	 RA/802063/M/80	 63mm diameter, 80mm stroke, ISO15552
PRA/802063/M/100	 RA/802063/M/100	 63mm diameter, 100mm stroke, ISO15552
PRA/802063/M/125	 RA/802063/M/125	 63mm diameter, 125mm stroke, ISO15552
PRA/802063/M/160	 RA/802063/M/160	 63mm diameter, 160mm stroke, ISO15552
PRA/802063/M/200	 RA/802063/M/200	 63mm diameter, 200mm stroke, ISO15552
PRA/802080/M/25	 RA/802080/M/25	 80mm diameter, 25mm stroke, ISO15552
PRA/802080/M/50	 RA/802080/M/50	 80mm diameter, 50mm stroke, ISO15552
PRA/802080/M/80	 RA/802080/M/80	 80mm diameter, 80mm stroke, ISO15552
PRA/802080/M/100	 RA/802080/M/100	 80mm diameter, 100mm stroke, ISO15552
PRA/802080/M/125	 RA/802080/M/125	 80mm diameter, 125mm stroke, ISO15552
PRA/802080/M/160	 RA/802080/M/160	 80mm diameter, 160mm stroke, ISO15552
PRA/802080/M/200	 RA/802080/M/200	 80mm diameter, 200mm stroke, ISO15552
PRA/802100/M/25	 RA/802100/M/25	 100mm diameter, 25mm stroke, ISO15552
PRA/802100/M/50	 RA/802100/M/50	 100mm diameter, 50mm stroke, ISO15552
PRA/802100/M/80	 RA/802100/M/80	 100mm diameter, 80mm stroke, ISO15552
PRA/802100/M/100	 RA/802100/M/100	 100mm diameter, 100mm stroke, ISO15552
PRA/802100/M/125	 RA/802100/M/125	 100mm diameter, 125mm stroke, ISO15552
PRA/802100/M/160	 RA/802100/M/160	 100mm diameter, 160mm stroke, ISO15552
PRA/802100/M/200	 RA/802100/M/200	 100mm diameter, 200mm stroke, ISO15552
Specialist Technical Centres
Know-How
FluidPower
94
Engineering
GREAT Solutions
Introducing Excelon®
Plus
The latest generation of
Air Preparation equipment
New filter maintenance system
Element assembly is
removed with the bowl
Service much faster and cleaner
Flush mounted
integrated gauge
Largest in the industry
Easy to read
Less vulnerable to damage
Tamper proof options built in
Padlock features on both shut-
off valves and regulator
guarantees safe operation of machinesRotating Safety Shut-off Valve
Easy to operate full flow device
Easy to isolate system with no
reduction in performance
Modern appearance
Looks great on customer machines
No compromise on Robustness
Metal construction - where it
matters most
Quality synonymous with IMI
Norgren brand
Reduced weight and size
35% lighter and 20% smaller
Maximises machine real estate
Double safety lock on bowl
Bowl clip with audible click
plus safety detent
when pressurised
Impossible to remove
the bowl when in use
IMI Precision Engineering
Visit us at eriks-techdirect.co.uk
FluidPower
95
Vacuum Filters
Plastic filters (shown) are made of
durable injection moulded nylon
and poly carbonate with a clear
sump/opaque head and feature a
1 MPa design pressure.
nn Metal filters are of rugged carbon
steel constructed with an enamel
coating
nn Features include a clamp-on cover with an easily removed
filter element and a positive seal Buna gasket
nn We also offer easily removed replacement elements featuring
a polyethylene 10-micron material for plastic filters
nn For metal filters, a polyester felt 5-micron paper element with
a material end is standard
Piab Suction Cups/Accessories
In most applications, suction cups are practical options for reliable and careful handling of most materials.
Piab supplies a diverse line of suction cups that can handle objects of virtually any weight, shape or surface.
Our suction cups are available in a wide variety of materials that can withstand extreme temperatures and
resist prolonged exposure to ozone and oily surfaces. The cup fittings offer many different thread options for
easy mounting. Suction cup diameters are available from 2–300mm.
DURAFLEX®
A highly durable and flexible material with
excellent sealing capability providing
a high coefficient of friction.
Various hardness, suitable for applications
such as the automotive market and
packaging industry.
piGRIP®
Modular suction cup allowing you to choose the ideal
combination of lip and bellow so lines can handle products
at previously unprecedented speeds while realising energy
savings.
Available with a range of independent lips, bellows and fittings
in sizes from 25–77mm and can be customised for thousands
of applications for full operational flexibility. Whereas traditional
grippers can only be used for select applications, the piGRIP®
can
be tailored to individual gripping, lifting and height requirements
to handle a variety of products.
piGRIP®
can be used with new machines as well as for retrofitting
existing systems, which extends use for long-term reliability.
Vacuum Switches
There are three different types of vacuum
switches: electric, pneumatic and electronic.
nn All switches feature an improved operating range of 5–95 –
kPa
nn The switches are dust-proof
nn They can be connected either normally open (NO) or normally
closed (NC)
nn The electronic switches have a long lifetime and can be
connected to a PLC unit (the PNP model) or the switches can
directly regulate a valve (the NPN) model
ValueLine®
The entire Value Line program consists of
suction cups and vacuum ejectors. Value
Line suction cups are developed for
standard/basic applications. The suction
cups have a long thin lip and provide
good sealing on slightly corrugated
surfaces (such as corrugated cardboard).
The Value Line vacuum ejectors are
available in two different designs, the traditional
inline that can be installed directly on the hose close to the
point of suction and the T-design that allows exhaust air to
be piped away. The T-design is also suitable for clean-room
environment.
Typical applications for this product line are case/carton erectors
with other examples such as equipment for loading/unloading or
sorting sheets into metal forming machines (laser cutting, water
jet, punching etc.) and parts removal from injection moulds.
Suction Cups
Specialist Technical Centres
Know-How
FluidPower
96 SMC Safety Valves
Residual pressure
release valve
Residual pressure
release valve â
Residual pressure
release valve â
Residual pressure
release valve ê
Residual pressure
release valve ê
Safety limit switch
Safety limit
switch
VP542-X536
Soft start-up
valve
Dual Residual Pressure Release Valve
VP544-X538
With Soft Start-up Function
VP544-X555
Dual Residual Pressure Release Valve
VG342-X87
Category 2
The detecting function of the main valve position detects a mismatch between
the input signal and valve operation.
Category 3,4
When the dual residual pressure release valve is used, if one of the valves fails to
operate, the other one releases residual pressure.
Residual pressure
release valve
Residual pressure
release valve â
Residual pressure
release valve â
Residual pressure
release valve ê
Residual pressure
release valve ê
Safety limit switch
Safety limit
switch
VP542-X536
Soft start-up
valve
Dual Residual Pressure Release Valve
VP544-X538
With Soft Start-up Function
VP544-X555
Dual Residual Pressure Release Valve
VG342-X87
Series VP/VG
Meeting tomorrow’s machine
safety standards today
ISO 13849-1 Safety Standard Compliant Valves – Series VP/VG
As the introduction of international machine safety standards continue to accelerate at full throttle, the issue of manufacturing safety is
now a critical consideration for all system operators and designers. SMC is committed to help and support equipment manufacturers and
end users with the safe design of their equipment and machines in three ways:
nn Developing and increasing its range of safety components
nn Providing technical support and guidance in the selection process
nn Supplying reliability information about its products - B10 and MTTF data
Visit us at eriks-techdirect.co.uk
FluidPower
97
2(A)
1(P)
P1
P2
Throttle Main valve Valve 1 Valve 2
Soft start-up
valve
Soft start-up
valve
Soft start-up valve: ON
Valve 1, Valve 2: ON
OutputP2
Time
P1
1/2P1
0
Soft start-up valve: OFF
Valve 1, Valve 2: ON
P2 reaches half of P1, and
then the main valve of the
soft start-up valve turns on.
Start supplying flow ad-
justed air with the throt-
tle by energizing valve 1
and valve 2.
Output Pressure (P2) vs Time Graph
Safety limit switch
Main valve Rod
VP544-X555
Highly reliable construction Safety limit switch can be selected
â	 The main valve position is detected by transferring the main valve movement
directly to the reed safety limit switch with the rod.
ê	 Long service life: B10d: 10 million times*
ô 	The return spring releases the residual pressure securely regardless of pressure level.
*	 For VP500/700, safety limit switch made by Omron
2(A)
1(P)
P1
P2
Throttle Main valve Valve 1 Valve 2
Soft start-up
valve
Soft start-up
valve
Soft start-up valve: ON
Valve 1, Valve 2: ON
OutputP2
Time
P1
1/2P1
0
Soft start-up valve: OFF
Valve 1, Valve 2: ON
P2 reaches half of P1, and
then the main valve of the
soft start-up valve turns on.
Start supplying flow ad-
justed air with the throt-
tle by energizing valve 1
and valve 2.
Output Pressure (P2) vs Time Graph
Safety limit switch
Main valve Rod
VP544-X555
Conduit (VP series only) and M12
connector (4 pin) types available.
M12 connector with 6 pins is
available.
2(A)
1(P)
P1
P2
Throttle Main valve Valve 1 Valve 2
Soft start-up
valve
Soft start-up
valve
Soft start-up valve: ON
Valve 1, Valve 2: ON
OutputP2
Time
P1
1/2P1
0
Soft start-up valve: OFF
Valve 1, Valve 2: ON
P2 reaches half of P1, and
then the main valve of the
soft start-up valve turns on.
Start supplying flow ad-
justed air with the throt-
tle by energizing valve 1
and valve 2.
Output Pressure (P2) vs Time Graph
Safety limit switch
Main valve Rod
VP544-X555
Made by Omron Made by Rockwell Automation
With soft start-up function (-X555)
2(A)
1(P)
P1
P2
Throttle Main valve Valve 1 Valve 2
Soft start-up
valve
Soft start-up
valve
Soft start-up valve: ON
Valve 1, Valve 2: ON
OutputP2
Time
P1
1/2P1
0
Soft start-up valve: OFF
Valve 1, Valve 2: ON
P2 reaches half of P1, and
then the main valve of the
soft start-up valve turns on.
Start supplying flow ad-
justed air with the throt-
tle by energizing valve 1
and valve 2.
Output Pressure (P2) vs Time Graph
Safety limit switch
Main valve Rod
VP544-X555
2(A)
1(P)
P1
P2
Throttle Main valve Valve 1 Valve 2
Soft start-up
valve
Soft start-up
valve
Soft start-up valve: ON
Valve 1, Valve 2: ON
OutputP2
Time
P1
1/2P1
0
Soft start-up valve: OFF
Valve 1, Valve 2: ON
P2 reaches half of P1, and
then the main valve of the
soft start-up valve turns on.
Start supplying flow ad-
justed air with the throt-
tle by energizing valve 1
and valve 2.
Output Pressure (P2) vs Time Graph
Safety limit switch
Main valve Rod
VP544-X555
2(A)
1(P)
P1
P2
Throttle Main valve Valve 1 Valve 2
Soft start-up
valve
Soft start-up
valve
Soft start-up valve: ON
Valve 1, Valve 2: ON
OutputP2
Time
P1
1/2P1
0
Soft start-up valve: OFF
Valve 1, Valve 2: ON
P2 reaches half of P1, and
then the main valve of the
soft start-up valve turns on.
Start supplying flow ad-
justed air with the throt-
tle by energizing valve 1
and valve 2.
Output Pressure (P2) vs Time Graph
Safety limit switch
Main valve Rod
VP544-X555
nn A function to gradually increase the initial
pressure of the pneumatic system has been
added to the dual residual pressure release valve.
nn Fixed orifice and variable throttle are available
as a throttle for adjusting the pressure increase.
(ø1, ø1.5, ø2)
Standards and Enclosure
Standards and Enclosure
Series Category
Port
size
Thread
Flow rate characteristics
C [dm3
/(s·bar)] 1 2 (P A)
5 10 15 20 25
Residual Pressure
Release Valve
VP542-X536
2
3/8
Rc,
G,
NPTResidual Pressure
Release Valve
VP742-X536
1/2
Dual Residual Pressure
Release Valve
VP544-X538
3, 4
3/8
Rc,
G,
NPTDual Residual Pressure
Release Valve
VP744-X538
1/2
Dual Residual Pressure Release
Valve with Soft Start-up Function
VP544-X555
3/8
Rc,
G,
NPTDual Residual Pressure Release
Valve with Soft Start-up Function
VP744-X555
1/2
Dual Residual Pressure
Release Valve
VG342-X87
3/4
Rc,
G,
NPT
* Only port size 3/4
Series Category
Safety limit switch
manufacturer
Standards
Enclosure
Machinery Directive 2006/42/EC
CE cUL RoHSHarmonized
standards
EN ISO13849-1: 2008
EN ISO13849-2: 2008
EN ISO4414:
2010
EN983: 1996 +
A1: 2008
Residual Pressure
Release Valve
VP542/742-X536
2
OMRON Corporation
IP65
Rockwell Automation, Inc.
Dual Residual Pressure
Release Valve
VP544/744-X538
3, 4
OMRON Corporation
IP65
Rockwell Automation, Inc.
Dual Residual Pressure Release Valve
with Soft Start-up Function
VP544/744-X555
3, 4
OMRON Corporation
IP65
Rockwell Automation, Inc.
Dual Residual Pressure
Release Valve
VG342-X87
3, 4
OMRON Corporation
*
IP40
Rockwell Automation, Inc.
26.6
15.1
6.5
5.2
10.3
9.8
8.9
Series Category
Port
size
Thread
Flow rate characteristics
C [dm3
/(s·bar)] 1 2 (P A)
5 10 15 20 25
Residual Pressure
Release Valve
VP542-X536
2
3/8
Rc,
G,
NPTResidual Pressure
Release Valve
VP742-X536
1/2
Dual Residual Pressure
Release Valve
VP544-X538
3, 4
3/8
Rc,
G,
NPTDual Residual Pressure
Release Valve
VP744-X538
1/2
Dual Residual Pressure Release
Valve with Soft Start-up Function
VP544-X555
3/8
Rc,
G,
NPTDual Residual Pressure Release
Valve with Soft Start-up Function
VP744-X555
1/2
Dual Residual Pressure
Release Valve
VG342-X87
3/4
Rc,
G,
NPT
* Only port size 3/4
Series Category
Safety limit switch
manufacturer
Standards
Enclosure
Machinery Directive 2006/42/EC
CE cUL RoHSHarmonized
standards
EN ISO13849-1: 2008
EN ISO13849-2: 2008
EN ISO4414:
2010
EN983: 1996 +
A1: 2008
Residual Pressure
Release Valve
VP542/742-X536
2
OMRON Corporation
IP65
Rockwell Automation, Inc.
Dual Residual Pressure
Release Valve
VP544/744-X538
3, 4
OMRON Corporation
IP65
Rockwell Automation, Inc.
Dual Residual Pressure Release Valve
with Soft Start-up Function
VP544/744-X555
3, 4
OMRON Corporation
IP65
Rockwell Automation, Inc.
Dual Residual Pressure
Release Valve
VG342-X87
3, 4
OMRON Corporation
*
IP40
Rockwell Automation, Inc.
26.6
15.1
6.5
5.2
10.3
9.8
8.9
Specialist Technical Centres
Know-How
FluidPower
98 Vacuum Pumps
Piab Vacuum Pumps
piINLINE®
A small lightweight inline ejector that uses the patented COAX®
technology.
nn 40–50% energy reductions compared to other competing
inline vacuum ejectors in corresponding size
nn They can be mounted directly on a hose close to the
suction cup (or point of suction)
nn Easy to retrofit to existing energy wasting in-line vacuum
ejectors thanks to generic plug-and-play design
piCOMPACT™
The first manifold mounted and functional ejector system on the
market based on the energy-efficient COAX®
technology.
Working at a low feed pressure and maximising the utilisation
rate of the compressed air, the COAX®
ejectors reduce energy
consumption by 30–50%.
An increased vacuum flow, excellent product grip, increase pickup
speed therefore minimising product damage and reduce waste.
VGS™
A unique product design where DURAFLEX®
suction cups are
integrated with a COAX®
vacuum cartridge.
nn The VGS™ makes selection, sizing and installation of vacuum
system easier
nn The decentralised vacuum system provides benefits of low
energy costs, fast response time for increased productivity,
complete mounting flexibility and high performance
piCLASSIC
Upgraded with COAX®
technology providing up to 22% more
energy efficiency.
nn Modular design makes for easy cleaning of ejector cartridges
and upgrades the performance when needed
nn Available with 1–6 COAX®
cartridges in 3-stage versions
nn Large vacuum capacity in relation to size
nn Suitable to replace larger electromechanical pumps
nn Mid- and large-size vacuum pump
P6040 Vacuum Pumps
With its smart design, the P6040 offers low and powerful
suction in a small package due to COAX®
technology.
The pump can be mounted close to the point of suction, resulting
in smaller pump requirements with less energy needs.
A natural extension of Piab’s P6010 pumps, the P6040’s
operating efficiency is further optimised with integrated control
options like Energy Saving (ES), helping companies reduce
carbon footprint and improve conservation efforts.
piSAVE optimise
A fully pneumatic device suitable
for air-driven ejectors/pumps
which automatically regulates
the feed pressure to the vacuum
pump/ejector to maintain the set
vacuum level. Air/energy usage
is kept to a minimum.
piSAVE sense
Shuts off the flow of
compressed air to the pump
when the preset level is
reached, and consequently
the consumption of
compressed air (energy
saving) is minimised. Pump
size can also be reduced.
99
YOUR Complete
Hydraulic solutions
Hydraulic systems are critical to most
industrial plants. So finding the right partner
to help you maintain, repair, refurbish or
replace them is also critical.
Fortunately ERIKS has all these capabilities and
more, as well as having the widest range of leading-
brand products available from a single supplier.
CUSTOMISATION AND
ENGINEERED
SOLUTIONS
From initial concept and
design through to prototype
and testing ERIKS are the
perfect partner
PRODUCT RANGE
nn Hose and couplings
nn Self assembly machinery
nn Adaptors
nn Test points
nn Pressure test kits
nn Oil transfer units
nn Ball valves
nn Fluid level gauges
nn Hydraulic filters
nn Directional control valves
Visit us at eriks-techdirect.co.uk
Specialist Technical Centres
Know-How
FluidPower
100
FOUNDATION COURSE
WORKING SAFELY WITH HYDRAULIC
HOSE AND CONNECTORS
Sign up to our one day
course covering all the
basics of working safely
with hydraulic hoses and
connectors.
Created and run in
partnership with the British
Fluid Power Association
(BFPA).
For ERIKS, safety is one of our business’s core values, we aim to ensure that
everyone returns home safely each and every day.
The know-how we have applied to health and safety within our own organisation can
also be shared with customers, to help create a zero accident workplace for you too.
And that is primary reason why this foundation course “Working Safely with
Hydraulic Hose and Connectors” is now available nationwide from ERIKS.
CALL: 0845 006 6000
In partnership
with the
BRITISH FLUID
POWER ASSOCIATION
(BFPA)
BOOK
YOUR PLACE
TODAY
Visit us at eriks-techdirect.co.uk
FluidPower
101Lifeguard Sleeve
Gates Lifeguard Sleeve
To reduce constraints, the installer must
Consider the risks associated with product
failure such as whiplash or fluid ejection
hazards.
In line with Industry
Standards
LifeGuard sleeving correlates to a variety of
industry standards, including ISO 3457 and
MSHA’s fire-resistance requirements.
Exceeds the intent of ISO 3457 that requires
operator protection within a 1 metre line-of-
sight of any hose conveying fluid above 50
bar at +49°C.
Beyond peak performance, Gates hydraulic
systems offer you safety. The LifeGuard™
Line-of-Sight Sleeving System is the first
true protection in line-of-sight hydraulic
applications.
It contains bursts up to 8,000 psi and pinhole
leaks up to 4,000 psi at 120°C for up to five
minutes. After redirecting the explosive force
down the length of the hose, the LifeGuard
sleeve disperses the energy and fluids at the
hose ends via carefully designed ‘channel’
clamps. The leaked fluid then allows for fast
hose failure detection.
Equipment operators working within a 1
metre line-of-sight of a hydraulic system
know the potential for problems.
n Personal injury
n Fluid burns and injection
n Fires and explosions
n Electrical shock
n Mechanical failure
The double-layer sleeve effectively shields
you against these hazards.
No other flexible connection safeguards
your operators, equipment and environment
like LifeGuard sleeving.
BS EN ISO 4413-2010 demands that new or replacement hoses are
assembled and fitted to hydraulic machinery taking into account:
Part No	 To Suit	 Pack Size
	 Hose Bore
14LG4KxCT37	 1/4	 37 mtrs
16LG4KxCT37	 3/8	 37 mtrs
20LG4KxCT37	 1/2	 37 mtrs
22LG4KxCT37	 5/8	 37 mtrs
26LG4KxCT37	 3/4	 37 mtrs
32LG4KxCT37	 1	 37 mtrs
Collars for
the Lifeguard
Sleeving 4000
Part No	 To Suit
	 Hose Bore
6SC-4	1/4
6PU-4	3/8
8SC-4	1/2
Part No	 To Suit
	 Hose Bore
10SC-4 	 5/8
12SC-4 	 3/4
16PU-4	1
LifeGuard Sleeving 4000
nn 	Handles all hydraulic fluids and biodiesel fuel
nn 	Allows fluid to safely escape down the length of the assembly
nn 	Creates noticeable spill for hose failure detection
nn 	Correlates to ISO 3457 and meets MSHA’s flame-resistance requirements
nn Safe fitting onto the machine
nn Reduce constraints
There’s A Better Way
To Protect Against
Hydraulic Hose Failure
Specialist Technical Centres
Know-How
FluidPower
102
MC1001 Starter Kit
nn 	MC1001
can crimp up
to 1 wire braid
nn 	Dies included ¼,
3
/8, ½ and ¾
nn 	Compact
Megacrimp
2-wire
hydraulic hose
from ¼ to ¾
nn 	Gates Megacrimp one-piece
couplings in BSP, JIC, Metric,
ORFS
Save time and money with
Gates self-assembly starter kits
Pick up either an MC1001, MCX20 or MCX25
self-assembly crimper for just £1
All you have to do is either spend £2,970 on hose and couplings via the starter kit
for the MC1001 or spend £5,200 on hose and couplings via the starter kit for the MCX20.
The Gates powered crimper is also available if you spend £6,400 on hose and couplings via
the MCX25 starter kit.
MCX20 Starter Kit
nn 	MCX20 can
crimp up to 1
multi-spiral hose
and
1¼ 2-wire
hydraulic hose
nn 	Dies included ¼,
3
/8, ½, ¾ and 1
nn 	Compact Megaflex 2-wire hydraulic
hose from ¼ to 1
nn 	EFG5K 5000 psi multi-spiral hose
in ¾ and 1
nn 	Gates Megacrimp one-piece
couplings in BSP, JIC, Metric,
ORFS
nn 	Gates Globalspiral no-skive
couplings in BSP, JIC, MetricDetailed listings of contents for the kits are available
on request from your local Eriks Service Centre.
Gates will support each starter kit with on-site
crimper training and certification.
Additional end terminations are
available, please do not hesitate to contact us.
MCX25
Starter Kit
nn 	Dies : ¼”,
3/8”, ½”, ¾”,
1” and 1 ¼”
nn Compact CM2T Megaflex 2-wire
hydraulic hose from ¼” to 1 ¼”
nn EFG5K 5000 psi multi spiral
hose from ¾” to 1”
nn Gates Megacrimp one piece
couplings in BSP, JIC, Metric and
ORFS
nn Gates Globalspiral no-skive
couplings in BSP, JIC, Metric,
ORFS and SAE Flanges
nn Crimpers available in 1, or 3
phase versions
nn Complete with a die storage
system and quick die change tool.
nn 	Gates guarantee all hose assemblies
produced with their self-assembly
systems after operator training and
certification by authorised ERIKS
personnel
nn 	No call out charge, no delay, no added
costs – 24/7 product availability
nn All terminations available – the starter
kits have been profiled to include the
most popular couplings with BSP, JIC,
ORFS, and Metric popular threads
and forms
CRIMPER
FOR
£1
Gates Integrated System Approach
+ + =
Superior products,
manufactured to
stringent tolerances
Innovative self-assembly
machines and dies,
rigorously validated
Optimal crimp data, derived
from meticulous testing
Factory-quality performance
above and beyond all
international standards in full
compliance with EU directives
Self-Assembly Starter Kits
Visit us at eriks-techdirect.co.uk
FluidPower
103High Pressure Hoses and Couplings
Gates High Pressure Wire
Braid Hoses and MegaCrimp®
Couplings
Din Light Series. 24° Cone – MegaCrimp couplings
BSP 60° Cone – MegaCrimp couplings
Excellent performance: Gates CM2T Megaflex Hydraulic Hose
Gates’ CM2T hose range for high pressure hydraulic applications offering excellent performance characteristics at a highly
competitive price. This compact hose exceeds EN 857 2SC, is tested and validated to 600,000 impulse cycles, and allows for
tighter bend radii than standard 2-wire hose. Available in sizes from 1
⁄4–1.
Couplings: MegaCrimp
Key benefits:
nn Easy to route and to install in tight areas
nn 70% of EN 857 2SC bend radius at rated
working pressure
nn Outstanding durability and flex impulse performance
nn Lightweight
nn Compatible with biodegradable hydraulic fluids such
as synthetic esters, polyglycols and vegetable oils
Female Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
4G10FDLORX	1/4	 M16x1.5	 10
6G12FDLORX	3/8	 M18x1.5	 10
8G15FDLORX	1/2	 M22x1.5	 10
10G18FDLORX	5/8	 M26x1.5	 10
Female 90° Swept Elbow
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
4G10FDLORX90	1/4	 M16x1.5	 10
6G12FDLORX90	3/8	 M18x1.5	 10
8G15FDLORX90	1/2	 M22x1.5	 10
10G18FDLORX90	5/8	 M26x1.5	 10
Male Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
4G10MDL	 1/4	M16x1.5	 10
6G12MDL	 3/8	M18x1.5	 10
8G15MDL	 1/2	M22x1.5	 10
10G18MDL	5/8	M26x1.5	 10
Din Heavy Series. 24° Cone – Megacrimp couplings
Female Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
4G10FDHORX	1/4	 M18x1.5	 10
6G12FDHORX	3/8	 M20x1.5	 10
8G16FDHORX	1/2	 M24x1.5	 10
10G20FDHORX	5/8	 M30x2.0	 10
Female 90° Swept Elbow
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
4G10FDHORX90	 1/4	M18x1.5	 10
6G12FDHORX90	 3/8	M20x1.5	 10
8G16FDHORX90	 1/2	M24x1.5	 10
10G20FDHORX90	5/8	 M30x2.0	 10
Male Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
4G10MDH	 1/4	M18x1.5	 10
6G12MDH	 3/8	M20x1.5	 10
8G16MDH	 1/2	M24x1.5	 10
10G20MDH	5/8	 M30x2.0	 10
Part No	 Bore Size 	 Max Working Pressure	 Qty.
CM2T04-CL30	 1/4	 400 Bar	 30 mtrs
CM2T06-CL30	 3/8	 330 Bar	 30 mtrs
CM2T08-CL30	 1/2	 275 Bar	 30 mtrs
CM2T10-RL50	 5/8	 250 Bar	 50 mtrs
CM2T12-RL50	 3/4	 215 Bar	 50 mtrs
CM2T16-CT40	 1	 165 Bar	 40 mtrs
Male BSP Parallel.
60° Cone
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
4G4MBSPP 	 1/4 	 G1/4 	 10
6G6MBSPP 	 3/8 	 G3/8 	 10
8G8MBSPP 	 1/2 	 G1/2	 10
10G10MBSPP 	 5/8 	 G5/8	 10
12G12MBSPP 	 3/4 	 G3/4 	 10
16G16MBSPP 	 1 	 G1 	 5
Female BSP. O-ring Swivel. 60° Cone
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
4G4FBSPORX 	 1/4 	 G1/4 	 10
6G6FBSPORX 	 3/8 	 G3/8	 10
8G8FBSPORX 	 1/2 	 G1/2 	 10
10G10FBSPORX	 5/8 	 G5/8 	 10
12G12FBSPORX 	 3/4 	 G3/4 	 10
16G16FBSPORX 	 1 	 G1 	 5
Female BSP. O-ring Swivel
60° Cone. 90° Swept Elbow
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
4G4FBSPORX90	 1/4 	 G1/4 	 10
6G6FBSPORX90 	 3/8 	 G3/8 	 10
8G8FBSPORX90 	 1/2	 G1/2 	 10
10G10FBSPORX90 	 5/8 	 G5/8 	 10
12G12FBSPORX90	 3/4 	 G3/4 	 10
16G16FBSPORX90 	 1 	 G1 	 5
Specialist Technical Centres
Know-How
FluidPower
104
Gates Extremely High
Pressure Multi-Spiral Hoses
and GlobalSpiral™ Couplings
BSP. 60° Cone – GlobalSpiral couplings
Highest flexibility for best results: Gates Envirofluid Hydraulic Spiral Hose (EFGxK)
Ideal for extremely high pressure and high impulse hydraulic applications, this spiral hose provides outstanding
durability and flexibility. Validated with GlobalSpiral (GS) couplings to one million impulse cycles this multi-spiral
hose offers you extended lifetime even in the harshest applications.
Couplings: GlobalSpiral
Key benefits:
nn Extremely flexible thanks to tight bend radii surpassing
European standards
nn Special nitrile-tube compound eliminating seeping through the
tube and the different layers of reinforcement
nn Excellent compatibility with synthetic and biodegradable hydraulic
fluids such as synthetic esters, polyglycols and vegetable oils
nn Outstanding product durability and superior impulse performance
up to 1,000,000 impulse cycles
Female Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
8GS8FBSPORX	 1/2	 G1/2–14 BSP	 1
10GS10FBSPORX	 5/8	 G5/8–14 BSP	 1
12GS12FBSPORX	 3/4	 G3/4–14 BSP	 1
16GS16FBSPORX	 1	 G1–11 BSP	 1
Female 90° Swept Elbow
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
8GS8FBSPORX90	 1/2	 G1/2–14 BSP	 1
10GS10FBSPORX90	 5/8	 G5/8–14 BSP	 1
12GS12FBSPORX90	 3/4	 G3/4–14 BSP	 1
16GS16FBSPORX90	 1	 G1–11 BSP	 1
Male Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
8GS8MBSPP	 1/2	 G1/2–14 BSP	 1
10GS10MBSPP	 5/8	 G5/8–14 BSP	 1
12GS12MBSPP	 3/4	 G3/4–14 BSP	 1
16GS16MBSPP	 1	 G1–11 BSP	 1
DIN Heavy. 24° Cone – GlobalSpiral couplings
Gates GlobalSpiral Plus
Gates GlobalSpiral Plus (GSP) is a new range of non-skive 2-piece large bore
couplings designed for 1 and 2-wire braid hydraulics hose.
Female Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
8GS16FDHORX	 1/2	M24x1.5	 1
10GS20FDHORX	 5/8	M30x2.0	 1
12GS25FDHORX	 3/4	M36x2.0	 1
16GS30FDHORX	 1	M42x2.0	 1
Female Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
24GSP24FBSPORX	1.1/2	 G1.1/2–11BSP	 1
32GSP32FBSPORX	2	 G2–11BSP	 1
Male Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
24GSP24MBSPP	 1.1/2	G1.1/2–11BSP	 1
32GSP32MBSPP	 2	 G2–11BSP	1
Female 90º Swept Elbow
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
24GSP24FBSPORX90	1.1/2	 G1.1/2–11BSP	 1
32GSP32FBSPORX90	2	 G2–11BSP	 1
Ferrules for 1 and 2-Wire Hose
Part No	 Hose 	 	 Pack
	 Bore 	 	 Size
24GSP1F-2	1.1/2		 1
32GSP1F-2	 2		1
Female 90° Swept Elbow
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
8GS16FDHORX90	1/2	M24x1.5	 1
10GS20FDHORX90	5/8	 M30x2.0	 1
12GS25FDHORX90	3/4	 M36x2.0	 1
16GS30FDHORX90	1	 M42x2.0	 1
Male Straight
Part No	 Hose 	 Thread 	 Pack
	 Bore 	 Size 	 Size
8GS16MDH	 1/2	M24x1.5	 1
10GS20MDH	 5/8	M30x2.0	 1
12GS25MDH	 3/4	M36x2.0	 1
16GS30MDH	 1	M42x2.0	 1
Gates Envirofluid Hydraulic Spiral Hose (EFGxK)
Part No	 Bore Size 	 Max Working Pressure	 Qty.
		 PSI	Bar
8EFG6K	 1/2	 6000	 420	 30 mtrs
10EFG5K	 5/8	 5000	 350	 30 mtrs
12EFG5K	 3/4	 5000	 350	 30 mtrs
16EFG4K	 1	 4000	 280	 60 mtrs
Ferrules
Part No	 Hose Bore
	Size
6GS1F-4	3/8
8GS1F-4	1/2
10GS1F-4 	 5/8
12GS1F-4 	 3/4
16GS1F-4 	 1
20GS1F-4 	 1.1/4
24GS1F 	 1.1/2
High Pressure Hoses and Couplings
Visit us at eriks-techdirect.co.uk
FluidPower
105Volume Hose Assemblies and
Hydraulic Components
Offering You More
nn Approved hose assembler for Gates Fluid Power
nn Accredited to The British Fluid Power Distribution
Association hose assembler programme
nn Hose assembly testing and certification
to international standards
nn Tailored training programmes covering hose assembly
installation, inspection and health and safety
Manufacturing Approach
nn Total cost reduction
nn Provider of Gates Global performance products
nn Range of FLEXION hydraulic hoses, fittings and connectors
nn Tube manipulation and EMB Din tube fittings
nn Bespoke fittings and manifold block solutions
nn Onsite application and system design support
What This Means To You
nn Warranty cost reduction
nn Improved service life of your machines
nn Leak-free Port to Port programme ensuring
the integrity of the whole assembly
nn Application engineering support in the
prototype process, to reduce the number
of components and connections
Logistic Solutions
nn Kitting services - Custom-packed parts to meet the specific
requirements of your production process
nn Inventory management service - A well-managed inventory
creates not only immediate financial benefits, but also a
leaner operation that performs better and more profitably
in the long term
nn Easy Order System - Combining logistics services and
e-Business solutions for purchase and management of
your production materials, at a reduced procurement cost.
Fast. Easy. Cost-
effective. Solutions
If you’re looking for a port-to-port hydraulic solution, you’ll find few to
engage with better as an innovative and reliable partner than ERIKS.
With an unparalleled blend of know-how, and experience, we offer
you a professional and cost-effective solution working with the best
products available.
Specialist Technical Centres
Know-How
FluidPower
106 Hydraulic Components and Fittings
Rexroth Cetop Valves,
Hydraulic Accessories
CETOP 3/5 Valves
High quality valve from the European market leader in hydraulics. Directly interchangeable
with other brands conforming to the CETOP 3 or 5 standard.
nn Coils can be rotated 90º
nn Coils can be replaced without loss of fluid
Cetop 3 Valve (Size 6)
Part No 	 Voltage 	 Spool Type 	 Seal Kit
4WE6D6X/EG24N9K4	 24V DC 	 D 	 313162
4WE6E6X/EG24N9K4	 24V DC 	 E 	 313162
4WE6J6X/EG24N9K4	 24V DC 	 J 	 313162
4WE6D6X/EW110N9K4	 110V AC 	 D 	 313162
4WE6E6X/EW110N9K4	 110V AC 	 E 	 313162
4WE6J6X/EW110N9K4	 110V AC 	 J 	 313162
Cetop 5 Valve (Size 10)
Part No 	 Voltage 	 Spool Type 	 Seal Kit
4WE10D3X/CG24N9K4	 24V DC 	 D 	 312582
4WE10E3X/CG24N9K4	 24V DC 	 E 	 312582
4WE10J3X/CG24N9K4	 24V DC 	 J 	 312582
4WE10D3X/CW110N9K4	 110V AC 	 D 	 312582
4WE10E3X/CW110N9K4	 110V AC 	 E 	 312582
4WE10J3X/CW110N9K4	 110V AC 	 J 	 312582
„„ Filter new oil before filling a reservoir or
system: New oil is not machine ready oil;
always filter new oil prior to loading
„„ Match oil cleanliness to system requirements:
Understand the requirements set by your
system’s manufacturer and ensure filtration
you choose meets that level
„„ Consider hydraulic systems designed with
easily accessible filter systems; otherwise,
maintenance and filter replacement will lag
or be routinely postponed
„„ Set up a maintenance schedule based
on your operational requirements, based
on environmental conditions, where, how
frequently the system is operated and
filtration system design
„„ Clean the areas around the filter before you
change it; this prevents accidental intrusion
of dirt particles
Top tips...
Visit us at eriks-techdirect.co.uk
FluidPower
107
Axial Piston Fixed Displacement
Motor A2FM series 6
Fixed displacement motor A2FM of axial piston, bent axis design
is suitable for hydrostatic drives in open and closed circuits. The
torque increases with the pressure differential between the high
and low pressure side and with increasing displacement. The
output speed depends on the flow capacity of the pump and the
displacement of the motor.
The pistons are directly supported by the drive shaft and there
create a pressure–dependent torque.
Features
nn Use in mobile and stationary application ranges
nn Axial tapered piston bent axis design
nn High power density
nn Small dimensions
nn High overall efficiency
nn Good start-up efficiency
nn Size 5…200
nn Nominal pressure: 315 bar (size 5),
400 bar (size 10-200)
nn Peak pressure: 350 bar (size 5),
450 bar (size 10-200)
nn Open and closed circuit
Size 5 10 12 16 23 28
Nominal pressure PN
bar 315 400 400 400 400 400
Peak pressure Pmax
bar 350 450 450 450 450 450
Swept volume Vg
cm3
4.93 10.3 12 16 22.9 28.1
Speed nmax
rpm 10000 8000 8000 8000 6300 6300
Inlet flow qv max
l/min 49 82 96 128 144 176
Torque ∆p = 400 bar T Nm 24.7 65 76 100 144 178
Weight (approx.) m kg 2.5 5.4 5.4 5.4 9.5 9.5
Proportional Directional Valves Operated
4WRE and 4WREE
The valve type 4WRE (E) is a direct operated proportional directional
valve with electrical position feedback for sub-plated mounting.
Operation is effected by means of proportional solenoids.
The solenoids are controlled either via external or via
integrated electronics.
Features
nn For sub plate mounting
nn Porting pattern according to ISO 4401
nn Control of flow direction and size
nn With electrical feedback
nn With integrated electronics (OBE)
(type 4WREE)
nn Spring-centred control spool
nn Sizes 6…10
nn Component series 2X
nn Maximum operating pressure 315 bar
nn Maximum flow 180 l/min
Size 6 10
Operating pressure Port A,B, P Pmax
bar 315 315
Nominal flow ∆p = 10 bar qv nom
Vmin 8, 16, 32 25,50, 75
Maximum hysteresis %
0.1 0.1
Step response 0 to 90% Tu
+Tg
ms 20 40
Operation voltage OBE U V 24 24
Comm. Value signal OBE U V ± 10 ± 10
I mA 4 to 20 4 to 20
Hydraulic Components
Specialist Technical Centres
Know-How
FluidPower
108
Gates-EMB Fittings
Gates-EMB DIN Tube Fittings
The EMB patented technique of pre and final assembly of cutting
rings reduces assembly time and costs whilst providing superior
“leak-free” characteristics and reliable reproducible assembly results.
The entire process of tube preparation until the final coupling runs
like clock work in no time at all, thanks to our investment in “state of
the art” machinery.
New Surface Finish
Gates – EMB is the only supplier to offer a full range of DIN Tube
Fittings with 3 types of coating in parallel: NanoProtect™,
Zinc-Nickel and Stainless Steal. So the customer can select the
finishing best suited for the application
nn The Gates-EMB DIN Tube Fittings range is now also available
with a zinc-nickel coating.
Advantages of the modified coating:  
nn Increased corrosion resistance
nn Constant friction coefficients compared to phosphating
nn Reduced wear during installation and clamping
Gates-EMB Opticam 4S
More control-more safety- easier to use!
Gates-EMB OPTICAM 4S for the secure and efficient assembly of
hydraulic cutting rings DS and DSW..
nn Extremely easy to handle
nn Automatic tool recognition excludes errors
nn SPC control of each assembly
nn Increased assembly accuracy through reference check after
each tool change
nn Improved error detection
nn Wear monitoring with individual cycle counter for each size
nn Export of assembly data available as CSV-file
Hydraulic Components and Fittings
Visit us at eriks-techdirect.co.uk
FluidPower
109Adaptors
Metric Tube
Compression Fittings
Manufactured to the highest standards, all compression
fittings conform to the international standard EN ISO 8434-1
(DIN 2353), and conform to the latest EU regulations on the
restricted use of hazardous substances.
EMB fittings in addition to the Chrome 6 Free surface finish
have an additional protection level- NANO Protect, which
provides up to 400 hours protection to Red Rust.
Male Stud Couplings
BSP Parallel
60° Cone Light Series L
Part No	 Tube	 BSP
	 OD	Male
GE6LR-60	 6mm 	 1/8”
GE8LR-60	 8mm 	 1/4”
GE10LR-60	 10mm 	 1/4”
GE12LR-60	 12mm 	 3/8”
GE15LR-60	 15mm 	 1/2”
GE18LR-60	 18mm 	 1/2”
GE22LR-60	 22mm 	 3/4”
GE28LR-60	 28mm 	 1”
GE35LR-60	 35mm 	 1.1/4”
GE42LR-60	 42mm 	 1.1/2”
other sizes on request
60° Cone Heavy Series S
Part No	 Tube	 BSP
	 OD	Male
GE6SR-60	 6mm	 1/4”
GE8SR-60	 8mm	 1/4”
GE10SR-60	 10mm 	 3/8”
GE12SR-60	 12mm 	 3/8”
GE14SR-60	 14mm	 1/2”
GE16SR-60	 16mm 	 1/2”
GE20SR-60	 20mm 	 3/4”
GE20SR1-60	 20mm 	 1”
GE25SR-60	 25mm 	 1”
GE30SR1-60	 30mm 	 1”
GE38SR-60	 38mm 	 1.1/2”
Tube to Tube
Equal Straight
Light Series L
Part No 	 Tube OD
G6PL	6mm
G8PL	8mm
G10PL	10mm
G12PL	12mm
G15PL	15mm
G18PL	18mm
G22PL	22mm
G28PL	28mm
G35PL	35mm
G42PL	42mm
Heavy Series S
Part No 	 Tube OD
G6PS	6mm
G8PS	8mm
G10PS	10mm
G12PS	12mm
G14PS	14mm
G16PS	16mm
G20PS	20mm
G25PS	25mm
G30PS	30mm
G38PS	38mm
Tube to Tube
Equal Tee
Light Series L
Part No	 Tube OD
T6PL	6mm
T8PL	8mm
T10PL	10mm
T12PL	12mm
T15PL	15mm
T18PL	18mm
T22PL	22mm
T28PL	28mm
T35PL	35mm
T42PL	42mm
Heavy Series S
Part No 	 Tube OD
T6PS	6mm
T8PS	8mm
T10PS	10mm
T12PS	12mm
T14PS	14mm
T16PS	16mm
T20PS	20mm
T25PS	25mm
T30PS	30mm
T38PS	38mm
Bulkhead
Straight
Light Series L
Part No	 Tube OD
SV6PL	6mm
SV8PL	8mm
SV10PL	10mm
SV12PL	12mm
SV15PL	15mm
SV18PL	18mm
SV22PL	22mm
SV28PL	28mm
SV35PL	35mm
SV42PL	42mm
Heavy Series S
Part No 	 Tube OD
SV6PS	6mm
SV8PS	8mm
SV10PS	10mm
SV12PS	12mm
SV14PS	14mm
SV16PS	16mm
SV20PS	20mm
SV25PS	25mm
SV30PS	30mm
SV38PS	38mm
Weld Nipple Assembly
DIN Fitting Body
Tube End Forming EMB FS System
Standard DIN nut
D
Single edged
Cutting Ring
DSW
Double Edge Cutting
Ring with Soft
Seal
DS
Double Edge
Cutting Ring
EMB – L Series Fittings Working Pressure up to 500 bar
EMB – S series Fittings Working pressures up to 800 bar
Size Range 6mm O.D – 42mm O.D
Adaptor System for 37° Flare
Specialist Technical Centres
Know-How
FluidPower
110 Hydraulic Accessories
Tee Pieces
BSP Male/Male/Male Tee
Part No	 Thread	 Thread	 Thread
	 A	B	 C
KBT04	1/4	 1/4	 1/4
KBT06	3/8	 3/8	 3/8
KBT08	1/2	 1/2	 1/2
KBT10	5/8	 5/8	 5/8
KBT12	3/4	 3/4	 3/4
KBT16	1	1	 1
KBT20	 1.1/4	1.1/4	 1.1/4
KBT24	 1.1/2	1.1/2	 1.1/2
BSP Female/Female/
Female Swivel Tee
Part No	 Thread	 Thread
	 A	B
KBTFFF040404	1/4	 1/4
KBTFFF060606	3/8	 3/8
KBTFFF080808	1/2	 1/2
KBTFFF121212	3/4	 3/4
KBTFFF161616	1	 1
KBTFFF202020	1.1/4	1.1/4
KBTFFF242424	 1.1/2	1.1/2
BSP Male/Male/Female
Swivel Tee
Part No	 Thread	Thread	Thread
	 A	B	C
KBTMMF040404	1/4	 1/4	 1/4
KBTMMF060606	3/8	 3/8	 3/8
KBTMMF080808	1/2	 1/2	 1/2
KBTMMF121212	3/4	 3/4	 3/4
KBTMMF161616	1	 1	 1
KBTMMF202020	1.1/4	 1.1/4	 1.1/4
KBTMMF242424	1.1/2	 1.1/2	 1.1/2
BSP Male/Female/Male
Swivel Tee
Part No	 Thread	Thread	Thread
	 A	B	C
KBTMFM040404	1/4	 1/4	 1/4
KBTMFM060606	3/8	 3/8	 3/8
KBTMFM080808	1/2	 1/2	 1/2
KBTMFM121212	3/4	 3/4	 3/4
KBTMFM161616	1	 1	 1
KBTMFM202020	1.1/4	 1.1/4	 1.1/4
KBTMFM242424	1.1/2	 1.1/2	 1.1/2
Female x Female Adaptors
Adaptors
High quality, market leading hydraulic adaptors.
nn Manufactured from steel BS EN 10277:3 1999 230 MOPb
and conforming to recognised international standards
nn Surface treatment Chromium-6 free conforming to EU regulations
Male x Male Adaptors
BSP Male/Male Equal
Part No	 Thread A	 Thread B
KB02	 1/8	1/8
KB04	 1/4	1/4
KB06	 3/8	3/8
KB08	 1/2	1/2
KB10	 5/8	5/8
KB12	 3/4	3/4
KB16	 1	1
KB20	 1.1/4	1.1/4
KB24	 1.1/2	1.1/2
KB32	 2	2
BSP Straight Bulkhead
Part No	 Thread A	 Thread B
KBH02	 1/8	1/8
KBH04	 1/4	1/4
KBH06	 3/8	3/8
KBH08	 1/2	1/2
KBH10	 5/8	5/8
KBH12	 3/4	3/4
KBH16	 1	1
BSP Male/Male
90º Compact Elbow
Part No	 Thread A	 Thread B
KB040490C	1/4	 1/4
KB060690C	3/8	 3/8
KB080890C	1/2	 1/2
KB101090C	5/8	 5/8
KB121290C	3/4	 3/4
KB161690C	1	 1
BSP Male/Male Unequal
Part No	 Thread A	 Thread B
KB0204	 1/8	1/4
KB0206	 1/8	3/8
KB0406	 1/4	3/8
KB0408	 1/4	1/2
KB0608	 3/8	1/2
KB0610	 3/8	5/8
KB0810	 1/2	5/8
KB0820	 1/2	1.1/4
KB0412	 1/4	3/4
KB0612	 3/8	3/4
KB0812	 1/2	3/4
KB1012	 5/8	3/4
KB1016	 5/8	1
KB0616	 3/8	1
KB0816	 1/2	1
KB1216	 3/4	1
KB1220	 3/4	1.1/4
KB1620	 1	1.1/4
KB1224	 3/4	1.1/2
KB1624	 1	1.1/2
KB2024	 1.1/4	1.1/2
KB1632	 1	2
KB2032	 1.1/4	2
KB2432	 1.1/2	2
BSP Female/Female
Swivel
Part No	 Thread	 Thread
	 A	B
KBFF0404	 1/4F	1/4F
KBFF0406	 1/4F	3/8F
KBFF0408	 1/4F	1/2F
KBFF0606	 3/8F	3/8F
KBFF0608	 3/8F	1/2F
KBFF0808	 1/2F	1/2F
KBFF0812	 1/2F	3/4F
Part No	 Thread	 Thread
		 A	 B
KBFF1010	 5/8F	5/8F
KBFF1212	 3/4F	3/4F
KBFF1216	3/4F	1F
KBFF1616	1F	1F
KBFF2020	 1.1/4F	1.1/4F
KBFF2424	 1.1/2F	1.1/2F
KBFF3232	2F	2F
BSP Female/Female 90º
Compact Swivel Elbow
Part No	 Thread	 Thread
	 A	B
KBFF040490C	 1/4F	1/4F
KBFF060690C	 3/8F	3/8F
KBFF080890C	 1/2F	1/2F
KBFF121290C	 3/4F	3/4F
KBFF161690C	 1F	1F
KBFF202090C	 1.1/4F	1.1/4F
KBFF242490C	 1.1/2F	1.1/2F
Visit us at eriks-techdirect.co.uk
FluidPower
111
Probe
Part No	 Port size
QRC-P04	 1/4 BSPP
QRC-P06	 3/8 BSPP
QRC-P08	 1/2 BSPP
QRC-P12	 3/4 BSPP
QRC-P16	 1 BSPP
Carrier
Part No	 Port size
QRC-C04	 1/4 BSPP
QRC-C06	 3/8 BSPP
QRC-C08	 1/2 BSPP
QRC-C12	 3/4 BSPP
QRC-C16	 1 BSPP
Probe
Part No	 Port size
QRC-P04FF	 1/4 BSPP
QRC-P06FF	 3/8 BSPP
QRC-P08FF	 1/2 BSPP
QRC-P12FF	 3/4 BSPP
QRC-P16FF	 1 BSPP
Carrier
Part No	 Port size
QRC-C04FF	 1/4 BSPP
QRC-C06FF	 3/8 BSPP
QRC-C08FF	 1/2 BSPP
QRC-C12FF	 3/4 BSPP
QRC-C16FF	 1 BSPP
Quick Release Couplings
ISO 7241 Series A
nn Cost effective solution, tested to
ISO 7421 standard
nn Zinc plated, heat treated carbon steel,
Nitrile “O” ring seals are fitted as
standard. Viton available on request
nn Suitable for both agricultural and
industrial use requiring frequent
connections and disconnections
nn Maximum working pressure range
from 350 bar (1/4) to 130 bar (2)
ISO 7241 Series B
nn Heat treated carbon steel, zinc
plated, Nitrile O-ring seals with
Teflon backing rings
nn Ideally suited to heavy duty
applications such as: automotive,
offshore, railways, petrochemical,
steel, civil engineering
nn Maximum working pressure
range from 300 bar
Screw to Connect
nn Screw connection style eliminates brinelling,
increasing the life of the coupling
nn Screw connection style allows for connection with
up to 50 bar pressure in each hydraulic hose line
nn Screw connection style prevents accidental
uncoupling under vibration
nn Suited to heavy duty industrial
applications which are subject to
heavy mechanical loads and high
pressure pulse application on
construction plant
Probe
Part No	 Port size
QRC-P04B	 1/4 BSPP
QRC-P06B	 3/8 BSPP
QRC-P08B	 1/2 BSPP
QRC-P12B	 3/4 BSPP
QRC-P16B	 1 BSPP
Carrier
Part No	 Port size
QRC-C04B	 1/4 BSPP
QRC-C06B	 3/8 BSPP
QRC-C08B	 1/2 BSPP
QRC-C12B	 3/4 BSPP
QRC-C16B	 1 BSPP
Probe
Part No	 Port size
QRC-P04SC	 1/4 BSPP
QRC-P06SC	 3/8 BSPP
QRC-P08SC	 1/2 BSPP
QRC-P12SC	 3/4 BSPP
QRC-P16SC	 1 BSPP
Carrier
Part No	 Port size
QRC-C04SC	 1/4 BSPP
QRC-C06SC	 3/8 BSPP
QRC-C08SC	 1/2 BSPP
QRC-C12SC	 3/4 BSPP
QRC-C16SC	 1 BSPP
Glycerine Filled
Pressure Gauges
A small selection of the range available from
ERIKS.
nn Stainless steel case
nn Accuracy ±1.6% FSD
nn 63mm (2.1/2) Diameter, 1/4 BSPP
nn Available bottom and rear entry fittings
Bottom Entry
Part No	 Pressure Range
PG63BO10	 0-10 bar
PG63BO16	 0-16 bar
PG63BO25	 0-25 bar
PG63BO40	 0-40 bar
PG63BO60	 0-60 bar
PG63BO100	 0-100 bar
PG63BO160	 0-160 bar
PG63BO250	 0-250 bar
PG63BO400	 0-400 bar
PG63BO600	 0-600 bar
Rear Entry
Part No	 Pressure Range
PG63RO10	 0-10 bar
PG63RO16 	 0-16 bar
PG63RO25	 0-25 bar
PG63RO40 	 0-40 bar
PG63RO60 	 0-60 bar
PG63RO100 	 0-100 bar
PG63RO160 	 0-160 bar
PG63RO250 	 0-250 bar
PG63RO400 	 0-400 bar
PG63RO600 	 0-600 bar
Flat Face
nn Zero leakage coupling, easy to clean
to prevent contamination ingress, and
manufactured to ISO 16028 standard
nn Pressure rated up to 350 bar,
warranty for 1 year including
on hammer applications
nn Zinc-Nickel plating reduces corrosion,
rated for 280 hours
to white rust in a salt spray test
nn Available in stainless steel
Hydraulic Accessories
Specialist Technical Centres
Know-How
FluidPower
112
Part No	 Description	 Thread	 Max WP
ESNA01	 1620 Male/Swivel Female Test Tee Piece	 BSP 1/4	 630 bar
ESNA02	 1620 Male/Swivel Female Test Tee Piece	 BSP 3/8	 630 bar
ESNA03	 1620 Male/Swivel Female Test Tee Piece	 BSP 1/2	 515 bar
ESNA04	 1620 Male/Swivel Female Test Tee Piece	 BSP 3/4	 430 bar
ESNA06	 1620 Male/Swivel Female Test Tee Piece	 BSP 1	 345 bar
1620 Male/Swivel Female Test
Tee Piece
nn Also available in stainless steel
Part No	 Description	 Hose Length
ETH1614-1000	 1620 Fem x 1/4 BSP Gauge Fem	 1000mm
ETH1614-2000	 1620 Fem x 1/4 BSP Gauge Fem	 2000mm
ETH1616-1000	 1620 Fem x 1620 Fem	 1000mm
ETH1616-2000	 1620 Fem x 1620 Fem	 2000mm
High Pressure Micro
Bore Assemblies
Other hose lengths/combinations available on request.
Max working pressure 400 bar, other pressures on request.
Single Gauge Digital Pressure Test Kits
Part No	 Pressure Range
EDPTK0/60	 0-60 Bar
EDPTK0/250	 0-250 Bar
EDPTK0/600	 0-600 Bar
Universal
Standard
Pressure Test Kits Digital Pressure Test Kits
nn Single digital pressure gauge with minimall test points,
adaptors and hose in a carry case
nn Three kits available in the different pressure ranges
nn Gauges have peak min/max storage, great accuracy
and easy to read display
Pressure Test Kits 40/400bar
Part No	 Pressure
ESPTK40/400	Standard
EUPTK40/400	Universal
Other pressure ranges available on request.
Part No	 Description	 Thread	 Max WP
EMA3R1/8ED	 1620 Test Point with Metal Cap	 BSP 1/8	 400 bar
EMA3R1/4ED	 1620 Test Point with Metal Cap	 BSP 1/4	 630 bar
1620 Test Point with Metal
Cap
nn Can be used as sampling points
Part No	 Description	 Thread	 Max WP
EPGC1604	 1620 Pressure Gauge Connection (direct)	 BSP 1/4	 630 bar
EPGC1608	 1620 Pressure Gauge Connection (direct)	 BSP 1/2	 630 bar
1620 Pressure Gauge
Connection (direct)
nn Also available in stainless steel
Lifetime leak free guarantee
Hydraulic Accessories
Visit us at eriks-techdirect.co.uk
FluidPower
113Oil Transfer Units and Ball Valves
Oil Transfer Units
This high performance series provides fast and efficient oil clean-up with
simple maintenance procedures that require no tools to change.
This filter is designed to ensure it does not become blocked on the outer fibres but allows
the full depth of the filter media to be utilised, capturing and retaining larger debris in the
outer layers and the finer particles in the inner contamination control section of the media.
This results in longer service life and better performance over
a wide range of different sized contaminants.
The assembly also includes an indicator button which activates when
the filter-can needs changing. Available in a range of high
performance efficiency ratings from 1 to 25 micron.
nn Group 2 gear pump giving up to 27 litres/min
nn Options of 110V, 240V standard supply
nn Includes standard DOL Starter
nn Fully wired and ready to use
nn Visual ‘pop-up’ contamination indicator
nn Includes 2 metre suction and delivery hose
nn Carrying handle
nn Pall 6 Micron cartridge fitted as standard
Oil Transfer Unit
Part No	 Description
OTU1-110V-25	 Oil transfer unit 110V, 25 litre	 A
OTU1-220V-25	 Oil transfer unit 220V, 25 litre	 A
Accessories
Part No	 Description
DIPTUBE-25	 Dip tube for 25 litre drum	 B
DIPTUBE-205	 Dip tube for 205 litre drum	 C
HC7400SKP4H	 Pall 3 Micron replacement cartridge	 D
HC7400SKN4H	 Pall 6 Micron replacement cartridge,
	 (fitted as standard)	 D
HC7400SKS4H	 Pall 12 Micron replacement cartridge	 D
QRC-P12	 QRC Probe, 3/4 BSP	 E
QRC-C12	 QRC Carrier, 3/4 BSP	 F
B
C
A
D
E
F
Cable Lock
Safety Retaining System for High Pressure Hydraulic Hose Assemblies
Cablelock is an innovative retention system for high-pressure hydraulic hoses, which
offers protection to a person from the dangerous effects of whip lash by the sudden
release of hydraulic energy. Cablelock will restrain the hose assembly if the end
termination is blown off or if there is end connection separation.
This retaining system allows for the compliance to the DIN ISO 4413 section of the
Machinery Directive 2006/42/EG
Advantages of the Cablelock system:
nn Installable without removing the current hydraulic hose assembly
nn Compact structure , can be installed in areas where space is a premium
nn Universal system, can be installed across different hose types
nn Cost effective, safe, easy and quick installation
Specialist Technical Centres
Know-How
FluidPower
114 Hydraulic Valves
Part No	 Port size	 Nominal pressure
HBV2G14	 BSP 1/4	 500
HBV2G38	 BSP 3/8	 500
HBV2G12	 BSP 1/2	 400
HBV2G34	 BSP 3/4	 315
HBV2G1	 BSP 1	 315
HBV2G114	 BSP 1.1/4	 315
HBV2G112	 BSP 1.1/2	 315
HBV2G2	 BSP 2	 315
Part No	 Port size	 Nominal
		pressure
DVG18	 BSP 1/8	 350
DVG14	 BSP 1/4	 350
DVG38	 BSP 3/8	 350
DVG12	 BSP 1/2	 350
DVG34	 BSP 3/4	 350
DVG1	 BSP 1	 350
DVG114	 BSP 1.1/4	 350
DVG112	 BSP 1.1/2	 350
Part No	 Port size	 Nominal
			 pressure
DRVG18	 BSP 1/8	 350
DRVG14	 BSP 1/4	 350
DRVG38	 BSP 3/8	 350
DRVG12	 BSP 1/2	 350
DRVG34	 BSP 3/4	 350
DRVG1	 BSP 1	350
DRVG114	 BSP 1.1/4	 350
DRVG112	 BSP 1.1/2	 350
Part No	 Port size	 Nominal
		pressure
RVG14	 BSP 1/4	 500
RVG38	 BSP 3/8	 500
RVG12	 BSP 1/2	 500
RVG34	 BSP 3/4	 400
RVG1	 BSP 1	 350
RVG114	 BSP 1.1/4	 350
RVG112	 BSP 1.1/2	 350	
RVG2	 BSP 2	 250
Part No	 Port size	 Nominal pressure
HBV3LG14	 BSP 1/4	 500
HBV3LG38	 BSP 3/8	 400
HBV3LG12	 BSP 1/2	 315
HBV3LG34	 BSP 3/4	 315
HBV3LG1	 BSP 1	 250
High Pressure 2-way Ball
Valves
High Pressure 3-way Ball
Valves L-port
Ball Valves
High-pressure ball valves have a true on-off function; they should not be used in a partially
opened position. Three-way ball valves come in different versions. The most commonly
used has an L-bore with one defined pressured inlet port (the centre one).
nn The flow can be switched from one to the other outlet port by turning the handle
over a 90º angle
nn In the 45º position the flow is blocked
Flow Control Valves
nn Flow control valves are designed
to restrict the flow going through the
valve from a fully opened position to a
fully closed position
nn Be aware that highly restricted
flow levels will cause
considerable
heat generation
Speed Control Valves
nn These speed control valves have
a built-in check valve which makes
the adjustable flow restriction only
work in one flow direction
nn In the reversed flow direction
the check valve opens
and offers virtually
unrestricted flow
Check Valves
nn A check valve simply allows flow in
one direction and completely blocks
flow in the reversed direction
nn The so-called cracking pressure is
normally set at 0.5 bar. This is the
pressure at which the valve starts
to open when pressured in the free
flow direction
Thousands of
products available
to order on
ERIKS
WEBSHOP
SHOP.ERIKS.CO.UK
SHOP.ERIKS
.CO.UKSHOP
.ERIKS.CO.UK
Visit us at eriks-techdirect.co.uk
FluidPower
115Bladder Accumulators and LAC Oil Coolers
Bladder Accumulators and
Accessories
Parker UK Series - a high pressure range of bladder accumulators and
accessories
Ideally suited for the UK Industrial market (207 to 420 bar/ up to 54L).
The UK series has been engineered to the highest quality standards to
optimize service life and product safety. Its robust shell and bladder design
offers strength and reliability which ensure the provision of constant
pressure storage in any hydraulic system.
The UK series is fitted with a bonded seal fluid port and 1/4” BSP Gas
Connection as standard.
A hydrostatic pressure test is carried out on all hydraulic accumulator
shells during the manufacturing process. We can also offer additional
pressure testing for shells or for a complete assembly - witnessed by a
specified Inspection Authority and/or customer - as an optional extra.
Benefits
nn Engineered to the highest quality standards
nn Long service life
nn Technical and application expertise
nn Accessories including charging kits.
Typical Applications
nn Hydrostatic bearings
nn Lubricating oil supplies
nn Chucking systems
nn Machine tools.
Also available: A complete range of piston and
diaphragm accumulators.
From 1kW up to a 300 kW cooling capacity. With its simple and
robust design and wide selection of accessories, this range will suit all
industrial applications with a high voltage electric source.
It is quiet in operation and offers a low pressure drop and high cooling
capacity. It has a single-phase or three-phase AC-motor and is suitable
for installation in most applications and environments.
Benefits with the correct working temperature
nn Extended system life
nn Increased output and fewer shutdowns
nn Reduced service and repair costs
nn High efficiency level maintained in continuous operation.
Typical Applications
nn Power units
nn Lubrication systems
nn Marine cranes
nn Presses
nn Wind power
LAC Oil Cooler Series and Accessories
Special versions also available for Marine
and ATEX applications.
Specialist Technical Centres
Know-How
FluidPower
116
Intelligent control valves
for electrical engineers
Need greater control or
better menu handling?
Advanced hydraulic control
for mechanical engineers
Focused on product quality,
speed and accuracy?
VIRTUAL REALITY
B261115-Parker Racor Advert-A5.indd 1 02/12/2015 12:46
• Enhanced motion control
gives repeatable, realistic
simulations for life
cycle testing
• Downloadable move
parameters let you easily
dump new data sets for
quick product line
changeovers or
replacement valve setup
• Fast voice coil technology
operates at frequencies
up to 350 Hz
• Higher valve precision means more
accurate cylinder positioning mid-stroke,
with better product quality and tolerance
• Robust design, tested in
up to one billion cycles in
tough marine diesel
applications, makes it
among the best-in-class
for reliability
• Optimised cycle times
boost productivity, even
with existing machines
and equipment
It’s time to get Parker’s DF Plus Valve on board.
Dynamic performance and intelligent
control, all in one clever valve.
To find out more, please contact
Tim Duffy at ERIKS on 024 7644 6644,
or email Tim.Duffy@eriks.co.uk.
http://www.parker.com/literature/Hydraulic%20
Controls%20Europe/Brochures/HY11-3328UK.pdf
C
M
Y
CM
MY
CY
CMY
K
Parker advert.pdf 1 26/01/2016 10:44
Hydraulic Valves
Visit us at eriks-techdirect.co.uk
FluidPower
117
Directional Control Valves
Series D1VW
Parker’s directional control valve series D1VW in NG06 (CETOP 03 / NFPA D03) provides
high functional limits up to 80 l/min in combination with a very low, energy-saving pressure
drop due to optimized flow passages. The maximum pressure is 350 bar.
Performance Characteristics
Nominal Size 		 NG06 / CETOP 03
Operation Style		 Direct
Maximum Flow Rate 	 80 Litres/Min (depending on spool), 60 (depending on spool)
Connection Type		 Connector as per EN 175301-803, plugs not included.
Actuation	 	Solenoid
Weight			 1.5kg (D1VW with 1 solenoid), 2.1 kg(D1VW with
				 2 solenoids) valves in more detail.
Part No.	 Voltage	 Spool in Neutral	 Spring Arrangement	 Spool Code
D1VW002CNYW 	 110V AC 50Hz 	 0 All Ports Connected 	 Spring Centred 	 2
D1VW002CNJW 	 24V DC 	 0 All Ports Connected 	 Spring Centred 	 2
D1VW001CNYW 	 110V AC 50Hz 	 2 All Ports Blocked 	 Spring Centred 	 1
D1VW001CNJW 	 24V DC 2 	 All Ports Blocked 	 Spring Centred 	 1
D1VW004CNYW 	 110V AC 50Hz 	 6 A and B to T 	 Spring Centred 	 4
D1VW004CNJW 	 24V DC 	 6 A and B to T 	 Spring Centred 	 8
D1VW008CNYW 	 110V AC 50Hz 	 8 A and B blocked, P to T 	 Spring Centred 	 8
D1VW008CNJW 	 24V DC 8 	 A and B blocked, P to T 	 Spring Centred 	 020
D1VW020HNYW 	 110V AC 50Hz 	 20 P to B, A to T 	 Spring Offset in Pos A	 020
D1VW020BNJW 	 24V DC 	 20 P to A, B to T 	 Spring Offset in Pos B 	 030
D1VW020BNYW	 110V AC 50Hz	 2 All Ports Blocked	 Spring Offset End to End	 020
D1VW020BNJW	 24V DC	 2 All Ports Blocked	 Spring Offset End to End	 020
D1VW030BNYW	 110V AC 50Hz	 0 All Ports Connected	 Spring Offset End to End	 030
D1VW030HNYW	 110V AC 50Hz 	 30 P to B, A to T 	 Spring Offset in Pos A 	 030
D1VW030BNJW 	 24V DC 	 30 P to A, B to T 	 Spring Offset in Pos B 	 030
Part No.	 Voltage	 Spool in Neutral	 Spring Arrangement	 Spool Code
D3W002CNYW	 110V AC 50Hz	 0 All Ports Connected	 Spring Centred	 002
D3W002CNJW	 24V DC	 0 All Ports Connected	 Spring Centred	 002
D3W001CNYW	 110V AC 50Hz	 2 All Ports Blocked	 Spring Centred	 001
D3W001CNJW	 24V DC	 2 All Ports Blocked	 Spring Centred	 001
D3W004CNYW	 110V AC 50Hz	 6 A and B to T	 Spring Centred	 004
D3W004CNJW	 24V DC	 6 A and B to T	 Spring Centred	 004
D3W008CNYW	 110V AC 50Hz	 8 A and B blocked, P to T	 Spring Centred	 008
D3W008CNJW	 24V DC	 8 A and B blocked, P to T	 Spring Centred	 008
D3W020HNYW	 110V AC 50Hz	 20 P to B, A to T	 Spring Offset in Pos A	 020
D3W020BNJW	 24V DC	 20 P to A, B to T	 Spring Offset in Pos B	 020
D3W030HNYW	 110V AC 50Hz	 30 P to B, A to T	 Spring Offset in Pos A	 030
D3W030BNJW	 24V DC	 30 P to A, B to T	 Spring Offset in Pos B	 030
Series D3W
Parker’s direct operated directional control valve series D3W in NG10 (CETOP 05/ NFPA
D05) features low energy losses due to optimized flow passages for economical operation.
It offers high functional limits up to 150 l/min and a maximum pressure of 350 bar.
Performance Characteristics
Nominal Size 		 NG10/CETOP 5
Mounting Style 		 Sub-plate mounting
Operation Style		 Direct
Actuation		 Solenoid
Series Type		 Directional control valve
Weight (kg)		 4.8 (1 solenoid), 6.3 (2 solenoids)
Spool Type Spool TypeCode Code
a 0 b
3 Position Spools 2 Position Spools
030
020
008
002
004
001
Spool Type Spool TypeCode Code
a 0 b
3 Position Spools 2 Position Spools
030
020
008
002
004
001
Specialist Technical Centres
Know-How
FluidPower
118 Hydraulic Cylinders
HASSLEDBYHYDRAULIC
CYLINDERFAILURES?
B261115-Parker Racor Advert-A5.indd 1 02/12/2015 12:46
To find out more, please contact
Tim Duffy at ERIKS on 024 7644 6644,
or email Tim.Duffy@eriks.co.uk.
http://ph.parker.com/gb/en/hydraulic-cylinders-and-parts
Managing a production line is hard work when you
need to run machines faster, work plant harder
or put new products down an existing line.
With 90 per cent of failures down to
misalignment, contamination or
mechanical damage, it’s vital to keep
track of what’s going wrong. Occasional
repairs are fine; but if the same problems
keep cropping up, it’s time for a rethink.
ERIKS offers expert advice, backed
by Parker’s industry-leading
application and technological
knowledge. So if you’d like a chat
on how to sort out your cylinder
problems, please get in touch.
C
M
Y
CM
MY
CY
CMY
K
Parker advert 2.pdf 2 26/01/2016 10:44
Visit us at eriks-techdirect.co.uk
FluidPower
119
Hydraulic Cylinders
Developed with an uncompromising approach to durability and performance. Every
component is built from high quality materials for maximum life in harsh conditions
and every feature designed to ensure high load capacity, wear resistance and smooth
performance even in the most demanding application.
Metric Tie Rod Series HMI/HMD Roundline MMA “Mill Type” Series
The HMI and HMD ranges described in this catalogue are
Compact Series cylinders to ISO 6020/2 and DIN 24 554, rated
for use at working pressures up to 210 bar depending on the rod
end and type of service. They have been designed to satisfy the
requirements of a wide range of industries in which cylinders to ISO
or DIN standards are specified.
Technical Features:
nn Working pressure up to 210 bar
nn Bore sizes: 25mm to 200mm
nn Piston rod diameters: 12mm to 140mm
nn Single and double rod designs available
nn Strokes – available in any practical stroke length
nn Cushions – available at either or both ends
nn Five seal types to suit a wide range of fluid specifications
nn Temperature ranges: -20°C to +150°C.
Application Benefits
nn Extended life due to critical component design and
serviceability
nn Smooth operation for precise and dynamic performance
nn Solutions for existing application problems with an ISO /DIN
Product.
The heavy duty series MMA cylinder has been designed for
service in steel mills and in other arduous applications where a
rugged, dependable cylinder is required. In addition to the standard
cylinders, MMA cylinders can be designed and manufactured to suit
individual customer requirements.
Technical Features:
nn Heavy duty construction
nn Styles and dimensions to: CETOP RP73H, ISO 6022, DIN
24 333, AFNOR NF E48-025, VW 39D 921
nn Rated pressure: 250 bar
nn Fatigue-free at the rated pressure
nn Hydraulic mineral oil – other fluids on request
nn Temperature range of standard seals: -20°C to +80°C
nn Construction: head and cap bolted to heavy steel flanges
nn Bore sizes: 50mm to 320mm
nn Piston rod diameters: 32mm to 220mm
nn Cushioning – optional at both ends
nn Air bleeds – optional at both ends
nn Tested in accordance with ISO 10100 : 2001.
Application Benefits
nn Extended life due to critical component design and
serviceability
nn Smooth operation for precise and dynamic performance
nn Customer specific solutions for special applications.
Specialist Technical Centres
Know-How
FluidPower
120
Can you afford unplanned and
expensive downtime?
You will receive:
nn Fixed price up front so you know exactly what you are paying
nn Free collection service of your old pump saving you valuable
time,
effort and money
nn Service exchange items available from stock
nn An “as new” 12 month manufacturers warranty
nn 3-5 day turnaround service
Benefits:
nn Prevention of repeat repairs
nn Reduction of downtime
nn All parts are fully tested and adjusted to Bosch Rexroth
settings
nn Increase in productivity
Whether you need spare parts, onsite or field service support,
product training, a system health check or you simply want to talk
through your service issues, don’t take the risk.
Price List
A10 Pump Type	 Size	 Price
A10VSO 18 	 18	 £721.43
A10VSO 28 	 28	 £764.29
A10VSO 45	 45	 £861.43
The cost effective exchange
programme for your A10
pumps
Bosch Rexroth is the only company that can
repair and replace Rexroth products
back to the original specification.
Brand new from Bosch Rexroth, an environmentally-
friendly A10 pump service exchange programme.
Call 0845 006 6000
Back to New Service
A10 Pump Type	 Size	 Price
A10VSO 71	 71	 £960.00
A10VSO 100 	 100	 £1,151.00
A10VSO 140 	 140	 £1,349.00
We can
n 	Help save you expensive downtime
n 	Help reduce your machinery failure
n 	Offer you bespoke service contracts at no 	
extra cost
n 	Provide a full warranty
Exchange Programme
Visit us at eriks-techdirect.co.uk
FluidPower
121
IT’S A SOLUTION THAT
LASTS A LIFETIME
ERIKS INDUSTRIAL Products, Services  Solutions
MORE THAN THE
	SUM OF THE PARTS
A product is just a product, but a
product supported by services that
are provided by people with know-
how is more than just a product...
we CAN,
we WILL 
we DO
SAVING TIME SAVING COSTS SAFETY CONSCIOUS
www.eriks.co.uk
Here for you for
greater EFFICIENCY,
greater RELIABILITY
and longer SERVICE
LIFE which equals
greater SAVINGS
Specialist Technical Centres
Know-How
FluidPower
122
RESPONSIVE
HYDRAULIC REPAIR
ERIKS offer a highly responsive
repair service to help keep your
’down time’ to a minimum.
We guarantee fast turn around
times, and great quality products
all supported by our application
engineers who have the technical
know-how when you need it most.
ENGINEERING 
SITE SERVICES
FUNCTIONS:
nn Full machine shop / fabrication
nn In house honing
nn Full testing facility
nn Working capacities for:
600bar – 200rpm
0-15 mtrs
0-18 mtr Diameter
nn Heavy duty torque multiplyer for excavator
rebuilds
nn Complete strip down of cylinder
WHY ERIKS:
A ‘Comprehensive’ Strip and Quote Service
which includes:
nn Comprehensive assessment and full diagnosis
nn Locating all spares required for the repair
nn Prompt quotation to reduce down time
CALL: 0845 006 6000
to contact your local workshop
YOUR Complete
FILTRATION solution
ERIKS has brought together a range of filtration
brands not available from any other supplier.
All market leaders in their specific fields, these
manufacturers are now partnered with the
UK’s number one distributor of pneumatic,
hydraulic and filtration products.
At ERIKS we believe that having field based, competent technical
sales engineers separates us from those who simply supply
product in a box
SERVICES
nn On-site fluid sampling
nn Independent filtration
audits
nn Lab services
nn Plant commissioning
PRODUCT RANGE
nn Hydraulic / Air / Process Filtration
nn Dust and fume control
nn Purifier equipment
nn Monitoring equipment
nn Housings and assemblies
nn Transfer units
123
Visit us at eriks-techdirect.co.uk
Specialist Technical Centres
Know-How
FluidPower
124
Industry leading filter performance
(Betax(c)≥2000), even under high
cyclic conditions
u Consistently high filter performance
delivers improved fluid cleanliness
for the full life of the filter
u The smallest footprint for your
operations
u Anti-static construction reduces
charge generation and virtually
eliminates static discharge
u Coreless, synthetic construction
minimizes waste disposal
maximise equipment
reliabilityreduce costs
Pall Corporation, serving the fluid power industry, specialize in the removal and control of contamination
in hydraulic, lubrication and fuel systems for markets such as mobile, mining, power generation, industrial
manufacturing, primary metals, offshore and petrochemicals. As the world’s premier provider of filtration,
separation and purification science enabling technologies, Pall has built a reputation as the applied solutions
experts in filtration, based on technical expertise, proven performance, quality products, and responsive
service. The breadth of our product line and scientific resources makes us uniquely qualified to deliver the
best product technologies for each application we support.
AthalonTM
Hydraulic
and Lube Oil Filters
Oil Purification
Systems
Reliability of systems, the life of system
components and fluids can be extended
by minimising water contamination
u Vacuum dehydration technology for
fluid viscosities up to 700cSt.
u Removes 100% free water, air and
gases and up to 80% dissolved
water, air and gases
u High efficiency particulate and salt
contamination removal
u Compact footprint in a range of flows
u Available for purchase and hire
Diagnostics and
monitoring equipment
u Fluid cleanliness monitoring using
proven mesh blockage technology
- Accurate results even in water
based, cloudy or aerated fluids
- Real time monitoring for immediate
corrective actions
u WS Series fixed and portable
water sensors measure dissolved
water levels in hydraulic, lube and
insulating oils, supporting predicative
maintenance programs of plant and
machinery
© 2016 Pall Corporation. Pall, Coralon, Profile, Nexis, Claris, FSI, Ultipleat,
Athalon and Ultipor are trademarks of Pall Corporation. ® indicates a trademark
registered in the USA. BETTER LIVES. BETTER PLANET and Filtration. Separation.
Solution.SM are service marks of Pall Corporation.
For more information visit www.pall.com/me
For further details, contact your local
ERIKS Service Centre on 0845 006 6000
Filtration. Separation. Solution.SM
Industry leading filter performance
(Betax(c)≥2000), even under high
cyclic conditions
u Consistently high filter performance
delivers improved fluid cleanliness
for the full life of the filter
u The smallest footprint for your
operations
u Anti-static construction reduces
charge generation and virtually
eliminates static discharge
u Coreless, synthetic construction
minimizes waste disposal
maximise equipment
reliabilityreduce costs
Pall Corporation, serving the fluid power industry, specialize in the removal and control of contamination
in hydraulic, lubrication and fuel systems for markets such as mobile, mining, power generation, industrial
manufacturing, primary metals, offshore and petrochemicals. As the world’s premier provider of filtration,
separation and purification science enabling technologies, Pall has built a reputation as the applied solutions
experts in filtration, based on technical expertise, proven performance, quality products, and responsive
service. The breadth of our product line and scientific resources makes us uniquely qualified to deliver the
best product technologies for each application we support.
AthalonTM Hydraulic
and Lube Oil Filters
Oil Purification
Systems
Reliability of systems, the life of system
components and fluids can be extended
by minimising water contamination
u Vacuum dehydration technology for
fluid viscosities up to 700cSt.
u Removes 100% free water, air and
gases and up to 80% dissolved
water, air and gases
u High efficiency particulate and salt
contamination removal
u Compact footprint in a range of flows
u Available for purchase and hire
Diagnostics and
monitoring equipment
u Fluid cleanliness monitoring using
proven mesh blockage technology
- Accurate results even in water
based, cloudy or aerated fluids
- Real time monitoring for immediate
corrective actions
u WS Series fixed and portable
water sensors measure dissolved
water levels in hydraulic, lube and
insulating oils, supporting predicative
maintenance programs of plant and
machinery
© 2016 Pall Corporation. Pall, Coralon, Profile, Nexis, Claris, FSI, Ultipleat,
Athalon and Ultipor are trademarks of Pall Corporation. ® indicates a trademark
registered in the USA. BETTER LIVES. BETTER PLANET and Filtration. Separation.
Solution.SM are service marks of Pall Corporation.
For more information visit www.pall.com/me
For further details, contact your local
ERIKS Service Centre on 0845 006 6000
Filtration. Separation. Solution.SM
Pall Filters for Hydraulic and Lubricating Fluids
Visit us at eriks-techdirect.co.uk
FluidPower
125
Pall AthalonTM
Filters Offer:
nn Betax(c)
≥2000 removal efficiency - unequalled in industry today
nn Stress Resistant media Technology (SRT)
nn Improved fluid cleanliness
nn Consistent performance throughout filter service life
nn Low, clean differential pressure
nn Long service life
nn Environmentally friendly coreless filter pack
Filters for Hydraulic
and Lubricating Fluids
For asset protection without compromise, Pall offers the most
innovative filtration technology available to achieve the optimum
fluid cleanliness levels to make your operations more reliable.
The Ultimate in Filter Performance
Pall’s Athalon™ hydraulic and lube oil filters combine
Betax(c)
≥2000 rated, stress-resistant filter technology and a
full range of housings to provide the greatest overall filter
performance and value available in industry today
Application Which Pall product to ask for?
Pre-filtration Pall FSI filter bags or Meltblown filter
cartridges (Profile®
, Nexis™ and Claris™)
Replacement filter
element upgrades
Coralon™ and Red1000 filter
elements
High performance
fluid cleanliness
control
Coralon (for existing Ultipor filters)
AthalonTM
filter elements and housings
for new installations
Water removal
from oil
HNP portable oil purifiers
Diagnostics and
Monitoring
Pall cleanliness monitors (PCM),
WS series water sensors and Pall
Cleanliness Cabinets (PCC)
Upgrade your existing Pall Ultipor™ filters with Coralon™ filter elements to provide improved
fluid cleanliness, enhanced fluid cleanliness consistency, and lower clean pressure drop
while providing equivalent service life of its Ultipor predecessor.
Coralon filter elements are the same form, fit, and function as Ultipor elements. Replace
alternative filter elements retrofitted into original Pall filter housings to return your hydraulic
and lubrication systems back up to 15x cleaner and more consistent fluid cleanliness.
Diagnostic and Monitoring Equipment
Fluid Condition Monitoring
For accurate, reliable measurement of fluid cleanliness, the PCM500 is the only fluid
cleanliness monitor you’ll need. Using proven mesh blockage technology the fully
portable PCM500 provides accurate 3-part ISO 4406 cleanliness class code results in
under 6 minutes, even in water based, cloudy or aerated fluids.
Our WS Series fixed (WS12) and portable (WS19) water sensors measure dissolved
water levels in hydraulic, lube and insulating oils, supporting predictive maintenance
programs of plant and machinery
For more information visit www.pall.com/me
Did you know?....
An effective filter is an
efficient filter. Pall’s
Athalon filters are
rated to Betax(c)
≥2000
efficiency - the highest
available rating in
industry today.
PCM500 Fluid
Cleanliness Monitor
WS19: Portable hand-held
Water Sensor
WS12 Fixed In-line
Water Sensor
Specialist Technical Centres
Know-How
FluidPower
126 Amazon Filtration
... A comprehensive off the shelf range of UK manufactured
Stainless Steel filter housings
... A variety of connection and couplings available as standard
(screwed, flanged, dairy type fittings etc.)
... Specialist Super Duplex and Hastelloy filter housing
fabrications
... Bespoke and Coded designs available (PD5500/ASME etc)
... An own manufactured range of process filter consumables
FIRST CLASS SERVICE
WORLD CLASS FILTERS
Amazon Filters Ltd makes what it sells.
We control our own quality, cost and lead times.
Our rigorous procedures and approvals ensure that quality is
assured, both ours and yours, when Amazon products are chosen.
Our success is underpinned by quality and also through the
application of our knowledge.
This is Amazon’s key differentiator and is the secret of our
progression into a globally recognised brand that provides
innovative filtration solutions.
Europe’s best kept filtration secret...
Process filtration specialist manufacturer
TEL: +44 (0) 1276 670600
FAX: +44 (0) 1276 670101
EMAIL: sales@amazonfilters.co.uk
WEB: www.amazonfilters.com
Supplied by TEL: 0845 006 6000 VISIT: www.eriks.co.uk
Do you know that Amazon provides ...
Visit us at eriks-techdirect.co.uk
FluidPower
127
From causing fatalities to killing a brand’s reputation, the Cryptosporidium
parasite – found in water – is a very real danger in any food or beverage
production process. Fortunately there is a simple, reliable and cost-effective
filtration solution.
Used as part of a product’s make-up, for rinsing food – such as salads – and simply
for washing-down equipment, water is an intrinsic part of food and beverage production. So
ensuring it is not contaminated by the deadly cryptosporidium parasite is essential.
But how can you stop it entering your
plant, mixing with your product, and ultimately reaching your end consumer
– with potentially fatal results?
Removing the Risks
Using the right filter for your water supply can minimise the risk of the cryptosporidium
parasite and its associated risks.
Amazon Filters offer a choice of two filter cartridges – the SupaSpun II depth filter and
SupaPleat II pleated filter – which
have been proven in use with numerous food and beverage producers.
By installing these products to filter incoming mains water, you can demonstrate ‘due
diligence’ in preventing contamination.
And you can ensure complete peace of mind for your customers and yourself.
Cryptosporidium – the facts
nn Potentially fatal parasite found
worldwide in water systems
nn Causes 50.8% of water-borne
diseases that are attributed
to parasites
nn Causes symptoms including
severe diarrhoea – lasting up to
two weeks even in healthy adults
nn Causes more serious problems
in the young, elderly and immuno
compromised
nn 	Protected by an outer shell that allows
it to survive outside the
body for long periods of time
nn 	Very tolerant of chlorine disinfection
When water can KILL
Amazon filters have the anwser
SupaSpun II
Features  Benefits
nn Absolute removal ratings for consistent and reliable performance
nn Graded density structure for maximum dirt holding capacity
nn Increased void volume giving high flow rates and low initial pressure losses
nn Wide chemical compatibility using polypropylene
nn Range of Absolute ratings from 0.3 to 180μm (Beta Ratio 5000)
nn Thermal bonding process minimises media migration and ensures minimal
extractables
SupaPleat II
Features  Benefits
nn Absolute removal ratings for consistent and reliable performance
nn PP – Wide chemical compatibility using 100% polypropylene to meet
nn XP - Extended life version for more challenging applications
nn GP – Glass microfibre media gives excellent dirt holding capacity
nn Thermal bonding process eliminates adhesives and ensures minimal extractables
nn Cryptosporidium grade (CRY) with typical 104 log reduction value for use in food
and beverage applications
nn Batch traceability
Specialist Technical Centres
Know-How
FluidPower
128 Filtration
Panel and Bag Filters
MANN+HUMMEL VOKES AIR filters are designed to provide maximum value
and performance in HVAC, industrial and clean room applications. Ranging from
panel pre-filters through bags to final compact filters, a wide range of sizes and
configurations are available. The products detailed here are our most popular sizes.
IF2 Pleated Panel Filters
Most commonly used as a pre-filter to M or F grade filters (bag and rigid bag
filters). Suitable for a very broad range of applications, but is commonly employed
in environments such as hospitals, food and beverage production areas and
installations where glass media is prohibited. Available in all cross sectional sizes;
22, 47 and 98mm depth as standard in card or metal case.
Rigid Bag Filters
With 20 or 25mm deep plastic frame, these compact filters are suitable for high
air volumes or where long filter life is required. Available in M6, F7, F8 and F9
grades and in 592x592, 490x592 and 287x592mm sizes.
Bag Filters
With a 20 or 25mm deep plastic or metal frame, these ultrasonically-sealed bag
filters are designed for use in general air conditioning equipment and computer
rooms. Available in M5, M6, F7 and F8 grades and in all cross sectional sizes. Speak
to us about our Low Energy Revo II Bag Filters.
Compatex FP Rigid bag filters, rated to F7
Part No	 Height	 Width	 Depth	 Box Qty
Compatex FP 592X592X300 F7	 592mm (24)	 592mm (24)	 300mm (12)	 1
Compatex FP592X287X300 F7	 592mm (24)	 287mm (12)	 300mm (12)	 2
SoniQ II Bag filters, 8/4 pocket rated to F7
Part No	 Pockets	 Height	 Width	 Depth	 Box Qty
SoniQ II 592X592X635-20H 	 8	 592mm (24)	 592mm (24)	 635mm (25)	 5
SoniQ II 592X592X535-20H 	 8	 592mm (24)	 592mm (24)	 535mm (20)	 5
SoniQ II 592X592X380-20H 	 8	 592mm (24)	 592mm (24)	 380mm (15)	 5
SoniQ II 592X287X635-20H 	 4	 592mm (24)	 287mm (12)	 635mm (25)	 8
SoniQ II 592X287X535-20H 	 4	 592mm (24)	 287mm (12)	 535mm (20)	 10
SoniQ II 592X287X380-20H 	 4	 592mm (24)	 287mm (12)	 380mm (15)	 9
Please note that these items are sold in box quantities only.
IF2 Pleated Synthetic Panel Filter – Rated to Grade 4
Part No	 Height 	 Width 	 Depth 	 Box Qty
IF2-496X395X47-G4	 496mm (20) 	 395mm (16) 	 47mm (2) 	 10
IF2-496X496X47-G4	 496mm (20) 	 496mm (20) 	 47mm (2) 	 10
IF2-496X496X98-G4	 496mm (20) 	 496mm (20) 	 98mm (4) 	 5
IF2-596X287X47-G4	 596mm (24) 	 287mm (12) 	 47mm (2) 	 20
IF2-596X496X47-G4	 596mm (24) 	 496mm (20) 	 47mm (2) 	 10
Part No	 Height 	 Width 	 Depth 	 Box Qty
IF2-596X596X47-G4	 596mm (24) 	 596mm (24) 	 47mm (2) 	 10
IF2-596X596X98-G4	 596mm (24) 	 596mm (24) 	 98mm (4) 	 5
IF2-624X395X47-G4	 624mm (25) 	 395mm (16) 	 47mm (2) 	 10
IF2-624X496X47-G4	 624mm (25) 	 496mm (20) 	 47mm (2) 	 10
IF2-624X496X98-G4	 624mm (25) 	 496mm (20) 	 98mm (4) 	 5
Visit us at eriks-techdirect.co.uk
FluidPower
129
How does a change of filter
help reduce energy bills?
Whether you are using an air filter as part
of your process (in a cooling, warming
or venting system, for example) or to
maintain an environment (as part of your
air conditioning system) you face the same
problem of maintaining an acceptable
balance of filtration efficiency and back
pressure.
The higher the filtration efficiency, the
higher the initial back pressure, and
the sooner the filter becomes clogged
– leading to a further increase in back
pressure. In both cases, reduced air flow
leads to higher energy use, as the fan has
to work harder or run faster to push the air
through the filter.
Developments in filter technology over
the past few years have largely been
aimed at achieving acceptable filtration
levels without increasing back pressure
or shortening filter life through faster
clogging, and without increasing energy
consumption through the need for a more
powerful or faster fan.
One way to do this is through an increased
filter surface area – providing exceptionally
low pressure drop – combined with high
filtration efficiency and a high dust-
holding capacity. This technology is now
commercially available in the shape
of the Vokes-Air Synsafe Revo II filter.
The Synsafe Revo II combines
advances in filtering technology.
Firstly, it utilises not one but four progressive
filter layers. This not only means a greater
dust-holding capacity but also ensures the
filters have a longer life before the build-up
of filtered particles increases and reduces
efficiency to unacceptable levels.
The four layers comprise:
1. Pre-filter with a coarse structure
to remove the largest particles
2. Primary fine filter to remove smaller
particles
3. Secondary fine filter incorporating
Nanofyne Technology™
4. Self-cleaning outer layer which also
provides rigidity to the media
Secondly, the filters in the Synsafe Revo II
are made from nano fibres, using unique
Nanofyne Technology. These fibres have
a diameter of less than 1μm (compared
with 3μm for fibres in conventional filters)
which means they offer a greater fibre
surface area for trapping dust, together
with less density to create back pressure.
The result is higher filtration efficiency
and a longer lower pressure drop, which
means the fan operates at lower speed
and consequently uses less energy. If the
fan is belt driven, then this will provide
the opportunity for a change of belt and
pulley ratio to reduce the fan speed, or an
inverter to provide speed control – both
areas in which ERIKS can provide expert
advice and assistance.
Synsafe Revo II vs. Conventional Filters
Airflow Velocity m/s
1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0
0
50
100
150
200
250
300
350
PressureDrop(pa)
Composite graph showing actual
airflow and pressure drop readings
on 10 air handling units
Pressure Drop (cost) Savings
Filter Tips
Just as cigarettes come with health warning, perhaps
some air filters should come with a ‘wealth warning’.
Because simply by changing your filter to a different type of technology
you can reduce your energy costs whilst still maintaining the level of
filtration and airflow you need.
*The current filtration efficiency grades categorised as G, M and F grades (to EN779:2012) will soon be superseded by products adhering to the new ISO 16890 test
standard. From 2018, all filters will be tested in accordance to the stipulations of ISO 16890 and will carry new product labelling in line with updated industry standards.
** Please call ERIKS to find out more about ISO 16890 and how this change may impact your filtration requirements.
Specialist Technical Centres
Know-How
FluidPower
130 Fluid Level Gauges and Hydraulic Filters
The perfect fluid control
programme from one source
Hydac is a multinational company with numerous production plants in Germany, UK, USA, Switzerland and China.
Sales are achieved, worldwide, through over 30 wholly owned subsidiaries, many who in turn work in partnership
with local distribution outlets.
The partnership of Hydac Technology and ERIKS supply all types of industry with high quality products
in a timely and efficient manner.
Section
Part No	 Micron	 Maximum nominal flow	 Filter
	 Rating	 rate litres/minute	 Material
0015S125W 	 125	 15	 Wire mesh
0025S125W 	 125	 25	 Wire mesh
0050S125W 	 125	 50	 Wire mesh
0100S125W 	 125	 100	 Wire mesh
0180S125W 	 125	 180	 Wire mesh
Return
Part No	 Micron	 Maximum nominal flow	 Filter
	 Rating	 rate litres/minute	 Material
0030R010P 	 10	 30	 Paper
0060R010P 	 10	 60	 Paper
0060R025W 	 25	 60	 Wire mesh
0100RK015MM 	 15	 100	 Mobilemicron
0110R010P 	 10	 110	 Paper
0110R020BN4HC 	 20	 110	 Betamicron
0151RK015MM 	 15	 151	 Mobilemicron
0160R010P 	 10	 160	 Paper
0160R025W 	 25	 160	 Wire mesh
0240R003BN4HC 	 25	 240	 Betamicron
0240R005BN4HC 	 3	 240	 Betamicron
0240R010P 	 10	 240	 Paper
0240RS125W 	 125	 240	 Wire mesh
0300RK010MM 	 10	 300	 Mobilemicron
0330R003BN4HC 	 3	 330	 Betamicron
0330R010BN/AM 	 10	 330	 Betamicron/
			Aquamicron
0330R010P 	 10	 330	 Paper
0330R010V 	 10	 330	 Metal fibre
0950R005BN4HC 	 5	 950	 Betamicron
0950R010BN4HC	10	 950	 Betamicron
Pressure
Part No	 Micron	 Maximum nominal flow	 Filter
	 Rating	 rate litres/minute	 Material
0030D010BN4HC 	 10	 30	 Betamicron
0030D010V 	 10	 30	 Metal fibre
0030D025W 	 25	 30	 Wire mesh
0060D003BH4HC 	 3	 60	 Betamicron
0060D005BN4HC 	 5	 60	 Betamicron
0060D010BN4HC 	 10	 60	 Betamicron
0060D025W 	 25	 60	 Wire mesh
0110D003BH3HC 	 3	 110	 Betamicron
0110D025W 	 25	 110	 Wire mesh
0110D050W 	 50	 110	 Wire mesh
0160D010BN4HC 	 10	 160	 Betamicron
0160D025W/HC 	 25	 160	 Wire mesh
0160D100W 	 100	 160	 Wire mesh
0160DN025W/HC 	 25	 160	 Wire mesh
0240D025W 	 25	 240	 Wire mesh
0330D020BN4HC	20	 330	 Betamicron
0660D020BN4HC 	 20	 660	 Betamicron
0660D020V 	 20	 660	 Metal fibre
0660D025W 	 25	 660	 Wire mesh
Spin on cartridge
Part No	 Micron	 Maximum nominal flow	 Filter
	 Rating	 rate litres/minute	 Material
0090MA010BN 	 10	 90	 Betamicron
0160MA003BN 	 3	 160	 Betamicron
0160MA005BN 	 5	 160	 Betamicron
0160MA010BN 	 10	 160	 Betamicron
0160MA020BN 	 20	 160	 Betamicron
0160MG010P 	 10	 160	 Paper
Fluid Level Gauges
Hydac fluid level gauges FSA are used to
monitor levels of operating fluids.
nn Available with or without thermometer
in display tube
nn 12mm banjo mounting bolts as
standard
Part No	 Description
FSA76-1.1/12 	 3 Gauge
FSA76-1.1/T/12 	 3 Gauge c/w thermometer
FSA127-1.1/12 	 5 Gauge
FSA127-1.1/T/12 	 5 Gauge c/w thermometer
FSA254-1.1/12 	 10 Gauge
FSA254-1.1/T/12 	 10 Gauge c/w thermometer
Visit us at eriks-techdirect.co.uk
FluidPower
131
Focused expertise and
high tech equipment produce
reliable operating fluids.
An operating fluid is as specialised as its application.
We are familiar with almost all aspects – the applications and the appropriate operating fluids.
The lubricating properties of hydraulic and lubricating fluids are key to properly functioning industrial systems.
Fluid condition monitoring and the corresponding fluid conditioning guarantee the functionality, availability, and
service life of industrial systems in stationary and mobile hydraulics and in lubrication technology.
In order to assess and predict the actual performance and characteristics of industrial fluids, a proper
understanding of the interaction of mechanical and chemical factors is required, experience and knowledge of
relevant factors, derived from research and real-world operations.
HYDAC have created a FluidCareCenter which is a centre of excellence for study and development of
optimised hydraulic applications.
In addition to the systematic analysis of various fluids, we perform tests commissioned by customers, tailored
to their specific applications. Our objective is to develop machines and systems optimised for lubrication
applications and to select the optimal type of fluid and ensure its proper conditioning.
HMG 3000, AS 1000
e.g. FTIR spectroscopy
Various chemical analyses
Electrostatic test stand,
Stat-Stick, HMG 3000
ICP-OES Karl Fischer Titration: TAN / TBN,
HYDACLab®
, RULER, MPC
Test rig for characterisation
of air separators
Mobile FluidCareCenter
Microscope, Patch test,
Spectroscopy
Automated Laboratory Particle
Counter (ALPC), Bottle
Sampling Unit, SEM-EDX
Mechanical shearing, thermal,
oxidative and hydrolytic oil
ageing, Brugger test etc.
Operating pressure
Temperature
Flow rate
Lubricant properties
Particle contamination
Contaminant analyses
Select analyses
Gaseous
contamination (air)
Analyses of oil,
additive degradation,
varnish analyses
Contamination
caused by water
Oil and additive
elemental analysis
Behaviour of fluids
and filter media
Synthetic, accelerated
oil ageing
Oil and additive
molecular analysis
Specialist Technical Centres
Know-How
FluidPower
132
Condition Monitoring
Using Condition Monitoring you can determine the health of your machinery
and even better predict when your machinery will require maintenance.
To ensure you have the best technology available to help your maintenance
needs, contact ERIKS for:
nn Dedicated Condition Monitoring Business Unit
nn In-house nationwide network of ISO 18436 certified
nn In-house oil analysis facilities
nn Online condition monitoring
nn Team of technical application engineers
In brief these comprise of:
nn An ERIKS branded oil sampling kit and laboratory analysis
nn ERIKS Application Engineer “Patch Test” report
nn Onsite analysis via particle counter and water sensor
nn Equipment hire fleet - filtration trolleys, purifier and diagnostic equipment
nn We also have access to a range of PALL equipment
132 Oil Cleanliness
*Figures based on ERIKS own research
If you fail to take avoidance
procedures this can result
in catastrophic failure.
You can resolve major contamination issues and reduce unexpected
downtime and systems failure by employing a really simple and
cost effective approach.
ERIKS UK has been offering services and support in the field of “Oil Cleanliness
Management” for over 10 years. We offer customers several levels of support
depending on the requirement, which also includes onsite technical support.
Benefit from:
of component failure
is due to system
contamination80%*
n	 Reduction of component
repairs/replacement
n	 Reduce downtime and increase
your production
n	 Reduction in energy use due
to less pressure drop
n	 Increasing lifetime of your
products reduces TCO
n	 Spares stock reduction
n	 Online reporting/condition
monitoring – central report
location, paperless and secure
Visit us at eriks-techdirect.co.uk
FluidPower
133Filtration Solutions
Nederman Filtration Solutions
FilterCart Original
The Nederman FilterCart Original is a lightweight, highly manoeuvrable mobile filter unit for light welding
and extraction applications, and includes a Nederman Original 3m extraction arm, a 0.75Kw fan and is
capable of extracting a maximum of 1050m3/hr.
Arm dia, mm	 Max airflow, 	 Filtration 	 Filter surface	 Voltage, 	 Power,	 Noise level,	 Part No.
	 m3/hr	 efficiency, %	 area, m2	 V	 Kw	 dB(A)
160	 1050	 99	 35	 110	 0.75	73	 12624745
160	 1050	 99	 35	 230	 0.75	73	 12621445
Product	 Voltage,	 Power, 	 Air flow	 Max vacuum, 	 Filtration 	 Weight, kg	 Noise level, 	Part no.
	 V	 W	 m3/hr	 (with 2.5m	 kPa	 efficiency, 	 dB(A)
				hose)		 %
FE 840	120	1000	150	-22	 99.7	 16	 73	 70840100
FE 840	230	1000	150	-22	 99.7	 16	 73	 70840442
FE 841	120	1000	150	-22	 99.7	 16	 73	 70841100
FE 841	230	1000	150	-22	 99.7	 16	 73	 70841010
Product	 Voltage, V	 Power, W	 Compressed air	 Part no.
			 consumption, l/min
SB750	230	 1000	 500	 70750073
				
Fume Eliminator
The Fume Eliminator is designed to be carried to the working area. Connected to a welding torch or
to an extraction nozzle, the FE unit extracts the fume directly at source. .
nn Manual or automatic start/stop function
nn Portable and easy to carry
nn Low service costs
SB750 Suction Blaster, compact portable vacuum sandblaster
The Suction Blaster 750 has a superior accessibility irrespective of the shape of the surface and
different accessory nozzles keep the blasting process closed and dust free.
nn Manual or automatic start/stop function
nn Portable and easy to carry
nn Low service costs
160E Mobile Dust Collector
The Nederman high vacuum dry vacuum 160E is ideal when you have quality standards for
effective cleaning and dust removal.
nn Easy to handle
nn Powerful single phase motor
nn High filtration efficiency
nn Long filter lifetime (4-6000 hours) with bag filters
nn Light weight
nn Low operating and maintenance costs
Product	 Voltage, 	 Power, 	 Capacity r	 Max vacuum, 	 Noise level, 	 Weight, 	 Part no.
	 V	 W	 freeblowing,	kPa	 dB(A)	 kg
			m3/h
160E	110	1200	160	 -22	 75	 19.5	40055030
160E	230	1200	160	 -22	 75	 19.5	40055020
ERIKS INDUSTRIAL Products, Services  Solutions
LIFE SUPPORT
	 FOR PRODUCTS
„„ Preventative maintenance and root
	 cause failure analysis
„„ Customisation and design
	engineering
„„ Impartial repair, replace or systems
	upgrade
„„ On-site installation and commissioning
„„ Sub-assemblies and kitting solutions
PREVENTION IS
BETTER THAN A CURE...
It also extends life and lowers
costs. Our comprehensive condition
monitoring support services cover all
forms of preventative and predictive
maintenance both on site and
remotely.
EXTENDED
PERFORMANCE
with our
PREVENTATIVE
MAINTENANCE
know-how
More TLC,
less TCO
www.eriks.co.uk
So much more than great
industrial hose supply
Hoses are subject to many factors that can lead
to premature failure, such as manual handling
or incompatible products used, these failures
can lead to severe implications. Such risks are
becoming increasingly high profile and ERIKS Hose
Technology are here to help mitigate risk via a host
of options, based upon many years of experience.
ERIKS assemble
the full range of
industrial hoses,
including PTFE,
composite, metallic,
rubber, silicone and
PVC.
nn Metallic
nn Hygienic
nn Rubber
nn Plastic
nn PTFE
nn Silicone
nn Ducting
nn Together with extensive stocks
of Bellows, Fittings
135
Visit us at eriks-techdirect.co.uk
Specialist Technical Centres
Know-How
FluidPower
136 Commodity Hose  Clips
Commodity Hose
Braided PVC
Can be used to convey many liquids and gases
under pressure, used in factory airlines, pneumatic
equipment  general workshop use.
nn Temp. Range: -15°C to +60°C
nn Working Pressure: 9 to 25 (Water)
nn Size: 05 to 50mm (Coil Length 30M)
nn Add EU Food 10/2011 simulant A, B, C, D1
Green Medium Duty
Outstanding resistance to the effects of
weather, widely used in agriculture,
construction and general industries.
nn Temp. Range: -15°C to +60°C
nn Working Pressure: 3 to 5 bar
nn Size: 25 to 152mm (Coil Length 30M)
PVC Superflex
High flexibility PVC ducting hose, reinforced
with a semi-rigid crush resistant white PVC
helix. Suitable for water, slurry, and powder in
agricultural and industrial applications
nn Temp. Range: -15°C to +55°C
nn Working Pressure: 0.5 Max
nn Size: 25 to 254mm (Coil Length 30M)
Green Tint
A lightweight PVC hose which is tough and
durable with outstanding weather resistance.
Suitable for water, slurry, and powder in
agricultural and industrial applications
nn Temp. Range: -15°C to +60°C
nn Working Pressure: 3 to 6 bar
nn Size: 12 to 102mm (Coil Length 30M)
Blue PVC Oil SD
Applications with exceptionally high flexibility
and resistance to hydrocarbons in industry,
engineering, construction, water supply and
waste water technology.
Hi Vac
Tough and flexible nontoxic transparent
PVC hose, used for suction and delivery of
water, slurries, granules, foodstuffs and dilute
chemicals.
nn Temp. Range: -15°C to +60°C
nn Working Pressure: 2.5 to 12 bar
nn Size: 12 to 152mm (Coil Length 30M)
nn Add EU Food 10/2011 simulant A,B,C,D1
EHT Code	 ID	 OD	 Wall	 Vacuum	 Min. Bend
		 (mm)	 (mm)	 Thickness (mm)	%	 Radius
1048-12	12.0	 19.2	 3.1	 88	 26	
1048-152	152.0	 170.4	 9.2	 88	 456
EHT Code	ID	 OD	 Wall	 OD over	 Vacuum	 Min. Bend
		 (mm)	(mm)	Thickness	 Helix	 %	 Radius
				(mm)	(mm)	Pressure	 	
1047-025	1	 25	 2.5	 30	 0.49	 25	
1047-254	10	 254	7.0	 268	 0.29	 254	
EHT Code	 ID 	 ID	 Wall	 Min Bend	
	 (Inches)	 (mm)	 Thickness (mm)	 Radius	
1041L-012	1/2	 12.0	 2.6	 57	
1041L-102	4	 102.0	 6.3	 459
EHT Code	 ID 	 ID	 Wall	 Min Bend	
	 (Inches)	 (mm)	 Thickness (mm)	 Thickness (mm)	
1042-025	1	 25	4	 88	
1042-101	 4	 102	6.3	 357
EHT Code	 Int. Dia	 ID	 Ext. Dia	 Min. Bend	 Coil
	 (mm)		(Inches)	 (mm)	 (mm)	 Radius
1003-05 	 5.0 	 3/16 	 10.0 	 32.5	 2.25	
1003-50 	 50.0	 2	 61.6	 325.0	 39.42
EHT Code	 ID	 OD	 Wall	 Min Bend	 Vacuum
		 (Inch)	 (mm)	 Thickness	 Radius 	
(%)	
1039-025 	 1 	 25 	 4.2 	 113 	 0.88
1039-254 	 10 	 254 	 13.0 	 1143 	 0.78
nn Temp. Range: -25°C to +60°C
nn Working Pressure: 2 to 5 bar
nn Size: 25 to 101mm (Coil Length 61 / 30.5M)
Tricoflex
A highly flexible easy handling garden
hose, with excellent resistance to
repeated bending, crushing and pulling
EHT Code	 ID	 Wall	 Burst	 Min. Bend	
		 (mm)	 Thickness (mm)	 Pressure Water (bar)	 Radius
1003T-12-25M	12.5	 2.75	 25	 125	
1003T-50-50M	50	 6.5	 20	 500
nn Temp. Range: -15°C to +60°C
nn Working Pressure: 8 to 10 bar
nn Size: 12 to 50mm (Coil Length 25, 50  100M)
Visit us at eriks-techdirect.co.uk
FluidPower
137
Core Product Available Ex Stock from Dudley
EHT Code	 ID 	 ID	 Wall	 Min Bend		
(Inches)	 (mm)	 Thickness (mm)	 Thickness (mm)	
1037-351-0013-0000	1	 25	 4	 88	
1037-351-0508-0000	4	 102	 6.3	 357
Jubilee®
Clips
Bolt Clamps
A stronger alternative to worm drive clamps, and able
to withstand greater pressures, whilst being completely
reusable.
nn Low carbon mild steel finished with a rust resistant
zinc plating or Stainless Steel
nn Size: 23-239
Wyrem
Heavy-duty ducting, suction and delivery, ideal
for general purpose dust and fume extraction.
nn Temp. Range: -20°C to +100°C
nn Working Pressure: 0.35
nn Size: 25 to 304mm (Coil Length 6M)
Silicone
High temperature Silicone ducting.
nn Temp. Range: -80°C to +310°C
nn Working Pressure: 0.1 to 1.5 bar
nn Size: 12 to 203mm (Coil Length 4M)
Neoprene
Ideal in the transportation of hot and cold air
in many air conditioning, refrigeration and
ventilation systems.
nn Temp. Range: -50°C to +150°C
nn Working Pressure: 0.1 to 1.5 bar
nn Size: 12 to 305mm
(Coil Length 2.5 4M)
Abraflex 351
Intro text: Medium duty, Ω rated, abrasive PU
suction  blower hose for abrasive solids such
as powder, chips and granulates. Also suitable
for aggressive gaseous and liquid products with
good resistance to oil and petrol vapors.
EHT Code	 ID (mm) 	 Vacuum (bar)	
1038N1-012		12	 0.68
1038N1-305		305	 0.05
EHT Code	 ID	 Vacuum 	 Vacuum
Unlined: 1038A-	 (mm)	 Single Ply (bar)	 Two Ply (bar
1038A-012	12	 0.52	 0.68
1038A-203	203	 0.07	 0.09
EHT Code	 ID (mm)	 Min. Bend Radius (mm)
1038-025	25	 60	
1038-304	304	 319
Worm Drive
Clips can be supplied in stainless steel or zinc plated
mild steel. A large range of sizes are available as
standard.
Non-standard sizes are also available.
nn Size: 12-160
Specialist Technical Centres
Know-How
FluidPower
138
When to use Metal Hose
There are many different types of hose available on the market.
They include metal, rubber, composite, PTFE and fabric. The decision of which hose type to buy depends on the
application for which the hose is being used. Generally, there are eight factors that should alert you to consider using
metal hose:
Temperature Extremes
If either the temperature of the media
going through the hose or the surrounding
atmospheric temperature is very cold or
hot, metal may be the only material that can
withstand the temperature extremes.
Chemical Compatibility
Metal hose can handle a wider variety of
chemicals than most of the other hose
types. If the hose will be exposed to
aggressive chemicals (either internally
or externally), metal hose should be
considered.
Permeation Concerns
Non-metal hose is susceptible to having
gases permeate through the hose wall
and into the atmosphere. Metal hose, on
the other hand, does not allow permeation.
If containing the gases inside the hose is
important, metal hose may be required.
Potential for
Catastrophic Failure
When a metal hose fails, it usually develops
small holes or cracks. Other hose types
tend to develop larger cracks or come apart
completely. If a sudden failure of the hose
can be catastrophic, a metal hose may help
minimise the effects of a failure by leaking
product at a slower rate.
Abrasion and Over-
bending Concerns
To prevent abrasion and over-bending, a
metal hose can be used as a protective
cover over wires or even other hoses.
Fire Safety
Other hose types will melt when exposed to
fire while metal hose maintains its integrity
up to 1200º F.
Achieving Full Vacuum
Under full vacuum, metal hose maintains its
shape while other hose types may collapse.
Flexibility in Fitting
Configuration
Virtually any type of fitting can be attached
to metal hose while other hose types
require special shanks and collars.
4
3
2
1 5
6
7
8
Applications:
nn Cryogenic
nn Gas
nn Oil
nn Steam
nn Chemical
nn Glue
nn Food
nn Bitumen
nn Water and many more....
Metal Hose
Visit us at eriks-techdirect.co.uk
FluidPower
139
Goodall®
MetalVisor®
A New Generation of Metal Hoses
and Fittings
At ERIKS we understand the importance of selecting the right metal hose for
your application. The new Goodall®
MetalVisor®
is a superior quality metal
hose which not only prevents leaks but reduces costly maintenance downtime
and improves the safety of both your plant and operators.
Extended Lifetime
nn High quality and thick stainless steel strip used for the corrugated tube
nn Extreme high coverage of the stainless steel braid
nn Welding procedures avoiding corrosion at the welds
nn No leaks and no loss of product
nn Fitting assortment designed for the Goodall®
MetalVisor®
hose
nn Special assembly and welding procedures
nn Single pass weld to avoid gaps and burrs between the hose end and the fitting
Mechanical strength
nn High working pressures
nn High braid coverage
Ergonomic
nn More flexibility and ease of use due to the design of the corrugated hose and braid
Welding procedures
Innovative single pass welding procedures
of the fittings on the corrugated hose
decrease the risk of corrosion and leaks
enormously
Goodall®
MetalVisor®
hoses stand up to
the toughest jobs, outlasting competitive
products for a lower lifetime cost and each
welded procedure and operator are subject
to strict certifications, which are renewed on
an annual basis.
All metal hoses have been subject to
extensive tests which include:
nn Surface cracks in weld using dye-
penetrant examination
nn Vacuum testing using helium leak
detection
nn Complete traceability of all parts with
original mill certification
EN ISO 10380: 2012
BS 6501-1: 2004
ASME IX
EN ISO 15614-1: 2004
Specialist Technical Centres
Know-How
FluidPower
140
Camlocks
ERIKS Hose Technology cam  groove couplers are available in aluminium, brass, stainless steel or polypropylene with
either BSP or NPT threads.
The couplers are fitted with standard nitrile rubber gaskets; nonstandard gaskets are available in: Viton, EPR, PTFE etc.
Other versions of cam and groove couplers include the “auto-Lock” with arms that lock into position
Camlocks  Bellows
Part A
Adptor (Female BSP thread)
Part B
B Coupler (Male BSP thread)
Part C
Coupler (Hosetail)
Part P
Dust Plug
Part D
Coupler (Female Thread)
Part E
Part E Adaptor (Hosetail)
Part F
Adaptor (Male BSP Thread)
Part H
Dust Cap
Size (Inch)	 Size (mm)	 Brass	 Stainless Steel	
Aluminium	Polypropylene
1/2”	 12	 1078QA-012	 1078SA-012	 1078A-012	1079A-012
3/4”	 19	 1078QA-019	 1078SA-019	 1078A-019	1079A-019
1”	 25	 1078QA-025	 1078SA-025	 1078A-025	1079A-025
1 1/4”	 32	 1078QA-032	 1078SA-032	 1078A-032	 1079A-032
1 1/2”	 38	 1078QA-038	 1078SA-038	 1078A-038	 1079A-038
2”	 50	 1078QA-050	 1078SA-050	 1078A-050	1079A-050
2 1/2”	 63	 1078QA-063	 1078SA-063	 1078A-063	 1079A-063
3”	 75	 1078QA-075	 1078SA-075	 1078A-075	1079A-075
4”	 101	 1078QA-101	 1078SA-101	 1078A-101	1079A-101
6”	 152	 1078QA-152	 1078SA-152	 1078A-152	1079A-152
Size (Inch)	 Size (mm)	 Brass	 Stainless Steel	
Aluminium	Polypropylene
1/2”	 12	 1078QB-012	 1078SB-012	 1078B-012	1079B-012
3/4”	 19	 1078QB-019	 1078SB-019	 1078B-019	1079B-019
1”	 25	 1078QB-025	 1078SB-025	 1078B-025	1079B-025
1 1/4”	 32	 1078QB-032	 1078SB-032	 1078B-032	 1079B-032
1 1/2”	 38	 1078QB-038	 1078SB-038	 1078B-038	 1079B-038
2”	 50	 1078QB-050	 1078SB-050	 1078B-050	1079B-050
2 1/2”	 63	 1078QB-063	 1078SB-063	 1078B-063	 1079B-063
3”	 75	 1078QB-075	 1078SB-075	 1078B-075	1079B-075
4”	 101	 1078QB-101	 1078SB-101	 1078B-101	1079B-101
6”	 152	 1078QB-152	 1078SB-152	 1078B-152	1079B-152
Size (Inch)	 Size (mm)	 Brass	 Stainless Steel	
Aluminium	Polypropylene
1/2”	 12	 1078QC-012	 1078SC-012	 1078C-012	1079C-012
3/4”	 19	 1078QC-019	 1078SC-019	 1078C-019	1079C-019
1”	 25	 1078QC-025	 1078SC-025	 1078C-025	1079C-025
1 1/4”	 32	 1078QC-032	 1078SC-032	 1078C-032	 1079C-032
1 1/2”	 38	 1078QC-038	 1078SC-038	 1078C-038	 1079C-038
2”	 50	 1078QC-050	 1078SC-050	 1078C-050	1079C-050
2 1/2”	 63	 1078QC-063	 1078SC-063	 1078C-063	 1079C-063
3”	 75	 1078QC-075	 1078SC-075	 1078C-075	1079C-075
4”	 101	 1078QC-101	 1078SC-101	 1078C-101	1079C-101
6”	 152	 1078QC-152	 1078SC-152	 1078C-152	1079C-152
Size (Inch)	 Size (mm)	 Brass	 Stainless Steel	
Aluminium	Polypropylene
1/2”	 12	 1078QP-012	 1078SP-012	 1078P-012	1079P-012
3/4”	 19	 1078QP-019	 1078SP-019	 1078P-019	1079P-019
1”	 25	 1078QP-025	 1078SP-025	 1078P-025	1079P-025
1 1/4”	 32	 1078QP-032	 1078SP-032	 1078P-032	 1079P-032
1 1/2”	 38	 1078QP-038	 1078SP-038	 1078P-038	 1079P-038
2”	 50	 1078QP-050	 1078SP-050	 1078P-050	1079P-050
2 1/2”	 63	 1078QP-063	 1078SP-063	 1078P-063	 1079P-063
3”	 75	 1078QP-075	 1078SP-075	 1078P-075	1079P-075
4”	 101	 1078QP-101	 1078SP-101	 1078P-101	1079P-101
6”	 152	 1078QP-152	 1078SP-152	 1078P-152	1079P-152
Size (Inch)	 Size (mm)	 Brass	 Stainless Steel	
Aluminium	Polypropylene
1/2”	 12	 1078QD-012	 1078SD-012	 1078D-012	1079D-012
3/4”	 19	 1078QD-019	 1078SD-019	 1078D-019	1079D-019
1”	 25	 1078QD-025	 1078SD-025	 1078D-025	1079D-025
1 1/4”	 32	 1078QD-032	 1078SD-032	 1078D-032	 1079D-032
1 1/2”	 38	 1078QD-038	 1078SD-038	 1078D-038	 1079D-038
2”	 50	 1078QD-050	 1078SD-050	 1078D-050	1079D-050
2 1/2”	 63	 1078QD-063	 1078SD-063	 1078D-063	 1079D-063
3”	 75	 1078QD-075	 1078SD-075	 1078D-075	1079D-075
4”	 101	 1078QD-101	 1078SD-101	 1078D-101	1079D-101
6”	 152	 1078QD-152	 1078SD-152	 1078D-152	1079D-152
Size (Inch)	 Size (mm)	 Brass	 Stainless Steel	
Aluminium	Polypropylene
1/2”	 12	 1078QE-012	 1078SE-012	 1078E-012	1079E-012
3/4”	 19	 1078QE-019	 1078SE-019	 1078E-019	1079E-019
1”	 25	 1078QE-025	 1078SE-025	 1078E-025	1079E-025
1 1/4”	 32	 1078QE-032	 1078SE-032	 1078E-032	 1079E-032
1 1/2”	 38	 1078QE-038	 1078SE-038	 1078E-038	 1079E-038
2”	 50	 1078QE-050	 1078SE-050	 1078E-050	1079E-050
2 1/2”	 63	 1078QE-063	 1078SE-063	 1078E-063	 1079E-063
3”	 75	 1078QE-075	 1078SE-075	 1078E-075	1079E-075
4”	 101	 1078QE-101	 1078SE-101	 1078E-101	1079E-101
6”	 152	 1078QE-152	 1078SE-152	 1078E-152	1079E-152
Size (Inch)	 Size (mm)	 Brass	 Stainless Steel	
Aluminium	Polypropylene
1/2”	 12	 1078QF-012	 1078SF-012	 1078F-012	1079F-012
3/4”	 19	 1078QF-019	 1078SF-019	 1078F-019	1079F-019
1”	 25	 1078QF-025	 1078SF-025	 1078F-025	1079F-025
1 1/4”	 32	 1078QF-032	 1078SF-032	 1078F-032	 1079F-032
1 1/2”	 38	 1078QF-038	 1078SF-038	 1078F-038	 1079F-038
2”	 50	 1078QF-050	 1078SF-050	 1078F-050	1079F-050
2 1/2”	 63	 1078QF-063	 1078SF-063	 1078F-063	 1079F-063
3”	 75	 1078QF-075	 1078SF-075	 1078F-075	1079F-075
4”	 101	 1078QF-101	 1078SF-101	 1078F-101	1079F-101
6”	 152	 1078QF-152	 1078SF-152	 1078F-152	1079F-152
Size (Inch)	 Size (mm)	 Brass	 Stainless Steel	
Aluminium	Polypropylene
1/2”	 12	 1078QH-012	 1078SH-012	 1078H-012	1079H-012
3/4”	 19	 1078QH-019	 1078SH-019	 1078H-019	1079H-019
1”	 25	 1078QH-025	 1078SH-025	 1078H-025	1079H-025
1 1/4”	 32	 1078QH-032	 1078SH-032	 1078H-032	 1079H-032
1 1/2”	 38	 1078QH-038	 1078SH-038	 1078H-038	 1079H-038
2”	 50	 1078QH-050	 1078SH-050	 1078H-050	1079H-050
2 1/2”	 63	 1078QH-063	 1078SH-063	 1078H-063	 1079H-063
3”	 75	 1078QH-075	 1078SH-075	 1078H-075	1079H-075
4”	 101	 1078QH-101	 1078SH-101	 1078H-101	1079H-101
6”	 152	 1078QH-152	 1078SH-152	 1078H-152	1079H-152
Visit us at eriks-techdirect.co.uk
FluidPower
141
Non Metallic
Moulded Rubber Bellows are designed to compensate for misalignment, neutralise movement and reduce
noise and vibration in pipelines. They effectively dampen the transmission of sound and vibration from plant
items in building service installations, and depending upon the grade of the rubber can be used for many
applications including:
Metallic
ERIKS Hose Technology (EHT) design and manufacture a comprehensive range of metallic expansion bellows,
metallic expansion joints and bellows assemblies in a wide range of stainless steels and exotic alloy
materials, with sizes from 50mm (2”) to 3000mm (120”) nominal diameter inclusive.
As a full metallic hose manufacturer, EHT are able to offer custom sizes of bellows to suit your
individual requirements.
Bellows
All installations may be subjected to movements, these movements can vary from very slow (thermal expansion or
shrinking movements) to very fast (vibrations). Thermal expansion and vibrations can result in adverse material stresses
in piping, with vibrations also causing unpleasant noise in the work environment. The solution for all these problems is
the RX® bellow, which has a fast turnaround and excellent stocks in the UK.
The faultless functioning of bellows requires careful fitting to take place according to the instructions and ensuring the
pressure and temperature limits concerned are not be exceeded.
Our knowledge and supply capabilities offer you the opportunity to choose the correct bellow to optimally meet your
requirements.
Applications:
nn High flexibility
nn Short lead times
nn Large movement capacity
nn Durability and excellent
chemical resistance
nn Pressure resistant
nn Vacuum tightness
nn 	Temperature resistant
nn 	Ageing resistant
nn 	Torsional rigidity
Max Working Temperature:
nn 600oC
Certification:
nn WRAS, ISO 9001, 3.1 mill
certificate, ISO 10380:2012,
ISO 6129-1 :1981
Options:
nn Different Lengths
nn Higher pressure/temperature
ratings
nn Flanges to suit i.e. BS, JIS, DIN,
ASA
nn External covers/insulation
nn Limit Rods
nn Swivel Flanges
Material:
nn Flanges 316 or 304 Stainless
Steel, or Mild Steel
nn Bellows 316 or 321 Stainless
Steel
Certification:
nn WRAS, ISO 9001, 3.1 mill
certificate, ISO 10380:2012,
ISO 6129-1 :1981
Material Colour Chart
Colour	 Material	Main Applications	 Max Temp. °C
Red	 EPDM	 Hot water, heating  ventilation systems, weak acids  alkalis	 90
Double Red	 EPDM	 High temperature hot water, heating  ventilation systems,
		 weak acids  alkalis	 120
Yellow	 Nitrile	 Oil  Gas transportation, refineries	 80
Green	 Hypalon	 Water, good chemical resistant qualities for acids	 90
Purple	 Viton	 High temp. applications, transportation of products derived from
		 petroleum / chemicals / oils / solvents	 180
White	 Food 	 Transportation of food stuffs, potable water distribution
	Grade
	 Nitrile		 80
Blue	 Butyl HT	 High temperature	 130
EHT Part No.	 Size	 Size	 Elongation 	Max. WP	 Flange Type
			 (mm)	 (inches)		 at 20°C (bar)
2901-050-PN16-130MM	 50	 2”	 + / - 10mm	 16 bar	 PN16 (st/st)
2901-063-PN16-130MM	 63	 2 ½”	 + / - 12.7mm	 16 bar	 PN16 (st/st)
2901-075-PN16-130MM	 75	 3”	 + / - 12.7mm	 16 bar	 PN16 (st/st)
2901-101-PN16-130MM	 101	 4”	 + / - 15mm	 16 bar	 PN16 (st/st)
2901-152-PN16-130MM	 152	 6”	 + / - 15mm	 16 bar	 PN16 (st/st)
2901-203-PN16-130MM	 203	 8”	 + / - 15mm	 16 bar	 PN16 (st/st)
2901-050-ASA150-130MM	 50	 2”	 + / - 10mm	 16 bar	 ASA150 (st/st)
2901-063-ASA150-130MM	 63	 2 ½”	 + / - 12.7mm	 16 bar	 ASA150 (st/st)
2901-075-ASA150-130MM	 75	 3”	 + / - 12.7mm	 16 bar	 ASA150 (st/st)
2901-101-ASA150-130MM	 101	 4”	 + / - 15mm	 16 bar	 ASA150 (st/st)
2901-152-ASA150-130MM	 152	 6”	 + / - 15mm	 16 bar	 ASA150 (st/st)
2901-203-ASA150-130MM	 203	 8”	 + / - 15mm	 16 bar	 ASA150 (st/st)
nn Water
nn Oils
nn Chemicals
nn Food Industry (please see Material Colour Chart)
They are available from 25mm nb to 600mm nb (1”nb to 24”nb)
and generally come complete with zinc plated carbon steel swivel
backing flanges.
They can be drilled to suit any table or special drillings and can be
supplied either tied or untied.
Specialist Technical Centres
Know-How
FluidPower
142
Goodall®
Tanker SD Flexoline
Suction and delivery hose for hydrocarbon
fuels and mineral oils having an aromatic
content of maximum 55% by volume.
nn Temp. Range: -30°C to +82°C
nn Working Pressure: 10 bar
nn Size: 19 to 152mm (Coil Length 30.5, 60M)
nn Ohm Hose: Yes
Goodall®
Titon Black
A light, flexible, multipurpose hose for air and
water up to 95°C. Also very flexible at low
temperatures, ideal for compressed air tools.
nn Temp. Range: -40°C to +95°C continuous
+110°C briefly
nn Working Pressure: 15 - 20 bar
nn Size: 6 to 50mm (Coil Length 50, 100M)
nn Burst: 4:1 (2” 3:1)
nn Ohm Hose: Yes
nn Standards: ISO 1402
Goodall®
Multiserve
A very strong multipurpose hose for compressed
air, oil, (lead free) petrol, diesel, hydraulic fluid,
aqueous solutions.
nn Temp. Range: -40°C to +95°C continuous
nn Working Pressure: 20 bar
nn Size: 6 to 50mm (Coil Length from 25M)
nn Burst: 4:1 (2” 3:1)
nn Ohm Hose: Yes
nn Standards: ISO 1402
Sand Blast Hose
Abrasion resistant sandblast hose for cleaning
and blasting metal, stone and concrete surfaces.
nn Temp. Range: -40°C to +70°C
nn Working Pressure: 12 bar
nn Ohm Hose: Yes
Goodall®
Alligator Water SD
Water suction and discharge hose for industrial
and construction services.
nn Temp. Range: -30°C to +100°C
nn Working Pressure: to 10 bar
nn Size: 25 to 203 mm (Coil Length 61M)
Goodall®
Tanker SD Flexotek
Very flexible and lightweight suction and
delivery hose for use in tank truck and other
general industrial fluid transfer operation.
nn Temp. Range: -30°C to +80°C
nn Working Pressure: 10 bar
nn Size: 51 to 152mm (Coil 40M)
nn Burst: 4:1
nn Ohm T hose: Yes
nn Standards: BD5119/A ISO 1403 EN1761:1999
Rubber Hose Including Assemblies
EHT Code ID (mm)	 Wall Thickness (mm)	 Min. Bend Radius
(mm)
1020MS-06	6	 40
1020MS-25	25	 150
EHT Code	 ID (inch)	 ID (mm)	 OD (mm)	 Min. Bend Radius
(mm)
1023-12-25	½	 12.7	 25	 65
1023-101-122	4	 101.6	 122	 600
EHT Code	ID	 ID	 OD	 Vacuum	 Min. Bend 	
		 (inch) 	 (mm) 	 (mm) 	 (bar G)	 Radius
1014GA-025	 1” 	 25 	 35	 Vac Bar 100% 	 100
1014GA-203	8” 	 203	 221	 Vac Bar 70% 	 1015
EHT Code	 ID	 ID	 Wall Thick	 Min. Bend 	
	 (inch)	 (mm)	 (mm)	 Radius (mm)
11014OIL-019-10BAR 	 ¾	 19	 5	 76
1014OIL-152-10BAR 	 6 	 152	 9	 608
EHT Code	 ID (mm)	 Wall Thickness (mm) 	 Min.
Bend Radius (mm)
1017TB-06	 6	3.5	 72
1017TB-38	 38	5	 456
EHT Code	 ID (mm)	 OD (mm)	
1014FLEX-051-10BAR 	 51	 61
1014FLEX-152-10BAR	152	 166
Compressor Hose
nn General purpose compressed air hose for use
with compressors in the construction industry.
nn Temp Range: -35°C to +95°C continuous +80
°C
nn Working Pressure: 20 bar
nn Size: 19 to 25mm (Coil Length 30M)
nn Standards: BS EN 2398 1997: BS 5118/2
EHT Code	 ID (mm)	 Length (m)
1015-019-15M 	 19	 15
1015-019-20M 	 19	 20
1015-019-30M 	 19	 30
nn Size: 125 to 122 (Coil Length 61M)
nn 	Standards: TS 5928 EN ISO 3861, ISO 1307
Rubber and Goodall®
Steam Hoses
Visit us at eriks-techdirect.co.uk
FluidPower
143
Steam
Goodall®
Inferno ISO 6134
Textile reinforced Steam Hose, for saturated
steam services, used in chemical plants, steel
mills, refineries, shipyards and all industries.
nn Temp. Range: -40
o
C to +232
o
C
nn Working Pressure: 18 bar
nn Size: 12 to 50mm (Coil Length 61)
nn Standards: ISO 6134-2a
Goodall®
Super Inferno
Steel wire reinforced Steam Hose for saturated
steam services, used in chemical plants, steel
mills, refineries, shipyards and all industries.
nn Temp. Range: -40
o
C to +232
o
C
nn Working Pressure: 17 bar
nn Burst Pressure: 20:1
nn Size: 19 to 50mm (Coil Length 30.5)
Steam Hose Fittings
Heavy-duty tapered male BSPT thread
coupling with long hose nipple that complies
with EN ISO 14423.
EHT Code	 ID	 ID	 OD	 Min. Bend		
		 (Inch)	 (mm)	 (mm)	 Radius (mm)	
1018R-12-Inferno	½	 12.7	 25	 130
1018R-50-Inferno	2	 50	 68	 500
Inferno
The GOODALL®
BR8 INFERNO distinguishes
itself from every other steam hose on the market.
Its longer service life ensures fewer failures,
greater up time, but in particular, the ability
to not popcorn despite not being
drained during use. Used for both steam
and hot water
nn Temp. Range: -40o
C to +232o
C
nn Working Pressure: 18 bar
nn Size: 12 to 50mm (Coil Length 60M)
nn Standards: Exceeds EN ISO 6134-2A
EHT Code	 ID	 ID	 Min. Bend	
		 (Inch)	 (mm)	 Radius (mm)
1018R-12-Inferno	½	 12.7	 130
1018R-19-Inferno	¾	 19	 190
1018R-25-Inferno	1	 25.4	 250
1018R-32-Inferno	 1 ¼	 32	 320
1018R-38-Inferno	 1 ½ 	 38	 380
1018R-50-Inferno	2	 50	 500
EHT Code	 Thread	 Hose Tail size
	 (inch)	(inch)
1018STM-12	1/2	 1/2
1018STM-19	3/4	 3/4
1018STM-25	 1	1
1018STM-38	 1 1/2	 1 1/2
1018STM-50	 2	2
Heavy flat sealed BSP female, with long
hose nozzle in compliance with EN ISO
14423.
EHT Code	 Thread	 Hose Tail size
		 (inch)	 (inch)
1018STF-12	1/2	 1/2
1018STF-19	3/4	 3/4
1018STF-25	1	 1
1018STF-38	 1 1/2	 1 1/2
1018STF-50	2	 2
Steam Hose Clamp
Steam hose safety clamp in compliance with EN ISO 14423.
EHT Code	 Clamp Size	 Hose OD
		 (Inch)	 Min - Max (mm)
1018SC-1227	1/2	 24-27
1018SC-1230	1/2	 27-30
1018SC-1937	3/4	 30-33
1018SC-1938	3/4	 33-38
1018SC-2540	1	 36-40
1018SC-2543	1	 38-43.5
1018SC-3851	 1 1/2	 48-52
1018SC-3856	 1 1/2	 52-57
1018SC-5063	2	 63-69
1018SC-5070	2	 50-70
EHT Code	 ID	 ID	 OD	 Min. Bend		
		 (Inch)	 (mm)	 (mm)	 Radius (mm)	
1018R-19-Inferno-S	¾	 19	 32.3	 101.6
1018R-50-Inferno-S	2	 51	 71.4	 355.6
Goodall®
DuraCrimp®
The new clamp system has been
specifically designed to:
nn Prevent leaks
nn Reduce maintenance time
nn Improve ergonomics
nn Increase safety
Call ERIKS to find out more...
Specialist Technical Centres
Know-How
FluidPower
144 Food  Beverage, Chemical  Pharmaceutical
Dairy
Excellent for suction and discharge
applications and for the food transfer
application that demands both flexibility
and ruggedness with a clean white FDA
grade tube. The food grade nitrile tube is
odourless and tasteless for oily transfer applications.
nn Temp. Range: -40°C to +99°C
nn Working Pressure: 10 bar
nn Size: 25 to 102mm (Coil Length 30M)
nn Standards: Meets FDA, USDA  3A sanitary standards
Dairy Lite
This food transfer hose is designed to
provide maximum flexibility along with
an abrasive resistant cover. Excellent
for the transfer of oily product in full
suction and discharge applications.
nn Temp. Range: -40°C to +99°C
nn Working Pressure: 10 bar
nn Size: 25 to 102mm (Coil Length 30M)
nn Standard: Meets FDA, USDA  3A sanitary standards
Goodall Blue Guardian
A flexible and strong hot water and steam hose
suitable for cleaning floors in abattoirs and food
industry with a nonmarking cover.
nn Temp: Hot water up to 95°C
nn Temp: Saturated Steam up to 164°C
nn Working Pressure: 6 Bar
nn Working Safety Factor Hot Water 3:1
nn Working Safety Factor Steam 10:1
nn Size: 10mm – 51mm
Food and Beverage
The food and beverage market requires a high degree of cleanliness and purity. All parts of a hose assembly should
have a very fine level of finish, and assemblies should be designed to avoid bug traps.
All EHT hoses for the Food and Beverage market have been checked and are approved as suitable, including where
necessary; 3.1 material certification, FDA and fill post assembly testing.
EHT Code	 ID	 ID	 Wall	 Min. Bend
	 (Inch)	 (mm)	 Thickness 	 Radius (mm)
HYGB101-010 	 3/8	 10	 5	 75
HYGB101-050 	 2	 50	 13.5	 310
EHT Code
RX1212-3001
EHT Code 	 ID (inch)	 ID (mm)	 Min Bend 	 Working Pressure (Bar)
HYGB701-012	1/2	 25	 XX	 10
HYGB701-102	 4	 102 	 XX	 10
EHT Code 	 ID (inch)	 ID (mm)	 Min Bend 	 Working Pressure (Bar)
HYGB601-025	 1	 25 	 x	 10
HYGB601-102	 4	 102 	 x 	 10
Catering Hoses
Ideal for the gas connections of all gas-fired catering
appliances
EHT Code	 ID (Inch)	 Length (mm)	 Description
EHT-9076	 1/2	 1000	 st/st male / quick
			 release check unit. c/w
			 yellow cover  lanyard
			 kit.
EHT-9077	 3/4	 1000	 st/st male / quick
			 release check unit.
			 Braided c/w yellow
			 cover  lanyard kit.
nn Constructed: 321 Stainless Steel corrugated inner hose and
sleeved with a non-chlorinated easy clean yellow cover for
cleanliness and are corrosion resistance
nn Standards: BS6173 : 2001 and BS669-2 : 1997
nn Connections: Fitted with carbon steel BSP Taper Hexagon Male to
connect to any appliance and a brass quick release rotary coupling
(valve) to connect to a gas supply
Dinga Gun
Heavy Duty Spray/Washdown Gun,
ideal for general wash-down, commonly
used in the food processing and dairy
industries
nn Temp. Range: -10°C to +80°C
nn Connections: 1/2” BSP
nn Max Pressure: 25 bar
Visit us at eriks-techdirect.co.uk
FluidPower
145
Chemical and Pharmaceutical
PTFE
nn PTFE tube has the best chemical resistance (alongside PFA) of all
known polymers. It has a temperature range of -70°C to +265°C
opens up PTFE tubing to many applications most other polymers
can’t withstand.
nn The electrical insulation properties of PTFE tubing are superb making
it an ideal choice for electrical sleeving. Chemical dosing  metering
pumps require long continuous lengths of PTFE tube, very difficult to
produce but possible with EHT.
UHMWPE
Ultra High Molecular Weight Polyethylene
Suction and Delivery hose for a variety of chemicals and solvents.
Highly resistant to abrasion and corrosive chemicals except
oxidizing acids (better than PTFE).
nn Temperature Range: -20°C to +65°C
nn Working Pressure: 10 bar
nn Size: From 19 to 102mm (Coil Length 40M)
nn Standards: FDA
Steri-vac
Platinum cured suction  delivery
nn Temp. Range: -60°C to +170°C
Please note that the burst pressure reduces
by 1% for every 1°C rise over 100°C.
nn Working Pressure: According to
EN ISO 7751 the ratio of burst pressure to
working pressure is:
Water 3:1, all other liquids 4:1
nn Size: From 12 to 101mm (Coil Length 4M)
nn Ohm Hose: Conductive through steel helix
Steri-sil
Platinum cured reinforced silicone hose,
manufactured from a medical grade clear silicone
rubber polymer producing a very high grade,
soft pliable hose making it ideal for critical
pharmaceutical, biomedical, food, and cosmetic
applications.
nn Temp. Range: -60°C to +180°C
nn Working Pressure: 2.3 to 140 psi
nn Size: From 3 to 32mm (Coil Length 10M)
nn Standards: FDA regulation 177.2600, Certified free of
animal-derived ingredients
EHT Code	 ID	 ID Tol.	 Wall	 Wall Tol.	 OD	 Bend Radius	 BP (bar)	
			 (mm)	 +/-(mm)	 (mm)	 +/- (mm)	 (mm)	 (mm) 20°C 	 (mm) 20°C
1219M-03-2	2	 0.1	 0.50	 0.10	 3.00	 13	 61
1219M-15-12	12	 0.30	 1.50	 0.20	 15.0	 122	 31
Other tube sizes available upon request.
Coil sizes; 24, 50, 75, 100m
EHT Code	 ID	 Wall Thickness	 Vacuum 	 Min. Bend
		 (mm)	 (mm) 	 %	 Radius	
1025-19	19	 6.5	 88	 135
1025-102	102	 6.5	 88	 800
EHT Code	 ID	 ID	 Wall	 Vacuum	 Min. Bend
	 (inch)	 (mm)	 Thickness (mm)	 (IN/HG)	 Radius
1008V-012	½”	 12.7	 4.9	 29”	 35
1008V-101	4”	 101.6	 8.0	 26”	 360 EHT Code	 ID (mm)	 OD (mm)	 Minimum Bend Radius (mm)
1008-03	3.0	 10	 30
1008-32	31.75	 40	 160
Specialist Technical Centres
Know-How
FluidPower
146
Industrial Hose  Cable Reels
Reelcare Ltd specialise in the supply of spring driven, manual and motor driven
hose reels in a variety of materials, if you have any requirements for a reel that
isn’t listed please contact your nearest ERIKS branch with your application
requirements.
Value Range
Part No	 Application	 Description
RE-SA02-05-9	 Compressed Air	 Value Air Reel C/W 9mt x 8mm PU tube terminating in a 1/4” BSPT male
RE-SA01-06-15	 Compressed Air	 Value Air Reel C/W 15mt x 9.5mm PU Mesh air hose terminating in a 1/4” BSPT male
Part No	 Application	 Description
AW815-001	 Air  Water	 Recoila GEN3 Air/Water Reel c/w 15m x 8mm Black rubber 20 Bar Air  Water Hose
AW820-001	 Air  Water	 Recoila GEN3 Air/Water Reel c/w 20m x 8mm Black rubber 20 Bar Air  Water hose
AW1015-001	 Air  Water	 Recoila GEN3 Air/Water Ree c/w 15m x 10mm Black rubber 20 Bar Air  Water hose
AW1020-001	 Air  Water	 Recoila GEN3 Air/ Water Reel c/w 20m x 10mm Black rubber 20 Bar Air  Water hose
AW1215-001	 Air  Water	 Recoila GEN3 Air/Water Reel c/w 15m x 12mm Black rubber 20 Bar Air  Water hose
AW1218-001	 Air  Water	 Recoila GEN3 Air/ Water Reel c/w 18m x 12mm Black rubber 20 Bar Air  Water hose
AW1020-001-HV	 Air  Water	 Recoila GEN3 Air/ Water Reel c/w 20m x 10mm Fluorescent Hi - Vis hose
AW1218-001-HV	 Air  Water	 Recoila GEN3 Air/Water Reel c/w 18m x 12mm Fluorescent Hi - Vis hose
HW1215-001	 Hot Water	 Recoila GEN3 Hot Water Hose Reel c/w 15m x 12mm Blue 10 bar 80°C hot water hose
OA615-001	 Oxy/ Acetylene	 Recoila GEN3 Hose Reel c/w Oxy/Acety 15m x 6mm hose
OA815-001	 Oxy/ Acetylene	 Recoila GEN3 Hose Reel c/w Oxy/Acety 15m x 8mm hose
Part No	 Application	 Description
ME-070-1302-320	 Air  Cold water	 ME Steel Hose Reel c/w 20M 10mm ID Black rubber 20 Bar Air  Water Hose
ME-070-1302-415	 Air  Cold water	 ME Steel Hose Reel c/w 15M 12mm ID Black rubber 20 Bar Air  Water Hose
ME-070-1402-425	 Air  Cold water	 ME Steel Hose Reel c/w 25M 12mm ID Black rubber 20 Bar Air  Water Hose
ME-070-1502-520	 Air  Cold water	 ME Steel Hose Reel c/w 20M 19mm ID Black rubber 20 Bar Air  Water Hose
ME-070-1502-615	 Air  Cold water	 ME Steel Hose Reel c/w 15M 25mm ID Black rubber 20 Bar Air  Water Hose
ME-070-1304-318	 Pressure Wash	 ME Steel Hose Reel c/w 18M 10mm ID Pressure Wash hose
ME-070-1408-515	 Fuel - Diesel	 ME Steel Hose Reel c/w 15M 19mm ID 1 Wire Fuel Hose
ME-070-1408-610	 Fuel - Diesel	 ME Steel Hose Reel c/w 10M 25mm ID 1 Wire Fuel Hose
ME-070-2302-415	 Air  Cold water	 ME Stainless Steel Hose Reel c/w 15M 12mm ID Black Rubber 20 Bar Air  Water Hose
ME-070-2402-425	 Air  Cold water	 ME Stainless Steel Hose Reel c/w 25M 12mm ID Black Rubber 20 Bar Air  Water Hose
ME-070-2502-520	 Air  Cold water	 ME Stainless Steel Hose Reel c/w 20M 19mm ID Black Rubber 20 Bar Air  Water Hose
ME-070-2502-615	 Air  Cold water	 ME Stainless Steel Hose Reel c/w 15M 25mm ID Black Rubber 20 Bar Air  Water Hose
ME-070-2305-318	 Pressure Wash	 ME Stainless Steel Hose Reel c/w 18M 10mm ID Pressure Wash hose
ME-070-2408-515	 Fuel - Diesel	 ME Stainless Steel Hose Reel c/w 15M 19mm ID 1 Wire Fuel Hose
ME-070-2408-610	 Fuel - Diesel	 ME Stainless Steel Hose Reel c/w 10M 25mm ID 1 Wire Fuel Hose
Reelcare value hose reels are an excellent
product ideal for the small to medium workshop
and most air tool applications, the value range
includes two hose reels with the following
features
nn Polypropylene Case
nn Pivoting Wall Bracket
nn Hose Layering System on the RE-SA01-06-15
only
nn PU tube on the RE-SA02-05-9  PU Mesh hose
on the RE-SA01-06-15
nn Supplied complete with feed hose
nn Auto Lock
GEN3 Recoila Range
The GEN3 Recoila Range of spring driven reels, is a durable, high quality range of UPVC hose reels
for many applications. Manufactured from high density UV stabilised polypropylene, all products in the
range boast a whole host of features some of which are listed below.
nn Virtually maintenance free
nn Full flow complete brass swivels to allow
maximum product delivery
nn Multi position locking mechanism to allow wall,
floor or ceiling mount
nn 160º pivot brackets
nn Rolled edge drive spring to ensure maximum
spring life
nn Supplied complete high quality hose
nn 5 Year limited warranty – subject to standard T’s
 C’s and not including hose
ME Range
The ME range of spring driven hose reels represents outstanding value for money. EU manufactured,
the range suits hose sizes ranging from 6mm id (1/4”) up to 25mm id (1”) hose sizes dependant on
your application.
nn 	Easy Installation
nn Powder Coated Steel or Stainless Steel
nn 	Enclosed Lubricated High Quality Drive Spring
nn 	Adjustable Guide Arm to allow wall, floor or
ceiling mount applications
nn 	Full Flow Swivel and fluid paths for maximum
product delivery with minimal flow restriction
nn 	Available with or without hose
nn 	Suitable for numerous applications
Hoses and Cable Reels
sealing  polymer
Technology
Quick reference
Our Technology Centre has sealing all
wrapped up. With products, materials,
processes, application know-how and
resources all available 24/7 - ERIKS really
does offer a complete sealing solution
package.
147
Sealing
O-rings	150-153
Clamp Seals	 151
Bonded Washer Seals	 154
Elastomeric Rotary Lip Seals	 155
Shaft Sleeves	 155
Circlips	156
V-Rings	156
Hydraulic Seals	 157-159
Component Mechanical Seals	160-161
Gaskets
Gasket Sheeting	 162-163
Soft Cut Flange Gaskets	 164
EPDM Cut Flange Gaskets	 165
Spiral Wound Gaskets	 166
Ring Type Joints	 167
Graphite Gaskets	 168
Elastograph Gaskets	 168
Gland Packings	 169
Quick Product Reference
162-168 168-169
150-161
Visit us at eriks-techdirect.co.uk
Seals
solutions for
Sealing  Polymer
Find out more
about our
Mechanical
Seals Refurb
Service
Product Range
n	 O-rings
n	 Rotary Shaft Seals
n	 Hydraulic Seals
n	 Unitised Seals
n	 Mechanical Seals
n	 Metal Face Seals
n	 Bespoke Mechanical Seals
n	 Gland Packings
n	 Gasket Sheets
ERIKS Sealing and Polymer is dedicated not
only to innovation in sealing technology, but also
to customer service and satisfaction. Continual
investment in technology and expertise
ensures product quality is maintained and new
compounds and technical solutions continue to
be developed for the benefit of our customers.
148
n	 Soft Cut Gaskets
n	 EPDM Gaskets
n	 Spiral Wound Gaskets
n	 Ring Type Joints
n 	 Elastograph®
Specialist Technical Centres
Know-How
INDUSTRIES SUPPORTED
Our team of specialist application
engineers are on hand to support
customers with technical know-how
across a wide range of industries
including:
„„ Chemical Process
„„ Agriculture and Earth Moving
„„ Oil and Gas
„„ Automotive and Transportation
„„ Heavy Industrial Application
„„ Utilities and Power Generation
„„ Defence and Aerospace
„„ Pharmaceutical
„„ Offshore
„„ Food and Beverage Industry
„„ HVAC
„„ OEM Industry
„„ Many more…
SEALING  POLYMER TECHNOLOGY
DESIGN ASSISTANCE
Our in-depth technical knowledge means
we can specify the optimal seal for your
application – whether it’s a standard
product from our premium manufacturers or
a bespoke solution, our design capabilities
include:
n	 Impartial application and design
support
n	 Industry specialists
n	 3D Computer Aided Design
n	 Finite Element Analysis
n	 Validation testing
ON-LINE TOOLS
Discover our on-line design tools at
http://oring-groove-wizard.eriks.co.uk
n	 Chemical Compatibility Chart
n	 Look-up Standard Sizes
n	 Groove Designer
Visit our Seal Shop to buy many standard
items and take advantage of the additional
services we offer.
https://sealshop.eriks.co.uk/
TAILORED LOGISTICAL
SOLUTIONS
Whether you’re looking for O-rings, rotary
shaft seals, hydraulic or mechanical seals,
our extensive branch network offers
unbeatable service and a range of delivery
solutions including direct supply through to
managed inventory.
KEEPING YOU WORKING
As a market leader we carry phenomenal
stock levels supported by an extensive, high
quality supply chain.
Our generous stocks are available 24 hours
a day allowing you to deal with unexpected
operational issues. Our in-house CNC
facilities are able to machine seals to-order
to help resolve breakdown situations.
Our technical experts are available to help
you in the event of premature failure or
obsolescence.
All of this is backed up by highly
professional and reactive supply chains all
focused upon keeping you working.
149
Visit us at eriks-techdirect.co.uk
150
Specialist Technical Centres
Know-How
Sealing
Polymers
Focus on Pharmaceutical and Food
Sealing solutions for the Pharmaceutical Industry
Material Compliance
The United States Food and Drug Administration (FDA) United Codes of Federal Regulations 21 CFR 177.2600 controls the specification
of rubber articles for use in food, pharmaceutical and similar applications through a list of approved ingredients: Paragraph A–D and
extraction limits in water and n-hexane, paragraphs E and F for aqueous and fatty applications.
United States Pharmacopeia (USP) Class VI testing determines the effects of materials upon living tissue in-vitro (Suffix 87)
and in-vivo (Suffix 88).
EHEDG DIN 11864 Sizes
	Nominal Size	 O-Ring Inner	 O-Ring 	
	 (inches)	 Diameter (mm) 	 Cross Section
	1/2	 12	 3.5
	 3/4	 18	 3.5
	 1 	 24	 3.5
	1.1/2	 37	 3.5
	 2 	 50	 5
	2.1/2	 62	 5
	 3 	 75	 5
	 4 	 100	 5
BS4825 Part 5 RJT Fitting Sizes
	Nominal Size	 O-Ring Inner	 O-Ring 	
	 (inches)	 Diameter (mm) 	 Cross Section
	 1 	 26.7	 6.6
	1.1/2	 39.4	 6.6
	 2 	 52.1	 6.6
	2.1/2	 64.8	 6.6
	 3 	 77.5	 6.6
	 4 	 93.9	 6.6
O-rings for Hygienic Couplings
ASTM
Family
Grade
Hardness
IRHD
Colour Available in:
FDA 21CFR177.2600
United States
Pharmacopeia
Dry food, paras A-D
formulation
compliance
Dry and
aqueous,
paras A-E
Dry,
aqueous
and fatty,
paras A-F
USP 87
in-vitro
USP 88
Class VI
in-vivo
NBR 366470 70 Black O-rings X X X
NBR Various* 70 Various
Hygienic Clamp,
SMS, ISO 2853
X
EPDM 55985 70 Black O-rings X X X X
EPDM Various* 70 Various
Hygienic Clamp,
SMS, ISO 2853
X X X
(please
enquire)
VMQ 714772 70 White O-rings X X X
VMQ 714177 70 Red O-rings X X X
VMQ Various* 70 Various
Hygienic Clamp,
SMS, ISO 2853
X X X
(please
enquire)
FKM (A) 514010 75 White O-rings X X X
FKM (GF) 514683 75 Black O-rings X X X
FKM (GF) 514592 70 White O-rings X X X X X
FKM (A) Various* 70 Various
Hygienic Clamp,
SMS, ISO 2853
X X X
(please
enquire)
FFKM FFKM-75-164 75 Black O-rings X X X
FFKM FFKM-70-246 70 White O-rings X X X X X
FEP / VMQ 900554 75 Clear / red O-rings
FDA 21CFR177.2600 A-F;
FDA 21CFR177.1550
Outer FEP
only
PFA / FKM 900561 75 Clear / black O-rings
FDA 21CFR177.2600 A-D;
FDA 21CFR177.1550
Outer PFA
only
				
Various* = please refer to http://sealshop.eriks.co.uk/
151
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
ASME BPE
	 Size	 Form	 Nom. Size	 C (Ref)	 F (Ref)
	(inch)		 (inch)	 (inch)	
	 1/4	 C	 0.250	 0.180	 0.800
	 3/8	 C	 0.375	 0.305	 0.800
	 1/2	 C	 0.500	 0.370	 0.800
	 3/4	 C	 0.750	 0.620	 0.800
	 1 	 C	 1.000	 0.870	 1.160
	 1 	 B	 1.000	 0.870	 1.718
	 1 1/2	 B	 1.500	 1.370	 1.718
	 2 	 B	 2.000	 1.870	 2.218
	 2 1/2	 B	 2.500	 2.370	 2.781
	 3 	 B	 3.000	 2.870	 3.281
	 4 	 B	 4.000	 3.834	 4.344
	 6 	 B	 6.000	 5.782	 6.176
Hygienic Clamp Seals
Standards:
nn BS 4825
nn ISO 2852
nn DIN 32676
nn ASME BPE
BS 4825
	Size (mm)	 Size (inch)	 C	 E/S
	25.4	 1	 22.8	 50.5
	38.1	 1.1/2	 35.5	 50.5
	50.8	 2	 48.2	 64
	63.5	 2.1/2	 60.5	 77.5
	76.2	 3	 73.2	 91
	101.6	 4	 97.8	 119
	114.3	 4.1/2	 110.5	 130
	139.7	 5.1/2	 135.9	 155
	168.3	 6.5/8	 163.3	 183
	219.1	 8.5/8	 214.1	 233.5
DIN 32676
	Nom. Size (mm)	 C (mm)	 E/S (mm)
	10	 10.2	 34
	15	 16.2	 34
	20	 20.2	 34
	25	 26.2	 50.5
	32	 32.2	 50.5
	40	 38.2	 50.5
	50	 50.2	 64
	65	 66.2	 91
	80	 81.2	 106
	100	 100.2	 119
	125	 125.2	 155
	150	 150.2	 183
	200	 200.2	 233.5
ISO 2852
	Nom. Size (mm)	 C (mm)	 E/S (mm)
	12	 10.2	 34
	12.7	 10.9	 34
	17.2	 15.4	 34
	21.3	 19.5	 34
	25	 22.8	 50.5
	33.7	 31.5	 50.5
	38	 35.8	 50.5
	40	 37.8	 64
	51	 48.78	 64
	63.5	 60.5	 77.5
	70	 67	 91
	76.1	 73.1	 91
	88.9	 85.1	 106
	101.6	 97.8	 119
	114.3	 110.5	 130
	139.7	 135.9	 155
	168.3	 163.3	 183
	219.1	 214.1	 233.5
Form A* Form B
Lipped Seal
Unlipped Seal
* Type A: Flanged seals are typically used and provide location
upon the mating hardware.
- -HCS B 0100 559515A
material
type
A (lipped)
B (non-lipped)
C (Compact)
Nominal size (Pipe Outer Diameter)
A or B – inches rounded down to
2 dp then X100.
I – mm to 1 decimal place
D – mm to 1 decimal place
‘standard’ designator
A – ASME BPE
B - BS4825
I – ISO2852 (Used with ISO 2037 pipes)
D – DIN32676 (Type A only)
clamp seal designator
Design Considerations
Square section O-ring grooves are unsuitable in most applications
due to the risk of bug traps.
Proven hygienic coupling designs are readily available
including: hygienic clamp seals, DIN 11851 D-Seals,
O-Rings for DIN 11864 and BS 4825 part 5 RJT fittings,
SMS and ISO 2853 couplings.
Further design guidelines are published
by the ASME-BPE (American Society of
Mechanical Engineers Bio Processing Equipment guidelines)
and the EHEDG (European Hygienic Engineering and Design
Group) which look beyond the seal material and consider the
seal in its operating environment.
Note that nominal/DIN sizes typically reflect the outer
diameter of the tube onto which the unions are fitted.
Compact Seal
Form C
152
Specialist Technical Centres
Know-How
Sealing
Polymers
Focus on Pharmaceutical and Food and O-rings
DIN 11851
This German standard hygienic fitting is
recognised by the round slotted nut,
D-section joint ring and the coned recess in
the male part.
ISO 2853 International Dairy
Federation (IDF)
This aseptic fitting is designed to accept an
L-section seal ring and give a true crevice free
bore. On assembly, the nut is tightened until
metal to metal contact is made between the
outer rim of the liner and male part. This gives
a pre-set compression on the seal, eliminating
the possibility of over-tightening and prolonging
joint life.
SMS 1149
This Swedish standard hygienic fitting can
be recognised by the round slotted nut and
square section joint ring.
-- DN51HIDF EP 70 559515
Compound reference
hardness
material family designator
hygienic L-ring designator
nominal size
-- DN38HSMS EP 70 559515
Compound reference
hardness
material family designator
hygienic SMS designator
nominal size
DIN Size	 ID	 OD	 H
	 d (mm)	 D (mm)	 (mm)
DN25	 23.6	32.5	 6
DN38	 36.6	46	 6
DN51	 49.6	59.5	 6
DN63.5	 61.3	73.2	 6
DN76.1	 73.9	86.5	 6
DN101.6	 98.6	112.5	 6
DIN Size	 ID	 OD	 H
	 d (mm)	 D (mm)	 (mm)
DN25	 25	 32	5.5
DN32	 32	 40	5.5
DN38	 38	 48	5.5
DN51	 51	 61	5.5
DN63.5	 63.5	 73.5	5.5
DN76	 76	 86	5.5
DN101.6	 101.6	113.5	5.5
-- DN25HDR EP 70 559515
Compound reference
hardness
material family designator
hygienic d-ring designator
nominal size
DIN Size	 ID	 OD	 H
	 d (mm)	 D (mm)	 (mm)
DN10	 12	 20	4.5
DN15	 18	 26	4.5
DN20	 23	 33	4.5
DN25	 30	 40	5
DN32	 36	 46	5
DN40	 42	 52	5
DN50	 54	 64	5
DN65	 71	 81	5
DN80	 85	 95	5
DN90	 94	 104	5
DN100	 104	114	6
DN125	 130	142	7
DN150	 155	167	7
153
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
O-ring
The most common type of static seal is the flexible elastomer O-ring. O-rings provide an affordable
seal that in most cases are simple to install and subject to correct material selection, give acceptable
life between maintenance checks.
Available in a variety of materials to suit every sealing application, fully moulded O-rings are manufactured to
several international sizes standards, including BS 1806, BS 4518, AS 568 and ISO 3601. Alternatively non-
standard custom sizes, up to 2.5m (8ft) diameter can be produced to specific requirements.
Imperial O-rings
Metric O-rings
O-rings are supplied to ISO 3601-1 class b
tolerances unless otherwise specified.
BS
139.3
-
-
214
5.7
NBR
FPM
70
75
36624
51414
compound REFERENCE
36624
compound REFERENCE
51414 Viton®
hardness
70 °IRHD ±5
hardness
75 °IRHD ±5
material family designator
NBR Nitrile
material family designator
FPM Viton®
dash size REFERENCE*
214
Nominal cross section
5.70mm
type
BS 1806, AS 568, ISO 3601-1
Nominal inner diameter
139.30mm
Teflex®
O-ring
Harsh chemicals may replace the use of conventional elastomeric O-ring seals.
This is where ERIKS FEP/PFA Teflex O-rings offer a high performance solution.
A Teflex O-ring comprises an elastomeric energising core, which has a seamless
jacket made from a fluoropolymer. The elastomeric core may be Viton®
or Silicone.
The jacket is made from Teflon®
FEP or PFA.
Advantages:
nn Excellent chemical resistance, comparable with that of PTFE
nn Special dimensions available on request
nn ADI (Animal Derived Ingredient) free
ASTM Designator Grade Colour Hardness Family Designator
NBR 36624 Black 70 NBR
FKM 51414 Black 75 FPM
EPDM 55985 Black 70 EP
VMQ 714177 Red 70 SIL
154
Specialist Technical Centres
Know-How
Sealing
Polymers
Bonded Seals and Rotary Lip Seals
Bonded Washer Seals
Bonded Seals were originally designed to replace copper type washers in high pressure systems.
The bonded seal comprises of a metal washer (square or rectangular in section), to which a trapezoidal elastomeric ring is bonded. The
advantages of this system is that the metal washer resists the bursting forces applied and also limits any deformation of the elastomeric
element. The metal washer also limits the compression of the seal and eliminates any over torque of the joint.
Bonded Seals
nn 	Reliable high and low pressure
sealing
nn 	Wide temperature capability
nn 	Over compression prevented by metal
outer ring
nn 	Wide range of metals and elastomers
nn 	Available in a wide range of imperial
and metric sizes
Self-Centring Bonded Seals
The self-centring type of bonded seal has
the additional benefit of pre-assembling on
to threads. The thin seal membrane offers
little resistance during assembly.
nn 	All key benefits of original design
nn 	Concentrically located
nn 	Positively retained
nn 	Ability to pre-assemble
nn 	Can be automatically installed
Bonded washer part number break down
---400 820 4490 41
Outer Ring
Mild Steel Zinc Plated
Elastomer Material Family
NBR 90 Shore
Size Code 1/8 BSP
Industrial grade Bonded Washer
Common sizes
BSP	 Standard	 Self	 ID (Lip)	 ID (Metal Ring)	 OD (Metal Ring)	 Thickness	 Minimum Burst
		 Centering	 ±0.13	 ±0.14	 +0.13 –0.01		 Pressure bar
1/8	020	 820	10.37	 11.84	 15.88	 2	 1480
1/4	021	 821	13.74	 15.21	 20.57	 2	 1540
3/8	023	 823	17.28	 18.75	 23.80	 2	 1230
1/2	025	 825	21.54	 23.01	 28.58	 2.34	 1120
5/8	026	 826	23.49	 24.97	 31.75	 2.34	 1240
3/4	027	 827	27.05	 28.53	 34.93	 2.34	 1050
7/8	029	 829	38.10	 32.29	 38.10	 2.34	 860
1	 030	 830	33.89	 36.88	 42.80	 3.25	 780
1.1/4	032	 832	 42.93	 45.93	 52.38	 3.25	 690
1.1/2	033	 833	 48.44	 51.39	 58.60	 3.25	 690
1.3/4	034	 834	 54.89	 58.3	 69.85	 3.25	 950
2	 036	 836	73.03	 63.63	 73.03	 3.25	 720
2.1/4	038	 838	 66.68	 69.98	 79.50	 3.25	 670
2.1/2	039	 839	 76.08	 79.38	 90.17	 3.25	 680
Elastomeric material options
Compound
reference
Elastomeric
materials/
shore hardness
4490 NBR 90
9775 FKM 75
Metal outer ring options
Metal reference Metal type
41 Mild steel zinc
plated
74 Stainless steel type
316
* Other metal options as well as
elastomeric options available on request.
155
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
Shaft Sleeves
Shaft Sleeves are typically used to repair
damaged running surfaces, however
they can be used in production to cost-
effectively achieve appropriate surface
hardness and finish.
ERIKS Sealing Technology can provide
shaft sleeves manufactured from chromed
stainless steel and HVOF-applied wear
surfaces. Our manufacturing processes
carefully control the average roughness
(Ra) and material ratio (Tp) of the surface to
maximise life and sealing efficiency.
METRIC
IMPERIAL
A1
AS
B1
BS
12
200
R
R
x x28
300
7
37
A1
A1
N#
N#
material
n = Nitrile v = fkm / fpm
material
n = Nitrile v = fkm / fpm
profile
a1, AS, B1, BS
profile
a1, AS, B1, BS
Width
7mm
Width
0.37
housing diameter
28mm
housing diameter
3.00
rotary seal designator
rotary seal designator
shaft diameter
12mm
shaft diameter
2.00
To download a PDF of Common Elastomeric Rotary
Lip Seal sizes
visit www.eriks.co.uk/techdirect/issue10-16 or scan the QR code.
Elastomeric Rotary Lip Seals
156
Specialist Technical Centres
Know-How
Sealing
Polymers
Circlips and Hydraulic Seals
V-rings
V-rings are an all elastomer axial seal for shafts and bearings. It installs onto the shaft or
counterface. This type of seal has been used widely for many applications and has proved to
be reliable and effective against dust, dirt, water, oil splash and other media.
Circlips
Circlips also known as retaining rings, are typically used to maintain the axial location of bearings and
seals within housings. Available in metric (DIN 471/DIN 472) and imperial sizing circlips are typically
produced in high performance spring steel, although other materials, including stainless steel and
phosphor-bronze are available upon request.
External circlips fit around the outside diameter of a shaft, and internal circlips are installed into a
housing bore recess.
*Metric Size is nominal shaft (External) / housing bore (Internal) diameter multiplied by 10, expressed as 4 digits.
*Imperial size, nominal shaft (External) / housing bore (Internal) diameter rounded down to two decimal places and multiplied by 100.
Part No	 Shaft Diameter (mm)
V0016A-NBR	 15.5 - 17.5
V0020A-NBR	 19 - 21
V0025A-NBR	 24 - 27
V0030A-NBR	 29 - 31
V0035A-NBR	 33 - 36
V0040A-NBR	 38 - 43
V0045A-NBR	 43 - 48
V0050A-NBR	 48 - 53
V0055A-NBR	 53 - 58
V0060A-NBR	 58 - 63
V0065A-NBR	 63 - 68
Part No	 Shaft Diameter (mm)
V0075A-NBR	 73 - 78
V0080A-NBR	 78 - 83
V0085A-NBR	 83 - 88
V0070A-NBR	 86 - 73
V0090A-NBR	 88 - 93
V0095A-NBR	 93 - 98
V0100A-NBR	 98 - 105
V0110A-NBR	 105 - 115
V0140A-NBR	 135 - 145
V0220A-NBR	 210 - 235
Part No	 Shaft Diameter (mm)
D1300-0080SS	8
D1300-0140	14
D1300-0190	19
D1300-0200	20
D1300-0220	22
D1300-0230	23
D1300-0260	26
D1300-0260SS	26
Part No	 Shaft Diameter (mm)
D1300-0280	28
D1300-0320	32
D1300-0340	34
D1300-0400	40
D1400-0070	7
D1400-0080	8
D1400-0100	10
D1400-0120	12
Part No	 Shaft Diameter (mm)
D1400-0150	15
D1400-0160	16
D1400-0170	17
D1400-0200	20
D1400-0250	25
D1400-0250SS	25
D1400-0300	30
D1400-0350	35
V-ring part number breakdown
Circlips part number breakdown
A Type
L Type
S Type
RME Type
–D1300 0520 SS
Special feature if applicable
SS = Stainless Steel
Size
52mm
Style
1300 = Internal 1400 = External
Call Out
D = Metric N = Imperial
V 0050 A - NBR
TYPE / MATERIAL FAMILY DESIGNATOR NBR NITRILE
Nominal shaft size
50mm
V-ring Designator
157
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
Hydraulic Seals
Our Series 21 hydraulic and pneumatics range allows you to specify commonly used dynamic seal profiles by hardware
envelope and function, but does not limit supply to
an individual manufacturer. Taking this approach clearly defines the product specifications, but maximises flexibility,
ensuring continuity of supply for readily available products, keeping your industrial fluid power equipment or mobile
plant operational. If your application requires a specific branded item we offer expertise in the optimal selection and
sourcing of such items. Our in-house design engineers are happy to help you select one of our premium hydraulics
range for applications demanding resistance both to mechanical extremes
and thermo-chemical attack.
Please contact ERIKS Sealing Technology for further assistance.
IMPERIAL
7
37
20
225
30
175
WR
U
–
–
/
/
/
/
/xx 10 WSB
UR
21
21
NBR
NBR
material
material
series
series
seal profile
seal profile
leg length
(if applicable)
DRIVING DIAMETER (Shaft Diameter for Rod,
Cylinder Bore Diameter for Piston)
housing diameter DRIVING DIAMETER
(Shaft Diameter for Rod, Cylinder Bore
Diameter for Piston)
inches rounded down to 2 dp then x100
class of hydraulic seal
class of hydraulic seal
length
length
driving diameter (Gland Diameter for Rod,
Piston Groove Diameter for Piston)
HOUSING DIAMETER (Gland Diameter for Rod,
Piston Groove Diameter for Piston)
inches rounded down to 2 dp then x100
Note: If selected profile requires leg length to be detailed insert / _ as detailed in metric part numbering above
METRIC
Classes
	 WR	 Wiper Ring
	U	U-Cup
	 SA	 Single Acting
	 DA	 Double Acting
	CSR	Composite Rod Working
	CSP	Composite Piston Working
Material
	NBR Nitrile	 B - Bronze PTFE
NFR Nitrile/ fabric	C - Carbon PTFE
PUR Polyurethane 	G - Glass PTFE
		 V - Virgin PTFE
Seal Profiles
	Rod Wipers	 WSA	WSB	WSM	WSF	WSG	WSO	WSW	WSV	WPA	WPB	WPE
	 Rod Seals	UR	UI	 SPB	 SEI	GPB	CSR	 VP
	 (Single Acting)
	Piston Seals	 DOP	DOP	DOP	DPB	DWL	DEO	CSP
	 (Double Acting)		 (Alpha)	 (Compact)
	Other Seals	CP	DI	DE	UE
158
Specialist Technical Centres
Know-How
Sealing
Polymers
Hydraulic Seals
Piston Seals
Features Advantages
DOP n Elastomeric energiser
n Compliant, wear resistant sealing element
n High strength anti-extrusion rings
n Integral bearing features
n Low compression set for extended operating life
n High sealing efficiency
n High pressure operation with large diametral clearances
n Reduced axial length requirements
CSP n Elastomer energiser
n Symmetric design
n Pressure assisted sealing
n Bi-directional operation
DE n Pressure actuated
n Radially asymmetric
n Deflected lip geometry
n High sealing efficiency
n Optimised for piston applications
n Low friction
n Often used for pneumatic/distributor applications
Wear Rings/Bearing Strip
Features Advantages
Fabric
Reinforced
n High compressive strength
n High compressive modulus
n High pressure velocity rating (PV) factor
n Low wear rate
n High side load
n Outstanding alignment
n Low axial length requirement
n Long life
PTFE
Styles
n Low friction
n Self-lubricating
n Low wear
n Energy efficient
n Dry running possible
n Long life
Valve Packing – VP
Features Advantages
VP n Staged design
n Multiple lips
n High pressure capabilities
n Redundancy and minimised fugitive emissions
Heavy Duty Hydraulic Seal Profiles
159
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
Rod Seals
Features Advantages
UR n Pressure actuated
n Radially symmetric
n Deflected lip geometry
n High sealing efficiency
n Can be used in both rod and piston applications
n Low friction
UI n Pressure actuated
n Radially asymmetric
n Deflected lip geometry
n High sealing efficiency
n Optimised for rod applications
n Low friction
SPB n Elastomer contact sealing
element
n Fabric reinforced jacket
n High sealing efficiency
n High pressure extrusion resistance
CSR n Thermoplastic sealing element
n Elastomer energiser
n Surface compliance
n Transmits sealing pressure to assist sealing
DI n Pressure actuated
n Radially asymmetric
n Deflected lip geometry
n High sealing efficiency
n Optimised for rod applications
n Low friction
n Often used for pneumatic/distributor
applications
Wipers
Features Advantages
WSB n Extended scraping lip n Excellent contaminant exclusion
WSM n Extended scraping lip
n Positive mechanical retention
n Excellent contaminant exclusion
n Improved hardware location
WSF n Pressure activated
n Axially located within groove
n Combined scraping and
sealing
n Cantilever sealing lip
n Efficient sealing efficiency
n Low hysteresis
n Low axial length requirement, ideal for
secondary sealing
n Low friction
WPB n Metallic insert location
n Extended scraping lip
n Press-fit
n Excellent contaminant exclusion
160
Specialist Technical Centres
Know-How
Sealing
Polymers
Component Mechanical Seals
Mechanical Seals
ERIKS Sealing Technology offers a vast range of products,
the company holds ISO 9001:2008 quality accreditations
for dynamic sealing solutions and specialist moulded
products.
Taper Spring Seals
An extremely popular and effective design featuring positive drive via the
spring, these seals are available in a wide range of sizes and styles, and
are used in many applications, including pumps, mixers, agitators and
compressors.
All designs feature O-ring sealing on the shaft and positive spring drive.
nn Wide range of metric sizes
nn For shafts from 10mm to 100mm
nn Faces: carbon, ceramic, stainless steel and silicon carbide
Bellow Seals
Non-directional and extremely versatile, these bellow seals are designed with no
loose parts that could be damaged during installation, and feature static sealing
that cannot cause shaft wear or fretting. Suitable for a wide range of applications,
such as pumps, mixers, agitators and compressors, they can also be used where a
previous seal has caused shaft damage.
nn Wide range of metric and imperial sizes
nn For shafts from 8mm to 100mm
nn Faces: carbon, ceramic, stainless steel and silicon carbide
Parallel Spring Seals
Widely used as the standard upgrade from packing to mechanical seals, parallel spring
seals are the mainstay for many industries. Using a rubber diaphragm to
seal against the shaft and provide drive to the face, they are suitable for use in
applications such as water, food and chemical processing. Designs are also available
with a balanced configuration to reduce heat and friction, extending seal life.
nn Wide range of metric and imperial sizes
nn For shafts from 10mm to 75mm
nn Faces: carbon, ceramic, stainless steel and silicon carbide
161
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
Stationary Components
Generally O-ring mounted stationary components, or seats, are available in
various materials to suit application requirements.
nn Some designs feature a pin groove to improve seat retention. It is important to
consider the application conditions and condition of the equipment when selecting
a stationary component
nn The stationaries illustrated are those commonly found in use today
PC0KA 0300 --- -0 C A N
ELASTOMER MATERIAL
STATIONARY MATERIAL
ROTARY MATERIAL
BUILD CODE
SIZE CODE
SEAL TYPE
IDENTIFIER
Identifier Build Code Rotary Material Code Stationary Material Code
Elastomer Material
Code
KA Assembly 0 Standard O Not Req’d 0 Not Req’d O Not Req’d
KR Rotary Only 1 SA0 Stationary A Alumina Ceramic A Alumina Ceramic E EPDM
KS Stationary Only 2 SB0 Stationary C
Double Phenolic Resin
Impregnated Carbon/
Graphite
C Carbon F FEP
3 SC0 Stationary C2 Antimony Carbon C2 Antimony Carbon N Nitrile
4 SD0 Stationary C3
Double Phenolic Resin
Impregnated Carbon/
Graphite FDA Compliant
C3 Carbon FDA P PTFE
5 SDA Stationary C4
Triple Phenolic Resin
Impregnated Carbon/
Graphite
N Ni-Resist V Viton
6 SE0 Stationary S
Reaction Bonded Silicon
Carbide
S
Reaction Bonded
Silicon Carbide
7 SF0 Stationary S2 Sintered Silicon Carbide S2
Sintered Silicon
Carbide
8 SG0 Stationary S3
Sintered Silicon Carbide
Graphite Loaded
T Tungsten Carbide
9 SGA Stationary T Tungsten Carbide X Stainless Steel
R Right Hand spring X Stainless Steel
L Left Hand spring
Mechanical seals part number breakdown
162
Specialist Technical Centres
Know-How
Sealing
Polymers
Gasket Jointing Materials (Super 8)
Maximum
Operating
Temperature
Degrees C
150
+250
(200-
Steam)
+200 +250 +450
-210
+260
-210
+260
-210
+260
-240
+230
Maximum
Pressure
Bar
60 100 85 100 150 55 85 55 230
Material PT20 PT30 PT50 PT60 Egraflex
Clipperlon
2110
Clipperlon
2100
Clipperlon
2115 Flowtite
Air Y Y Y Y Y Y Y Y Y
Steam Y Y Y Y Y
Oxygen Y Y
Oil Y Y Y Y Y
Solvent Y Y Y Y Y Y
Petrochemical
Products Y Y
Potable Water Y Y Y Y Y Y Y
Weak Acid Y Y Y Y Y Y Y Y Y
Strong Acid Y Y
Weak Alkali Y Y Y Y Y Y Y Y
Strong Alkali Y Y Y
Food Stuffs Y Y Y Y Y Y
General Duty Y Y Y Y Y Y Y Y Y
Gasket Selection Chart
Gasket jointing materials can fulfil over 80 original material types with a simple selection of just 8 and are supplied as
complete sheets or cut gaskets.
ERIKS Gasket Jointing Materials
SHT PT20 05
Thickness in mm
See the chart for availability
Material
See the chart for availability
Product
SHT
Part Number Identifier
All sheets are available at 1.5mtr sq as standard
Example
SHTPT2005		 0.5mm thick PT20 sheet
SHTFLOW15		 1.5mm thick Flowtite sheet
Material Code
Thicknesses available in mm
0.5 0.8 1 1.5 2 3 4
PT20 PT20
PT30 PT30
PT50 PT50
PT60 PT60
Egraflex EGRA
Clipperlon2110 C211
Clipperlon2100 C210
Clipperlon2115 C215
Flowtite FLOW
163
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
Fibre Sheet Jointing
General Grade Non-Asbestos
Gasket Materials
PT20 is a composite of mineral and aramid
fibres with NBR binders. Suitable for use in
low pressure applications, in a wide range
of non-aggressive media.
BS7531 Grade Y
For use with water, steam and gases at
temperatures up to 200ºC and for oil,
solvents and inert liquids at temperatures
up to 350ºC.
PT30 is a high quality, sheet jointing
comprising of a mixture of polyaramid and
inorganic fibres, bonded with a NBR binder.
It is a general purpose gasket material,
suitable for hot and cold water, steam, oil,
fuel, gases and other general duties.
PT50 is an aramid based sheet jointing.
Suitable for general purpose low
temperature applications.
BS7531 Grade X
A Premium Grade Non-Asbestos
Gasket Materials
For use with water, steam and gases at
temperatures up to 250ºC and for oil,
solvents and inert liquids at temperatures
up to 440ºC.
PT60 is our premium quality, private brand
sheet jointing, comprising of glass and
aramid fibres, bonded together with a NBR
binder. It is a general purpose, medium
pressure rated gasket material and an
excellent choice for general chemical
applications.
Pink Modified PTFE sheeting. High
performance biaxially orientated sheet
sealing material containing PTFE with silica
filler. Excellent resistance against cold-
creep. Universal quality for (petro) chemical
applications,
acids and gases.
Clipperlon 2115 USP is modified PTFE
sheet specially designed for high purity
applications such as Pharmaceutical,
Semicon, Food and beverage. The material
is free of any pigment and has a natural
white color and meets the requirements for
USP class VI plastics (USP 88) and meets
Food  Diary requirements FDA 21 CFR.
1771550 and EC 1935/10/2011.
Highly recommended for low torque
applications, plastic pipe systems and
flanges, as well as glass and ceramic lined
equipment in a wide variety high purity
applications.
Graphite Laminates
A semi-rigid laminated material
manufactured from high purity exfoliated
graphite reinforced with nickel or stainless
foil or tanged stainless steel. It is suitable
for sealing against steam and most other
media with the exception of strongly
oxidising reagents. General material grades
available from ERIKS Gasket Technology
include:
Egraflex is a Graphite Laminate sheeting
reinforced with a Tanged 316 stainless
steel insert.
A universal material for (petro)chemicals.
Used in high pressure and high temperature
applications. Recommended for applications
involving high sealing stresses and where
high blowout resistance is required. The
inclusion of the steel reinforcing layer gives
rise to a robust sheet. Can be used to seal
a wide range of media, with the exception
of strong oxidising agents, at extremes of
temperature and pressure.
Expanded PTFE Sheet
100% multidirectional expanded PTFE
sheet, minimum of cold-creep, high gas
permeability. Universal chemical resistant,
pH 0-14, excellent on rough or damaged
flange surfaces.
nn WRc
nn TA-Luft
nn Blow-Out-Test VDI 2200
nn FDA
nn USP Plastic Class VI
nn Germanischer Lloyd
nn BAM
nn AREVA
Composite
PTFE Products
Modified PTFE Materials
Composite PT150 and PT160 are a
PTFE-based group of products capable of
sealing chemicals right across the 0–14pH
range, at temperatures from cryogenic
to 260°C and at pressures from 85 bar
down to vacuum. Typified by low creep,
sustained service capability and robustness
and has numerous advantages over many
alternatives including pure and filled PTFE
and envelope gaskets.
Blue Modified PTFE sheeting. High
performance biaxially orientated sheet
sealing material containing PTFE with hollow
glass micro spheres. Excellent resistance
against cold-creep and very gas tight. Seals
with low bolt force. Universal chemical
resistance and can be used for several
flange materials: steel, plastic, glass and
ceramic lined.
PT30
PT20
PT50
PT60
Egraflex
Clipperlon 2110
Clipperlon 2100
Clipperlon 2115
Flowtite
164
Specialist Technical Centres
Know-How
Sealing
Polymers
Soft Cut Flange  EPDM Cut Flange Gaskets
SCG A
Size
(1 ¼” = 125 1000mm = 1000)
Class
eg. 150, 600, PN16, PN40 , TABE or TABF
Flange
FF=Full Face RF =Raised Face
Material
see selection chart
Specification
A, B, C, D or E
Product
SCG
PT20 FF 150 M
Soft Cut Flange Gaskets
As one of the UK’s leading gasket manufacturers ERIKS Gasket Technology
can offer a tailored fast service for Soft Cut Flange Gaskets. Encompassing
materials from PTFE, non-asbestos fibre and high temperature sheeting
through to graphite, ERIKS Super 8 range provides a complete product
portfolio that can be selected to suit your application
Specification Class
A
B
C
D
E
B16.21
B16.47 A
B16.47 B
DIN
TABLE/BS10
150, 300, 600, 900 1500
150, 300, 600  900
150, 300  600
PN6, PN10, PN16,
PN25  PN40
TABA, TABD, TABE, TABF, TABH
TABJ, TABK,
TABR  TABS
Part Number Identifier
Thickness
05, 08, 10, 15, 20  30
1000
Example: 	 Metric = SCGDPT60FFPN25M100015
	Imperial = SCGAPT20RF1500I12530
Unit of Measure
I = Imperial M = Metric
05
In addition Clipperlon offers outstanding
chemical resistance across a wide range of
temperature extremes. This material has a
rather high compressibility characteristics and
low minimum seating stress value, therefore
highly recommended for low torque applica-
tions.
Combined with ERIKS gasket cutting facility
ensures that each gasket is cut to the exact
dimensions of each door to provide the
perfect seal.
Following an FDA audit a large blue-
chip pharmaceutical company contacted
ERIKS to assist with changing all of the
vessel manway door seals, which were all
unique.
It was suggested that Leader’s Clipperlon 2115
would be the best solution. Designed for high
purity applications such as the pharmaceutical
industry, the material is natural white modified
PTFE, free from pigments and meets USP-6
compliance which would more that satisfy the
demands of the FDA audit.
FDA COMPLIANCE WITH CLIPPERLON GASKETS
Material Code
Thicknesses available in mm
0.5 0.8 1 1.5 2 3 4
PT20 PT20
PT30 PT30
PT50 PT50
PT60 PT60
Egraflex EGRA
Clipperlon2110 C211
Clipperlon2100 C210
Clipperlon2115 C215
Flowtite FLOW
165
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
EPDM Cut Flange Gaskets
EPDM rubber has excellent resistance to weathering and ozone; it has good, to very good ageing resistance and
low temperature flexibility, low electrical conductivity and satisfactory resistance to polar chemicals. ERIKS Gasket
Technology can supply EPDM Cut gaskets that have WRAS approval or FDA approval. These are ideal choices for
Food and Pharmaceutical Industries.
SCG A
Size
(1 ¼” = 125 1000mm = 1000)
Class
eg. 150, 600, PN16, PN40 , TABE or TABF
Flange
FF=Full Face RF =Raised Face
Material
see selection chart
Specification
A, B, C, D or E
Product
SCG
E772 FF 150 M
Specification Class
A
B
C
D
E
B16.21
B16.47 A
B16.47 B
DIN
TABLE/BS10
150, 300, 600, 900 1500
150, 300, 600  900
150, 300  600
PN6, PN10, PN16,
PN25  PN40
TABA, TABD, TABE, TABF, TABH
TABJ, TABK,
TABR  TABS
Part Number Identifier
Thickness
15, 20, 30, 50  60
1000
Example: 	 Metric = SCGE772FFPN25M100015
	Imperial = SCGAE773RF1500I12530
Unit of Measure
I = Imperial M = Metric
15
Chemical Composition E-70-772 E-70-773
Physical Form Sheet/Cut Gaskets Sheet/Cut Gaskets
Colour Black White
Storage Stability* 10 Years 10 Years
Compliance/Approvals WRAS FDA 177.2600-rubber articles for repeated use
Specific Gravity 1.13 1.30
Polymer Content 100% 100%
Tensile Strength 10.8 Mpa 4.9Mpa
Elongation at Break 400% 300%
Compression Set 22h/70`C 8% 30%
Parametric Material Code E772 E773
Material Code
Thicknesses available in mm
1.5 2 3 4 5 6
E-70-772
EPDM
E772
E-70-773
EPDM
E773
Other thicknesses available on request
166
Specialist Technical Centres
Know-How
Sealing
Polymers
Spiral Wound Gaskets  Ring Type Joints
Specification Class Rings Windings Filler
A
B
C
D
E
B16.50
B16.47 A
B16.47 B
DIN
TABLE
150, 300, 600, 900 1500
150, 300, 600  900
150, 300  600
PN6, PN10, PN16, PN25  PN40
TABA, TABD, TABE, TABF, TABH TABJ, TABK, TABR, TABS
00 No ring
01 316
03 Carbon Steel
02 316L
GR Graphite
SRI A
Class
eg. 150, 600, PN16, PN40 , TABE or TABF
Filler
GR
Spiral Wound Gaskets
A comprehensive stock of SWG manufactured in accordance with ASME
B16.20 is available for immediate delivery. Spiral wound gaskets are used for
high pressure and temperature applications. ERIKS has a selection
in all conceivable models and in various materials. In addition, special
gaskets can be made quickly in our own production facility.
All SR and SRI gaskets for these standard flanges are 0.175” (4.5mm)
thick, fitted with 0.125” (3.2mm) thick solid metal rings, unless
otherwise stated.
Windings
02,
Specification
A, B, C, D or E
Product
SRI = Inner  Outer Ring
SR = Outer Ring only
01 GR 150 M
Part Number Identifier
Inner Ring
00, 01
Outer Ring
01, 03
02 03
Example: 	
Imperial SRIA0102GR03600I125
Metric SRD0002GR03PN40M1000
Size
(1 ¼” = 125 1000mm = 1000)
Unit of Measure
I = Imperial M = Metric
1000
167
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
Ring Type Joints
Ring joint gaskets are used primarily in the up-stream oil and gas industries
where high pressures are often encountered.
nn Manufactured to API 6A and ASME
standards
nn Standard materials are soft iron
and 316 stainless steel
nn Available in a range of styles
Size
11 to 303
Shape
OVR, OCR, RX or BX (See opposite)
Product
RTJ
RTJ OCR 11
Material
SI=Soft Iron SS=316
SI
Part Number Identifier
Example: 	 RTJOCR11SI
	RTJRX303SS
Style R
Octagonal Section - For use with ASME and API
flanges with flat bottomed groove
Style R
Oval Section - For use with ASME and API flanges
with flat bottomed or oval groove
Style BX
Square Octagonal Section - For use in API BX flanges
Style RX
Asymmetric Octagonal Section - For use in
ASME and API flat bottomed grooves
168
Specialist Technical Centres
Know-How
Sealing
Polymers
Graphite Gaskets
Novaphit®
with XP technology
The first graphite gasket that is easy to remove from the flange
Long-term non-stick properties throughout the application temperature range from
–200°C to +550°C:
nn Time and money are saved in maintenance operations thanks to
fast gasket replacement without any residue
nn Higher plant reliability and less downtime, because the sealing surfaces
do not need to be cleaned mechanically and are not therefore damaged
Higher oxidation resistance:
nn More stable long-term sealing properties
nn Consistently low leakage
High density graphite (115lb) on the
“humps” results in low gas permeability,
super sealability and exceptional recovery.
By contrast, the exceptionally low density
(40lb) compressive inner ring provides an
extremely low “minimum design seating
stress” of just 800psi.
The patented DynaGraph™ bonding
process eliminates volume loss due
to adhesive bake off, resists over-
compression damage, and allows for easy
removal from flanges.
The new Elastagraph®
emission
reduction gasket from Leader Gasket
Technologies enables fugitive emission
control to 50ppm or lower.
Manufactured from a combination of
high- and low-density graphite, the gasket
has unique “humps” and “valleys” in the
Elastagraph®
corrugated steel, creating
a bellows effect to counter the effects
of movement and misalignment. The
corrugation of the whole gasket – including
the metal layer – creates a spring-back
effect.
ERIKS Leads the way with new
emission-reducing gasket
Elastograph®
The Leader Elastagraph®
gasket
for standard EN/ASME and
non-standard flanges is ideal for
process piping, fuel refineries,
and other locations where fugitive
emissions pose an environmental
and health and safety issue.
Operating Limits**  Specifications
Maximum Operating
Temperature
1200F Steam – 850F Oxidizing
PH Range 0-14
Composition High Purity Inhibited Grade flexible graphite infused over a
corrugated metal core
Metal Substrate 316L (standard), 304ss, Monel, Zirconium, Hast B276 etc.
(other metals available upon request)
Values M value = 1.5 Y value = 2000
Most commonly used for standard ANSI/ASME and DIN pipe flange connections. Standard stock
items are 316L metal core for 1/2” through 24”. Other special sizes available upon request.
Frenzalit, Elastograph®
 Gland Packings
169
Visit us at eriks-techdirect.co.uk
Sealing
Polymers
High Temperature
Materials
High temperature gaskets for extreme applications and environments.
Frenzelit NovaMICA®
Thermex
NovaMICAThermex is a brand-new gasket material based on processed phlogopite mica
resistant to continuous temperatures of up to 1000ºC.
Suitable for extreme thermal and mechanical applications, especially exhaust.
nn Extremely high temperature stability
(up to 1000 °C)
nn Low long-term leakage even at high temperatures due to the expanded metal insert
nn Reliable handling
nn Smooth processability by all standard manufacturing processes
Gland Packings
Material Grades
ERIKS Gasket Technology is able to supply a comprehensive range of material
grades to suit your specific needs. In addition, we also stock a wide range of
extraction tools.
GLP 110 065
Size in sq mm
3, 5, 6.5, 8, 9.5, 12.5, 14, 16, 19, 22 or 25
Material
110, 130, 140, 150, 170, 180 or 200
Product
GLP
All coils are generally supplied at 8mtrs in length
Example: 	GLP140125 	GLP200050	
Part Number Identifier
Material Application
110
130
140
150
170
180
200
Cost effective cotton fibre gland packing with graphite and lubricated
Graphite/PTFE with aramid in corners reinforced braided with a silicone rubber core
Twisted fibreglass and impregnated with a composite inc. a high percentage of graphite with lubricant
General use twisted fibreglass gland packing impregnated with PTFE and silicone lubricant
Braided PTFE filament, also impregnated with PTFE dispersion and additional lubricants
Braided and manufactured from expanded graphite yarn with an exceptionally high carbon content
Extremely hard wearing gland packing with aramid fibres, braided and impregnated with PTFE
170
Specialist Technical Centres
Know-How
Sealing
Polymers
CALL: 0845 006 6000
to contact your local workshop
Repair or rewind
Maintain and Monitor
Replace
ENGINEERING 
SITE SERVICES
FUNCTIONS:
n HV motor and generator rewind
n Overhaul of high voltage machines
n Partial discharge analysis
n Removal, re-installation and commissioning
n Site monitoring and testing
n Diamond, concentric hairpin or alternator half bar
coils produced
n Maintenance and repair of HV rotating equipment
n In-house copper rolling mill
n Fully documented repairs
WHY ERIKS:
n Timeous effective solutions
n Facilities to support a broad
range of customers
n Largest electrical service
providers in the UK
HIGH VOLTAGE
MACHINES
FLOW
CONTROL
Quick reference
ERIKS Flow Technology have the know-how
to ensure your plant runs efficiently, keeping
expensive downtime to a minimum.
Whether you need a solution for Pumps, Hose
or Valves ERIKS have the engineering capability,
technical experience and supply chain you can
rely on, year in year out!
171
Valves
Econ®
 Partner Brands	 174
Ball Valves	 175
Gate, Globe and Check Valves	 176
Butterfly Valves	 177
Knife Gate Valves	 177
Pumps
Hygienic Rotary Lobe Pumps	181, 194
End Suction Pumps	 183
Diaphragm Pumps	 184-185
Grundfos Pumps	 186-187
Munsch Chemical Pumps	 188
Gorman-Rupp Pumps	 189
Submersible Pumps	 190-191
Hydra-cell Pumps	 192-193
Hose Pumps	 195
Petrol Driven Pumps	 196
Coolant Pumps	 197
Wobble Pumps	 198
DOC 3 Pumps	 198
Cavity Pumps	 199
Quick Product Reference
174, 169
184-185
192-193
174, 175-177
174
186-187
195
174
180-181 189
190-191 198-199
174
182-183
188
Visit us at eriks-techdirect.co.uk
172
WHAT WE DO:
„„ Ball valves
„„ Gate, globe and check valves
„„ Butterfly valves
„„ Valves for marine service
„„ Bespoke manufactured solutions
„„ Actuators
„„ Full range of services from
actuation, modifications, drilling,
painting and special finishes
„„ Testing for pressure, temperature,
non-destructive examination and
PMI material testing all available
LEADING THE WAY IN
VALVE TECHNOLOGY
ERIKS Flow Control has reputation for
supplying quality products, technical know-how
and excellent customer service and has been
relied upon globally for over 25 years.
Strategically placed
UK warehouses
and 3 technology
centres in Leicester,
Aberdeen and
Glasgow
Specialist Technical Centres
Know-How
VALVE TECHNOLOGY
173
SPECIALISTS IN VALVE ACTUATION PROJECT MANAGEMENT
ERIKS Flow Control works closely with
major engineering contractors both in
the UK and overseas and has developed
frame agreements with highly respected
companies within the industry.
Our dedicated experienced Projects team
have the required high level of technical
expertise, to manage your specialist
applications from concept to completion.
Products can be modified or manufactured
to suit the project or precise specification.
SERVICES
Customer service is at the heart of all
we do and our technical expertise is
relied upon throughout a wide range of
industries. Our total solution service
means we are able to support our
customers with:
„„ Seal changes
„„ Special finishes or painting
„„ Actuation
„„ Modifications
„„ Extensions
From our in-house actuation centre,
our team of technical experts offer an
unparalleled level of service. Using Econ®
or AMG pneumatic actuators from our
vast stock enables both a fast and cost
effective total solution. Other brands or
types are available and fitted to customers
bespoke specifications.
„„ Body material: Stainless Steel,
Aluminium and Steel
„„ Namur Mounting
„„ Rack and Pinion
„„ Spring Return (Single acting)
„„ Fail Open or Close
„„ Double Acting
„„ Fitted and tested in house with full
certification
„„ Scotch Yoke
„„ Tailored logistical solutions
Range of actuator ancillaries including:
„„ Solenoids
„„ Switchboxes
„„ Positioners
„„ Speed controllers common to safety
requirements
„„ 12 / 24 / 48VDC - 110 / 210 / 220 /
240VAC – IP65 / SAFE AREA / IP66
/ EXD / EXIA
„„ Mounting Kits
„„ Filters
„„ Manual valve visual indicators
Supported by ECON®
Electric
Actuators
„„ Direct Mounted
„„ ELA40 – ELA3000 Torque
40-3000Nm
„„ IP67, (IP68  ATEX OPTIONAL)
„„ 24VDC, 110VAC or 230VAC
Visit us at eriks-techdirect.co.uk
Specialist Technical Centres
Know-How
Flow
Technology
174 Econ®
, Partner Brands and Ball Valves
®
Exclusive to ERIKS
The Econosto Group, part of the ERIKS
Group, has been developing quality
products since 1892 and its ECON®
brand products are manufactured to
strictly controlled quality standards
whilst offering a cost-effective range to
complement other market-leading brands
supplied.
Suitable for a wide variety of applications,
the Econ® range includes:
nn Valves
nn Instrumentation
nn Related products
Econ®
 Partner Brands
More and more customers are relying on the Econ® brand for their valves
and instrumentation. Products that qualify for the Econ® quality mark have
been specifically designed to meet the needs of our customers and our
sustainability policy.
In addition, ERIKS Flow Control supply a broad selection of ‘A’ brands from
renowned manufacturers covering all industry sectors, ranging from standard
products to high quality sustainable and environmentally-friendly products.
Partner Brands
ERIKS Flow Control strives to offer the
widest range of valves currently available
and has formed partnership agreements
with some of the industries leading
manufacturers including:
nn Smith
nn Taylor
nn JC
nn SRi
nn Vinco
nn Stockham
nn Valve Enterprise
nn CMO Smith
The Newdell Company became part of
the ERIKS group in 2010 resulting in the
opportunity fo ERIKS Flow Control to offer
their highly regarded Smith Valve brand to
the UK market.
Smith is one of the oldest valve brands
for API 602 forged steel valves in the
industry today. The products consist of
a wide range of gate, globe and check
valves used in the oil and gas, refinery,
petrochemical and many other industries
throughout the world. Smith also offers
many speciality products for services such
as HF acid, sour gas, cryogenic, chlorine
and oxygen.
Smith valves
are renowned
for offering a
useful colour
coding system,
whereby the
colour of the
handwheel
(gate and
globe valves)
indicates the
body/bonnet
material of
the valve and
the nameplate
colour (gate, globe and check) indicates
the trim material.
Taylor
For over 50 years, Taylor Valve has been
a pioneer in the design, development
and manufacture of valves and precision
instrumentation. With over 100 US
and foreign patents their unique
design, precision manufacturing and
uncompromising quality has enabled them
to build a reputation for excellence.
Every Taylor product is designed to meet
the highly demanding requirements of oil
and gas producers,
refiners, chemical plant
operators , power
generators and the
processing industry
in order to more
effectively control their
liquid, steam and gas
operations.
AMG Pesch
AMG Pesch manufactures a range of
rack and pinion actuators, positioners,
monitoring units and valves to strict quality
standards.
The patented rod-guide piston design
of the actuators ensures drives are
maintenance-free, compact and offer high
levels of reliability and long service life.
Since early 2011, when AMG-Pesch
became part of the ERIKS group, ERIKS
Flow Control have been able to offer these
actuators to the UK market.
Inoxpa
Expanding their Valve offering to food-
processing and pharmaceutical industries
ERIKS Flow Control secured UK
distributorship for Inoxpa Valves.
Founded in Banyoles,
Spain, Inoxpa is a
renowned and long-
standing business
group specialised in the
manufacture and trade
of stainless steel Valves
including:
nn Butterfly
nn Seat
nn Diaphragm and Pinch
nn C-Top Control Units
nn Ball and Check
nn Overflow and Vent
Visit us at eriks-techdirect.co.uk
Flow
Technology
175
Material 	 Temperature
	range
Brass 	 –20°/+150°C
ST/ST	–34°/+205°C
Size 	 Temperature
	range
1/4–8 	 –10°/+200°C
	–10°/+200°C
	–10°/+200°C
	–10°/+200°C
Size 	 Temperature
	range
1/4–2	–34°/+205°C
Flanged Floating Ball Valves
General Ball Valves
nn 1  2 piece in Bronze, Brass, Carbon
and Stainless Steels
nn Wafer Pattern
nn Multi-Port, 3  4 way
Trunnion Mounted Ball Valves
nn Soft  Metal Seated
nn Cavity Relief
nn Flanged, Screwed, Hub and Weld Ends
nn Cryogenic to high temperature
nn Metal seats for severe service
nn Tandem Valves
nn Cast iron, Stainless and Carbon steel
(including low temperature options)
from stock
nn Special alloys available
nn 1/2”-16”
nn ANSI 150-2500 and DIN Flanges
nn V Ball Control
nn Firesafe
nn NACE
nn ATEX
nn Low temperature carbon, Stainless
and Duplex Stainless steels from stock
Special alloys available
nn 1/2” - 30”
nn ANSI 150-2500. API 3000-15000
nn Firesafe
nn NACE
3 Piece Ball Valves
nn Stainless and Carbon steel (including
low temperature options) from stock
nn Special alloys available
nn 1/4” - 4”
nn ANSI 150-2500
nn Firesafe
nn NACE
nn Screwed, Weld End and Flanged
Ball Valves
Ball valves take a lead role in the valve industry and have
wide-ranging applications. The high flow capacity
coupled with being very simple to automate make
ball valves ideal for many applications where an
open/close facility is required but not regulating of
flow. They can however, be used for regulation with
characterised seat/ball combinations.
Specialist Technical Centres
Know-How
Flow
Technology
176 Gate, Globe, Check Butterfly and Knife Gate Valves
Size 	 Temperature
	range
2–16 	 –9°/+500°C 	 20
	 –9°/+500°C 	 51
Gate, Globe  Check Valves
When process applications are critical, Gate, Globe or Check Valves are used. Manufactured from a variety of materials
makes them suitable for all types of media and they can be modified to customer’s requirements.
Forged Steel
nn A105, LF2, F304, F316, F11, F22
from stock
nn Special alloys available
nn Various trim options
nn ANSI 150-2500
nn 1/4” - 2”
nn Screwed, flanged and weld-end
nn Bolted and welded bonnet
nn Bellows, sealed and conventional
Cast
nn Cast iron, Bronze, low temperature
Carbon steel and Stainless steel from
stock
nn Special alloys available
nn 2” - 72”
nn ANSI 150-2500 also API 6A
Wellhead valves
nn Flanged, hub and weld ends.
nn Wide range of bonnet, gland designs
and trim options available
gland
nn NACE
Wafer  Lugged Check
nn Al-Bronze, Cast iron, Carbon, low
temperature Carbon and Stainless
steel from stock.
nn Special alloys available
nn Dual plate, swing and
disc type.
nn 1/2” - 84”
nn ANSI 150-
2500 and
DIN to suit a
flanged or hub
connection
Modifications
nn Seat, seal, trim and/or bolt changes
nn Special operators
nn Full actuation
nn Painting and coating
nn Fabrication, assemblies and pipe pups
nn Locking and interlocking
nn Flange facing and drilling
nn Extended spindles and bonnets
nn Cleaning
nn Special packaging options
Testing
nn PMI testing
nn Hydraulic and pneumatic tests
nn High pressure gas testing
nn Low temperature testing
nn Hot oil testing
nn Non-destructive examination. Dye
penetrant, magnetic particle, radiography,
ultrasonic etc.
nn Ferritescope inspection
nn Hardness testing
nn Paint thickness verification
A full range of testing is available from our Leicester
and Aberdeen facilities including:
Visit us at eriks-techdirect.co.uk
Flow
Technology
177
Butterfly Valves
These valves can be used for many applications either as open/close or simple
regulating valves. A useful characteristic of butterfly valves is the availability
of different lining materials, this allows for uses ranging from non-aggressive
media such as water or air through to chemicals and corrosive media.
High Performance Butterfly
Valves
nn Carbon steel and stainless steel from
stock
nn Aluminium-bronze and special alloys
available to order
nn 2”-24”
nn ANSI 150 to 300 (other classes
available)
nn Wafer, Lugged and Flanged
nn Firesafe Certified
nn Double and triple offset disc
nn Soft and metal seated
Resilient Seated Valves
nn Cast iron from stock
nn Carbon Steel, Bronze, Stainless and
special alloys available
nn 2” - 60”
nn PN6 - PN16, ANSI versions
available
nn Bonded and replaceable liners
nn Liners in Nitrile, EPDM, Viton
 PTFE (others available)
Knife Gate Valves
Knife gate valves are widely been used in pulp or paper industry applications
and for handling slurries, they are also used in the offshore sector and are
suitable for a wide range of wet or dry media.
Both Uni and bi-directional designs are available, and are ideal where quarter
turn valves are unsuitable and can also be fitted with actuators or otherwise
modified to suit the customer’s application.
Knife Gate stock range
nn Cast iron and Stainless steel from
stock.
nn Cast carbon steel and special alloys
available
nn 2”-24” (DN50-DN600)
nn PN10 also ANSI 150
nn Wafer Pattern
nn Handwheel, lever and Double-acting
cylinder
nn EPDM, Viton, Nitrile, PTFE or metal
seats
Special valves
nn Sizes up to 40”
nn Special flange drilling
nn Lugged pattern flanged, square flange
nn Double knife, Rubber coated blade
nn Bi-directional, Penstocks
Other valve types
We stock a range of other valves in a wide
variety of materials and sizes. If we do
not have the item you require in stock we
will endeavour to obtain it from one of our
global suppliers.
178
YOUR Complete
pump solutions
ERIKS Pump Services provides a
comprehensive and cost-effective solution
for all your pump requirements, whatever the
application. From abstraction, through the
production process, to the final discharge, we
offer a complete service to take care of every
aspect.
ERIKS Pump services
offers a range of
pumps covering all of
the configurations and
applications you could
need
Complete capabilities:
„„ Design
„„ New supply
„„ Spares
„„ Installation
„„ Maintenance
„„ Repair
„„ Reverse engineering
„„ Pump and system energy audits
Specialist Technical Centres
Know-How
PUMP TECHNOLOGY
179
CHOOSING FROM THE
MARKET LEADERS
A broad range of pump industry
experience enables us to put forward
solutions on the basis of impartiality
and fitness for purpose. We are not
constrained by the limitations or range of
products.
Our focus is clearly aimed at increasing
efficiency, reliability, durability, ease of
maintenance and product support while
reducing operating costs.
PUMP PARTNERS:
„„ Aro
„„ Capari
„„ Energy Pumps
„„ Gardener Denver
„„ GEA Hilge
„„ Gorman Rupp
„„ Graco
„„ Grundfos
„„ Munsch
„„ Seepex
„„ Wanner
„„ Xylem (Lowara, Flygt  Jabsco)
PUMP AUDITS
ERIKS’ pump audits, data logging and
condition monitoring services will reveal
a wide range of information about your
pumps, including:
„„ Their energy efficiency
„„ Their actual performance
„„ The efficiency of the complete
hydraulic system
With these facts and figures to hand,
we can work with you to determine
whether you should continue to support
your existing plant – even through
obsolescence – or carry out replacements.
We will calculate Whole Life Costs and
provide payback analysis, giving you
factual evidence on which you can base
your final decision.
If maintaining existing pumps proves to be
the most cost-effective solution, ERIKS
Pump Services reverse engineering
capabilities mean we can help you to
keep your pumps running even after
parts obsolescence, and can also modify
and up-rate components, for improved
performance and reliability.
WE ARE FOCUSED ON:
„„ Delivering pump repair and
refurbishment to a high standard
„„ Reliability improvements as
collaborative projects
„„ Obsolescence risk auditing
„„ Site services
„„ Repair and maintenance contracts
„„ Asset management contracts
„„ Supply, installation and commissioning
„„ Reverse engineering
„„ Energy efficiency testing
and system diagnostics
„„ Training schemes
We are able to conduct pump
performance and system testing in our
workshops and on site.
Our ATEX accreditation qualifies us to
carry out work on rotating equipment
operating in all hazardous and explosive
environments and we have experience of
operating on COMAH tier 1 sites.
Visit us at eriks-techdirect.co.uk
Specialist Technical Centres
Know-How
Flow
Technology
180 Jabsco Hygienic Rotary Lobe Pumps
Visit us at eriks-techdirect.co.uk
Flow
Technology
181
Jabsco Lobe Pumps:
HP  UL Series
With a proven 50 year heritage in Lobe Pump manufacture, Jabsco branded
lobe pumps are taking the next step in flexibility and value. The Hy~Line+
(HP Series) and Ultra~Line (UL Series) range of lobe pumps replace the
Hy~Line, Ultima and 24 Series lobe pump offering the combined strengths and
experience on one key platform.
Combined strengths and experience on one key platform
Jabsco lobe pumps offer high flow, high pressure capabilities from a positive
displacement non contacting rotary lobe pump package.
With applications in industry, food, beverage and bio-pharmaceutical processing sectors,
Jabsco lobe pumps can be found decanting, transferring, filling, spraying, dosing a wide
range of fluids in many varied environments (including ATEX designated zones).
Product Range
The Jabsco HP/UL range of rotary lobe pumps offers low maintenance solutions to
pumping needs in multiple markets including essential industrial, demanding food and
beverage and critical bio-pharma. Up to 1809 litres per minute and up to 15 bar from a
single robust and effective design principle covered by 5 frame sizes.
Resilient construction materials ensure long pump life even in the toughest of
environments. Clever design allows multiple pump variant configuration from one pump
size providing the flexibility to meet ever demanding end user lead times and business
needs.
Jabsco Lobe Pump Range overview:
nn Product Description: High flow, high
pressure positive displacement non
contacting rotary lobe pump.
nn Applications: Industrial, food and
beverage, bio-pharmaceutical
processing; decanting, transfer, filling,
spraying.
nn Power Source: Shaft coupled electric
motor drive (not provided).
How do they work?
1. Fluid is drawn into the pump and
completely fills the space between
the rotors.
2. Held between the rotor lobes and the
pump case, closed cells of fluid are
carried smoothly through the pump.
3. The intermeshing rotor lobes positively
displace the fluid volume, generating
flow and overcoming the discharge
pressure.
Features
nn Modular ordering of port kits, foot kits
and pumping unit
nn Bi-wing Scimitar and tri-lobe rotors on
3A approved HP series
nn All 316L wetted part hygienic
construction, comprehensive seal
arrangements and EN1935:2004
approved elastomer choice
nn Simple design; front loading zero
contact rotors  shaft seals
nn Robust preloaded large diameter shaft
taper bearings and Helical gearing
nn 	EHEDG approval on UL models
nn 	Optional all stainless steel construction
and USP Class VI elastomers available
on selected models
nn 	Materials of construction: 316L wetted
parts with epoxy coated aluminium
gear cover; choice of seals including
C/SS, SiC/SiC, single or double with
flush; 304 stainless steel mounting
feet with synthetic elastomer sealing
joints available in Nitrile, EPDM, Viton
and PTFE.
Specialist Technical Centres
Know-How
Flow
Technology
182
LET’S CONSUME LESS
WHILE DOING MORE.
www.lowara.co.uk
© 2015 Xylem Inc. Lowara is a trademark of Xylem Inc. or one of its subsidiaries.
Achieve higher levels of efficiency and performance with the newly designed
e-range of in-line and end-suction pumps from Lowara. The system experts of
Xylem and its Lowara brand have redesigned and enhanced the hydraulic efficiency
of the e-range for an MEI better than 0.6 to exceed the ErP 2015 requirements.
Through cutting-edge design, the new e-range provides improved overall system
performance, with flows up to 2200 m³/h and heads up to 160 meters, while
enabling reduced electricity consumption and lower life cycle costs. And when
combined with the Hydrovar variable speed drive, you can see systems energy
savings of up to 70%. The e-range is available in several standardized sizes with
performance and curves specifically optimized for HVAC applications.
Find out more at www.uk.buildings.xylem.com
xylem GWP advert 210 x 280 mm.indd 1 07/07/2015 16:27:34
Lowara Pumps
Visit us at eriks-techdirect.co.uk
Flow
Technology
183
Lowara e-NSC Series
Material options
nn Pumphousing: cast iron, ductile iron, stainless steel
1.4401/1.4408, duplex stainless steel 1.4517
nn Impeller: cast iron, bronze, stainless steel 1.4401/1.4408,
duplex stainless steel 1.4517
nn Elastomers: EPDM, FPM (other marterials on demand)
nn Mechanical face seal: Carbon, Ceramic, Silicon Carbide
and Widia
Configuration options
nn Configurations: Bare shaft, closed coupled
and frame mounted
Range Overview
nn Sizes: DN32 to DN300
nn Power: 1.1 kW – 75 kW (2-pole)
0.25 kW – 315 kW (4-pole)
nn Heads up to: 160 m
nn Flows up to: 1800 m3/h
nn Pressure class: PN16
nn Temperature of pumped liquid: - 25°C
to +120°C, extended temperature
nn Version -25°C to +140°C
nn Variable speed option: Hydrovar
High flexibility, heavy duty end suction pumps for building services, public
utilities and industry.
By combining high efficiency with high flexibility regarding installation, material options
and temperature, the new Lowara e-NSC series is the natural choice for water transport,
hydronic heating and chiller systems, fire protection systems and a vast number of
industrial applications. With efficiency levels well exceeding ErP 2015, the e-NSC series
offer long term economical pumping solutions.
High efficiency
New designed high efficiency hydraulics with MEI values well
above the ErP 2015 level and IE3 motors set the basis for very
low pperation costs.
Long service life  easy maintenance
Robust design, different bearing frame sizes and stainless steel
replaceable wear rings ensure a long service life. The e-NSC
is also designed for easy maintenance and all service points
are easy reachable to reduce downtime.
Adapt to needs
In many applications. the need for water is always varying. By
equipping the e-NSC with a Hydrovar pump controller, the duty
is always exactly where it should be. And it pays off: reducing the
speed by 50% reduces the power consumption by 85%.
Exactly the right configuration
With materials options spanning from cast iron to duplex stainless
steel, the e-NSC is the right solution for 1000’s
of liquids.
Hot or cold
The standard e-NSC can handle liquid temperatures from -40°C
up to +140°C and the extended temperature version from -40°C
up to +140°C.
No leakage
The e-NSC offers a wide range of mechanical face seal options
regarding types and materials.
Specialist Technical Centres
Know-How
Flow
Technology
184 ARO®
Diaphragm Pumps
ARO®
Diaphragm Pumps
Non-Metallic Models – Range and Performance
MaterialMaterial
bar
ATEX
certified
EXPERT
Series
1/4”
20
l/min
8.6 bar
(125 psi)
1/4” NPT
1/4” BSP
1/4” NPT
1/4” BSP
Polypro-
pylene
PVDF
Groundable
acetal
1.6 mm
With
wetted
parts in
groundable
acetal.
EXPERT
Series
3/8”
40.1
l/min
6.9 bar
(100 psi)
3/8” NPT
3/8” BSP
3/8” NPT
3/8” BSP
Polypro-
pylene
PVDF
Groundable
acetal
1.6 mm
With
wetted
parts in
groundable
acetal.
EXPERT
Series
1/2”
54.5
l/min
6.9 bar
(100 psi)
1/2” NPT
1/2” BSP
1/2” NPT
1/2” BSP
Polypro-
pylene
PVDF
Groundable
acetal
2.4 mm
With
wetted
parts in
groundable
acetal.
EXPERT
Series
3/4”
56
l/min
6.9 bar
(100 psi)
3/4” NPT
3/4” BSP
3/4” NPT
3/4” BSP
Polypro-
pylene
2.4 mm
­—
PRO
Series
1”
178
l/min
8.3 bar
(120 psi)
1” NPT
1” BSP
1”ANSI/DIN
1” NPT
1” BSP
1”ANSI/DIN
Polypro-
pylene
PVDF
3.2 mm
­—
EXPERT
Series
1”
200
l/min
8.3 bar
(120 psi)
1” NPT
1” BSP
1”ANSI/DIN
1” NPT
1” BSP
1”ANSI/DIN
Polypro-
pylene
PVDF
Conductive
polypro-
pylene
3.2 mm
With
conductive
polypro-pylene
motor
PRO
Series
11
/2
”
378
l/min
8.3 bar
(120 psi)
11
/2
”
ANSI / DIN
11
/2
”
ANSI / DIN
Polypro-
pylene
PVDF
6.4 mm
­—
EXPERT
Series
11
/2
”
465
l/min
8.3 bar
(120 psi)
11
/2
”
ANSI / DIN
11
/2
”
ANSI / DIN
Polypro-
pylene
PVDF
Conductive
polypro-
pylene
6.4 mm
With
conductive
polypro-pylene
motor
PRO
Series
2”
549
l/min
8.3 bar
(120 psi)
2”
ANSI / DIN
2”
ANSI / DIN
Polypro-
pylene
PVDF
6.4 mm
­—
EXPERT
Series
2”
696
l/min
8.3 bar
(120 psi)
2”
ANSI / DIN
2”
ANSI / DIN
Polypro-
pylene
PVDF
Conductive
polypro-
pylene
6.4 mm
With
conductive
polypro-pylene
motor
Specialty Specialty
Specialty Specialty
Specialty Specialty
Specialty Specialty
Visit us at eriks-techdirect.co.uk
Flow
Technology
185
Metallic Models – Range and Performance
1/2”
EXPERT
Series
45.4
l/min
6.9 bar
(100 psi)
1/2” NPT
1/2” BSP
1/2” NPT
1/2” BSP
Aluminium
Stainless
steel
2.4 mm
All
models
3/4”
EXPERT
Series
51.5
l/min
6.9 bar
(100 psi)
3/4” NPT
3/4” BSP
3/4” NPT
3/4” BSP
Aluminium
2.4 mm
All
models
1”
PRO
Series
133
l/min
8.3 bar
(120 psi)
1” NPT
1” BSP
1” NPT
1” BSP
Aluminium
Cast iron
Stainless
steel
3.2 mm
All
models
1”
EXPERT
Series
197
l/min
8.3 bar
(120 psi)
1” NPT
1” BSP
1” NPT
1” BSP
Aluminium
Cast iron
Stainless
steel
Hastelloy
3.3 mm
With
aluminium
or stainless
steel motor
11
/2
”
PRO
Series
340
l/min
8.3 bar
(120 psi)
1 1
/2
” NPT
1 1
/2
” BSP
1 1
/2
” NPT
1 1
/2
” BSP
Aluminium
Cast iron
Stainless
steel
6.4 mm
All
models
11
/2
”
EXPERT
Series
465
l/min
8.3 bar
(120 psi)
1 1
/2
” NPT
1 1
/2
” BSP
11
/2
”ANSI/DIN
1 1
/2
” NPT
1 1
/2
” BSP
11
/2
”ANSI/DIN
Aluminium
Cast iron
Stainless
steel
Hastelloy
6.4 mm
With
aluminium
or stainless
steel motor
2”
PRO
Series
651
l/min
8.3 bar
(120 psi)
2” NPT
2” BSP
2” NPT
2” BSP
Aluminium
Cast iron
Stainless
steel
6.4 mm
All
models
2”
EXPERT
Series
651
l/min
8.3 bar
(120 psi)
2” NPT
2” BSP
2”ANSI/
DIN
2” NPT
2” BSP
2”ANSI/
DIN
Aluminium
Cast iron
Stainless
steel
Hastelloy
6.4 mm
With
aluminium
or stainless
steel motor
3”
PRO
Series
897
l/min
8.3 bar
(120 psi)
3” NPT
3” BSP
3” NPT
3” BSP
Aluminium
Cast iron
Stainless
steel
9.5 mm
All
models
3”
EXPERT
Series
1041
l/min
8.3 bar
(120 psi)
3” NPT
3” BSP
3” NPT
3” BSP
Aluminium
Cast iron
Stainless
steel
Hastelloy
9.5 mm
With
aluminium
or stainless
steel motor
Specialty Specialty
Specialty Specialty
Specialty Specialty
Specialty Specialty
Specialist Technical Centres
Know-How
Flow
Technology
186
be
think
innovate
INDUSTRIAL SOLUTIONS
PUMPS  SYSTEMS FOR INDUSTRIAL APPLICATIONS
For more information
scan the QR code or go to
www.grundfos.co.uk/industry
MAGNA1/MAGNA3
High Efficiency Glandless Circulators
CM
Horizontal Multistage Pumps
SMART DIGITAL
Digital Dosing Pumps
TP
In-line Industrial Circulators
CR
Vertical In-line Multistage Pumps
NB(G)  NK(G)
EN733 and ISO2858 End Suction Pumps
MAGNA1/MAGNA3MAGNA1/MAGNA3 TP
HYDRO MPC-E
One of a range of packaged booster sets
SE/SL FEATURING S-TUBE IMPELLER
Submersible Waste Water Pumps
Particularly in replacement situations, Grundfos understands that
sometimes fast delivery is essential. This is why it has invested in stock
and systems to create its Fast Track express delivery scheme.
Now available on selected models of boosters, borehole, and end
suction (NB(G) and NK(G)) pumps, with deliveries as fast as next day.
Call your sales manager / office for more details.
www.grundfos.co.uk
bebe
SMART DIGITAL
Digital Dosing Pumps
Particularly in replacement situations, Grundfos understands that
sometimes fast delivery is essential. This is why it has invested in stock
and systems to create its Fast Track express delivery scheme.
Now available on selected models of boosters, borehole, and end
suction (NB(G) and NK(G)) pumps, with deliveries as fast as next day.
Call your sales manager / office for more details.
GRUNDFOS FAST TRACK
FASTER DELIVERY
EVERY TIME
GRUNDFOS GO REMOTE
Smartphone app  wireless transceiver for
easy set up, diagnostics  reporting
Grundfos Pumps
Visit us at eriks-techdirect.co.uk
Flow
Technology
187
Grundfos Pumps
Multistage centrifugal
pumps
CR(E), CRI(E) , CRN(E)
(E version is electronically controlled)
IE5 Motors
Featured on the latest hydro booster sets
and TPE, CRE, CME  NBE models, the
Grundfos MGE motor with IE5 efficiency
is one of the world’s most efficient motors.
Selecting a pump with these motors
incorporated can mean 10% energy and
up to 25% reduction in payback time.
End Suction Pumps
NB(G), NK(G)
nn 	Standard dimensions according to EN
and ISO standards
nn 	Compact design
nn 	Flexible pump range
nn 	EN 12756 shaft seal
nn 	Various shaft seals options
nn 	Cast iron, bronze or stainless steel
impeller options
nn 	Cast iron or stainless steel pump
housing options
HYDRO MPC-E
Turnkey booster system with CR(I)(E) pumps for transfer and pressure boosting of
water in buildings.
Smart Digital Dosing Pumps
DDI, DME
nn 	Accuracy: Industry-leading accuracy
confirmed by independent study
nn Durability: Diaphragm resistant to
virtually all chemicals; pump housing
IP65/NEMA4X certified
nn Reliability: Industry-leading service
intervals
nn No vapor lock: De-aeration features
enable continuous dosing of gassing
chemicals
nn High viscosity dosing: Handles liquids
with viscosities up to 3000 mPas
nn Watching your system: Advanced
monitoring and self-analysis features
nn Any application, anywhere: Any supply
voltage, flexible mounting options, and
a wide selection of accessories and
service kits
nn Easy to operate: Intuitive user
interface and easy set-up
nn Fully flexible control system
nn Low energy consumption
nn 2-6 pumps in cascade
nn 	Easy installation
nn 	Plug and pump solution no extra
programming or cabling required
nn 	Large user-friendly display
nn 	Energy-optimised control
nn 	Data communication
nn 	Perfect constant pressure
nn 	Application-optimised software
nn 	Custom built solutions available
nn 	Reduced noise level
nn 	Space-saving installation – no need
for control cabinets
nn 	WRAS approved product.
nn Reliability
nn High efficiency
nn In-line design
nn Extensive range
nn Service-friendly
nn Space-saving
nn Superior dry-running
protection
nn Suitable for slightly
aggressive liquids
nn E range for high
efficiency
Specialist Technical Centres
Know-How
Flow
Technology
188 Non-Metallic Chemical and Self-Priming Pumps
NP/NP-B series Standardised Chemical pumps
to EN 22858/ISO2858
nn Capacity up to [1200 m³/h]
nn Differential head up to 85 [m]
nn Temperature range: –20°C up to 110 °C
nn Unique mechanical seal design specialised
for the individual requirements
CM/CM-B series Standardised Chemical pumps
to EN 22858/ISO2858
nn Capacity up to [180 m³/h]
nn Differential head up to 85 [m]
nn Temperature range: –20°C up to 180 °C
Vertical chemical pumps in Cantilever design
(dry-running proof) or with plain bearing
nn Capacity up to 700 [m³/h]
nn Head up to 90 [m]
nn Length up to 3000 [mm]
nn With suction pipe or strainer if required
nn Temperature range: –20 °C up to 100°C
MUNSCH Chemical pumps are non-metallic and designed for maximum
operating reliability, easy maintenance and lowest lifecycle cost to operate in
abrasive and corrosive service conditions.
Every pump is designed exactly to customer’s specification, and tested to EN ISO
9906 standards before it leaves the factory. Dedicated assembly engineers take full
responsibility for the complete assembly of each of their assigned pumps, which results
in shorter delivery times and increased quality. Munsch pumps are available in a variety of
materials specifically suited to the liquid being used in the application.
On request all pumps are available to be supplied with conformance to EU directive
94/9/EC for use in hazardous areas.
MUNSCH Chemical Pumps www.munsch.de
Visit us at eriks-techdirect.co.uk
Flow
Technology
189
Super U Series
Super U Series pumps
are among the most efficient
self-priming solids-handling
pumps available.
nn Unique hydraulic design and
smooth wall volute casing
minimise friction loss and drag
nn The multi-vane, open impeller
is designed for high efficiency
operation yet can still handle
limited solids
nn Delivering high efficiencies (up to 75%), and performs
efficiently across a broad operating range
nn Varying machine loads minimally affects operating efficiency
10 Series®
Gorman-Rupp 10 Series®
pumps
are designed for handling:
nn Solids
nn Corrosive liquids
nn Slurries
Gorman-Rupp Pumps
Super T Series
Super T Series pumps are our
leading Gorman-Rupp range.
nn Robust construction
nn Extremely reliable and
simplistic operation
nn Applications range from pumping thick
abrasive slurries/sludges on flooded
suction to solid laden wastewater
nn Achieving suction lifts of up to 7.5m
nn External shimless adjustment
nn Dual protection of bearings
nn Easy grip cover plate handle
Ultra V Series
The very latest from the
Gorman-Rupp range.
nn Ultra V Series pumps
combine high head
performance with
outstanding efficiency
nn Priming and solids
handling capability
nn Available as single stage
units (V series) or as extreme
heads double stage units
(VS series)
80 Series®
80 Series®
pumps are
designed for non-stop workloads.
nn The straight-in-suction
design of these high-efficiency
pumps guarantees quick,
positive self-priming
nn Operates at higher suction levels than
most other self-priming centrifugal
pumps
nn Liquid enters directly into the
impeller eye
nn A suction check valve presents in-line
return flow when the pump is shut off
nn Minimal maintenance due to fewer
moving parts
nn Available with self-lubricated
mechanical shaft seals
Specialist Technical Centres
Know-How
Flow
Technology
190 Submersible Pumps
LB, HS and LSC Series
Portable 1 phase submersible drainage
pumps. Heavy duty with excellent wear
resistance. LSC will pump water levels
down to 1mm.
KTZ(E)  KTV(E) Series
Portable 3 phase submersible drainage
pumps. Heavy duty with excellent wear
resistance and performance in seapage
conditions.
KRS Series
3 phase submersible drainage pumps.
Heavy duty, high volume pumps with 4
pole motors for increased wear resistance
and performance in seapage conditions.
Tsurumi Manufacturing Company of Japan manufacture a wide range of submersible pumps for use in the toughest of applications found
in construction site dewatering, quarries and processing. Their growing reputation has been formed by integrating advance designs with
high grade materials to produce pumps with excellent durability and versatility. In many cases, Tsurumi pumps are selected and work
reliably, with minimal maintenance, in applications where other brands have previously failed to keep up with the duty. Hence, all Tsurumi
submersible pumps carry a 3 year guarantee.
The Tsurumi drainage pump range includes:
Submersible Pumps
series	 outlet sizes	 motor sizes	 flow range	 head range	 solids	 motor/RPM
	 (mm)	(kW)	 (LPM)	 (mtrs)	 (mm)
LB/HS/LSC	 25-80	 0.48 - 1.50	 205 - 420	 11 - 18	 6-7	 2 pole - 2850
series	 outlet sizes	 motor sizes	 flow range	 head range	 solids	 motor/RPM
	 (mm)	(kW)	 (LPM)	(mtrs)	 (mm)
KTZ(E)/KTV(E)	 50 - 150	 0.75 - 11.0	 320 - 2,440	 14 - 49	 6 - 20	 2 pole - 2850
series	 outlet sizes	 motor sizes	 flow range	 head range	 solids	 motor/RPM
	(mm)	 (kW)	 (LPM)	 (mtrs)	 (mm)
KRS	 100 - 250	 3 - 22	 1,820 - 12,000	 8 - 34	 12 - 30	 4 pole - 1450
nn Pressed steel or aluminium  cast iron outer
construction
nn Urethane rubber impeller
nn Double mechanical seal
nn Internal motor protection
nn 10 Metre power cable
nn Available with or without level control
nn Cast iron or cast aluminium  pressed steel outer
construction
nn Ductile iron impeller (KTV 0.75kW urethane
rubber)
nn Cast iron or rubber pump chamber
nn Double mechanical seal
nn Internal overloads
nn 20 metre power cable (KTV 0.75kW: 10 metre)
nn Available as manual start or with probe level
sensor (KTVE  KTZE)
nn Cast iron outer construction
nn Ductile iron impellers
nn Cast-iron pump chamber
nn Double mechanical seal
nn Internal overloads
nn 20 Metre power cable
nn Single phase drainage pumps: series
LB, HS, LSC
nn Three phase drainage pumps: series
KTV(E), KTZ(E), KRS
nn Three phase high-head pumps: series
LH(W), LH
nn Three phase sand  slurry pumps:
series KTV2, KTD, NKZ, KRS2, GPN
nn One phase  three phase chemical
pumps: Series SFQ  TM
Visit us at eriks-techdirect.co.uk
Flow
Technology
191
LH(W)  LH Series
3 phase submersible drainage
pumps. Heavy duty, high head pumps
incorporating a narrow base area with
excellent wear resistance and performance
in seapage conditions
KTD  KTV2 Series
Portable 3 phase submersible slurry
pumps with agitators. Heavy duty and
compact, with excellent wear resistance
and performance when pumping slurry,
sand, silt etc.
KRS2, NKZ  GPN Series
3 phase submersible slurry pumps with
agitators. Heavy duty, high volume
pumps with 4 pole motors for increased
wear resistance and performance when
pumping slurry, sand, bentonite etc.
SFQ  TM Series
Submersible pumps constructed in 316
grade (1.4436) cast stainless steel or
titanium for industrial pumping of sea-
water, salt-water and chemicals
series	 outlet sizes	 motor sizes	 flow range	 head range	 solids	 motor/RPM
	 (mm)	 (kW)	 (LPM)	(mtrs)	 (mm)
KTD/KTV2	 50 - 80	 2.0 - 3.0	 425 - 800	 20 - 23	 8.5 - 10	 2 pole - 2850
series	 outlet sizes	 motor sizes	 flow range	 head range	 solids	 motor/RPM
	 (mm)	 (kW)	 (LPM)	 (mtrs)	(mm)
KRS2/NKZ/GPN	 80 - 150	 2.2 - 22.0	 930 - 5,000	 12.6 - 34.0	 20 - 30	 4 pole - 1450
series	 outlet sizes	 motor sizes	 flow range	 head range	 solids	 motor/RPM
	 (mm)	 (kW)	 (LPM)	(mtrs)	 (mm)
SFQ/TM	 50-80	 0.4 - 3.7	 290 - 1,180	 21.0 - 24.6	 6 - 15	 2 pole -2850
series	 outlet sizes	 motor sizes	 flow range	 head range	 solids	 motor/RPM
	 (mm)	(kW)	 (LPM)	 (mtrs)	 (mm)
LH(W)/LH	 50 - 200	 3 - 110	 600 - 6,500	 39 - 216	 6 - 20	 2 pole - 2850
nn Cast iron outer construction
nn Chromium iron impellers
nn Double mechanical seal
nn Internal overloads
nn 20 Metre power cable
nn Grey cast iron or aluminium and pressed steel
outer construction
nn Chromium iron impeller and agitator
nn Grey cast iron rubber pump chamber
nn Double mechanical seal
nn Internal overloads
nn 20 metre power cable
nn Available as manual start or automatic
nn Cast iron and steel outer construction
nn Impellers: KRS2: 2.2kW to 3.7KW ductile iron,
KRS2: 5.5 kW to 11kW  all NKZ models:
chromium
nn Grey cast iron pump chamber and casing
nn Double mechanical seal
nn Internal overloads
nn 20 metre power cable
nn Cast stainless steel or titanium and ABS
construction
nn Pressed stainless steel or ABS strainer
nn Double mechanical seal
nn Internal overloads
nn SQ: 3ph only, TM: 1ph  3ph with automatic options
nn 20 metre or 10 metre neoprene power cable
Specialist Technical Centres
Know-How
Flow
Technology
192
Hydra-Cell Metering and
Dosing Pumps
For both Safe and ATEX/Explosive Environments
Unique, seal-less, API 675, positive displacement pumps with multiple, hydraulically
balanced diaphragms in a single pump head, designed to feed a precise, predetermined
volume of liquid into a system or process.
nn Virtually Pulseless Flow
nn Meet or exceed API 675 Performance Standards
		 Steady State Accuracy (±1%)
		 Linearity (±3%)
		 Repeatability (±3%)
nn Multiple Local and Remote Control Options
nn Compact Size… High Performance
nn Infinite Turndown Ratios
(1) Also applicable for pumps used in ATEX/Explosive Environments where the Variable Frequency Drive is sited in a safe area
P100 P200 P300 P400 P500 P600
Flow Range (l/hr) Safe
Environments(1) 1 to 85 1 to 256 1 to 256 5 to 764 10 to 1340 20 to 2800
Max Pressure (bar)
Safe Environments(1)
Metallic 103
PP 17
PVDF 24
Metallic 103
PP 17
PVDF 24
172
Metallic 103
PP 17
PVDF 24
172
Metallic 70
PP 17
PVDF 24
Flow Range (l/hr) ATEX/
Explosive Environments
Not Available 1 to 90 1 to 90 5 to 294 Not Available Not Available
Max Pressure (bar)
ATEX/Explosive
Environments
Not Available
Metallic 100
PP 1
PVDF 24
172
Metallic 100
PP 17
PVDF 24
Not Available Not Available
Liquid Head Materials
Brass
316L SS
Hastelloy
Polypropylene
PVDF
Brass
316L SS
Hastelloy
Polypropylene
PVDF
Brass
304 SS
316L SS
Hastelloy
Brass
Cast Iron
316L SS
Hastelloy
Duplex 2205
S-Duplex 2207
Polypropylene
PVDF
Brass
316L SS
Duplex 2205
Brass
Cast Iron
316L SS
Hastelloy
Duplex 2205
S-Duplex 2207
G13 G03 G04 G10 G25 G35
Flow Range (l/hr)
Safe Environments(1) 1.8 to 678 1.8 to 678 1.8 to 678 6 to 1818 24 to 4530 42 to 8400
Max Pressure (bar)
Safe Environments(1)
Metallic 103
PP 17
PVDF 24
Metallic 103
PP 17
PVDF 24
172
Metallic 103
PP 17
PVDF 24
Metallic 70
PP 17
PVDF 24
103
Flow Range (l/hr) ATEX/
Explosive Environments
19 to 462 38 to 462 19 to 452 60 to 1470 216 to 2600 396 to 6360
Max Pressure (bar)
ATEX/Explosive
Environments
Metallic 60
PP 17
PVDF 24
Metallic 103
PP 17
PVDF 24
172
Metallic 103
PP 17
PVDF 24
Metallic 60
PP 17
PVDF 24
30
Hydra-cell Pumps
Visit us at eriks-techdirect.co.uk
Flow
Technology
193
Hydra-Cell Industrial
 Process Pumps
Unique seal-less, positive displacement pumps with multiple, hydraulically balanced
diaphragms in a single pump head, for liquid transfer, spraying, filling, blending, cleaning,
sampling, injecting, coating, cleaning and mixing.
Handles low to high viscosity liquids
nn Accurate and Controllable, Virtually Pulseless Flow
nn Long Service Life with Low Lifecycle Cost
nn Can Run-dry... Indefinitely
nn 100% Sealed  Safe
nn Pumps Aggressive  Corrosive Liquids and Abrasives
nn Compact Size, High Performance
T100 (Low Pressure)(3)
T100 (Medium Pressure)(3)
T100 (High Pressure)(3)
Flow Rate (l/min) up to 366 up to 170 up to 96
Max Pressure (bar) 144 241 345
Liquid Head
Materials
Nickel Aluminum
Bronze (NAB)
316L SS
Nickel Aluminum
Bronze (NAB)
316L SS
Nickel Aluminum
Bronze (NAB)
(1) For vertical mounting. Available in Brass, Cast iron (Nickel plated)  316L SS
(2) For vertical mounting. Available in Brass, Duplex 2205  316L SS
(3) API 674 options available
G20 G03 G04 G10(3)
 G12(1)
G15(3)
 G17(2)
G25(3)
G35(3)
Flow Rate (l/min) up to 3.79 up to 11.3 up to 11.3 up to 30.3 up to 50 up to 75.7 up to 140
Max Pressure (bar)
Metallic 103
PP 17
PVDF 24
Metallic 103
PP 17
PVDF 24
172
Metallic 103
PP 17
PVDF 24
172
Metallic 70
PP 17
PVDF 24
103
Liquid Head
Materials
Brass
316L SS
Hastelloy
Polypropylene
PVDF
Brass
316L SS
Hastelloy
Polypropylene
PVDF
Brass
304 SS
316L SS
Hastelloy
Brass
Cast Iron
316L SS
Hastelloy
Duplex 2205
S-Duplex 2207
Polypropylene
PVDF
Brass
316L SS
Duplex 2205
Brass
Cast Iron
316L SS
Hastelloy
Duplex 2205
S-Duplex 2207
Cast Iron(Nickel
Plated)
316L SS
Hastelloy
Duplex 2205
S-Duplex 2207
	Propane/	 Freon	 Ammonia	 Polymers	 Fuels/	 D.I. Water	 Glycols	 Chlorine	 Acids/	 Glues/	 Inks/	 Resins	 Slurries
	 Butane				 Additives				 Caustics	 Adhesives	 Paints
Specialist Technical Centres
Know-How
Flow
Technology
194 Pumps
TECHNICAL DATA PUMP SIZE
T30 T80 T125 T225 T425
Max capacity [l/min] 30 80 125 225 425
Volume per stroke* [ml] 70 140 300 700 2600
Max discharge pressure [bar] 8
Max air pressure [bar] 8
Max suction lift dry** [m] 1.5 3 4 5 5
Max suction lift wet [m] 8
Max size of solids ø in [mm] 3 4 6 10 15
Max temp. With EPDM/NBR [°C] 80
Max temp. With PTFE [°C] 110
Weight [kg] 4 8 11 21 35
Low energy diaphragm pumps available on all Tapflo Models.
Hygienic Series
The sanitary pump range
nn T30 - 28 l/min, 1”
nn T80 - 78 l/min, 1”
nn T125 - 155 l/min, 1 ½”
nn T225 - 330 l/min, 2”
nn T425 - 570 l/min, 2 ½”
nn Reduce carbon footprint
nn Lower operational costs reduced air consumption
nn Ultra low start pressure 0.1 bar (1.5 PSI)
nn Full control and feedback
nn Easy to maintain lowest number of parts of any
AODD pump
nn Low noise
nn Low pulsation
nn Retrofit to pumps already in the field
Achieve up to 70%
energy savings
Thousands of
products available
to order on
ERIKS
WEBSHOP
SHOP.ERIKS.CO.UK
SHOP.ERIKS
.CO.UKSHOP
.ERIKS.CO.UK
Visit us at eriks-techdirect.co.uk
Flow
Technology
195
Tapflo Hose Pumps
Specifications PT hose pumps
Pump range  Flow rate (l/h)
Type/
rpm
20 40 60 80 100
Max
Pressure
Bars
PT10 30 60 90 120 - 8
PT15 100 200 300 400 500 8
PT20 170 340 500 670 880 8
PT25 400 800 1200 1600 2000 15
PT32 750 1500 2250 3000 3750 15
PT40 1170 2340 3510 4680 - 15
PTX40 1600 3200 4800 6400 - 15
PT50 3500 7000 10500 - - 15
PT65 4900 9800 14700 - - 15
PTX65 8000 16000 24000 - - 15
PTX80 11000 22000 - - - 15
Darker cells indicate intensive use.
Lighter cells indicate intermittent use.
Specifications PTL hose pumps
Pump range  Flow rate (l/h)
Type/
rpm
20 40 60 80
Max
Pressure
Bars
PTL09 20 40 60 80 4
PTL13 49 99 149 198 4
PTL17 130 260 390 520 4
PTL25 390 780 1160 1550 4
PTL30 830 1650 2490 3320 4
PTL45 2300 4620 6920 9240 4
Darker cells indicate intensive use.
Lighter cells indicate intermittent use.
Specialist Technical Centres
Know-How
Flow
Technology
196 Pumps
SEH - 50x – 2 Water Pump
Water Pump 2 (50mm) 4hp Honda GX120
nn Power unit Honda GX120 4hp
nn Weight 24kg
nn Pump type centrifugal, self-priming
nn Maximum output 620 litre/min
nn Maximum head 30m
SEH - 80x – 3 Water Pump
Water Pump 3 (75mm) 5hp Honda GX160
nn Power unit Honda GX160 5.5hp
nn Weight 32kg
nn Pump type centrifugal, self-priming
nn Maximum output 900 litre/min
nn Maximum head 26m
Part No	 Description
WR/050-022	 SHE-50X 2” Petrol Driven Pump
WR/030-390	 2” Suction hose 6 metre
WR/030-306	 2” Layflat delivery hose 1 metre (priced per metre)
Part No	 Description
WR/050-032	 SHE-80X 3” Petrol Driven Pump
WR/030-439	 3” Suction hose 6 metre
WR/030-308	 3” Layflat delivery hose 1 metre (priced per metre)
Petrol Driven Pumps
Self-priming petrol engine driven water pumps, ideal for mobile pumping applications and those unplanned
emergencies!
nn Powered by top of the range Honda engines to provide years of trouble free service
nn Units come complete with full carry frame with rubber feet, hose couplings and suction filter
1 Petrol Driven Pump
A very lightweight unit for easy portability. Because of the high
pressure and flow rate, it is a very suitable pump for sprinkling and
irrigation.
Ideal for:
nn Irrigation applications
nn Pumping of well water
nn Feeding or training water
from a pond or trough
nn Agricultural uses
Part No			 Description
WR/050-003		 SHE-25L 1” Petrol Driven Pump
nn 	Centrifugal pumps suitable for general
water and waste water
nn Hygienic pumps – suitable for food and
pharmaceutical
nn Air operated diaphragm pumps suitable for
chemicals, slurries, etc.
nn Magnetic drive pumps suitable for
chemicals
nn Suds coolant pumps suitable for
machine coolants
Other pumps
available from ERIKS
Visit us at eriks-techdirect.co.uk
Flow
Technology
197
Part No*	 Supply	 Absorbed kW	 Amps	 Max Head/Flow
SAC/P/IMM50A-XXX-1-240 	 230V 1-phase 	 0.11 	 0.60 	 3m / 10 l/min
SAC/P/IMM63A-XXX-1-240 	 230V 1-phase 	 0.30 	 2.00 	 6m / 5 l/min
SAC/P/IMM63B-XXX-1-240 	 230V 1-phase 	 0.40 	 2.90 	 7m / 10 l/min
SAC/P/IMM71A-XXX-1-240 	 230V 1-phase 	 0.53 	 4.30 	 11m / 28 l/min
SAC/P/IMM71B-XXX-1-240 	 230V 1-phase 	 0.78 	 7.50 	 13m / 55 l/min
SAC/P/IMM50A-XXX-3-380 	 230/400V 3-phase 	 0.11 	 0.30 	 3m / 10 l/min
SAC/P/IMM63A-XXX-3-380 	 230/400V 3-phase 	 0.30 	 0.58 	 6m / 5 l/min
SAC/P/IMM63B-XXX-3-380 	 230/400V 3-phase 	 0.40 	 0.90 	 7m / 10 l/min
SAC/P/IMM71A-XXX-3-380 	 230/400V 3-phase 	 0.53 	 1.40 	 11m / 28 l/min
SAC/P/IMM71B-XXX-3-380 	 230/400V 3-phase 	 0.78 	 1.90 	 13m / 55 l/min
SAC/P/IMM80A-XXX-3-380 	 230/400V 3 phase 	 1.15 	 1.90 	 16m / 90 l/min
SAC/P/IMM80B-XXX-3-380 	 230/400V 3-phase 	 1.47 	 2.80 	 18m / 60 l/min
Coolant Pumps
IMM Series Coolant Pumps
The IMM range of coolant pumps offers a comprehensive and
economical range which is suitable for most machine tool coolants.
nn 1-phase or 3-phase options
nn Suitable for most machine tool coolants
nn Fast delivery
Basic Dimensions
Type 	 Flange Diameter 	 Outlet Port 	 Stem Lengths
IMM50 	 130mm 	 3/8 BSP 	 080,120,150,180
IMM63 	 180mm 	 3/4	 BSP 150,200,250,300
IMM71 	 230mm 	 1	 BSP 200,250,325
IMM80 	 250mm 	 1.1/4	 BSP 200,250,300,350
Part No*	 Supply	 Absorbed kW	 Amps	 Max Head/Flow
SAC/P/SPV12-XXX-1-240 	 230V 1-phase 	 0.15 	 0.65 	 4m / 7 l/min
SAC/P/SPV18-XXX-1-240 	 230V 1-phase 	 0.16 	 0.70 	 5m / 5 l/min
SAC/P/SPV25-XXX-1-240 	 230V 1-phase 	 0.30 	 2.00 	 6m / 5 l/min
SAC/P/SPV33-XXX-1-240 	 230V 1-phase 	 0.40 	 2.90 	 7m / 5 l/min
SAC/P/SPV12-XXX-3-380 	 230/400V 3-phase 	 0.15 	 0.32 	 4m / 7 l/min
SAC/P/SPV18-XXX-3-380	 230/400V 3-phase 	 0.16 	 0.55 	 5m / 5 l/min
SAC/P/SPV25-XXX-3-380 	 230/400V 3-phase 	 0.30 	 0.58 	 6m / 5 l/min
SAC/P/SPV33-XXX-3-380 	 230/400V 3-phase 	 0.40 	 0.90 	 7m / 5 l/min
SPV Coolant Pumps
The SPV range is suitable for most machine tool coolants and offers cost-effective
solution to all coolant pump requirements within 1-phase or 3-phase areas.
nn 6 standard stem lengths
nn 1-phase or 3-phase options
nn Suitable for most machine tool coolants
Basic Dimensions
Flange Diameter 	 Outlet Port 	 Pump Body
130mm 	 3/4 BSP 	 98mm
* The XXX in the part number should be replaced with the required stem length code – (see above table for options).
* The XXX in the part number should be replaced with the required stem length code: (090=90mm, 120=120mm, 170=170mm, 220=220mm, 270=270mm and 350=350mm).
IMM71 and
IMM80 are
available in longer
stem lengths –
please call
for details
Specialist Technical Centres
Know-How
Flow
Technology
198 Pumps
Lowara DOC 3 Pump
ITT Lowara DOC 3 pumps are versatile, corrosion-resistant and compact. Ideal for the
drainage of sumps, cellars, and basements, these pumps have stainless steel housings
and are fitted with 10 metres of cable.
Applications:
nn Emptying of residential sump pits, rainwater tanks or laundry drainage
nn Garden and lawn irrigation, with suction from rainwater tanks
nn Emergency draining of flooded basements and garages
nn Transfer of water from tanks, cisterns and swimming pools
nn Water display fountains
SEEPEX Wobble Pump
The SEEPEX Wobble Pump is a progressive cavity pump. Pumps of this design can be used in almost all industries.
They are able to handle liquids of all viscosities and even products with high solids contents. Due to the simple construction
wobble pumps are cost effective and easy to maintain.
Advantages and Characteristics:
nn Accurate linear variable flow rate: up to 10m³/h
nn Pulsation free flow
nn Pressure: up to 4 bar, 60 psi
nn Service-friendly and economical due
to simple pump construction
nn Rapid exchange of conveying elements
due to rotating unit with only one joint
nn Space-saving due to short, compact design
with directly flanged drive (block design)
Where would you imagine the major costs – and therefore potential savings
– associated with a pump would arise? The purchase price? The cost of
maintenance? Or the running costs?
In fact, the purchase price of a pump represents less than 5% of the whole life
cost, and even maintenance costs amount to only 8% on average. Which leaves
the remaining 87% of the cost taken up by energy consumption. And in some
applications, energy costs can actually rise to as much as 95% of the whole life cost
– which means there are huge savings to be made through more efficient pump
operation and more effective maintenance.
But to realise these potential savings, you first need to know what makes
pumping so expensive, then how to select the right pump for the job, and
finally how best to maintain the pump so it provides optimum performance
and maximum energy efficiency.
Visit eriks.co.uk/knowhow for more information on pump savings
and developing a sustainable pumping action plan.
Pump up the savings
Visit us at eriks-techdirect.co.uk
Flow
Technology
199
Pump configuration
Choosing the right materials of
construction is essential for specific
applications. We have a wide range of
options for casing and hoppers, rotor and
stator materials, sealing options and drive
choice. Whatever you want to do we can
configure the correct pump for you.
SEEPEX Progressive
Cavity Pumps (PCP)
For low and high viscosity products with and without solid particles – we make All Things Flow
SEEPEX develops and produces progressive cavity pumps (PCP), macerators and control systems. We offer products for all market
sectors including water and waste water, food and beverage, biogas, pharmaceutical, oil and gas and many more. Our product groups
have high performance ranges within them. Modular design provides customers with tailor-made pumps for every application. For
complex handling we supply competent consulting, planning and project management.
Pumps for all applications
Low and high viscosity products,
containing soft solids can all be pumped
by SEEPEX PCP. The basic pump action
is low shear, making it ideal for most shear
sensitive food products e.g yeast, yogurt,
jams and pie-fillings etc. Open hopper
pumps transfer high viscosity products,
even whole chickens or mango stones
are pumped by our specialized solutions.
Hygienic ranges which are CIPable are 3A
sanitary standard and comply with FDA
and EHEDG regulations. Abrasive and
corrosive products can also be handled
using SEEPEX pumps.
Low operating costs
Smart Conveying Technology, a patented
development from SEEPEX, enables
internal inspection and rotor and stator
replacement when needed without
pipework removal, reducing maintenance
time by up to 85%. Adjusting the
stator segments restores original pump
performance, extending stator life by
up to 300%. Level control, dry running
protection and over pressure protection
are available from SEEPEX for all pumps
to optimise performance and reduce
operating costs.
Product Groups
nn N Range: standard configuration, for
flowable products 30L/hr - 500m3/hr
nn 	T Range: open hopper with feed auger,
for high viscosity products 50L/hr –
500m3/hr
nn 	D Range: metering pumps accurate to
+/- 1%, for accurate dosing 200ml/
hr – 1000L/hr
nn 	CS range: Hygienic and easy to clean,
for food and pharmaceutical 30L/hr –
130m3/hr
nn 	E range: semi-submersible, for very
high suction lifts 30L/hr – 300m3/hr
nn 	W range: single UJ, effective and
inexpensive up to 10m3/hr
nn 	M range: macerators, for particle size
reduction and pump protection 2m3/
hr – 150m3/hr
Accurate metering and
dosing
Accurate low pulsation linear flow is a
characteristic of our pumps, meaning that
flow rates are controlled by one variable
– pump speed. Simple installation and
calibration without the need for check ball
valves or calibration pots. Smart Dosing
Pumps have intelligent drives for added
control functionality
Versatile in Operation
SEEPEX pumps have an excellent
suction lift – up to 9m as standard and
more if needed using semi-submersible
pumps. They can be installed horizontally
or vertically and run both ‘forwards and
backwards’ enabling filling and emptying
vessels using a single pump. They can
generate pressures up to 144 bar if
needed and operate at temperatures from
-20 °C to 150° C.
Specialist Technical Centres
Know-How
Flow
Technology
200
CALL: 0845 006 6000
to contact your local workshop
PUMP
SERVICES
Repair, overhaul or rewind
Repair work carried out on customer’s site or an
ERIKS Engineering workshop
Maintain and Monitor
Preventative maintenance and condition monitoring
carried out using the latest technologies
Replace
If the two remedial actions above have not
suitable then a more energy and waste efficient
replacement product can be recommended.
ENGINEERING 
SITE SERVICES
FUNCTIONS:
n Pump repairs and new pump supply
n Spare part and kitting capability
n Full in-house fabrication and machining facilities
n Reverse and surface engineering
n Pump coating approved contractors
n Stock rationalisation and obsolescence projects
n Pump energy audits and testing
WHY ERIKS:
n Technical and trading partnerships with most
major pump suppliers
n Reliability improvements and up-rating
n Obsolescence risk management
n Energy efficiency audits
n Certified Pump System Auditors
n Active members of the Pump Centre and BPMA
TOOLS, SAFETY AND
MAINTENANCE
ERIKS Tools, Safety and Maintenance Product
business unit are able to provide brand
leaders in all of its 3 main product areas –
Safety, Tooling and Consumables.
Choosing the right tools safety and maintenance
equipment is not just about getting the job done more
efficiently; it is also about protecting employees from the
risk of injury and protecting their employers from potential
compensation claims.
201
Wiping Products	 204-205
Storage	206-207
Adhesives	208-209
Non-Sparking Tools	 210
Safety Footwear	 211
Safety Eyewear	 212
Respiratory	213
Spill Control	 214-215
Gloves	216-219
Lock Boxes and Labelling	 220-221
Metal Cutting Tools	 222-225
Torque Wrenches	 226-227
Live Centres, Chucks  Vices	 228
Lubricants	229-243
Line Marking	 241
Position Sensors	 244-245
Torches	246
Variabox	247
Quick Product Reference
240-241 204-205, 211-217, 237230-233, 242 234
238-239 243 235 244-245
247
206-207 220-221 218-219 222-225
246 208-209 228226-227
Quick reference
Visit us at eriks-techdirect.co.uk
TOOLS, safety AND
MAINTENANCE
TOOLS Technology
Selecting products based purely on
price can be unproductive in terms of
efficiency, comfort and perhaps most
importantly the safety of the user.
We understand the stresses and
strains you face daily, and can help
you select the correct tool for the
correct job.
ERIKS can provide all the essentials required
for a safe and productive environment within
an engineering workshop.
Our range of products have been carefully selected by
experienced Tools, Safety and Maintenance specialists, to
ensure you receive the best quality service and value in the
marketplace, whilst ensuring your safety.
202
Specialist Technical Centres
Know-How
TOOLS
ERIKS provide a comprehensive range
of tools, from a wide selection of leading
brands.
All products and brand partners are
selected with careful consideration in
terms of reliability, availability, performance
and the ergonomic effect to the user.
Providing you with the equipment that will
enable you to complete tasks in a timely
and safe manner.
nn Hand Tools
nn Cutting Tools
nn Power Tools
nn Metrology
nn Abrasives
TOOLS SAFETY AND MAINTENANCE
WORKSHOP
SAFETY
The working environment and conditions
determine the most appropriate protection
in order to guarantee the safety of people
in the workplace.
Working alongside our partner suppliers
you can rest assured that our range
of products conform to all the current
legislation and adopt best practice to
provide a safe working environment.
nn Personal Protective Equipment (PPE)
nn Spill Control
nn Hand Hygiene
nn Janitorial
nn Lock Out - Tag Out Systems
EQUIPMENT
Through ERIKS you can also source all
your functional, durable storage solutions
with a wide range of workplace equipment.
nn Workbenches
nn Tool cupboards
nn Storage bins
nn Perforated and Louvred panels
MRO CONSUMABLES
ERIKS can provide you with a single
source for all your consumable
requirements, whether you are looking
for lubrication, adhesives, sealants or
fasteners we have the products to meet
your requirements.
All products conform to current safety
legislation and are fully traceable attaining
COSHH standards.
nn Lubrication
nn Cutting Fluids and Compounds
nn Degreasers
nn Adhesives and Sealants
nn Fasteners
nn Technical Wipes
203
Visit us at eriks-techdirect.co.uk
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
204 Cloths and Wet Wipes
Part No 	 Description
RX-PW-CF2138B	 RX Centrefeed 2 Ply Wiper Rolls Blue
RX-PW-CF2138W	 RX Centrefeed 2 Ply Wiper Rolls White
RX Wiping Products
New to the RX portfolio are a range of industrial wiping
products, they have been carefully selected to provide
you with a cost effective solution helping you get the
task in hand completed quicker and efficiently, whilst
ensuring hygiene levels are kept high.
Our products are manufactured to a
high quality specification, giving you the
confidence that the RX range of Wiping
Products will protect your employees
and customers reducing the risk of cross
contamination and enhance your hygiene
controls.
2 Ply Centrefeed Wiper Rolls
Highly absorbent solution for
dealing with everyday
non-hazardous substances
nn Pack Size: 6 rolls
Part No 	 Description
RX-PW-HR225B	 RX 2 Ply Hygiene Rolls, Blue, 250mm
RX-PW-HR225W	 RX 2 Ply Hygiene Rolls, White, 250mm
RX-PW-HR250B	 RX 2 Ply Hygiene Rolls, Blue, 500mm
RX-PW-HR250W	 RX 2 Ply Hygiene Rolls, White, 500mm		
2 Ply Hygiene Rolls
RX 2 Ply hygiene rolls provide a solution to a
multitude of wiping tasks. 100 sheets/roll
nn Pack Sizes: 	250mm18 rolls/pack
	 500mm 9rolls/pack
Part No 	 Description
RX-PW-LR2380B	 RX 2 Ply Large Rolls Blue
RX-PW-LR2380W	 RX 2 Ply Large Rolls White
2 Ply Large Rolls
The 2 Ply large rolls are
the perfect, highly absorbent
solution for dealing with
a wide variety of applications.
nn Pack Size: 2 rolls
Part No 	 Description
RX-PW-LR3260B	 RX 3 Ply Wiper Large Roll, Blue
3 Ply Large Rolls
The additional thickness ensures
even faster absorbance for
non-hazrdous spill situations.
nn Pack Size: 1 roll
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
205
Part No 	 Description
RX-NW-LWQB	 Quarterfold Lite Wipes, Blue
RX-NW-LWQG	 Quarterfold Lite Wipes, Green
RX-NW-LWQR	 Quarterfold Lite Wipes, Red
RX-NW-LWQY	 Quarterfold Lite Wipes, Yellow
Part No 	 Description
RX-NW-LWRB	 RX Lite Wipe Roll, Blue
Lite Wipe Roll
Light-weight, disposable cleaning cloth, ideal
for general cleaning tasks.
nn Pack Sizes: 	500 sheets/roll
Tech Wipes
Highly absorbent solution for
dealing with everyday
non-hazardous substances
nn Pack Sizes: Various
Part No 	 Description
RX-WW-SS150	 Sani surface sanitising wipes, 150 wipes tubs
RX-WW-SS1500	 Sani surface sanitising wipes, 1500 wipes tubs
Sani Surface Sanitising Wipes
Medium-weight wipe eliminating
cross-contamination concerns
with a single stroke. Suitable
for use in a wide range of
applications.
nn Pack Sizes: 	150 wipes/tub			
	 1500 wipes/tub
Part No 	 Description
RX-WW-MX80	 RX Heavy Duty Max Wipes
Heavy Duty Max Wipes
Heavy duty hand wipe with a textured
finish on one side and impregnated
with orange scrub for fast cleaning and
degreasing.
nn Pack Sizes: 1 tub
Part No 	 Description
RX-WW-MP150	 RX Multi-Purpose Hand and Wet Surface Wipes
Multi-Purpose Hand and Wet
Surface Wipes
The ultimate portable wet hand wipe for
general applications.
nn Pack Sizes: 	150 wipes/tub
Quarterfold Wipes
Reusable product designed
for the toughest wiping
tasks.
nn Pack Sizes: 	Heavy, 6 packs/25
	 Lite, 20 packs/50
Part No 		 Description
RX-NW-HWQB	 Quarterfold Heavy Wipes, Blue
RX-NW-HWQG	 Quarterfold Heavy Wipes, Green
RX-NW-HWQR	 Quarterfold Heavy Wipes, Red
RX-NW-HWQY	 Quarterfold Heavy Wipes, Yellow
Part No 	 Description
RX-NW-TWQB	 RX Quarterfold Tech Wipes, Blue
RX-NW-TWQDW	RX Quarterfold Tech Wipes in Dispenser Box, White
RX-NW-TWRB	 RX Tech Wipes Roll, Blue
RX-NW-TWRW	 RX Tech Wipes Roll, White		
Heavy Wipes
Lite Wipes
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
206 Workplace Storage
Why buy Bott
Understand
The Bott and ERIKS sales team will work together with you
to understand your requirements.
Develop
Using their knowledge and experience they will propose a
tailored solution and can provide full 3D simulations giving
a clear impression of the proposed workspace.
Manufacture
Bott products are manufactured here in the UK using the
latest sophisticated manufacturing processes, a dedicated
workforce and high quality materials. Bott are fully ISO 9001
and ISO 14001 certified.
Deliver
Bott have their own delivery vehicle fleet to get the products
to your site on time and in good condition.
Install
If required the Bott installation team will unwrap, assemble
and position the equipment.
Aftercare
Bott and ERIKS believe in long-term business relationships,
so you can be assured of an excellent aftersales service.
Built to last
All products undergo a rigorous testing and validation
programme, ensuring they are truly fit for purpose.
All Bott manufactured workplace storage equipment is proudly
covered by a 10 year guarantee so you can be totally confident
in the quality and durability of our range.
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
207
Bott Cubio
A comprehensive storage system designed for the most demanding of applications.
The range covers drawer cabinets, cupboards, workbenches and mobile storage solutions.
The modular system forms a harmonious solution and can be integrated with the Bott perfo
storage range.
All Bott Cubio products are epoxy powder coated in a choice of four standard colour schemes
and come in a vast range of sizes.
Heavy Duty Cabinets
nn Heavy duty construction with up to
1000kg U.D.L. capacity
nn Centrally lockable with
drawer blocking
nn 75kg U.D.L. capacity, 100% extension
drawers
nn Static and mobile versions
nn Optional adjustable metal, plastic box
and trough section divider kits
nn Top trays, worktops and base plinth
optional accessories
Heavy Duty Cupboards
nn Heavy duty construction with up to
1000kg U.D.L. capacity
nn Lockable doors with hinged, sliding,
up/over and window styles
nn Galvanised steel shelves with up
to 160kg capacity and wooden
shelf/worktop options
nn 75kg U.D.L. capacity, 100% extension
drawers
nn Perfo and louvre backpanels with
hook and bin accessories
Heavy Duty Benches
nn Heavy duty construction with up to
1200kg U.D.L. capacity
nn 40mm thick worktops in many styles
to cover all applications
nn Wide variety of bench styles from
basic framework to high capacity
storage with integrated cabinets
nn Static and mobile options
nn Backpanel and overhead shelf and
light accessories
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
208
Universal Structural Bonders
LIMITLESS
BONDING
LIMITLESS
REPAIR
LIMITLESS
DESIGN
Introducing limitless bonding
for limitless design and repair
Whatever your industry, Loctite has an adhesive solution.
Contact us on 01442 278100 www.loctite.co.uk
Henkel Loctite Adhesives
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
209
Universal Structur
LIMITLES
BONDIN
LIMITLESS
REPAIR
Introducing limitless
for limitless design a
Whatever your industry, Loctite has
Contact us on 01442 278100
LOCTITE 243
Medium
Strength Threadlocker
nn Resists vibration loosening
nn Threads are completely sealed
nn Temperature resistance up to
180°C
nn Improved cure even on mildly oil
contaminated parts
For general purpose threadlocking
LOCTITE HY 4070
Ultra Fast
Universal Repair Adhesive –
fixtures  60 secondsr
nn Gap fill up to 5mm
nn Bonds most substrates
including metals, most
plastics and rubbers
nn Good moisture, temperature and
chemical resistance
LOCTITE HY 4080
Toughened
Structural bonding with
good impact resistance
nn Fixtures in approximately
10 minutes even with a
2mm gap
nn Good moisture, temperature and
chemical resistance
nn Bonds most substrates including
metals, most plastics and rubbers
LOCTITE HY 4090
Fast
Fast and Strong
Structural Bonder
nn Good moisture,
temperature and
chemical resistance
nn Bonds most substrates
including metals, most plastics and
rubbers
nn Ultimate strength with maximum
temperature resistance up to 150°C
LOCTITE 638
High strength retaining
compound
nn Maximium strength
nn Prevents fretting
nn Gap fill up to 0.25mm
nn Temperature resistance up to 180°C
Ideal for bonding gears and impellors
onto shafts.
Use where permanent fixing is
required
LOCTITE 401,
406  454
Range of
instant adhesives
nn Thin to gel
consistencies
nn Temperature resistance up to 120°C
nn Handling strength in seconds
nn Can be used with LOCTITE 770
nn Polyolefin Primer
Suitable for bonding most close
fitting plastic and rubber
components. Single component
LOCTITE 577
Pipe Thread Sealant
nn Coarse pipe threads up to 3”
BSP
nn Instant seal on taper/parallel
joints
nn Temperature resistance up to 180°C
nn Improved cure even on mildly oil
contaminated parts
For sealing metal coarse threads,
locks and seals in any position
LOCTITE 577
Flange Sealant
nn One product for any shape or
size gasket
nn Seals scored or damaged rigid
flanges
nn No gasket relaxation
nn Improved heat aging
For sealing rigid flanges with gaps up
to 0.3mm
LOCTITE 3090
2 part instant gel
adhesive
nn Clear
nn Gap fill up to 5mm
nn Handling strength –
seconds to minutes
depending on gap
nn Temperature resistance up to 80°C
For sealing rigid flanges with gaps up
to 0.3mm
Continued innovation
from LOCTITE
New Hybrid
Technology
Established product range and New Hybrid Technology
- Threadlocking - Thread Sealing - Gasketing - Retaining - Structural Bonding
- Instant adhesives
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
210
RX
NON-SPARKING
TOOLS
The Range Includes:
nn Pliers
nn Screwdrivers
nn Spanners Wrenches
nn Sockets and sets
At ERIKS we take your
safety seriously and
when it comes to using
tools in potentially
explosive environments
we simply don’t offer
second best.
The RX range of non-sparking
safety tools are recommended
for use in all potentially explosive
environments, all areas where
combustible or easily ignitable
vapours, liquids and dusts are
present and anywhere that a
potential fire and explosion risk
from sparks is possible.
Safety at your fingertips...
nn Hex keys
nn Hammers
nn Brushes
nn Chisels and Bars
Non-sparking Tools
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
211Safety Footwear
RX®
Securo Safety Shoe
The RX Securo is a quality safety shoe made of lightweight materials, with shock absorbent
soles and composite toe protection, plus MS3 non-metallic penetration resistant midsole.
This makes the RX Footwear one of the most comfortable and stylish on the market.
RX®
Solido Safety Boot
The RX Solido is a quality safety boot made of lightweight materials,
with shock absorbent soles and composite toe protection, plus MS3 non-metallic
penetration resistant midsole. This makes the RX Footwear one
of the most comfortable and stylish on the market.
Part No	 Description	 UK size
W93L-50005	 RX Safety Shoe Securo	 5
W93L-50006	 RX Safety Shoe Securo	 6
W93L-50007	 RX Safety Shoe Securo	 6.5
W93L-50008	 RX Safety Shoe Securo	 7
W93L-50009	 RX Safety Shoe Securo	 8
Part No	 Description	 UK size
W93L-50010	 RX Safety Shoe Securo	 9
W93L-50011	 RX Safety Shoe Securo	 9.5
W93L-50012	 RX Safety Shoe Securo	 10
W93L-50013	 RX Safety Shoe Securo	 11
W93L-50014	 RX Safety Shoe Securo	 12
Part No	 Description	 UK size
W93L-50015	 RX Safety Boot Solido	 5
W93L-50016	 RX Safety Boot Solido	 6
W93L-50017	 RX Safety Boot Solido	 6.5
W93L-50018	 RX Safety Boot Solido	 7
W93L-50019	 RX Safety Boot Solido	 8
Part No	 Description	 UK size
W93L-50020	 RX Safety Boot Solido	 9
W93L-50021	 RX Safety Boot Solido	 9.5
W93L-50022	 RX Safety Boot Solido	 10
W93L-50023	 RX Safety Boot Solido	 11
W93L-50024	 RX Safety Boot Solido	 12
nn Composite toe cap which can
resist a pressure of 200 J
nn Anti-perforation sole made
from MS3 textile; very flexible,
gives a much better walking
comfort, isolates against the
cold and/or heat, protects a
larger area of the foot
nn Scuff pad allows more ‘give’
at the point where the foot
flexes. Ideal for jobs where
kneeling is required
nn Quality uppers stabilises
and supports the foot
nn TPU heel support
nn Reflective accents
for high visibility
nn Shock-absorbing comfort sole
for better walking comfort
nn PU/rubber sole material;
oil and petrol resistant	
nn HRO resistant to 300°C
contact heat
nn SRC sole for improved
slip resistance	
nn Ladder grip prevents
slipping on ladders
nn Extra wide fit
nn Composite toe cap which can
resist a pressure of 200 J
nn Anti-perforation sole made
from MS3 textile; very flexible,
gives a much better walking
comfort, isolates against the
cold and/or heat, protects a
larger area of the foot
nn Scuff pad allows more ‘give’
at the point where the foot
flexes. Ideal for jobs where
kneeling is required.
nn Quality uppers stabilises
and supports the foot
nn TPU heel support
nn Reflective accents
for high visibility
nn Shock-absorbing comfort sole
for better walking comfort
nn PU/rubber sole material;
oil and petrol resistant	
nn HRO resistant to 300°C
contact heat
nn SRC sole for improved
slip resistance	
nn Ladder grip prevents
slipping on ladders
nn Extra wide fit
RX Safety Footwear
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
212
Part No
W93L-50004
Safety Glasses, Goggles and Respiratory
Part No
W93L-50000
Part No
W93L-50001
	 Part No
	W93L-50003
Part No
W93L-50002
RX Safety Glasses and Goggles
Maximum comfort and the highest level of protection
are essential when eye-protection must be worn.
Features such as lightweight, stability and a perfect fit
contribute to this end.
RX®
Optiflex-V Safety Glasses
nn Lightweight stylish design
nn Fits over regular glasses without compromising comfort
nn Side ventilation
nn Polycarbonate lens
Optiflex-B
Brown polycarbonate
lens improves the
adaptation of the eye
to variable lighting
conditions
Optiflex-W
Green polycarbonate
lens offer protection
against UV rays
and beams of light.
Shade 5 Lens
Optiflex-C
Clear polycarbonate
lens, the perfect
protection for a
wide range of
lighting conditions
CHOOSING THE RIGHT LENS
RX®
Optiflex-C Safety Glasses
nn Lightweight stylish design
nn Clear polycarbonate lens
nn Compliant with EN166 and EN170
nn Anti-scratch coating
nn Anti-fog coating
nn Ventilating
RX®
Optiflex-C Safety Glasses
nn Lightweight stylish design
nn Green lens protects against UV rays and beams of light
nn Shade 5 lens for oxy-fuel welding and soldering
nn Compliant with EN166 and EN169
nn Anti-scratch and anti-fog coating
nn Ventilating
RX®
Optiflex-B Safety Glasses
nn Lightweight stylish design
nn Brown lens protects against UV rays and beams of light
nn Good colour recognition, TSR (traffic signal recognition)
nn Compliant with EN166 and EN170
nn Anti-scratch coating
nn Anti-fog coating
nn Ventilating
RX®
Optiflex-G Wide Vision Goggles
nn Lightweight stylish design with adjustable elastic headband
nn Ergonomically designed, 180° wide-vision
nn Highest optical quality lens, class 1
nn CE approved, EN166 protection against splashes of chemical
liquids and molten metals
nn Anti-scratch and anti-fog coating
nn Indirect ventilation
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
213
		 Pack	Normal Protection	 Assigned
Part No	 Description	 Size	 Factor	 Protection Factor
W93L-50031	 RX FFP2 pre-formed disposable mask reinforced	 10	 12	 10
W93L-50033	 RX FFP2V P2 pre-formed disposable mask reinforced, valve	 10	 12	 10
W93L-50035	 RX FFP3V P2 pre-formed disposable mask reinforced, valve	 5	 50	 20
			Normal Protection	 Assigned
Part No	 Description	 Packaging	 Factor	 Protection Factor
W93L-50028	 RX FFP1 disposable mask folded	 20	 4	 4
W93L-50027	 RX FFP1V disposable mask folded and valve	 10	 4	 4
W93L-50029	 RX FFP2 disposable mask folded	 20	 12	 10
W93L-50030	 RX FFP2V disposable mask folded and valve	 10	 12	 10
W93L-50032	 RX FFP3V disposable mask folded and valve	 10	 50	 20
			Normal Protection	 Assigned
Part No	 Description	 Packaging	 Factor	 Protection Factor
W93L-50037	 RX FFP1 pre-formed disposable mask	 20	 4	 4
W93L-50036	 RX FFP1V pre-formed disposable mask and valve	 10	 4	 4
W93L-50034	 RX FFP2 pre-formed disposable mask	 20	 12	 10
W93L-50026	 RX FFP2V pre-formed disposable mask and valve	 10	 12	 10
W93L-50025	 RX FFP3V pre-formed disposable mask and valve	 5	 50	 20
Respiratory
RX®
Fold Flat Disposable Mask
Single use, lightweight, ergonomically shaped disposable respirator for protection against
non-toxic and toxic particles.
nn Multi-layered filter medium electrostatically charged
nn Ergonomically shaped with adjustable head straps to provide individual fit
nn Adjustable nose clip to ensure a good seal around the nose
nn Conforms to the European approved standard EN149:2001 and A1:2009NR
nn Exhalation valve added for easier breathing (P1V, P2V and P3V)
RX®
Fold Flat Disposable Mask
RX®
pre-formed masks are manufactured to the highest standards, providing excellent comfort
and protection. A range of protective factors are available both with and without a valve.
nn Multi-layered filter medium electrostatically charged
nn Ergonomically shaped with adjustable nose clip to ensure a good seal around the nose
nn Conforms to the European approved standard EN149:2001 and A1:2009NR
nn Exhalation valve added for easier breathing (P1V, P2V and P3V)
RX®
Fold Flat Disposable Mask
Due to its lightweight netted construction, this mask has a very low breathing resistance,
so even during the most demanding working conditions the wearer enjoys the highest
possible comfort.
nn Multi-layered filter medium electrostatically charged
nn Reinforced net keeps the mask in its original form making it last longer
nn Integrated cover protects the valve avoiding mechanical damage
nn Adjustable head straps to provide an individual fit
nn Conforms to the European approved standard EN149:2001 and A1:2009NR
nn Exhalation valve added for easier breathing (P2V and P3V)
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
214
RX®
PERFORM+ Oil Range
Spill Control
Advantages of Melt Blown Polypropylene (MBPP) over Traditional Granules
Part No	 Description	 Size and Packaging	 Adsorption capacity (L)
RX-SC100-O3	 Oil Only Heavyweight Triple Layer Pad	 41cm x 46cm 100 Pads/Dispenser Box	 120L
RX-SC200-O3	 Oil Only Lightweight Triple Layer Pad	 41cm x 46cm 200 Pads/Dispenser Box	 154L
RX-SC81-O3	 Oil Only Heavyweight Triple Layer Roll	 81cm x 46m 1 Roll/Box	 240L
RX-SC41-O3	 Oil Only Heavyweight Triple Layer Roll	 41cm x 46m 1 Roll/Dispenser Box	 120L
RX-SC122-O	 Oil Only Sock	 7.6cm dia x 122cm 15 Socks/Box	 85L
RX-SC305-O	 Oil Only Sock	 7.6cm dia x 305cm 6 Socks/Box	 85L
RX-SC4646-O	 Oil Only Pillow	 46cm x 46cm 10 Pillows/Box	 78L
RX Spill Control
Spill control is not just incident management, it’s about
meeting Legal and Regulatory Frameworks that apply
to everyone in today’s environment.
Made from Melt Blown Polypropylene (MBPP) RX®
adsorbents are
a high quality, high performance workplace spill control solution.
Products are available for general maintenance use in
factories, workshops, and the manufacturing industry where there
is a general requirement for a clean workplace.
In outdoor situations, where oil and other liquids must be
controlled, RX®
provides an oil and fuel solution. This
is a hydrophobic product which will not adsorb water.
For incidents, and day-to-day situations involving chemicals
and solvents, the RX®
chemical range provides an instantly
recognisable and complete solution.
Available in:
nn Pads
nn Rolls
nn Socks
nn Pillows
nn Adsorbs petroleum based liquids and repels water
nn Spunbound cover on both sides give superior strength allowing for high abrasion
resistance when wiping rough surfaces
nn Dimple bonded for added strength and speeds up the wicking of liquids
nn Available in two different weights
nn Virtually lint-free
nn Can be deployed even faster
nn Adsorbs spills more quickly
nn Flexibility of use; can be used reactively
or as a preventative measure
nn Easier and quicker to dispose of, can
be incinerated
nn Granules are dusty and messy
	 and in some cases harmful to
	 employees and machinery
nn Lower cost in use, customer
	can save over 40%
RX®
Site Surveys
ERIKS can offer a full site survey for
assessment of suitable leak and spill
provision, ensuring full compliance
with current health and safety and
environmental legislation.
RX®
Spill Control Training
We can provide certified spill control
training for first responders or tailored
solutions dependant on requirements.
This will help with compliance with
Environmental Management Systems as
set out in ISO 14001.
Quicker and
faster than
granules
SITE SURVEYS
AND TRAINING
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
215
Part No	 Description	 Size and Packaging	 Adsorption capacity (L)
RX-SC100-C	 Perforated Heavyweight Pad	 41cm x 46cm 100 Pads/Dispenser Box	 134L
RX-SC81-C	 Heavy Weight Perforated Roll	 81cm x 46m 1 Roll/Bag	 267L
RX-SC41-C	 Heavy Weight Perforated Roll	 41cm x 46m 2 Rolls/Bag	 134L
RX-SC122-C	 Chemical Sock	 7.6cm dia x 122cm 15 Socks/Box	 85L
RX-SC305-C	 Chemical Sock	 7.6cm dia x 305cm 6 Socks/Box	 84L
RX-SC4646-C	 Chemical Pillow	 46cm x 46cm 10 Pillows/Box	 78L
Part No	 Description	 Size and Packaging	 Adsorption capacity (L)
RX-SC100-M3	 Perforated Heavyweight Pad	 41cm x 46cm 100 Pads/Dispenser Box	 120L
RX-SC200-M3	 Perforated Lightweight Pad	 41cm x 46cm 200 Pads/Dispenser Box	 154L
RX-SC81-M3	 Perforated Heavyweight Triple Layer Roll	 81cm x 46m 1 Roll/Box	 240L
RX-SC41-M3	 Perforated Heavyweight Triple Layer Roll	 41cm x 46m 1 Roll/Dispenser Box	 120L
RX-SC122-M	 Maintenance Sock	 7.6cm dia x 122cm 15 Socks/Box	 85L
RX-SC305-M	 Maintenance Sock	 7.6cm dia x 305cm 6 Socks/Box	 84L
RX-SC4646-M	 Universal Pillow	 46cm x 46cm 10 Pillows/Box	 78L
Part No	 Description	 Content	 Adsorption
			 capacity (L)
RX-SCKIT130-M	 Maintenance Mobile Response Kit	 50 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags,	 Up to 136L		
		 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties	
RX-SCKIT250-M	 Maintenance Mobile Response Kit	 150 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags,	 Up to 250L
		 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties 	
RX-SCKIT130-O	 Oil Only Mobile Response Kit	 50 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags,	 Up to 136L
		 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties	
RX-SCKIT250-O	 Oil Only Mobile Response Kit	 150 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags,	 Up to 250L
		 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties	
RX-SCKIT130-C	 Chemical Mobile Response Kit	 50 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags,	 Up to 136L
		 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties	
RX-SCKIT250-C	 Chemical Mobile Response Kit	 150 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags	 Up to 250L	 	
		 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties	
Available in:
nn Pads
nn Rolls
nn Socks
nn Pillows
nn Spunbound cover offers high abrasion resistance when wiping rough surfaces
nn Dimple bonded for added strength and faster, easier clean up of spills
nn Static resistant, offering greater safety when handling flammable liquids
nn Available in two different weights
nn Virtually lint-free
RX®
PERFORM+ Maintenance Range
nn Designed to adsorb chemical and other hazardous liquids
nn Ideal for use in laboratories, hospitals and chemical storage areas
nn Spunbound cover offers high abrasion resistance and added strength when wiping
rough surfaces
nn Dimple bonded for added strength and faster, easier clean up of spills
nn Static resistant, offering greater safety when handling flammable liquids
RX®
PERFORM+ Maintenance Range Available in:
nn Pads
nn Rolls
nn Socks
nn Pillows
nn All models available in oil only, Maintenance and Chemical Versions
nn Adsorption capacity up to 250 litres
nn Wheels give mobility indoors and outdoors
RX®
Spill Control Mobile Response Kits Adsorption
Capacity:
nn 136 Litre
nn 250 Litre
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
216 Safety Gloves
Part No	Glove Size
RX-PG-CR5N7 	 7
RX-PG-CR5N8 	 8
RX-PG-CR5N9	9
RX-PG-CR5N10 	 10
RX-PG-CR5N11	11
Part No.	 Size
W93L-50057	6
W93L-50059	7
W93L-50058	8
W93L-50056	9
W93L-50055	10
RX Safety Gloves
RX®
Safe5 Cut Resistant Glove
Seamless knitted high cut resistant liner with a nitrile palm coating that offers
outstanding protection.
nn The seamless construction provides an exceptional level of comfort, whilst the
open back style allows excellent breathability
nn This lightweight glove attains to the maximum EN388 standard offering the
wearer an excellent level of protection
nn The nitrile palm coating is incredibily resilient and flexible, allowing for good
gripping ability
nn Elasticated, for a snug fit. The knitted wrist is extra long for optimal wrist
protection
nn Suitable applications include: component handling, assembly, electronics and
construction
nn Sold in packs of 12 pairs
RX®
Dyneema®
Safe3 Cut Resistant Glove
Seamless knitted Dyneema® glove with polyurethane coating.
nn The seamless construction provides an exceptional level of comfort, whilst
the open back style allows excellent breathability
nn This lightweight glove with Dyneema®
provides excellent resistance to cuts,
	 abrasion and tears
nn The glove has been designed to be tight fitting to give maximum dexterity
for the most tactile of operations
nn Elasticated, for a snug fit. The knitted wrist is extra long for optimal
wrist protection
nn Suitable applications include: component handling, assembly, electronics
and cutting activities
nn Sold in packs of 12 pairs
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
217
	 Part No.	 Size
	W93L-50067	 6
	W93L-50066	 7
	W93L-50039	 8
	W93L-50041	 9
	W93L-50064	 10
Part No.	 Size	 Colour
W93L-50048	6	 Black
W93L-50051	7	 Black
W93L-50053	8	 Black
W93L-50054	9	 Black
W93L-50047	10	 Black
W93L-50049	6	 White
W93L-50046	7	 White
W93L-50050	8	 White
W93L-50052	9	 White
W93L-50044	10	 White
RX®
Top-Flex PU Precision Gloves
Seamless knitted nylon glove with polyurethane coating.
nn The seamless construction provides an exceptional level of comfort, whilst the
open back style allows excellent breathability
nn The glove has been designed to be tight fitting to give maximum dexterity for
the most tactile of operations
nn Knitted elasticated wrist for a snug fit
nn Suitable applications include: component handling, assembly, electronics and
light engineering
nn Available in black or white versions
nn Sold in packs of 12 pairs
RX®
Nitri-4-Grip Safety Gloves for Extra Grip
Seamless knitted nylon glove with a light porous breathable foam nitrile coating.
nn The seamless construction provides an exceptional level of comfort, whilst the
open back style allows excellent breathability
nn The snug fit provides maximum dexterity for the most tactile of applications
nn As well as providing excellent dry grip, Nitri-4 Grip channels oils and liquids
away from the surface ensuring superb wet grip
nn Suitable applications include; component handling and assembly
nn Sold in packs of 12 pairs
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
218 Thormas Safety Gloves
Part No	Glove Size
THMS2420031	6
THMS2420032	7
THMS2420033	8
THMS2420034	9
THMS2420035	10
Part No	Glove Size
THMS2420036	6
THMS2420037	7
THMS2420038	8
THMS2420039	9
THMS2420040	10
Part No	Glove Size
THMS2420011	6
THMS2420012	7
THMS2420013	8
THMS2420014	9
THMS2420015	10
Thormas Safety Gloves
Precision Handling PU
Second Skin fit gloves are light but strong with an exceptionally tactile feel and snug
fit. They have a close-fitting knitted wrist with a white polyurethane coated palm on a
seamless knitted white nylon liner. Hard-wearing and excellent dexterity for applications
where fine handling is important. Perfect for inspection jobs where the use of white gloves
is desirable. Conform to EN 388 4.1.3.1
Precision Handling PU
Second Skin fit gloves are light but strong with an exceptionally tactile feel and snug fit.
They have a close-fitting knitted wrist with a black polyurethane coated palm on a seamless
knitted black nylon liner. Hard-wearing and excellent dexterity for applications where fine
handling is important. Conform to EN 388 4.1.3.1
Precision Grip NIT
High quality grey nitrile foam palm coating on a seamless 13g white nylon liner for extra
comfort. Open back style allows excellent breathability. Tight fitting to for maximum
dexterity for the most tactile of applications. Elasticated knitted wrist for a snug fit. Conform
to EN 388: 4.1.2.1
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
219
Part No	Glove Size
THMS2420021	6
THMS2420022	7
THMS2420023	8
THMS2420024	9
THMS2420025	10
Part No	Glove Size
THMS2420026	6
THMS2420027	7
THMS2420028	8
THMS2420029	9
THMS2420030	10
Part No	Glove Size
THMS2420016	6
THMS2420017	7
THMS2420018	8
THMS2420019	9
THMS2420020	10
Precision Grip NIT
Designed and developed as a breathable glove, the Ultimate Flex has a 15g nylon/spandex
grey liner with a black nitrile foam palm coating. Ideal glove for precision handling in dry
environments. Suitable for a wide variety of applications such as packaging, logistics and
warehousing, using tools and instruments, wiring operations, automotive and construction.
Conform to EN 388 4.1.3.1
Precision Grip NIT
The Ultimate Flex Pro glove offers cutting edge technology nitrile micro-foam with a black
palm coating on a 15g grey nylon/spandex liner. Extremely comfortable for prolonged wear.
Excellent dexterity, sensitivity, tactility and fit. Superior grip and abrasion resistance. Good
for both wet and dry applications such as handling oily components. Conform to EN 388
4.1.3.1
Cut protection pu3
The HPPE 13g cut resistant grey liner is super-lightweight and flexible for optimum
comfort and dexterity. Grey polyurethane palm coating gives excellent handling
performance in wet or oily environments as it channels liquids away from the glove surface.
Cut level 3 protection for applications with medium cut risk.
Thousands of
products available
to order on
ERIKS
WEBSHOP
SHOP.ERIKS.CO.UK
SHOP.ERIKS
.CO.UKSHOP
.ERIKS.CO.UK
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
220
With best practice
machine-specific procedures,
software to easily create and
evaluate them, and the tools
to isolate any machine from its
energy supply, you can avoid
accidents during machine
interventions and push your go for
zero programme to the next level!
www.bradyeurope.com/LOTOservices
GO FOR
ZEROWITH LOCKOUT/TAGOUT
Request the Lockout/
Tagout guide book
“Safer machine
interventions”!
Lockout/Tagout
Guide Book
SAFERMACHINE INTERVENTIONS
ENABLE
Reduce accidents,
increase productivity
Print lean  safety signs on-site
Brady offers durable visual workplace labels, including
amongst others lean and 5S labels, floor marking, storage
area labels, level indicators, gauge labels, equipment
identification labels and logistics labelling.
These labels can be printed on-site
when needed with a Brady printer.
Discover the advantages of visual
workplace signs with our complete
range of sign  label printers.
www.bradyeurope.com/diy BRADY UK
Wildmere Industrial Estate,
Banbury, Oxon OX16 3JU
Discover our printers!
With best practice
machine-specific procedures,
software to easily create and
evaluate them, and the tools
to isolate any machine from its
energy supply, you can avoid
accidents during machine
interventions and push your go for
zero programme to the next level!
www.bradyeurope.com/LOTOservices
GO FOR
ZEROWITH LOCKOUT/TAGOUT
Request the Lockout/
Tagout guide book
“Safer machine
interventions”!
Lockout/Tagout
Guide Book
SAFERMACHINE INTERVENTIONS
ENABLE
Reduce accidents,
increase productivity
Print lean  safety signs on-site
Brady offers durable visual workplace labels, including
amongst others lean and 5S labels, floor marking, storage
area labels, level indicators, gauge labels, equipment
identification labels and logistics labelling.
These labels can be printed on-site
when needed with a Brady printer.
Discover the advantages of visual
workplace signs with our complete
range of sign  label printers.
www.bradyeurope.com/diy BRADY UK
Wildmere Industrial Estate,
Banbury, Oxon OX16 3JU
Discover our printers!
Brady
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
221
Discover the advantages of visual
workplace signs with our complete
range of sign  label printers.
www.bradyeurope.com/diy BRADY UK
Wildmere Industrial Estate,
Banbury, Oxon OX16 3JU
Discover our printers!
Part No	 Description
W15D-54376	 BMP21-PLUS Label Printer
W15D-57633	 19.05mm Vinyl Tape Cartridge - Black on White
W15D-57647	 19.05mm Vinyl Tape Cartridge - Black on Yellow
Part No	 Description
W15D-52690	 Portable Metal Group Lock Box Blue
W15D-53302	 Portable Metal Group Lock Box Yellow
W15D-53312	 Portable Metal Group Lock Box Red
Label Printers and
Lock Boxes
BMP™ 21-Plus Label Printer
Once you experience the BMP™21-PLUS Label Printer’s unstoppable labelling power,
you’re not going to want to share. It combines a tough exterior with smart printing
capabilities for wires, cables and flat surfaces.
nn Drop-lock-and-print cartridges
nn Super rugged with moulded rubber bumpers
nn Rechargeable lithium-ion battery
nn 7 durable continuous materials with widths from 6 to 38.10 mm
nn Automatic label formatting for wire wraps, terminal blocks, patch panels and cable
flags and general banner labels
nn 104 symbols for electric, smart home, safety and datacom
nn Label grabber, printer holds label after cutting
nn Standard 2 year warranty
BBP™ 31 Sign and Label Printer
The BBP™31 Sign  Label Printer is exactly how a printer is supposed to be. It’s easy to
use. It’s packed with functionality. And best of all, it’s got so many material options that this
one printer can handle all the labelling needs in your facility.
Group Lock Box
For group lockout situations involving a large number of workers and equipment
nn After machine or process is locked out, the key or keys of the machine are placed in a
lock box.
Each authorized work team member places a personal lock or tagout device in the
group lock box.
nn Ensures that no single employee has access to the box
unless ALL employees have removed their locks or tags.
Part No	 Description
W15D-62522 	 BBP31 Sign  Label Printer QWERTY - UK
W15D-57302	 101mm Indoor/Outdoor Vinyl Tape - White
W15D-57302	 101mm Indoor/Outdoor Vinyl Tape - Yellow
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
222 Metal Cutting Tools
HSS Tap and Drill Set
nn Brand new 14pc set
nn Features E500 straight flute taps
and A002 TiN coated jobbers
nn Ideal for a wide range of general
purpose machining applications
nn Contains M3-M12 taps and
equivalent pre-tapping dril sizes
Part No
DORL115NO101
90° Countersink Set
nn Metric set (Plastic case)
containing G136 HSS 90 degree
straight shank countersinks
nn For production of 90° countersinks
in most materials
nn Can also be used as a
de-burring tool
nn Bright finish, 3 flute, ground all over
Part No
DORG236-1
A002 TiN Tipped Jobber Drill
Numerous aspects of Dormer’s renowned A002’s design
contribute to its outstanding all-round capabilities
nn Special 118° four facet point enables excellent centring
nn Titanium Nitride (TiN) coating not only resists wear but also
reduces friction.
nn Thick web design optimises the structural strength of the drill
Part No
DORA002-XX
Burrs
Dormer’s range of carbide
burrs is a high quality,
comprehensive program which
includes designs and shapes
to offer a solution for the
majority of applications in all
major industry segments.
nn Cut styles include aluminium and double cut
nn Toughened and hardened steel shanks
nn Special brazing elements provide excellent braze strength
nn Ball Nose Geometry, skip flute grinding
nn TiAIN Coating
nn For all general internal and external turning operations
nn Tool holders and boring bars available in left hand or right hand
nn D style holder with top clamp for increased security
nn Available in styles that enable the use of all insert edges
Negative Turning Holders and Boring Bars
Part No
DCLNR PCLNR PCKNR PCBNR
Metal Cutting Tools
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
223
Negative Turning Inserts
Part No
	 CNMG 09/12/16/19
	 DNMG 11/1504/1506
	RNMG 12/15/19
	SNMG 12/15/19
	 TNMG 16/22
	 VNMG 16
	 WNMG 06T3/0604/08
nn For all general internal and external turning operations
nn Tool holders and boring bars available in left hand or right hand
nn D style holder with top clamp for increased security
nn Available in styles that enable the use of all insert edges
Positive Turning Holders and Boring Bars
Part No
SCLCR SDNCN SRDCN
Positive Turning Inserts
nn Available with corner radii 0.2mm - 1.6mm
nn Chip Breakers and Grades for all materials and
machining conditions
nn Toolholders and Boring Bars available
nn For all general internal and external turning operations
nn Tool holders and boring bars available in left hand or right hand
nn D style holder with top clamp for increased security
nn Available in styles that enable the use of all insert edges
Part No
	 CCGT/MT 06/08/09/12
	 DCGT/MT 07/11
	RCGT/MT 		
	06/08/10/12/16/20
	SCMT 09/12
	 TCGT/MT 09/11/16
	 VBMT 11/16
	 VCGT/MT 07/11/13/16
nn Available with corner radii 0.2mm - 1.6mm
nn Chip Breakers and Grades for all materials and machining
conditions
nn Toolholders and Boring Bars available
nn For all general internal and external
turning operations
nn Tool holders and boring bars available
in left hand or right hand
nn D style holder with top clamp
for increased security
nn Available in styles that enable the
use of all insert edges
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
224 Metal Cutting Tools
Parting  Grooving
Part No 	Holder	 Inserts
W24A-71384 	 XLCFN 2602 J 3.00 (x1) 	 LFMX 3.1-.20TNF2 T8330 (x10)
W24A-71385 	 XLCFN 2603 J 4.00 (x1) 	 LFMX 4.1-.20SNF2:T8330 (x10)
W24A-71386 	 XLCFN 3202 M 3.00 (x1) 	 LFMX 3.1-.20TNF2 T8330 (x10)
W24A-71387 	 XLCFN 3203 M 4.00 (x1) 	 LFMX 4.1-.20SNF2:T8330 (x10)
Milling
Part No
	 ADMX 07/11/16
U-Drills
nn Available in diameters 15mm - 58mm, in lengths 2D, 3D, 4D  5D.
nn High drill body stability with low friction coating
nn Versatile with high application security
Part No
	 SCET 			
	05/06/07/09/12/15
	XPET
	05/06/07/09/
	11/12/15/19
Strong square insert in Grades and Chip Breakers to suit all materials and machining conditions
2D 3D 4D 5D
nn Versatile range of cutters for face
milling, shoulder milling, slot milling,
plunge milling, ramping and helical
interpolation.
nn End Mills, Helical End Mills and Face
mills available
nn For radial parting and grooving
applications
nn Single edge inserts for production of
deeper grooves
nn Back stop incorporated within insert for
improved depth control
nn 4 different kits available
Each kit comes with a blade and a
packet of 10 x LFMX inserts (T8330
Grade)
Chip Breakers and Grades for all materials and machining
conditions
Available with corner radii 0.2mm - 3.0mm
Metal Cutting Tools
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
225
Metric  Unified Threading Kits
nn For the production of external and internal metric threads in most materials
nn Tool holders for both conventional and partial profile inserts
nn Left hand holders and inserts also available
nn Suitable for a wide range of materials
A087201 A08910 L700N781
nn A002 TiN coated jobber drills with self
centering point
nn Excellent performance in a wide range
of materials
nn Supplied in robust, attractive plastic
case
Contains
nn 19 PC A002 TiN coated jobber drills
for general purpose drilling in a wide
range of materials
nn 1.00mm - 10.0mm x 0.5mm
nn 5 PC A002 TiN coated jobber drills with
self centering point
nn Excellent performance in a wide range
of materials
nn Supplied in robust, attractive plastic
case
Contains
nn A002 HSS TiN Coated Jobber Drills:
nn 4.0, 5.0, 6.0, 8.00  10.00mm
nn HSS METRIC COARSE STRAIGHT
FLUTE TAP SET (M3-M10)
nn Metric coarse taps set for maintenance
repair and overhaul
nn Manufactured from premium quality
HSS
nn For increased hardness toughness and
improved strength
nn Bright finish universally suitable for
many materials
nn Manufactured to Din standards with
chamfer form C for blind and through
holes
Part No 	 Style
W24A-71388	External
W24A-71389	External
W24A-71390	Internal
W24A-71391	Internal
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
226
Norbar Torque Wrenches
Torque Screwdrivers
Versatile, accurate and easy torqueing for smaller fasteners and restricted
spaces
TT Torque Wrenches
For no-nonsense torqueing – comfortable, accurate and easy to use
NorTorque®
Utilises Norbar’s proven mechanism and internal components and incorporates
them into a purposeful and attractive torque wrench
Norbar
Part No	 Details
NOR13475	 TTs1.5 0.3 – 1.5 N�m screwdriver
NOR13476	 TTs 3.0 0.6 – 3 N�m screwdriver	
NOR13509	 TTs 6.0 1.2 – 6 N�m screwdriver
Part No	 Details
NOR13285	 TTi 20 1/4 1 – 20 N�m, 10 -180 lbf�in
NOR13640	 TTi 20 3
/8 1 – 20 N�m, 10 -180 lbf�in
NOR13658	 TTi 50 3
/8 8 – 50 N�m, 6 – 35 lbf�ft
NOR13659	 TTi 50 ½ 8 – 50 N�m, 6 – 35 lbf�ft
Part No	 Details
NOR130101+
	NorTorque®
model 60 3
/8 12 - 60 N�m, 10 - 45 lbf�ft
NOR130103*
	NorTorque®
model 100 ½ 20 - 100 N�m, 15 - 75 lbf�ft
NOR130104	NorTorque®
model 200 ½ 40 - 200 N�m, 30 - 150 lbf�ft
NOR130105	NorTorque®
model 300 ½ 60 - 300 N�m, 45 - 220 lbf�ft
NOR130106	NorTorque®
model 340 ½ 60 - 340 N�m, 45 - 250 lbf�ft
nn 	Accuracy exceeds the requirement of
ISO 6789:2003
nn 	Tool 'slips' when torque is achieved
removing the possibility of 'over-
tightening'
nn 	Supplied with a 1/4 hexagon bit holder
designed using a 4mm hexagon stem
nn 	Bit holder can be removed and replaced
with widely available screwdriver bits
nn 	All tools feature a lock to prevent
accidental adjustment of set torque
nn 	Easy torque adjustment without the
need of additional specialist tools
nn 	Traceable calibration certificate for the
clockwise direction supplied with all
adjustable tools
nn Accurate to ±3% of reading which
meets and exceeds ISO 6789:2003
nn Micrometer scale for simple and error
free setting
nn All models feature a lock to prevent
accidental adjustment of the set torque
nn Handle and lens materials resistant to
commonly used industrial chemicals
nn Adjustment over the entire scale can
quickly be achieved and with minimal
effort in approximately ten complete
turns
nn Each wrench is supplied with a traceable
calibration certificate
nn Accurate to ±3% of reading which
meets and exceeds ISO 6789:2003
nn Push/pull lock is fast and intuitive to use
and prevents accidental adjustment of
the set torque
nn Light and fast adjustment saves operator
time and effort
nn Micrometer scale applying to the primary
torque units (N·m on a dual scale
wrench) for simple and error free setting
nn Tough ratchets with narrow engagement
angles for easy positioning in confined
spaces
nn Convenient hanger feature for tool
storage also aids wrench unlocking and
adjustment
nn Supplied with traceable calibration
certificate.
+
Supplied with a 1/2 sq. dr. adaptor
* Supplied with a 3
/8 sq. dr. adaptor
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
227
Professional Torque Wrenches
Norbar’s Professional torque wrench range has become one of the most
popular wrench ranges available worldwide
Industrial Torque Wrenches
For ultimate torque control in heavy duty applications
HandTorque®
Designed for use where it is necessary to provide higher torques than would
otherwise be possible due to limitations of space or operator strength. Input
to the multiplier is via a ratchet torque wrench set to one fifth of the desired
output torque.
Part No	 Details
NOR15002	 Pro 50 3
/8 10 – 50 N�m, 7.5 – 37.5 lbf�ft
NOR15003	 Pro 100 ½ 20 – 100 N�m, 15 - 75 lbf�ft
NOR15004	 Pro 200 ½ 40 – 200 N�m, 30- 150 lbf�ft
NOR15005	 Pro 300 ½ 60 – 300 N�m, 50 – 220 lbf�ft
NOR15006	 Pro 340 ½ 60 – 340 N�m, 50 – 250 lbf.ft
NOR15007	 Pro 400 ½ 80 – 400 N�m, 60 – 300 lbf�ft
Part No	 Details
NOR12001	 3AR 3/4 100 – 500 N�m, 70 – 350 lbf�ft
NOR12006	 4R 1 150 – 700 N�m, 100 – 500 lbf�ft
NOR12007	 4AR 3/4 200 – 800 N�m 150 – 600 lbf�ft
NOR12009	 5R 3/4 300 – 1000 N�m 200 – 750 lbf�ft
NOR12012	 5AR 1 700 – 1500 N�m 500 – 1000 lbf�ft
Part No	 Details
NOR180260	 HT3-1000 N�m Kit, ½ input, 3/4 output
NOR17220	 HT3 1300 N�m Kit, ½ input, 3/4 output
NOR17221	 HT3 2700 N�m Kit, 3/4 input, 1 output
nn Accurate to ±3% of reading which
meets and exceeds ISO 6789:2003
nn Large scale for better visibility and more
accurate setting
nn Fast scale adjustment reducing the
effort required to adjust
nn Ergonomic new handle with a high
proportion of soft-feel, high grip material
nn Handle material and lens resist all
chemicals in common automotive,
industrial and aviation use
nn Unique on a torque wrench, the
TimeStrip®
gives a visual indication that
the wrench is due for re-calibration
nn Supplied with a traceable calibration
certificate
nn Unique ‘break action’ mechanism gives
unparalleled control over the applied
torque
nn Perfect for wheel nuts and many other
applications
nn Accurate to ±4% of reading
nn Supplied with traceable calibration
certificate
nn 5:1 multiplication, accuracy ±4%
nn Small and compact design
nn Robust construction means minimal
maintenance and long life
nn 1300 N.m version has a spare 3/4 output
square included in the kit
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
228
RÖHM Live Centres, Chucks and
Compact Vices
Live Centres
The requirement for high cutting capacities and high working precision demands an
additional support by a revolving live centre for many workpieces due to their shape
and length.
Thanks to their precision bearings, RÖHM live centres offer optimal force absorption
and a maximum concentricity deviation of up to 0.003 mm. Thanks to the lifetime
lubrication, the centre points are maintenance free.
nn 	Maximum concentricity and optimal force absorption thanks to proven precision bearings
nn 	Special lubrication for long service life and little required maintenance
nn 	Minimum interference contour thanks to slender housing shape
Key Bar Chucks With Quick-Acting
Jaw Change System
The RÖHM key bar chucks with quick-acting jaw change system are used successfully
in areas where extremely high clamping forces, high concentricity and reliable long-
term repeatability are required.
Thanks to the quick-acting jaw change system, the jaws can be quickly and easily
turned, changed or offset over the entire clamping range within a few seconds.
nn 	Maximum clamping forces thanks to direct force transfer via the key bar system
nn 	Maximum concentricity and axial run-out tolerance
nn 	High user-friendliness thanks to quick-acting jaw change system
NC-Compact Vices
NC-compact vices are particularly suited for use on machining centers, milling
machines and are ideal for 5-axis machining.
These premium vices are very impressive with their stable and compact design for
maximum clamping accuracy and optimal workpiece accessibility.
By simply turning the clamping force presetting, a clamping force of up to 60 kN can
be achieved. With workpieces that are sensitive to deformation, the force amplification
can be disabled.
nn Large clamping range and precise positioning due to fixed clamping jaw
nn 	The compact design resists deformation for the greatest possible clamping precision
nn 	Consistent clamping force and maximum repeatability of 0.01 mm
RÖHM
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
229
High Performance
LUBRICATION
DID YOU KNOW...
36% of rolling
bearings fail
due inadequate
lubrication
Product Range
nn Lubricants; grease, oil, pastes, dry film
lubricants and cleaners
nn Lubricators
nn Lubrication Systems
nn Equipment and accessories including
grease guns and storage systems
Services
nn Application and selection advice
nn Lubricant management contracts
nn Oil sampling
nn Condition Monitoring
Products from all the Leading Brands
LUBRICATION Technology
An effective lubrication service does more
than keep machinery functioning smoothly,
it can improve reliability, lengthen machinery
life, increase efficiency and enhance
productivity.
We offer lubricants for every industry
and every requirement including special
lubricants for the Food and Beverage and
Pharmaceutical industries to meet the very
highest legislative requirements.
We bring our experience, our know-how
and our passion for technology and we
apply them not just at your machinery’s
lubrication points but at every stage of
your process.
We can recommend products across one brand or a range
of brands, ensuring the best performance and best value,
regardless of supplier.
229
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
230
White
Grease Spray
Part No
RX-WHITEGREASE-400ML
High
Temperature
EP2 Bearing
Grease
Part No
OKS422-400ML
ERIKS Lubrication Essentials
Open Gear
Grease
Spray
Part No
ROC-TUFGEAR SPRAY
Wire Rope
Spray
Part No
ROC-WIRE ROPE SPRAY
Multi-Purpose
Grease EP2
Part No
EP2-400G-RX
Multi-Purpose
Lithium
Complex
Grease
Part No
EP2-HP-400G-RX
Wide
Temperature
Range EP2
Grease
Part No
OKS404-400ML
Food Grade
EP2 Bearing
Grease
Part No
OKS479-400ML
Marine
Grease
Part No
OKS403-400ML
Food Safe
Silicone
Grease
Part No
OKS1110-80ML
OKS110-500G
OKS-1111-400ML
DON’T FORGET
Side Lever
Grease Gun
Suitable for use with 400ml cartridges
Part No: OKS5500
Bearing Greases and Technical Lubricants
Bearing Greases
ERIKS Lubrication Essentials,
featured across pages 220-223,
is a range of high quality, readily
available items designed to meet the
most common industrial lubrication
and maintenance applications. ERIKS Lubrication EssentialsYour core lubrication rangeERIKS Lubrication Essentials
Your core lubrication range
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
231
High
Temp
Chain Oil
Part No
OKS352-5LTR
Chain Oil
Food
Grade
Gear Oil
Part No
OKS3720-5LTR
OKS3720-25LTR
Food Grade
Chain Spray
Part No
OKS3751-500ML
Compressor
Oil
Part No
CAS-AIRCOLPD100-20LTR
Food
Grade
Hydraulic
Oil
Part No
OKS3770-5LTR
Gear Oil
Part No
CAS-ALPHASP220-20LTR
CAS-ALPHASP320-20LTR
Synthetic
Gear Oil
Part No
CAS-ALPHASYNPG320-20KG
Chain
Spray
Part No
OKS671-400ML
Premium
Hydraulic
Oil
Part No
CAS-HYSPINAWS32-20LTR
CAS-HYSPINASW46-20LTR
Hydraulic
Oil
Part No
EP32-25LTR-RX
Dry Film
Part No
OKS571-400ML
Silicone Oil
Part No
OKS1361-500ML
Gear Oil
Chain Oil Hydraulic Oil
Hydraulic Oil
Feedback from our customers has
indicated two common problems
with lubricant supply...
Problem 1
The ever expanding plethora of different
lubricants, additives and performance
claims is becoming impossible to keep
up with. Also, it’s easy to become blinded
by the “science” of performance claims
which sound too good to be true, but
how do you cut through the jargon and
find out if it is really the right product for
your application?
Problem 2
When surveying customer stores we
regularly encounter several stocked
items which all do exactly the same
job, multiplying our customers stock
values and wasting their time managing
excessive inventory.
WHY LUBRICATION ESSENTIALS?
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
232
Anti-Seize
Air Duster
Part No
AMB-AIRDUSTER-400ML
Jointing
Compound
Part No
ROC-HYLOMAR-100G
Rust
Remover
Part No
OKS611-400ML
Cutting Oil
Part No
OKS391-400ML
Leak
Detector
Spray
Part No
OKS2801-400ML
Belt
Dressing
Spray
Part No
OKS2901-400ML
Moly Paste
(and Spray)
Part No
OKS221-400ML
Copper
Anti-Seize
Paste
Part No
OKS245-250G
Multi-
Purpose
WD Spray
Part No
WD40-400ML
Multi-Purpose
Maintenance
Spray with
PTFE
Part No
TRIFLOW-500ML
High
Perfromance
Maintenance
Spray
Part No
OKS641-400ML
Food Grade
Maintenance
Spray
Part No
OKS371-400ML
Maintenance Sprays
Workbox Essentials
Workbox Essentials
Maintenance and Workbox Essentials
WHY LUBRICATION ESSENTIALS?
The Concept
With this in mind we set out to define a
core range of items with excellent stock
availability, hand picked, by our lubrication
engineers to cover as wide a range of
applications as possible while always
maintaining the very best in performance
and compliance.
The Products
ERIKS Lubrication Essentials range
meets the widest variety of applications
imaginable from around 50 core items.
These are amongst our most popular
products and are proven in hundreds of
applications across as wide a variety of
industrial sectors imaginable.
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
233
Temporary
Protective
Film, Wax
Based
Part No
OKS2101-400ML
Food
Grade,
Anti-Seize
Paste
Part No
OKS252-250G
Corrosion Protection
Zinc
Galvanising
Spray,
Permanent
Part No
OKS2511-400ML
Zinc Spray
Part No
RX-ZINCSPRAY-400ML
Automatic Lubricator
Single-point
Automatic Lubricator
Part No
SIMASL24 Multi Purpose Grease
SIMASL10 Food Industry Grease
SIMASL01 Water Resistant
SIMASL14 Chain Oil
SIMASL15 High Temperature Chain Oil
SIMASL18 Food Industry Oil
n	 Proven 		
Performance
n	 Simplify and Reduce
Inventory
n	 Excellent Availability
n	 Ensure Compliance
Bio-
degradeable
Cleaner
Part No
OKS2650-500ML
Electrical
Contact
Cleaner
Part No
OKS2621-400ML
Fast
Drying
Cleaner
Part No
AMB-AMBERKLFE10-400ML
Industrial
Degreaser
Food Safe
Part No
AMB-INDDEGREASERFG-500ML
Universal
Cleaner
Part No
RX-DEGREASER-400M
High
Performance
Universal
Cleaner
Part No
OKS2611-500ML
Multi-Foam
Cleaner
Part No
OKS2631-400ML
Cleaners
LUBRICATION
ESSENTIALS
ERIKS Lubrication EssentialsYour core lubrication range
Brake
Cleaner
Part No
RX-BRAKECLEANER-500ML
Anti-Seize
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
234
Because my bearings are worth it!
maintenance products
smart technologies
Lubricators
The simalube lubricator provides automatic
lubrication over a period of one month to
a year and can be adjusted in an infinitely
variable manner. simalube supplies eve-
ry lubricating point with the ideal amount
of lubricant – be it oil or grease – so that
subsequent manual lubrication is no longer
needed and maintenance costs are reduced
in the long term.
Induction Heaters
simatherm induction heaters heat circular
metal parts, such as roller bearings, in a
very short amount of time, so they can be
installed quickly and efficiently. The induc-
tive heating of metallic workpieces makes
sense from both an economical and ecolo-
gical perspective. simatec is the world’s lea-
ding manufacturer of these types of heaters.
Tools
The simatool toolkits enable the fast installati-
on and removal of roller bearings and seals.
They are used all over the world in machine
and maintenance workshops within all indust-
ries.
Simatec Maintenance Products and Multi-Use Lubricants
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
235
WD-40 Multi-Use Product Bulk
nn Cleans, protects, penetrates, lubricates
and displaces moisture
nn Prevents rust and corrosion
nn Silicone free
nn Easy to use
nn Versatile
Part No	 Size
WD40-5LTR	5ltr
WD40-25LTR	25ltr
WD-40 Multi-Use Product
WD-40 Multi-Use Product is still ‘the’ maintenance spray for use in Industry for good
reason. It helps to keep plant efficiency and operating costs down whilst solving
problems and helping to maintain equipment along the way.
WD-40 Multi-Use Product stops squeaks and noise, it is designed to drive out water, it cleans and
protects equipment  prevents corrosion.
This is especially relevant for machinery and appliances exposed to the elements, it leaves
a protective coating with a dielectric strength of ~38kV, and it penetrates to loosen rusted,
seized parts.
A useful problem solver for a lot of the tasks faced by technicians and engineering staff today,
simply taken care of from one quick convenient application of WD-40 Multi-Use Product.
WD-40 Multi-Use Product Aerosols
nn Cleans, protects, penetrates, lubricates and displaces moisture
nn Prevents rust and corrosion
nn Silicone free
nn Easy to use
nn Versatile
nn Smart straw variant available
Part No	 Size
WD40-100ML	100ml
WD40-SMARTSTRAW-300ML	300ml
WD40-SMARTSTRAW-450ML	450ml
WD40-600ML	600ml
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
236 Maintenance Sprays
The new range of RX Maintenance Sprays is a
complete line-up of readily available products designed
to cover the most common industrial applications.
Less is More with
RX®
Maintenance Sprays
With an ever-increasing choice of maintenance sprays
on the market today, it can be challenging to identify
the most compatible solutions for your requirements.
Keeping up to date with the latest technology, additives
and performance claims can be equally confusing.
It is with this in mind that we have developed the
RX Maintenance range, which allows you to source
all the core products your workshop needs from a
single supplier.
Each product in this series has been handpicked by
ERIKS lubrication engineers to cover as wide a range
of applications as possible across a variety of industrial
sectors, whilst always maintaining the very best in
performance and compliance.
Because sometimes less is more.
Order your RX®
Maintenance Sprays today.
Call 0800 006 6000 or visit www.eriks.co.uk
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
237
Multi-Purpose
Spray with
PTFE
Multi-purpose
oil aerosol spray
with PTFE
White
Grease
High-grade
white grease
aerosol spray
with PTFE
Zinc Spray
High purity zinc
aerosol spray for
protecting metal
surfaces
Silicone
Spray
High-grade
silicone oil
aerosol spray
Super
Industrial
Degreaser
Solvent degreaser
aerosol spray
removes oil,
grease and dirt
Part No
RX-WHITEGREASE-400ML
Part No
RX-MULTIOIL+PTFE-400ML
Part No
RX-FOAMCLEANER-500ML
Part No
RX-BRAKECLEANER-500ML
Part No
RX-BIOCLEANER-500ML
Part No
RX-ZINCSPRAY-400ML
Part No
RX-SILICONESPRAY-400ML
Part No
RX-DEGREASER-400ML
RX Oil, Grease and Maintenance Sprays
Foam
Cleaner
Foaming aerosol
spray cleaner for
universal use
Brake
Cleaner
Fast-drying
aerosol spray
cleaner for brake
and clutch parts
Biological
Small Parts
Cleaner
Biological
cleaner trigger
spray
RX Lubricants
The range of RX products has
been developed by ERIKS over
many years of practical applica-
tion engineering and develop-
ment, this knowledge and
understanding is designed into
all of our products with the aim
to increase your performance
and extend reliability.
Hydraulic Oil Bearing Grease
Hydraulic
Oil EP32
EP32
hydraulic oil
formulated
with mineral
oil
Part No
EP32-25LTR-RXL
Maintenance Sprays
Part No
EP2-400G-RX
Part No
EP2-HP-400G-RX
Multi-
Purpose
Grease EP2
EP2 lithium soap
based highly
refined mineral oil
Multi-
Purpose
Lithium
Complex
EP2 lithium
complex grease
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
238
Trust in TOTAL Lubricants
Food Grade Lubricants and Gear Oils
Developing your productivity
TOTAL are at your side to help you get
the best from your machinery and to
accompany your development at both
local and international levels.
Industry specific solutions
Each industrial sector has a specific
operating environment, their knowledge
and experience of industrial applications
means that our products are suited
perfectly to meet your requirements.
Mineral Gear Oils
CARTER EP 68 - 1000 For industrial gears, bearings under high loads and high
temperatures. Extends oil drain intervals. Protects against micropitting.
Part Number	 Description	 Size
TOTAL-CARTEREP100-208LTR	 Total Carter EP 100 Gear Oil 208ltr	 208 Litre
TOTAL-CARTEREP150-208LTR	 Total Carter EP 150 Gear Oil 208ltr	 208 Litre
TOTAL-CARTEREP150-20LTR	 Total Carter EP 150 Gear Oil 20ltr	 20 Litre
TOTAL-CARTEREP220-208LTR	 Total Carter EP 220 Gear Oil 208ltr	 208 Litre
TOTAL-CARTEREP220-20LTR	 Total Carter EP 220 Gear Oil 20ltr	 20 Litre
TOTAL-CARTEREP320-208LTR	 Total Carter EP 320 Gear Oil 208ltr	 208 Litre
TOTAL-CARTEREP320-20LTR	 Total Carter EP 320 Gear Oil 20ltr	 20 Litre
TOTAL-CARTEREP460-208LTR	 Total Carter EP 460 Gear Oil 208ltr	 208 Litre
TOTAL-CARTEREP460-20LTR	 Total Carter EP 460 Gear Oil 20ltr	 20 Litre
TOTAL-CARTEREP68-208LTR	 Total Carter EP 68 Gear Oil 208ltr	 208 Litre
TOTAL-CARTEREP68-20LTR	 Total Carter EP 68 Gear Oil 20ltr	 20 Litre
TOTAL-CARTEREP680-208LTR	 Total Carter EP 680 Gear Oil 208ltr	 208 Litre
TOTAL-CARTEREP680-20LTR	 Total Carter EP 680 Gear Oil 20ltr	 20 Litre
Synthetic Gear Oils
CARTER SH For Gears subjected to very high loads and high temperatures
in difficult environments, especially gears for wind turbine. Excellent protection
against corrosion, wear and micropitting. Extended oil service life due to
excellent thermal stability. Can operate outdoors thanks to a very low pour
point.
CARTER SY For severe temperature conditions and high loads; gears,
slideways, plain bearings and (roller) bearings. Excellent level of equipment
protection. Extension of oil drain intervals. Extended equipment service life.
Part Number	 Description	 Size
TOTAL-CARTERSH1000-208L	 Total Carter SH 1000 Gear Oil 208ltr	 208 Litre
TOTAL-CARTERSH1000-20LTR	 Total Carter SH 1000 Gear Oil 20ltr	 20 Litre
TOTAL-CARTERSH150-20LTR	 Total Carter SH 150 Gear Oil 20ltr	 20 Litre
TOTAL-CARTERSH220-208LTR	 Total Carter SH 220 Gear Oil 208ltr	 208 Litre
TOTAL-CARTERSH220-20LTR	 Total Carter SH 220 Gear Oil 20ltr	 20 Litre
TOTAL-CARTERSH320-208LTR	 Total Carter SH 320 Gear Oil 208ltr	 208 Litre
TOTAL-CARTERSH320-20LTR	 Total Carter SH 320 Gear Oil 20ltr	 20 Litre
TOTAL-CARTERSH460-208LTR	 Total Carter SH 460 Gear Oil 208ltr	 208 Litre
TOTAL-CARTERSH460-20LTR	 Total Carter SH 460 Gear Oil 20ltr	 20 Litre
TOTAL-CARTERSY150-208LTR	 Total Carter SY 150 Gear Oil 208ltr	 208 Litre
TOTAL-CARTERSY150-20LTR	 Total Carter SY 150 Gear Oil 20ltr	 20 Litre
TOTAL-CARTERSY220-208LTR	 Total Carter SY 220 Gear Oil 208ltr	 208 Litre
TOTAL-CARTERSY220-20LTR	 Total Carter SY 220 Gear Oil 20ltr	 20 Litre
TOTAL-CARTERSY320-208LTR	 Total Carter SY 320 Gear Oil 208ltr	 208 Litre
TOTAL-CARTERSY320-20LTR	 Total Carter SY 320 Gear Oil 20ltr	 20 Litre
TOTAL-CARTERSY460-208LTR	 Total Carter SY 460 Gear Oil 208ltr	 208 Litre
TOTAL-CARTERSY460-20LTR	 Total Carter SY 460 Gear Oil 20ltr	 20 Litre
TOTAL lubricants offer a comprehensive
range of oils, greases and special
products for industries such as:
n	 Chemicals
n	 Energy
n	 Metals
n	 Automotive
n	 Original Equipment Manufacturers
n	 Building, Mining and Construction
n	 Papermaking
n	 Food Processing Industry
Innovative products
Innovation is priority for TOTAL, with
several research centres, where chemical
and mechanical engineers and specialists
in tribology work together. Their close
relations with equipment manufacturers
enable the formulation and testing of
tomorrow’s products, and guarantee
optimal performance and protection of
your machines.
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
239
NEVASTANE Food Grade Lubricants
A range of products adapted to your needs, the NEVASTANE range spans a
wide array of products that have been completely reformulated to meet the latest
requirements of industrial equipment suppliers. Offering improved performance
NEVASTANE products protect your equipment and extend its working life, even in the
most difficult working conditions and across wide temperature ranges.
Part Number	 Description	 Size
TOTAL-FINAVEST360B-20LTR	 Total Finavestan A 360B White Oil 20ltr	 20 Litre
TOTAL-FINAVESTA360B-208L	 Total Finavestan A 360B White Oil 208ltr	 208 Litre
TOTAL-FINAVESTANA80B-20L	 Total Finavestan A 80B White Oil 20ltr	 20 Litre
TOTAL-LUNARIASH46-208LTR	 Total Lunaria SH 46 Food Grade Compressor Oil 208ltr	 208 Litre
TOTAL-LUNARIASH46-20LTR	 Total Lunaria SH 46 Food Grade Compressor Oil 20ltr	 20 Litre
TOTAL-LUNARIASH68-20LTR	 Total Lunaria SH 68 Food Grade Compressor Oil 20ltr	 20 Litre
TOTAL-N/STANEAF-205LTR	 Total Nevastane Food Grade Antifreeze 205ltr	 205 Litre
TOTAL-N/STANEAW22-208LTR	 Total Nevastane AW 22 Food Grade Hydraulic Oil 208ltr	 208 Litre
TOTAL-N/STANEAW22-20LTR	 Total Nevastane AW 22 Food Grade Hydraulic Oil 22ltr	 22 Litre
TOTAL-N/STANEAW32-208LTR	 Total Nevastane AW 32 Food Grade Hydraulic Oil 208ltr	 208 Litre
TOTAL-N/STANEAW32-20LTR	 Total Nevastane AW 32 Food Grade Hydraulic Oil 20ltr	 20 Litre
TOTAL-N/STANEAW46-20LTR	 Total Nevastane AW 46 Food Grade Hydraulic Oil 20ltr	 20 Litre
TOTAL-N/STANEAW68-20LTR	 Total Nevastane AW 68 Food Grade Hydraulic Oil 20ltr	 20 Litre
TOTAL-N/STANECHAINXT-20L	 Total Nevastane Chain Oil XT Food Grade Chain Oil Xt 20ltr	 20 Litre
TOTAL-N/STANEEP100-20LTR	 Total Nevastane EP 100 Food Grade Gear Oil 20ltr	 20 Litre
TOTAL-N/STANEEP150-20LTR	 Total Nevastane EP 150 Food Grade Gear Oil 20ltr	 20 Litre
TOTAL-N/STANEEP220-20LTR	 Total Nevastane EP 220 Food Grade Gear Oil 20ltr	 20 Litre
TOTAL-N/STANEEP320-20LTR	 Total Nevastane EP 320 Food Grade Gear Oil 20ltr	 20 Litre
TOTAL-N/STANEEP460-20LTR	 Total Nevastane EP 460 Food Grade Gear Oil 20ltr	 20 Litre
TOTAL-N/STANEHTF-208LTR	 Total Nevastane HTF Food Grade Heat Transfer Oil 208ltr	 208 Litre
TOTAL-N/STANESDO-10LTR	 Total Nevastane SDO Food Grade Sugar Dissolving Oil 10ltr	 10 Litre
TOTAL-N/STANESH100-20LTR	 Total Nevastane SH 100 Food Grade Hydraulic Oil 20ltr	 20 Litre
TOTAL-N/STANESH32-20LTR	 Total Nevastane SH 32 Food Grade Hydraulic Oil 20ltr	 20 Litre
TOTAL-N/STANESH46-208LTR	 Total Nevastane SH 46 Food Grade Hydraulic Oil 208ltr	 208 Litre
TOTAL-N/STANESH46-20LTR	 Total Nevastane SH 46 Food Grade Hydraulic Oil 20ltr	 20 Litre
TOTAL-N/STANESH68-20LTR	 Total Nevastane SH 68 Food Grade Hydraulic Oil 20ltr	 20 Litre
TOTAL-N/STANESIL-207ML	 Total Nevastane Food Grade Silicone Safe Guard 207ml	 207 ml Aerosol
TOTAL-N/STANESPGRE-300ML	 Total Nevastane Food Grade Grease Aerosol 300ml	 300 ml Aerosol
TOTAL-N/STANESPLUB-300ML	 Total Nevastane Food Grade Lube Aerosol 300ml	 300 ml Aerosol
TOTAL-N/STANESY220-25KG	 Total Nevastane SY 220 Food Grade Gear Oil 25kg	 25 Kg
TOTAL-N/STANESY460-210KG	 Total Nevastane SY 460 Food Grade Gear Oil 210kg	 210 Kg
TOTAL-N/STANESY460-25KG	 Total Nevastane SY 460 Food Grade Gear Oil 25kg	 25 Kg
TOTAL-N/STANEXMF0-16KG	 Total Nevastane XMF 0 Food Grade Grease 16kg	 16 Kg
TOTAL-N/STANEXMF00-16KG	 Total Nevastane XMF 00 Food Grade Grease 16kg	 16 Kg
TOTAL-N/STANEXMF2-16KG	 Total Nevastane XMF 2 Food Grade Grease 16kg	 16 Kg
TOTAL-N/STANEXMF2-375G	 Total Nevastane XMF 2 Food Grade Grease 375g	 375 g Cartridge
TOTAL-N/STANEXMF2LS-375G	 Total Nevastane XMF 2 Food Grade Grease Lube Shuttle Cartridge 375g	 375 g Cartridge
TOTAL-N/STANEXS320-400G	 Total Nevastane XS 320 Food Grade Grease 400g	 400 g Cartridge
TOTAL-N/STANEXS80-16KG	 Total Nevastane XS 80 Food Grade Grease 16Kg	 16 Kg
TOTAL-N/STANEXS80-400G	 Total Nevastane XS 80 Food Grade Grease 400g	 400 g Cartridge
TOTAL-N/STANEXS80LS-400G	 Total Nevastane XS 80 Food Grade Grease Lube Shuttle Cartridge 400g	 400 g Cartridge
TOTAL-N/STANEXSH150-208L	 Total Nevastane XSH 150 Food Grade Gear Oil 208ltr	 208 Litre
TOTAL-N/STANEXSH150-20L	 Total Nevastane XSH 150 Food Grade Gear Oil 20ltr	 20 Litre
TOTAL-N/STANEXSH220-208L	 Total Nevastane XSH 220 Food Grade Gear Oil 208ltr	 208 Litre
TOTAL-N/STANEXSH220-20L	 Total Nevastane XSH 220 Food Grade Gear Oil 20ltr	 20 Litre
TOTAL-N/STANEXSH320-208L	 Total Nevastane XSH 320 Food Grade Gear Oil 208ltr	 208 Litre
TOTAL-N/STANEXSH320-20L	 Total Nevastane XSH 320 Food Grade Gear Oil 20ltr	 20 Litre
TOTAL-N/STANEXSH460-20L	 Total Nevastane XSH 460 Food Grade Gear Oil 20ltr	 20 Litre
nn Registered NSF H1
nn Free of any compound of animal origin
nn GMO free
nn Allergen free
nn Manufactured in ISO 21469-certified
plants
nn Innovative packaging
Safe and environmentally friendly
They have made a commitment to safety,
health and respect for the environment.
Their RD teams integrate from the initial
design stage of new products parameters
conducive to the reduction of toxicity risks
and VOC emissions, biodegradability,
recycling or disposal of the products.
High added value services
We bring our expertise to help you to
optimize the productivity of your machinery
and improve your competitiveness. You
benefit from our specialist knowledge
and high-level after-sales services that
include: rationalization and organization of
lubrication operations, maintenance and
laboratory analyses of the fluids in service,
training of your personnel.
Thousands of
products available
to order on
ERIKS
WEBSHOP
SHOP.ERIKS.CO.UK
SHOP.ERIKS
.CO.UKSHOP
.ERIKS.CO.UK
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
240 Lubricants and Site Safety Paint Solutions
Food Grade Lubricants
Our market-leading FOODLUBE® food grade products are widely recognised
for their pioneering new technologies.
FOODLUBE Extreme
nn 	Extreme resistance to water wash-off
nn 	Prevents wear and protects under high load
conditions
nn 	Anti-microbial additives protect grease from
deterioration and odour
nn 	Significantly extends bearing life
nn NSF H1, ISO 21469, Halal and Kosher
certified
FOODLUBE Premier 1
nn 	Multi-purpose EP grease
nn 	Highly resistant to water wash-off
nn 	Outstanding corrosion protection
nn 	Excellent oxidation stability increases service
life of the grease, extending re-lubrication
intervals
nn NSF H1, ISO 21469, Halal and Kosher
certified
STAINLESS STEEL
CLEANER Spray
nn 	Effectively removes grease, grime and
dirt
nn 	Leaves clean, smear free, polished
surface
nn 	NSF A7 registered: used for non-food
contact surfaces
FOODLUBE
Anti-Seize
An advanced next-generation anti-seize
grease designed specifically for the
challenges of the food processing industry.
It prevents galling and seizure of joints
and fasteners in high temperature / humid
environments and those with regular
wash-down with chemical cleaning agents.
nn Advanced non-drying formula holds
lubricating agents in place to allow
controlled assembly or disassembly of
machinery over extended periods
nn Consistent coefficient of friction makes
allowances for minor variations in
engineering tolerance:
nn Increases precision of assembly for critical
equipment
nn Allows more accurate bolt tension; particularly
important for pressurised and gasketed joints
nn Optimised for use on stainless steel
nn NSF H1, ISO 21469, Halal and Kosher
certified
Product	 Description	 Pack Volume/Weight	
ROC-FOODLUBE-EXT-18KG	 ROCOL FOODLUBE Extreme 	 18kg
ROC-FOODLUBE-EXT-380G	 ROCOL FOODLUBE Extreme Shuttle Cartridge 	 380g
ROC-FOODLUBE-EXT-4KG	 ROCOL FOODLUBE Extreme 	 4kg
ROC-FOODLUBE-EXTSC-380G	 ROCOL FOODLUBE Extreme Shuttle Cartridge 	 380g
ROC-FOODLUBE-PREM1-18KG	 ROCOL FOODLUBE Premier 1 	 18kg
ROC-FOODLUBE-PREM1-380G	 ROCOL FOODLUBE Premier 1 	 380g
ROC-FOODLUBE-PREM1-4KG	 ROCOL FOODLUBE Premier 1 	 4kg
ROC-FOODLUBE-ANTISEIZE	 ROCOL FOODLUBE Anti-seize 	 500g
ROC-SS-CLEANER-400ML	 ROCOL STAINLESS STEEL CLEANER Spray	 400ml
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
241
BIOGEN WIRESHIELD®
ROCOL BIOGEN WIRESHIELD is a VGP compliant lubricant for wire ropes and
ROV umbilicals, proven to excel in the most corrosive of atmospheres.
nn 	Market leading corrosion protection ensures extended rope and umbilical life
nn 	Extreme resistance to water wash off-reduces re-lubrication intervals
nn 	Non-melting formulation; suitable for use in high temperature environments
nn 	Environmentally Acceptable Lubricant (EAL) and Vessel General Permit (VGP) Compliant; can be
used in US waters
nn 	BIOGEN®
range also includes fluid and spray
BIOGEN TUFLUBE
ROCOL BIOGEN TUFLUBE is an extreme heavy duty, biodegradable jacking and
open gear grease. Designed to protect heavily loaded, slow moving mechanisms in
the wettest and most corrosive conditions, it is the ideal lubricant for the protection of
critical assets in the marine, offshore and freshwater environments.
nn 	Extreme pressure: unique additive package protects against metal wear
nn 	Extreme adhesion: blend of Hi-Tac boosters ensures staying power, even when submerged
nn 	Extreme temperatures: ideal for use in the hottest and coldest climates
nn 	HOCNF classification ‘E’: certified for use in the North Sea
nn 	VGP compliant: can be used in US waters
Product	 Description	 Pack Volume/Weight
ROC-BIO-WIRESHIELD-160KG	 ROCOL BIOGEN WIRESHIELD 	 160kg
ROC-BIO-WIRESHIELD-18KG	 ROCOL BIOGEN WIRESHIELD 	 18kg
ROC-BIOGENTUFLUBE-18KG	 ROCOL BIOGEN TUFLUBE 	 18kg
ROC-BIOGEN-SPRAY	 ROCOL BIOGEN Spray 	 400ml
Product	 Description	 Pack Volume/Weight
ROC-EASYLINE-BLUE-EDGE	 EASYLINE EDGE Aerosol Line Marking Paint 	 750ml Blue
ROC-EASYLINE-EDGE-APP	 EASYLINE EDGE Applicator
ROC-EASYLINE-EDGE-PLATES	 EASYLINE EDGE Spare Masking Plates 2 Sets
ROC-EASYLINE-FLYEL-EDGE	 EASYLINE EDGE Aerosol Line Marking Paint 	 750ml Fl. Yellow
ROC-EASYLINE-GREEN-EDGE	 EASYLINE EDGE Aerosol Line Marking Paint 	 750ml Green
ROC-EASYLINE-GREY-EDGE	 EASYLINE EDGE Aerosol Line Marking Paint 	 750ml Grey
ROC-EASYLINE-ORANGE-EDGE	 EASYLINE EDGE Aerosol Line Marking Paint 	 750ml Orange
ROC-EASYLINE-RED-EDGE	 EASYLINE EDGE Aerosol Line Marking Paint 	 750ml Red
ROC-EASYLINE-WHITE-EDGE	 EASYLINE EDGE Aerosol Line Marking Paint 	 750ml White
ROC-EASYLINE-YELLOW-EDGE	 EASYLINE EDGE Aerosol Line Marking Paint 	 750ml Yellow
Line Marking Paint
EASYLINE® EDGE
The world’s leading aerosol line marking system
nn 	Simple and effective, with consistent results
nn 	Unrivalled clean, sharp line edge definition
with 3 line widths
nn 	EASYLINE EDGE paint is touch dry in 10
minutes
nn 	Easy to use, simple set up, ready to paint
straight out of the box
nn 	Intuitive applicator with adjustable height
settings
nn 	No need for contractors-professional quality
line
nn 	Durable, thick and long lasting coating
nn 	Marks up to 100 meters with a 50mm line
width*
nn 	EASYLINE EDGE paint is UV stable-
powerful colour even after 2000 hours
nn 	Environmentally Safe
nn 	Non-toxic, non-irritant and non-harmful to
the environment**
*May vary due to surface conditions
** Classified in accordance with Regulation EC No.
1272/2008
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
242
A Freudenberg Group Company
OKS High Perfomance Lubricants and Multi-Use Lubricants
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
243
Tri-Flow Industrial Lubricants
Tri-Flow Lubricant is ideal for preventive and corrective maintenance in industrial
applications. Tri-Flow will keep equipment in service longer and reduce costly
breakdowns caused by worn and grimy parts.
Tri-Flow Industrial Lubricant, 200ml
nn For general applications
nn Formulated with PTFE
nn High temperature range (-53°C to
+246°C)
nn Extends machinery service life
Tri-Flow Industrial Lubricant 500ml
nn For general applications
nn Formulated with PTFE
nn High temperature range (-53°C to
+246°C)
nn Improves machinery performance
Tri-Flow Industrial Lubricant Precision
Spray (NEW) 500ml
nn For hard to reach applications
nn Formulated with PTFE
nn High temperature range (-53°C to
+246°C)
nn Reduces operating costs
nn Protects against moisture and
corrosion
Tri-Flow Industrial Lubricant 4ltr
nn For larger volume users
nn Formulated with PTFE
nn High temperature range (-53°C to
+246°C)
nn Ideal for use on closed system
industrial machinery
Part No	 Size
TRIFLOW-200ML	200ML
Part No	 Size
TRIFLOW-500ML	500ML
Part No	 Size
TRIFLOW-PREC-500ML	500ML
Part No	 Size
TRIFLOW-4LTR	4LTR
Also Available*
Tri-Flow Lubricant Drip Bottle, 59ml
nn For precision applications
nn Formulated with PTFE
nn High temperature range (-53C to +246C)
nn Ideal for use on nuts, bolts, locks and hinges
nn Penetrates inaccessible areas to displace contaminants
Part No	 Size
TRIFLOW-DRIP BOTTLE 20Z	 59ML
*available on extended lead time
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
244
Position Sensors
Kplus Sensor
Constant correction factor
Kplus sensors have the same sensing range for all types of metals. They are for
example perfectly suited for the detection of aluminium, where conventional sensors
show a considerably reduced sensing range. The high switching frequencies enable
the monitoring of fast changing switching states.
The resistant stainless steel sleeve allows reliable use in oil and coolant applications.
The wide temperature range as well as the high protection ratings enable universal use
of the new Kplus sensors.
IFM Position Sensors
M8 connector · 3 wire DC PNP ·
Output function normally open	
Type	 Total	 Sensing	 Installation	 Switching 	 Current	 Part no.
	 length	range		 frequency	 load
	 (mm)	 (mm)		 [Hz]	 [mA]
M8	40	 3	 flush	 2000	 100	 IFIES200
M8	40	 6	 non-flush	 2000	 100	 IFIES201
M12 connector · 3 wire DC PNP
Output function normally open	
Type	 Total	 Sensing	 Installation	 Switching 	 Current	 Part no.
	 length	range		 frequency	 load
	 (mm)	 (mm)		 [Hz]	 [mA]
M12	45	 4	 flush	 2000	 100	 IFIFS297
M12	45	 8	 non-flush	 2000	 100	 IFIFS298
M12	45	 10	 non-flush	 2000	 100	 IFIFS299
M12	60	 4	 flush	 2000	 100	 IFIFS304
M12	60	 8	 non-flush	 2000	 100	 IFIFS305
M12	60	 10	 non-flush	 2000	 100	 IFIFS306
M18	45	 8	 flush	 2000	 100	 IFIGS287
M18	45	 12	 non-flush	 2000	 100	 IFIGS288
M18	45	 15	 non-flush	 2000	 100	 IFIGS289
M18	60	 8	 flush	 2000	 100	 IFIGS290
M18	60	 12	 non-flush	 2000	 100	 IFIGS291
M18	60	 15	 non-flush	 2000	 100	 IFIGS292
M30	45	 15	 flush	 2000	 100	 IFIIS281
M30	60	 15	 flush	 2000	 100	 IFIIS282
M30	60	 22	 non-flush	 2000	 100	 IFIIS283
M30	60	 30	 non-flush	 2000	 100	 IFIIS284
nn Uniform sensing range for the reliable
detection of all metals
nn Compact dimensions for use in the
smallest of space
nn Electromagnetic field immune sensor
technology to prevent incorrect switching
nn High-quality stainless steel housing
nn High reliability thanks to protection
rating from IP 65 / IP 69KK
Further technical data
Operating voltage	 [V DC]	 10...30
Reverse polarity protection		 •
Short-circuit protection		 •
Overload protection		 •
Protection		 IP 65 / IP 66 / IP 67 /
		 IP 68 / IP 69K
Protection class		 III
Ambient temperature	 [°C]	 -40...85
Housing materials sensing face		 High-grade
		 stainless steel
		 (316L) sensing
		 face LCP
Switching status indication	 [LED]	 yellow (4 x 90°)
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
245
Electromagnetic field immune Kplus sensors
Use in harsh welding applications The inductive Kplus sensors withstand harsh
operating conditions and reliably detect metal objects even in case of soiling. The
sensor housing and the fixing nuts have a non-stick coating to prevent sticking of weld
slag.
Strong magnetic fields occur in welding processes. The new sensor technology
prevents incorrect switching. The quick connection with the connector and matching
cable from the ecolink range is the ideal basis for permanent use
M8 connector · 3 wire DC PNP ·
Output function normally open · stainless steel (316L) anti-spatter	
Type	 Total	 Sensing	 Installation	 Switching 	 Current	 Part no.
	 length	range		 frequency	 load
	 (mm)	 (mm)		 [Hz]	 [mA]
M8	40	 3	 flush	 2000	 100	 IFIEW200
M8	 40	 6	 non flush	 2000	 100	 IFIEW20
M12 connector · 3 wire DC PNP ·
Output function normally open · brass anti-spatter	
Type	 Total	 Sensing	 Installation	 Switching 	 Current	 Part no.
	 length	range		 frequency	 load
	 (mm)	 (mm)		 [Hz]	 [mA]
M12	65	 4	 flush	 2000	 100	 IFIFW204
M18	65	 8	 flush	 2000	 100	 IFIGW202
M30	65	 15	 flush	 2000	 100	 IFIIW202
nn 	Uniform sensing range for the reliable
detection of all metals
nn Robust design with non-stick coating
nn Electromagnetic field immune sensor
technology to prevent incorrect
switching
nn Wide temperature range for universal
use
nn High protection ratings up to IP 68 /
IP 69K
Further technical data
Operating voltage	 [V DC]	 10...30
Current consumption	 [mA]	  20
Reverse polarity protection		 •
Short-circuit protection		 •
Overload protection		 •
Protection		 IP 65 / IP 66 / IP 67 /
		 IP 68 / IP 69K
Protection class		 II
Ambient temperature	 [°C]	 -40...85
Housing materials sensing face		 LCP
Switching status indication	 [LED]	 yellow (4 x 90°)
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
246
Part No
LEDL7298
LEDL7297 non-rechargeable
	 Part No
	LED9407
	 Part No
	LEDL8404
Part No
LEDL9405R
Part No
LEDL9802QCTP
Torches and Headlamps
Ledlenser®
P7.2
This best-selling medium-sized LED torch is made from
uncompromisingly tough, aircraft-grade aluminium for protection
against knocks and shocks, It weighs 175g and measures 130mm
in length. Delivers up to 320 lumens brightness, a maximum beam
distance of 260 metres and as long as 50 hours burn time.
nn Advanced Focus System™ Optics
nn Speed Focus™ enables smooth single-handed beam focusing
nn Corrosion resistant gold plated contacts for better conductivity
nn Dynamic Switch™
Ledlenser®
P5R.2 - Rechargeable
A small, slimline LED hand torch with a durable aluminium body
and a high-end CREE LED generating 270 lumens of bright
white light for up to 240 metres.
nn Recalibrated lens for wide light beam angle
nn Robust, yet lightweight aircraft-grade aluminium housing
nn Corrosion resistant gold plated contacts for better conductivity
nn Smart Light Technology™ - choose from Power, Low Power
and Defence Strobe
Ledlenser®
SEO3
This stylish LED head torch makes light work of any hands-free
illumination task, providing superior comfort and excellent light
distribution for the user.
nn Advanced Focus System™ Optics
nn Three Smart Light Technology light functions – Power, Low
Power, Signal
nn White CREE LED + glare-free red LED for night vision
Ledlenser®
T2QC
This clever T7QC hand torch offers instant white, red, green or
blue light from a single multi-coloured CREE Power LED light
chip. A prismatic diffuser inside the lens helps optimise light
distribution across all colours up to 140 lumens brightness.
nn Four colours: white, red (night vision technology and stop
signal), green (go signal) and blue (crack detection)
nn Prismatic diffuser for optimum light and colour performance
nn Quick flick changes light colour instantly
nn Fixed focus beam
nn Durable metal body
Ledlenser®
H7R.2 - Rechargeable
Up to 300 lumen output on Boost mode combined with up to
60 hours burn time on Low Power (20 lumens), makes this
a seriously versatile hands-free lighting companion for any
environment.
nn Rechargeable Head Lamp packed full of smart technologies
and outstanding optics
nn Multi-function Dynamic ‘wheel’ switch
nn Rear safety light – either red or
blinking options
Ledlenser®
P4BM
This slim, metal-bodied pen torch is frequently used by engineers,
mechanics and technicians, who like to have on hand a top
quality inspection instrument that can throw light into narrow or
inaccessible areas.
nn Blue Moon Focus System™ delivers a brighter, whiter beam
nn Speed Focus™ enables smooth single-handed beam focusing
nn Superior rear tail cap switch
Part No 	 Colour
LEDL6103	Orange
LEDL6104	Green
Torches and Headlamps
Visit us at eriks-techdirect.co.uk
Tools,Safety
Maintenance
247
VARIABOX
CEENORM VARIABOX
One for all: the VARIABOX meets all requirements for a modern distributor housing and can be individually
configured in five different sizes. With versions S, M, L, XL and XXL, as surface-mounting or mobile combination,
we always have the right distributor for your needs
nn Housing made of high-grade, impact-resistant plastic
nn Top and bottom can be sealed together
nn Modular expansion on all 4 sides
nn Fuse elements arranged below transparent, lockable
operating window with userfriendly OTC mechanism (one
touch close)
nn All CEE sockets with screwless, maintenance free
QUICK-CONNECT technology
nn The mounting dimension of the panel mounting socket outlets
is not manufacturer-specific (standard dimension)
Specialist Technical Centres
Know-How
Tools,Safety
MAintenance
248 Centro Industrial Essentials
Visit us at www.eriks.co.uk
249Index
Ball Busings.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 24
Bearing Fitting Tools.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 29
Condition monitoring.  .  .  .  .  .  .  .  .  .  .  .  .  .  . 27-28, 32
Cylindrical Roller Bearings. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 18
Deep Groove Ball Bearings. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 6
Housed Units.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 12-13
Housings.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 23
Linear Bearings.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 16
Linear Motion and Actuation. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 8
Lubricators .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 26
Needle Roller Bearings. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 25
Radial Ball Bearings. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 10
Rotary Bearings. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 17
Self-Lube® Bearings.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 22
SNT Split Plummer Blocks.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 11
Spherical Roller Bearings .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4-5
Split Roller Bearings.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 9
Super Precision Bearings. . . . . . . . . . . . . . .19-21
Tapered Roller Bearings. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 14
Test and Measurement Tools. .  .  .  .  .  .  .  .  .  . 29-31
Y-Bearings.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
Pneumatics. .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 82-98
Air Preparation. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 86-87
Compact Cylinders.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 83
Cylinders and Actuators.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 93
Push-in Fittings.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 84-85
Safety Valves.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 96-97
Suction Cups.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 95
Vacuum Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 98
Valves.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 88-91
Hydraulics.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 99-122
Adaptors. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 109-110
Ball Valves. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 114
Bladder Accumulators. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 115
Components and Fittings. .  .  .  .  .  .  .  .  .  .  . 106-108
EMB Fittings. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 108
High Pressure Hoses and Couplings.  103-104
Hose Assemblies and Components.  .  .  .  .  .  . 105
Hydraulic Accessories. .  .  .  .  .  .  .  .  .  .  .  .  .  . 111-112
Hydraulic Valves and Cylinders.  .  .  .  .  . 116-119
Hydraulics Course. . . . . . . . . . . . . . . . . . . . . . . .100
Lifeguard Sleeves. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 101
Oil Transfer Units.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 113
Repair, Replace Solutions.  .  .  .  .  .  .  .  .  .  . 120-122
Self Assembly Starter Kits. .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 102
Filtration .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 123-134
Filtration Solutions.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 133
Fluid Filters.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 124-125
Fluid Level Gauges. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 130-131
Panel and Bag Filter.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 128-129
Water Filters.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 125-126
Fluid Filters.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 122-123
Oil Cleanliness.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 130
Panel  Bag Filters.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 126-127
Water Filters.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 124-125
Industrial Hose .  .  .  .  .  .  .  .  . 135-146
Camlocks and Bellows.  .  .  .  .  .  .  .  .  .  .  .  .  . 140-141
Chemical and Pharmaceutical Hose.  .  .  .  .  . 145
Commodity Hose and Clips. .  .  .  .  .  .  .  .  . 136-137
Food and Beverage Hose.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 144
Industrial Hose Reels and Cable Reels. .  .  . 146
Metal Hose.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 138-139
Rubber Hose.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 142
Steam Hose.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 143
Fluid Power
Pg 79-146
Bearings
Pg 1-32
Power
Transmission
Pg 33-78
Adapter Chain.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 58
Chain Accessories.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 64
Classic Vee Belts. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 36
Couplings .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 52-55
Drives and Rollers. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 66-67
Electric Motors. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 65, 68-69
Emergency Belts. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 38-39
Gearboxes.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 75-77
High Performance Wedge Belts.  .  .  .  .  .  .  .  .  .  .  . 37
Inverters.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 71-73
Performance Special Chain. .  .  .  .  .  .  .  .  .  .  .  . 60-63
Pulleys. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46-47
Ribbed Belts.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 42
Roller Chain and Sprockets. .  .  .  .  .  .  .  .  .  .  .  . 56-57
Shaft Fixings. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 49-51
Speed Reducer.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 74
Tensioners. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 43
Timing Belts.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 44-45, 48
Total Cost of Ownership. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 70
Vibration Solutions.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 78
Wedge Belts. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 40-41
Thousands of
products available
to order on
ERIKS
WEBSHOP
SHOP.ERIKS.CO.UK
SHOP.ERIKS
.CO.UKSHOP
.ERIKS.CO.UK
Specialist Technical Centres
Know-How
250
Adhesives.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 208-209
Gloves. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 216-219
Line Marking. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 241
Live Centres, Chucks  Vices.  .  .  .  .  .  .  .  .  .  .  . 228
Lock Boxes and Labelling.  .  .  .  .  .  .  .  .  .  . 220-221
Lubricants.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 229-243
Metal Cutting Tools.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 222-225
Non-Sparking Tools.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 210
Position Sensors.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 244-245
Respiratory.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 213
Safety Eyewear.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 212
Safety Footwear.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 211
Spill Control. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 214-215
Storage. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 206-207
Torches. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 246
Torque Wrenches.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 226-227
Variabox.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 247
Wiping Products.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 204-205
Tools, Safety 
Maintenance
pg 201-248
Sealing 
Polymer
pg 147-170
Sealing Technology.  .  .  .  . 147-161
Bonded Washer Seals. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 154
Circlips.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 156
Clamp Seals.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 151
Component Mechanical Seals.  .  .  .  .  .  . 160-161
Elastomeric Rotary Lip Seals.  .  .  .  .  .  .  .  .  .  .  .  . 155
Hydraulic Seals.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 157-159
O-rings.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 150-153
Shaft Sleeves.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 155
V-Rings. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 156
Gasket Technology. .  .  .  .  . 162-169
Elastograph Gaskets.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 168
EPDM Cut Flange Gaskets. .  .  .  .  .  .  .  .  .  .  .  .  .  . 165
Gasket Sheeting.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 162-163
Gland Packings.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 169
Graphite Gaskets.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 168
Ring Type Joints.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 167
Soft Cut Flange Gaskets.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 164
Spiral Wound Gaskets. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 166
Index
Valves. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 172-177
Ball Valves. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 175
Butterfly Valves.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 177
Econ®  Partner Brands. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 174
Gate, Globe and Check Valves. .  .  .  .  .  .  .  .  .  .  . 176
Knife Gate Valves. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 177
Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 177-200
Cavity Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 199
Coolant Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 197
Diaphragm Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 184-185
DOC 3 Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 198
End Suction Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 183
Gorman-Rupp Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 189
Grundfos Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 186-187
Hose Pumps. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 195
Hydra-cell Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 192-193
Hygienic Rotary Lobe Pumps. .  .  .  .  .  .  . 181, 194
Munsch Chemical Pumps. . . . . . . . . . . . . . . . .188
Petrol Driven Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 196
Submersible Pumps.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 190-191
Wobble Pumps. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 198
Flow
Technology
pg 171-200
Visit us at www.eriks.co.uk
251
order online SHOP.ERIKS.CO.UK
call 0845 006 6000
CallLocal08450066000Issue15
Product  Service Know-How
0845 006 6000
Issue15
Your quick guide to our
PRODUCTS  SERVICES
Tools, Safety
 Maintenance
Flow
Control
Sealing 
Polymer
Fluid Power,
Transfer 
Control
Power
Transmission
Bearings
TechDirect

Tech Direct issue 15

  • 1.
    order online SHOP.ERIKS.CO.UK call0845 006 6000 CallLocal08450066000Issue15 Product & Service Know-How 0845 006 6000 Issue15 Your quick guide to our PRODUCTS & SERVICES Tools, Safety & Maintenance Flow Control Sealing & Polymer Fluid Power, Transfer & Control Power Transmission Bearings TechDirect
  • 2.
    Your product journey withERIKS ONE CONVERSATION to unlock COUNTLESS SOLUTIONS... ERIKS’ understanding of the environment in which a transmission system must work, the stresses it has to handle, and the results it has to produce, enables us to engineer a solution you can rely on - for increased efficiency, extended life, minimum maintenance and maximum productivity. Power Transmission Belt & Chain Drives | Motors | Couplings | Gearboxes I Inverters Pages 33-78 ERIKS offers you fast, cost-effective access to an extensive range of world-leading brands. Our exceptional product know-how, coupled with our range of in-house application engineers, means that we are ideally positioned to provide solutions based on a true understanding of your needs. Fluid Power, Transfer & Control Pneumatics | Hydraulics | Filtration | Industrial Hose Pages 79-146 ERIKS Tools, Safety and Maintenance provide brand leaders in all of its 3 main product areas – Safety, Tooling and Consumables. Choosing the right tools safety and maintenance equipment is not just about getting the job done more efficiently; it is also about protecting employees from the risk of injury. Tools, Safety & Maintenance Tools | Spill Control | PPE | Lubricants | Adhesives Pages 201-248 ERIKS Flow Control have the know-how to ensure your plant runs efficiently, keeping expensive downtime to a minimum. Whether you need a solution for Pumps or Valves ERIKS have the engineering capability, technical experience and supply chain you can rely on, year in year out! Flow Control Pumps | Valves & Automation Pages 171-200 Our Technology Centre has sealing all wrapped up. With products, materials, processes, application know-how and resources all available 24/7 - ERIKS really does offer a complete sealing solution package. Sealing & Polymer Industrial Seals | Gaskets Pages 147-170 Pages 1-32 ERIKS offers over £5 million of bearing stock available the same day with a further £150 million of stock available next day. As an authorised distributor for the key global bearing brands, ERIKS has integrated logistic links with all key manufacturers delivering the most reliable supply service. Bearings Bearings | Fitting Tools | Condition Monitoring You only have to ask ERIKS, to get all the answers you need. That’s because it only takes one con- versation to unlock countless solutions, for all your industrial product, service, supply and support needs. In fact, there’s no simpler way to get things done than talking to ERIKS.
  • 3.
    Sealing & Polymer Our extensive PRODUCT RANGEhas the DEPTH and BREADTH you need £22m of stock with access to over 1.3m product lines Tools, Safety & Maintenance Flow Control Fluid Power, Transfer & Control Power Transmission Bearings & Lubrication For most ERIKS customers, that conversation starts with products. And since ERIKS is the European market leader for Industrial Products and Services, why wouldn’t it? The company has over £23m of mechanical and electrical engineering components in stock, all manufactured with care to the highest quality. So one conversation with ERIKS can unlock a huge range of product solutions, across:  Bearings and lubrication  Power transmission  Fluid power, transfer and control  Sealing and polymer  Flow control  Tools, safety and maintenance But products alone are only the start of what makes ERIKS unique. Our engineering know-how is decades of technical experience It’s engineers with real expertise gained and applied in real-life situations, where minimising downtime, optimising productivity and maximising safety are part and parcel of any project. It’s also a deep understanding of customers’ industries and product applications, so that product issues can be quickly and accurately identified, and effectively solved, prevented or mitigated. From APPLICATION toCUSTOMISED andENGINEERED solutions,wedo what’sRIGHT forYOU ADD to that what we CAN DO with our unrivalled technical KNOW-HOW More TLC less TCO with our PRODUCT LIFE CYCLE management PRODUCTS are only the START, we MONITOR, MAINTAIN, REPAIR or UPGRADE to keep your plant running EFFICIENTLY A thorough understanding of applications also makes it easier for ERIKS to provide customised and engineered solutions, where off-the-shelf won’t do. Unique problems demand unique solutions, and ERIKS has the skills and resources to engineer them. However, ERIKS’ know-how doesn’t end with providing a product solution, whether ready-made or custom-built. In fact, that’s only the beginning. Life-support for products ERIKS understand that the most forward-looking customers don’t judge a product’s performance on its price tag. After all, any savings on the initial purchase can soon be wiped out by the costs of excessive maintenance, unforeseen repairs, or a shorter than expected service life.
  • 4.
    That’s why ERIKSpromise to supply products which provide long-term solutions and reliable, sustainable, energy-efficient operation – for a longer, more cost- effective life. Every single product supplied by ERIKS is then supported by ERIKS. This TLC for your products throughout their lifecycle – including Condition Monitoring, Asset Management and On-Site Maintenance – means a lower TCO in the long-run. And the company can also commit to repairing, upgrading, and replacing at the end of the product’s service life, to ensure you maintain optimum efficiency and productivity. All of which helps to put into perspective investing a few extra pennies on a price tag at the start. People make Solutions Whether they’re product specialists or van drivers, switchboard operators or maintenance engineers, sales staff or accountants, everyone at ERIKS works in customer service. So ERIKS people make products into solutions, by combining customer service that’s consistently great with insight and solutions that deliver performance at the best TCO. ERIKS’ aim is to work with you in a true partnership. One that makes it hard to tell where your team ends and ERIKS’ begins. By adding an extra layer of knowledge – without adding an extra layer of complexity – working with ERIKS is seamless, complementary, efficient and effective. Again, the statistics speak for themselves: ERIKS can save your engineers’ time, and already delivers a total of £2m every month in signed-off cost-savings for customers. That’s not just for now, but for the future too. ERIKS invest heavily in internal training, continued professional development and apprenticeship and graduate schemes, to bring on board then develop new talent ready to meet new challenges. The industrial engineering workforce may be ageing and shrinking, but ERIKS is ready to fill the gap. It’s our GREAT PEOPLE that MAKE IT WORK each and EVERY DAY Investing in SKILLS for TODAY and TOMORROW ZERO accident policy We can SAVE 10-15% of your engineers TIME
  • 5.
    All backed upby a ROBUST and EFFICIENT LOGISTICS infrastructure 99.6% on time DELIVERY RATE ERIKS WEBSHOP purchasing power at your FINGERTIPS Full STOCK MANAGEMENT through our INTEGRATED or ONSITE solution There for you LOCALLY through our network of HUBS and SERVICE CENTRES Many businesses trust ERIKS to help them achieve their KPIs and meet their SLAs. Others simply rely on them to help keep their production running at its optimum, by providing condition monitoring and predictive maintenance solutions. Or timely repair, replace or upgrade advice. By helping them keep up to date with new products, new technology and new legislation. And of course, by providing the right products at the right time. For those customers who need ERIKS people on site, the ERIKS Zero Accidents policy is highly reassuring. As a health and safety goal, it makes the company safer to work for and safer to work with. It also means that your own safety record won’t be compromised by ERIKS’ engineers or other teams, because you can be sure they’re as safety conscious as you are. Solutions at your fingertips Even the best and most appropriate product solution is no use to you unless it’s readily available and quickly, efficiently and reliably delivered. So it’s reassuring to know that even the largest companies, which depend absolutely on a robust supply chain, depend absolutely on ERIKS. As a major global business, ERIKS can guarantee continuity of supply. And as a business, with long-term partnerships with many manufacturers, they can also remove the risk of inadvertently purchasing counterfeit products. In fact, many products supplied by ERIKS have been developed as a result of these partnerships. ERIKS’ application know-how has informed the manufacturer’s design expertise, to produce a high-quality and highly efficient end result. Even ordering is made easier with ERIKS, thanks to the availability of a sophisticated ecommerce solution which can be integrated into your own ERP system. There’s also a national network of ERIKS Service Centres and Regional Hubs, ensuring products and expertise are always within quick and easy reach. The statistics speak for themselves: 99.6% on-time delivery means less downtime and less lost production. Or if you want the products you need, exactly where you need them, ERIKS’ stock management, integrated or on- site solutions – taking ownership of your MRO supply chain – mean stock is always on site and always on time. Talk is cheap It’s easy to talk about the great products, great services and great people you’ll find at ERIKS. It’s harder to prove it’s all true. However, all it takes is one conversation to find out for yourself. Talk to ERIKS about your product requirements. About a tricky application. About avoiding un- planned maintenance. About saving energy. About any one of the countless challenges you face every day. ERIKS... making it SIMPLE to get things DONE
  • 6.
    With ERIKS, exceptionalservice isn’t something you have to search for. It’s there when you need it, wherever you are. From our high-level Technology Centres, to our Regional Hubs in your area, and our Integrated Service Centres on your site, ERIKS exceptional service is at your service. Exceptional service at every level Parts warehouse Carries a significant stock of factory fresh key parts and consumables profiles to the local industry across the full ERIKS product range, these parts, all from leading brands are fully traceable and are backed by continuity of supply. Product Customisation Cells Able to produce customised assemblies and solutions in moments, these flexible cells respond to orders within moments of receiving the request. Located next to the component parts stores, they can call off, build and test assemblies and systems faster than most companies can acknowledge your enquiry. Engineering Covering both mechanical and electrical (LV and HV) disciplines, the facilities have initial inspection and cleaning areas, repair bays staffed by time served specialists with years of expertise supported by machining cells able to produce hard to find or long lead-time components and dedicated equipment to aid the speed and quality of repairs from burnout ovens and balancing machines to winding machines
  • 7.
    Demonstration and Training A livelearning area designed and equipped to help maintenance and supply chain professionals learn about the latest best practice, techniques and innovative products. Technical Support Our technical specialists can help with everything from a simple parts selection to a full turnkey product and everything between including customisation, subassemblies and application engineering across all nine of our core product areas. Maintenance Engineering The ERIKS maintenance engineering team cover both workshop based facilities and mobile customer site based team as well as technical support functions. Site Services The ERIKS site services team are on hand to support you install, commission and maintain many parts of your plant, trained to the highest standard and with the latest tools and technologies to keep your equipment performing as you need. Technology Centre Home of a Product Business Unit (the new name to replace Core Competence Centre or CCC) undertaking product design, innovation and development often in conjunction with key brands and supply partners, building and managing supplier agreements and relationships, engineering turnkey solutions for large projects, developing line side supply for volume manufacturers, supporting and developing technical knowhow for all ERIKS operations. Regional Hubs Strengthens ERIKS local knowhow operating as a complete and comprehensive business unit supporting local service centres, integrated and onsites along with their own customers with engineering capability, parts customisation, commercial knowhow, application engineering and logistics across the complete ERIKS core product and service offering. Technical Service Centres Service centres with additional areas of capability such as engineering/repair or customisation in specific product areas such as gasket cutting or hose assembly with the supporting application engineering anchor points. These sites will be located in areas with high demand for specific capabilities required by local industry. Service Centres Support and service the ERIKS broad customer base calling on specific support from Regional Hubs or Technical service centres as and when required, these teams have the strongest relationship with our customers helping them achieve their specific goals and objectives. Onsite Service Centre Located on a customer’s site to support the selection and specification of core products with support from technical specialists and the logistics operations of ERIKS. Integrated Service Centre Located on a customer’s site owning some or all of the indirect supply chain; from specification, purchasing, stores, asset management and technical/application support directly integrated with the customers systems and procedures. Customer Service The customer service team make sure you are up to date with all activity on the go, from checking a price and availability to a progress report on a new build, repair or requesting a site visit by one of the ERIKS site engineering service crew.
  • 9.
    BEARING Technology Quick reference ERIKS offersover £5 million of bearing stock available the same day with a further £150 million of stock available next day. As an authorised distributor for the key global bearing brands, ERIKS has integrated logistic links with all key manufacturers delivering the most reliable supply service. 1 Spherical Roller Bearings 4-5 Deep Groove Ball Bearings 6 Y-Bearings 7 Linear Motion and Actuation 8 Split Roller Bearings 9 Radial Ball Bearings 10 SNT Split Plummer Blocks 11 Housed Units 12-13 Tapered Roller Bearings 14 Linear Bearings 16 Rotary Bearings 17 Cylindrical Roller Bearings 18 Super Precision Bearings 19-21 Self-Lube® Bearings 22 Housings 23 Ball Busings 24 Needle Roller Bearings 25 Lubricators 26 Condition monitoring 27-28, 32 Bearing Fitting Tools 29 Test and Measurement Tools 29-31 Quick Product Reference 4-8, 28-29 9-14 15-18 19-23 2524 26 30-31 smart technologies Visit us at www.eriks.co.uk
  • 10.
    Bearings SUPERIOR Performance BEARING Solutions AuthorisedDistributors for all the top global brands. Stock and logistics excellence with 5 million of stock available same day and 150 million next day. Real bearing know-how from our Application, Project and Design Engineers. ERIKS are not just a supplier; we are a leader in condition based monitoring (CM), bearing fitting and gearbox repairs. Our bearing engineering ‘know-how’ can produce significant reductions in downtime and maintenance costs while helping you increase productivity. We can help you to positively impact the total cost of your bearings. 2 WHY USE AN AUTHORISED DISTRIBUTOR? Short answer, total peace of mind with full manufacture back up, warranty and guaranteed genuine products. n Full traceability n Avoid fake bearings n Availability n Full technical support n Access to the latest technologies Product Range n Ball and Roller Bearings n Bearing Housings, Units and Split Bearings n Plain Bearings, Bushes and Rod Ends n Linear Bearings n Linear Actuators n Bearing Tools n Lubricants and Lubricators Services n Fitting n Sealing n Lubrication Selection and dDelivery n Preventative Maintenance n Repair and Refurbishment n Sub-assembly n Kitting n Bespoke Bearing and Housing Design INNOVATIVE NEW PRODUCTS n SKF Explorer Upgrade n NSK Molded Oil n Timken Blue Brute Specialist Technical Centres Know-How
  • 11.
    TOTAL FAN SOLUTIONS Industrialfans play a key backstage role in a variety of operations, from delivering process gases to extracting dangerous fumes. But their ‘behind the scenes’ nature means they are often ignored. So understanding the most common issues they suffer – and how to overcome them – can help you minimise unplanned downtime and maximise equipment productivity. n Premature failure n Excessive noise n Excessive vibration n High temperatures n Poor access, poor maintenance To discover how we can help you improve reliability and efficiency of these crucial - often overlooked assets - request a copy of our latest Fan Solutions brochure. BEARING TECHNOLOGY 10 POINT PLAN FOR GETTING THE MOST FROM YOUR BEARINGS Select the Correct Bearing Choosing the right bearing at the design stage is critical to the safe, consistent, efficient running of your machine. Consider all the operating parameters such as space, speed, load direction as well as material, lubrication and shock-load. Get What you Paid For Counterfeit bearings are on the rise - and can be difficult to spot - making it more important than ever to deal with authorised sources in the purchasing stage. The implications can be extensive, resulting in catastrophic failure. Store Bearings Correctly Keep bearings in their original, unopened packaging until mounting, to prevent corrosion and ingress of contaminants. Beware of the shelf-life of pre- greased bearings which can range from 3-5 years. Prepare for Installation Take care when removing existing bearings as damage to components can significantly delay the fitting and performance of the new ones. Check you have the right equipment to hand and select the correct fitting method, before you begin. Fit and Align 16% of premature failures result from incorrect fitting, damage from hammer blows can ruin the bearings, before they even run. Adhere to correct fitting practices and you can help extend the bearing’s service life and reduce costs over time. 3 Correct Sealing Arrangement The correct seal can reduce premature failures by 14%. Even a tiny amount of contamination can adversely affect the bearing operating life - which is why adequate sealing arrangements are key. Maintain Lubrication Despite the availability of ‘sealed for life’ bearings, 36% of premature bearing failures occur as a result of incorrect lubricant specification or inadequate application. Monitor Bearing Condition Regular interval checks for bearings are ideal, even if it’s just visual, temperature and noise checks. Condition monitoring techniques such as vibration analysis can be used to determine bearing status, enabling companies to address any issues early on and before any downtime occurs. Plan for Replacement No matter how much you care for your bearings, they will need to be replaced at some point, condition monitoring can help you to plan for that replacement. Ensuring you can plan for the right people, components and tools to be available when you need them. Upgrade for Savings When it comes to replacement, don’t just settle for like-for-like; consider upgrades to sealing, materials or different fittings - all of which can help you improve performance further. Visit us at www.eriks.co.uk
  • 12.
    4 Specialist Technical Centres Know-How Bearings SphericalRoller Bearings and Housings Open bearing Sealed bearing Competitor bearings L10m SKF rating life L10 Basic rating life SKF Explorer Bearing life
  • 13.
    5 Visit us atwww.eriks.co.uk Bearings SKF Explorer Spherical Roller Bearings All SKF Explorer spherical roller bearings have been upgraded to a new level of performance, featuring a combination of high-quality steel and an improved heat treatment process. Combining the clean and homogenous high- quality steel used in the original SKF Explorer bearings with an improved heat treatment process the upgraded bearings provide longer service life, particularly under difficult operating conditions where bearings are subjected to contamination or poor lubrication. SKF Spherical Roller Bearings for Vibratory Applications SKF Explorer spherical roller bearings for vibrating screens (VA405) are proven to last twice as long as other screen bearings and operate at much cooler temperatures, which helps: nn Lower maintenance and repair costs nn Reduce downtime nn Improve safety SKF Explorer spherical bearings (VA406) provide all the same benefits as VA405 bearings, plus they feature a PTFE coated bore which virtually eliminates fretting corrosion between the shaft and the bearing bore. This helps: nn Extend maintenance intervals nn Reduce associated labour costs The SKF Three-Barrier Solution For highly contaminated environments, SKF recommends the SKF Three-barrier solution, as contaminants must pass through three barriers to reach the bearing. The SKF Three-barrier solution extends bearing service life without the use of large quantities of grease to purge contamination. nn Sealed SKF Explorer spherical roller bearings nn SKF split block housings nn Standard SKF L or S-type seals for SNL housings nn SKF LGGB2 biodegradable or LGEP2 as the barrier grease 11 22 33 SKF Housing Kits Place a single SKF Housing Kit order and receive one package containing a high-quality SKF Explorer bearing, housing and all of the components needed to create a high performing bearing system. Sealed SKF Explorer Spherical Roller Bearings The sealed bearings can significantly increase bearing service life in contaminated environments. The bearings are pre-lubricated with a specially formulated grease and sealed with highly effective contact seals. In many applications, these bearings can be considered lubricated for the life of the bearing. By eliminating or extending relubrication intervals, these bearings can significantly reduce the cost to purchase, apply and dispose of grease. Reduced maintenance costs will, in many cases, substantially reduce the total cost of ownership of an application. Half the friction, twice the speed with a new design that results in up to 50% less seal friction, SKF’s small sealed spherical roller bearings reduce operating temperatures by as much as 20 °C. NEW Part No ID (mm) OD (mm) Length (mm) 22205E 25 52 18 22210E 50 90 23 22215E 75 130 31 Part No ID (mm) OD (mm) Length (mm) BS2-2205-2RS/VT143 25 52 18 BS2-2210-2RS/VT143 50 90 28 BS2-2215-2RS/VT143 75 130 38 Part No ID (mm) OD (mm) Length (mm) 22310 E/VA405 50 110 40 22315 EJA/VA405 75 160 55 22320 EJA/VA405 100 215 73 Part No ID (mm) OD (mm) Length (mm) 22310 E/VA405 50 110 40 22315 EJA/VA405 75 160 55 22320 EJA/VA405 100 215 73 Part No Bearing Housing Seal SE 22211 TA 22211 E SE 211 TSN 211 A SE 22511 TL/C3 22211 EK/C3 SE 511-609 TSN 511 L SE 22213 TA 22213 E SE 213 TSN 213 A
  • 14.
    6 Specialist Technical Centres Know-How Bearings DeepGroove Ball Bearings and Y-bearing units Deep Groove Ball Bearings These bearings are simple in design, non-separable, suitable for high and very high speeds and are robust in operation, requiring little maintenance. Because deep groove ball bearings are the most widely used bearing type, they are available from SKF in many designs, variants and sizes. SKF Explorer Bearings SKF Explorer deep groove ball bearings are designed to run cooler, smoother, quieter and longer than standard design deep groove ball bearings The performance of these bearings has been substantially improved by optimising the internal geometry and surface finish of all contact surfaces, redesigning the cage, combining the extremely clean and homogenous steel with a unique heat treatment and improving the quality and uniformity of the balls. SKF Energy Efficient Bearings Shielded and sealed SKF E2 deep groove ball bearings cut bearing friction losses by 30–50% compared to SKF Explorer bearings. Compared to bearings from other manufacturers, SKF E2 bearings can reduce friction losses even more. Installing these bearings during your next round of repairs provides a valuable opportunity to save energy. Corrosion resistant bearings These bearings are manufactured to withstand tough application requirements and to be the first choice when moisture, corrosive or abrasive materials are present. Applications include food and beverage, pharmaceutical, chemical and hydrocarbon processing or medical which require components that can provide high operational reliability and long service life. Shielded E2 Bearings INSOCOAT Bearings These bearings have an electrically insulating coating on the external surfaces of the outer ring or the inner ring. They are a very cost-effective solution compared with other methods of protecting bearings against damage and eventual failure due to the passage of electric current through their rolling contacts. SKF Deep Groove Ball Bearings and Y-Bearing Units Part No ID (mm) OD (mm) Width (mm) 6000 10 26 8 6001 12 28 8 6002 15 32 9 6004 20 42 12 6005 25 47 12 Part No ID (mm) OD (mm) Width (mm) E2.625-2Z 5 16 5 E2.6000-2Z 10 26 8 E2.6004-2Z 20 42 12 Part No ID (mm) OD (mm) Width (mm) E2.626-2RSH 6 19 6 E2.6000-2RSH 10 26 8 E2.6002-2RSH 15 32 9 Sealed E2 Bearings Part No ID (mm) OD (mm) Width (mm) 6314/C3VL0241 70 150 35 6216/C3VL0241 80 140 26 6220/C3VL0241 100 180 34 Part No ID (mm) OD (mm) Width (mm) W 605 5 14 5 W 6000 10 26 8 W 6002 15 32 9
  • 15.
    7 Visit us atwww.eriks.co.uk Bearings SKF Y-Bearing Units These are ready-to-mount and ready-to-use units equipped with a superior sealing system. This system provides reliable protection against moisture and contaminants, plus exceptional lubricant retention. The assortment is extensive and includes a wide range of housing designs and materials, and a variety of Y-bearings with locking mechanisms and seals suited to different requirements. Housing types include Y-bearing plummer block units, flanged Y-bearing units and Y-bearing take-up units. Housing materials include composite material, grey cast iron, sheet steel and stainless steel. SKF Energy Efficient Y-Bearing Units Helping to reduce total cost of ownership, these lightweight, cost- effective and ready-to-mount units are particularly well suited for applications where high speeds, moderate loads, reliability and minimal maintenance are all key parameters. The units can be optimised for specific applications and conditions, helping customers reduce energy use and total cost of ownership. SKF Food Line Y-Bearing Units These units offer a maintenance-free solution that enables increased productivity, coupled with reduced costs. Once installed, the units require no re-lubrication. They feature a maintenance- free, stainless steel bearing insert that is fitted with a very efficient multiple-lip seal and a rotating flinger on both sides to keep the lubricant in, and harsh washdown solutions out, even under high pressure washing. SKF Agricultural Y-Bearing Units Developed specifically for agricultural applications, these units are designed to withstand the toughest operating conditions, reduce downtime and reduce environmental impact. Suitable for normal and demanding applications, they are re-lubrication- free and feature a robust, five-lip seal design, an advanced, truly concentric locking method, and optional corrosion protection. SKF High Temperature Y-Bearing Units These units incorporate graphite-based lubricants that continuously lubricate the bearing, eliminating the use of grease. Ideal for industries such as metals and food and beverage, these bearings are designed for re-lubrication-free operation at temperatures up to 350 °C. Part No ID (mm) Width (mm) SY 15 TF 15 32 SY 20 TF 20 32 SY 25 TF 25 36 Part No ID (mm) Width (mm) SYK 20 FE 20 32 SYK 25 FE 25 32 SYK 30 FE 30 40 Part No ID (mm) Width (mm) SYWK 20 YTH 20 32 SYWK 25 YTH 25 32 SYWK 30 YTH 30 40 Part No ID (mm) Width (mm) YSPAG 205 25 52 YSPAG 206 30 62 YSPAG 207 35 72 Part No ID (mm) Width (mm) SY 20 TF/VA201 20 32 SY 30 TF/VA201 30 40 SY 40 TF/VA201 40 48
  • 16.
    8 Specialist Technical Centres Know-How Bearings CAHBand CAT Actuators for Quick Delivery Available for delivery in just five working days this initiative is designed to help speed up machine build, modification and repairs, while reducing stockholding. Typical applications include medical, factory automation, food and beverage, and off- highway. SKF Roller Profile Rail Guide LLU Series Specifically designed for machine tool applications where high accuracy, high system rigidity, low heat generation and low noise and vibration levels are prerequisites. nn Full ISO interchangeability nn High load rating at compact design nn Outstanding running smoothness nn Longer service life nn Reduced maintenance Linear Motion and Actuation Linear Ball Bearings Delivers advantages over competitor’s solutions, and is considered a benchmark among linear guidance system users. SKF technology innovations, product quality, wide range availability, reliability and service life all contribute to efficient and cost- effective solutions. LBC D-series nn Full ISO interchangeability nn Self-aligning capability nn Optimised cage design nn Factory pre-lubrication nn Corrosion-resistant design nn Food grade lubrication option CASM Electric Cylinders with Brushless DC Motors When compared to pneumatics, the investment cost will be paid back in a short time period due to the tremendous energy savings. Simply define the cylinder’s operating parameters by using SKF Drive Assistant software and benefit from variable speed, high positioning accuracy, high force and a long lifetime. NEW NEW SKF Linear Motion and Actuation Technology Part No ID (mm) OD (mm) Length (mm) LBCR 12 D 12 22 32 LBCR 16 D 16 26 36 LBCR 20 D 20 32 45 Without Seals Part No ID (mm) OD (mm) Length (mm) LBCR 12 D-2LS 12 22 32 LBCR 16 D-2LS 16 26 36 LBCR 20 D-2LS 20 32 45 With 2 Double Lip Seals SKF Profile Rail Guide LLT Series Available in a wide range of sizes, carriages and accessories as well as in various preload and accuracy classes, which facilitates the adaptation to individual application demands. nn Improved service life and reliability nn Ready-to-mount due to factory pre-lubrication nn High flexibility in application design nn Interchangeability nn Simplified stock management Part No Rail Width (mm) LLTHC 15 SA T0 P5 15 LLTHC 20 SA T0 P5 20 LLTHC 25 SA T0 P5 25 Part No Rail Width (mm) LLUHS 25 A 70 LLUHS 35 A 100 LLUHS 45 A 120
  • 17.
    9 Visit us atwww.eriks.co.uk Bearings TIMKEN Split Roller Bearings Removable support caps and housing halves permit quick visual inspection of bearing components during scheduled maintenance. Innovative cage clip is fixed to the cage and prevents loss during assembly and disassembly. Machined brass cage is standard to accommodate higher speeds and temperatures. Profiled rolling elements reduce damaging edge stress to increase bearing life and reliability. Eight seal styles, including Kevlar® packing seal and aluminum triple labyrinth, handle any operating environment. ASTM 48A - Grade 40/BS EN1561:1997 - Grade 250 cast iron for strength and durability. Spherical housing outside diameter allows for +/- 1.5 degrees misalignment. Engineered to perform SPLIT CYLINDRICAL ROLLER BEARINGS Revolvo Split Cylindrical Bearings are designed to help increase operational life and reduce maintenance expense. • Capable of handling higher speeds, temperature and acceleration from a highly engineered machined brass cage. • Longer life due to a robust design featuring double webs and thick sections of high grade cast iron. • Improved performance provided by profiled rolling elements that reduce damaging edge stress. • Ability to closely match application load requirements with engineered bearing configurations. • Able to handle a range of operating environments with available selection of eight seal designs. • Available in application appropriate housing styles. © 2016 The Timken Company. Timken® is a registered trademark of The Timken Company. The Timken team applies their know-how to improve the reliability and performance of machinery in diverse markets worldwide. The company designs, makes and markets high-performance mechanical components, including bearings, belts, gears, chain and related mechanical power transmission products and services. CALL ON TIMKEN For your nearest Timken sales engineer, visit www.timken.com
  • 18.
    10 Specialist Technical Centres Know-How Bearings Timkenradial ball bearings consist of an inner and outer ring with a cage containing a complement of precision balls. The standard Conrad-type bearing has a deep groove construction capable of handling radial and axial loads from either direction in versatile designs that permit relatively high-speed operation. Series Base Open Open C3 2 Rubber Seals 2 Rubber Seals 2 Metal Sheilds 2 Metal Shields C3 2RS 2RS C3 ZZ ZZ C3 6000 Series 6000 6000-TIMKEN 6000C3-TIMKEN 60002RS-TIMKEN 60002RSC3-TIMKEN 6000ZZ-TIMKEN 6000ZZC3-TIMKEN 6001 6001-TIMKEN 6001C3-TIMKEN 60012RS-TIMKEN 60012RSC3-TIMKEN 6001ZZ-TIMKEN 6001ZZC3-TIMKEN 6002 6002-TIMKEN 6002C3-TIMKEN 60022RS-TIMKEN 60022RSC3-TIMKEN 6002ZZ-TIMKEN 6002ZZC3-TIMKEN 6003 6003-TIMKEN 6003C3-TIMKEN 60032RS-TIMKEN 60032RSC3-TIMKEN 6003ZZ-TIMKEN 6003ZZC3-TIMKEN 6004 6004-TIMKEN 6004C3-TIMKEN 60042RS-TIMKEN 60042RSC3-TIMKEN 6004ZZ-TIMKEN 6004ZZC3-TIMKEN 6005 6005-TIMKEN 6005C3-TIMKEN 60052RS-TIMKEN 60052RSC3-TIMKEN 6005ZZ-TIMKEN 6005ZZC3-TIMKEN 6006 6006-TIMKEN 6006C3-TIMKEN 60062RS-TIMKEN 60062RSC3-TIMKEN 6006ZZ-TIMKEN 6006ZZC3-TIMKEN 6007 6007-TIMKEN 6007C3-TIMKEN 60072RS-TIMKEN 60072RSC3-TIMKEN 6007ZZ-TIMKEN 6007ZZC3-TIMKEN 6008 6008-TIMKEN 6008C3-TIMKEN 60082RS-TIMKEN 60082RSC3-TIMKEN 6008ZZ-TIMKEN 6008ZZC3-TIMKEN 6009 6009-TIMKEN 6009C3-TIMKEN 60092RS-TIMKEN 60092RSC3-TIMKEN 6009ZZ-TIMKEN 6009ZZC3-TIMKEN 6010 6010-TIMKEN 6010C3-TIMKEN 60102RS-TIMKEN 60102RSC3-TIMKEN 6010ZZ-TIMKEN 6010ZZC3-TIMKEN 6011 6011-TIMKEN 6011C3-TIMKEN 60112RS-TIMKEN 60112RSC3-TIMKEN 6011ZZ-TIMKEN 6011ZZC3-TIMKEN 6012 6012-TIMKEN 6012C3-TIMKEN 60122RS-TIMKEN 60122RSC3-TIMKEN 6012ZZ-TIMKEN 6012ZZC3-TIMKEN 6013 - - 60132RS-TIMKEN 60132RSC3-TIMKEN - - 6014 - - 60142RS-TIMKEN 60142RSC3-TIMKEN - - 6015 - - 60152RS-TIMKEN 60152RSC3-TIMKEN - - 6016 - - 60162RS-TIMKEN 60162RSC3-TIMKEN - - 6017 - - - 60172RSC3-TIMKEN - - 6200 Series 6200 6200-TIMKEN 6200C3-TIMKEN 62002RS-TIMKEN 62002RSC3-TIMKEN 6200ZZ-TIMKEN 6200ZZC3-TIMKEN 6201 6201-TIMKEN 6201C3-TIMKEN 62012RS-TIMKEN - 6201ZZ-TIMKEN 6201ZZC3-TIMKEN 6202 6202-TIMKEN 6202C3-TIMKEN 62022RS-TIMKEN 62022RSC3-TIMKEN 6202ZZ-TIMKEN 6202ZZC3-TIMKEN 6203 6203-TIMKEN 6203C3-TIMKEN 62032RS-TIMKEN 62032RSC3-TIMKEN 6203ZZ-TIMKEN 6203ZZC3-TIMKEN 6204 6204-TIMKEN 6204C3-TIMKEN 62042RS-TIMKEN 62042RSC3-TIMKEN 6204ZZ-TIMKEN 6204ZZC3-TIMKEN 6205 6205-TIMKEN 6205C3-TIMKEN 62052RS-TIMKEN 62052RSC3-TIMKEN 6205ZZ-TIMKEN 6205ZZC3-TIMKEN 6206 6206-TIMKEN 6206C3-TIMKEN 62062RS-TIMKEN 62062RSC3-TIMKEN 6206ZZ-TIMKEN 6206ZZC3-TIMKEN 6207 6207-TIMKEN 6207C3-TIMKEN 62072RS-TIMKEN 62072RSC3-TIMKEN 6207ZZ-TIMKEN 6207ZZC3-TIMKEN 6208 6208-TIMKEN 6208C3-TIMKEN 62082RS-TIMKEN 62082RSC3-TIMKEN 6208ZZ-TIMKEN 6208ZZC3-TIMKEN 6209 6209-TIMKEN 6209C3-TIMKEN 62092RS-TIMKEN 62092RSC3-TIMKEN 6209ZZ-TIMKEN 6209ZZC3-TIMKEN 6210 6210-TIMKEN 6210C3-TIMKEN 62102RS-TIMKEN 62102RSC3-TIMKEN 6210ZZ-TIMKEN 6210ZZC3-TIMKEN 6211 6211-TIMKEN 6211C3-TIMKEN 62112RS-TIMKEN 62112RSC3-TIMKEN 6211ZZ-TIMKEN 6211ZZC3-TIMKEN 6212 6212-TIMKEN 6212C3-TIMKEN 62122RS-TIMKEN 62122RSC3-TIMKEN 6212ZZ-TIMKEN 6212ZZC3-TIMKEN 6213 - - 62132RS-TIMKEN 62132RSC3-TIMKEN - - 6300 Series 6300 6300-TIMKEN 6300C3-TIMKEN 63002RS-TIMKEN 63002RSC3-TIMKEN 6300ZZ-TIMKEN 6300ZZC3-TIMKEN 6301 6301-TIMKEN 6301C3-TIMKEN 63012RS-TIMKEN 63012RSC3-TIMKEN 6301ZZ-TIMKEN 6301ZZC3-TIMKEN 6302 6302-TIMKEN 6302C3-TIMKEN 63022RS-TIMKEN 63022RSC3-TIMKEN 6302ZZ-TIMKEN 6302ZZC3-TIMKEN 6303 6303-TIMKEN 6303C3-TIMKEN 63032RS-TIMKEN 63032RSC3-TIMKEN 6303ZZ-TIMKEN 6303ZZC3-TIMKEN 6304 6304-TIMKEN 6304C3-TIMKEN 63042RS-TIMKEN 63042RSC3-TIMKEN 6304ZZ-TIMKEN 6304ZZC3-TIMKEN 6305 6305-TIMKEN 6305C3-TIMKEN 63052RS-TIMKEN 63052RSC3-TIMKEN 6305ZZ-TIMKEN 6305ZZC3-TIMKEN 6306 6306-TIMKEN 6306C3-TIMKEN 63062RS-TIMKEN 63062RSC3-TIMKEN 6306ZZ-TIMKEN 6306ZZC3-TIMKEN 6307 6307-TIMKEN 6307C3-TIMKEN 63072RS-TIMKEN 63072RSC3-TIMKEN 6307ZZ-TIMKEN 6307ZZC3-TIMKEN 6308 6308-TIMKEN 6308C3-TIMKEN 63082RS-TIMKEN 63082RSC3-TIMKEN 6308ZZ-TIMKEN 6308ZZC3-TIMKEN 6309 6309-TIMKEN 6309C3-TIMKEN 63092RS-TIMKEN 63092RSC3-TIMKEN 6309ZZ-TIMKEN 6309ZZC3-TIMKEN 6310 6310-TIMKEN 6310C3-TIMKEN 63102RS-TIMKEN 63102RSC3-TIMKEN 6310ZZ-TIMKEN 6310ZZC3-TIMKEN 6311 6311-TIMKEN 6311C3-TIMKEN 63112RS-TIMKEN 63112RSC3-TIMKEN 6311ZZ-TIMKEN 6311ZZC3-TIMKEN 6312 6312-TIMKEN 6312C3-TIMKEN 63122RS-TIMKEN 63122RSC3-TIMKEN 6312ZZ-TIMKEN 6312ZZC3-TIMKEN Miniature 607 - - 6072RS-TIMKEN 6072RSC3-TIMKEN 607ZZ-TIMKEN 607ZZC3-TIMKEN 608 608-TIMKEN - 6082RS-TIMKEN 6082RSC3-TIMKEN 608ZZ-TIMKEN 608ZZC3-TIMKEN 609 - - 6092RS-TIMKEN 6092RSC3-TIMKEN 609ZZ-TIMKEN 609ZZC3-TIMKEN 626 626-TIMKEN - 6262RS-TIMKEN 6262RSC3-TIMKEN 626ZZ-TIMKEN 626ZZC3-TIMKEN 627 627-TIMKEN - 6272RS-TIMKEN 6272RSC3-TIMKEN 627ZZ-TIMKEN - 628 - - - - 628ZZ-TIMKEN - 629 629-TIMKEN - 6292RS-TIMKEN 6292RSC3-TIMKEN 629ZZ-TIMKEN - Radial Ball Bearings Radial Ball Bearings and Plummer Blocks
  • 19.
    11 Visit us atwww.eriks.co.uk Bearings SNT Split Plummer Blocks Features nn Split construction for convenient assembly and disassembly. nn Units include pry-tool slots for quick and easy installation. nn Centre marks to simplify alignment and dimples for positioning pins and four-bolt mounting. nn Seal grooves allow for various sealing options. nn The design allows for simplified bearing inspection, service and replacement. Applications nn Conveyors nn Ball Millls Design and Construction Timken offers split plummer block housings that can be built with either tapered bore bearings with adapters for mounting on straight shafts or cylindrical bore bearings for assembly on shouldered shafts. Timken uses a system of dowelling caps and bases together at an early stage of manufacturing, so that they remain a single unit during machining. They are not interchangeable as separate parts and become precisely mated components, helping to ensure a precise fit. Timken supplies plummer block housings for mounting with two or four bolts. Split-block housings Provide proper support with precision-fit matched cap-and-base with dowel pins. Simplifies alignment and installation of heavy housings. Convenient pry-tool slots for easy cap removal speeds bearing inspection and replacement. Timken® spherical roller bearings Increase reliability with a high- performance bearing that runs cooler for longer bearing life. Locating rings Provide flexibility to fix or float the bearing. Optional end caps Avoid damage to bearing and housing. Easy to install and remove. Cast-iron Rugged cast-iron is well-suited for harsh industrial applications. Available in steel or ductile iron. Seal options Protect the bearing with double-lip, labyrinth, V-ring and taconite sealing options. Tapered adapter For straight bore mounting secure each bearing onto the shaft. Standard metric mounting dimensions Ease installation with same dimensions as industry norms for bolt holes, centre heights and shaft diameters. Conforms to ISO 113:1999. Sizes nn 20–400mm shafts nn Casters nn Rolling mills nn Heavy movable structures Timken’s capabilities in engineering and manufacturing heavy-duty plummer blocks help ensure high performance from their products
  • 20.
    12 Specialist Technical Centres Know-How Bearings HousedUnits Spherical Roller Bearing Steel Cage (EJ) Size Range 25mm bore up to 400mm outside diameter Design • Internal geometry and surface finishes optimised to maximise bearing performance and lower running temperature Industries & Applications • Continuous casters • Gear drives • Cement • Aggregate • Mining and construction • Oil and gas • Pumps and compressors • Air handling units • Cranes, lifts and hoists SNT Plummer BlocksSpherical Roller Bearing Brass Cage (EM, EMB) Size Range 30mm to 1500mm bore size Design • EM type feature precision- machined, roller-riding brass cages and are designed for harsh industrial environments • EMB type feature precision-machined land- riding one-piece brass cages, and are designed for applications requiring a larger bore size Industries & Applications EM • Continuous casters • Vibratory screens • Gear drives EMB • Continuous casters • Gear drives • Cement and aggregate • Mining & construction • Oil & gas • Pumps & Compressors Size Range 20mm to 380mm bore size Design • Durable cast-iron housing and robust sealing options to keep lubrication in and contamination out • Separate, matched caps and bases ease installation • Simply remove the cap using a pry-tool slot for bearing inspection, service and replacement Industries & Applications • Gear drives • Cement • Aggregate • Mining and construction • Oil and gas • Pumping and compressors • Air handling units Size Range Available in sizes up to 900mm Design • Adapter sleeves are used with a nut and locking device to simplify mounting a tapered bore bearing on a straight shaft using a pull-type fit • Withdrawal sleeves feature a push-type mounting arrangement and a locking device to secure a bearing to a shaft Industries & Applications • Continuous casters • Gear drives • Cement • Aggregate • Mining and construction • Oil and gas • Air handling units Spherical Roller Bearing Accessories Designed for the toughest conditions Tough bearings for tough jobs from Timken...
  • 21.
    13 Visit us atwww.eriks.co.uk Bearings Size Range 1.3/8 to 11.13/16 11" with special shaft sizes available up to 39.3/8" and beyond Design • Rugged cast-iron or cast-steel housings with high capacity spherical roller bearings to meet the toughest demands of heavy industry • Split construction allows for easy assembly and disassembly • Multiple sealing options protect against contamination Industries & Applications • Conveyors • Mining applications • Pulp and paper mills • Rolling mills SAF Pillow Blocks Spherical Roller Bearing Solid-Block Housed Units Size Range Shafts from 35 to 400mm (1.7/16" to 15.3/4") Design • Made with cast-steel housings and Timken high- performance spherical roller bearings, these are the only spherical roller bearing housed units to offer steel solid-block housings as standard • Can run on misaligned shafts up to ±1.5° without a reduction in life expectancy Industries & Applications • Metal mills • Aggregate and cement • Mining • Power generation • Pulp and paper • Material conveying • Sugar mills • Agriculture • Waste management • Waste waste treatment • HVAC, fans & blowers • Cranes, Lifts and hoists Type E Tapered Roller Bearing Housed Units Revolvo Split Roller Bearing Size Range Shafts from 35 to 125mm bore size Design • Timken Type E tapered roller bearing housed units feature industry- leading premium tapered roller bearings, high- performance seals, e-coated housings and powerful locking collars • Available as: Pillow blocks, Flange units, Take-up units Industries & Applications • Material-handling • Processing equipment • Air-handling equipment • Mixers • Washers • Shredders • Mills • Vibrating equipment • Ovens and furnaces Size Range 35mm to 600mm (Larger in special design) Design • Split-to-the-shaft design enables the bearing to be fitted without requiring access to the shaft ends, can be built around the shaft. Huge savings in unnecessary downtime as there is no need to remove other drive components Industries & Applications • Metal mills • Aggregate and cement • Mining • Power generation • Pulp and paper • Material conveying • Sugar mills • Agriculture • Waste management • Waste waste treatment • HVAC, fans & blowers • Cranes, Lifts and hoists Formally QM Blue-Brute
  • 22.
    14 Specialist Technical Centres Know-How Bearings TaperedRoller Bearings Timken offers the most extensive line of tapered roller bearings available anywhere in the world. Tapered roller bearings are uniquely designed to manage both thrust and radial loads on rotating shafts and in housings. Available in single-, double- and four-row configurations, customised geometries and engineered surfaces can be applied to these bearings to further enhance performance in demanding applications. Single-Row Tapered Roller Bearings The most basic and widely used tapered bearing, usually fitted as one of an opposing pair. Double-Row Tapered Roller Bearings With double cups and two single cones, these are available in a variety of configurations. Four-Row Tapered Roller Bearings Combine the inherent high-load, radial/ thrust capacity and direct/indirect mounting variables of tapered roller bearings into assemblies of maximum load rating in minimum space. Part No Inside Outside Diameter Diameter Width 30202-TIMKEN 15mm 35mm 11.75mm 30203-TIMKEN 17mm 40mm 13.25mm 30204-TIMKEN 20mm 47mm 15.25mm 30205-TIMKEN 25mm 52mm 16.25mm 30206-TIMKEN 30mm 62mm 17.25mm 30207-TIMKEN 35mm 72mm 18.25mm 30208-TIMKEN 40mm 80mm 19.75mm 30209-TIMKEN 45mm 85mm 20.75mm 30210-TIMKEN 50mm 90mm 21.75mm 30211-TIMKEN 55mm 100mm 22.75mm 30212-TIMKEN 60mm 110mm 23.75mm 30213-TIMKEN 65mm 120mm 24.75mm 30214-TIMKEN 70mm 125mm 26.25mm Part No Inside Outside Diameter Diameter Width 30218-TIMKEN 90mm 160mm 32.5mm 30302-TIMKEN 15mm 42mm 14.25mm 30303-TIMKEN 17mm 47mm 15.25mm 30304-TIMKEN 20mm 52mm 16.25mm 30305-TIMKEN 25mm 62mm 18.25mm 30306-TIMKEN 30mm 72mm 20.75mm 30307-TIMKEN 35mm 80mm 22.75mm 30308-TIMKEN 40mm 90mm 25.25mm 31305-TIMKEN 25mm 62mm 18.25mm 31308-TIMKEN 40mm 90mm 25.25mm 31310-TIMKEN 50mm 110mm 29.25mm 31311-TIMKEN 55mm 120mm 31.5mm 31313-TIMKEN 65mm 140mm 36mm Part No Inside Outside Diameter Diameter Width 32004-TIMKEN 20mm 42mm 15mm 32005-TIMKEN 25mm 47mm 15mm 32006-TIMKEN 30mm 55mm 17mm 32007-TIMKEN 35mm 62mm 18mm 32008-TIMKEN 40mm 68mm 19mm 32009-TIMKEN 45mm 75mm 20mm 32010-TIMKEN 50mm 80mm 20mm 32011-TIMKEN 55mm 90mm 23mm 32012-TIMKEN 60mm 95mm 23mm 32013-TIMKEN 65mm 100mm 23mm 32014-TIMKEN 70mm 110mm 25mm 32024-TIMKEN 120mm 180mm 38mm Here’s just our best sellers. Don’t forget we have 100s of other sizes – call us with your needs! Tapered Roller Bearings Thousands of products available to order on ERIKS WEBSHOP SHOP.ERIKS.CO.UK SHOP.ERIKS .CO.UKSHOP .ERIKS.CO.UK
  • 23.
    15 Visit us atwww.eriks.co.uk Bearings Mobility for Tomorrow Future trends are clear - increasingly intelligent bearings and mechatronics systems require the Products and Maintenance Management solutions of Tomorrow. Yet Schaeffler provides those revolutionary solutions Today ... Products which are ever-more efficient, safer and quieter; keeping pace with the demands of heavy industry, renewable energy, automotive and rail transport applications. And Condition Monitoring which remotely evaluates real-load data to extend maintenance intervals safely leading to greater cost savings. Mobility for Tomorrow ... it’s here today
  • 24.
    16 Specialist Technical Centres Know-How Bearings LinearBearings nn Compact Series (KH..) Ø6 to Ø50 nn Light Series (KN..) Ø12 to Ø50 nn Machined Series (KB..) Ø12 to Ø50 nn Permaglide® Plain Series (PAB..) Ø12 to Ø50 nn Shafts have metric dimensions and are manufactured to tolerance class h6 nn Made from quenched and tempered steel with a surface hardness of 59 to 65 HRC nn Corrosion-resistant version available nn Can be machined to customer specification nn Shafts have metric dimensions and are manufactured to tolerance class h6 or h7 depending on size nn Made from quenched and tempered steel with a surface hardness of 59 to 65 HRC nn Corrosion-resistant version available nn Can be machined to customer specification nn Hollow section carriage made from anodized, profiled aluminium nn Comprises carriage plate, four bolts, four track rollers, two end covers and eight T-nuts nn Preset clearance, no adjustment required nn LFS guideways supplied single piece or multi piece nn Can be installed in any combination with all guideways LFS nn Other carriages available (LFL.., LFDL.., LFKL.. etc) nn Four-row linear recirculating ball bearing and guideway assembly nn Wide range of carriage types nn For applications with long unlimited stroke lengths nn Moderate and high loads, moderate and high rigidity nn Guideways supplied in single or multi piece lengths nn High speed version (10m/s) also available nn Wide range of accessories available nn Also available in 6 row design KUSE Part No Height (mm) Width (mm) Length (mm) LFCL25 30.5 80 110 LFCL42 38.1 116 150 LFCL86 48.4 190 335 Part No Rail Width (mm) KUVE15B-INA 15 KUVE20B-INA 20 KUVE25B-INA 25 KUVE30B-INA 30 KUVE35B-INA 35 KUVE45B-INA 45 KUVE55B-INA 55 Max Single Piece Part No OD (mm) Length (mm) SHAFT-4MM 4 2500 SHAFT-5MM 5 3600 SHAFT-6MM 6 4000 SHAFT-8MM 8 4000 SHAFT-10MM 10 6000 SHAFT-12MM 12 6000 SHAFT-14MM 14 6000 SHAFT-15MM 15 6000 SHAFT-16MM 16 6000 SHAFT-18MM 18 6000 Max Single Piece Part No OD (mm) Length (mm) SHAFT-20MM 20 6000 SHAFT-24MM 24 6000 SHAFT-25MM 25 6000 SHAFT-30MM 30 6000 SHAFT-32MM 32 6000 SHAFT-40MM 40 6000 SHAFT-50MM 50 6000 SHAFT-60MM 60 6000 SHAFT-80MM 80 6000 Max Single Piece Part No ID (mm) OD (mm) Length (mm) WH12-INA 4 12 6000 WH16-INA 7 16 6000 WH20-INA 14 20 6000 WH25-INA 15.5 25 6000 WH30-INA 18.2 30 6000 WH40-INA 27 40 6000 WH50-INA 29 50 6000 WH60-INA 36 60 6000 WH60-INA 56 80 6000 Hollow Shafts Other Series nn Segmented design with high load capacity nn Compensation of misalignment up to ±40 angular minutes nn Available with gap seals: series KS, KSO nn Available with contact seals: series KS..PP, KSO..PP nn Available with open outer ring: series KSO, KSO..PP nn Available with housings nn Available in corrosion-resistant version KS Series Part No ID (mm) OD (mm) Length KN12B-INA 12 22 32 KN16B-INA 16 26 36 KN20B-INA 20 32 45 KN25B-INA 25 40 58 KN30B-INA 30 47 68 KN40B-INA 40 62 80 KN50B-INA 50 75 100 Part No ID (mm) OD (mm) Length (mm) KS12-INA 12 22 32 KS16-INA 16 26 36 KS20-INA 20 32 45 KS25-INA 25 40 58 KS30-INA 30 47 68 KS40-INA 40 62 80 KS50-INA 50 75 100 Solid Shafts Track Roller Guidance Systems (LFCL) Ball Monorail Guidance Systems (KUVE) Shaft Guidance Systems Linear Bearings
  • 25.
    17 Visit us atwww.eriks.co.uk Bearings Rotary Bearings Drawn Cup Needle Roller Bearings (HK) Cylindrical Roller Bearings – Full Complement (SL) nn Thin walled caged needle roller bearing assembly nn Produced to DIN 618-1 / ISO 3 245 nn Size range 3 to 60 mm bore nn Can be used with INA IR or LR inner rings nn Press fit in housing, no further axial location required nn Can be combined with axial needle roller bearings of series AXW…. nn Can be supplied with: integral seals, special lubricants, anti-corrosion protection, and closed end nn Machined series needle roller bearings, light range nn Available sizes 5mm to 100mm nn Sizes > 7mm supplied with oil hole and lubrication groove nn Can be supplied with Corrotect® anti-corrosion coating nn Can be supplied with special bearing greases nn Other ground series bearings include: NA 48.. (DIN 617/ISO 1 206) 110mm to 380mm, NA 49.. (DIN 617/ISO 1 206) 10mm to 140mm, NKIS.. 15mm to 65mm, NA.. RS single sealed 10mm to 50mm, NA.. 2RS double sealed 10mm to 50mm, NAO without ribs 6mm to 90mm nn Cylindrical roller bearing – double row full complement nn Highest dynamic and static basic load ratings due to the maximum number of rolling elements nn Support radial forces as well as limited axial forces in both directions nn Outer ring axially split and held together with retaining clips nn Dimension series according to DIN 5 412-9 nn Other designs include: SL18 48.. dimension series according to DIN 5 412-9, non locating series SL02.. semi locating series SL18 50.., single row semi locating series SL18 18.., SL18 22.., SL18 29.., SL18 30.., SL19 23... single row semi locating with spacing elements ZSL19 23.., single row semi locating with disc cage LSL19 23.., Part No ID (mm) OD (mm) Width (mm) HK0408-INA 4 8 8 HK0609-INA 6 10 9 HK0810-INA 8 12 10 HK1010-INA 10 14 10 HK1012-INA 10 14 12 HK1210-INA 12 16 10 HK1212-INA 12 18 12 Part No ID (mm) OD (mm) Width (mm) HK1612-INA 16 22 12 HK1622-INA 16 22 22 HK2020-INA 20 26 20 HK2030-INA 20 26 30 HK2210-INA 22 28 10 HK2520-INA 25 32 20 HK3026-INA 30 37 26 Part No ID (mm) OD (mm) Width (mm) HK3520-INA 35 42 20 HK4012-INA 40 47 12 HK4020-INA 40 47 20 HK4516-INA 45 52 16 HK5020-INA 50 58 20 HK5025-INA 50 58 25 Part No ID (mm) OD (mm) Width (mm) NKI5/12-INA 5 15 12 NKI7/12-INA 7 17 12 NKI10/16-INA 10 22 16 NKI12/16-INA 12 24 16 NKI15/16-INA 15 27 16 NKI17/20-INA 17 29 20 NKI20/16-INA 20 32 16 Part No ID (mm) OD (mm) Width (mm) NKI20/20-INA 20 32 20 NKI22/16-INA 22 34 16 NKI22/20-INA 22 34 20 NKI25/20-INA 25 38 20 NKI25/30-INA 25 38 30 NKI28/30-INA 28 42 30 NKI30/20-INA 30 45 20 Part No ID (mm) OD (mm) Width (mm) NKI35/20-INA 35 50 20 NKI40/30-INA 40 55 30 NKI45/35-INA 45 62 35 NKI50/35-INA 50 68 35 NKI60/35-INA 60 82 35 NKI75/25-INA 75 105 25 Part No ID (mm) OD (mm) Width (mm) SL014912-INA 60 85 25 SL014914-INA 70 100 30 SL014916-INA 80 110 30 SL014918-INA 90 125 35 SL014920-INA 100 140 40 SL014922-INA 110 150 40 SL014924-INA 120 165 45 Part No ID (mm) OD (mm) Width (mm) SL014926-INA 130 180 50 SL014928-INA 140 190 50 SL014930-INA 150 210 60 SL014932-INA 160 220 60 SL014934-INA 170 230 60 SL014936-INA 180 250 69 SL014940-INA 200 280 80 Part No ID (mm) OD (mm) Width (mm) SL014944-INA 220 300 80 SL014952-INA 260 360 100 SL014960-INA 300 420 118 SL014964-INA 320 440 118 SL014972-INA 360 480 118 SL014980-INA 400 540 140 Machined Needle Roller Bearings With Inner Ring (NKI) Rotary Bearings
  • 26.
    18 Specialist Technical Centres Know-How Bearings FAGBearings FAG Cylindrical Roller Bearing with non-locating polyamide cage nn N and NU prefixes nn Supports radial forces only nn Size range 15mm up to 148mm bore nn Brass cage version available nn Cages can be supplied in other materials, available on application nn Available in C3 and C4 clearances nn Support axial and radial forces nn Handles angular misalignment nn Size range 20mm up to 900mm nn Available in steel, brass and polyamide cages nn Available in tapered bore – suffix K nn Can be supplied sealed and greased, available on application nn Supports high axial forces in one direction and radial loads nn Size range 10mm up to 170mm bore nn Contact angle of 40° nn Available in sealed version - suffix 2RS nn Universally matched bearings - please request the amount of sets you require not the number of single bearings FAG Cylindrical Roller Bearing with semi-locating polyamide cage nn NJ and NUP prefixes nn Supports high radial force and axial force in one direction nn Guides shaft in one direction nn Size range 15mm up to 140mm bore nn Brass cage available from 120mm bore nn Cages can be supplied in other materials, available on application nn Available in C3 and C4 clearance Part No Bore OD Width (mm) (mm) (mm) N 202-E-XL-TVP2-FAG 15 35 11 N 203-E-XL-TVP2-FAG 17 40 12 N 204-E-XL-TVP2-FAG 20 47 14 NU 202-E-XL-TVP2-FAG 15 35 11 NU 203-E-XL-TVP2-FAG 17 40 12 NU 204-E-XL-TVP2-FAG 20 47 14 Part No Bore OD Width (mm) (mm) (mm) 22205-E1-XL-FAG 25 52 18 22206-E1-XL-FAG 30 62 20 22207-E1-XL-FAG 35 72 23 Part No Bore OD Width (mm) (mm) (mm) 7200-B-XL-TVP-FAG 10 30 9 7201-B-XL-TVP-FAG 12 32 10 7202-B-XL-TVP-FAG 15 35 11 Part No Bore OD Width (mm) (mm) (mm) NJ 202-E-XL-TVP2-FAG 15 35 11 NJ 203-E-XL-TVP2-FAG 17 40 12 NJ 204-E-XL-TVP2-FAG 20 47 14 NUP 203-E-XL-TVP2-FAG 17 40 12 NUP 204-E-XL-TVP2-FAG 20 47 14 FAG Cylindrical Roller Bearings with Cage FAG Spherical Roller Bearings FAG Angular Contact Ball Bearings – Single Row Cylindrical Bearings Varying modifications available: S With lubrication groove and hole; E1 Increased capacity design; T41A For oscillating load with restricted diameter tolerances C4; T41D T41A with layer of chromium on bore; TVPB Solid window cage made from glass fibre and reinforced polyamide etc.
  • 27.
    19 Visit us atwww.eriks.co.uk Bearings NSK AIP Programme NSK sets many things in motion – for example in the industrial gearbox industry. As a leading global manufacturer of rolling bearings, NSK combines 100 years of success and a total quality approach. THREE LETTERS. TOTAL QUALITY. www.nskeurope.com NSK_Ad_Image_IndustrialGearboxes_180x232_E.indd 1 16.05.17 11:18
  • 28.
    20 Specialist Technical Centres Know-How Bearings SuperPrecision Ball Bearings NSK is the world leader in the manufacture of deep groove ball bearings, with manufacturing plants globally and in particular Europe. NSK invests heavily into continued research and development to ensure the needs of our customers are adhered to now and in the future. Suitable for a wide variety of applications including gearbox’s, washing machines, vacuum cleaners, electric motors, pumps, compressors, computers, conveyors and even skate boards. NSK’s deep groove ball bearings offer the following:- Deep Groove Ball Bearings nn Made from Z Steel which increases the bearing life by up to 80% nn Precision steel balls, coined cage pockets and both raceways super finished delivering ultra-quiet operation nn Superior quality grade lubricants in a variety of different temperature ranges resulting in low starting torque and extended service life nn A range of radial internal clearance grades including the unique CM (standard clearance to electric motor specification) and the popular C3 nn Available in bore sizes from 1mm up to 800mm nn Available in a variety of enclosures, including the patented labyrinth DDU rubber seal offering superb sealed for life features, DDW light-contact seals, VV non-contact and ZZ metal shields seals as shown below:- NSK Seals and shields DU Seal (Full Contact) nn Maximum Sealing Protection V Seal (Non-Contact) nn Low Torque nn High Speed Limit nn Contaminant Protection Z Shield (Metal Shield) nn Low Torque nn High Temperature Limit nn High Speed Limit DW Seal (Light Contact) nn Excellent Contaminant Protection nn 1/3 Less Drag than Full Contact Seal
  • 29.
    21 Visit us atwww.eriks.co.uk Bearings NSK Cylindrical Roller Bearings are available with a patented high strength cage design in pressed steel, machined brass or polyamide. Cylindrical Roller Bearings nn NSK offers a complete range in both metric and imperial sizes ranging from ½” to 1320mm bore sizes nn Cage material in pressed steel, machined brass and polyamide throughout the range nn EM series combines the strength and technology of previous brass cage design into a one piece brass roller- guided cage resulting in a higher load carrying capacity, improved oil flow and quieter operation nn EW series with the press steel cage enables higher limiting speeds, low noise and superior cage strength nn Available in a variety of configurations, enabling users to customise for specific applications as shown right:- For more arduous applications, they can also be supplied in a range of advanced special materials. These bearings offer low noise and heat generation, and - by virtue of the line contact between rolling elements and raceways, have high radial load capacity and are suited for high-speed applications. REQUEST A COPY NSK and ERIKS have been partners for many years. By dealing with ERIKS, an Authorised NSK Distribution Partner, you get access to full NSK technical back-up and excellent stock availability delivered via ERIKS’ 60+ nationwide Distribution and Engineering Service Centres. For more information request your copy of the dual branded ERIKS and NSK brochure on Super Precision Bearings.
  • 30.
    22 Specialist Technical Centres Know-How Bearings Self-Lube® Bearings RHPSelf-Lube® housed bearing units offer flexibility, with the capability of accommodating moderate misalignment and can be adapted to a huge number of applications using a range of inserts, housings, sealing and lubrication solutions as shown below. Self Lube® Bearings Sealing Arrangements Moulded nitrile lip bonded to strong seal pressing secured in the bearing outer ring. Suitable for a large range of applications. Example part number is 1020-20G The flinger seal has a nitrile moulded lip bonded to a steel former, which is pressed onto the bearing inner ring. Extra seal gives added protection compared to standard seal to extend the bearing life in arduous conditions without any loss in speed capability. Example part number is 1020-20GFS Triple lip seal consists of a one piece nitrile moulding with three sealing lips bonded to a steel pressing. Recommended where there is a high degree of contamination with a restriction in speed rating Example part number is T1020-20G Locking Types Locking arrangements consists of two knurled-cup point set screws fitted in the extended inner ring which can be tightened down onto the shaft. This simple locking system is suitable for most applications except where vibration is an issue. Example part number is SF25 Consists of an eccentric diameter formed on the extended inner ring of the bearing which engages an eccentric diameter in the bore of the separate collar. This collar is then locked into position on the shaft with a knurled-cup point set screw. Often used when vibration is an issue. Example part number is SF25EC or SF25DEC Locking arrangement consists of a standard taper adaptor sleeve, locknut and lock washer. Recommend where a positive concentric lock is required, heavy vibration and/or shock load is present Example part number is MSF10205-25K Grease Types nn Standard - High quality mineral oil based grease suitable for high load, medium speed applications. Temperature range: -20° to +110°C nn HLT - high quality grease with temperature resistant silicone seals suitable for high and low ranges. Temperature range -40°C to +180°C nn Silver-Lube - approved for food grade grease to NSF H1 standard. Temperature range: -20°C to +90°C nn Molded-Oil­™ - Optimum lubrication held in a solid polyolefin matrix and sealed for life. Temperature range: -15°C to +80°C
  • 31.
    23 Visit us atwww.eriks.co.uk Bearings Housings Housings Standard Housings - Cast Iron Features Benefits High grade cast iron Elimination of housing defects and premature failures Designed for exceptional strength High strength in all mounting orientations Extensive range of housing types available Offering comprehensive solutions for a variety of applications Well established and proven design Provides end user with confidence in critical applications Special Housings - Silver-Lube® Corrosion Resistant Housings Features Benefits Housings manufactured in PBT thermoplastic resin Smooth surface resists fungicidal growth and aggregation of food particles Stainless steel grease nipple and bolt hole liners Corrosion resistant, ideal for frequent washdowns Plastic end covers available Additional protection for the bearing and an aid to safety requirements Stainless steel inserts have aluminium complex, high temperature, approved food grade grease as standard Suitable for food applications Available in PNP, PSF, PSFT and PST style housings from 20mm to 40mm bore sizes Housing types available are the most used styles in this industry Special Housings - Life-Lube® Bearing Units Features Benefits Housings manufactured in PBT thermoplastic resin Smooth surface resists fungicidal growth and aggregation of food particles Fully interchangeable with RHP Self- Lube® units Corrosion resistant and resistant to chemical attach Molded-Oil­™ insert manufactured in Martensitic stainless steel with solid lubrication Lubrication will not wash out during frequent washdowns Molded-Oil­™ inserts available from 20mm to 50mm bore sizes No need to re-lubricate and easy to retrofit
  • 32.
    24 Specialist Technical Centres Know-How Bearings ThomsonImperial Precision Steel Linear Ball Bushing Bearings nn All steel construction for maximum system rigidity nn Available in 14 bore sizes and 9 configurations nn Steady state travel speeds of up to 10ft/s and accelerations of up to 450ft/s2 without the use of derating factors nn Operating temperature of up to 600°F nn Available in self-aligning pillow block housing for ease of installation and use nn Coefficient of friction as low as 0.001 Part No ID OD Length A4812-THO 1/4 1/2 3/4 A81014-THO 3/8 5/8 7/8 A81420-THO 1/2 7/8 1. 1/4 A101824-THO 5/8 1. 1/8 1. 1/2 A122026-THO 3/4 1. 1/4 1. 5/8 A162536-THO 1 1. 9/16 2. 1/4 A203242-THO 1. 1/4 2 2. 5/8 A243848-THO 1. 1/2 2. 3/8 3 A324864-THO 2 3 4 A406080-THO 2. 1/2 3. 3/4 5 A487296-THO 3 4. 1/2 6 A6496128-THO 4 6 8 Thomson Imperial Super Ball Bushing Linear Bearings nn Self aligning capability of up to 0.5 degrees compensating for inaccuracies in base flatness or carriage machining nn Travel speeds of up to 10ft/s without a reduction in load capacity nn Lightweight, wear resistant, engineered-polymer retainers and outer sleeves that reduce inertia and noise nn Radially floating bearing plates. When installed in an adjustable housing the Super Ball bushing bearing may be adjusted to a specific diametrical fit-up for accurate and repeatable movement nn Coefficient of friction as low as 0.001 Part No ID OD Length SUPER4-THO 1/4 1/2 3/4 SUPER10-THO 5/8 1. 1/8 1. 1/2 SUPER12-THO 3/4 1. 1/4 1. 5/8 SUPER20-THO 1. 1/4 2 2. 5/8 SUPER24-THO 1. 1/2 2. 3/8 3 Closed Type without seals for End Supported Applications Closed Type without seals for End Supported Applications Ball Bushings Ball Bushings
  • 33.
    25 Visit us atwww.eriks.co.uk Bearings Needle Roller Bearings Part No Shaft Diameter MJ36-1-KOYO 3/16" MJ65-1-KOYO 3/8" MJ1210-1-KOYO 3/4" MJ2412-1-KOYO 1.1/2" MJ2812-1-KOYO 1.3/4" MJ3216-1-KOYO 2" HK SERIES – Caged-Open ends B SERIES – Full Complement-Open ends KR Series – Caged Stud Type – Metric M SERIES – Full Complement-Closed end BK SERIES – Caged-Closed end HK.RS SERIES – Caged-Single Seal J SERIES – Caged-Open ends MJ SERIES – Caged-Closed end HK.2RS SERIES – Caged-Double Seal DL SERIES – Full Complement-Open ends JT SERIES – Caged-Single seal JTT SERIES – Caged-Double Seal Part No Shaft Diameter HK0408-KOYO 4mm HK1010-KOYO 10mm HK1522-KOYO 15mm HK3016-KOYO 30mm HK4020-KOYO 40mm HK4520-KOYO 45mm Part No Shaft Diameter S24-KOYO 1/8" S66-KOYO 3/8" S85-KOYO 1/2" S1210-KOYO 3/4" S328-KOYO 2" S5612-KOYO 3.1/2" Crowned outer Cylindrical outer Outside Diameter Standard Sealed Standard Sealed KR16-KOYO KR16PP-KOYO KR16X-KOYO KR16PPX-KOYO 16mm KR19-KOYO KR19PP-KOYO KR19X-KOYO KR19PPX-KOYO 19mm KR22-KOYO KR22PP-KOYO KR22X-KOYO KR22PPX-KOYO 22mm KR26-KOYO KR26PP-KOYO KR26X-KOYO KR26PPX-KOYO 26mm KR30-KOYO KR30PP-KOYO KR30X-KOYO KR30PPX-KOYO 20mm KR32-KOYO KR32PP-KOYO KR32X-KOYO KR32PPX-KOYO 30mm Part No Shaft Diameter M85-1-KOYO 1/2" M146-1-KOYO 7/8" M167-1-KOYO 1" M208-1-KOYO 1.1/4" M328-1-KOYO 2" M4420-1-KOYO 2.3/4" Part No Shaft Diameter BK0408-KOYO 4mm BK1010-KOYO 10mm BK1522-KOYO 15mm BK3016-KOYO 30mm BK4020-KOYO 40mm BK4520-KOYO 45mm Part No Shaft Diameter HK0810RS-KOYO 8mm HK1414RS-KOYO 14mm HK2018RS-KOYO 20mm HK2414RS-KOYO 24mm HK3518RS-KOYO 35mm HK5022RS-KOYO 50mm Part No Shaft Diameter SCE36-KOYO 3/16" SCE68-KOYO 3/8" SCE126-KOYO 3/4" SCE2412-KOYO 1.1/2" SCE3216-KOYO 2" SCE4412-KOYO 2.3/4" Part No Shaft Diameter HK12162RS-KOYO 12mm HK14162RS-KOYO 14mm HK20202RS-KOYO 20mm HK25162RS-KOYO 25mm HK35202RS-KOYO 35mm HK50242RS-KOYO 50mm Part No Shaft Diameter DL610-KOYO 6mm DL1210-KOYO 12mm DL2016-KOYO 20mm DL3520-KOYO 35mm DL5012-KOYO 50mm DL5520-KOYO 55mm Part No Shaft Diameter SCE56P-KOYO 5/16" SCE109P-KOYO 5/8" SCE1613P-KOYO 1" SCE2421P-KOYO 1.1/2" Part No Shaft Diameter SCE57PP-KOYO 5/16" SCE1010PP-KOYO 5/8" SCE1614PP-KOYO 1" SCE2018PP-KOYO 1.1/4" Part No Shaft Diameter DLF610-KOYO 6mm DLF1210-KOYO 12mm DLF2016-KOYO 20mm DLF3520-KOYO 35mm DLF5012-KOYO 50mm DLF5520-KOYO 55mm Koyo Metric Drawn Cup Needle Roller Bearings Koyo Inch Drawn Cup Needle Roller Bearings Koyo Cam Follower – Stud type – Metric DLF SERIES – Full Complement-Closed end Needle Roller Bearings
  • 34.
    26 Specialist Technical Centres Know-How Bearings AutomaticLubricators, Bearing Tools and Ball Bushings Part No SIMAFT33 Part No SIMABP61 Part No SIMASP50 Single-point automatic lubricator Simalube is a gas powered single point automatic lubricator filled with 30, 60, 125 or 250 ml of grease or oil. The patented hydrogen producing dry cells drive a piston to dispense lubricant at a consistent rate of between 1 and 12 months, which is adjustable in operation. Gas production is initiated by turning the adjustment disk on the top with a Hex key or Allen key. nn 1 to 12 month dispense time nn Infinitely adjustable during operation nn Patented gas producing dry cell technology means no liquid or dangerous chemicals, no toxic waste nn ATEX approval to Zone 2 nn Works in any orientation even upside down nn Grease or oil filled (oil filled units have a non-return valve) nn Suitable for the lubrication of rotary bearings, linear bearings, chain, open gears, sprockets etc Part No Description Size Temp range Base oil Thickener/ DIN 51502 Soap SIMASL24-125 Multi purpose grease with EP, NLGI 2 125 –30°C to +140°C Mineral oil Li/Comp. KP2N-30 SIMASL10-125 Food industry grease, NSF H1 approved, NLGI 2 125 –30°C to +140°C Synthetic Al/Comp. KPHC2N-30 SIMASL01-125 Water resistant grease, NLGI 2 125 –30°C to +120°C Mineral oil Li/Ca KP2K-30 SIMASL14-125 Chain oil 125 –10°C to +90°C Mineral oil CGLP68 SIMASL15-125 High temperature chain oil 125 –30°C to +250°C Synthetic CGLPE220-320 SIMASL18-125 Food industry oil, NSF H1 approved 125 –15°C to +150°C Synthetic CLPHC220 For other sizes change suffix 125 to relevant size. i.e.. SIMASL10-125 becomes SIMASL10-60 Simatool Kits Bearing Puller BP 61 Seal Puller SP 50 Perfect for installing and removing bearings and seals! Available individually as well as accessories or spare parts, these high-quality tool components are supplied in a compact case with liner, allowing all tool components to be neatly stored. A comprehensive user manual, containing data tables and illustrations is also provided. Part No SIMAIH025-VOLCANO/115V SIMAIH025-VOLCANO/230V Simatherm IH 025 Volcano The Simatherm IH 025 Volcano marks the start of a new era in the field of portable induction heaters. The patented technology enables outstanding heating performance from an extremely light structure. You can use it to heat roller bearings with an inner diameter as small as 20mm up to an outer diameter of 160mm and a weight of up to 10kg. To do this, simply place the work piece onto the Volcano’s cone shaped heating surface. nn Portable, compact and very light (3.5kg) nn A bearing weighing 5kg can be heated to 110°C in under four minutes nn Silent in operation nn No support yoke required – simply place the work piece on the device nn Predictive temperature control (PTC) for automatic temperature monitoring Bearing Fitting Tool FT 33
  • 35.
    27 Visit us atwww.eriks.co.uk Bearings CALL: 0845 006 6000 to contact your local workshop IS YOUR CONDITION MONITORING MONITORED? ENGINEERING & SITE SERVICES STEPS TO SUCCESS n Step 1 Consultation n Step 2 Recommendation n Step 3 Supply, installation & commissioning n Step 4 Reporting and training n Step 5 On-going support Condition Monitoring is only as good as the data it collects. Ensuring maximum plant uptime demands permanent data monitoring. ERIKS’ cloud-hosted solution uses the latest telemetary coupled with site diagnostic solutions ensuring that equipment status is available at your fingertips: n View machine performance online with Machine WebWatch n Receive SMS or email alerts of triggered alarms for faster reaction, and less downtime n Analyse or alter configurations without going on-site – save time and money n Cloud-based database of maintenance routines, information, inspection routes
  • 36.
  • 37.
    29 Visit us atwww.eriks.co.uk Bearings Bearing Tools and Condition Monitoring SKF Drive-up Method This fitting method is unique to SKF and delivers accurate axial drive-up of spherical roller and CARB bearings mounted on tapered seatings. Incorporates the use of an SKF HMV ..E hydraulic nut fitted with a dial indicator, and a high accuracy digital pressure gauge mounted on the selected pump. The SKF QuickCollect sensor is an easy to use, bluetooth enabled, handheld sensor that connects to apps on your smart phone or tablet. Combining vibration and temperature sensing, overall data can be viewed on the spot in real time or pushed to the cloud for future analysis. The sensor is ideal for service, reliability, operations, or maintenance personnel as part of a walk around data collection program. Hydraulic Nuts HMV ..E series Mounting bearings on tapered seatings can be a difficult and time-consuming job. Using a hydraulic nut facilitates easy and quick application of the high drive-up forces required. The time taken to dismount bearings mounted on either adapter or withdrawal sleeves is also greatly reduced. Hydraulic puller sets TMMA ..H /SET series Set consists of a hydraulically assisted SKF EasyPull together with a tri-section pulling plate, TMMS series, and a puller protection blanket facilitate an easy, safe and virtually damage-free dismounting. The set is especially suitable for dismounting roller bearings, and other components such as pulleys and flywheels. SKF Oil Injection Set THKI series The THKI is used for the mounting and dismounting of pressure joints of all sizes and applications such as rolling bearings, couplings and gears. The set consists of a stand-mounted oil injector complete with a high pressure pipe, pressure gauge and a range of connection nipples. SKF Hydraulic Techniques for Mounting and Dismounting Bearings SKF QuickCollect Sensor Machine monitoring made easy Benefits nn Gets you started quickly nn Can be used with minimum training and experience nn Identify developing rotating machinery issues before they become problems SKF designation CMDT 390-K-SL nn Connect directly to expert advice when you need it nn Expand functionality via apps to grow and compliment your existing maintenance program nn Suitable for use in hazardous environments (ATEX Zone 1, Class 1, Div 1) Measurement displays Measurements taken by the sensor are shown on your mobile device, which displays velocity, acceleration, and temperature. Each reading displays a current overall measurement, including alarm status, minimum and maximum values, and alert and danger thresholds. NEW
  • 38.
    30 Specialist Technical Centres Know-How Bearings Test,Measurement and E-Series Illuminated voltage detection Versatile moisture meter Easily manoeuvrable videoscope The new FLIR Test and Measurement Range FLIR Systems has broadened the scope of its product range, applying its hallmark quality design and build to a brand new range of test and measurement tools. Three electrical meters all feature large and clear LCD displays and bright dual-LED work lights to illuminate dimly lit work areas. They include Bluetooth® connectivity to Android™ mobile devices running the latest FLIR Tools Mobile® app. They can be connected wirelessly to Meterlink® enabled FLIR thermal imaging cameras so that electrical readings can be embedded into IR images in real-time. Streamlined VFD troubleshooting Simplify power and VFD analysis Multifunctional clamp meter The FLIR DM93 is a rugged digital multimeter with advanced variable frequency drive (VFD) filtering that allows accurate analysis of non-sinusoidal waveforms and noisy signals found in VFD-controlled equipment. A special mode to eliminate ghost readings and automatic data recording to detect intermittent glitches are also standard features. The FLIR CM83 is an industrial-grade power clamp meter with power analysis and advanced VFD filtering for testing three-phase systems and VFD-controlled equipment. Other features include a harmonics mode to find noise from different electrical sources; ‘phase rotation’ to confirm phase orientation of three-phase systems and ‘inrush current’ to detect start-up transients. Combining the capabilities of a true RMS multimeter and clamp meter with a non-contact IR thermometer and Type K thermocouple is the new FLIR CM78. Ideal for use on industrial equipment and complex machinery, this new instrument enables users to capture accurate AC/DC readings up to 1000A or 1000V. The FLIR VP52, is a compact, non- contact voltage detector with a powerful LED work light and dual-LED convenience light at the probe tip. Other features include vibration feedback and multi-coloured LED alarms. High/low sensitivity modes for testing industrial equipment low voltage systems and tamper-proof outlets are also standard. The FLIR MR77 moisture meter features a pinless sensor and an external pin probe that capture moisture readings up to 19mm below the surface of various building materials. This rugged instrument also includes a field-replaceable temperature/ humidity sensor, spot IR thermometer and laser pointer. The FLIR VS70, videoscope is designed for industrial environments. It features intuitive handset controls that enable the user to guide the probe into tight areas to deliver clear video images to a large 5.7" colour LCD display. It provides 180° and 90° camera views and SD card storage of video, image and audio files. Voice comments can also be captured via the product’s headset.
  • 39.
    31 Visit us atwww.eriks.co.uk Bearings FLIR E-Series Lightweight design, heavyweight performers The FLIR E-Series are small and lightweight thermal imaging cameras designed for those needing higher resolution and more features and for whom documentation of findings are important. The cameras are ideal for predictive maintenance and planned inspections of electrical and mechanical systems to ensure they operate at maximum efficiency and safety with minimal energy consumption. n Up to 320 x 240 pixels resolution n Compact and lightweight n Extremely rugged n High quality visual camera n Thumbnail image gallery n ±2% accuracy n LCD touchscreen n Built-in LED light n Long-life battery n Laser Pointer n Picture-in-Picture (PiP) n Thermal fusion* n Instant reports* n Text and voice annotations* n Interchangeable lenses * Features dependant on camera model, please check technical specifications for more details. ERIKS_catalogue.indd 1 4/5/13 3:02 PM Mechanical check-up of an electrical motor using the FLIR E-Series ERIKS_catalogue.indd 1 4/5/13 3:02 PM Motor bearing problem ERIKS_catalogue.indd 1 4/5/13 3:02 PM Inspecting a transformer using the Fusion Picture-in-Picture function Large 3.5 touchscreen Connect to smartphone or tablet via Wi-Fi, using the FLIR Tools mobile app (Apple iOS and Android) for processing and sharing results as well as for remote control. Images used are for illustration purposes only For further details contact your local ERIKS Service Centre on 0845 006 6000 or visit eriks.co.uk nn Advice about the correct maintenance strategy and camera selection is available from the ERIKS Condition Monitoring Business Unit nn Training is essential and available from ERIKS TO HELP...
  • 40.
    32 CALL: 0845 0066000 to contact your local workshop CONDITION MONITORING Condition Monitoring is only as good as the data taken and it takes a skilled engineer to interpret the results accurately. ERIKS is proud of its team of condition monitoring experts across the UK who specialise in analysis of electromechanical machinery. ENGINEERING SITE SERVICES FUNCTIONS: n Experts in electromechanical machines/rotating equipment n Accurate analysis of machine data in a form you can understand n Heat energy surveys with cost saving information n Flexible local staff to fit with your schedules n Machine protection by: – Periodic portable monitoring – Linking to PLC/SCADA or internet WHY ERIKS: n ISO 18436 certified personnel n Certified maintenance partner of SKF n Improved uptime of client’s plant n Reduced energy consumption n Safer working environment
  • 41.
    POWER TRANSMISSION Quick reference ERIKS’ understandingof the environment in which a transmission system must work, the stresses it has to handle, and the results it has to produce, enables us to engineer a solution you can rely on - for increased efficiency, extended life, minimum maintenance and maximum productivity. 33 Quick reference Classic Vee Belts 36 High Performance Wedge Belts 37 Emergency Belts 38-39 Wedge Belts 40-41 Ribbed Belts 42 Tensioners 43 Timing Belts 44-45, 48 Pulleys 46-47 Shaft Fixings 49-51 Couplings 52-55 Roller Chain and Sprockets 56-57 Adapter Chain 58 Performance Special Chain 60-63 Chain Accessories 64 Electric Motors 65, 68-69 Drives and Rollers 66-67 Total Cost of Ownership 70 Inverters 71-73 Speed Reducer 74 Gearboxes 75-77 Vibration Solutions 78 Quick Product Reference RIALEVOLUTION forenergysavings dlongerchainlife 68 36-47, 49-53, 56-58, 69-77 54-55, 59 54 48 66-67 66 65 60-64 78 Visit us at www.eriks.co.uk
  • 42.
    Power Transmission SUPERIOR Performance POWERTRANSMISSION True reliability is more than simply continuous operation. It’s a continuous level of performance, minimal energy consumption and a predictable life span. We understand the environment in which a transmission system must work, the stresses it has to handle and the results it has to produce, but above all we understand how each part of your drive system is intrinsically linked. 34 POWER TRANSMISSION Technology Whatever the dilemma you face, the chances are we can provide you an alternative solution to increase efficiency, and extend product life. 70% of belts are fitted to worn pulleys, which can waste up to 10% of the energy input Power Transmissions n Friction belts and pulleys n Synchronous belts and pulleys n Chain and sprockets n Conveyor chain n Couplings n Shaft fixings n Materials handling chain belts Drives n Gearboxes, new and repair n Geared motors n Electric motors, new and repair n Inverters n Starters and controllers n Automation Specialist Technical Centres Know-How
  • 43.
    IMPROVING YOUR TOTAL COSTOF OWNERSHIP Our knowledge and passion for technology make us more than simply a supplier of drives and transmission products, ERIKS has the Power Transmission know-how when and where you need it. n Unmatched know-how and experience from our in-house technical experts n Solutions and advice for both MRO and OEM requirements n Complete project management from initial drive selection through to installation and commissioning n Failure diagnosis, offering advice so you don’t risk the same failure repeating itself n Rapid gearbox assembly, built to order from stock across the Fenner range n Product customisation n Total cost of ownership advice, ensuring you get the best POWER TRANSMISSION DRIVE DESIGN AND UPGRADE When a drive fails or is coming to the end of its working life a number of choices can be made. A repair or like-for-like replacement is not always feasible or the best solution so when you need options for improving your process and extending the life of your machinery ERIKS can work with you to upgrade or re-design you drive system. n Upgrade to modern technology n 3D CAD modelling capability n Fabrication and re-engineering services n Whole drive train packaged solutions n Drop-in replacements n Extended warranty options n Turnkey solutions Benefits n Minimal down time to your application n Extraction, installation and commissioning services n Optimised total cost of ownership n Lower running costs n Extended lifecycle n Full product lifecycle support CONDITION MONITORING Unexpected downtime and costly repairs can have a negative impact on your bottom line. Most Condition Monitoring reports only give you a diagnosis. But the comprehensive capabilities and holistic point of view of ERIKS mean a Condition Monitoring report gives you the cure too. The Condition Monitoring Team collects, stores, compares and analyses key variables from your machines, enabling you to assess their health. Then - if failures or deviations from the norm are detected - ERIKS’ know-how comes into play, to diagnose the cause and prescribe the cure. Services Include: n Vibration Analysis n Thermographic analysis n Oil debris and condition analysis n Endoscope inspection n Internet based asset monitoring protection device 35 Visit us at www.eriks.co.uk
  • 44.
    36 Specialist Technical Centres Know-How Power Transmission HighStrength Wedge Belts Belt Section Pitch Length (mm) Fenner Brand SPB 2240 -FENSections: SPZ, SPA, SPB, SPC, 8V Length: 487–12500mm Relative power 100% Vee Belts offer a versatile and economical low maintenance drive which is standardised throughout the world and Fenner Classic Vee Belts are fully approved to all international standards allowing for optimised drives for compact size and economy. Increased Performance, More Power, Longer Life But did you know that a simple upgrade to the Fenner range of Ultra PLUS wrapped wedge belts will transmit significantly more power than the classical vee product and run in the same pulleys! Fenner Ultra PLUS wedge belts are available in a large range of lengths, and conform to all the relevant ISO, BS, DIN and RMA standards. So why not upgrade your drives today to wedge belts – increase your drives capacity and efficiency. Classic Vee Belts... Ever Considered Trading Up? For any belt drive, the pulleys can be adjusted closer together to allow removal or installation of the belt. Equally, the pulleys can be adjusted further apart to allow the belt to be tensioned correctly. These two adjustments are referred to as “Installation Allowance”, and “Take Up Allowance”. For Example You may be looking for a SPZ1 012 belt, the standard size available is SPZ 1010, so what next? You will see from the table below that there is 20mm installation allowance and a 20mm take- up allowance. So in Conclusion... The 2mm difference in belt size will make no difference whatsoever, and a standard off-the- shelf product will do the job perfectly, and you won’t be paying a premium. Size Matters... What Size Wedge Belts are You Buying? Wedge Belt Lengths mm Sections Available Installation Allowance SPZ Installation Allowance SPA Installation Allowance SPB Installation Allowance SPC Take up Allowance Upto 630 SPZ 20mm 5mm 630 - 800 SPZ/SPA 20mm 25mm 10mm 800 - 1000 SPZ/SPA 20mm 25mm 15mm 1000 - 1250 SPZ/SPA 20mm 25mm 20mm 1250 - 1600 SPZ/SPA/SPB 20mm 25mm 30mm 25mm 1600 - 2000 SPZ/SPA/SPB 20mm 25mm 30mm 30mm 2000 - 2500 SPZ/SPA/SPB/SPC 20mm 25mm 30mm 50mm 40mm 2500 - 3150 SPZ/SPA/SPB/SPC 20mm 25mm 30mm 50mm 50mm 3150 - 4000 SPZ/SPA/SPB/SPC 20mm 25mm 30mm 50mm 60mm 4000 - 5000 SPA/SPB/SPC 25mm 30mm 50mm 70mm 5000 - 6300 SPB/SPC 30mm 50mm 85mm 6300 - 8000 SPB/SPC 30mm 50mm 105mm 8000 - 10000 SPB/SPC 30mm 50mm 140mm 10000 - 12500 SPC 50mm 175mm Installation and Take Up Allowances for Fenner Wedge Belts How many times have you asked for an “odd” sized belt that we just don’t have in stock? But are you aware that there is a solution just sitting on the shelf.
  • 45.
    37 Visit us atwww.eriks.co.uk Power Transmission Ultra PLUS 150 Wedge Belts nn Greater reliability and working life nn Increased power ratings potentially reducing the number of belts required and grooves on a pulley nn Increased durability in harsh environments due to the asymmetric weave jacket nn Length stability, minimal stretch and elongation Fenner Ultra PLUS 150 drive belts are specifically designed for applications where rugged durability is paramount, combining the highest level of performance with the longest possible service life. www.fptgroup.com nn Waste compactors nn Shredders nn Crushers nn Heavy duty conveyors nn Bucket elevators Ideal for heavy duty applications nn 50% more power - High tensile aramid cords transmit more power than standard wrapped wedge belts nn Unsurpassed strength - Fibre reinforced polychloroprene rubber supports the cords and ensures unsurpassed rigidity nn 96% energy efficient - asymmetrical weave outer jacket produces belt length stability second to none, guaranteeing unbeatable efficiency. Why use Fenner Ultra PLUS 150? nn Woodworking machinery nn Quarry plant nn Saw mills nn Compressors nn Calendars Sections: USPB, USPC Length: 1600–12500mm Relative power 150% Belt Section Pitch Length (mm) Belt Type Fenner Brand SPC 7500 ULTRA150 -FEN Downtime Crushed with Ultra PLUS 150 A large quarry based in the Midlands was experiencing problems with regular failures of vee belts belts on their crusher drives. The belts were subjected to very high impact and shock loads, and as a consequence the belts were stretching unevenly resulting in belt slippage and premature failures. The Fenner Ultra PLUS 150 belts was the perfect solution, due to the high tensile aramid cords and the robust rubber construction which ensured there was virtually no stretch, whilst delivering a significantly high power rating. The quarry has since decided to standardise on Fenner Ultra PLUS 150 across the plant where possible, helping reduce inventory costs and keeping downtime costs to a minimum.
  • 46.
    38 Specialist Technical Centres Know-How Power Transmission EmergencyBelting Fenner Drive Alignment Laser Product Ref: FEN/A/230L0000 Belt Efficiency Kit Product Ref: FEN_BELT_MAINT_KIT 70% of belt drives are estimated to be operating inefficiently and are in imminent danger of failing. By taking a proactive stance to belt drive maintenance and looking at the condition of the belt and pulley set then you can bring both peace of mind and productivity improvements. It’s as easy as 1, 2, 3. 1 Check Pulley Condition The drive stands or falls by the accuracy of its installation, so don’t forget to check the condition of your pulleys – 50% of new belts are fitted to worn pulleys, which can waste up to 10% of your energy input. The Fenner groove gauge can quickly help you assess the health of your pulleys. 2 Select the Correct Drive Solution 3 Simple Steps to Increase Productivity Pulley Condition Worn Belt New Belt Ultra PLUS Upgrade Quattro PLUS Upgrade Ultra PLUS 150 Worn pulley Imminent Failure 1 year 1½ years 2 years New Pulley Premature Failure 3 years 3½ years 4 years 3 Install Correctly Correct installation once you have carefully selected your belt drive components is paramount to the longevity and efficiency of your belt drive. We are able to offer you a range of installation tools to help you maximise productivity and uptime. Worn Pulley New Pulley Have you seen... Our Fenner belt efficiency kit? Get the most from your wedge belt drives with the Fenner Belt Efficiency Kit. The kit contains all the tools necessary to help achieve optimum performance: nn Belt tension indicator nn Pulley groove gauge nn Guide to wedge belt efficiency Product Code: 230K0000
  • 47.
    39 Visit us atwww.eriks.co.uk Power Transmission Fenner QuickFix The Fenner QuickFix belt is incredibly versatile, featuring a dual groove profile so that one belt fits both V and wedge belts profiles. nn Quick and simple to install nn Available in four different width profiles; SPZ, SPA, SPB SPC nn Comes five metre roll enabling the maintenance teams to cut it to the desired length Fenner QuickFix enables you to reduce stock inventory considerably, requiring just two five metres boxes of each section size, to cover all eventualities for both new and old systems and for both wedge belt and V belt profiles – saving both time and money. www.fptgroup.com nn Hospitals nn Airports nn Facilities Management Companies nn Universities nn Shopping malls and retail parks nn Distribution Centres nn Anyone with a large number of belt drives Perfect for use in the following: nn Dual groove profile - means one belt fits both Vee and wedge belts nn Jointed belting - ensures minimum strip down when installing nn Any length - Can be made to any length within minutes nn Reduces potential downtime - quick and simple to install keeping downtime to an absolute minimum Why use Fenner QuickFix Belts? A Quick Fix for Breakdowns A well-known Facilities Management company were experiencing call out difficulties from customers who were experiencing breakdowns on their HVAC units. Engineers would arrive on-site, only to find they could not complete the task due to the lack of belts being stocked. The Fenner QuickFix emergency belt was the ideal solution. Available in four profiles: SPZ, SPA, SPB SPC in 5 metre boxes meant any size belt could be accommodated and fitted without the need of strip down of machinery. In addition this gave the engineer time to reorder the Fenner rubber belts which could be fitted once they arrived. Service levels for the FM company increased significantly following a relatively low investment the Fenner QuickFix belt range - which is now carried by all the engineers - with the confidence that any breakdown calls can be quickly fixed. Part Number: SPZ - 283Z1111 SPA - 283A1111 SPB - 283B1111 SPC - 283C1111 Thousands of products available to order on ERIKS WEBSHOP SHOP.ERIKS.CO.UK SHOP.ERIKS .CO.UKSHOP .ERIKS.CO.UK
  • 48.
    40 Specialist Technical Centres Know-How Power Transmission WedgeBelts Quattro PLUS Wedge Belts nn ‘One Shot’ tensioning with no matching nn Meets industry standards for static conductivity and non-ignition properties nn Highest efficiency drive for low running costs nn Working temperature range –40°C to 80°C This CRE belt transmits up to 4 times the power of conventional Vee belts. The increase in cross sectional rigidity provided by the fibre-reinforced polychloroprene contributes significantly to the performance advantages. www.fptgroup.com nn HVAC nn Waste compactors nn Shredders nn Crushers nn Heavy duty conveyors Ideal for all applications Why use Fenner Quattro PLUS? nn Bucket elevators nn Woodworking machinery nn Quarry plant nn Saw mills nn Compressors Sections: QXPZ, QXPA, QXPB, QXPC Length: 630–5000mm Relative power 130% Airport Efficiency Increased ERIKS were contacted by a local airport were interested in improving efficiency throughout the airport, and in particular on their air handling units. The existing belts and pulleys were badly worn and not performing the their optimum efficiency. The Power Transmission Engineers suggested redesigning the drive, with the introduction of Fenner Quattro PLUS wedge belts combined with new pulleys, which would provide a drive that operated at 96% efficiency. Fenner Quattro PLUS CRE wedge belts can significantly reduce energy consumption when used in conjunction with variable speed drives. They can also vastly improve production and process speeds in their own right, by reducing slip and giving increased performance from the driven machine. Six months down the line the airport has confirmed that the new drive has increased efficiency by 10% and are now looking at similar solutions on other applications around the airport. Belt Section Pitch Length (mm) Belt Type Fenner Brand SPA 1400 FOZ-Q -FEN nn 4 times the power - Transmits for times the power of conventional vee belts, allowing for a more compact drive envelope nn Absorbs greater shock loadings - providing a more robust drive solution nn Superior anti-static - to ISO 1813, heat and oil resistant nn Greater length stability - minimal stretch and elongation
  • 49.
    41 Visit us atwww.eriks.co.uk Power Transmission Fenner Ultra Plus Wedge belts are precision built ( ) allowing extended life, offering superior anti-static, heat and oil resistant properties. nn Ideal for use in single or multi-belt drives nn One shot tensioning for fit and forget applications nn Will not self-ignite under severe slip/stall conditions Ultra PLUS Wedge Belts Belt Section Pitch Length (mm) Fenner Brand SPB 2240 -FEN Sections: SPZ, SPA, SPB, SPC, 8V Length: 487–12500mm Relative power 100% The Fenner Ultra PLUS wedge belt has stood the test of time, and once again proved its mettle when ERIKS were contacted by a large university. The local ERIKS Application Engineer was asked to do a feasibility study on a set of Air Handling Units (AHU’s). Fenner Cogged Raw Edge (CRE) Wedge Belts excel in high ratio compact applications by combining flexibility with structural stability. They offer all the advantages of Fenner Power PLUS including: nn Special compounds improve flexibility and strength nn Higher running efficiency than wrapped belts nn Precision built ( ) allowing excellent length matching CRE Wedge Belts Sections: XPZ, XPA, XPB, XPC, Length: 630–5000mm Relative power 110% Belt Section Pitch Length (mm) Belt Type Fenner Brand SPA 1400 CRE -FEN ERIKS were tasked to devise a plan to upgrade 12 AHU drives which supplied air into the canteens, lecture rooms etc. The incumbent drives were old and inefficient - some consisting of classical vee belts, along with a with a variety different makes - and pulleys that had not been changed for over 10 years. The AHU’s were fitted with Fenner Ultra PLUS wedge belts and new pulleys, which helped improve the drive efficiency, reduced running costs, and provided a reliable solution for the university. University Upgrade with Ultra PLUS
  • 50.
    42 Specialist Technical Centres Know-How Power Transmission RibbedBelts and Tensioners Width Profile Pitch Fenner Brand 16 T5- 1500 -FEN Belt Length Length Pitch Fenner Brand 695 PL 8 -FE N 1765 PL 8 -FE N No of Ribs Imperial Metric Fenner PolyDrive PLUS ribbed belts are an ideal solution for compact drives in household appliances and heavy machinery. The ribbed belts enable economic solutions even under difficult drive conditions, such as large transmission ratios, high belt speeds, small pulley diameters and back idler pulleys. n High belt speeds up to 60m/s n Designed for high transmission ratios n High power output n Low vibration, efficient belt n Long service life n Fully approved to all international standards n Static conductivity to ISO 1813 PolyDrive PLUS Ribbed Belts Why use Fenner PowerFlex PU Belting? Manufactured in thermoplastic polyurethane, that gives superior wear and abrasion resistance nn High Power Transmission nn The Steel Cord gives good running characteristics and high traction loads. nn Low noise running nn Free Maintenance nn Low pretension nn Constant length TThe Fenner PowerFlex metric timing belt is manufactured from a high- grade polyurethane material, reinforced with helically wound zinc coated steel tension member, allowing high breaking load and extremely low elongation. With excellent dimensional stability, consistent length and thickness, it makes it ideal for use in processing and packaging industries along with any clean areas where contamination would be an issue. nn Also available in OPEN LENGTHS nn Non-standard widths cut from stocked sleeves nn Steel Cord winding in S and Z profile allow high breaking load and extremely low elongation. nn Ozone and temperature resistance (-25 °C / +80 °C) nn Oil, grease and gasoline resistance PowerFlex PU Belting
  • 51.
    43 Visit us atwww.eriks.co.uk Power Transmission Tensioners The new range of Fenner tensioners have been designed to help maximise drive efficiency whilst extending your drive lifecycle. Range includes Tension Arms in Cast iron Stainless Steel – Standard Front Mount – with a Boomerang version. Fixtures include Simplex, Duplex Triplex idler sprockets, Chain Riders Rollers, with supporting brackets to complement the range. Why Choose Fenner Tensioners? nn Increases chain and belt life nn Noise and vibration damping nn Absorbs shock loads nn Maintenance free nn Safe in operation nn Self-adjusting nn Progressive spring characteristics nn Operating angle -30° to 30° nn Resistant to temperature -40° to 80°C www.fptgroup.com Tensioner Simplex Duplex Triplex Pitch No Teeth Size Standard Tensioner Idler Sprocket Idler Sprocket Idler Sprocket 3/8” 15 FT2 186B0002 186S1001 186D2001 186T3001 3/8” 15 FT3 186B0003 186S1001 186D2001 186T3001 1/2” 15 FT4 186B0004 186S1002 186D2002 186T3002 5/8” 15 FT5 186B0005 186S1003 186D2003 186T3003 5/8” 15 FT5 186B0005 - - 186T3004 3/4” 15 FT5 186B0005 186S1004 186D2004 - 3/4” 15 FT6 186B0006 186S1005 186D2005 186T3005 1” 13 FT6 186B0006 186S1006 186D2006 186T3006 1.1/4” 13 FT7 186B0007 186S1007 186D2007 186T3007 1.1/4” 13 FT8 186B0008 186S1007 186D2007 186T3007 1.1/2” 11 FT7 186B0007 186S1008 186D2008 186T3008 1.1/2” 11 FT8 186B0008 186S1008 186D2008 186T3008
  • 52.
    44 Specialist Technical Centres Know-How Power Transmission TimingBelts Upgrade form Chain Drives to Fenner Torque Drive PLUS 3 It’s as easy as 1, 2, Free! www.fptgroup.com Torque Drive PLUS 3 The state-of-the-art Torque Drive PLUS 3 works with standard HTD pulleys tp provide the ultimate combination of power capacity, low noise and high accuracy in a belt drive. nn The highest power rating in the range nn Enhanced compounding and glass fibre cord excel in highly dynamic applications nn Ultra compact and cost effective nn Quiet operation even at high speeds nn Replaces HTD belts to extend life and increase load capability Widths: 20–170mm Pitches: 8, 14mm Relative power 150% Pitch (mm) Length (mm) Width (mm) Fenner Brand 14MXP- 3150- 55 -FEN Determine your drive requirements to replace existing chain, or determine requirements for new Fenner Torque Drive PLUS 3 synchronous belt drive. Use the Fenner Drive Design Selector: http://selectors.fptgroup.com nn Free from the noise associated with chain drives nn Free from maintenance; no wear elongation, no need for regular adjustment nn Free from lubrication costs and oil contamination of machine or product nn Free from the space limitations associated with traditional synchronous belt drives nn Free extended service life, Fenner TDP3 synchronous belts offer up to twice the normal service life compared to roller chain drives 5,000 10,000 15,000 20,000 25,000 Chain Drive* Fenner TDP3 WorkingLifeinHours Approx. 9420 hours Approx. 20,000 hours Typical operating life, chain drive versus synchronous drive *Chain drive: 2.2kW 3:1 reduc- tion chain drive using 122 pitches ½” BS chain using 19 tooth driver and 57 tooth driven sprockets at 510mm centre distance. Fenner Torque Drive PLUS 3 Drive versus Chain Drive nn Same size, and space envelope nn Lighter and quieter nn Greater power rating nn Up to twice the service life
  • 53.
    45 Visit us atwww.eriks.co.uk Power Transmission Fenner HTD belts have a curvilinear tooth form giving a more uniform distribution of shear stresses within the teeth. This also provides a more uniform transition of tooth loads to the tensile members in the belt which significantly improves upon classical timing belts. nn Ultra compact and cost-effective drives nn Runs optimally on standard HTD pulleys nn Minimum backlash for precise positioning nn Non-standard widths cut to size from stock sleeve nn ISO 13050 (International Standards Organisation) HTD Timing Belts Widths: 9–170mm Pitches: 3, 5, 8, 14mm Relative power 100% Can’t Find The Right Size... Try Our Belt Cutting Service In-House Belt Cutting Service If you can’t find the correct size belt, give your local ERIKS Service Centre a ring and they will be able to call upon our in-house belt cutting service, based at the Power Transmission Technology Centre in Dudley. We stock a wide range of Timing Belts and Multi Vee Belts in sleeve from which can be cut to any width required. Profiles include:- nn Classic Timing Belt XL, L , H XH nn HTD Timing 5mm, 8mm 14mm nn Torque Drive PLUS 3 5mm, 8mm 14mm nn PU metric 5, AT5. T10 AT10 nn Multi V rib PM, PL, PJ PK Length (mm) Pitch (mm) Width (mm) Fenner Brand 1040 -8M 30 -FEN
  • 54.
    46 Specialist Technical Centres Know-How Power Transmission Vee,Wedge and Timing Pulleys Belt Section Pitch Dia. (mm) No. of Grooves Fenner Brand S P A 5 0 0 X 5 - F E N Available in: Z, SPZ, XPZ, QXPZ from 56–630mm pitch dia. A, SPA, XPA, QXPA from 80–800mm pitch dia. B, SPB, XPB, QXPB, USPB from 112–1000mm dia. C, SPC, XPC, QXPC, USPC from 200–1250mm pitch dia. Vee and Wedge Taper Lock® Pulleys Statically balanced to grade G6.3 for high accuracy www.fptgroup.com Why Choose Fenner Friction Pulleys Available with pilot bore fixings or using Taper Lock® shaft fixings system for ultimate versatility. nn Manufactured to ISO standards nn Surface treated to reduce corrosion nn Specials available Superior material specification and design allows guaranteed Superior performance at rim speeds up to 40m/s. Designed for use with both Vee and Wedge section belts. nn Dual duty grooves to ISO 4183, dual duty pulleys accept both wedge and vee belts nn High grade cast iron used for construction nn All pulleys are statically balanced nn Rim speeds to a maximum of 40m/s nn Special designs available Save Energy, Improve Efficiency... Your belt drive stands or falls by the accuracy of its installation, so don’t forget to check the condition of your pulleys. 50% of new belts are fitted to worn pulleys, which can waste up to 10% of your energy input. n Worn pulleys waste up to 10% of energy input n Check yours now with the Fenner pulley groove gauge Request your free pulley groove gauge today! http://knowhow.eriks.co.uk/fenner-groove-gauge-request Worn Pulley New Pulley
  • 55.
    47 Visit us atwww.eriks.co.uk Power Transmission Fenner timing pulleys are manufactured from steel and high grade cast iron (GG25), tolerate shock loadings and can achieve rim speeds of up to 40m/s. nn Available in both Classical Timing and HTD profiles nn Meet ISO 13050 and ISO 5296 standards nn High grade cast iron used for construction nn Precision machined grooves protect and maximise belt life while reducing noise emissions nn Special designs and sizes are available nn Maximum rim speed up to 40m/s nn Available with standard Taper Lock® fitting Timing Pulleys Have you seen... Our On-Line Drive Design Assistants Boost your drive efficiency Optimising your drive at the design stage can contribute significantly to the operating life, reliability and overall efficiency of your application. With this in mind, we developed easy-to-use Fenner Select® on-line drive design assistants, providing engineers with a structured, detailed approach to achieving optimum drive performance. The family of on-line drive design assistants include: nn Friction belt drives nn Synchronous belt drives nn Chain drives No of Teeth Pitch Size (mm) Belt Width (mm) Fenner Brand 4 0 - 8 M 2 0 - F E N Visit http://selectors.fptgroup.com and check out this invaluable, FREE resource!
  • 56.
    48 Specialist Technical Centres Know-How Power Transmission TimingBelts and Shaft Fixings CONTI® Synchrochain Carbon Heavy Duty Timing Belt Conti® Synchrochain Carbon utilises state-of-the-art materials with unparalleled smart production techniques which result in one of the most versatile and technically outstanding products on the market today. Whether your key driver is maximum production out, minimum drive size or total cost of ownership – Conti® Synchrochain Carbon is the solution! nn Higher power capacity nn Almost zero tension loss (initial) nn Excellent length stability nn Reduced belt width nn Reduced noise nn Increased service life nn Reduced system costs and drive envelope Specially treated fabric Polyurethane teeth Tension member Aramide cord with S/Z twists wound in pairs Polyurethane backing Conti® Synchrochain Heavy Duty Timing Belt The newly developed CTD profile ensures faultless meshing and hence smooth running at high speeds. At the same time it prevents a jump-over at high torques. So the Conti Synchrochain is well able to cope with a wide range of requirements. It is suitable for new drive designs and at the same time also compatible for use in existing systems. Available in pitches CTD8M and CTD14M. Details of pitch, lengths and widths can be obtained on request. Properties: nn Temperature range, depending on application, from –40°C to +80°C nn Suitable for tropical climates nn Resistant to aging and ozone nn Withstands reverse flexing nn Resistant to oils, grease and fuel nn Conditionally resistant to acid and lye nn Raw materials and production are silicone free Timing Belts from CONTI® Conti® SilentSync Self-tracking Timing Belt Conti SilentSync is a self-tracking timing belt made for very quiet and reduced vibration operation, making it an excellent choice for horizontal drives Properties: nn Temperature range from –40°C to +85°C nn Electrically conductive to ISO 9563 nn Very low noise nn Low vibration nn Resistant to ageing and ozone nn Conditionally oil-resistant nn Maintenance-free Synthetic rubber backing Specially treated fabric Synthetic rubber feet Aramide tension member
  • 57.
    49 Visit us atwww.eriks.co.uk Power Transmission Fenner Taper Lock® Bushes Exclusively for use with Taper Lock bored pulleys, sprockets and couplings, easy to install, off-the-shelf solution. Offering a full range of both metric and imperial sizes as well as a full range of weld-on hubs, bolt-on hubs and hub adaptors. Available for shafts 9 to 125mm diameter - up to 7,400Nm transmission n Quick and easy to install or remove n Unique 4-hole design to reduce vibration for balanced assemblies n Removes the need for re-boring with a full range of both metric and imperial bores n Manufactured from high grade, close- grain grey iron or steel FenLock™ Cone Clamping Elements Fenner Trantorque GTR Fast and accurate, single fastener shaft locking. Ideal for quick change parts or assemblies. It offers a mechanical shrink-fit eliminating the problems of fretting corrosion, backlash and key wallowing. Trantorque Mini available for 5 to 16mm shafts (up to 50Nm transmission). Trantorque GTR available for 15 to 75mm shafts (up to 2000Nm transmission) n Precise radial and axial adjustments on shafts n Self-centering, requires no location diameter to retain concentricity n Offers a mechanical shrink-fit eliminating backlash n Can be used directly over empty keyways to repair a worn or damaged connection Extreme duty, high torque transmission shaft fixing. The ultimate solution for arduous equipment where reliability is essential. Offering simple installation, increased shaft strength and high torque transmission capacity. Available for shaft sizes 6 to 900mm diameter - transmission of up to 1,650kNm n Accommodates infinite axial and radial positioning n Can be installed and removed multiple times n Enclosed design eliminates ingress of contaminants n Offers high torque transmission capacity Which Shaft Fixing is Right for your Application? Simplepage 50 Standard page 51 Solutionspage 51
  • 58.
    50 Specialist Technical Centres Know-How Power Transmission TaperLock Bushes, Trantorque Bushes and FenLock Cone Clamping Elements Bolt-on Hub B F 2 5 - F E N Bush Size Keyway KM for Metric PM for Plain Fenner BrandConstant 2517 KM -ADAPTOR -FEN WH 25 HUBS -FEN Adaptors n For use with parallel bore eliminating the cost of drilling, tapping and taper boring n Keyed version also available for heavy duty applications n Taper bored to receive 4-hole Taper Lock® bush sizes 1008 to 4040 Bolt-on hubs n A convenient means to secure fan rotors, steel pulleys, plate sprockets, impellers etc to a shaft n Welding not necessary n Taper bored to receive 4-hole Taper Lock® bush sizes 1210 to 3040 Weld-on hubs n Manufactured from steel to provide convenient means to secure fan rotors, steel pulleys, plate sprockets, impellers etc to a shaft n Shouldered outer diameter allows for easy location n Taper bored to receive 4-hole Taper Lock® bush sizes 1210 to 5040 Bush Size (1st 2nd digits of bush size) Fenner Brand Weld-on Hub Bush Size (1st 2nd digits of bush size) Fenner BrandConstant Taper Lock® Bushes Easy on, easy off - the simplest and quickest shaft fixing www.fptgroup.com Machined to exacting tolerances in cast iron and steel, the Fenner Taper Lock® four hole bush has been tried and tested in over 40 million applications. It is the most successful shaft fixing in the market place today with a full range of both metric and imperial sizes as well as a full range of weld-on hubs, bolt-on hubs and hub adaptors. nn No costly re-boring nn High grade, close grain grey iron (GG25) material nn Tolerates shock loading nn Accommodates wide shaft diameter limits +0.05mm (0.002”) to 0.125mm (0.005”) nn Perfect for use with V-pulleys, timing and HTD pulleys, sprockets, shaft couplings, hubs and adaptors Metric Range: 1008–5050 Bore Diameter 16mm–125mm Imperial Range: 1008–5050 Bore Diameter 3/8–5 Bush Size Bore Size Fenner Brand 1 6 1 0 X 3 8 - F E N 2 5 1 7 X1.5/8 - F E N Metric Imperial Simple
  • 59.
    51 Visit us atwww.eriks.co.uk Power Transmission n Eliminate Keys, Keyways, Setscrews Eliminate costly matching with inexpensive Trantorque GTR mounts. They grip like a shrink-fit on shaft and bore, and resist shocks and torque reversals better than keyways. Single-nut design, self-centres accurately, locks or unlocks with the twist of a wrench. n Infinite, Precise Radial Adjustment The positive lock and release action permits exact initial positioning with easy readjustment at a later date. n Use Smaller Shafts Eliminate the weak spot in shafts and hubs caused by machining keyways. This, plus the rigidising effect, permits smaller and less expensive shafts and bearings with equal strength and stiffness. n Retrofit and Repair Can be used directly over empty keyways to repair a worn or damaged connection. Both metric and imperial units are available. n Mount Hubless Devices Trantorque GTR mounts are unique in their ability to mount thin hubless devices. They need not be completely within the bore. This permits mounting plate sprockets, hubless gears, disc brakes, etc. – often at substantial savings to the user or OEM. FenLock™ cone clamping elements provide a wide and versatile range of keyless shaft/hub assemblies. n Simple installation/dissembly n Resistance to alternating torques n Increased shaft strength n High torque transmission capacity n No backlash n Axial and angular adjustment capability n No fretting corrosion To Help... When ordering shaft fixings, consider the following: nn Shaft dimension nn Keyway details nn Transmitted torque nn Hub details (diameter, length, material) TranTorque GTR Bushes FenLock Cone Clamping Elements Standard Solutions FLK 200 Medium High Torque, non self-centering FLK110 Medium/High Torque, self centering, fewer screws FLK130 High torque, self-centering FLK131 High torque, self-centering larger dia. location collar FLK603 Medium/high torque, self centering, shrink disc device Conatct your local ERIKS service centre for details on the full range available.
  • 60.
    52 Specialist Technical Centres Know-How Power Transmission FenaflexTyre, Rigid, HRC and Jaw Couplings Fenaflex Couplings Less stress, more flexibility These highly elastic lubrication-free couplings tolerate large amounts of misalignment in all planes as well as offering simple installation and inspection without disrupting the drive. The Fenaflex® coupling also has excellent shock absorbing properties while reducing vibration and torsional oscillations. nn Accepts misalignment simultaneously in all planes nn Highly resilient to absorb shock loads nn Lubrication-free nn Sample visual inspection to aid maintenance nn ATEX approved variant nn Simple installation without moving coupled machines nn Taper Lock® and pilot bore flanges nn Pump spacer and flywheel fixing variants Rigid Couplings Taper Lock® Rigid couplings provide a convenient method of rigidly connecting shafts. Taper Lock® bushes permit easier and quicker fixing to the shafts with the firmness of a shrunk-on fit. nn Peripheral speeds of up to 33m/s available nn Vertical assemblies possible in FF design nn Taper Lock® fixing as standard nn 8 sizes in the range Couplings Available in Taper Lock® or pilot bore flanges. Taper Lock® have a massive torque capacity and are available with a fire resistant, anti-static tyre. Pump Spacer Variant Spacer variant available for pump drives to allow disassembly of pump shaft without disturbing the prime mover, minimising downtime. Flywheel Variant Flywheel coupling version available for standard SAE flywheel fixings and elements available in different dynamic stiffness’s to accommodate a wide range of engine and driven machine parameters.
  • 61.
    53 Visit us atwww.eriks.co.uk Power Transmission Why Choose HRC... When looking for a value for money coupling, OEMs have specified the HRC since its launch in the 1970s. HRC Couplings Exceptional performance, exceptional value Permitting quick and easy installation by means of Taper Lock® bushes, and offering quick alignment, the semi-elastic general purpose HRC coupling is ideal for use with electric motors. nn Offers the simplest, most straightforward fitting available nn Ease of alignment and fitting using straight edge and machined outside diameters nn Fail-safe design due to interacting dog design nn Accommodates incidental misalignment nn Exceptional performance at low cost nn Power ratings are matched to standard motor sizes nn Standard and FRAS elements available nn Flywheel fixing variant available nn Pilot bore design also available Jaw Couplings A low-cost general purpose solution to absorb incidental misalignment, shockloads and small amplitude vibrations. nn Ease of alignment nn Fail-safe shaft connection nn Range of element materials available including; nitrile, urethane and hytrel nn Pump spacer variant available nn Design powers up to 42.2kW available at 1440rpm Much copied, the original Fenner HRC product outlasts its competitors due to subtle design differences such as, higher levels of surface finish on the drive dogs and having flexible elements manufactured in the UK to extremely high specifications. Its high grade rugged cast iron construction is a must for heavy duty industries such as mining and quarrying so it’s no surprise this coupling is the crusher and screen manufacturers choice every time.
  • 62.
    54 Specialist Technical Centres Know-How Power Transmission Rexnordand Falk Couplings Disc CouplingsCouplings Rexnord® • Ov • Up • Up • Sp • All rep • Fe an • Me sp • AT Rexnord A • 13 • Up • Up • Hi cu • Up • Co ele ow • Pa de eli • Sh Lubricated Couplings Falk® Stee • 25 • 11 fly • Up • Up • Up • Fiv wi Falk Lifelig • 28 • 13 an • Up • Up • La ap • Th Disc CouplingsCouplings Rexnord® Th • Over • Up to • Up to • Spee • Allow repla • Featu and e • Meet speci • ATEX Rexnord Add • 13 siz • Up to • Up to • High- custo • Up to • Corro elem owne • Paten degre elimin • Ships Lubricated Couplings Falk® Steelfle • 25 siz • 11 m flywh • Up to • Up to • Up to • Five- with L Falk Lifelign® • 28 siz • 13 m and h • Up to • Up to • Large appli • Three Disc CouplingsCouplings Rexnord® Thom • Over 20 • Up to 43 • Up to 28 • Speed ra • Allows fo replacem • Features and elec • Meets A specified • ATEX ce Rexnord Addax • 13 sizes • Up to 13 • Up to 4,0 • High-per custom s • Up to 50 • Corrosio element ownersh • Patented degree o eliminate • Ships in Lubricated Couplings Falk® Steelflex® • 25 sizes • 11 mode flywheel • Up to 50 • Up to 93 • Up to 10 • Five-yea with Lon Falk Lifelign® G • 28 sizes • 13 mode and high • Up to 1,0 • Up to 8,1 • Large fle applicati • Three-ye Disc Couplings Lubricated Couplings Rexnord® Thomas® XTSR Disc Couplings nn Over 20 sizes nn Up to 430 mm bore capacity nn Up to 283,000 Nm torque capacity nn Speed ratings up to 20,000 rpm nn Allows for visual inspection and easy replacement of disc packs and center members nn Features zero backlash, low-restoring forces, and electrically-insulated designs nn Meets API 671 or API 610 specifications when specified nn ATEX certified Rexnord Addax® Composite Disc Couplings nn 13 sizes nn Up to 130 mm bore capacity nn Up to 4,090 Nm torque capacity nn High-performance composite spacer with custom spacer lengths, up to 6,985 mm nn Up to 500 hp nn Corrosion-resistant center member, flex element, hub, and hardware lower the cost of ownership and extend service life nn Patented unitized flex elements provide 1 degree of misalignment per element and eliminate fretting nn Ships in less than 24 hours if required Falk® Steelflex® Grid Couplings nn 25 sizes nn 11 models including high-speed, spacer, flywheel, brake and controlled torque nn Up to 508 mm bore capacity nn Up to 932,126 Nm torque capacity nn Up to 10,000 rpm nn Five-year heavy-duty warranty when lubricated with Long Term Grease (LTG) Falk Lifelign® Gear Couplings nn 28 sizes nn 13 models for general purpose, high-speed and high-torque applications nn Up to 1,067 mm bore capacity nn Up to 8,185,763 Nm torque capacity nn Large flex hubs accommodate high-torque applications in space-limited installations nn Three-year, heavy-duty warranty
  • 63.
    55 Visit us atwww.eriks.co.uk Power Transmission Elastomeric Couplings Falk Wrapflex® Elastomeric Couplings • 12 sizes • Up to 184 mm bore capacity • Up to 15,027 Nm torque capacity • Up to 4,500 rpm • Patented hub and flex element design ensure long life • Close-coupled and spacer designs available to accommodate shaft spacing • Polyurethane element has excellent wear and chemical resistance and an operating temperature range of -40°C to 95°C • ATEX certified Torque Management Products Rexnord Autogard® Torque Limiters • Protect equipment from damaging torque spik and inertias • Instant and complete disengagement of the drive when overloaded • Adjustable, accurate, and repeatable torque setting • Reduced downtime due to quick and easy rese • Rapid-reset, remote-reset, synchronous-reset options • Torque ranges from 1Nm to 1,000,000 Nm + Couplings Elastomeric Couplings Falk Wrapflex® Elastomeric Couplings • 12 sizes • Up to 184 mm bore capacity • Up to 15,027 Nm torque capacity • Up to 4,500 rpm • Patented hub and flex element design ensure long life • Close-coupled and spacer designs available to accommodate shaft spacing • Polyurethane element has excellent wear and chemical resistance and an operating temperature range of -40°C to 95°C • ATEX certified Rexnord Viva® Elastomeric Couplings • 12 Viva sizes • Up to 165 mm bore capacity • Up to 6,270 Nm torque capacity • Up to 4,300 rpm • Split-in-half flex element design for efficient installation and replacement • Mounting hole patterns allow for a wide range of shaft gaps: from 6 to 300 mm • Non-lubricated and low-maintenance • Viva model features patented “V” notch design which provides uniform failure area for overload protection • ATEX certified Torque Management Products PT Drive Components Elastomeric Couplings Falk Wrapflex® Elastomeric Couplings • 12 sizes • Up to 184 mm bore capacity • Up to 15,027 Nm torque capacity • Up to 4,500 rpm • Patented hub and flex element design ensure long life • Close-coupled and spacer designs available to accommodate shaft spacing • Polyurethane element has excellent wear and chemical resistance and an operating temperature range of -40°C to 95°C • ATEX certified Torque Management Products Rexnord Autogard® Torque Limiters • Protect equipment from damaging torque spikes and inertias • Instant and complete disengagement of the drive when overloaded • Adjustable, accurate, and repeatable torque setting • Reduced downtime due to quick and easy reset • Rapid-reset, remote-reset, synchronous-reset options • Torque ranges from 1Nm to 1,000,000 Nm + Elastomeric Couplings Torque Limiters Falk Wrapflex® Elastomeric Couplings nn 12 sizes nn Up to 184 mm bore capacity nn Up to 15,027 Nm torque capacity nn Up to 4,500 rpm nn Patented hub and flex element design ensure long life nn Close-coupled and spacer designs available to accommodate shaft spacing nn Polyurethane element has excellent wear and chemical resistance and an operating temperature range of -40°C to 95°C nn ATEX certified Rexnord Viva® Elastomeric Couplings nn 12 Viva sizes nn Up to 165 mm bore capacity nn Up to 6,270 Nm torque capacity nn Up to 4,300 rpm nn Split-in-half flex element design for efficient installation and replacement nn Mounting hole patterns allow for a wide range of shaft gaps: from 6 to 300 mm nn Non-lubricated and low-maintenance nn Viva model features patented “V” notch design which provides uniform failure area for overload protection nn ATEX certified Rexnord Autogard® Torque Limiters nn Protect equipment from damaging torque spikes and inertias nn Instant and complete disengagement of the drive when overloaded nn Adjustable, accurate, and repeatable torque setting nn Reduced downtime due to quick and easy reset nn Rapid-reset, remote-reset, synchronous-reset options nn Torque ranges from 1Nm to 1,000,000 Nm + nn PT Drive Components
  • 64.
    56 Specialist Technical Centres Know-How Power Transmission Sprockets Fennersprockets are available with either Taper Lock or pilot bored fixings and are precision manufactured from fine grade steel. Sprockets are available in simplex, duplex and triplex forms for sizes 05B to 20B. nn Surface treated to reduce corrosion nn Short-reach bushes on selected sizes - compact hubs nn Hardened teeth on Taper Lock sprockets Roller Chain and Sprockets Fenner PLUS Roller Chain High Performance Chain Fenner PLUS chain has been designed to provide the optimum combination of tensile strength, wear resistance and fatigue life. Increased fatigue resistance nn Shot peening of roller and side plates gives increased fatigue resistance nn Ball swaged side plate holes improve finish and combat fatigue failure nn Deep waisted side plates increase effective cross section lowering fatigue Fit and forget reliability nn Preloaded to bed in all component parts nn Final 100% quality check enabling you to simply fit and forget OKS Chain and Drive Spray Product Ref: OKS3751- 500ML Also available Sprocket Reworking Service The ERIKS Power Transmission Technology Centre is pleased to offer you a new in-house sprocket reworking service. nn Stocking 3/8” to 3/4” pitch simplex in preferred tooth numbers** nn Bored to H7 tolerance nn B.S. keyway/grubscrew nn Can be machined to drawing Number of teeth Pitch (Inches) FixingForm Fenner Brand 5/8 D- 27T- TL -FEN
  • 65.
    57 Visit us atwww.eriks.co.uk Power Transmission Lubrication Free Chain The Greener Cleaner Option Fenner PLUS Lubrication-Free roller chain utilises sintered bush chain technology which negates the need to pre-lubricate the chain for storage or running. The porous bush is lightly impregnated with oil which gives the same performance characteristics as lubricated chain without the need for periodical applications of lubricant whilst the chain is in use. This reduces risk to personnel as they don’t have to climb into machines to lubricate product and reduces waste oil products having to be recycled safely and legally. Fenner PLUS lubrication-free roller chain is an ideal solution for situations where lubrication is difficult or contamination and fire are serious potential problems. nn Built-in lubrication – Fenner PLUS lubrication-free chain has been specially manufactured to exacting standards and features its own built-in lubrication nn Using sintered bushes impregnated with oil, Fenner lubrication-free chain can operate at up to 2.5m/sec, which is more than twice that of composite bush chains Dramatically Reduced Downtime ERIKS were contacted by a large pet food manufacturer, as they were experiencing problems with the roller chains on their pet food conveyors. The chains were failing after just six months of use, and were also contaminated with debris attracted by excess oil which had been applied to the products. Following a site visit and after a lengthy technical discussion it was recommended that Fenner PLUS lubrication-free roller chain would be the best solution. Not only would this negate the need for costly and time consuming maintenance procedures, it would save the customer the expense of recycling the oil based lubricant after use. 100 metres were subsequently trialled, and a year later are still performing! The end user is delighted not only with the enhanced performance, but also with the lube-free benefits using this product resulting in an environmentally friendly factory. All conveyor lines have been and will continue to be fitted with Fenner PLUS lubrication-free roller chain.
  • 66.
    58 Specialist Technical Centres Know-How Power Transmission AdaptedChain EXTENDED PINS K1 K2 M1 M2 163 164 563 564 Circlip Type Plain Duplex Pin Fenner PLUS Adapted Chain Fenner PLUS adapted chain builds on the heritage and engineering experience of the Fenner product range by optimising the benefits of performance enhancing features which work together to give Fenner PLUS chain the optimum combination of tensile strength, wear resistance and fatigue life. nn Enhanced performance in hostile environments nn Solid rollers manufactured to achieve high surface hardness nn Shot peened plates for increased fatigue resistance and extended chain life 3 Simple Steps to an Adapted Solution Determine your adapted chain requirement using our simple adapted chain enquiry form and pass to your ERIKS representative Our engineering team will assess and quote for your requirements We will assemble and deliver your adapted chain swiftly and efficiently so that you can enjoy the market leading benefits of Fenner PLUS adapted chain3 Everything You Need nn Carbon and stainless steel variants nn British (BS) and American (ANSI) standard specification nn Simplex and duplex nn K and M attachments nn Extended pin variants nn Hollow pin variants nn Matched lengths available 48 HourAdapted Chain Service
  • 67.
    59 Visit us atwww.eriks.co.uk Power Transmission When the Industry Moves, Rexnord is the Preferred Choice. www.rexnord.com When it comes to providing highly engineered products that improve productivity and efficiency for industrial applications worldwide, Rexnord is the most reliable in the industry. From durable products like plastic bottles, to a more delicate product like a bag of chips, Rexnord works to ensure the sustainability of your product through production and distribution. Our commitment to customer satisfaction and superior value extends to every area of our business.
  • 68.
    60 Specialist Technical Centres Know-How Power Transmission RenoldPerformance Chain www.renold.com/synergy To find out how Renold Synergy can enhance your productivity, call us on; Tel: +44 (0)161 498 4600 Email: synergy@renold.com • Unbeatable wear and fatigue resistance • Withstands shock loadings better than any other standard chain • Reduced initial wear • Productivity improves with Renold Synergy Renold Synergy is the only high performance transmission chain on the market LASTS 3 TIMES LONGER IN WEAR THAN YOUR CURRENT CHAIN OR YOUR NEXT CHAIN IS FREE 3XXXX Renold Synergy Ad 210x280 v1_Layout 1 25/07/2012 10:43 Page 1 www.renold.com/attachmentchain Contact ERIKS, your Renold authorised distributor on 0845 006 6000 Attachment Chain from Renold. Attachment chain requires excellent service; prompt quoting, rapid availability and quick delivery. 39269 Renold ERIKS A4 ATTACHMENT Advert.indd 1 30/04/2013 09:56
  • 69.
    61 Visit us atwww.eriks.co.uk Power Transmission Synergy Chain If lubrication’s a problem – here’s the solution! Designed around unique Renold technology, these chains set a new benchmark for chain performance with little or no lubrication. Offering real improvements in working life, thanks to outstanding wear and fatigue resistance, the range covers both small and large pitch sizes and is dimensionally interchangeable with standard chains. Using food industry-approved lubricant within the sintered bush, they have an ISO standard pin diameter, and therefore standard attachments on the outer links. nn Large and small pitch sizes nn No lubrication normally required nn Totally dry to the touch nn Nickel-plated plates nn Excellent corrosion resistance nn Unique food industry-approved roller coating nn Dimensionally interchangeable with standard chain nn ISO standard pin diameter Part No ISO Ref Pitch (inch) Box Qty (ft) 110438-10FT-REN 06B-1 3/8 10 110446-10FT-REN 08B-1 1/2 10 110456-10FT-REN 10B-1 5/8 10 110466-10FT-REN 12B-1 3/4 10 110488-10FT-REN 16B-1 1 10 Syno Chain The only true high performance roller chain on the market! This isn’t our verdict, but that of engineers around the world, who consistently report that these superb products offer excellent wear and fatigue resistance, and exceptional working life. Its performance which results from years of research and development to deliver a product which is quite simply the most reliable of its kind. nn Backed by the Synergy Wear Life Guarantee nn Unbeatable wear resistance delivers maximum productivity nn Special platinum-coloured connecting link for easy identification and fast disconnect nn Unique end-softened pins for quick and easy cutting to length – without damaging the rest of the chain nn High resistance to shock loading Part No ISO Ref Pitch (inch) Box Qty (ft) 110038-25FT-REN 06B-1 3/8 25 110046-25FT-REN 08B-1 1/2 25 110056-25FT-REN 10B-1 5/8 25 110066-25FT-REN 12B-1 3/4 25 110088-10FT-REN 16B-1 1 10 110106-10FT-REN 20B-1 1.1/4 10 110127-10FT-REN 24B-1 1.1/2 10 114038-25FT-REN 06B-2 3/8 25 114046-25FT-REN 08B-2 1/2 25 114056-25FT-REN 10B-2 5/8 25 114066-25FT-REN 12B-2 3/4 25 114088-10FT-REN 16B-2 1 10 114106-10FT-REN 20B-2 1.1/4 10 114127-10FT-REN 24B-2 1.1/2 10 116038-25FT-REN 06B-3 3/8 25 116046-25FT-REN 08B-3 1/2 25 116056-25FT-REN 10B-3 5/8 25 116066-25FT-REN 12B-3 3/4 25 116088-10FT-REN 16B-3 1 10 116106-10FT-REN 20B-3 1.1/4 10 116127-10FT-REN 24B-3 1.1/2 10 The biggest single innovation in power transmission technology since Renold invented the bush roller chain Wear resistance and performance without equal
  • 70.
    62 Specialist Technical Centres Know-How Power Transmission RenoldSpecial Chain www.renold.com/attachmentchain Contact ERIKS, your Renold authorised distributor on 0845 006 6000 Attachment Chain from Renold. Attachment chain requires excellent service; prompt quoting, rapid availability and quick delivery. 39269 Renold ERIKS A4 ATTACHMENT Advert.indd 1 30/04/2013 09:56 www.renold.com/attachmentchain Contact ERIKS, your Renold authorised distributor on 0845 006 6000 Attachment Chain from Renold. Attachment chain requires excellent service; prompt quoting, rapid availability and quick delivery. 39269 Renold ERIKS A4 ATTACHMENT Advert.indd 1 30/04/2013 09:56
  • 71.
    63 Visit us atwww.eriks.co.uk Power Transmission Renold Hydro-Service chain delivers superior corrosion resistance, lasting as much as 30 times longer than standard carbon steel in applications that have to deal with water or salt spray. Renold Stainless Steel chain should be slected when resistance to chemical action is critical. Ideal for use in food processing. Renold Sovereign Renold Stainless Steel Renold Hydro-Service Part No ISO Ref Pitch (inch) Box Qty (ft) 110846-25FT-REN 08B-1 1/2 25 110856-25FT-REN 10B-1 5/8 25 110866-25FT-REN 12B-1 3/4 25 110888-10FT-REN 16B-1 1 10 Part No ISO Ref Pitch (inch) Box Qty (ft) 185118-10FT-REN 05B-1 5/16 10 185302-10FT-REN 06B-1 3/8 10 181707-10FT-REN 08B-1 1/2 10 180280-10FT-REN 10B-1 5/8 10 185634-10FT-REN 12B-1 3/4 10 187900-10FT-REN 16B-1 1 10 Part No ISO Ref Pitch (inch) Box Qty (ft) 530038-10FT-REN 06B-1 3/8 10 530046-10FT-REN 08B-1 1/2 10 530056-10FT-REN 10B-1 5/8 10 530066-10FT-REN 12B-1 3/4 10 530088-10FT-REN 16B-1 1 10 530106-10FT-REN 20B-1 1.1/4 10 530127-10FT-REN 24B-1 1.1/2 10 Part No ISO Ref Pitch (inch) Box Qty (ft) 114846-25FT-REN 08B-2 1/2 25 114856-25FT-REN 10B-2 5/8 25 114866-25FT-REN 12B-2 3/4 25 114888-10FT-REN 16B-2 1 10 Part No ISO Ref Pitch (inch) Box Qty (ft) 185122-10FT-REN 06B-2 3/8 10 185125-10FT-REN 08B-2 1/2 10 185126-10FT-REN 10B-2 5/8 10 185127-10FT-REN 12B-2 3/4 10 185128-10FT-REN 16B-2 1 10 Part No ISO Ref Pitch (inch) Box Qty (ft) 534038-10FT-REN 06B-2 3/8 10 534046-10FT-REN 08B-2 1/2 10 534056-10FT-REN 10B-2 5/8 10 534066-10FT-REN 12B-2 3/4 10 534088-10FT-REN 16B-2 1 10 534106-10FT-REN 20B-2 1.1/4 10 534127-10FT-REN 24B-2 1.1/2 10 Renold Sovereign is the perfect solution for abrasive environments where dirt and dust ingress is commonplace. Renold Sovereign offers up to 4 times longer wear life, reduces pin wear, and is suitable for high speed or heavy load applications.
  • 72.
    64 Specialist Technical Centres Know-How Power Transmission Accessories,Drives and Rollers Chain Pin Extractor Do you have to grind chain to cut it? Renold makes cutting chain easy. Using the Renold Chain Pin Extractor cutting chain is effortless, it takes just seconds and there’s no mess. Chain Wear Guide You can use a simple wear guide to identify when your chain has reached the point when it needs to be replaced. Running a worn chain will reduce efficiency, accelerate the wearing of sprocket teeth and increase operational noise. The Renold Chain Wear Guide helps you to measure chain extension and improve maintenance. www.chainwearguide.com Chain Pin Extractor Do you have to grind chain to cut it? Renold makes cutting chain easy. Using it takes just seconds and there’s no mess. www.renoldpinextractor.com Renold Chain Selector The new Chain Selector from Renold has been launched, making it even eas to specify the right transmission chain for the job. You can quickly and easil generate a selection, alter parameters to include environmental factors like corrosion or lubrication and even allow for applications with shock loads. www.renoldchainselector.com Chain Wear Guide You can use a simple wear guide to identify when your chain has reached the point when it needs to be replaced. Running a worn chain will reduce efficiency, accelerate the wearing of sprocket teeth and increase operational noise. The Renold Chain Wear Guide helps you to measure chain extension and improve maintenance. ar Guide ple wear guide to identify when your chain oint when it needs to be replaced. Running reduce efficiency, accelerate the wearing and increase operational noise. The Renold helps you to measure chain extension and ance. earguide.com Extractor nd chain to cut it? Renold makes cutting chain easy. Using the Renold Chain Pin Extractor cutting chain is effortless, ds and there’s no mess. inextractor.com hain Selector ector from Renold has been launched, making it even easier t transmission chain for the job. You can quickly and easily on, alter parameters to include environmental factors like ation and even allow for applications with shock loads. hainselector.com Renold Klik-Top polymer block chain Renold Klik-Top polymer block chain is a modern alternative to conventional polymer block chain. If you need to remove a Klik-Top block it’s easy, no need to disassemble the chain. Renold: making life easier! www.kliktopchain.com ndd 1 30/04/2013 09:53 Renold Chain Selector The new Chain Selector from Renold has been launched, making it even easier to specify the right transmission chain for the job. You can quickly and easily generate a selection, alter parameters to include environmental factors like corrosion or lubrication and even allow for applications with shock loads. www.renoldchainselector.com r Guide e wear guide to identify when your chain nt when it needs to be replaced. Running duce efficiency, accelerate the wearing d increase operational noise. The Renold elps you to measure chain extension and ce. rguide.com xtractor d chain to cut it? Renold makes cutting chain easy. Using the Renold Chain Pin Extractor cutting chain is effortless, and there’s no mess. extractor.com Renold Klik-Top polymer block chain Renold Klik-Top polymer block chain is a modern alternative to conventional polymer block chain. If you need to remove a Klik-Top block it’s easy, no need to disassemble the chain. Renold: making life easier! www.kliktopchain.com Renold Klik-Top Polymer Block Chain You can use a simple wear guide to identify when your chain has reached the point when it needs to be replaced. Running a worn chain will reduce efficiency, accelerate the wearing of sprocket teeth and increase operational noise. The Renold Chain Wear Guide helps you to measure chain extension and improve maintenance.
  • 73.
    65 Visit us atwww.eriks.co.uk Power Transmission Premiun efficiency IE3 and Super Premium efficiency IE4 Lower total operational costs Energy saving Versatile, robust design Reduced noise W22 IE3 Premium Efficiency and IE4 Super Premium Efficiency- Cast Iron Range High efficiency and low cost of ownership throughout the entire motor lifetime have been the basis for the W22 development. Available with outputs from 0.12 to 500kW in either 2, 4, 6 and 8 pole speeds. W21 - Aluminium Range Offering improved thermal dissipation with a lower overall weight than cast iron, the aluminium frame is suitable for most industrial environments. Available with outputs from 0.12 to 11kW in either 2, 4, 6 and 8 pole speeds. High efficiency IE2 and Premium Efficiency IE3 Multi-mounting Class F insulation system IP55 protection Suitable for inverter duty applications W22X IE3 Premium Efficiency and IE4 Super Premium Efficiency - Flameproof Range Although not yet included within the EU MEPS, the W22X is available at both IE3 Premium efficiency and IE4 Super Premium efficiency rating Available with outputs from 0.12 to 1,600 kW in either 2, 4, 6 and 8 pole speeds. Premium efficiency IE3 and Super Premium efficiency IE4 Low total operational costs EXd rated for explosive atmospheres Suitable for Zones 1 and 2 ; Zone 21 and 22 certified IIC group certified WEG IE3 and IE4: equipping you to meet tomorrow’s industrial challenges With changing statutory standards and rising energy costs, efficient motor performance will be one of your biggest priorities. As a world-leader in the design and manufacture of industrial motors, our focus is not only on helping you to meet new IE3 standards, but to exceed them, with our new W22 IE4 range, giving greater savings with WEG quality.
  • 74.
    66 Specialist Technical Centres Know-How Power Transmission 86 POWER TRANSMISSION Drivesand Rollers Workshops offering repair or replacement Attention T H E H E A R T O F C O N V E Y O R T E C H N O L O G Y D R I V E S A N D R O L L E R S The Interroll Group is one of the world's leading manufacturers of key products for unit load handling systems, internal logistics and automation. Interroll UK has recently strengthened its position to offer customers an all embracing drive solution that includes professional consulting services, a product portfolio for drum drive technology and conveying components, with the assurance of a dedicated repair and servicing department geared to promptly respond to your needs. • Motorised Drums 80mm - 217mm Dia. • Synchronous Drum Motors 82mm -113mm Dia • Drives for all makes of modular belts • Zone Controlled RollerDrives • Gravity Rollers • Fixed Friction Drive Rollers • 50mm Dia Magnetic Speed Controller • Tapered Rollers • Conveyor Wheels • Omniwheels Ball Transfer Units • Roller Tracks • Pallet Drives / Rollers Interroll Drives and Rollers
  • 75.
    67 Visit us atwww.eriks.co.uk Power Transmission 86 POWER TRANSMISSION Drives and Rollers Workshops offering repair or replacement Attention T H E H E A R T O F C O N V E Y O R T E C H N O L O G Y D R I V E S A N D R O L L E R S The Interroll Group is one of the world's leading manufacturers of key products for unit load handling systems, internal logistics and automation. Interroll UK has recently strengthened its position to offer customers an all embracing drive solution that includes professional consulting services, a product portfolio for drum drive technology and conveying components, with the assurance of a dedicated repair and servicing department geared to promptly respond to your needs. • Motorised Drums 80mm - 217mm Dia. • Synchronous Drum Motors 82mm -113mm Dia • Drives for all makes of modular belts • Zone Controlled RollerDrives • Gravity Rollers • Fixed Friction Drive Rollers • 50mm Dia Magnetic Speed Controller • Tapered Rollers • Conveyor Wheels • Omniwheels Ball Transfer Units • Roller Tracks • Pallet Drives / Rollers DRIVE FOR THE NEXT GENERATION_Layout 1 26/05/2017 11:14 Page 1 Interroll Drum Motors Drive for the next generation The new generation of Drum Motors with fully modular synchronous and asynchronous design are engineered for high performance and longevity, and to meet stringent hygiene requirements. nn Modular platform strategy available with an 80-mm diameter nn Easier to plan and implement user-specific material-handling solutions nn Stronger shafts and ball bearings guarantee a long service life nn Robust planetary gears make it possible to transfer high levels of torque to conveyor belts efficiently and quietly nn A greater speed range achieve throughput requirements precisely nn Short and reliable delivery times nn Offer high energy efficiencies compared to alternative drive systems, cutting operating costs further Ultra-hygienic belt drive nn New generation Drum Motors with protection class IP69K, meet the highest hygiene requirements nn Makes cleaning the facility much faster and easier nn Reducs the risk of product contamination in the food processing area nn The PTFE-sealing allows a high pressure cleaning with chemicals according to ECOLAB Specifications Pioneering drive solutions In pioneering drive solutions for modular plastic belt conveyors Interroll utilises a range of purpose designed, food quality FDA approved profiled rubber and PU lagging, and stainless steel or polymeric sprockets. To provide maximum flexibility of speed and control, all Interroll Drum Motors can be connected with most types of frequency inverters. Continuous Development Growth An important element of Interroll’s Group strategy is its commitment to developing and refining intelligent products that allow our customers to save space, energy and delivers a fast return on investment. nn Magnetic Speed Controller MSC 50 - the new patented Interroll MSC 50 provides the optimal technical solution for controlling descending product speeds on gravity conveyors with materials weighing from 0.5 kg to a maximum of 35 kg. nn Interroll RollerDrive - a 24 VDC brushless motor integrated in a conveyor roller provides the most energy efficient all-purpose drive employed with controllers in automated conveyor technology. Interroll Drum Motors are available with a wide range of voltages, powers, speeds, high torque motors, accessories and many other options.
  • 76.
    68 Specialist Technical Centres Know-How Power Transmission WFlameproof Range Brook Crompton’s flameproof motors are designated Ex db (eb) flameproof and are designed for operation in Zone 1 hazardous areas. They comply with all relevant national and international standards. They are of a rugged cast iron construction to withstand an internal explosion. Outputs range from 0.37kW to 200kW with smaller or larger outputs on request. Standard motors are suitable for applications classified T4, in addition, T5 and T6 can be supplied, although this may involve reduced outputs. Special build options: nn Ex db eb IIB or IIC nn Group I mining nn Special shaft dimensions nn Special voltage nn Low starting torque nn Offshore nn Roller bearing nn plus many more Special build options: nn Multi-speed nn Encoder nn Force ventilated (IC416) nn Brake/brake kit friendly (aluminium range, frames 63-132 only) nn Special shaft/special flange dimensions nn Special paint nn Special voltage nn Roller bearing nn Low starting torque nn Marine nn Hoist/crane duty nn Fumex (smoke extraction) nn plus many more W Range The Brook Crompton W motor range is a high quality, high variant product with outputs from 0.07kW to 400kW in frame sizes 80 to 355L (for cast iron range) and WU-DA63S to WU-DA180L (aluminium range). They are suitable for use within a diverse range of applications from food and drink, china clay production to water and sewage. From roller table drives to refrigeration. Many applications often have adverse operating conditions including repeated starting and occasional overloading; the ‘W’ range is well suited to these situations. A virtual “go anywhere” motor that has a full three year guarantee. Some of the benefits of aluminium over cast iron, include, high resistance to corrosion and atmospheric attack (except chlorine, salt-laden or sulphuric acid) and the fact that aluminium is approximately one third the weight of cast iron. The clear choice for the UK Multi-Mount... By simply changing the position of the feet, the user is able to obtain right, left or top mounted terminal box positions and by removing the standard endshield you can change it for a flange or face version. Brook Crompton Motors
  • 77.
    69 Visit us atwww.eriks.co.uk Power Transmission FM:3 Series Motors Premium Efficiency (IE3) Motors Built to exacting standards the FM:3 range offers a rugged, feature packed design delivering an energy efficient, robust solution. Designed to give the user both operational excellence and a lower Total Cost of Ownership throughout its life cycle. nn 60 to 315 frame all multi-mount design nn All motors fitted with thermistors terminated in the terminal box nn High quality 63 series bearings from major European manufacturers nn Re-greaseable bearings on 180 frame and above with button type grease nipple nn Drive end bearings fixed nn Two external earth fixings on all frames nn Spring lip seals standard on both drive end and none drive end nn B14 and B5 flanges are fitted with lip seals for use on wet gearboxes nn Large Terminal box with two cable entries nn Symmetrical design allowing the terminal box to be moved towards the fan cowl nn Two lifting eye bolts that are moveable Options Available nn Electro-mechanical Brake Kits nn Encoders for speed and positional feedback nn Force Ventilation Fan kits for wide speed range operation with inverter control nn Rain Canopies for vertical, shaft down mounting nn Bearing changes to suit different applications and moutning arrangements Efficiency Built-In as Standard A large building products manufacturer recognised the demand electric motors put on their electrical energy consumption and set about taking steps to tackle the issue. Total cost of ownership has now become the deciding factor for their choice of electric motors and the Fenner FM:3 IE3 range ticks all the boxes when it comes to energy efficiency and TCO. On a 37kW motor installation that had failed it was calculated that the existing EFF2 machine would consume over 1.84 million kW hours over a 10 year period which equated to 988 tonnes of CO2 emissions. The same application fitted with a Fenner IE3 motor would use 1.76 million kW hours, a saving of 80,000 kW hours and therefore a significant reduction in running cost over it’s life cycle with the Fenner IE3 motor also reducing CO2 emissions by 43 tonnes to 945. With the added benefit of qualification for the UK Enhanced Capital Allowance scheme and the realization of the scrap value of the existing motor the payback period for choosing Fenner IE3 over lower efficiency options was less than 6 months. IEC 60034-30 International Efficiency Code EFF1 EFF2 EFF3 IE4 IE3 IE2 IE1 0.75 - 375kW 1000v 2, 4 6 pole Efficiency Standards Electric Motors
  • 78.
    70 Specialist Technical Centres Know-How Power Transmission CALL:0845 006 6000 to contact your local workshop VISIT: ERIKS.CO.UK REPAIR OR REPLACE? CALCULATING THE COST When a motor fails, the priority is to get production back online – and that is always ERIKS’ priority too. But either at the time of failure or later, ERIKS know-how and the ERIKS Total Cost of Ownership (TCO) online calculator can help you decide whether you have more options for a longer-term, added value solution TOTAL COST OF OWNERSHIP The calculator uses basic data about your current motor and application: n Existing motor efficiency grade n Motor power and speed n Annual operation hours n Motor running load n Type of failure From this the Total Cost of Ownership tool calculates a number of factors including: n Annual running cost n Carbon footprint (CO2 tonnes/annum) n Energy usage (kWh) It then extrapolates these figures to provide the cost – over any term from one year to twenty – of repairing and running the existing motor, and of replacing it with a minimum efficiency, or premium efficiency motor. The calculation even takes into account the Enhanced Capital Allowance claim value and the end-of-life scrap value, to give you a set of figures to help you make a fully-informed repair, replace or upgrade decision.
  • 79.
    71 Visit us atwww.eriks.co.uk Power Transmission Inverters Optional LED or OLED (IP55 IP66) DIN Rail Mount (IP20) Cable Management High Quality Long-life Fans Convenient Help Card Pluggable Terminals + QD:Neo Inverters Constant Torque 0.75kW - 200kW Fenner QD:Neo offers the perfect combination of high performance and ease of use, providing a solid solution for even the most demanding applications. Fenner QD:Neo is suitable for use with both standard induction and permanent magnet motors. High Performance nn Sensorless Vector Control: nn Up to 200% torque from 0 speed ensures reliable starting and accurate speed control nn PM Motor Control future proof: nn Can be upgraded to the latest high efficiency permanent magnet motors nn I/O Communications: Fenner QD:Neo supports a wide range of machine control systems interfaces Key Features nn Just 14 basic parameters nn Pluggable control terminals nn Internal RFI filter complies with the latest EMC standards nn Up to 32kHz Output Switching Frequency gives ultra quiet motor operation nn Integral Brake Transistor nn Modbus and CANopen as standard nn IP20, IP55 IP66 enclosures nn Bluetooth compatible Q-Stick for fast, accurate repeat programming Applications nn Cranes nn Compressors nn Winding nn Mixers nn Packaging nn Conveyors nn Hoists nn Extruders nn Crushers nn Cutting Safe Torque Off Function The Fenner QD:Neo features a safe torque off function, as standard, to allow simple integration into machine critical safety circuits. nn Faster shut down and reset procedures reduce system maintenance time nn Better safety standard compared to mechanical solution nn Better motor connection, single cable with no interruption
  • 80.
    72 Specialist Technical Centres Know-How Power Transmission 72Inverters Optional LED or OLED (IP55 IP66) Spin Start Hand Auto Belt Break Detection Bluetooth Q:Stick Programming + High Quality Long-life Fans QD:Flow Inverters Variable Torque 0.75kW - 200kW The Fenner QD:Flow sets a new standard for dedicated fan and pump control whilst retaining the ease of use you come to expect from Fenner inverters. Fenner QD:Flow has an innovative design, combined with robust performance to provide powerful flow control and reliability in a compact drive. Designed for HVAC nn Energy optimisation nn Energy monitoring nn Built in pump cascade control nn Multiple fan operation nn Resonance avoidance Key Features nn 14 basic parameters nn Internal RFI filter nn Belt brake detection nn Anti-ragging function nn Fire-mode nn Spin start nn Bypass mode nn BACnet and Modbus RTU as standard nn Maintenance interval timer nn Multi-language OLED display nn Intelligent standby Dedicated to optimising efficiency The Fenner QD:Flow has been designed to optimise efficiency in pumping and HVAC systems. nn Multiple fan operation nn Fire override mode nn Stairwell pressurisation nn PID Control Applications nn Industrial nn Domestic nn Airports nn Hospitals nn Kitchens nn Offices nn Hotels nn Conference Centres nn Swimming Pools nn Additional Buildings
  • 81.
    73 Visit us atwww.eriks.co.uk Power Transmission QD:Evo Inverters Easy to Use 0.37kW - 11.0kW The Fenner QD:Evo is a value packed basic drive ideally suited for low power applications that require “best in class” purchase value. Operating from a small space-saving envelope the QD:Evo is fast to set up, simple to use and suitable for most applications. High Performance nn Easy to install nn Simple keypad control nn 50°C ambient rating for hot, tough applications nn Free lifetime technical support nn Energy optimisng function Key Features nn Simple commissioning, 12 basic parameter settings, default settings suitable for most applications nn Internal RFI filter for full EMC compliance nn Modbus RTU allows easy integration with your control and monitoring systems nn Compact enclosures help minimise your space requirements nn Brake chopper on sizes 2 3, dynamic and compact options with heatsink mounted resistor. nn High overload capacity, 150% overload for 60 seconds and 170% overload for 2 seconds Applications nn Cranes nn Compressors nn Winding nn Mixers nn Packaging nn Conveyors nn Hoists nn Extruders nn Crushers nn Cutting Q-Stick for fast programming For fast, accurate repeat programming. nn Upload/download buttons allow for fast copying of parameters between drives nn Infra-red and bluetooth communications capability provides remote control convenience nn Can be programmed by PDA/smart phone Q:Stick Programming DIN Rail Mount (IP20) Optional Braking Resistor EMC Varistor Disconnect Convenient Help Card Need Sah to check
  • 82.
    74 Specialist Technical Centres Know-How Power Transmission Taper-Grip ™ Bushes Theunique Taper-Grip bush locking system allows Fenner SMSRs to be secured to the driven shaft overcoming the difficulties that can be experienced with other methods of mounting – particularly in corrosive environments. Transmits 300% more torque and accommodates shaft tolerance to h11. nn Resistant to fretting corrosion nn Allows easy removal of gear unit nn Wide selection of metric and imperial bush sizes available nn Requires no key SMSR PowerPLUS Shaft Mounted Speed Reducer Precision gearing with increased face width allows the Power PLUS range of SMSR units to operate within smaller gear cases than many of its rivals. The modular cases design allows the unit to be mounted in a number of ways. nn Compact design – reduced gear case size nn Modular case design, variety of mounting options nn Easy-fit, up-rated Taper-Grip bush option nn Easy fit backstops available nn Comprehensive output speeds available with a simple Fenner belt drive. nn Extended manufacturer’s warranty nn Quick and simple upgrade nn New extra sizes in the range nn Quicker installation and removal, no keyways nn Flange mounting holes machined on both faces as standard nn Full mounting flexibility for any application Available in nn Power ratings up to 250kW/ 44,000Nm nn Ratio range; 5:1, 13:1 and 25:1 The Fenner SMSR excels in harsh environments such as quarries and as such is used extensively across a wide range of applications in arduous environments worldwide. The UK’s leading shaft mounted drive gives you a 50% increase in power-to-weight ratio for a compact drive solution. 50% Better, 100% Fenner Speed Reducers and Gearboxes
  • 83.
    75 Visit us atwww.eriks.co.uk Power Transmission Fenner Cyclo Basic dimensions (All dimensions are in mm) Size Shaft ø Shaft length Footprint Shaft height 606 14 (k6) 30 60 x 120 80 607 20 (k6) 40 60 x 120 80 608 25 (k6) 50 75 x 120 90 609 25 (k6) 50 90 x 150 100 610 30 (k6) 60 90 x 150 100 611 35 (k6) 70 90 x 150 120 612 35 (k6) 70 115 x 190 120 613 50 (k6) 100 145 x 290 150 614 50 (k6) 100 145 x 290 150 616 60 (h6) 90 150 x 370 160 614 70 (h6) 90 275 x 380 200 618 80 (h6) 110 320 x 420 220 619 95 (h6) 135 380 x 480 250 Fenner Series W Basic dimensions (All dimensions are in mm) Size Centres Standard Base to Footprint Flange bore centre options 740 25 11 35 34 x 45 75 741 30 14 40 44 x 54 80 742 40 18 50 60 x 70 110 742 40 18 50 60 x 70 120 742 40 18 50 60 x 70 140 743 50 25 60 70 x 80 125 743 50 25 60 70 x 80 145 743 50 25 60 70 x 80 160 744 63 25 72 85 x 100 160 744 63 25 72 85 x 100 180 744 63 25 72 85 x 100 200 745 75 28 86 90 x 120 160 745 75 28 86 90 x 120 200 746 90 35 103 100 x 140 200 746 90 35 103 100 x 140 210 746 90 35 103 100 x 140 250 747 105 42 127.5 115 x 170 280 749 130 45 147.5 120 x 200 320 A modern modular designed aluminium worm box available in a vast range of sizes and ratios for cost-effective solutions. nn Dimensionally interchangeable with the market leaders nn Versatile mounting nn Excellent mechanical strength whilst being especially lightweight nn Accepts standard IEC electric motors The revolutionary design of the Cyclo discs offers smooth and silent operation and excellent resistance to overloads. Extremely high ratios can be achieved within a very small envelope offering high efficiency in a very compact package. nn High overload capacity up to 500% and high efficiency, even at high reduction ratios nn Compact size and reduced noise level nn High reliability with 2 years warranty nn Exceptional life compared to other types of gearing Cyclo Cyclodial Gearbox Series W Worm Gearbox Fenner Gearboxes
  • 84.
    76 Specialist Technical Centres Know-How Power Transmission 76 FennerSeries M Basic dimensions (All dimensions are in mm) Size Shaft ø Shaft length Footprint Shaft height 860 20 (k6) 40 110 x 110 75 801 25 (k6) 50 130 x 110 90 861 25 (k6) 50 130 x 110 90 802 30 (k6) 60 165 x 135 115 862 35 (k6) 70 165 x 135 115 803 35 (k6) 70 195 x 150 130 863 40 (k6) 80 205 x 170 140 864 50 (k6) 100 260 x 215 180 865 60 (m6) 120 310 x 250 225 866 70 (m6) 140 370 x 290 250 867 90 (m6) 170 410 x 340 265 Fenner Series C Basic dimensions (All dimensions are in mm) Size Standard Alternate Shaft Footprint* Flange bore bore height* ø 870 20 H7 NA 80 90 x 63 120/160 871 30 H7 25 H7 100 100 x 80 160 872 35 H7 30 H7 110 110 x 100 200 873 45 H7 40 H7 130 130 x 130 200 874 60 H7 50 H7 180 150 x 100 250 875 70 H7 60 H7 225 200 x 120 350 876 90 H7 70 H7 280 250 x 135 450 877 100 H7 80 H7 335 300 x 150 450 Modern design techniques and high quality components enable the Fenner® Series C helical worm gear unit to outperform any other Gearbox in terms of lowest cost/Nm. The Series C right angle range provides a highly efficient and compact solution to meet most requirements. nn Right angled nn Up to 10,000Nm nn 8:1 to 60,000:1 ratios nn Foot, flange or shaft mounting nn DryFit, sealed gear-head nn Standard IEC motor connection *These dimensions include additional mounting feet not supplied with the standard unit but available as an accessory on sizes 870, 871, 872 and 873. The innovative Fenner® Series M Coaxial Gearbox is the culmination of many years of expertise. Designed to be utilised in a wide variety of situations it combines high load carrying capacity with high efficiency and reliability and is manufactured using the highest quality materials and components. nn In-Line nn Up to 11,000Nm nn 5:1 to 16,200:1 ratios nn Foot or flange mounting nn DryFit, sealed gear-head nn Standard IEC motor connection Series M Coaxial Gearbox Series C Helical Worm Gearbox Fenner Gearboxes Gearboxes
  • 85.
    77 Visit us atwww.eriks.co.uk Power Transmission Fenner Series K Basic dimensions (All dimensions are in mm) Size Shaft ø Shaft length Footprint Shaft height 890 30 180 110 x 100 100 891 35 200 130 x 120 112 892 40 250 130 x 130 132 893 40 250 120 x 140 140 894 50 300 150 x 165 180 895 60 350 180 x 180 212 896 70 450 240 x 240 265 897 80 450 280 x 270 315 898 100 450 350 x 330 375 Fenner Series F Basic dimensions (All dimensions are in mm) Size Bore ø Shaft* Off-set Torque Flange restraint options 780 25 – 96 ø15 – 140mm* 160 781 30 25 x 47 121 ø15 – 158mm* 160 782 35 30 x 56 121 ø15 – 170mm* 160 783 40 35 x 66 144 ø15 – 198mm* 250 784 40 40 x 76 165 ø15 – 218mm* 250 785 50 50 x 95 200 ø24 – 278mm* 300 786 60 60 x 114 243 ø24 – 346mm* 350 787 70 70 x 135 274 ø27 – 395mm* 450 788 80 90 x 172 332 ø27 – 485mm* 450 789 90 90 x 170 385 ø26 – 485mm* 550 790 100 110 x 210 414 ø33 – 550mm* 650 The newly improved Fenner® Series F range is primarily designed as a shaft mounted unit incorporating an integral torque reaction bracket. This compact range of parallel shaft mounted geared motors and speed reducers offer high efficiency and interchangeability with other leading brands. nn Parallel off-set nn Up to 16,500Nm nn 4.5:1 to 5,700:1 ratios nn Flange or shaft mounting nn DryFit, sealed gear-head nn Standard IEC motor connection The Series K range incorporates all Fenner’s core design features in a highly efficient yet flexible bevel helical drive. With high load carrying capabilities and increased efficiency over worm units, the right angled Series K range is proven to save energy and reduce running costs. nn Right angled nn Up to 12,300Nm nn 8:1 to 36,000:1 ratios nn Foot, flange or shaft mounting nn DryFit, sealed gear-head nn Standard IEC motor connection Series F Helical Gearbox Series K Helical Bevel Gearbox * From centre
  • 86.
    78 Specialist Technical Centres Know-How Power Transmission MVSSStainless Steel Electric Vibrator MVCC DC Electric Vibrator it lole in  all neac Vibrator VHE5 Eternal Hydralic Vibrator  rbine neac Vibrator Vibrators wit in centres to sit alternae aes MVSI-R olised Alini Electric Vibrator  neac Vibrator VIBRATECHNIQUES LTD 20 Cecil asley ay, Sorea Airport, Sorea by Sea, est Ssse. N43 5 elepone: 01274 430977 a: 01273 430978 Eail: sales@ibtec.co eb: www.ibtec.co T U    78 Vibration Solutions
  • 87.
    FLUID POWER, TRANSFER ANDCONTROL Why should you partner with ERIKS? One compelling reason is that we offer you fast, cost-effective access to an extensive range of world-leading brands. But this is far from all. Our exceptional product know-how, coupled with our range of in-house application engineers, means that we are ideally positioned to provide solutions based on a true understanding of your needs. Solutions which make a real difference to your business. Pneumatics Compact Cylinders 83 Push-in Fittings 84-85 Air Preparation 86-87 Valves 88-91 Cylinders and Actuators 93 Suction Cups 95 Safety Valves 96-97 Vacuum Pumps 98 Hydraulics Hydraulics Course 100 Lifeguard Sleeves 101 Self Assembly Starter Kits 102 High Pressure Hoses and Couplings 103-104 Hose Assemblies and Components 105 Components and Fittings 106-108 EMB Fittings 108 Adaptors 109-110 Hydraulic Accessories 111-112 Oil Transfer Units 113 Ball Valves 114 Bladder Accumulators 115 Hydraulic Valves and Cylinders 116-119 Repair, Replace Solutions 120-122 Filtration Fluid Filters 124-125 Water Filters 125-126 Panel and Bag Filter 128-129 Fluid Level Gauges 130-131 Filtration Solutions 133 Industrial Hoses Commodity Hose and Clips 136-137 Metal Hose 138-139 Camlocks and Bellows 140-141 Rubber Hose 142 Steam Hose 143 Food and Beverage Hose 144 Chemical and Pharmaceutical Hose 145 Industrial Hose Reels and Cable Reels 146 Quick Product Reference 126-127 89-9182-88 100-105, 108 130-131 113,124-125 95, 98 133 138-139, 142-144 146 92-94 115-119 106-107, 120 96-97 128-129 79 Quick reference Visit us at eriks-techdirect.co.uk
  • 88.
    80 FLUID POWER, TRANSFER ANDCONTROL ERIKS technical expertise and product knowledge, together with strong partnerships with the leading names in Fluid Power, Transfer and Control means we can offer you the right solution for your application, regardless of manufacturer or brand. We also take a holistic approach to your problems, which looks beyond the products to the process, the application and the project as a whole. The result is the most cost-effective, most reliable solution. Compressed Air Savings Programme A systematic approach to compressed air management could result in significant cost savings - up to 70% „„ Compressed air audits „„ Design, build and installation „„ On-site oil sampling and analysis „„ Commodity management „„ Hydraulic repairs „„ Hose assemblies Specialist Technical Centres Know-How
  • 89.
    FLUID POWER, TRANSFER ANDCONTROL 81 PNEUMATICS As the UK’s largest distributor of pneumatic products, we stock a comprehensive range, and real-time visibility, from the world’s leading manufacturers. Our application know-how means we can supply complete solutions, giving us the ability to configure parts and provide modular assembled products – enabling cost effective customisation to your requirements. „„ Control valves and actuators „„ Air preparation equipment „„ Push-in and compression fittings „„ Compression fittings „„ Quick Release Couplings HYDRAULICS At ERIKS we have the skills and services to help you ensure your hydraulic systems and equipment are always running at optimum efficiency. Visit us at eriks-techdirect.co.uk INDUSTRIAL HOSE As one of the UK’s leading Industrial Hose specialists, our technical Know-how is relied upon to solve a wide range of challenges that our customers face across all industries. Our team of in-house technical specialists can provide you with support to help you select the correct hose specification for your application. „„ Wide range of hoses from Metallic to Silicone „„ Bellows and fittings „„ Pre-manufactured assemblies „„ Hose testing and management „„ Hose tagging Whatever you’re looking for, from a single product, through repair and refurbishment services, to end-to-end system design, build and commissioning, you’ll find our ability to meet your needs is second to none.. „„ Directional Control Valves, Compression Fitting and Adaptors „„ Hose, Couplings and Crimpers „„ OE Kitting Solutions „„ 2-3 Way Ball Valves FILTRATION Whether you need clean compressed air to separate oil from water, or remove solid particulate from a chemical or other fluid, ERIKS has the solution. And if we don’t we’ll design one. „„ Hydraulic / Air / Process Filtration „„ Dust and fume control „„ Purifier equipment „„ Monitoring equipment
  • 90.
    YOUR FLUID POWER SOLUTION Call us todayon: 0845 006 6000 www.eriks.co.uk/flexion YOUR FLUID POWER SOLUTION FOR: · HYDRAULICS · PNEUMATICS · CUSTOMISED SOLUTIONS · ENGINEERED SYSTEMS · CONTAMINATION MONITORING FLEXION DELIVERS A WIDE RANGE OF FLUID POWER PRODUCTS AND SERVICES THAT OFFER VALUE TO DESIGN AND MAINTENANCE ENGINEERS, BOTH IN TERMS OF PERFORMANCE AND COST THE FLEXION RANGE GIVES YOU: • Access to proven Fluid Power solutions and customisation • Dedicated Fluid Power application and technical support • Engineering products that exceed international standards • Effective product development through shared knowledge • Proven track record in providing Fluid Power solutions Untitled-1 1 16/06/2015 12:07:18 Flexion
  • 91.
    Visit us ateriks-techdirect.co.uk FluidPower 83Compact Cylinders Compact Cylinders 16mm Bore Part No Stroke (mm) EPC16-5CFDA-FX 5 EPC16-10CFDA-FX 10 EPC16-10CFDA-FX 15 EPC16-20CFDA-FX 20 EPC16-25CFDA-FX 25 20mm Bore Part No Stroke (mm) EPC20-5CFDA-FX 5 EPC20-10CFDA-FX 10 EPC20-15CFDA-FX 15 EPC20-20CFDA-FX 20 EPC20-25CFDA-FX 25 25mm Bore Part No Stroke (mm) EPC25-5CFDA-FX 5 EPC25-10CFDA-FX 10 EPC25-15CFDA-FX 15 EPC25-20CFDA-FX 20 EPC25-25CFDA-FX 25 EPC25-30CFDA-FX 30 EPC25-40CFDA-FX 40 EPC25-50CFDA-FX 50 32mm Bore Part No Stroke (mm) EPC32-10CFDA-FX 10 EPC32-20CFDA-FX 20 EPC32-25CFDA-FX 25 EPC32-30CFDA-FX 30 EPC32-40CFDA-FX 40 EPC32-50CFDA-FX 50 40mm Bore Part No Stroke (mm) EPC40-10CFDA-FX 10 EPC40-20CFDA-FX 20 EPC40-25CFDA-FX 25 EPC40-30CFDA-FX 30 EPC40-40CFDA-FX 40 EPC40-50CFDA-FX 50 50mm Bore Part No Stroke (mm) EPC50-10CFDA-FX 10 EPC50-20CFDA-FX 20 EPC50-25CFDA-FX 25 EPC50-30CFDA-FX 30 EPC50-40CFDA-FX 40 EPC50-50CFDA-FX 50 63mm Bore Part No Stroke (mm) EPC63-10CFDA-FX 10 EPC63-20CFDA-FX 20 EPC63-25CFDA-FX 25 EPC63-30CFDA-FX 30 EPC63-40CFDA-FX 40 EPC63-50CFDA-FX 50 80mm Bore Part No Stroke (mm) EPC80-10CFDA-FX 10 EPC80-20CFDA-FX 20 EPC80-25CFDA-FX 25 EPC80-40CFDA-FX 40 EPC80-50CFDA-FX 50 EPC80-80CFDA-FX 80 EPC80-100CFDA-FX 100 100mm Bore Part No Stroke (mm) EPC100-10CFDA-FX 10 EPC100-20CFDA-FX 20 EPC100-25CFDA-FX 25 EPC100-40CFDA-FX 40 EPC100-50CFDA-FX 50 EPC100-80CFDA-FX 80 EPC100-100CFDA-FX 100 Constant ERIKS Pneumatic Cylinder Constant C – Compact F – Female Piston Rod Thread DA – Double Acting 16, 20, 25, 32, 40, 50, 63, 80, 100 Bore Size (mm) 5, 10, 15, 20, 25, 30, 40, 50, 80, 100 Stroke (mm) Max Stroke 100 FLEXION™ Compact cylinders conform to UNITOP standards (16mm bore), or ISO 21287 (20mm–100mm). The profile of the body is designed to use the same sensors as the existing cylinders in the FLEXION™ range, simplifying stock requirements. 32mm to 100mm bore cylinders have the same fixing centres as the ISO 15552 range of cylinders, making the cylinder mounting accessories interchangeable. Equipped with elastomer cushions to increase cylinder life and reduce noise levels, the FLEXION™ compact cylinder is the ideal choice of actuator where space is limited, with overall body lengths up to 60% shorter than an ISO 15552 equivalent. EPC CFDA FX- - Constant Constant Constant FLEXION Brand FLEXION™ ISO 21287 COMPACT CYLINDERS 16-100MM BORE
  • 92.
    Specialist Technical Centres Know-How FluidPower 84 FLEXION™Stainless steel fittings are manufactured to the highest quality standards to ensure they provide you with increased performance and extended reliability when used in aggressive environments or when in contact with corrosive fluids. Typical industry applications include: chemical, food, printing, marine and pharmaceutical industries. Push-in Fittings nn Simple and quick to install nn Flexible space-saving design nn Wide range to suit all applications nn Compatible with all other leading systems nn Tubing can be freely rotated, even after installation nn All taper threads are pre-coated with PTFE Push-in Fittings Male Stud Taper Code Tube OD Thread Size SSPC4-M5-FX 4 M5 SSPC4-G01-FX 4 G1/8 SSPC6-G01-FX 6 G1/8 SSPC6-G02-FX 6 G1/4 SSPC8-G01-FX 8 G1/8 SSPC8-G02-FX 8 G1/4 SSPC10-G02-FX 10 G1/4 SSPC10-G03-FX 10 G3/8 Code Tube OD Thread Size SSPC4-01-FX 4 R1/8 SSPC4-02-FX 4 R1/4 SSPC6-01-FX 6 R1/8 SSPC6-02-FX 6 R1/4 SSPC8-01-FX 8 R1/8 SSPC8-02-FX 8 R1/4 SSPC10-02-FX 10 R1/4 SSPC10-03-FX 10 R3/8 SSPC12-03-FX 12 R3/8 SSPC12-04-FX 12 R1/2 Male Stud Parallel Technical Data Tube sizes 4 - 12mm Threads 1/8” - 1/2”, BSPT Max Pressure 15 bar Vacuum Up to 750mmHg Temp Range -20°C to +150°C Materials: Body: Stainless Steel AISI 316 Seal: Viton (FPM) Grab Ring: Stainless Steel Release Release Collet: Stainless Steel AISI 316 FLEXION™ STAINLESS STEEL PUSH-IN FITTINGS Thousands of products available to order on ERIKS WEBSHOP SHOP.ERIKS.CO.UK SHOP.ERIKS .CO.UKSHOP .ERIKS.CO.UK
  • 93.
    Visit us ateriks-techdirect.co.uk FluidPower 85 Male Swivel Elbow Parallel Code Tube OD Thread Size SSPL4-M5-FX 4 M5 SSPL4-G01-FX 4 G1/8 SSPL6-G01-FX 6 G1/8 SSPL6-G02-FX 6 G1/4 SSPL8-G01-FX 8 G1/8 SSPL8-G02-FX 8 G1/4 SSPL10-G02-FX 10 G1/4 SSPL10-G03-FX 10 G3/8 Male Swivel Elbow Taper Code Tube OD Thread Size SSPLN4-G01-FX 4 G1/8 SSPLN6-G01-FX 6 G1/8 SSPLN6-G02-FX 6 G1/4 SSPLN8-G01-FX 8 G1/8 SSPLN8-G02-FX 8 G1/4 SSPLN10-G02-FX 10 G1/4 Code Tube OD Thread Size SSPL4-01-FX 4 R1/8 SSPL6-01-FX 6 R1/8 SSPL6-02-FX 6 R1/4 SSPL8-01-FX 8 R1/8 SSPL8-02-FX 8 R1/4 SSPL10-02-FX 10 R1/4 SSPL10-03-FX 10 R3/8 SSPL12-03-FX 12 R3/8 SSPL12-04-FX 12 R1/2 SSPC12-04-FX 12 R1/2 Male Tee Parallel Code Tube OD Thread Size SSPB4-G01-FX 4 G1/8 SSPB6-G01-FX 6 G1/8 SSPB6-G02-FX 6 G1/4 SSPB8-G01-FX 8 G1/8 SSPB8-G02-FX 8 G1/4 Male Elbow Parallel Male Tee Taper Code Tube OD Thread Size SSPB4-01-FX 4 R1/8 SSPB6-01-FX 6 R1/8 SSPB6-02-FX 6 R1/4 SSPB8-01-FX 8 R1/8 SSPB8-02-FX 8 R1/4 SSPB10-02-FX 10 R1/4 SSPB10-03-FX 10 R3/8 Elbow Union Code Tube OD SSPU4-FX 4 SSPU6-FX 6 SSPU8-FX 8 SSPU10-FX 10 SSPU12-FX 12 Tee Code Tube Size SSPE4-FX 4 SSPE6-FX 6 SSPE8-FX 8 SSPE10-FX 10 SSPE12-FX 12 Straight Union Code Tube OD SSPV4-FX 4 SSPV6-FX 6 SSPV8-FX 8 SSPV10-FX 10 SSPV12-FX 12 Bulkhead Code Tube Size SSPM4-FX 4 SSPM6-FX 6 SSPM8-FX 8 SSPM10-FX 10 SSPM12-FX 12 Flow Regulator Code Tube OD Stem Size SSPGJ6-4-FX 4 6 SSPGJ8-6-FX 6 8 SSPGJ10-8-FX 8 10 Code Tube OD Thread Size SSL4-G01-FX 4 G1/8 SSL6-G01-FX 6 G1/8 SSL6-G02-FX 6 G1/4 SSL8-G01-FX 8 G1/8 SSL8-G02-FX 8 G1/4 SSL10-G02-FX 10 G1/4 SSL10-G03-FX 10 G3/8 SSL4-G01B-FX 4 G1/8 Stem Reducer Code Tube OD Thread Size SSL6-G01B-FX 6 G1/8 SSL6-G02B-FX 6 G1/4 SSL8-G01B-FX 8 G1/8 SSL8-G02B-FX 8 G1/4 SSL10-G02B-FX 10 G1/4 SSL10-G03B-FX 10 G3/8
  • 94.
    Specialist Technical Centres Know-How FluidPower 86 AirPreparation Air Preparation The FLEXION™ range of FRL equipment has been selected to give the optimum price versus performance ratio. With the bodies manufactured from technopolymers, these units are extremely light, but still offer rugged, robust performance. As standard, all the bowls have an outer protection, and the bowls themselves are manufactured from polyamide, giving significantly better resistance to crazing than the more commonly used polycarbonate type. The FLEXION™ ranges also have the automatic filling lubricator option, refilling the lubricator quickly and easily “on-line” saving time and money. FLEXION™ AIR PREPARATION Code Bar Description EPA-R-1/2M-08-FX 8 Bar Modular Code Description EPA-L-1/2M-M-FX Modular, Standard Fill EPA-L-1/2M-A-FX Modular, Automatic Fill Code Bar Description EPA-F-1/2M-M-FX 20µ Drain Modular, Manual Drain EPA-F-1/2M-A-FX 20µ Drain Modular, Auto Drain Code Bar Filtration Description Microns EPA-FR-1/2M-M-FX 8 Bar 20µ Modular, Manual Drain EPA-FR-1/2M-A-FX 8 Bar 20µ Modular, Auto Drain Code Filtration Description Microns EPA-MF-1/2M-A-FX 0.01µ Modular, Auto Drain EPA-MF-1/2M-M-FX 0.01µ Modular, Manual Drain 1/2” range Regulator 1/2” range Lubricator 1/2” range Filter 1/2” range Filter Regulator 1/2” range Microfilter
  • 95.
    Visit us ateriks-techdirect.co.uk FluidPower 87 Code Bar Description EPA-SV-1/2M-FX Lockable, Modular For suitable silencer use SLNCR-B-STD-1/4-FX Code Description EPA-SS-1/2M Soft Start Code Description EPA-MTGRING-1/2-RX Neck Mounting Ring Code Description EPA-CK-1/2M-FX Modular Assembly Unit Code Description EPA-TO-1/2M-FX Intermediate Take Off Block Code Description EPA-SVE-1/2M-FX Modular EPA-SVE-SOL-24VDC-FX Solenoid Operator, 24V DC EPA-SVE-SOL-110VAC-FX Solenoid Operator, 110V AC EPA-SVE-SOL-230VAC-FX Solenoid Operator, 230V AC For suitable silencer use SLNCR-B-STD-1/4-FX 1/2” range Manual Shut Off Valve 1/2” range Soft Start 1/2” range Neck Mounting Ring 1/2” range Modular Assembly Unitt 1/2” range Intermediate Take-Off Block 1/2” range Electrical Shut Off Valve Code Bar Filtration Description Microns EPA-FRL-1/2M-M-FX 8 Bar 20µ Modular, Manual Drain EPA-FRL-1/2M-A-FX 8 Bar 20µ Modular, Auto Drain Code Bar Filtration Description Microns EPA-FRL-1/2M-M-FX 8 Bar 20µ Modular, Manual Drain EPA-FRL-1/2M-A-FX 8 Bar 20µ Modular, Auto Drain For suitable silencer for shut off valve use SLNCR-B-STD-1/4-FX 1/2” range Filter Regulator / Lubricator 1/2” range Filter / Regulator / Lubricator with Shut Off Valve
  • 96.
    Specialist Technical Centres Know-How FluidPower 88 Product Part No Description Size Operator EPVP-5/2-ISO1-SP W89A-50541 Pneu Valve 5/2 Single Pilot ISO1 ISO 1 Pilot EPVP-5/2-ISO1-DP W89A-50542 Pneu Valve 5/2 Double Pilot ISO1 ISO 1 Pilot / Pilot EPVP-5/3-ISO1-CC W89A-50543 Pneu Valve 5/3 Pilot Centre Closed ISO1 ISO 1 Pilot / Pilot EPVP-5/3-ISO1-CE W89A-50544 Pneu Valve 5/3 Pilot Centre Exh ISO1 ISO 1 Pilot / Pilot EPVP-5/3-ISO1-CP W89A-50549 Pneu Valve 5/3 Pilot Centre Press ISO1 ISO 1 Pilot / Pilot EPVS-5/2-ISO1-SS W89A-50550 Pneu Valve 5/2 Single Sol ISO1 ISO 1 Solenoid EPVS-5/2-ISO1-DS W89A-50551 Pneu Valve 5/2 Double Sol ISO1 ISO 1 Solenoid / Solenoid EPVS-5/3-ISO1-CC W89A-50552 Pneu Valve 5/3 Sol Centre Closed ISO1 ISO 1 Solenoid / Solenoid EPVS-5/3-ISO1-CE W89A-50553 Pneu Valve 5/3 Sol Centre Exh ISO1 ISO 1 Solenoid / Solenoid EPVS-5/3-ISO1-CP W89A-50556 Pneu Valve 5/3 Sol Centre Press ISO1 ISO 1 Solenoid / Solenoid EPVP-5/2-ISO2-SP W89A-50545 Pneu Valve 5/2 Single Pilot ISO2 ISO 2 Pilot EPVP-5/2-ISO2-DP W89A-50546 Pneu Valve 5/2 Double Pilot ISO2 ISO 2 Pilot / Pilot EPVP-5/3-ISO2-CC W89A-50547 Pneu Valve 5/3 Pilot Centre Closed ISO2 ISO 2 Pilot / Pilot EPVP-5/3-ISO2-CE W89A-50548 Pneu Valve 5/3 Pilot Centre Exh ISO2 ISO 2 Pilot / Pilot EPVS-5/2-ISO2-SS W89A-50555 Pneu Valve 5/2 Single Sol ISO2 ISO 2 Solenoid EPVP-5/3-ISO2-CP W89A-50554 Pneu Valve 5/3 Pilot Centre Press ISO2 ISO 2 Solenoid / Solenoid EPVS-5/2-ISO2-DS W89A-50557 Pneu Valve 5/2 Double Sol ISO2 ISO 2 Solenoid / Solenoid EPVS-5/3-ISO2-CC W89A-50558 Pneu Valve 5/3 Sol Centre Closed ISO2 ISO 2 Solenoid / Solenoid EPVS-5/3-ISO2-CE W89A-50559 Pneu Valve 5/3 Sol Centre Exh ISO2 ISO 2 Solenoid / Solenoid EPVS-5/3-ISO2-CP W89A-50560 Pneu Valve 5/3 Sol Centre Press ISO2 ISO 2 Solenoid / Solenoid Manifolds Product Part No Description Size EPV-SBA1S W89A-50575 Pneu Valve Single sub-base ISO1 ISO 1 EPV-SBA1C W89A-50568 Pneu Valve Blank Manfld end plate ISO1 ISO 1 EPV-SBA1T W89A-50573 Pneu Valve Manfld blanking plate ISO1 ISO 1 EPV-SBA2T W89A-50574 Pneu Valve Manfld blanking plate ISO2 ISO 1 EPV-SBA1M W89A-50566 Pneu Valve Manfld sub-base ISO1 ISO 1 EPV-SBA1A W89A-50569 Pneu Valve Ported Manfld end plate ISO1 ISO 1 EPV-SBA2S W89A-50576 Pneu Valve Single sub-base ISO2 ISO 2 EPV-SBA2C W89A-50570 Pneu Valve Blank Manfld end plate ISO2 ISO 2 EPV-SBA1A2 W89A-50572 Pneu Valve I/face sub-base ISO1 to ISO2 ISO 2 EPV-SBA2M W89A-50567 Pneu Valve Manfld sub-base ISO2 ISO 2 EPV-SBA2A W89A-50571 Pneu Valve Ported Manfld end plate ISO2 ISO 2 Product Part No Description Size EPV-C-30MM-24VDC W89A-50561 Pneu Valve 24VDC Coil 30mm ISO 24vdc EPV-C-30MM-24VAC W89A-50562 Pneu Valve 24VAC Coil 30mm ISO 24vac EPV-C-30MM-110VAC W89A-50563 Pneu Valve 110VAC Coil 30mm ISO 110vac EPV-C-30MM-230VAC W89A-50564 Pneu Valve 230VAC Coil 30mm ISO 230vac Product Part No Description Size EPV-CSTD-30MM W89A-50565 30mm Din Conn, standard 12vdc - 240vac EPV-CNL24V-30MM W89A-50577 30mm Din Conn With LED+VDR, 24 V 24vdc EPV-CNL110V-30MM W89A-50578 30mm Din Conn With LED+VDR, 115 V 110-120vac EPV-CNL230V-30MM W89A-50579 30mm Din Conn With LED+VDR, 230 V 220-240vac ISO Valves The range of FLEXION™ ISO valves conform to the ISO 5599/1 standard, with sizes 1 and 2, solenoid and air pilot operation versions with 5/2 and 5/3 spools available. Fitted with CNOMO standard interface for the solenoid versions, this minimises installation space. They deliver high flow rates and are have a pressure rating of 10bar. The 30mm coils are rated at 2.5 watt for the DC option, and 2.5VA for the AC voltages ensuring these maintain suitability for replacing existing valves. Valves FLEXION™ ISO VALVES
  • 97.
    Visit us ateriks-techdirect.co.uk FluidPower 89Festo’s new robust “star” valve range Core pneumatics blue star products Festo core product range covers 80% of your automation tasks Worldwide: Always in stock Superb: Festo quality at an attractive price Fast: Next day delivery
  • 98.
    Specialist Technical Centres Know-How FluidPower 90 Angledsocket; screw terminal Type C, to fit 1/8 valve H 151687 Type B, to fot 1/4 valve H 34431 VUVS Individual Valve Range Robust valves for challenging environments Your first choice for simple, cost-effective pneumatic control Individual valves VUVS – flexible, modern, robust and durable quality. For up to 100% more flow with higher energy density. Proven technologies and materials. Comprehensive range of accessories. Numerous mounting options and easy operation. That is what today's valves should be! New: simplicity at an attractive price VUVS-LK...S In-line individual valve; internal pilot air supply; manual override; operating voltage 24V DC Port 2,4 Width (mm) 3/2-way valve; NC pneumatic spring 5/2-way valve; single solenoid pneumatic spring 5/2-way valve; double solenoid 5/3-way valve; centre closed 1/8 20 H 8043213 H 8043214 H 8043215 H 575268 1/4 25 - - - H 575525 nn Attractive price nn Robust design nn Festo quality nn High flow rate nn 24 hour delivery nn Pressure range up to 8 bar nn IP65 rated with socket nn Many more variants with additional features available Benefits Festo Industrial Valves
  • 99.
    Visit us ateriks-techdirect.co.uk FluidPower 91 Plug cable with sheath to open end, 2.5m length to fit H 566660 M8 cable, 3 pin to open end, 2.5m length to fit H 541338 New: essential features at an attractive price VUVG-LK...S In-line individual valve; internal pilot air supply; manual override; operating voltage 24V DC Port 2,4 Width (mm) 2 x 3/2 way valve; NC pneumatic spring 5/2 way valve; single solenoid; pneumatic spring 5/2 way valve; 5/3 way valve double solenoid 5/3 valve, centrefeed M5 10 H 8042538 H 8042542 H 8042539 H 8042543 H 8042540 H 8042544 H 577346 M7 10 H 8042546 H 8042550 H 8042547 H 8042551 H 8042548 H 8042552 H 574223 G1 /8 14 H 8042562 H 8042566 H 8042563 H 8042567 H 8042564 H 8042568 H 574231 VUVG Individual Valve Range Compact valves for machine automation Individual valves VUVG – for more power from a smaller design! Price attractive, impressive and installed in a flash. Perfect for all high-speed applications requiring a particularly high flow combined with a compact size, e.g. in small parts assembly and electronics industry or in the food and packaging industry. nn Attractive price nn Compact design nn Festo quality nn High flow rate nn 24 hour delivery nn Pressure range up to 8 bar nn IP65 rated (M8) nn Many more variants with additional features available Benefits
  • 100.
    Specialist Technical Centres Know-How FluidPower 92IMI Precision Engineering Engineering GREAT Solutions We help move man’s most marvellous machines Just imagine what else we could do for you… Visit: www.mostmarvellousmachines.com Actuators. Valves. Air Preparation. Fittings. Open. Push. Swing. Twist. Lift. Close. We’re ideas makers. Creators of motion. Applying our imagination to help you keep your machines moving, in everything from industrial automation to rail. Working with you, we help render your vision real. All the time keeping our eyes on swift service and smart support.
  • 101.
    Visit us ateriks-techdirect.co.uk FluidPower 93Cylinders and Actuators Introducing ISOLineTM Comprehensive range for the utmost versatility Cylinders and mountings that conform to ISO 15552 All sizes supplied magnetic as standard Polyurethane seals ensure efficient low friction operation and long life Introducing the IMI Norgren Adaptive Cushioning System (ACS) Our cushioning system will automatically adapt to an application without the need for any adjustment of the cushion screw. This removes the need for specialist knowledge for set-up and simplifies installation. Also, the ACS will adjust to any changes in the application, such as varying loads, which may occur over a cylinder cycle, a working shift or the life of the machine. This will help to ensure the application always runs efficiently and potentially extend the servicing period of the machine. For extreme applications involving high speeds or heavy loads, a cushion screw is included for manual adjustment if required. ISOLineTM P-PRA/802000 nn Ø32 -125mm nn Profile barrel nn Clean appearance nn Protection against ingress nn Flush mounted reed and solid state switches available for position sensing ISOLineTM R-RA/802000 nn Ø32 -125mm nn Robust construction nn Suitable for more aggressive environments nn Reed and solid state switches available for position sensing nn External tie rod construction Benefits nn Adaptive Cushioning System (ACS) - No cushioning setting required, cylinder auto-adapts to application - Fit Forget nn Improved performance - Operates at low pressures with very low leakage nn Wide range of applications - Heavy industrial to clean food beverage to rail and truck nn Modern appearance - Looks great - Smooth end covers contoured to barrel for easy cleaning nn Reduced weight - Lower overall weight of machine - Reduced transport costs nn Additional switch mounting - Great flexibility for machine designers 135 Visit us at eriks-techdirect.co.uk to find your local Service Centre PNEUMATICS H MOUNTINGS SWITCHES SIMPLE MODs AVAILABLE Generally Ex Stock M/50 series Ext’d piston rod (/IU), different rod thread, end caps turned Generally Ex Stock M/50 series plus bracket Ext’d piston rod (/IU), different rod thread, end caps turned Generally Ex Stock M/50 series plus bracket Ext’d piston rod (/IU), different rod thread Generally Ex Stock M/50 series plus bracket None Generally Ex Stock M/50 series plus bracket None Generally Ex Stock M/50 series plus bracket None Generally Ex Stock M/50 series None Generally Ex Stock M/50 series None Specify at time of enquiry M/50 series (up to 4) None Specify at time of enquiry N/A None Generally Ex Stock N/A None Generally Ex Stock M/50 series plus bracket None Generally Ex Stock M/50 series plus bracket None N/A N/A None Reliable, Tried and Trusted Product Ranges IMI Precision Engineering products have been proven over many years and in some of the most harshest and challenging environments. All IMI Precision Engineering products are backed by an industry leading 2-year warranty. Manufactured to the most exacting standards, the product ranges include names such as IMI Norgren, Pneufit, Enots, IMI Herion, Martonair, IMI Buschjost, Lintra Plus, Excelon, Olympian Plus and Fleetfit. Profile Tie Rod Description PRA/802032/M/25 RA/802032/M/25 32mm diameter, 25mm stroke, ISO15552 PRA/802032/M/50 RA/802032/M/50 32mm diameter, 50mm stroke, ISO15552 PRA/802032/M/80 RA/802032/M/80 32mm diameter, 80mm stroke, ISO15552 PRA/802032/M/100 RA/802032/M/100 32mm diameter, 100mm stroke, ISO15552 PRA/802032/M/125 RA/802032/M/125 32mm diameter, 125mm stroke, ISO15552 PRA/802032/M/160 RA/802032/M/160 32mm diameter, 160mm stroke, ISO15552 PRA/802032/M/200 RA/802032/M/200 32mm diameter, 200mm stroke, ISO15552 PRA/802040/M/25 RA/802040/M/25 40mm diameter, 25mm stroke, ISO15552 PRA/802040/M/50 RA/802040/M/50 40mm diameter, 50mm stroke, ISO15552 PRA/802040/M/80 RA/802040/M/80 40mm diameter, 80mm stroke, ISO15552 PRA/802040/M/100 RA/802040/M/100 40mm diameter, 100mm stroke, ISO15552 PRA/802040/M/125 RA/802040/M/125 40mm diameter, 125mm stroke, ISO15552 PRA/802040/M/160 RA/802040/M/160 40mm diameter, 160mm stroke, ISO15552 PRA/802040/M/200 RA/802040/M/200 40mm diameter, 200mm stroke, ISO15552 PRA/802050/M/25 RA/802050/M/25 50mm diameter, 25mm stroke, ISO15552 PRA/802050/M/500 RA/802050/M/50 50mm diameter, 500mm stroke, ISO15552 PRA/802050/MX/60 RA/802050/M/80 50mm diameter, 50mm stroke, ISO15552 PRA/802050/M/100 RA/802050/M/100 50mm diameter, 100mm stroke, ISO15552 PRA/802050/M/125 RA/802050/M/125 50mm diameter, 125mm stroke, ISO15552 PRA/802050/M/160 RA/802050/M/160 50mm diameter, 160mm stroke, ISO15552 PRA/802050/M/200 RA/802050/M/200 50mm diameter, 200mm stroke, ISO15552 PRA/802063/M/25 RA/802063/M/25 63mm diameter, 25mm stroke, ISO15552 PRA/802063/M/50 RA/802063/M/50 63mm diameter, 50mm stroke, ISO15552 PRA/802063/M/80 RA/802063/M/80 63mm diameter, 80mm stroke, ISO15552 PRA/802063/M/100 RA/802063/M/100 63mm diameter, 100mm stroke, ISO15552 PRA/802063/M/125 RA/802063/M/125 63mm diameter, 125mm stroke, ISO15552 PRA/802063/M/160 RA/802063/M/160 63mm diameter, 160mm stroke, ISO15552 PRA/802063/M/200 RA/802063/M/200 63mm diameter, 200mm stroke, ISO15552 PRA/802080/M/25 RA/802080/M/25 80mm diameter, 25mm stroke, ISO15552 PRA/802080/M/50 RA/802080/M/50 80mm diameter, 50mm stroke, ISO15552 PRA/802080/M/80 RA/802080/M/80 80mm diameter, 80mm stroke, ISO15552 PRA/802080/M/100 RA/802080/M/100 80mm diameter, 100mm stroke, ISO15552 PRA/802080/M/125 RA/802080/M/125 80mm diameter, 125mm stroke, ISO15552 PRA/802080/M/160 RA/802080/M/160 80mm diameter, 160mm stroke, ISO15552 PRA/802080/M/200 RA/802080/M/200 80mm diameter, 200mm stroke, ISO15552 PRA/802100/M/25 RA/802100/M/25 100mm diameter, 25mm stroke, ISO15552 PRA/802100/M/50 RA/802100/M/50 100mm diameter, 50mm stroke, ISO15552 PRA/802100/M/80 RA/802100/M/80 100mm diameter, 80mm stroke, ISO15552 PRA/802100/M/100 RA/802100/M/100 100mm diameter, 100mm stroke, ISO15552 PRA/802100/M/125 RA/802100/M/125 100mm diameter, 125mm stroke, ISO15552 PRA/802100/M/160 RA/802100/M/160 100mm diameter, 160mm stroke, ISO15552 PRA/802100/M/200 RA/802100/M/200 100mm diameter, 200mm stroke, ISO15552
  • 102.
    Specialist Technical Centres Know-How FluidPower 94 Engineering GREATSolutions Introducing Excelon® Plus The latest generation of Air Preparation equipment New filter maintenance system Element assembly is removed with the bowl Service much faster and cleaner Flush mounted integrated gauge Largest in the industry Easy to read Less vulnerable to damage Tamper proof options built in Padlock features on both shut- off valves and regulator guarantees safe operation of machinesRotating Safety Shut-off Valve Easy to operate full flow device Easy to isolate system with no reduction in performance Modern appearance Looks great on customer machines No compromise on Robustness Metal construction - where it matters most Quality synonymous with IMI Norgren brand Reduced weight and size 35% lighter and 20% smaller Maximises machine real estate Double safety lock on bowl Bowl clip with audible click plus safety detent when pressurised Impossible to remove the bowl when in use IMI Precision Engineering
  • 103.
    Visit us ateriks-techdirect.co.uk FluidPower 95 Vacuum Filters Plastic filters (shown) are made of durable injection moulded nylon and poly carbonate with a clear sump/opaque head and feature a 1 MPa design pressure. nn Metal filters are of rugged carbon steel constructed with an enamel coating nn Features include a clamp-on cover with an easily removed filter element and a positive seal Buna gasket nn We also offer easily removed replacement elements featuring a polyethylene 10-micron material for plastic filters nn For metal filters, a polyester felt 5-micron paper element with a material end is standard Piab Suction Cups/Accessories In most applications, suction cups are practical options for reliable and careful handling of most materials. Piab supplies a diverse line of suction cups that can handle objects of virtually any weight, shape or surface. Our suction cups are available in a wide variety of materials that can withstand extreme temperatures and resist prolonged exposure to ozone and oily surfaces. The cup fittings offer many different thread options for easy mounting. Suction cup diameters are available from 2–300mm. DURAFLEX® A highly durable and flexible material with excellent sealing capability providing a high coefficient of friction. Various hardness, suitable for applications such as the automotive market and packaging industry. piGRIP® Modular suction cup allowing you to choose the ideal combination of lip and bellow so lines can handle products at previously unprecedented speeds while realising energy savings. Available with a range of independent lips, bellows and fittings in sizes from 25–77mm and can be customised for thousands of applications for full operational flexibility. Whereas traditional grippers can only be used for select applications, the piGRIP® can be tailored to individual gripping, lifting and height requirements to handle a variety of products. piGRIP® can be used with new machines as well as for retrofitting existing systems, which extends use for long-term reliability. Vacuum Switches There are three different types of vacuum switches: electric, pneumatic and electronic. nn All switches feature an improved operating range of 5–95 – kPa nn The switches are dust-proof nn They can be connected either normally open (NO) or normally closed (NC) nn The electronic switches have a long lifetime and can be connected to a PLC unit (the PNP model) or the switches can directly regulate a valve (the NPN) model ValueLine® The entire Value Line program consists of suction cups and vacuum ejectors. Value Line suction cups are developed for standard/basic applications. The suction cups have a long thin lip and provide good sealing on slightly corrugated surfaces (such as corrugated cardboard). The Value Line vacuum ejectors are available in two different designs, the traditional inline that can be installed directly on the hose close to the point of suction and the T-design that allows exhaust air to be piped away. The T-design is also suitable for clean-room environment. Typical applications for this product line are case/carton erectors with other examples such as equipment for loading/unloading or sorting sheets into metal forming machines (laser cutting, water jet, punching etc.) and parts removal from injection moulds. Suction Cups
  • 104.
    Specialist Technical Centres Know-How FluidPower 96SMC Safety Valves Residual pressure release valve Residual pressure release valve â Residual pressure release valve â Residual pressure release valve ê Residual pressure release valve ê Safety limit switch Safety limit switch VP542-X536 Soft start-up valve Dual Residual Pressure Release Valve VP544-X538 With Soft Start-up Function VP544-X555 Dual Residual Pressure Release Valve VG342-X87 Category 2 The detecting function of the main valve position detects a mismatch between the input signal and valve operation. Category 3,4 When the dual residual pressure release valve is used, if one of the valves fails to operate, the other one releases residual pressure. Residual pressure release valve Residual pressure release valve â Residual pressure release valve â Residual pressure release valve ê Residual pressure release valve ê Safety limit switch Safety limit switch VP542-X536 Soft start-up valve Dual Residual Pressure Release Valve VP544-X538 With Soft Start-up Function VP544-X555 Dual Residual Pressure Release Valve VG342-X87 Series VP/VG Meeting tomorrow’s machine safety standards today ISO 13849-1 Safety Standard Compliant Valves – Series VP/VG As the introduction of international machine safety standards continue to accelerate at full throttle, the issue of manufacturing safety is now a critical consideration for all system operators and designers. SMC is committed to help and support equipment manufacturers and end users with the safe design of their equipment and machines in three ways: nn Developing and increasing its range of safety components nn Providing technical support and guidance in the selection process nn Supplying reliability information about its products - B10 and MTTF data
  • 105.
    Visit us ateriks-techdirect.co.uk FluidPower 97 2(A) 1(P) P1 P2 Throttle Main valve Valve 1 Valve 2 Soft start-up valve Soft start-up valve Soft start-up valve: ON Valve 1, Valve 2: ON OutputP2 Time P1 1/2P1 0 Soft start-up valve: OFF Valve 1, Valve 2: ON P2 reaches half of P1, and then the main valve of the soft start-up valve turns on. Start supplying flow ad- justed air with the throt- tle by energizing valve 1 and valve 2. Output Pressure (P2) vs Time Graph Safety limit switch Main valve Rod VP544-X555 Highly reliable construction Safety limit switch can be selected â The main valve position is detected by transferring the main valve movement directly to the reed safety limit switch with the rod. ê Long service life: B10d: 10 million times* ô The return spring releases the residual pressure securely regardless of pressure level. * For VP500/700, safety limit switch made by Omron 2(A) 1(P) P1 P2 Throttle Main valve Valve 1 Valve 2 Soft start-up valve Soft start-up valve Soft start-up valve: ON Valve 1, Valve 2: ON OutputP2 Time P1 1/2P1 0 Soft start-up valve: OFF Valve 1, Valve 2: ON P2 reaches half of P1, and then the main valve of the soft start-up valve turns on. Start supplying flow ad- justed air with the throt- tle by energizing valve 1 and valve 2. Output Pressure (P2) vs Time Graph Safety limit switch Main valve Rod VP544-X555 Conduit (VP series only) and M12 connector (4 pin) types available. M12 connector with 6 pins is available. 2(A) 1(P) P1 P2 Throttle Main valve Valve 1 Valve 2 Soft start-up valve Soft start-up valve Soft start-up valve: ON Valve 1, Valve 2: ON OutputP2 Time P1 1/2P1 0 Soft start-up valve: OFF Valve 1, Valve 2: ON P2 reaches half of P1, and then the main valve of the soft start-up valve turns on. Start supplying flow ad- justed air with the throt- tle by energizing valve 1 and valve 2. Output Pressure (P2) vs Time Graph Safety limit switch Main valve Rod VP544-X555 Made by Omron Made by Rockwell Automation With soft start-up function (-X555) 2(A) 1(P) P1 P2 Throttle Main valve Valve 1 Valve 2 Soft start-up valve Soft start-up valve Soft start-up valve: ON Valve 1, Valve 2: ON OutputP2 Time P1 1/2P1 0 Soft start-up valve: OFF Valve 1, Valve 2: ON P2 reaches half of P1, and then the main valve of the soft start-up valve turns on. Start supplying flow ad- justed air with the throt- tle by energizing valve 1 and valve 2. Output Pressure (P2) vs Time Graph Safety limit switch Main valve Rod VP544-X555 2(A) 1(P) P1 P2 Throttle Main valve Valve 1 Valve 2 Soft start-up valve Soft start-up valve Soft start-up valve: ON Valve 1, Valve 2: ON OutputP2 Time P1 1/2P1 0 Soft start-up valve: OFF Valve 1, Valve 2: ON P2 reaches half of P1, and then the main valve of the soft start-up valve turns on. Start supplying flow ad- justed air with the throt- tle by energizing valve 1 and valve 2. Output Pressure (P2) vs Time Graph Safety limit switch Main valve Rod VP544-X555 2(A) 1(P) P1 P2 Throttle Main valve Valve 1 Valve 2 Soft start-up valve Soft start-up valve Soft start-up valve: ON Valve 1, Valve 2: ON OutputP2 Time P1 1/2P1 0 Soft start-up valve: OFF Valve 1, Valve 2: ON P2 reaches half of P1, and then the main valve of the soft start-up valve turns on. Start supplying flow ad- justed air with the throt- tle by energizing valve 1 and valve 2. Output Pressure (P2) vs Time Graph Safety limit switch Main valve Rod VP544-X555 nn A function to gradually increase the initial pressure of the pneumatic system has been added to the dual residual pressure release valve. nn Fixed orifice and variable throttle are available as a throttle for adjusting the pressure increase. (ø1, ø1.5, ø2) Standards and Enclosure Standards and Enclosure Series Category Port size Thread Flow rate characteristics C [dm3 /(s·bar)] 1 2 (P A) 5 10 15 20 25 Residual Pressure Release Valve VP542-X536 2 3/8 Rc, G, NPTResidual Pressure Release Valve VP742-X536 1/2 Dual Residual Pressure Release Valve VP544-X538 3, 4 3/8 Rc, G, NPTDual Residual Pressure Release Valve VP744-X538 1/2 Dual Residual Pressure Release Valve with Soft Start-up Function VP544-X555 3/8 Rc, G, NPTDual Residual Pressure Release Valve with Soft Start-up Function VP744-X555 1/2 Dual Residual Pressure Release Valve VG342-X87 3/4 Rc, G, NPT * Only port size 3/4 Series Category Safety limit switch manufacturer Standards Enclosure Machinery Directive 2006/42/EC CE cUL RoHSHarmonized standards EN ISO13849-1: 2008 EN ISO13849-2: 2008 EN ISO4414: 2010 EN983: 1996 + A1: 2008 Residual Pressure Release Valve VP542/742-X536 2 OMRON Corporation IP65 Rockwell Automation, Inc. Dual Residual Pressure Release Valve VP544/744-X538 3, 4 OMRON Corporation IP65 Rockwell Automation, Inc. Dual Residual Pressure Release Valve with Soft Start-up Function VP544/744-X555 3, 4 OMRON Corporation IP65 Rockwell Automation, Inc. Dual Residual Pressure Release Valve VG342-X87 3, 4 OMRON Corporation * IP40 Rockwell Automation, Inc. 26.6 15.1 6.5 5.2 10.3 9.8 8.9 Series Category Port size Thread Flow rate characteristics C [dm3 /(s·bar)] 1 2 (P A) 5 10 15 20 25 Residual Pressure Release Valve VP542-X536 2 3/8 Rc, G, NPTResidual Pressure Release Valve VP742-X536 1/2 Dual Residual Pressure Release Valve VP544-X538 3, 4 3/8 Rc, G, NPTDual Residual Pressure Release Valve VP744-X538 1/2 Dual Residual Pressure Release Valve with Soft Start-up Function VP544-X555 3/8 Rc, G, NPTDual Residual Pressure Release Valve with Soft Start-up Function VP744-X555 1/2 Dual Residual Pressure Release Valve VG342-X87 3/4 Rc, G, NPT * Only port size 3/4 Series Category Safety limit switch manufacturer Standards Enclosure Machinery Directive 2006/42/EC CE cUL RoHSHarmonized standards EN ISO13849-1: 2008 EN ISO13849-2: 2008 EN ISO4414: 2010 EN983: 1996 + A1: 2008 Residual Pressure Release Valve VP542/742-X536 2 OMRON Corporation IP65 Rockwell Automation, Inc. Dual Residual Pressure Release Valve VP544/744-X538 3, 4 OMRON Corporation IP65 Rockwell Automation, Inc. Dual Residual Pressure Release Valve with Soft Start-up Function VP544/744-X555 3, 4 OMRON Corporation IP65 Rockwell Automation, Inc. Dual Residual Pressure Release Valve VG342-X87 3, 4 OMRON Corporation * IP40 Rockwell Automation, Inc. 26.6 15.1 6.5 5.2 10.3 9.8 8.9
  • 106.
    Specialist Technical Centres Know-How FluidPower 98Vacuum Pumps Piab Vacuum Pumps piINLINE® A small lightweight inline ejector that uses the patented COAX® technology. nn 40–50% energy reductions compared to other competing inline vacuum ejectors in corresponding size nn They can be mounted directly on a hose close to the suction cup (or point of suction) nn Easy to retrofit to existing energy wasting in-line vacuum ejectors thanks to generic plug-and-play design piCOMPACT™ The first manifold mounted and functional ejector system on the market based on the energy-efficient COAX® technology. Working at a low feed pressure and maximising the utilisation rate of the compressed air, the COAX® ejectors reduce energy consumption by 30–50%. An increased vacuum flow, excellent product grip, increase pickup speed therefore minimising product damage and reduce waste. VGS™ A unique product design where DURAFLEX® suction cups are integrated with a COAX® vacuum cartridge. nn The VGS™ makes selection, sizing and installation of vacuum system easier nn The decentralised vacuum system provides benefits of low energy costs, fast response time for increased productivity, complete mounting flexibility and high performance piCLASSIC Upgraded with COAX® technology providing up to 22% more energy efficiency. nn Modular design makes for easy cleaning of ejector cartridges and upgrades the performance when needed nn Available with 1–6 COAX® cartridges in 3-stage versions nn Large vacuum capacity in relation to size nn Suitable to replace larger electromechanical pumps nn Mid- and large-size vacuum pump P6040 Vacuum Pumps With its smart design, the P6040 offers low and powerful suction in a small package due to COAX® technology. The pump can be mounted close to the point of suction, resulting in smaller pump requirements with less energy needs. A natural extension of Piab’s P6010 pumps, the P6040’s operating efficiency is further optimised with integrated control options like Energy Saving (ES), helping companies reduce carbon footprint and improve conservation efforts. piSAVE optimise A fully pneumatic device suitable for air-driven ejectors/pumps which automatically regulates the feed pressure to the vacuum pump/ejector to maintain the set vacuum level. Air/energy usage is kept to a minimum. piSAVE sense Shuts off the flow of compressed air to the pump when the preset level is reached, and consequently the consumption of compressed air (energy saving) is minimised. Pump size can also be reduced.
  • 107.
    99 YOUR Complete Hydraulic solutions Hydraulicsystems are critical to most industrial plants. So finding the right partner to help you maintain, repair, refurbish or replace them is also critical. Fortunately ERIKS has all these capabilities and more, as well as having the widest range of leading- brand products available from a single supplier. CUSTOMISATION AND ENGINEERED SOLUTIONS From initial concept and design through to prototype and testing ERIKS are the perfect partner PRODUCT RANGE nn Hose and couplings nn Self assembly machinery nn Adaptors nn Test points nn Pressure test kits nn Oil transfer units nn Ball valves nn Fluid level gauges nn Hydraulic filters nn Directional control valves Visit us at eriks-techdirect.co.uk
  • 108.
    Specialist Technical Centres Know-How FluidPower 100 FOUNDATIONCOURSE WORKING SAFELY WITH HYDRAULIC HOSE AND CONNECTORS Sign up to our one day course covering all the basics of working safely with hydraulic hoses and connectors. Created and run in partnership with the British Fluid Power Association (BFPA). For ERIKS, safety is one of our business’s core values, we aim to ensure that everyone returns home safely each and every day. The know-how we have applied to health and safety within our own organisation can also be shared with customers, to help create a zero accident workplace for you too. And that is primary reason why this foundation course “Working Safely with Hydraulic Hose and Connectors” is now available nationwide from ERIKS. CALL: 0845 006 6000 In partnership with the BRITISH FLUID POWER ASSOCIATION (BFPA) BOOK YOUR PLACE TODAY
  • 109.
    Visit us ateriks-techdirect.co.uk FluidPower 101Lifeguard Sleeve Gates Lifeguard Sleeve To reduce constraints, the installer must Consider the risks associated with product failure such as whiplash or fluid ejection hazards. In line with Industry Standards LifeGuard sleeving correlates to a variety of industry standards, including ISO 3457 and MSHA’s fire-resistance requirements. Exceeds the intent of ISO 3457 that requires operator protection within a 1 metre line-of- sight of any hose conveying fluid above 50 bar at +49°C. Beyond peak performance, Gates hydraulic systems offer you safety. The LifeGuard™ Line-of-Sight Sleeving System is the first true protection in line-of-sight hydraulic applications. It contains bursts up to 8,000 psi and pinhole leaks up to 4,000 psi at 120°C for up to five minutes. After redirecting the explosive force down the length of the hose, the LifeGuard sleeve disperses the energy and fluids at the hose ends via carefully designed ‘channel’ clamps. The leaked fluid then allows for fast hose failure detection. Equipment operators working within a 1 metre line-of-sight of a hydraulic system know the potential for problems. n Personal injury n Fluid burns and injection n Fires and explosions n Electrical shock n Mechanical failure The double-layer sleeve effectively shields you against these hazards. No other flexible connection safeguards your operators, equipment and environment like LifeGuard sleeving. BS EN ISO 4413-2010 demands that new or replacement hoses are assembled and fitted to hydraulic machinery taking into account: Part No To Suit Pack Size Hose Bore 14LG4KxCT37 1/4 37 mtrs 16LG4KxCT37 3/8 37 mtrs 20LG4KxCT37 1/2 37 mtrs 22LG4KxCT37 5/8 37 mtrs 26LG4KxCT37 3/4 37 mtrs 32LG4KxCT37 1 37 mtrs Collars for the Lifeguard Sleeving 4000 Part No To Suit Hose Bore 6SC-4 1/4 6PU-4 3/8 8SC-4 1/2 Part No To Suit Hose Bore 10SC-4 5/8 12SC-4 3/4 16PU-4 1 LifeGuard Sleeving 4000 nn Handles all hydraulic fluids and biodiesel fuel nn Allows fluid to safely escape down the length of the assembly nn Creates noticeable spill for hose failure detection nn Correlates to ISO 3457 and meets MSHA’s flame-resistance requirements nn Safe fitting onto the machine nn Reduce constraints There’s A Better Way To Protect Against Hydraulic Hose Failure
  • 110.
    Specialist Technical Centres Know-How FluidPower 102 MC1001Starter Kit nn MC1001 can crimp up to 1 wire braid nn Dies included ¼, 3 /8, ½ and ¾ nn Compact Megacrimp 2-wire hydraulic hose from ¼ to ¾ nn Gates Megacrimp one-piece couplings in BSP, JIC, Metric, ORFS Save time and money with Gates self-assembly starter kits Pick up either an MC1001, MCX20 or MCX25 self-assembly crimper for just £1 All you have to do is either spend £2,970 on hose and couplings via the starter kit for the MC1001 or spend £5,200 on hose and couplings via the starter kit for the MCX20. The Gates powered crimper is also available if you spend £6,400 on hose and couplings via the MCX25 starter kit. MCX20 Starter Kit nn MCX20 can crimp up to 1 multi-spiral hose and 1¼ 2-wire hydraulic hose nn Dies included ¼, 3 /8, ½, ¾ and 1 nn Compact Megaflex 2-wire hydraulic hose from ¼ to 1 nn EFG5K 5000 psi multi-spiral hose in ¾ and 1 nn Gates Megacrimp one-piece couplings in BSP, JIC, Metric, ORFS nn Gates Globalspiral no-skive couplings in BSP, JIC, MetricDetailed listings of contents for the kits are available on request from your local Eriks Service Centre. Gates will support each starter kit with on-site crimper training and certification. Additional end terminations are available, please do not hesitate to contact us. MCX25 Starter Kit nn Dies : ¼”, 3/8”, ½”, ¾”, 1” and 1 ¼” nn Compact CM2T Megaflex 2-wire hydraulic hose from ¼” to 1 ¼” nn EFG5K 5000 psi multi spiral hose from ¾” to 1” nn Gates Megacrimp one piece couplings in BSP, JIC, Metric and ORFS nn Gates Globalspiral no-skive couplings in BSP, JIC, Metric, ORFS and SAE Flanges nn Crimpers available in 1, or 3 phase versions nn Complete with a die storage system and quick die change tool. nn Gates guarantee all hose assemblies produced with their self-assembly systems after operator training and certification by authorised ERIKS personnel nn No call out charge, no delay, no added costs – 24/7 product availability nn All terminations available – the starter kits have been profiled to include the most popular couplings with BSP, JIC, ORFS, and Metric popular threads and forms CRIMPER FOR £1 Gates Integrated System Approach + + = Superior products, manufactured to stringent tolerances Innovative self-assembly machines and dies, rigorously validated Optimal crimp data, derived from meticulous testing Factory-quality performance above and beyond all international standards in full compliance with EU directives Self-Assembly Starter Kits
  • 111.
    Visit us ateriks-techdirect.co.uk FluidPower 103High Pressure Hoses and Couplings Gates High Pressure Wire Braid Hoses and MegaCrimp® Couplings Din Light Series. 24° Cone – MegaCrimp couplings BSP 60° Cone – MegaCrimp couplings Excellent performance: Gates CM2T Megaflex Hydraulic Hose Gates’ CM2T hose range for high pressure hydraulic applications offering excellent performance characteristics at a highly competitive price. This compact hose exceeds EN 857 2SC, is tested and validated to 600,000 impulse cycles, and allows for tighter bend radii than standard 2-wire hose. Available in sizes from 1 ⁄4–1. Couplings: MegaCrimp Key benefits: nn Easy to route and to install in tight areas nn 70% of EN 857 2SC bend radius at rated working pressure nn Outstanding durability and flex impulse performance nn Lightweight nn Compatible with biodegradable hydraulic fluids such as synthetic esters, polyglycols and vegetable oils Female Straight Part No Hose Thread Pack Bore Size Size 4G10FDLORX 1/4 M16x1.5 10 6G12FDLORX 3/8 M18x1.5 10 8G15FDLORX 1/2 M22x1.5 10 10G18FDLORX 5/8 M26x1.5 10 Female 90° Swept Elbow Part No Hose Thread Pack Bore Size Size 4G10FDLORX90 1/4 M16x1.5 10 6G12FDLORX90 3/8 M18x1.5 10 8G15FDLORX90 1/2 M22x1.5 10 10G18FDLORX90 5/8 M26x1.5 10 Male Straight Part No Hose Thread Pack Bore Size Size 4G10MDL 1/4 M16x1.5 10 6G12MDL 3/8 M18x1.5 10 8G15MDL 1/2 M22x1.5 10 10G18MDL 5/8 M26x1.5 10 Din Heavy Series. 24° Cone – Megacrimp couplings Female Straight Part No Hose Thread Pack Bore Size Size 4G10FDHORX 1/4 M18x1.5 10 6G12FDHORX 3/8 M20x1.5 10 8G16FDHORX 1/2 M24x1.5 10 10G20FDHORX 5/8 M30x2.0 10 Female 90° Swept Elbow Part No Hose Thread Pack Bore Size Size 4G10FDHORX90 1/4 M18x1.5 10 6G12FDHORX90 3/8 M20x1.5 10 8G16FDHORX90 1/2 M24x1.5 10 10G20FDHORX90 5/8 M30x2.0 10 Male Straight Part No Hose Thread Pack Bore Size Size 4G10MDH 1/4 M18x1.5 10 6G12MDH 3/8 M20x1.5 10 8G16MDH 1/2 M24x1.5 10 10G20MDH 5/8 M30x2.0 10 Part No Bore Size Max Working Pressure Qty. CM2T04-CL30 1/4 400 Bar 30 mtrs CM2T06-CL30 3/8 330 Bar 30 mtrs CM2T08-CL30 1/2 275 Bar 30 mtrs CM2T10-RL50 5/8 250 Bar 50 mtrs CM2T12-RL50 3/4 215 Bar 50 mtrs CM2T16-CT40 1 165 Bar 40 mtrs Male BSP Parallel. 60° Cone Part No Hose Thread Pack Bore Size Size 4G4MBSPP 1/4 G1/4 10 6G6MBSPP 3/8 G3/8 10 8G8MBSPP 1/2 G1/2 10 10G10MBSPP 5/8 G5/8 10 12G12MBSPP 3/4 G3/4 10 16G16MBSPP 1 G1 5 Female BSP. O-ring Swivel. 60° Cone Part No Hose Thread Pack Bore Size Size 4G4FBSPORX 1/4 G1/4 10 6G6FBSPORX 3/8 G3/8 10 8G8FBSPORX 1/2 G1/2 10 10G10FBSPORX 5/8 G5/8 10 12G12FBSPORX 3/4 G3/4 10 16G16FBSPORX 1 G1 5 Female BSP. O-ring Swivel 60° Cone. 90° Swept Elbow Part No Hose Thread Pack Bore Size Size 4G4FBSPORX90 1/4 G1/4 10 6G6FBSPORX90 3/8 G3/8 10 8G8FBSPORX90 1/2 G1/2 10 10G10FBSPORX90 5/8 G5/8 10 12G12FBSPORX90 3/4 G3/4 10 16G16FBSPORX90 1 G1 5
  • 112.
    Specialist Technical Centres Know-How FluidPower 104 GatesExtremely High Pressure Multi-Spiral Hoses and GlobalSpiral™ Couplings BSP. 60° Cone – GlobalSpiral couplings Highest flexibility for best results: Gates Envirofluid Hydraulic Spiral Hose (EFGxK) Ideal for extremely high pressure and high impulse hydraulic applications, this spiral hose provides outstanding durability and flexibility. Validated with GlobalSpiral (GS) couplings to one million impulse cycles this multi-spiral hose offers you extended lifetime even in the harshest applications. Couplings: GlobalSpiral Key benefits: nn Extremely flexible thanks to tight bend radii surpassing European standards nn Special nitrile-tube compound eliminating seeping through the tube and the different layers of reinforcement nn Excellent compatibility with synthetic and biodegradable hydraulic fluids such as synthetic esters, polyglycols and vegetable oils nn Outstanding product durability and superior impulse performance up to 1,000,000 impulse cycles Female Straight Part No Hose Thread Pack Bore Size Size 8GS8FBSPORX 1/2 G1/2–14 BSP 1 10GS10FBSPORX 5/8 G5/8–14 BSP 1 12GS12FBSPORX 3/4 G3/4–14 BSP 1 16GS16FBSPORX 1 G1–11 BSP 1 Female 90° Swept Elbow Part No Hose Thread Pack Bore Size Size 8GS8FBSPORX90 1/2 G1/2–14 BSP 1 10GS10FBSPORX90 5/8 G5/8–14 BSP 1 12GS12FBSPORX90 3/4 G3/4–14 BSP 1 16GS16FBSPORX90 1 G1–11 BSP 1 Male Straight Part No Hose Thread Pack Bore Size Size 8GS8MBSPP 1/2 G1/2–14 BSP 1 10GS10MBSPP 5/8 G5/8–14 BSP 1 12GS12MBSPP 3/4 G3/4–14 BSP 1 16GS16MBSPP 1 G1–11 BSP 1 DIN Heavy. 24° Cone – GlobalSpiral couplings Gates GlobalSpiral Plus Gates GlobalSpiral Plus (GSP) is a new range of non-skive 2-piece large bore couplings designed for 1 and 2-wire braid hydraulics hose. Female Straight Part No Hose Thread Pack Bore Size Size 8GS16FDHORX 1/2 M24x1.5 1 10GS20FDHORX 5/8 M30x2.0 1 12GS25FDHORX 3/4 M36x2.0 1 16GS30FDHORX 1 M42x2.0 1 Female Straight Part No Hose Thread Pack Bore Size Size 24GSP24FBSPORX 1.1/2 G1.1/2–11BSP 1 32GSP32FBSPORX 2 G2–11BSP 1 Male Straight Part No Hose Thread Pack Bore Size Size 24GSP24MBSPP 1.1/2 G1.1/2–11BSP 1 32GSP32MBSPP 2 G2–11BSP 1 Female 90º Swept Elbow Part No Hose Thread Pack Bore Size Size 24GSP24FBSPORX90 1.1/2 G1.1/2–11BSP 1 32GSP32FBSPORX90 2 G2–11BSP 1 Ferrules for 1 and 2-Wire Hose Part No Hose Pack Bore Size 24GSP1F-2 1.1/2 1 32GSP1F-2 2 1 Female 90° Swept Elbow Part No Hose Thread Pack Bore Size Size 8GS16FDHORX90 1/2 M24x1.5 1 10GS20FDHORX90 5/8 M30x2.0 1 12GS25FDHORX90 3/4 M36x2.0 1 16GS30FDHORX90 1 M42x2.0 1 Male Straight Part No Hose Thread Pack Bore Size Size 8GS16MDH 1/2 M24x1.5 1 10GS20MDH 5/8 M30x2.0 1 12GS25MDH 3/4 M36x2.0 1 16GS30MDH 1 M42x2.0 1 Gates Envirofluid Hydraulic Spiral Hose (EFGxK) Part No Bore Size Max Working Pressure Qty. PSI Bar 8EFG6K 1/2 6000 420 30 mtrs 10EFG5K 5/8 5000 350 30 mtrs 12EFG5K 3/4 5000 350 30 mtrs 16EFG4K 1 4000 280 60 mtrs Ferrules Part No Hose Bore Size 6GS1F-4 3/8 8GS1F-4 1/2 10GS1F-4 5/8 12GS1F-4 3/4 16GS1F-4 1 20GS1F-4 1.1/4 24GS1F 1.1/2 High Pressure Hoses and Couplings
  • 113.
    Visit us ateriks-techdirect.co.uk FluidPower 105Volume Hose Assemblies and Hydraulic Components Offering You More nn Approved hose assembler for Gates Fluid Power nn Accredited to The British Fluid Power Distribution Association hose assembler programme nn Hose assembly testing and certification to international standards nn Tailored training programmes covering hose assembly installation, inspection and health and safety Manufacturing Approach nn Total cost reduction nn Provider of Gates Global performance products nn Range of FLEXION hydraulic hoses, fittings and connectors nn Tube manipulation and EMB Din tube fittings nn Bespoke fittings and manifold block solutions nn Onsite application and system design support What This Means To You nn Warranty cost reduction nn Improved service life of your machines nn Leak-free Port to Port programme ensuring the integrity of the whole assembly nn Application engineering support in the prototype process, to reduce the number of components and connections Logistic Solutions nn Kitting services - Custom-packed parts to meet the specific requirements of your production process nn Inventory management service - A well-managed inventory creates not only immediate financial benefits, but also a leaner operation that performs better and more profitably in the long term nn Easy Order System - Combining logistics services and e-Business solutions for purchase and management of your production materials, at a reduced procurement cost. Fast. Easy. Cost- effective. Solutions If you’re looking for a port-to-port hydraulic solution, you’ll find few to engage with better as an innovative and reliable partner than ERIKS. With an unparalleled blend of know-how, and experience, we offer you a professional and cost-effective solution working with the best products available.
  • 114.
    Specialist Technical Centres Know-How FluidPower 106Hydraulic Components and Fittings Rexroth Cetop Valves, Hydraulic Accessories CETOP 3/5 Valves High quality valve from the European market leader in hydraulics. Directly interchangeable with other brands conforming to the CETOP 3 or 5 standard. nn Coils can be rotated 90º nn Coils can be replaced without loss of fluid Cetop 3 Valve (Size 6) Part No Voltage Spool Type Seal Kit 4WE6D6X/EG24N9K4 24V DC D 313162 4WE6E6X/EG24N9K4 24V DC E 313162 4WE6J6X/EG24N9K4 24V DC J 313162 4WE6D6X/EW110N9K4 110V AC D 313162 4WE6E6X/EW110N9K4 110V AC E 313162 4WE6J6X/EW110N9K4 110V AC J 313162 Cetop 5 Valve (Size 10) Part No Voltage Spool Type Seal Kit 4WE10D3X/CG24N9K4 24V DC D 312582 4WE10E3X/CG24N9K4 24V DC E 312582 4WE10J3X/CG24N9K4 24V DC J 312582 4WE10D3X/CW110N9K4 110V AC D 312582 4WE10E3X/CW110N9K4 110V AC E 312582 4WE10J3X/CW110N9K4 110V AC J 312582 „„ Filter new oil before filling a reservoir or system: New oil is not machine ready oil; always filter new oil prior to loading „„ Match oil cleanliness to system requirements: Understand the requirements set by your system’s manufacturer and ensure filtration you choose meets that level „„ Consider hydraulic systems designed with easily accessible filter systems; otherwise, maintenance and filter replacement will lag or be routinely postponed „„ Set up a maintenance schedule based on your operational requirements, based on environmental conditions, where, how frequently the system is operated and filtration system design „„ Clean the areas around the filter before you change it; this prevents accidental intrusion of dirt particles Top tips...
  • 115.
    Visit us ateriks-techdirect.co.uk FluidPower 107 Axial Piston Fixed Displacement Motor A2FM series 6 Fixed displacement motor A2FM of axial piston, bent axis design is suitable for hydrostatic drives in open and closed circuits. The torque increases with the pressure differential between the high and low pressure side and with increasing displacement. The output speed depends on the flow capacity of the pump and the displacement of the motor. The pistons are directly supported by the drive shaft and there create a pressure–dependent torque. Features nn Use in mobile and stationary application ranges nn Axial tapered piston bent axis design nn High power density nn Small dimensions nn High overall efficiency nn Good start-up efficiency nn Size 5…200 nn Nominal pressure: 315 bar (size 5), 400 bar (size 10-200) nn Peak pressure: 350 bar (size 5), 450 bar (size 10-200) nn Open and closed circuit Size 5 10 12 16 23 28 Nominal pressure PN bar 315 400 400 400 400 400 Peak pressure Pmax bar 350 450 450 450 450 450 Swept volume Vg cm3 4.93 10.3 12 16 22.9 28.1 Speed nmax rpm 10000 8000 8000 8000 6300 6300 Inlet flow qv max l/min 49 82 96 128 144 176 Torque ∆p = 400 bar T Nm 24.7 65 76 100 144 178 Weight (approx.) m kg 2.5 5.4 5.4 5.4 9.5 9.5 Proportional Directional Valves Operated 4WRE and 4WREE The valve type 4WRE (E) is a direct operated proportional directional valve with electrical position feedback for sub-plated mounting. Operation is effected by means of proportional solenoids. The solenoids are controlled either via external or via integrated electronics. Features nn For sub plate mounting nn Porting pattern according to ISO 4401 nn Control of flow direction and size nn With electrical feedback nn With integrated electronics (OBE) (type 4WREE) nn Spring-centred control spool nn Sizes 6…10 nn Component series 2X nn Maximum operating pressure 315 bar nn Maximum flow 180 l/min Size 6 10 Operating pressure Port A,B, P Pmax bar 315 315 Nominal flow ∆p = 10 bar qv nom Vmin 8, 16, 32 25,50, 75 Maximum hysteresis % 0.1 0.1 Step response 0 to 90% Tu +Tg ms 20 40 Operation voltage OBE U V 24 24 Comm. Value signal OBE U V ± 10 ± 10 I mA 4 to 20 4 to 20 Hydraulic Components
  • 116.
    Specialist Technical Centres Know-How FluidPower 108 Gates-EMBFittings Gates-EMB DIN Tube Fittings The EMB patented technique of pre and final assembly of cutting rings reduces assembly time and costs whilst providing superior “leak-free” characteristics and reliable reproducible assembly results. The entire process of tube preparation until the final coupling runs like clock work in no time at all, thanks to our investment in “state of the art” machinery. New Surface Finish Gates – EMB is the only supplier to offer a full range of DIN Tube Fittings with 3 types of coating in parallel: NanoProtect™, Zinc-Nickel and Stainless Steal. So the customer can select the finishing best suited for the application nn The Gates-EMB DIN Tube Fittings range is now also available with a zinc-nickel coating. Advantages of the modified coating:   nn Increased corrosion resistance nn Constant friction coefficients compared to phosphating nn Reduced wear during installation and clamping Gates-EMB Opticam 4S More control-more safety- easier to use! Gates-EMB OPTICAM 4S for the secure and efficient assembly of hydraulic cutting rings DS and DSW.. nn Extremely easy to handle nn Automatic tool recognition excludes errors nn SPC control of each assembly nn Increased assembly accuracy through reference check after each tool change nn Improved error detection nn Wear monitoring with individual cycle counter for each size nn Export of assembly data available as CSV-file Hydraulic Components and Fittings
  • 117.
    Visit us ateriks-techdirect.co.uk FluidPower 109Adaptors Metric Tube Compression Fittings Manufactured to the highest standards, all compression fittings conform to the international standard EN ISO 8434-1 (DIN 2353), and conform to the latest EU regulations on the restricted use of hazardous substances. EMB fittings in addition to the Chrome 6 Free surface finish have an additional protection level- NANO Protect, which provides up to 400 hours protection to Red Rust. Male Stud Couplings BSP Parallel 60° Cone Light Series L Part No Tube BSP OD Male GE6LR-60 6mm 1/8” GE8LR-60 8mm 1/4” GE10LR-60 10mm 1/4” GE12LR-60 12mm 3/8” GE15LR-60 15mm 1/2” GE18LR-60 18mm 1/2” GE22LR-60 22mm 3/4” GE28LR-60 28mm 1” GE35LR-60 35mm 1.1/4” GE42LR-60 42mm 1.1/2” other sizes on request 60° Cone Heavy Series S Part No Tube BSP OD Male GE6SR-60 6mm 1/4” GE8SR-60 8mm 1/4” GE10SR-60 10mm 3/8” GE12SR-60 12mm 3/8” GE14SR-60 14mm 1/2” GE16SR-60 16mm 1/2” GE20SR-60 20mm 3/4” GE20SR1-60 20mm 1” GE25SR-60 25mm 1” GE30SR1-60 30mm 1” GE38SR-60 38mm 1.1/2” Tube to Tube Equal Straight Light Series L Part No Tube OD G6PL 6mm G8PL 8mm G10PL 10mm G12PL 12mm G15PL 15mm G18PL 18mm G22PL 22mm G28PL 28mm G35PL 35mm G42PL 42mm Heavy Series S Part No Tube OD G6PS 6mm G8PS 8mm G10PS 10mm G12PS 12mm G14PS 14mm G16PS 16mm G20PS 20mm G25PS 25mm G30PS 30mm G38PS 38mm Tube to Tube Equal Tee Light Series L Part No Tube OD T6PL 6mm T8PL 8mm T10PL 10mm T12PL 12mm T15PL 15mm T18PL 18mm T22PL 22mm T28PL 28mm T35PL 35mm T42PL 42mm Heavy Series S Part No Tube OD T6PS 6mm T8PS 8mm T10PS 10mm T12PS 12mm T14PS 14mm T16PS 16mm T20PS 20mm T25PS 25mm T30PS 30mm T38PS 38mm Bulkhead Straight Light Series L Part No Tube OD SV6PL 6mm SV8PL 8mm SV10PL 10mm SV12PL 12mm SV15PL 15mm SV18PL 18mm SV22PL 22mm SV28PL 28mm SV35PL 35mm SV42PL 42mm Heavy Series S Part No Tube OD SV6PS 6mm SV8PS 8mm SV10PS 10mm SV12PS 12mm SV14PS 14mm SV16PS 16mm SV20PS 20mm SV25PS 25mm SV30PS 30mm SV38PS 38mm Weld Nipple Assembly DIN Fitting Body Tube End Forming EMB FS System Standard DIN nut D Single edged Cutting Ring DSW Double Edge Cutting Ring with Soft Seal DS Double Edge Cutting Ring EMB – L Series Fittings Working Pressure up to 500 bar EMB – S series Fittings Working pressures up to 800 bar Size Range 6mm O.D – 42mm O.D Adaptor System for 37° Flare
  • 118.
    Specialist Technical Centres Know-How FluidPower 110Hydraulic Accessories Tee Pieces BSP Male/Male/Male Tee Part No Thread Thread Thread A B C KBT04 1/4 1/4 1/4 KBT06 3/8 3/8 3/8 KBT08 1/2 1/2 1/2 KBT10 5/8 5/8 5/8 KBT12 3/4 3/4 3/4 KBT16 1 1 1 KBT20 1.1/4 1.1/4 1.1/4 KBT24 1.1/2 1.1/2 1.1/2 BSP Female/Female/ Female Swivel Tee Part No Thread Thread A B KBTFFF040404 1/4 1/4 KBTFFF060606 3/8 3/8 KBTFFF080808 1/2 1/2 KBTFFF121212 3/4 3/4 KBTFFF161616 1 1 KBTFFF202020 1.1/4 1.1/4 KBTFFF242424 1.1/2 1.1/2 BSP Male/Male/Female Swivel Tee Part No Thread Thread Thread A B C KBTMMF040404 1/4 1/4 1/4 KBTMMF060606 3/8 3/8 3/8 KBTMMF080808 1/2 1/2 1/2 KBTMMF121212 3/4 3/4 3/4 KBTMMF161616 1 1 1 KBTMMF202020 1.1/4 1.1/4 1.1/4 KBTMMF242424 1.1/2 1.1/2 1.1/2 BSP Male/Female/Male Swivel Tee Part No Thread Thread Thread A B C KBTMFM040404 1/4 1/4 1/4 KBTMFM060606 3/8 3/8 3/8 KBTMFM080808 1/2 1/2 1/2 KBTMFM121212 3/4 3/4 3/4 KBTMFM161616 1 1 1 KBTMFM202020 1.1/4 1.1/4 1.1/4 KBTMFM242424 1.1/2 1.1/2 1.1/2 Female x Female Adaptors Adaptors High quality, market leading hydraulic adaptors. nn Manufactured from steel BS EN 10277:3 1999 230 MOPb and conforming to recognised international standards nn Surface treatment Chromium-6 free conforming to EU regulations Male x Male Adaptors BSP Male/Male Equal Part No Thread A Thread B KB02 1/8 1/8 KB04 1/4 1/4 KB06 3/8 3/8 KB08 1/2 1/2 KB10 5/8 5/8 KB12 3/4 3/4 KB16 1 1 KB20 1.1/4 1.1/4 KB24 1.1/2 1.1/2 KB32 2 2 BSP Straight Bulkhead Part No Thread A Thread B KBH02 1/8 1/8 KBH04 1/4 1/4 KBH06 3/8 3/8 KBH08 1/2 1/2 KBH10 5/8 5/8 KBH12 3/4 3/4 KBH16 1 1 BSP Male/Male 90º Compact Elbow Part No Thread A Thread B KB040490C 1/4 1/4 KB060690C 3/8 3/8 KB080890C 1/2 1/2 KB101090C 5/8 5/8 KB121290C 3/4 3/4 KB161690C 1 1 BSP Male/Male Unequal Part No Thread A Thread B KB0204 1/8 1/4 KB0206 1/8 3/8 KB0406 1/4 3/8 KB0408 1/4 1/2 KB0608 3/8 1/2 KB0610 3/8 5/8 KB0810 1/2 5/8 KB0820 1/2 1.1/4 KB0412 1/4 3/4 KB0612 3/8 3/4 KB0812 1/2 3/4 KB1012 5/8 3/4 KB1016 5/8 1 KB0616 3/8 1 KB0816 1/2 1 KB1216 3/4 1 KB1220 3/4 1.1/4 KB1620 1 1.1/4 KB1224 3/4 1.1/2 KB1624 1 1.1/2 KB2024 1.1/4 1.1/2 KB1632 1 2 KB2032 1.1/4 2 KB2432 1.1/2 2 BSP Female/Female Swivel Part No Thread Thread A B KBFF0404 1/4F 1/4F KBFF0406 1/4F 3/8F KBFF0408 1/4F 1/2F KBFF0606 3/8F 3/8F KBFF0608 3/8F 1/2F KBFF0808 1/2F 1/2F KBFF0812 1/2F 3/4F Part No Thread Thread A B KBFF1010 5/8F 5/8F KBFF1212 3/4F 3/4F KBFF1216 3/4F 1F KBFF1616 1F 1F KBFF2020 1.1/4F 1.1/4F KBFF2424 1.1/2F 1.1/2F KBFF3232 2F 2F BSP Female/Female 90º Compact Swivel Elbow Part No Thread Thread A B KBFF040490C 1/4F 1/4F KBFF060690C 3/8F 3/8F KBFF080890C 1/2F 1/2F KBFF121290C 3/4F 3/4F KBFF161690C 1F 1F KBFF202090C 1.1/4F 1.1/4F KBFF242490C 1.1/2F 1.1/2F
  • 119.
    Visit us ateriks-techdirect.co.uk FluidPower 111 Probe Part No Port size QRC-P04 1/4 BSPP QRC-P06 3/8 BSPP QRC-P08 1/2 BSPP QRC-P12 3/4 BSPP QRC-P16 1 BSPP Carrier Part No Port size QRC-C04 1/4 BSPP QRC-C06 3/8 BSPP QRC-C08 1/2 BSPP QRC-C12 3/4 BSPP QRC-C16 1 BSPP Probe Part No Port size QRC-P04FF 1/4 BSPP QRC-P06FF 3/8 BSPP QRC-P08FF 1/2 BSPP QRC-P12FF 3/4 BSPP QRC-P16FF 1 BSPP Carrier Part No Port size QRC-C04FF 1/4 BSPP QRC-C06FF 3/8 BSPP QRC-C08FF 1/2 BSPP QRC-C12FF 3/4 BSPP QRC-C16FF 1 BSPP Quick Release Couplings ISO 7241 Series A nn Cost effective solution, tested to ISO 7421 standard nn Zinc plated, heat treated carbon steel, Nitrile “O” ring seals are fitted as standard. Viton available on request nn Suitable for both agricultural and industrial use requiring frequent connections and disconnections nn Maximum working pressure range from 350 bar (1/4) to 130 bar (2) ISO 7241 Series B nn Heat treated carbon steel, zinc plated, Nitrile O-ring seals with Teflon backing rings nn Ideally suited to heavy duty applications such as: automotive, offshore, railways, petrochemical, steel, civil engineering nn Maximum working pressure range from 300 bar Screw to Connect nn Screw connection style eliminates brinelling, increasing the life of the coupling nn Screw connection style allows for connection with up to 50 bar pressure in each hydraulic hose line nn Screw connection style prevents accidental uncoupling under vibration nn Suited to heavy duty industrial applications which are subject to heavy mechanical loads and high pressure pulse application on construction plant Probe Part No Port size QRC-P04B 1/4 BSPP QRC-P06B 3/8 BSPP QRC-P08B 1/2 BSPP QRC-P12B 3/4 BSPP QRC-P16B 1 BSPP Carrier Part No Port size QRC-C04B 1/4 BSPP QRC-C06B 3/8 BSPP QRC-C08B 1/2 BSPP QRC-C12B 3/4 BSPP QRC-C16B 1 BSPP Probe Part No Port size QRC-P04SC 1/4 BSPP QRC-P06SC 3/8 BSPP QRC-P08SC 1/2 BSPP QRC-P12SC 3/4 BSPP QRC-P16SC 1 BSPP Carrier Part No Port size QRC-C04SC 1/4 BSPP QRC-C06SC 3/8 BSPP QRC-C08SC 1/2 BSPP QRC-C12SC 3/4 BSPP QRC-C16SC 1 BSPP Glycerine Filled Pressure Gauges A small selection of the range available from ERIKS. nn Stainless steel case nn Accuracy ±1.6% FSD nn 63mm (2.1/2) Diameter, 1/4 BSPP nn Available bottom and rear entry fittings Bottom Entry Part No Pressure Range PG63BO10 0-10 bar PG63BO16 0-16 bar PG63BO25 0-25 bar PG63BO40 0-40 bar PG63BO60 0-60 bar PG63BO100 0-100 bar PG63BO160 0-160 bar PG63BO250 0-250 bar PG63BO400 0-400 bar PG63BO600 0-600 bar Rear Entry Part No Pressure Range PG63RO10 0-10 bar PG63RO16 0-16 bar PG63RO25 0-25 bar PG63RO40 0-40 bar PG63RO60 0-60 bar PG63RO100 0-100 bar PG63RO160 0-160 bar PG63RO250 0-250 bar PG63RO400 0-400 bar PG63RO600 0-600 bar Flat Face nn Zero leakage coupling, easy to clean to prevent contamination ingress, and manufactured to ISO 16028 standard nn Pressure rated up to 350 bar, warranty for 1 year including on hammer applications nn Zinc-Nickel plating reduces corrosion, rated for 280 hours to white rust in a salt spray test nn Available in stainless steel Hydraulic Accessories
  • 120.
    Specialist Technical Centres Know-How FluidPower 112 PartNo Description Thread Max WP ESNA01 1620 Male/Swivel Female Test Tee Piece BSP 1/4 630 bar ESNA02 1620 Male/Swivel Female Test Tee Piece BSP 3/8 630 bar ESNA03 1620 Male/Swivel Female Test Tee Piece BSP 1/2 515 bar ESNA04 1620 Male/Swivel Female Test Tee Piece BSP 3/4 430 bar ESNA06 1620 Male/Swivel Female Test Tee Piece BSP 1 345 bar 1620 Male/Swivel Female Test Tee Piece nn Also available in stainless steel Part No Description Hose Length ETH1614-1000 1620 Fem x 1/4 BSP Gauge Fem 1000mm ETH1614-2000 1620 Fem x 1/4 BSP Gauge Fem 2000mm ETH1616-1000 1620 Fem x 1620 Fem 1000mm ETH1616-2000 1620 Fem x 1620 Fem 2000mm High Pressure Micro Bore Assemblies Other hose lengths/combinations available on request. Max working pressure 400 bar, other pressures on request. Single Gauge Digital Pressure Test Kits Part No Pressure Range EDPTK0/60 0-60 Bar EDPTK0/250 0-250 Bar EDPTK0/600 0-600 Bar Universal Standard Pressure Test Kits Digital Pressure Test Kits nn Single digital pressure gauge with minimall test points, adaptors and hose in a carry case nn Three kits available in the different pressure ranges nn Gauges have peak min/max storage, great accuracy and easy to read display Pressure Test Kits 40/400bar Part No Pressure ESPTK40/400 Standard EUPTK40/400 Universal Other pressure ranges available on request. Part No Description Thread Max WP EMA3R1/8ED 1620 Test Point with Metal Cap BSP 1/8 400 bar EMA3R1/4ED 1620 Test Point with Metal Cap BSP 1/4 630 bar 1620 Test Point with Metal Cap nn Can be used as sampling points Part No Description Thread Max WP EPGC1604 1620 Pressure Gauge Connection (direct) BSP 1/4 630 bar EPGC1608 1620 Pressure Gauge Connection (direct) BSP 1/2 630 bar 1620 Pressure Gauge Connection (direct) nn Also available in stainless steel Lifetime leak free guarantee Hydraulic Accessories
  • 121.
    Visit us ateriks-techdirect.co.uk FluidPower 113Oil Transfer Units and Ball Valves Oil Transfer Units This high performance series provides fast and efficient oil clean-up with simple maintenance procedures that require no tools to change. This filter is designed to ensure it does not become blocked on the outer fibres but allows the full depth of the filter media to be utilised, capturing and retaining larger debris in the outer layers and the finer particles in the inner contamination control section of the media. This results in longer service life and better performance over a wide range of different sized contaminants. The assembly also includes an indicator button which activates when the filter-can needs changing. Available in a range of high performance efficiency ratings from 1 to 25 micron. nn Group 2 gear pump giving up to 27 litres/min nn Options of 110V, 240V standard supply nn Includes standard DOL Starter nn Fully wired and ready to use nn Visual ‘pop-up’ contamination indicator nn Includes 2 metre suction and delivery hose nn Carrying handle nn Pall 6 Micron cartridge fitted as standard Oil Transfer Unit Part No Description OTU1-110V-25 Oil transfer unit 110V, 25 litre A OTU1-220V-25 Oil transfer unit 220V, 25 litre A Accessories Part No Description DIPTUBE-25 Dip tube for 25 litre drum B DIPTUBE-205 Dip tube for 205 litre drum C HC7400SKP4H Pall 3 Micron replacement cartridge D HC7400SKN4H Pall 6 Micron replacement cartridge, (fitted as standard) D HC7400SKS4H Pall 12 Micron replacement cartridge D QRC-P12 QRC Probe, 3/4 BSP E QRC-C12 QRC Carrier, 3/4 BSP F B C A D E F Cable Lock Safety Retaining System for High Pressure Hydraulic Hose Assemblies Cablelock is an innovative retention system for high-pressure hydraulic hoses, which offers protection to a person from the dangerous effects of whip lash by the sudden release of hydraulic energy. Cablelock will restrain the hose assembly if the end termination is blown off or if there is end connection separation. This retaining system allows for the compliance to the DIN ISO 4413 section of the Machinery Directive 2006/42/EG Advantages of the Cablelock system: nn Installable without removing the current hydraulic hose assembly nn Compact structure , can be installed in areas where space is a premium nn Universal system, can be installed across different hose types nn Cost effective, safe, easy and quick installation
  • 122.
    Specialist Technical Centres Know-How FluidPower 114Hydraulic Valves Part No Port size Nominal pressure HBV2G14 BSP 1/4 500 HBV2G38 BSP 3/8 500 HBV2G12 BSP 1/2 400 HBV2G34 BSP 3/4 315 HBV2G1 BSP 1 315 HBV2G114 BSP 1.1/4 315 HBV2G112 BSP 1.1/2 315 HBV2G2 BSP 2 315 Part No Port size Nominal pressure DVG18 BSP 1/8 350 DVG14 BSP 1/4 350 DVG38 BSP 3/8 350 DVG12 BSP 1/2 350 DVG34 BSP 3/4 350 DVG1 BSP 1 350 DVG114 BSP 1.1/4 350 DVG112 BSP 1.1/2 350 Part No Port size Nominal pressure DRVG18 BSP 1/8 350 DRVG14 BSP 1/4 350 DRVG38 BSP 3/8 350 DRVG12 BSP 1/2 350 DRVG34 BSP 3/4 350 DRVG1 BSP 1 350 DRVG114 BSP 1.1/4 350 DRVG112 BSP 1.1/2 350 Part No Port size Nominal pressure RVG14 BSP 1/4 500 RVG38 BSP 3/8 500 RVG12 BSP 1/2 500 RVG34 BSP 3/4 400 RVG1 BSP 1 350 RVG114 BSP 1.1/4 350 RVG112 BSP 1.1/2 350 RVG2 BSP 2 250 Part No Port size Nominal pressure HBV3LG14 BSP 1/4 500 HBV3LG38 BSP 3/8 400 HBV3LG12 BSP 1/2 315 HBV3LG34 BSP 3/4 315 HBV3LG1 BSP 1 250 High Pressure 2-way Ball Valves High Pressure 3-way Ball Valves L-port Ball Valves High-pressure ball valves have a true on-off function; they should not be used in a partially opened position. Three-way ball valves come in different versions. The most commonly used has an L-bore with one defined pressured inlet port (the centre one). nn The flow can be switched from one to the other outlet port by turning the handle over a 90º angle nn In the 45º position the flow is blocked Flow Control Valves nn Flow control valves are designed to restrict the flow going through the valve from a fully opened position to a fully closed position nn Be aware that highly restricted flow levels will cause considerable heat generation Speed Control Valves nn These speed control valves have a built-in check valve which makes the adjustable flow restriction only work in one flow direction nn In the reversed flow direction the check valve opens and offers virtually unrestricted flow Check Valves nn A check valve simply allows flow in one direction and completely blocks flow in the reversed direction nn The so-called cracking pressure is normally set at 0.5 bar. This is the pressure at which the valve starts to open when pressured in the free flow direction Thousands of products available to order on ERIKS WEBSHOP SHOP.ERIKS.CO.UK SHOP.ERIKS .CO.UKSHOP .ERIKS.CO.UK
  • 123.
    Visit us ateriks-techdirect.co.uk FluidPower 115Bladder Accumulators and LAC Oil Coolers Bladder Accumulators and Accessories Parker UK Series - a high pressure range of bladder accumulators and accessories Ideally suited for the UK Industrial market (207 to 420 bar/ up to 54L). The UK series has been engineered to the highest quality standards to optimize service life and product safety. Its robust shell and bladder design offers strength and reliability which ensure the provision of constant pressure storage in any hydraulic system. The UK series is fitted with a bonded seal fluid port and 1/4” BSP Gas Connection as standard. A hydrostatic pressure test is carried out on all hydraulic accumulator shells during the manufacturing process. We can also offer additional pressure testing for shells or for a complete assembly - witnessed by a specified Inspection Authority and/or customer - as an optional extra. Benefits nn Engineered to the highest quality standards nn Long service life nn Technical and application expertise nn Accessories including charging kits. Typical Applications nn Hydrostatic bearings nn Lubricating oil supplies nn Chucking systems nn Machine tools. Also available: A complete range of piston and diaphragm accumulators. From 1kW up to a 300 kW cooling capacity. With its simple and robust design and wide selection of accessories, this range will suit all industrial applications with a high voltage electric source. It is quiet in operation and offers a low pressure drop and high cooling capacity. It has a single-phase or three-phase AC-motor and is suitable for installation in most applications and environments. Benefits with the correct working temperature nn Extended system life nn Increased output and fewer shutdowns nn Reduced service and repair costs nn High efficiency level maintained in continuous operation. Typical Applications nn Power units nn Lubrication systems nn Marine cranes nn Presses nn Wind power LAC Oil Cooler Series and Accessories Special versions also available for Marine and ATEX applications.
  • 124.
    Specialist Technical Centres Know-How FluidPower 116 Intelligentcontrol valves for electrical engineers Need greater control or better menu handling? Advanced hydraulic control for mechanical engineers Focused on product quality, speed and accuracy? VIRTUAL REALITY B261115-Parker Racor Advert-A5.indd 1 02/12/2015 12:46 • Enhanced motion control gives repeatable, realistic simulations for life cycle testing • Downloadable move parameters let you easily dump new data sets for quick product line changeovers or replacement valve setup • Fast voice coil technology operates at frequencies up to 350 Hz • Higher valve precision means more accurate cylinder positioning mid-stroke, with better product quality and tolerance • Robust design, tested in up to one billion cycles in tough marine diesel applications, makes it among the best-in-class for reliability • Optimised cycle times boost productivity, even with existing machines and equipment It’s time to get Parker’s DF Plus Valve on board. Dynamic performance and intelligent control, all in one clever valve. To find out more, please contact Tim Duffy at ERIKS on 024 7644 6644, or email Tim.Duffy@eriks.co.uk. http://www.parker.com/literature/Hydraulic%20 Controls%20Europe/Brochures/HY11-3328UK.pdf C M Y CM MY CY CMY K Parker advert.pdf 1 26/01/2016 10:44 Hydraulic Valves
  • 125.
    Visit us ateriks-techdirect.co.uk FluidPower 117 Directional Control Valves Series D1VW Parker’s directional control valve series D1VW in NG06 (CETOP 03 / NFPA D03) provides high functional limits up to 80 l/min in combination with a very low, energy-saving pressure drop due to optimized flow passages. The maximum pressure is 350 bar. Performance Characteristics Nominal Size NG06 / CETOP 03 Operation Style Direct Maximum Flow Rate 80 Litres/Min (depending on spool), 60 (depending on spool) Connection Type Connector as per EN 175301-803, plugs not included. Actuation Solenoid Weight 1.5kg (D1VW with 1 solenoid), 2.1 kg(D1VW with 2 solenoids) valves in more detail. Part No. Voltage Spool in Neutral Spring Arrangement Spool Code D1VW002CNYW 110V AC 50Hz 0 All Ports Connected Spring Centred 2 D1VW002CNJW 24V DC 0 All Ports Connected Spring Centred 2 D1VW001CNYW 110V AC 50Hz 2 All Ports Blocked Spring Centred 1 D1VW001CNJW 24V DC 2 All Ports Blocked Spring Centred 1 D1VW004CNYW 110V AC 50Hz 6 A and B to T Spring Centred 4 D1VW004CNJW 24V DC 6 A and B to T Spring Centred 8 D1VW008CNYW 110V AC 50Hz 8 A and B blocked, P to T Spring Centred 8 D1VW008CNJW 24V DC 8 A and B blocked, P to T Spring Centred 020 D1VW020HNYW 110V AC 50Hz 20 P to B, A to T Spring Offset in Pos A 020 D1VW020BNJW 24V DC 20 P to A, B to T Spring Offset in Pos B 030 D1VW020BNYW 110V AC 50Hz 2 All Ports Blocked Spring Offset End to End 020 D1VW020BNJW 24V DC 2 All Ports Blocked Spring Offset End to End 020 D1VW030BNYW 110V AC 50Hz 0 All Ports Connected Spring Offset End to End 030 D1VW030HNYW 110V AC 50Hz 30 P to B, A to T Spring Offset in Pos A 030 D1VW030BNJW 24V DC 30 P to A, B to T Spring Offset in Pos B 030 Part No. Voltage Spool in Neutral Spring Arrangement Spool Code D3W002CNYW 110V AC 50Hz 0 All Ports Connected Spring Centred 002 D3W002CNJW 24V DC 0 All Ports Connected Spring Centred 002 D3W001CNYW 110V AC 50Hz 2 All Ports Blocked Spring Centred 001 D3W001CNJW 24V DC 2 All Ports Blocked Spring Centred 001 D3W004CNYW 110V AC 50Hz 6 A and B to T Spring Centred 004 D3W004CNJW 24V DC 6 A and B to T Spring Centred 004 D3W008CNYW 110V AC 50Hz 8 A and B blocked, P to T Spring Centred 008 D3W008CNJW 24V DC 8 A and B blocked, P to T Spring Centred 008 D3W020HNYW 110V AC 50Hz 20 P to B, A to T Spring Offset in Pos A 020 D3W020BNJW 24V DC 20 P to A, B to T Spring Offset in Pos B 020 D3W030HNYW 110V AC 50Hz 30 P to B, A to T Spring Offset in Pos A 030 D3W030BNJW 24V DC 30 P to A, B to T Spring Offset in Pos B 030 Series D3W Parker’s direct operated directional control valve series D3W in NG10 (CETOP 05/ NFPA D05) features low energy losses due to optimized flow passages for economical operation. It offers high functional limits up to 150 l/min and a maximum pressure of 350 bar. Performance Characteristics Nominal Size NG10/CETOP 5 Mounting Style Sub-plate mounting Operation Style Direct Actuation Solenoid Series Type Directional control valve Weight (kg) 4.8 (1 solenoid), 6.3 (2 solenoids) Spool Type Spool TypeCode Code a 0 b 3 Position Spools 2 Position Spools 030 020 008 002 004 001 Spool Type Spool TypeCode Code a 0 b 3 Position Spools 2 Position Spools 030 020 008 002 004 001
  • 126.
    Specialist Technical Centres Know-How FluidPower 118Hydraulic Cylinders HASSLEDBYHYDRAULIC CYLINDERFAILURES? B261115-Parker Racor Advert-A5.indd 1 02/12/2015 12:46 To find out more, please contact Tim Duffy at ERIKS on 024 7644 6644, or email Tim.Duffy@eriks.co.uk. http://ph.parker.com/gb/en/hydraulic-cylinders-and-parts Managing a production line is hard work when you need to run machines faster, work plant harder or put new products down an existing line. With 90 per cent of failures down to misalignment, contamination or mechanical damage, it’s vital to keep track of what’s going wrong. Occasional repairs are fine; but if the same problems keep cropping up, it’s time for a rethink. ERIKS offers expert advice, backed by Parker’s industry-leading application and technological knowledge. So if you’d like a chat on how to sort out your cylinder problems, please get in touch. C M Y CM MY CY CMY K Parker advert 2.pdf 2 26/01/2016 10:44
  • 127.
    Visit us ateriks-techdirect.co.uk FluidPower 119 Hydraulic Cylinders Developed with an uncompromising approach to durability and performance. Every component is built from high quality materials for maximum life in harsh conditions and every feature designed to ensure high load capacity, wear resistance and smooth performance even in the most demanding application. Metric Tie Rod Series HMI/HMD Roundline MMA “Mill Type” Series The HMI and HMD ranges described in this catalogue are Compact Series cylinders to ISO 6020/2 and DIN 24 554, rated for use at working pressures up to 210 bar depending on the rod end and type of service. They have been designed to satisfy the requirements of a wide range of industries in which cylinders to ISO or DIN standards are specified. Technical Features: nn Working pressure up to 210 bar nn Bore sizes: 25mm to 200mm nn Piston rod diameters: 12mm to 140mm nn Single and double rod designs available nn Strokes – available in any practical stroke length nn Cushions – available at either or both ends nn Five seal types to suit a wide range of fluid specifications nn Temperature ranges: -20°C to +150°C. Application Benefits nn Extended life due to critical component design and serviceability nn Smooth operation for precise and dynamic performance nn Solutions for existing application problems with an ISO /DIN Product. The heavy duty series MMA cylinder has been designed for service in steel mills and in other arduous applications where a rugged, dependable cylinder is required. In addition to the standard cylinders, MMA cylinders can be designed and manufactured to suit individual customer requirements. Technical Features: nn Heavy duty construction nn Styles and dimensions to: CETOP RP73H, ISO 6022, DIN 24 333, AFNOR NF E48-025, VW 39D 921 nn Rated pressure: 250 bar nn Fatigue-free at the rated pressure nn Hydraulic mineral oil – other fluids on request nn Temperature range of standard seals: -20°C to +80°C nn Construction: head and cap bolted to heavy steel flanges nn Bore sizes: 50mm to 320mm nn Piston rod diameters: 32mm to 220mm nn Cushioning – optional at both ends nn Air bleeds – optional at both ends nn Tested in accordance with ISO 10100 : 2001. Application Benefits nn Extended life due to critical component design and serviceability nn Smooth operation for precise and dynamic performance nn Customer specific solutions for special applications.
  • 128.
    Specialist Technical Centres Know-How FluidPower 120 Canyou afford unplanned and expensive downtime? You will receive: nn Fixed price up front so you know exactly what you are paying nn Free collection service of your old pump saving you valuable time, effort and money nn Service exchange items available from stock nn An “as new” 12 month manufacturers warranty nn 3-5 day turnaround service Benefits: nn Prevention of repeat repairs nn Reduction of downtime nn All parts are fully tested and adjusted to Bosch Rexroth settings nn Increase in productivity Whether you need spare parts, onsite or field service support, product training, a system health check or you simply want to talk through your service issues, don’t take the risk. Price List A10 Pump Type Size Price A10VSO 18 18 £721.43 A10VSO 28 28 £764.29 A10VSO 45 45 £861.43 The cost effective exchange programme for your A10 pumps Bosch Rexroth is the only company that can repair and replace Rexroth products back to the original specification. Brand new from Bosch Rexroth, an environmentally- friendly A10 pump service exchange programme. Call 0845 006 6000 Back to New Service A10 Pump Type Size Price A10VSO 71 71 £960.00 A10VSO 100 100 £1,151.00 A10VSO 140 140 £1,349.00 We can n Help save you expensive downtime n Help reduce your machinery failure n Offer you bespoke service contracts at no extra cost n Provide a full warranty Exchange Programme
  • 129.
    Visit us ateriks-techdirect.co.uk FluidPower 121 IT’S A SOLUTION THAT LASTS A LIFETIME ERIKS INDUSTRIAL Products, Services Solutions MORE THAN THE SUM OF THE PARTS A product is just a product, but a product supported by services that are provided by people with know- how is more than just a product... we CAN, we WILL we DO SAVING TIME SAVING COSTS SAFETY CONSCIOUS www.eriks.co.uk Here for you for greater EFFICIENCY, greater RELIABILITY and longer SERVICE LIFE which equals greater SAVINGS
  • 130.
    Specialist Technical Centres Know-How FluidPower 122 RESPONSIVE HYDRAULICREPAIR ERIKS offer a highly responsive repair service to help keep your ’down time’ to a minimum. We guarantee fast turn around times, and great quality products all supported by our application engineers who have the technical know-how when you need it most. ENGINEERING SITE SERVICES FUNCTIONS: nn Full machine shop / fabrication nn In house honing nn Full testing facility nn Working capacities for: 600bar – 200rpm 0-15 mtrs 0-18 mtr Diameter nn Heavy duty torque multiplyer for excavator rebuilds nn Complete strip down of cylinder WHY ERIKS: A ‘Comprehensive’ Strip and Quote Service which includes: nn Comprehensive assessment and full diagnosis nn Locating all spares required for the repair nn Prompt quotation to reduce down time CALL: 0845 006 6000 to contact your local workshop
  • 131.
    YOUR Complete FILTRATION solution ERIKShas brought together a range of filtration brands not available from any other supplier. All market leaders in their specific fields, these manufacturers are now partnered with the UK’s number one distributor of pneumatic, hydraulic and filtration products. At ERIKS we believe that having field based, competent technical sales engineers separates us from those who simply supply product in a box SERVICES nn On-site fluid sampling nn Independent filtration audits nn Lab services nn Plant commissioning PRODUCT RANGE nn Hydraulic / Air / Process Filtration nn Dust and fume control nn Purifier equipment nn Monitoring equipment nn Housings and assemblies nn Transfer units 123 Visit us at eriks-techdirect.co.uk
  • 132.
    Specialist Technical Centres Know-How FluidPower 124 Industryleading filter performance (Betax(c)≥2000), even under high cyclic conditions u Consistently high filter performance delivers improved fluid cleanliness for the full life of the filter u The smallest footprint for your operations u Anti-static construction reduces charge generation and virtually eliminates static discharge u Coreless, synthetic construction minimizes waste disposal maximise equipment reliabilityreduce costs Pall Corporation, serving the fluid power industry, specialize in the removal and control of contamination in hydraulic, lubrication and fuel systems for markets such as mobile, mining, power generation, industrial manufacturing, primary metals, offshore and petrochemicals. As the world’s premier provider of filtration, separation and purification science enabling technologies, Pall has built a reputation as the applied solutions experts in filtration, based on technical expertise, proven performance, quality products, and responsive service. The breadth of our product line and scientific resources makes us uniquely qualified to deliver the best product technologies for each application we support. AthalonTM Hydraulic and Lube Oil Filters Oil Purification Systems Reliability of systems, the life of system components and fluids can be extended by minimising water contamination u Vacuum dehydration technology for fluid viscosities up to 700cSt. u Removes 100% free water, air and gases and up to 80% dissolved water, air and gases u High efficiency particulate and salt contamination removal u Compact footprint in a range of flows u Available for purchase and hire Diagnostics and monitoring equipment u Fluid cleanliness monitoring using proven mesh blockage technology - Accurate results even in water based, cloudy or aerated fluids - Real time monitoring for immediate corrective actions u WS Series fixed and portable water sensors measure dissolved water levels in hydraulic, lube and insulating oils, supporting predicative maintenance programs of plant and machinery © 2016 Pall Corporation. Pall, Coralon, Profile, Nexis, Claris, FSI, Ultipleat, Athalon and Ultipor are trademarks of Pall Corporation. ® indicates a trademark registered in the USA. BETTER LIVES. BETTER PLANET and Filtration. Separation. Solution.SM are service marks of Pall Corporation. For more information visit www.pall.com/me For further details, contact your local ERIKS Service Centre on 0845 006 6000 Filtration. Separation. Solution.SM Industry leading filter performance (Betax(c)≥2000), even under high cyclic conditions u Consistently high filter performance delivers improved fluid cleanliness for the full life of the filter u The smallest footprint for your operations u Anti-static construction reduces charge generation and virtually eliminates static discharge u Coreless, synthetic construction minimizes waste disposal maximise equipment reliabilityreduce costs Pall Corporation, serving the fluid power industry, specialize in the removal and control of contamination in hydraulic, lubrication and fuel systems for markets such as mobile, mining, power generation, industrial manufacturing, primary metals, offshore and petrochemicals. As the world’s premier provider of filtration, separation and purification science enabling technologies, Pall has built a reputation as the applied solutions experts in filtration, based on technical expertise, proven performance, quality products, and responsive service. The breadth of our product line and scientific resources makes us uniquely qualified to deliver the best product technologies for each application we support. AthalonTM Hydraulic and Lube Oil Filters Oil Purification Systems Reliability of systems, the life of system components and fluids can be extended by minimising water contamination u Vacuum dehydration technology for fluid viscosities up to 700cSt. u Removes 100% free water, air and gases and up to 80% dissolved water, air and gases u High efficiency particulate and salt contamination removal u Compact footprint in a range of flows u Available for purchase and hire Diagnostics and monitoring equipment u Fluid cleanliness monitoring using proven mesh blockage technology - Accurate results even in water based, cloudy or aerated fluids - Real time monitoring for immediate corrective actions u WS Series fixed and portable water sensors measure dissolved water levels in hydraulic, lube and insulating oils, supporting predicative maintenance programs of plant and machinery © 2016 Pall Corporation. Pall, Coralon, Profile, Nexis, Claris, FSI, Ultipleat, Athalon and Ultipor are trademarks of Pall Corporation. ® indicates a trademark registered in the USA. BETTER LIVES. BETTER PLANET and Filtration. Separation. Solution.SM are service marks of Pall Corporation. For more information visit www.pall.com/me For further details, contact your local ERIKS Service Centre on 0845 006 6000 Filtration. Separation. Solution.SM Pall Filters for Hydraulic and Lubricating Fluids
  • 133.
    Visit us ateriks-techdirect.co.uk FluidPower 125 Pall AthalonTM Filters Offer: nn Betax(c) ≥2000 removal efficiency - unequalled in industry today nn Stress Resistant media Technology (SRT) nn Improved fluid cleanliness nn Consistent performance throughout filter service life nn Low, clean differential pressure nn Long service life nn Environmentally friendly coreless filter pack Filters for Hydraulic and Lubricating Fluids For asset protection without compromise, Pall offers the most innovative filtration technology available to achieve the optimum fluid cleanliness levels to make your operations more reliable. The Ultimate in Filter Performance Pall’s Athalon™ hydraulic and lube oil filters combine Betax(c) ≥2000 rated, stress-resistant filter technology and a full range of housings to provide the greatest overall filter performance and value available in industry today Application Which Pall product to ask for? Pre-filtration Pall FSI filter bags or Meltblown filter cartridges (Profile® , Nexis™ and Claris™) Replacement filter element upgrades Coralon™ and Red1000 filter elements High performance fluid cleanliness control Coralon (for existing Ultipor filters) AthalonTM filter elements and housings for new installations Water removal from oil HNP portable oil purifiers Diagnostics and Monitoring Pall cleanliness monitors (PCM), WS series water sensors and Pall Cleanliness Cabinets (PCC) Upgrade your existing Pall Ultipor™ filters with Coralon™ filter elements to provide improved fluid cleanliness, enhanced fluid cleanliness consistency, and lower clean pressure drop while providing equivalent service life of its Ultipor predecessor. Coralon filter elements are the same form, fit, and function as Ultipor elements. Replace alternative filter elements retrofitted into original Pall filter housings to return your hydraulic and lubrication systems back up to 15x cleaner and more consistent fluid cleanliness. Diagnostic and Monitoring Equipment Fluid Condition Monitoring For accurate, reliable measurement of fluid cleanliness, the PCM500 is the only fluid cleanliness monitor you’ll need. Using proven mesh blockage technology the fully portable PCM500 provides accurate 3-part ISO 4406 cleanliness class code results in under 6 minutes, even in water based, cloudy or aerated fluids. Our WS Series fixed (WS12) and portable (WS19) water sensors measure dissolved water levels in hydraulic, lube and insulating oils, supporting predictive maintenance programs of plant and machinery For more information visit www.pall.com/me Did you know?.... An effective filter is an efficient filter. Pall’s Athalon filters are rated to Betax(c) ≥2000 efficiency - the highest available rating in industry today. PCM500 Fluid Cleanliness Monitor WS19: Portable hand-held Water Sensor WS12 Fixed In-line Water Sensor
  • 134.
    Specialist Technical Centres Know-How FluidPower 126Amazon Filtration ... A comprehensive off the shelf range of UK manufactured Stainless Steel filter housings ... A variety of connection and couplings available as standard (screwed, flanged, dairy type fittings etc.) ... Specialist Super Duplex and Hastelloy filter housing fabrications ... Bespoke and Coded designs available (PD5500/ASME etc) ... An own manufactured range of process filter consumables FIRST CLASS SERVICE WORLD CLASS FILTERS Amazon Filters Ltd makes what it sells. We control our own quality, cost and lead times. Our rigorous procedures and approvals ensure that quality is assured, both ours and yours, when Amazon products are chosen. Our success is underpinned by quality and also through the application of our knowledge. This is Amazon’s key differentiator and is the secret of our progression into a globally recognised brand that provides innovative filtration solutions. Europe’s best kept filtration secret... Process filtration specialist manufacturer TEL: +44 (0) 1276 670600 FAX: +44 (0) 1276 670101 EMAIL: sales@amazonfilters.co.uk WEB: www.amazonfilters.com Supplied by TEL: 0845 006 6000 VISIT: www.eriks.co.uk Do you know that Amazon provides ...
  • 135.
    Visit us ateriks-techdirect.co.uk FluidPower 127 From causing fatalities to killing a brand’s reputation, the Cryptosporidium parasite – found in water – is a very real danger in any food or beverage production process. Fortunately there is a simple, reliable and cost-effective filtration solution. Used as part of a product’s make-up, for rinsing food – such as salads – and simply for washing-down equipment, water is an intrinsic part of food and beverage production. So ensuring it is not contaminated by the deadly cryptosporidium parasite is essential. But how can you stop it entering your plant, mixing with your product, and ultimately reaching your end consumer – with potentially fatal results? Removing the Risks Using the right filter for your water supply can minimise the risk of the cryptosporidium parasite and its associated risks. Amazon Filters offer a choice of two filter cartridges – the SupaSpun II depth filter and SupaPleat II pleated filter – which have been proven in use with numerous food and beverage producers. By installing these products to filter incoming mains water, you can demonstrate ‘due diligence’ in preventing contamination. And you can ensure complete peace of mind for your customers and yourself. Cryptosporidium – the facts nn Potentially fatal parasite found worldwide in water systems nn Causes 50.8% of water-borne diseases that are attributed to parasites nn Causes symptoms including severe diarrhoea – lasting up to two weeks even in healthy adults nn Causes more serious problems in the young, elderly and immuno compromised nn Protected by an outer shell that allows it to survive outside the body for long periods of time nn Very tolerant of chlorine disinfection When water can KILL Amazon filters have the anwser SupaSpun II Features Benefits nn Absolute removal ratings for consistent and reliable performance nn Graded density structure for maximum dirt holding capacity nn Increased void volume giving high flow rates and low initial pressure losses nn Wide chemical compatibility using polypropylene nn Range of Absolute ratings from 0.3 to 180μm (Beta Ratio 5000) nn Thermal bonding process minimises media migration and ensures minimal extractables SupaPleat II Features Benefits nn Absolute removal ratings for consistent and reliable performance nn PP – Wide chemical compatibility using 100% polypropylene to meet nn XP - Extended life version for more challenging applications nn GP – Glass microfibre media gives excellent dirt holding capacity nn Thermal bonding process eliminates adhesives and ensures minimal extractables nn Cryptosporidium grade (CRY) with typical 104 log reduction value for use in food and beverage applications nn Batch traceability
  • 136.
    Specialist Technical Centres Know-How FluidPower 128Filtration Panel and Bag Filters MANN+HUMMEL VOKES AIR filters are designed to provide maximum value and performance in HVAC, industrial and clean room applications. Ranging from panel pre-filters through bags to final compact filters, a wide range of sizes and configurations are available. The products detailed here are our most popular sizes. IF2 Pleated Panel Filters Most commonly used as a pre-filter to M or F grade filters (bag and rigid bag filters). Suitable for a very broad range of applications, but is commonly employed in environments such as hospitals, food and beverage production areas and installations where glass media is prohibited. Available in all cross sectional sizes; 22, 47 and 98mm depth as standard in card or metal case. Rigid Bag Filters With 20 or 25mm deep plastic frame, these compact filters are suitable for high air volumes or where long filter life is required. Available in M6, F7, F8 and F9 grades and in 592x592, 490x592 and 287x592mm sizes. Bag Filters With a 20 or 25mm deep plastic or metal frame, these ultrasonically-sealed bag filters are designed for use in general air conditioning equipment and computer rooms. Available in M5, M6, F7 and F8 grades and in all cross sectional sizes. Speak to us about our Low Energy Revo II Bag Filters. Compatex FP Rigid bag filters, rated to F7 Part No Height Width Depth Box Qty Compatex FP 592X592X300 F7 592mm (24) 592mm (24) 300mm (12) 1 Compatex FP592X287X300 F7 592mm (24) 287mm (12) 300mm (12) 2 SoniQ II Bag filters, 8/4 pocket rated to F7 Part No Pockets Height Width Depth Box Qty SoniQ II 592X592X635-20H 8 592mm (24) 592mm (24) 635mm (25) 5 SoniQ II 592X592X535-20H 8 592mm (24) 592mm (24) 535mm (20) 5 SoniQ II 592X592X380-20H 8 592mm (24) 592mm (24) 380mm (15) 5 SoniQ II 592X287X635-20H 4 592mm (24) 287mm (12) 635mm (25) 8 SoniQ II 592X287X535-20H 4 592mm (24) 287mm (12) 535mm (20) 10 SoniQ II 592X287X380-20H 4 592mm (24) 287mm (12) 380mm (15) 9 Please note that these items are sold in box quantities only. IF2 Pleated Synthetic Panel Filter – Rated to Grade 4 Part No Height Width Depth Box Qty IF2-496X395X47-G4 496mm (20) 395mm (16) 47mm (2) 10 IF2-496X496X47-G4 496mm (20) 496mm (20) 47mm (2) 10 IF2-496X496X98-G4 496mm (20) 496mm (20) 98mm (4) 5 IF2-596X287X47-G4 596mm (24) 287mm (12) 47mm (2) 20 IF2-596X496X47-G4 596mm (24) 496mm (20) 47mm (2) 10 Part No Height Width Depth Box Qty IF2-596X596X47-G4 596mm (24) 596mm (24) 47mm (2) 10 IF2-596X596X98-G4 596mm (24) 596mm (24) 98mm (4) 5 IF2-624X395X47-G4 624mm (25) 395mm (16) 47mm (2) 10 IF2-624X496X47-G4 624mm (25) 496mm (20) 47mm (2) 10 IF2-624X496X98-G4 624mm (25) 496mm (20) 98mm (4) 5
  • 137.
    Visit us ateriks-techdirect.co.uk FluidPower 129 How does a change of filter help reduce energy bills? Whether you are using an air filter as part of your process (in a cooling, warming or venting system, for example) or to maintain an environment (as part of your air conditioning system) you face the same problem of maintaining an acceptable balance of filtration efficiency and back pressure. The higher the filtration efficiency, the higher the initial back pressure, and the sooner the filter becomes clogged – leading to a further increase in back pressure. In both cases, reduced air flow leads to higher energy use, as the fan has to work harder or run faster to push the air through the filter. Developments in filter technology over the past few years have largely been aimed at achieving acceptable filtration levels without increasing back pressure or shortening filter life through faster clogging, and without increasing energy consumption through the need for a more powerful or faster fan. One way to do this is through an increased filter surface area – providing exceptionally low pressure drop – combined with high filtration efficiency and a high dust- holding capacity. This technology is now commercially available in the shape of the Vokes-Air Synsafe Revo II filter. The Synsafe Revo II combines advances in filtering technology. Firstly, it utilises not one but four progressive filter layers. This not only means a greater dust-holding capacity but also ensures the filters have a longer life before the build-up of filtered particles increases and reduces efficiency to unacceptable levels. The four layers comprise: 1. Pre-filter with a coarse structure to remove the largest particles 2. Primary fine filter to remove smaller particles 3. Secondary fine filter incorporating Nanofyne Technology™ 4. Self-cleaning outer layer which also provides rigidity to the media Secondly, the filters in the Synsafe Revo II are made from nano fibres, using unique Nanofyne Technology. These fibres have a diameter of less than 1μm (compared with 3μm for fibres in conventional filters) which means they offer a greater fibre surface area for trapping dust, together with less density to create back pressure. The result is higher filtration efficiency and a longer lower pressure drop, which means the fan operates at lower speed and consequently uses less energy. If the fan is belt driven, then this will provide the opportunity for a change of belt and pulley ratio to reduce the fan speed, or an inverter to provide speed control – both areas in which ERIKS can provide expert advice and assistance. Synsafe Revo II vs. Conventional Filters Airflow Velocity m/s 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 0 50 100 150 200 250 300 350 PressureDrop(pa) Composite graph showing actual airflow and pressure drop readings on 10 air handling units Pressure Drop (cost) Savings Filter Tips Just as cigarettes come with health warning, perhaps some air filters should come with a ‘wealth warning’. Because simply by changing your filter to a different type of technology you can reduce your energy costs whilst still maintaining the level of filtration and airflow you need. *The current filtration efficiency grades categorised as G, M and F grades (to EN779:2012) will soon be superseded by products adhering to the new ISO 16890 test standard. From 2018, all filters will be tested in accordance to the stipulations of ISO 16890 and will carry new product labelling in line with updated industry standards. ** Please call ERIKS to find out more about ISO 16890 and how this change may impact your filtration requirements.
  • 138.
    Specialist Technical Centres Know-How FluidPower 130Fluid Level Gauges and Hydraulic Filters The perfect fluid control programme from one source Hydac is a multinational company with numerous production plants in Germany, UK, USA, Switzerland and China. Sales are achieved, worldwide, through over 30 wholly owned subsidiaries, many who in turn work in partnership with local distribution outlets. The partnership of Hydac Technology and ERIKS supply all types of industry with high quality products in a timely and efficient manner. Section Part No Micron Maximum nominal flow Filter Rating rate litres/minute Material 0015S125W 125 15 Wire mesh 0025S125W 125 25 Wire mesh 0050S125W 125 50 Wire mesh 0100S125W 125 100 Wire mesh 0180S125W 125 180 Wire mesh Return Part No Micron Maximum nominal flow Filter Rating rate litres/minute Material 0030R010P 10 30 Paper 0060R010P 10 60 Paper 0060R025W 25 60 Wire mesh 0100RK015MM 15 100 Mobilemicron 0110R010P 10 110 Paper 0110R020BN4HC 20 110 Betamicron 0151RK015MM 15 151 Mobilemicron 0160R010P 10 160 Paper 0160R025W 25 160 Wire mesh 0240R003BN4HC 25 240 Betamicron 0240R005BN4HC 3 240 Betamicron 0240R010P 10 240 Paper 0240RS125W 125 240 Wire mesh 0300RK010MM 10 300 Mobilemicron 0330R003BN4HC 3 330 Betamicron 0330R010BN/AM 10 330 Betamicron/ Aquamicron 0330R010P 10 330 Paper 0330R010V 10 330 Metal fibre 0950R005BN4HC 5 950 Betamicron 0950R010BN4HC 10 950 Betamicron Pressure Part No Micron Maximum nominal flow Filter Rating rate litres/minute Material 0030D010BN4HC 10 30 Betamicron 0030D010V 10 30 Metal fibre 0030D025W 25 30 Wire mesh 0060D003BH4HC 3 60 Betamicron 0060D005BN4HC 5 60 Betamicron 0060D010BN4HC 10 60 Betamicron 0060D025W 25 60 Wire mesh 0110D003BH3HC 3 110 Betamicron 0110D025W 25 110 Wire mesh 0110D050W 50 110 Wire mesh 0160D010BN4HC 10 160 Betamicron 0160D025W/HC 25 160 Wire mesh 0160D100W 100 160 Wire mesh 0160DN025W/HC 25 160 Wire mesh 0240D025W 25 240 Wire mesh 0330D020BN4HC 20 330 Betamicron 0660D020BN4HC 20 660 Betamicron 0660D020V 20 660 Metal fibre 0660D025W 25 660 Wire mesh Spin on cartridge Part No Micron Maximum nominal flow Filter Rating rate litres/minute Material 0090MA010BN 10 90 Betamicron 0160MA003BN 3 160 Betamicron 0160MA005BN 5 160 Betamicron 0160MA010BN 10 160 Betamicron 0160MA020BN 20 160 Betamicron 0160MG010P 10 160 Paper Fluid Level Gauges Hydac fluid level gauges FSA are used to monitor levels of operating fluids. nn Available with or without thermometer in display tube nn 12mm banjo mounting bolts as standard Part No Description FSA76-1.1/12 3 Gauge FSA76-1.1/T/12 3 Gauge c/w thermometer FSA127-1.1/12 5 Gauge FSA127-1.1/T/12 5 Gauge c/w thermometer FSA254-1.1/12 10 Gauge FSA254-1.1/T/12 10 Gauge c/w thermometer
  • 139.
    Visit us ateriks-techdirect.co.uk FluidPower 131 Focused expertise and high tech equipment produce reliable operating fluids. An operating fluid is as specialised as its application. We are familiar with almost all aspects – the applications and the appropriate operating fluids. The lubricating properties of hydraulic and lubricating fluids are key to properly functioning industrial systems. Fluid condition monitoring and the corresponding fluid conditioning guarantee the functionality, availability, and service life of industrial systems in stationary and mobile hydraulics and in lubrication technology. In order to assess and predict the actual performance and characteristics of industrial fluids, a proper understanding of the interaction of mechanical and chemical factors is required, experience and knowledge of relevant factors, derived from research and real-world operations. HYDAC have created a FluidCareCenter which is a centre of excellence for study and development of optimised hydraulic applications. In addition to the systematic analysis of various fluids, we perform tests commissioned by customers, tailored to their specific applications. Our objective is to develop machines and systems optimised for lubrication applications and to select the optimal type of fluid and ensure its proper conditioning. HMG 3000, AS 1000 e.g. FTIR spectroscopy Various chemical analyses Electrostatic test stand, Stat-Stick, HMG 3000 ICP-OES Karl Fischer Titration: TAN / TBN, HYDACLab® , RULER, MPC Test rig for characterisation of air separators Mobile FluidCareCenter Microscope, Patch test, Spectroscopy Automated Laboratory Particle Counter (ALPC), Bottle Sampling Unit, SEM-EDX Mechanical shearing, thermal, oxidative and hydrolytic oil ageing, Brugger test etc. Operating pressure Temperature Flow rate Lubricant properties Particle contamination Contaminant analyses Select analyses Gaseous contamination (air) Analyses of oil, additive degradation, varnish analyses Contamination caused by water Oil and additive elemental analysis Behaviour of fluids and filter media Synthetic, accelerated oil ageing Oil and additive molecular analysis
  • 140.
    Specialist Technical Centres Know-How FluidPower 132 ConditionMonitoring Using Condition Monitoring you can determine the health of your machinery and even better predict when your machinery will require maintenance. To ensure you have the best technology available to help your maintenance needs, contact ERIKS for: nn Dedicated Condition Monitoring Business Unit nn In-house nationwide network of ISO 18436 certified nn In-house oil analysis facilities nn Online condition monitoring nn Team of technical application engineers In brief these comprise of: nn An ERIKS branded oil sampling kit and laboratory analysis nn ERIKS Application Engineer “Patch Test” report nn Onsite analysis via particle counter and water sensor nn Equipment hire fleet - filtration trolleys, purifier and diagnostic equipment nn We also have access to a range of PALL equipment 132 Oil Cleanliness *Figures based on ERIKS own research If you fail to take avoidance procedures this can result in catastrophic failure. You can resolve major contamination issues and reduce unexpected downtime and systems failure by employing a really simple and cost effective approach. ERIKS UK has been offering services and support in the field of “Oil Cleanliness Management” for over 10 years. We offer customers several levels of support depending on the requirement, which also includes onsite technical support. Benefit from: of component failure is due to system contamination80%* n Reduction of component repairs/replacement n Reduce downtime and increase your production n Reduction in energy use due to less pressure drop n Increasing lifetime of your products reduces TCO n Spares stock reduction n Online reporting/condition monitoring – central report location, paperless and secure
  • 141.
    Visit us ateriks-techdirect.co.uk FluidPower 133Filtration Solutions Nederman Filtration Solutions FilterCart Original The Nederman FilterCart Original is a lightweight, highly manoeuvrable mobile filter unit for light welding and extraction applications, and includes a Nederman Original 3m extraction arm, a 0.75Kw fan and is capable of extracting a maximum of 1050m3/hr. Arm dia, mm Max airflow, Filtration Filter surface Voltage, Power, Noise level, Part No. m3/hr efficiency, % area, m2 V Kw dB(A) 160 1050 99 35 110 0.75 73 12624745 160 1050 99 35 230 0.75 73 12621445 Product Voltage, Power, Air flow Max vacuum, Filtration Weight, kg Noise level, Part no. V W m3/hr (with 2.5m kPa efficiency, dB(A) hose) % FE 840 120 1000 150 -22 99.7 16 73 70840100 FE 840 230 1000 150 -22 99.7 16 73 70840442 FE 841 120 1000 150 -22 99.7 16 73 70841100 FE 841 230 1000 150 -22 99.7 16 73 70841010 Product Voltage, V Power, W Compressed air Part no. consumption, l/min SB750 230 1000 500 70750073 Fume Eliminator The Fume Eliminator is designed to be carried to the working area. Connected to a welding torch or to an extraction nozzle, the FE unit extracts the fume directly at source. . nn Manual or automatic start/stop function nn Portable and easy to carry nn Low service costs SB750 Suction Blaster, compact portable vacuum sandblaster The Suction Blaster 750 has a superior accessibility irrespective of the shape of the surface and different accessory nozzles keep the blasting process closed and dust free. nn Manual or automatic start/stop function nn Portable and easy to carry nn Low service costs 160E Mobile Dust Collector The Nederman high vacuum dry vacuum 160E is ideal when you have quality standards for effective cleaning and dust removal. nn Easy to handle nn Powerful single phase motor nn High filtration efficiency nn Long filter lifetime (4-6000 hours) with bag filters nn Light weight nn Low operating and maintenance costs Product Voltage, Power, Capacity r Max vacuum, Noise level, Weight, Part no. V W freeblowing, kPa dB(A) kg m3/h 160E 110 1200 160 -22 75 19.5 40055030 160E 230 1200 160 -22 75 19.5 40055020
  • 142.
    ERIKS INDUSTRIAL Products,Services Solutions LIFE SUPPORT FOR PRODUCTS „„ Preventative maintenance and root cause failure analysis „„ Customisation and design engineering „„ Impartial repair, replace or systems upgrade „„ On-site installation and commissioning „„ Sub-assemblies and kitting solutions PREVENTION IS BETTER THAN A CURE... It also extends life and lowers costs. Our comprehensive condition monitoring support services cover all forms of preventative and predictive maintenance both on site and remotely. EXTENDED PERFORMANCE with our PREVENTATIVE MAINTENANCE know-how More TLC, less TCO www.eriks.co.uk
  • 143.
    So much morethan great industrial hose supply Hoses are subject to many factors that can lead to premature failure, such as manual handling or incompatible products used, these failures can lead to severe implications. Such risks are becoming increasingly high profile and ERIKS Hose Technology are here to help mitigate risk via a host of options, based upon many years of experience. ERIKS assemble the full range of industrial hoses, including PTFE, composite, metallic, rubber, silicone and PVC. nn Metallic nn Hygienic nn Rubber nn Plastic nn PTFE nn Silicone nn Ducting nn Together with extensive stocks of Bellows, Fittings 135 Visit us at eriks-techdirect.co.uk
  • 144.
    Specialist Technical Centres Know-How FluidPower 136Commodity Hose Clips Commodity Hose Braided PVC Can be used to convey many liquids and gases under pressure, used in factory airlines, pneumatic equipment general workshop use. nn Temp. Range: -15°C to +60°C nn Working Pressure: 9 to 25 (Water) nn Size: 05 to 50mm (Coil Length 30M) nn Add EU Food 10/2011 simulant A, B, C, D1 Green Medium Duty Outstanding resistance to the effects of weather, widely used in agriculture, construction and general industries. nn Temp. Range: -15°C to +60°C nn Working Pressure: 3 to 5 bar nn Size: 25 to 152mm (Coil Length 30M) PVC Superflex High flexibility PVC ducting hose, reinforced with a semi-rigid crush resistant white PVC helix. Suitable for water, slurry, and powder in agricultural and industrial applications nn Temp. Range: -15°C to +55°C nn Working Pressure: 0.5 Max nn Size: 25 to 254mm (Coil Length 30M) Green Tint A lightweight PVC hose which is tough and durable with outstanding weather resistance. Suitable for water, slurry, and powder in agricultural and industrial applications nn Temp. Range: -15°C to +60°C nn Working Pressure: 3 to 6 bar nn Size: 12 to 102mm (Coil Length 30M) Blue PVC Oil SD Applications with exceptionally high flexibility and resistance to hydrocarbons in industry, engineering, construction, water supply and waste water technology. Hi Vac Tough and flexible nontoxic transparent PVC hose, used for suction and delivery of water, slurries, granules, foodstuffs and dilute chemicals. nn Temp. Range: -15°C to +60°C nn Working Pressure: 2.5 to 12 bar nn Size: 12 to 152mm (Coil Length 30M) nn Add EU Food 10/2011 simulant A,B,C,D1 EHT Code ID OD Wall Vacuum Min. Bend (mm) (mm) Thickness (mm) % Radius 1048-12 12.0 19.2 3.1 88 26 1048-152 152.0 170.4 9.2 88 456 EHT Code ID OD Wall OD over Vacuum Min. Bend (mm) (mm) Thickness Helix % Radius (mm) (mm) Pressure 1047-025 1 25 2.5 30 0.49 25 1047-254 10 254 7.0 268 0.29 254 EHT Code ID ID Wall Min Bend (Inches) (mm) Thickness (mm) Radius 1041L-012 1/2 12.0 2.6 57 1041L-102 4 102.0 6.3 459 EHT Code ID ID Wall Min Bend (Inches) (mm) Thickness (mm) Thickness (mm) 1042-025 1 25 4 88 1042-101 4 102 6.3 357 EHT Code Int. Dia ID Ext. Dia Min. Bend Coil (mm) (Inches) (mm) (mm) Radius 1003-05 5.0 3/16 10.0 32.5 2.25 1003-50 50.0 2 61.6 325.0 39.42 EHT Code ID OD Wall Min Bend Vacuum (Inch) (mm) Thickness Radius (%) 1039-025 1 25 4.2 113 0.88 1039-254 10 254 13.0 1143 0.78 nn Temp. Range: -25°C to +60°C nn Working Pressure: 2 to 5 bar nn Size: 25 to 101mm (Coil Length 61 / 30.5M) Tricoflex A highly flexible easy handling garden hose, with excellent resistance to repeated bending, crushing and pulling EHT Code ID Wall Burst Min. Bend (mm) Thickness (mm) Pressure Water (bar) Radius 1003T-12-25M 12.5 2.75 25 125 1003T-50-50M 50 6.5 20 500 nn Temp. Range: -15°C to +60°C nn Working Pressure: 8 to 10 bar nn Size: 12 to 50mm (Coil Length 25, 50 100M)
  • 145.
    Visit us ateriks-techdirect.co.uk FluidPower 137 Core Product Available Ex Stock from Dudley EHT Code ID ID Wall Min Bend (Inches) (mm) Thickness (mm) Thickness (mm) 1037-351-0013-0000 1 25 4 88 1037-351-0508-0000 4 102 6.3 357 Jubilee® Clips Bolt Clamps A stronger alternative to worm drive clamps, and able to withstand greater pressures, whilst being completely reusable. nn Low carbon mild steel finished with a rust resistant zinc plating or Stainless Steel nn Size: 23-239 Wyrem Heavy-duty ducting, suction and delivery, ideal for general purpose dust and fume extraction. nn Temp. Range: -20°C to +100°C nn Working Pressure: 0.35 nn Size: 25 to 304mm (Coil Length 6M) Silicone High temperature Silicone ducting. nn Temp. Range: -80°C to +310°C nn Working Pressure: 0.1 to 1.5 bar nn Size: 12 to 203mm (Coil Length 4M) Neoprene Ideal in the transportation of hot and cold air in many air conditioning, refrigeration and ventilation systems. nn Temp. Range: -50°C to +150°C nn Working Pressure: 0.1 to 1.5 bar nn Size: 12 to 305mm (Coil Length 2.5 4M) Abraflex 351 Intro text: Medium duty, Ω rated, abrasive PU suction blower hose for abrasive solids such as powder, chips and granulates. Also suitable for aggressive gaseous and liquid products with good resistance to oil and petrol vapors. EHT Code ID (mm) Vacuum (bar) 1038N1-012 12 0.68 1038N1-305 305 0.05 EHT Code ID Vacuum Vacuum Unlined: 1038A- (mm) Single Ply (bar) Two Ply (bar 1038A-012 12 0.52 0.68 1038A-203 203 0.07 0.09 EHT Code ID (mm) Min. Bend Radius (mm) 1038-025 25 60 1038-304 304 319 Worm Drive Clips can be supplied in stainless steel or zinc plated mild steel. A large range of sizes are available as standard. Non-standard sizes are also available. nn Size: 12-160
  • 146.
    Specialist Technical Centres Know-How FluidPower 138 Whento use Metal Hose There are many different types of hose available on the market. They include metal, rubber, composite, PTFE and fabric. The decision of which hose type to buy depends on the application for which the hose is being used. Generally, there are eight factors that should alert you to consider using metal hose: Temperature Extremes If either the temperature of the media going through the hose or the surrounding atmospheric temperature is very cold or hot, metal may be the only material that can withstand the temperature extremes. Chemical Compatibility Metal hose can handle a wider variety of chemicals than most of the other hose types. If the hose will be exposed to aggressive chemicals (either internally or externally), metal hose should be considered. Permeation Concerns Non-metal hose is susceptible to having gases permeate through the hose wall and into the atmosphere. Metal hose, on the other hand, does not allow permeation. If containing the gases inside the hose is important, metal hose may be required. Potential for Catastrophic Failure When a metal hose fails, it usually develops small holes or cracks. Other hose types tend to develop larger cracks or come apart completely. If a sudden failure of the hose can be catastrophic, a metal hose may help minimise the effects of a failure by leaking product at a slower rate. Abrasion and Over- bending Concerns To prevent abrasion and over-bending, a metal hose can be used as a protective cover over wires or even other hoses. Fire Safety Other hose types will melt when exposed to fire while metal hose maintains its integrity up to 1200º F. Achieving Full Vacuum Under full vacuum, metal hose maintains its shape while other hose types may collapse. Flexibility in Fitting Configuration Virtually any type of fitting can be attached to metal hose while other hose types require special shanks and collars. 4 3 2 1 5 6 7 8 Applications: nn Cryogenic nn Gas nn Oil nn Steam nn Chemical nn Glue nn Food nn Bitumen nn Water and many more.... Metal Hose
  • 147.
    Visit us ateriks-techdirect.co.uk FluidPower 139 Goodall® MetalVisor® A New Generation of Metal Hoses and Fittings At ERIKS we understand the importance of selecting the right metal hose for your application. The new Goodall® MetalVisor® is a superior quality metal hose which not only prevents leaks but reduces costly maintenance downtime and improves the safety of both your plant and operators. Extended Lifetime nn High quality and thick stainless steel strip used for the corrugated tube nn Extreme high coverage of the stainless steel braid nn Welding procedures avoiding corrosion at the welds nn No leaks and no loss of product nn Fitting assortment designed for the Goodall® MetalVisor® hose nn Special assembly and welding procedures nn Single pass weld to avoid gaps and burrs between the hose end and the fitting Mechanical strength nn High working pressures nn High braid coverage Ergonomic nn More flexibility and ease of use due to the design of the corrugated hose and braid Welding procedures Innovative single pass welding procedures of the fittings on the corrugated hose decrease the risk of corrosion and leaks enormously Goodall® MetalVisor® hoses stand up to the toughest jobs, outlasting competitive products for a lower lifetime cost and each welded procedure and operator are subject to strict certifications, which are renewed on an annual basis. All metal hoses have been subject to extensive tests which include: nn Surface cracks in weld using dye- penetrant examination nn Vacuum testing using helium leak detection nn Complete traceability of all parts with original mill certification EN ISO 10380: 2012 BS 6501-1: 2004 ASME IX EN ISO 15614-1: 2004
  • 148.
    Specialist Technical Centres Know-How FluidPower 140 Camlocks ERIKSHose Technology cam groove couplers are available in aluminium, brass, stainless steel or polypropylene with either BSP or NPT threads. The couplers are fitted with standard nitrile rubber gaskets; nonstandard gaskets are available in: Viton, EPR, PTFE etc. Other versions of cam and groove couplers include the “auto-Lock” with arms that lock into position Camlocks Bellows Part A Adptor (Female BSP thread) Part B B Coupler (Male BSP thread) Part C Coupler (Hosetail) Part P Dust Plug Part D Coupler (Female Thread) Part E Part E Adaptor (Hosetail) Part F Adaptor (Male BSP Thread) Part H Dust Cap Size (Inch) Size (mm) Brass Stainless Steel Aluminium Polypropylene 1/2” 12 1078QA-012 1078SA-012 1078A-012 1079A-012 3/4” 19 1078QA-019 1078SA-019 1078A-019 1079A-019 1” 25 1078QA-025 1078SA-025 1078A-025 1079A-025 1 1/4” 32 1078QA-032 1078SA-032 1078A-032 1079A-032 1 1/2” 38 1078QA-038 1078SA-038 1078A-038 1079A-038 2” 50 1078QA-050 1078SA-050 1078A-050 1079A-050 2 1/2” 63 1078QA-063 1078SA-063 1078A-063 1079A-063 3” 75 1078QA-075 1078SA-075 1078A-075 1079A-075 4” 101 1078QA-101 1078SA-101 1078A-101 1079A-101 6” 152 1078QA-152 1078SA-152 1078A-152 1079A-152 Size (Inch) Size (mm) Brass Stainless Steel Aluminium Polypropylene 1/2” 12 1078QB-012 1078SB-012 1078B-012 1079B-012 3/4” 19 1078QB-019 1078SB-019 1078B-019 1079B-019 1” 25 1078QB-025 1078SB-025 1078B-025 1079B-025 1 1/4” 32 1078QB-032 1078SB-032 1078B-032 1079B-032 1 1/2” 38 1078QB-038 1078SB-038 1078B-038 1079B-038 2” 50 1078QB-050 1078SB-050 1078B-050 1079B-050 2 1/2” 63 1078QB-063 1078SB-063 1078B-063 1079B-063 3” 75 1078QB-075 1078SB-075 1078B-075 1079B-075 4” 101 1078QB-101 1078SB-101 1078B-101 1079B-101 6” 152 1078QB-152 1078SB-152 1078B-152 1079B-152 Size (Inch) Size (mm) Brass Stainless Steel Aluminium Polypropylene 1/2” 12 1078QC-012 1078SC-012 1078C-012 1079C-012 3/4” 19 1078QC-019 1078SC-019 1078C-019 1079C-019 1” 25 1078QC-025 1078SC-025 1078C-025 1079C-025 1 1/4” 32 1078QC-032 1078SC-032 1078C-032 1079C-032 1 1/2” 38 1078QC-038 1078SC-038 1078C-038 1079C-038 2” 50 1078QC-050 1078SC-050 1078C-050 1079C-050 2 1/2” 63 1078QC-063 1078SC-063 1078C-063 1079C-063 3” 75 1078QC-075 1078SC-075 1078C-075 1079C-075 4” 101 1078QC-101 1078SC-101 1078C-101 1079C-101 6” 152 1078QC-152 1078SC-152 1078C-152 1079C-152 Size (Inch) Size (mm) Brass Stainless Steel Aluminium Polypropylene 1/2” 12 1078QP-012 1078SP-012 1078P-012 1079P-012 3/4” 19 1078QP-019 1078SP-019 1078P-019 1079P-019 1” 25 1078QP-025 1078SP-025 1078P-025 1079P-025 1 1/4” 32 1078QP-032 1078SP-032 1078P-032 1079P-032 1 1/2” 38 1078QP-038 1078SP-038 1078P-038 1079P-038 2” 50 1078QP-050 1078SP-050 1078P-050 1079P-050 2 1/2” 63 1078QP-063 1078SP-063 1078P-063 1079P-063 3” 75 1078QP-075 1078SP-075 1078P-075 1079P-075 4” 101 1078QP-101 1078SP-101 1078P-101 1079P-101 6” 152 1078QP-152 1078SP-152 1078P-152 1079P-152 Size (Inch) Size (mm) Brass Stainless Steel Aluminium Polypropylene 1/2” 12 1078QD-012 1078SD-012 1078D-012 1079D-012 3/4” 19 1078QD-019 1078SD-019 1078D-019 1079D-019 1” 25 1078QD-025 1078SD-025 1078D-025 1079D-025 1 1/4” 32 1078QD-032 1078SD-032 1078D-032 1079D-032 1 1/2” 38 1078QD-038 1078SD-038 1078D-038 1079D-038 2” 50 1078QD-050 1078SD-050 1078D-050 1079D-050 2 1/2” 63 1078QD-063 1078SD-063 1078D-063 1079D-063 3” 75 1078QD-075 1078SD-075 1078D-075 1079D-075 4” 101 1078QD-101 1078SD-101 1078D-101 1079D-101 6” 152 1078QD-152 1078SD-152 1078D-152 1079D-152 Size (Inch) Size (mm) Brass Stainless Steel Aluminium Polypropylene 1/2” 12 1078QE-012 1078SE-012 1078E-012 1079E-012 3/4” 19 1078QE-019 1078SE-019 1078E-019 1079E-019 1” 25 1078QE-025 1078SE-025 1078E-025 1079E-025 1 1/4” 32 1078QE-032 1078SE-032 1078E-032 1079E-032 1 1/2” 38 1078QE-038 1078SE-038 1078E-038 1079E-038 2” 50 1078QE-050 1078SE-050 1078E-050 1079E-050 2 1/2” 63 1078QE-063 1078SE-063 1078E-063 1079E-063 3” 75 1078QE-075 1078SE-075 1078E-075 1079E-075 4” 101 1078QE-101 1078SE-101 1078E-101 1079E-101 6” 152 1078QE-152 1078SE-152 1078E-152 1079E-152 Size (Inch) Size (mm) Brass Stainless Steel Aluminium Polypropylene 1/2” 12 1078QF-012 1078SF-012 1078F-012 1079F-012 3/4” 19 1078QF-019 1078SF-019 1078F-019 1079F-019 1” 25 1078QF-025 1078SF-025 1078F-025 1079F-025 1 1/4” 32 1078QF-032 1078SF-032 1078F-032 1079F-032 1 1/2” 38 1078QF-038 1078SF-038 1078F-038 1079F-038 2” 50 1078QF-050 1078SF-050 1078F-050 1079F-050 2 1/2” 63 1078QF-063 1078SF-063 1078F-063 1079F-063 3” 75 1078QF-075 1078SF-075 1078F-075 1079F-075 4” 101 1078QF-101 1078SF-101 1078F-101 1079F-101 6” 152 1078QF-152 1078SF-152 1078F-152 1079F-152 Size (Inch) Size (mm) Brass Stainless Steel Aluminium Polypropylene 1/2” 12 1078QH-012 1078SH-012 1078H-012 1079H-012 3/4” 19 1078QH-019 1078SH-019 1078H-019 1079H-019 1” 25 1078QH-025 1078SH-025 1078H-025 1079H-025 1 1/4” 32 1078QH-032 1078SH-032 1078H-032 1079H-032 1 1/2” 38 1078QH-038 1078SH-038 1078H-038 1079H-038 2” 50 1078QH-050 1078SH-050 1078H-050 1079H-050 2 1/2” 63 1078QH-063 1078SH-063 1078H-063 1079H-063 3” 75 1078QH-075 1078SH-075 1078H-075 1079H-075 4” 101 1078QH-101 1078SH-101 1078H-101 1079H-101 6” 152 1078QH-152 1078SH-152 1078H-152 1079H-152
  • 149.
    Visit us ateriks-techdirect.co.uk FluidPower 141 Non Metallic Moulded Rubber Bellows are designed to compensate for misalignment, neutralise movement and reduce noise and vibration in pipelines. They effectively dampen the transmission of sound and vibration from plant items in building service installations, and depending upon the grade of the rubber can be used for many applications including: Metallic ERIKS Hose Technology (EHT) design and manufacture a comprehensive range of metallic expansion bellows, metallic expansion joints and bellows assemblies in a wide range of stainless steels and exotic alloy materials, with sizes from 50mm (2”) to 3000mm (120”) nominal diameter inclusive. As a full metallic hose manufacturer, EHT are able to offer custom sizes of bellows to suit your individual requirements. Bellows All installations may be subjected to movements, these movements can vary from very slow (thermal expansion or shrinking movements) to very fast (vibrations). Thermal expansion and vibrations can result in adverse material stresses in piping, with vibrations also causing unpleasant noise in the work environment. The solution for all these problems is the RX® bellow, which has a fast turnaround and excellent stocks in the UK. The faultless functioning of bellows requires careful fitting to take place according to the instructions and ensuring the pressure and temperature limits concerned are not be exceeded. Our knowledge and supply capabilities offer you the opportunity to choose the correct bellow to optimally meet your requirements. Applications: nn High flexibility nn Short lead times nn Large movement capacity nn Durability and excellent chemical resistance nn Pressure resistant nn Vacuum tightness nn Temperature resistant nn Ageing resistant nn Torsional rigidity Max Working Temperature: nn 600oC Certification: nn WRAS, ISO 9001, 3.1 mill certificate, ISO 10380:2012, ISO 6129-1 :1981 Options: nn Different Lengths nn Higher pressure/temperature ratings nn Flanges to suit i.e. BS, JIS, DIN, ASA nn External covers/insulation nn Limit Rods nn Swivel Flanges Material: nn Flanges 316 or 304 Stainless Steel, or Mild Steel nn Bellows 316 or 321 Stainless Steel Certification: nn WRAS, ISO 9001, 3.1 mill certificate, ISO 10380:2012, ISO 6129-1 :1981 Material Colour Chart Colour Material Main Applications Max Temp. °C Red EPDM Hot water, heating ventilation systems, weak acids alkalis 90 Double Red EPDM High temperature hot water, heating ventilation systems, weak acids alkalis 120 Yellow Nitrile Oil Gas transportation, refineries 80 Green Hypalon Water, good chemical resistant qualities for acids 90 Purple Viton High temp. applications, transportation of products derived from petroleum / chemicals / oils / solvents 180 White Food Transportation of food stuffs, potable water distribution Grade Nitrile 80 Blue Butyl HT High temperature 130 EHT Part No. Size Size Elongation Max. WP Flange Type (mm) (inches) at 20°C (bar) 2901-050-PN16-130MM 50 2” + / - 10mm 16 bar PN16 (st/st) 2901-063-PN16-130MM 63 2 ½” + / - 12.7mm 16 bar PN16 (st/st) 2901-075-PN16-130MM 75 3” + / - 12.7mm 16 bar PN16 (st/st) 2901-101-PN16-130MM 101 4” + / - 15mm 16 bar PN16 (st/st) 2901-152-PN16-130MM 152 6” + / - 15mm 16 bar PN16 (st/st) 2901-203-PN16-130MM 203 8” + / - 15mm 16 bar PN16 (st/st) 2901-050-ASA150-130MM 50 2” + / - 10mm 16 bar ASA150 (st/st) 2901-063-ASA150-130MM 63 2 ½” + / - 12.7mm 16 bar ASA150 (st/st) 2901-075-ASA150-130MM 75 3” + / - 12.7mm 16 bar ASA150 (st/st) 2901-101-ASA150-130MM 101 4” + / - 15mm 16 bar ASA150 (st/st) 2901-152-ASA150-130MM 152 6” + / - 15mm 16 bar ASA150 (st/st) 2901-203-ASA150-130MM 203 8” + / - 15mm 16 bar ASA150 (st/st) nn Water nn Oils nn Chemicals nn Food Industry (please see Material Colour Chart) They are available from 25mm nb to 600mm nb (1”nb to 24”nb) and generally come complete with zinc plated carbon steel swivel backing flanges. They can be drilled to suit any table or special drillings and can be supplied either tied or untied.
  • 150.
    Specialist Technical Centres Know-How FluidPower 142 Goodall® TankerSD Flexoline Suction and delivery hose for hydrocarbon fuels and mineral oils having an aromatic content of maximum 55% by volume. nn Temp. Range: -30°C to +82°C nn Working Pressure: 10 bar nn Size: 19 to 152mm (Coil Length 30.5, 60M) nn Ohm Hose: Yes Goodall® Titon Black A light, flexible, multipurpose hose for air and water up to 95°C. Also very flexible at low temperatures, ideal for compressed air tools. nn Temp. Range: -40°C to +95°C continuous +110°C briefly nn Working Pressure: 15 - 20 bar nn Size: 6 to 50mm (Coil Length 50, 100M) nn Burst: 4:1 (2” 3:1) nn Ohm Hose: Yes nn Standards: ISO 1402 Goodall® Multiserve A very strong multipurpose hose for compressed air, oil, (lead free) petrol, diesel, hydraulic fluid, aqueous solutions. nn Temp. Range: -40°C to +95°C continuous nn Working Pressure: 20 bar nn Size: 6 to 50mm (Coil Length from 25M) nn Burst: 4:1 (2” 3:1) nn Ohm Hose: Yes nn Standards: ISO 1402 Sand Blast Hose Abrasion resistant sandblast hose for cleaning and blasting metal, stone and concrete surfaces. nn Temp. Range: -40°C to +70°C nn Working Pressure: 12 bar nn Ohm Hose: Yes Goodall® Alligator Water SD Water suction and discharge hose for industrial and construction services. nn Temp. Range: -30°C to +100°C nn Working Pressure: to 10 bar nn Size: 25 to 203 mm (Coil Length 61M) Goodall® Tanker SD Flexotek Very flexible and lightweight suction and delivery hose for use in tank truck and other general industrial fluid transfer operation. nn Temp. Range: -30°C to +80°C nn Working Pressure: 10 bar nn Size: 51 to 152mm (Coil 40M) nn Burst: 4:1 nn Ohm T hose: Yes nn Standards: BD5119/A ISO 1403 EN1761:1999 Rubber Hose Including Assemblies EHT Code ID (mm) Wall Thickness (mm) Min. Bend Radius (mm) 1020MS-06 6 40 1020MS-25 25 150 EHT Code ID (inch) ID (mm) OD (mm) Min. Bend Radius (mm) 1023-12-25 ½ 12.7 25 65 1023-101-122 4 101.6 122 600 EHT Code ID ID OD Vacuum Min. Bend (inch) (mm) (mm) (bar G) Radius 1014GA-025 1” 25 35 Vac Bar 100% 100 1014GA-203 8” 203 221 Vac Bar 70% 1015 EHT Code ID ID Wall Thick Min. Bend (inch) (mm) (mm) Radius (mm) 11014OIL-019-10BAR ¾ 19 5 76 1014OIL-152-10BAR 6 152 9 608 EHT Code ID (mm) Wall Thickness (mm) Min. Bend Radius (mm) 1017TB-06 6 3.5 72 1017TB-38 38 5 456 EHT Code ID (mm) OD (mm) 1014FLEX-051-10BAR 51 61 1014FLEX-152-10BAR 152 166 Compressor Hose nn General purpose compressed air hose for use with compressors in the construction industry. nn Temp Range: -35°C to +95°C continuous +80 °C nn Working Pressure: 20 bar nn Size: 19 to 25mm (Coil Length 30M) nn Standards: BS EN 2398 1997: BS 5118/2 EHT Code ID (mm) Length (m) 1015-019-15M 19 15 1015-019-20M 19 20 1015-019-30M 19 30 nn Size: 125 to 122 (Coil Length 61M) nn Standards: TS 5928 EN ISO 3861, ISO 1307 Rubber and Goodall® Steam Hoses
  • 151.
    Visit us ateriks-techdirect.co.uk FluidPower 143 Steam Goodall® Inferno ISO 6134 Textile reinforced Steam Hose, for saturated steam services, used in chemical plants, steel mills, refineries, shipyards and all industries. nn Temp. Range: -40 o C to +232 o C nn Working Pressure: 18 bar nn Size: 12 to 50mm (Coil Length 61) nn Standards: ISO 6134-2a Goodall® Super Inferno Steel wire reinforced Steam Hose for saturated steam services, used in chemical plants, steel mills, refineries, shipyards and all industries. nn Temp. Range: -40 o C to +232 o C nn Working Pressure: 17 bar nn Burst Pressure: 20:1 nn Size: 19 to 50mm (Coil Length 30.5) Steam Hose Fittings Heavy-duty tapered male BSPT thread coupling with long hose nipple that complies with EN ISO 14423. EHT Code ID ID OD Min. Bend (Inch) (mm) (mm) Radius (mm) 1018R-12-Inferno ½ 12.7 25 130 1018R-50-Inferno 2 50 68 500 Inferno The GOODALL® BR8 INFERNO distinguishes itself from every other steam hose on the market. Its longer service life ensures fewer failures, greater up time, but in particular, the ability to not popcorn despite not being drained during use. Used for both steam and hot water nn Temp. Range: -40o C to +232o C nn Working Pressure: 18 bar nn Size: 12 to 50mm (Coil Length 60M) nn Standards: Exceeds EN ISO 6134-2A EHT Code ID ID Min. Bend (Inch) (mm) Radius (mm) 1018R-12-Inferno ½ 12.7 130 1018R-19-Inferno ¾ 19 190 1018R-25-Inferno 1 25.4 250 1018R-32-Inferno 1 ¼ 32 320 1018R-38-Inferno 1 ½ 38 380 1018R-50-Inferno 2 50 500 EHT Code Thread Hose Tail size (inch) (inch) 1018STM-12 1/2 1/2 1018STM-19 3/4 3/4 1018STM-25 1 1 1018STM-38 1 1/2 1 1/2 1018STM-50 2 2 Heavy flat sealed BSP female, with long hose nozzle in compliance with EN ISO 14423. EHT Code Thread Hose Tail size (inch) (inch) 1018STF-12 1/2 1/2 1018STF-19 3/4 3/4 1018STF-25 1 1 1018STF-38 1 1/2 1 1/2 1018STF-50 2 2 Steam Hose Clamp Steam hose safety clamp in compliance with EN ISO 14423. EHT Code Clamp Size Hose OD (Inch) Min - Max (mm) 1018SC-1227 1/2 24-27 1018SC-1230 1/2 27-30 1018SC-1937 3/4 30-33 1018SC-1938 3/4 33-38 1018SC-2540 1 36-40 1018SC-2543 1 38-43.5 1018SC-3851 1 1/2 48-52 1018SC-3856 1 1/2 52-57 1018SC-5063 2 63-69 1018SC-5070 2 50-70 EHT Code ID ID OD Min. Bend (Inch) (mm) (mm) Radius (mm) 1018R-19-Inferno-S ¾ 19 32.3 101.6 1018R-50-Inferno-S 2 51 71.4 355.6 Goodall® DuraCrimp® The new clamp system has been specifically designed to: nn Prevent leaks nn Reduce maintenance time nn Improve ergonomics nn Increase safety Call ERIKS to find out more...
  • 152.
    Specialist Technical Centres Know-How FluidPower 144Food Beverage, Chemical Pharmaceutical Dairy Excellent for suction and discharge applications and for the food transfer application that demands both flexibility and ruggedness with a clean white FDA grade tube. The food grade nitrile tube is odourless and tasteless for oily transfer applications. nn Temp. Range: -40°C to +99°C nn Working Pressure: 10 bar nn Size: 25 to 102mm (Coil Length 30M) nn Standards: Meets FDA, USDA 3A sanitary standards Dairy Lite This food transfer hose is designed to provide maximum flexibility along with an abrasive resistant cover. Excellent for the transfer of oily product in full suction and discharge applications. nn Temp. Range: -40°C to +99°C nn Working Pressure: 10 bar nn Size: 25 to 102mm (Coil Length 30M) nn Standard: Meets FDA, USDA 3A sanitary standards Goodall Blue Guardian A flexible and strong hot water and steam hose suitable for cleaning floors in abattoirs and food industry with a nonmarking cover. nn Temp: Hot water up to 95°C nn Temp: Saturated Steam up to 164°C nn Working Pressure: 6 Bar nn Working Safety Factor Hot Water 3:1 nn Working Safety Factor Steam 10:1 nn Size: 10mm – 51mm Food and Beverage The food and beverage market requires a high degree of cleanliness and purity. All parts of a hose assembly should have a very fine level of finish, and assemblies should be designed to avoid bug traps. All EHT hoses for the Food and Beverage market have been checked and are approved as suitable, including where necessary; 3.1 material certification, FDA and fill post assembly testing. EHT Code ID ID Wall Min. Bend (Inch) (mm) Thickness Radius (mm) HYGB101-010 3/8 10 5 75 HYGB101-050 2 50 13.5 310 EHT Code RX1212-3001 EHT Code ID (inch) ID (mm) Min Bend Working Pressure (Bar) HYGB701-012 1/2 25 XX 10 HYGB701-102 4 102 XX 10 EHT Code ID (inch) ID (mm) Min Bend Working Pressure (Bar) HYGB601-025 1 25 x 10 HYGB601-102 4 102 x 10 Catering Hoses Ideal for the gas connections of all gas-fired catering appliances EHT Code ID (Inch) Length (mm) Description EHT-9076 1/2 1000 st/st male / quick release check unit. c/w yellow cover lanyard kit. EHT-9077 3/4 1000 st/st male / quick release check unit. Braided c/w yellow cover lanyard kit. nn Constructed: 321 Stainless Steel corrugated inner hose and sleeved with a non-chlorinated easy clean yellow cover for cleanliness and are corrosion resistance nn Standards: BS6173 : 2001 and BS669-2 : 1997 nn Connections: Fitted with carbon steel BSP Taper Hexagon Male to connect to any appliance and a brass quick release rotary coupling (valve) to connect to a gas supply Dinga Gun Heavy Duty Spray/Washdown Gun, ideal for general wash-down, commonly used in the food processing and dairy industries nn Temp. Range: -10°C to +80°C nn Connections: 1/2” BSP nn Max Pressure: 25 bar
  • 153.
    Visit us ateriks-techdirect.co.uk FluidPower 145 Chemical and Pharmaceutical PTFE nn PTFE tube has the best chemical resistance (alongside PFA) of all known polymers. It has a temperature range of -70°C to +265°C opens up PTFE tubing to many applications most other polymers can’t withstand. nn The electrical insulation properties of PTFE tubing are superb making it an ideal choice for electrical sleeving. Chemical dosing metering pumps require long continuous lengths of PTFE tube, very difficult to produce but possible with EHT. UHMWPE Ultra High Molecular Weight Polyethylene Suction and Delivery hose for a variety of chemicals and solvents. Highly resistant to abrasion and corrosive chemicals except oxidizing acids (better than PTFE). nn Temperature Range: -20°C to +65°C nn Working Pressure: 10 bar nn Size: From 19 to 102mm (Coil Length 40M) nn Standards: FDA Steri-vac Platinum cured suction delivery nn Temp. Range: -60°C to +170°C Please note that the burst pressure reduces by 1% for every 1°C rise over 100°C. nn Working Pressure: According to EN ISO 7751 the ratio of burst pressure to working pressure is: Water 3:1, all other liquids 4:1 nn Size: From 12 to 101mm (Coil Length 4M) nn Ohm Hose: Conductive through steel helix Steri-sil Platinum cured reinforced silicone hose, manufactured from a medical grade clear silicone rubber polymer producing a very high grade, soft pliable hose making it ideal for critical pharmaceutical, biomedical, food, and cosmetic applications. nn Temp. Range: -60°C to +180°C nn Working Pressure: 2.3 to 140 psi nn Size: From 3 to 32mm (Coil Length 10M) nn Standards: FDA regulation 177.2600, Certified free of animal-derived ingredients EHT Code ID ID Tol. Wall Wall Tol. OD Bend Radius BP (bar) (mm) +/-(mm) (mm) +/- (mm) (mm) (mm) 20°C (mm) 20°C 1219M-03-2 2 0.1 0.50 0.10 3.00 13 61 1219M-15-12 12 0.30 1.50 0.20 15.0 122 31 Other tube sizes available upon request. Coil sizes; 24, 50, 75, 100m EHT Code ID Wall Thickness Vacuum Min. Bend (mm) (mm) % Radius 1025-19 19 6.5 88 135 1025-102 102 6.5 88 800 EHT Code ID ID Wall Vacuum Min. Bend (inch) (mm) Thickness (mm) (IN/HG) Radius 1008V-012 ½” 12.7 4.9 29” 35 1008V-101 4” 101.6 8.0 26” 360 EHT Code ID (mm) OD (mm) Minimum Bend Radius (mm) 1008-03 3.0 10 30 1008-32 31.75 40 160
  • 154.
    Specialist Technical Centres Know-How FluidPower 146 IndustrialHose Cable Reels Reelcare Ltd specialise in the supply of spring driven, manual and motor driven hose reels in a variety of materials, if you have any requirements for a reel that isn’t listed please contact your nearest ERIKS branch with your application requirements. Value Range Part No Application Description RE-SA02-05-9 Compressed Air Value Air Reel C/W 9mt x 8mm PU tube terminating in a 1/4” BSPT male RE-SA01-06-15 Compressed Air Value Air Reel C/W 15mt x 9.5mm PU Mesh air hose terminating in a 1/4” BSPT male Part No Application Description AW815-001 Air Water Recoila GEN3 Air/Water Reel c/w 15m x 8mm Black rubber 20 Bar Air Water Hose AW820-001 Air Water Recoila GEN3 Air/Water Reel c/w 20m x 8mm Black rubber 20 Bar Air Water hose AW1015-001 Air Water Recoila GEN3 Air/Water Ree c/w 15m x 10mm Black rubber 20 Bar Air Water hose AW1020-001 Air Water Recoila GEN3 Air/ Water Reel c/w 20m x 10mm Black rubber 20 Bar Air Water hose AW1215-001 Air Water Recoila GEN3 Air/Water Reel c/w 15m x 12mm Black rubber 20 Bar Air Water hose AW1218-001 Air Water Recoila GEN3 Air/ Water Reel c/w 18m x 12mm Black rubber 20 Bar Air Water hose AW1020-001-HV Air Water Recoila GEN3 Air/ Water Reel c/w 20m x 10mm Fluorescent Hi - Vis hose AW1218-001-HV Air Water Recoila GEN3 Air/Water Reel c/w 18m x 12mm Fluorescent Hi - Vis hose HW1215-001 Hot Water Recoila GEN3 Hot Water Hose Reel c/w 15m x 12mm Blue 10 bar 80°C hot water hose OA615-001 Oxy/ Acetylene Recoila GEN3 Hose Reel c/w Oxy/Acety 15m x 6mm hose OA815-001 Oxy/ Acetylene Recoila GEN3 Hose Reel c/w Oxy/Acety 15m x 8mm hose Part No Application Description ME-070-1302-320 Air Cold water ME Steel Hose Reel c/w 20M 10mm ID Black rubber 20 Bar Air Water Hose ME-070-1302-415 Air Cold water ME Steel Hose Reel c/w 15M 12mm ID Black rubber 20 Bar Air Water Hose ME-070-1402-425 Air Cold water ME Steel Hose Reel c/w 25M 12mm ID Black rubber 20 Bar Air Water Hose ME-070-1502-520 Air Cold water ME Steel Hose Reel c/w 20M 19mm ID Black rubber 20 Bar Air Water Hose ME-070-1502-615 Air Cold water ME Steel Hose Reel c/w 15M 25mm ID Black rubber 20 Bar Air Water Hose ME-070-1304-318 Pressure Wash ME Steel Hose Reel c/w 18M 10mm ID Pressure Wash hose ME-070-1408-515 Fuel - Diesel ME Steel Hose Reel c/w 15M 19mm ID 1 Wire Fuel Hose ME-070-1408-610 Fuel - Diesel ME Steel Hose Reel c/w 10M 25mm ID 1 Wire Fuel Hose ME-070-2302-415 Air Cold water ME Stainless Steel Hose Reel c/w 15M 12mm ID Black Rubber 20 Bar Air Water Hose ME-070-2402-425 Air Cold water ME Stainless Steel Hose Reel c/w 25M 12mm ID Black Rubber 20 Bar Air Water Hose ME-070-2502-520 Air Cold water ME Stainless Steel Hose Reel c/w 20M 19mm ID Black Rubber 20 Bar Air Water Hose ME-070-2502-615 Air Cold water ME Stainless Steel Hose Reel c/w 15M 25mm ID Black Rubber 20 Bar Air Water Hose ME-070-2305-318 Pressure Wash ME Stainless Steel Hose Reel c/w 18M 10mm ID Pressure Wash hose ME-070-2408-515 Fuel - Diesel ME Stainless Steel Hose Reel c/w 15M 19mm ID 1 Wire Fuel Hose ME-070-2408-610 Fuel - Diesel ME Stainless Steel Hose Reel c/w 10M 25mm ID 1 Wire Fuel Hose Reelcare value hose reels are an excellent product ideal for the small to medium workshop and most air tool applications, the value range includes two hose reels with the following features nn Polypropylene Case nn Pivoting Wall Bracket nn Hose Layering System on the RE-SA01-06-15 only nn PU tube on the RE-SA02-05-9 PU Mesh hose on the RE-SA01-06-15 nn Supplied complete with feed hose nn Auto Lock GEN3 Recoila Range The GEN3 Recoila Range of spring driven reels, is a durable, high quality range of UPVC hose reels for many applications. Manufactured from high density UV stabilised polypropylene, all products in the range boast a whole host of features some of which are listed below. nn Virtually maintenance free nn Full flow complete brass swivels to allow maximum product delivery nn Multi position locking mechanism to allow wall, floor or ceiling mount nn 160º pivot brackets nn Rolled edge drive spring to ensure maximum spring life nn Supplied complete high quality hose nn 5 Year limited warranty – subject to standard T’s C’s and not including hose ME Range The ME range of spring driven hose reels represents outstanding value for money. EU manufactured, the range suits hose sizes ranging from 6mm id (1/4”) up to 25mm id (1”) hose sizes dependant on your application. nn Easy Installation nn Powder Coated Steel or Stainless Steel nn Enclosed Lubricated High Quality Drive Spring nn Adjustable Guide Arm to allow wall, floor or ceiling mount applications nn Full Flow Swivel and fluid paths for maximum product delivery with minimal flow restriction nn Available with or without hose nn Suitable for numerous applications Hoses and Cable Reels
  • 155.
    sealing polymer Technology Quickreference Our Technology Centre has sealing all wrapped up. With products, materials, processes, application know-how and resources all available 24/7 - ERIKS really does offer a complete sealing solution package. 147 Sealing O-rings 150-153 Clamp Seals 151 Bonded Washer Seals 154 Elastomeric Rotary Lip Seals 155 Shaft Sleeves 155 Circlips 156 V-Rings 156 Hydraulic Seals 157-159 Component Mechanical Seals 160-161 Gaskets Gasket Sheeting 162-163 Soft Cut Flange Gaskets 164 EPDM Cut Flange Gaskets 165 Spiral Wound Gaskets 166 Ring Type Joints 167 Graphite Gaskets 168 Elastograph Gaskets 168 Gland Packings 169 Quick Product Reference 162-168 168-169 150-161 Visit us at eriks-techdirect.co.uk
  • 156.
    Seals solutions for Sealing Polymer Find out more about our Mechanical Seals Refurb Service Product Range n O-rings n Rotary Shaft Seals n Hydraulic Seals n Unitised Seals n Mechanical Seals n Metal Face Seals n Bespoke Mechanical Seals n Gland Packings n Gasket Sheets ERIKS Sealing and Polymer is dedicated not only to innovation in sealing technology, but also to customer service and satisfaction. Continual investment in technology and expertise ensures product quality is maintained and new compounds and technical solutions continue to be developed for the benefit of our customers. 148 n Soft Cut Gaskets n EPDM Gaskets n Spiral Wound Gaskets n Ring Type Joints n Elastograph® Specialist Technical Centres Know-How
  • 157.
    INDUSTRIES SUPPORTED Our teamof specialist application engineers are on hand to support customers with technical know-how across a wide range of industries including: „„ Chemical Process „„ Agriculture and Earth Moving „„ Oil and Gas „„ Automotive and Transportation „„ Heavy Industrial Application „„ Utilities and Power Generation „„ Defence and Aerospace „„ Pharmaceutical „„ Offshore „„ Food and Beverage Industry „„ HVAC „„ OEM Industry „„ Many more… SEALING POLYMER TECHNOLOGY DESIGN ASSISTANCE Our in-depth technical knowledge means we can specify the optimal seal for your application – whether it’s a standard product from our premium manufacturers or a bespoke solution, our design capabilities include: n Impartial application and design support n Industry specialists n 3D Computer Aided Design n Finite Element Analysis n Validation testing ON-LINE TOOLS Discover our on-line design tools at http://oring-groove-wizard.eriks.co.uk n Chemical Compatibility Chart n Look-up Standard Sizes n Groove Designer Visit our Seal Shop to buy many standard items and take advantage of the additional services we offer. https://sealshop.eriks.co.uk/ TAILORED LOGISTICAL SOLUTIONS Whether you’re looking for O-rings, rotary shaft seals, hydraulic or mechanical seals, our extensive branch network offers unbeatable service and a range of delivery solutions including direct supply through to managed inventory. KEEPING YOU WORKING As a market leader we carry phenomenal stock levels supported by an extensive, high quality supply chain. Our generous stocks are available 24 hours a day allowing you to deal with unexpected operational issues. Our in-house CNC facilities are able to machine seals to-order to help resolve breakdown situations. Our technical experts are available to help you in the event of premature failure or obsolescence. All of this is backed up by highly professional and reactive supply chains all focused upon keeping you working. 149 Visit us at eriks-techdirect.co.uk
  • 158.
    150 Specialist Technical Centres Know-How Sealing Polymers Focuson Pharmaceutical and Food Sealing solutions for the Pharmaceutical Industry Material Compliance The United States Food and Drug Administration (FDA) United Codes of Federal Regulations 21 CFR 177.2600 controls the specification of rubber articles for use in food, pharmaceutical and similar applications through a list of approved ingredients: Paragraph A–D and extraction limits in water and n-hexane, paragraphs E and F for aqueous and fatty applications. United States Pharmacopeia (USP) Class VI testing determines the effects of materials upon living tissue in-vitro (Suffix 87) and in-vivo (Suffix 88). EHEDG DIN 11864 Sizes Nominal Size O-Ring Inner O-Ring (inches) Diameter (mm) Cross Section 1/2 12 3.5 3/4 18 3.5 1 24 3.5 1.1/2 37 3.5 2 50 5 2.1/2 62 5 3 75 5 4 100 5 BS4825 Part 5 RJT Fitting Sizes Nominal Size O-Ring Inner O-Ring (inches) Diameter (mm) Cross Section 1 26.7 6.6 1.1/2 39.4 6.6 2 52.1 6.6 2.1/2 64.8 6.6 3 77.5 6.6 4 93.9 6.6 O-rings for Hygienic Couplings ASTM Family Grade Hardness IRHD Colour Available in: FDA 21CFR177.2600 United States Pharmacopeia Dry food, paras A-D formulation compliance Dry and aqueous, paras A-E Dry, aqueous and fatty, paras A-F USP 87 in-vitro USP 88 Class VI in-vivo NBR 366470 70 Black O-rings X X X NBR Various* 70 Various Hygienic Clamp, SMS, ISO 2853 X EPDM 55985 70 Black O-rings X X X X EPDM Various* 70 Various Hygienic Clamp, SMS, ISO 2853 X X X (please enquire) VMQ 714772 70 White O-rings X X X VMQ 714177 70 Red O-rings X X X VMQ Various* 70 Various Hygienic Clamp, SMS, ISO 2853 X X X (please enquire) FKM (A) 514010 75 White O-rings X X X FKM (GF) 514683 75 Black O-rings X X X FKM (GF) 514592 70 White O-rings X X X X X FKM (A) Various* 70 Various Hygienic Clamp, SMS, ISO 2853 X X X (please enquire) FFKM FFKM-75-164 75 Black O-rings X X X FFKM FFKM-70-246 70 White O-rings X X X X X FEP / VMQ 900554 75 Clear / red O-rings FDA 21CFR177.2600 A-F; FDA 21CFR177.1550 Outer FEP only PFA / FKM 900561 75 Clear / black O-rings FDA 21CFR177.2600 A-D; FDA 21CFR177.1550 Outer PFA only Various* = please refer to http://sealshop.eriks.co.uk/
  • 159.
    151 Visit us ateriks-techdirect.co.uk Sealing Polymers ASME BPE Size Form Nom. Size C (Ref) F (Ref) (inch) (inch) (inch) 1/4 C 0.250 0.180 0.800 3/8 C 0.375 0.305 0.800 1/2 C 0.500 0.370 0.800 3/4 C 0.750 0.620 0.800 1 C 1.000 0.870 1.160 1 B 1.000 0.870 1.718 1 1/2 B 1.500 1.370 1.718 2 B 2.000 1.870 2.218 2 1/2 B 2.500 2.370 2.781 3 B 3.000 2.870 3.281 4 B 4.000 3.834 4.344 6 B 6.000 5.782 6.176 Hygienic Clamp Seals Standards: nn BS 4825 nn ISO 2852 nn DIN 32676 nn ASME BPE BS 4825 Size (mm) Size (inch) C E/S 25.4 1 22.8 50.5 38.1 1.1/2 35.5 50.5 50.8 2 48.2 64 63.5 2.1/2 60.5 77.5 76.2 3 73.2 91 101.6 4 97.8 119 114.3 4.1/2 110.5 130 139.7 5.1/2 135.9 155 168.3 6.5/8 163.3 183 219.1 8.5/8 214.1 233.5 DIN 32676 Nom. Size (mm) C (mm) E/S (mm) 10 10.2 34 15 16.2 34 20 20.2 34 25 26.2 50.5 32 32.2 50.5 40 38.2 50.5 50 50.2 64 65 66.2 91 80 81.2 106 100 100.2 119 125 125.2 155 150 150.2 183 200 200.2 233.5 ISO 2852 Nom. Size (mm) C (mm) E/S (mm) 12 10.2 34 12.7 10.9 34 17.2 15.4 34 21.3 19.5 34 25 22.8 50.5 33.7 31.5 50.5 38 35.8 50.5 40 37.8 64 51 48.78 64 63.5 60.5 77.5 70 67 91 76.1 73.1 91 88.9 85.1 106 101.6 97.8 119 114.3 110.5 130 139.7 135.9 155 168.3 163.3 183 219.1 214.1 233.5 Form A* Form B Lipped Seal Unlipped Seal * Type A: Flanged seals are typically used and provide location upon the mating hardware. - -HCS B 0100 559515A material type A (lipped) B (non-lipped) C (Compact) Nominal size (Pipe Outer Diameter) A or B – inches rounded down to 2 dp then X100. I – mm to 1 decimal place D – mm to 1 decimal place ‘standard’ designator A – ASME BPE B - BS4825 I – ISO2852 (Used with ISO 2037 pipes) D – DIN32676 (Type A only) clamp seal designator Design Considerations Square section O-ring grooves are unsuitable in most applications due to the risk of bug traps. Proven hygienic coupling designs are readily available including: hygienic clamp seals, DIN 11851 D-Seals, O-Rings for DIN 11864 and BS 4825 part 5 RJT fittings, SMS and ISO 2853 couplings. Further design guidelines are published by the ASME-BPE (American Society of Mechanical Engineers Bio Processing Equipment guidelines) and the EHEDG (European Hygienic Engineering and Design Group) which look beyond the seal material and consider the seal in its operating environment. Note that nominal/DIN sizes typically reflect the outer diameter of the tube onto which the unions are fitted. Compact Seal Form C
  • 160.
    152 Specialist Technical Centres Know-How Sealing Polymers Focuson Pharmaceutical and Food and O-rings DIN 11851 This German standard hygienic fitting is recognised by the round slotted nut, D-section joint ring and the coned recess in the male part. ISO 2853 International Dairy Federation (IDF) This aseptic fitting is designed to accept an L-section seal ring and give a true crevice free bore. On assembly, the nut is tightened until metal to metal contact is made between the outer rim of the liner and male part. This gives a pre-set compression on the seal, eliminating the possibility of over-tightening and prolonging joint life. SMS 1149 This Swedish standard hygienic fitting can be recognised by the round slotted nut and square section joint ring. -- DN51HIDF EP 70 559515 Compound reference hardness material family designator hygienic L-ring designator nominal size -- DN38HSMS EP 70 559515 Compound reference hardness material family designator hygienic SMS designator nominal size DIN Size ID OD H d (mm) D (mm) (mm) DN25 23.6 32.5 6 DN38 36.6 46 6 DN51 49.6 59.5 6 DN63.5 61.3 73.2 6 DN76.1 73.9 86.5 6 DN101.6 98.6 112.5 6 DIN Size ID OD H d (mm) D (mm) (mm) DN25 25 32 5.5 DN32 32 40 5.5 DN38 38 48 5.5 DN51 51 61 5.5 DN63.5 63.5 73.5 5.5 DN76 76 86 5.5 DN101.6 101.6 113.5 5.5 -- DN25HDR EP 70 559515 Compound reference hardness material family designator hygienic d-ring designator nominal size DIN Size ID OD H d (mm) D (mm) (mm) DN10 12 20 4.5 DN15 18 26 4.5 DN20 23 33 4.5 DN25 30 40 5 DN32 36 46 5 DN40 42 52 5 DN50 54 64 5 DN65 71 81 5 DN80 85 95 5 DN90 94 104 5 DN100 104 114 6 DN125 130 142 7 DN150 155 167 7
  • 161.
    153 Visit us ateriks-techdirect.co.uk Sealing Polymers O-ring The most common type of static seal is the flexible elastomer O-ring. O-rings provide an affordable seal that in most cases are simple to install and subject to correct material selection, give acceptable life between maintenance checks. Available in a variety of materials to suit every sealing application, fully moulded O-rings are manufactured to several international sizes standards, including BS 1806, BS 4518, AS 568 and ISO 3601. Alternatively non- standard custom sizes, up to 2.5m (8ft) diameter can be produced to specific requirements. Imperial O-rings Metric O-rings O-rings are supplied to ISO 3601-1 class b tolerances unless otherwise specified. BS 139.3 - - 214 5.7 NBR FPM 70 75 36624 51414 compound REFERENCE 36624 compound REFERENCE 51414 Viton® hardness 70 °IRHD ±5 hardness 75 °IRHD ±5 material family designator NBR Nitrile material family designator FPM Viton® dash size REFERENCE* 214 Nominal cross section 5.70mm type BS 1806, AS 568, ISO 3601-1 Nominal inner diameter 139.30mm Teflex® O-ring Harsh chemicals may replace the use of conventional elastomeric O-ring seals. This is where ERIKS FEP/PFA Teflex O-rings offer a high performance solution. A Teflex O-ring comprises an elastomeric energising core, which has a seamless jacket made from a fluoropolymer. The elastomeric core may be Viton® or Silicone. The jacket is made from Teflon® FEP or PFA. Advantages: nn Excellent chemical resistance, comparable with that of PTFE nn Special dimensions available on request nn ADI (Animal Derived Ingredient) free ASTM Designator Grade Colour Hardness Family Designator NBR 36624 Black 70 NBR FKM 51414 Black 75 FPM EPDM 55985 Black 70 EP VMQ 714177 Red 70 SIL
  • 162.
    154 Specialist Technical Centres Know-How Sealing Polymers BondedSeals and Rotary Lip Seals Bonded Washer Seals Bonded Seals were originally designed to replace copper type washers in high pressure systems. The bonded seal comprises of a metal washer (square or rectangular in section), to which a trapezoidal elastomeric ring is bonded. The advantages of this system is that the metal washer resists the bursting forces applied and also limits any deformation of the elastomeric element. The metal washer also limits the compression of the seal and eliminates any over torque of the joint. Bonded Seals nn Reliable high and low pressure sealing nn Wide temperature capability nn Over compression prevented by metal outer ring nn Wide range of metals and elastomers nn Available in a wide range of imperial and metric sizes Self-Centring Bonded Seals The self-centring type of bonded seal has the additional benefit of pre-assembling on to threads. The thin seal membrane offers little resistance during assembly. nn All key benefits of original design nn Concentrically located nn Positively retained nn Ability to pre-assemble nn Can be automatically installed Bonded washer part number break down ---400 820 4490 41 Outer Ring Mild Steel Zinc Plated Elastomer Material Family NBR 90 Shore Size Code 1/8 BSP Industrial grade Bonded Washer Common sizes BSP Standard Self ID (Lip) ID (Metal Ring) OD (Metal Ring) Thickness Minimum Burst Centering ±0.13 ±0.14 +0.13 –0.01 Pressure bar 1/8 020 820 10.37 11.84 15.88 2 1480 1/4 021 821 13.74 15.21 20.57 2 1540 3/8 023 823 17.28 18.75 23.80 2 1230 1/2 025 825 21.54 23.01 28.58 2.34 1120 5/8 026 826 23.49 24.97 31.75 2.34 1240 3/4 027 827 27.05 28.53 34.93 2.34 1050 7/8 029 829 38.10 32.29 38.10 2.34 860 1 030 830 33.89 36.88 42.80 3.25 780 1.1/4 032 832 42.93 45.93 52.38 3.25 690 1.1/2 033 833 48.44 51.39 58.60 3.25 690 1.3/4 034 834 54.89 58.3 69.85 3.25 950 2 036 836 73.03 63.63 73.03 3.25 720 2.1/4 038 838 66.68 69.98 79.50 3.25 670 2.1/2 039 839 76.08 79.38 90.17 3.25 680 Elastomeric material options Compound reference Elastomeric materials/ shore hardness 4490 NBR 90 9775 FKM 75 Metal outer ring options Metal reference Metal type 41 Mild steel zinc plated 74 Stainless steel type 316 * Other metal options as well as elastomeric options available on request.
  • 163.
    155 Visit us ateriks-techdirect.co.uk Sealing Polymers Shaft Sleeves Shaft Sleeves are typically used to repair damaged running surfaces, however they can be used in production to cost- effectively achieve appropriate surface hardness and finish. ERIKS Sealing Technology can provide shaft sleeves manufactured from chromed stainless steel and HVOF-applied wear surfaces. Our manufacturing processes carefully control the average roughness (Ra) and material ratio (Tp) of the surface to maximise life and sealing efficiency. METRIC IMPERIAL A1 AS B1 BS 12 200 R R x x28 300 7 37 A1 A1 N# N# material n = Nitrile v = fkm / fpm material n = Nitrile v = fkm / fpm profile a1, AS, B1, BS profile a1, AS, B1, BS Width 7mm Width 0.37 housing diameter 28mm housing diameter 3.00 rotary seal designator rotary seal designator shaft diameter 12mm shaft diameter 2.00 To download a PDF of Common Elastomeric Rotary Lip Seal sizes visit www.eriks.co.uk/techdirect/issue10-16 or scan the QR code. Elastomeric Rotary Lip Seals
  • 164.
    156 Specialist Technical Centres Know-How Sealing Polymers Circlipsand Hydraulic Seals V-rings V-rings are an all elastomer axial seal for shafts and bearings. It installs onto the shaft or counterface. This type of seal has been used widely for many applications and has proved to be reliable and effective against dust, dirt, water, oil splash and other media. Circlips Circlips also known as retaining rings, are typically used to maintain the axial location of bearings and seals within housings. Available in metric (DIN 471/DIN 472) and imperial sizing circlips are typically produced in high performance spring steel, although other materials, including stainless steel and phosphor-bronze are available upon request. External circlips fit around the outside diameter of a shaft, and internal circlips are installed into a housing bore recess. *Metric Size is nominal shaft (External) / housing bore (Internal) diameter multiplied by 10, expressed as 4 digits. *Imperial size, nominal shaft (External) / housing bore (Internal) diameter rounded down to two decimal places and multiplied by 100. Part No Shaft Diameter (mm) V0016A-NBR 15.5 - 17.5 V0020A-NBR 19 - 21 V0025A-NBR 24 - 27 V0030A-NBR 29 - 31 V0035A-NBR 33 - 36 V0040A-NBR 38 - 43 V0045A-NBR 43 - 48 V0050A-NBR 48 - 53 V0055A-NBR 53 - 58 V0060A-NBR 58 - 63 V0065A-NBR 63 - 68 Part No Shaft Diameter (mm) V0075A-NBR 73 - 78 V0080A-NBR 78 - 83 V0085A-NBR 83 - 88 V0070A-NBR 86 - 73 V0090A-NBR 88 - 93 V0095A-NBR 93 - 98 V0100A-NBR 98 - 105 V0110A-NBR 105 - 115 V0140A-NBR 135 - 145 V0220A-NBR 210 - 235 Part No Shaft Diameter (mm) D1300-0080SS 8 D1300-0140 14 D1300-0190 19 D1300-0200 20 D1300-0220 22 D1300-0230 23 D1300-0260 26 D1300-0260SS 26 Part No Shaft Diameter (mm) D1300-0280 28 D1300-0320 32 D1300-0340 34 D1300-0400 40 D1400-0070 7 D1400-0080 8 D1400-0100 10 D1400-0120 12 Part No Shaft Diameter (mm) D1400-0150 15 D1400-0160 16 D1400-0170 17 D1400-0200 20 D1400-0250 25 D1400-0250SS 25 D1400-0300 30 D1400-0350 35 V-ring part number breakdown Circlips part number breakdown A Type L Type S Type RME Type –D1300 0520 SS Special feature if applicable SS = Stainless Steel Size 52mm Style 1300 = Internal 1400 = External Call Out D = Metric N = Imperial V 0050 A - NBR TYPE / MATERIAL FAMILY DESIGNATOR NBR NITRILE Nominal shaft size 50mm V-ring Designator
  • 165.
    157 Visit us ateriks-techdirect.co.uk Sealing Polymers Hydraulic Seals Our Series 21 hydraulic and pneumatics range allows you to specify commonly used dynamic seal profiles by hardware envelope and function, but does not limit supply to an individual manufacturer. Taking this approach clearly defines the product specifications, but maximises flexibility, ensuring continuity of supply for readily available products, keeping your industrial fluid power equipment or mobile plant operational. If your application requires a specific branded item we offer expertise in the optimal selection and sourcing of such items. Our in-house design engineers are happy to help you select one of our premium hydraulics range for applications demanding resistance both to mechanical extremes and thermo-chemical attack. Please contact ERIKS Sealing Technology for further assistance. IMPERIAL 7 37 20 225 30 175 WR U – – / / / / /xx 10 WSB UR 21 21 NBR NBR material material series series seal profile seal profile leg length (if applicable) DRIVING DIAMETER (Shaft Diameter for Rod, Cylinder Bore Diameter for Piston) housing diameter DRIVING DIAMETER (Shaft Diameter for Rod, Cylinder Bore Diameter for Piston) inches rounded down to 2 dp then x100 class of hydraulic seal class of hydraulic seal length length driving diameter (Gland Diameter for Rod, Piston Groove Diameter for Piston) HOUSING DIAMETER (Gland Diameter for Rod, Piston Groove Diameter for Piston) inches rounded down to 2 dp then x100 Note: If selected profile requires leg length to be detailed insert / _ as detailed in metric part numbering above METRIC Classes WR Wiper Ring U U-Cup SA Single Acting DA Double Acting CSR Composite Rod Working CSP Composite Piston Working Material NBR Nitrile B - Bronze PTFE NFR Nitrile/ fabric C - Carbon PTFE PUR Polyurethane G - Glass PTFE V - Virgin PTFE Seal Profiles Rod Wipers WSA WSB WSM WSF WSG WSO WSW WSV WPA WPB WPE Rod Seals UR UI SPB SEI GPB CSR VP (Single Acting) Piston Seals DOP DOP DOP DPB DWL DEO CSP (Double Acting) (Alpha) (Compact) Other Seals CP DI DE UE
  • 166.
    158 Specialist Technical Centres Know-How Sealing Polymers HydraulicSeals Piston Seals Features Advantages DOP n Elastomeric energiser n Compliant, wear resistant sealing element n High strength anti-extrusion rings n Integral bearing features n Low compression set for extended operating life n High sealing efficiency n High pressure operation with large diametral clearances n Reduced axial length requirements CSP n Elastomer energiser n Symmetric design n Pressure assisted sealing n Bi-directional operation DE n Pressure actuated n Radially asymmetric n Deflected lip geometry n High sealing efficiency n Optimised for piston applications n Low friction n Often used for pneumatic/distributor applications Wear Rings/Bearing Strip Features Advantages Fabric Reinforced n High compressive strength n High compressive modulus n High pressure velocity rating (PV) factor n Low wear rate n High side load n Outstanding alignment n Low axial length requirement n Long life PTFE Styles n Low friction n Self-lubricating n Low wear n Energy efficient n Dry running possible n Long life Valve Packing – VP Features Advantages VP n Staged design n Multiple lips n High pressure capabilities n Redundancy and minimised fugitive emissions Heavy Duty Hydraulic Seal Profiles
  • 167.
    159 Visit us ateriks-techdirect.co.uk Sealing Polymers Rod Seals Features Advantages UR n Pressure actuated n Radially symmetric n Deflected lip geometry n High sealing efficiency n Can be used in both rod and piston applications n Low friction UI n Pressure actuated n Radially asymmetric n Deflected lip geometry n High sealing efficiency n Optimised for rod applications n Low friction SPB n Elastomer contact sealing element n Fabric reinforced jacket n High sealing efficiency n High pressure extrusion resistance CSR n Thermoplastic sealing element n Elastomer energiser n Surface compliance n Transmits sealing pressure to assist sealing DI n Pressure actuated n Radially asymmetric n Deflected lip geometry n High sealing efficiency n Optimised for rod applications n Low friction n Often used for pneumatic/distributor applications Wipers Features Advantages WSB n Extended scraping lip n Excellent contaminant exclusion WSM n Extended scraping lip n Positive mechanical retention n Excellent contaminant exclusion n Improved hardware location WSF n Pressure activated n Axially located within groove n Combined scraping and sealing n Cantilever sealing lip n Efficient sealing efficiency n Low hysteresis n Low axial length requirement, ideal for secondary sealing n Low friction WPB n Metallic insert location n Extended scraping lip n Press-fit n Excellent contaminant exclusion
  • 168.
    160 Specialist Technical Centres Know-How Sealing Polymers ComponentMechanical Seals Mechanical Seals ERIKS Sealing Technology offers a vast range of products, the company holds ISO 9001:2008 quality accreditations for dynamic sealing solutions and specialist moulded products. Taper Spring Seals An extremely popular and effective design featuring positive drive via the spring, these seals are available in a wide range of sizes and styles, and are used in many applications, including pumps, mixers, agitators and compressors. All designs feature O-ring sealing on the shaft and positive spring drive. nn Wide range of metric sizes nn For shafts from 10mm to 100mm nn Faces: carbon, ceramic, stainless steel and silicon carbide Bellow Seals Non-directional and extremely versatile, these bellow seals are designed with no loose parts that could be damaged during installation, and feature static sealing that cannot cause shaft wear or fretting. Suitable for a wide range of applications, such as pumps, mixers, agitators and compressors, they can also be used where a previous seal has caused shaft damage. nn Wide range of metric and imperial sizes nn For shafts from 8mm to 100mm nn Faces: carbon, ceramic, stainless steel and silicon carbide Parallel Spring Seals Widely used as the standard upgrade from packing to mechanical seals, parallel spring seals are the mainstay for many industries. Using a rubber diaphragm to seal against the shaft and provide drive to the face, they are suitable for use in applications such as water, food and chemical processing. Designs are also available with a balanced configuration to reduce heat and friction, extending seal life. nn Wide range of metric and imperial sizes nn For shafts from 10mm to 75mm nn Faces: carbon, ceramic, stainless steel and silicon carbide
  • 169.
    161 Visit us ateriks-techdirect.co.uk Sealing Polymers Stationary Components Generally O-ring mounted stationary components, or seats, are available in various materials to suit application requirements. nn Some designs feature a pin groove to improve seat retention. It is important to consider the application conditions and condition of the equipment when selecting a stationary component nn The stationaries illustrated are those commonly found in use today PC0KA 0300 --- -0 C A N ELASTOMER MATERIAL STATIONARY MATERIAL ROTARY MATERIAL BUILD CODE SIZE CODE SEAL TYPE IDENTIFIER Identifier Build Code Rotary Material Code Stationary Material Code Elastomer Material Code KA Assembly 0 Standard O Not Req’d 0 Not Req’d O Not Req’d KR Rotary Only 1 SA0 Stationary A Alumina Ceramic A Alumina Ceramic E EPDM KS Stationary Only 2 SB0 Stationary C Double Phenolic Resin Impregnated Carbon/ Graphite C Carbon F FEP 3 SC0 Stationary C2 Antimony Carbon C2 Antimony Carbon N Nitrile 4 SD0 Stationary C3 Double Phenolic Resin Impregnated Carbon/ Graphite FDA Compliant C3 Carbon FDA P PTFE 5 SDA Stationary C4 Triple Phenolic Resin Impregnated Carbon/ Graphite N Ni-Resist V Viton 6 SE0 Stationary S Reaction Bonded Silicon Carbide S Reaction Bonded Silicon Carbide 7 SF0 Stationary S2 Sintered Silicon Carbide S2 Sintered Silicon Carbide 8 SG0 Stationary S3 Sintered Silicon Carbide Graphite Loaded T Tungsten Carbide 9 SGA Stationary T Tungsten Carbide X Stainless Steel R Right Hand spring X Stainless Steel L Left Hand spring Mechanical seals part number breakdown
  • 170.
    162 Specialist Technical Centres Know-How Sealing Polymers GasketJointing Materials (Super 8) Maximum Operating Temperature Degrees C 150 +250 (200- Steam) +200 +250 +450 -210 +260 -210 +260 -210 +260 -240 +230 Maximum Pressure Bar 60 100 85 100 150 55 85 55 230 Material PT20 PT30 PT50 PT60 Egraflex Clipperlon 2110 Clipperlon 2100 Clipperlon 2115 Flowtite Air Y Y Y Y Y Y Y Y Y Steam Y Y Y Y Y Oxygen Y Y Oil Y Y Y Y Y Solvent Y Y Y Y Y Y Petrochemical Products Y Y Potable Water Y Y Y Y Y Y Y Weak Acid Y Y Y Y Y Y Y Y Y Strong Acid Y Y Weak Alkali Y Y Y Y Y Y Y Y Strong Alkali Y Y Y Food Stuffs Y Y Y Y Y Y General Duty Y Y Y Y Y Y Y Y Y Gasket Selection Chart Gasket jointing materials can fulfil over 80 original material types with a simple selection of just 8 and are supplied as complete sheets or cut gaskets. ERIKS Gasket Jointing Materials SHT PT20 05 Thickness in mm See the chart for availability Material See the chart for availability Product SHT Part Number Identifier All sheets are available at 1.5mtr sq as standard Example SHTPT2005 0.5mm thick PT20 sheet SHTFLOW15 1.5mm thick Flowtite sheet Material Code Thicknesses available in mm 0.5 0.8 1 1.5 2 3 4 PT20 PT20 PT30 PT30 PT50 PT50 PT60 PT60 Egraflex EGRA Clipperlon2110 C211 Clipperlon2100 C210 Clipperlon2115 C215 Flowtite FLOW
  • 171.
    163 Visit us ateriks-techdirect.co.uk Sealing Polymers Fibre Sheet Jointing General Grade Non-Asbestos Gasket Materials PT20 is a composite of mineral and aramid fibres with NBR binders. Suitable for use in low pressure applications, in a wide range of non-aggressive media. BS7531 Grade Y For use with water, steam and gases at temperatures up to 200ºC and for oil, solvents and inert liquids at temperatures up to 350ºC. PT30 is a high quality, sheet jointing comprising of a mixture of polyaramid and inorganic fibres, bonded with a NBR binder. It is a general purpose gasket material, suitable for hot and cold water, steam, oil, fuel, gases and other general duties. PT50 is an aramid based sheet jointing. Suitable for general purpose low temperature applications. BS7531 Grade X A Premium Grade Non-Asbestos Gasket Materials For use with water, steam and gases at temperatures up to 250ºC and for oil, solvents and inert liquids at temperatures up to 440ºC. PT60 is our premium quality, private brand sheet jointing, comprising of glass and aramid fibres, bonded together with a NBR binder. It is a general purpose, medium pressure rated gasket material and an excellent choice for general chemical applications. Pink Modified PTFE sheeting. High performance biaxially orientated sheet sealing material containing PTFE with silica filler. Excellent resistance against cold- creep. Universal quality for (petro) chemical applications, acids and gases. Clipperlon 2115 USP is modified PTFE sheet specially designed for high purity applications such as Pharmaceutical, Semicon, Food and beverage. The material is free of any pigment and has a natural white color and meets the requirements for USP class VI plastics (USP 88) and meets Food Diary requirements FDA 21 CFR. 1771550 and EC 1935/10/2011. Highly recommended for low torque applications, plastic pipe systems and flanges, as well as glass and ceramic lined equipment in a wide variety high purity applications. Graphite Laminates A semi-rigid laminated material manufactured from high purity exfoliated graphite reinforced with nickel or stainless foil or tanged stainless steel. It is suitable for sealing against steam and most other media with the exception of strongly oxidising reagents. General material grades available from ERIKS Gasket Technology include: Egraflex is a Graphite Laminate sheeting reinforced with a Tanged 316 stainless steel insert. A universal material for (petro)chemicals. Used in high pressure and high temperature applications. Recommended for applications involving high sealing stresses and where high blowout resistance is required. The inclusion of the steel reinforcing layer gives rise to a robust sheet. Can be used to seal a wide range of media, with the exception of strong oxidising agents, at extremes of temperature and pressure. Expanded PTFE Sheet 100% multidirectional expanded PTFE sheet, minimum of cold-creep, high gas permeability. Universal chemical resistant, pH 0-14, excellent on rough or damaged flange surfaces. nn WRc nn TA-Luft nn Blow-Out-Test VDI 2200 nn FDA nn USP Plastic Class VI nn Germanischer Lloyd nn BAM nn AREVA Composite PTFE Products Modified PTFE Materials Composite PT150 and PT160 are a PTFE-based group of products capable of sealing chemicals right across the 0–14pH range, at temperatures from cryogenic to 260°C and at pressures from 85 bar down to vacuum. Typified by low creep, sustained service capability and robustness and has numerous advantages over many alternatives including pure and filled PTFE and envelope gaskets. Blue Modified PTFE sheeting. High performance biaxially orientated sheet sealing material containing PTFE with hollow glass micro spheres. Excellent resistance against cold-creep and very gas tight. Seals with low bolt force. Universal chemical resistance and can be used for several flange materials: steel, plastic, glass and ceramic lined. PT30 PT20 PT50 PT60 Egraflex Clipperlon 2110 Clipperlon 2100 Clipperlon 2115 Flowtite
  • 172.
    164 Specialist Technical Centres Know-How Sealing Polymers SoftCut Flange EPDM Cut Flange Gaskets SCG A Size (1 ¼” = 125 1000mm = 1000) Class eg. 150, 600, PN16, PN40 , TABE or TABF Flange FF=Full Face RF =Raised Face Material see selection chart Specification A, B, C, D or E Product SCG PT20 FF 150 M Soft Cut Flange Gaskets As one of the UK’s leading gasket manufacturers ERIKS Gasket Technology can offer a tailored fast service for Soft Cut Flange Gaskets. Encompassing materials from PTFE, non-asbestos fibre and high temperature sheeting through to graphite, ERIKS Super 8 range provides a complete product portfolio that can be selected to suit your application Specification Class A B C D E B16.21 B16.47 A B16.47 B DIN TABLE/BS10 150, 300, 600, 900 1500 150, 300, 600 900 150, 300 600 PN6, PN10, PN16, PN25 PN40 TABA, TABD, TABE, TABF, TABH TABJ, TABK, TABR TABS Part Number Identifier Thickness 05, 08, 10, 15, 20 30 1000 Example: Metric = SCGDPT60FFPN25M100015 Imperial = SCGAPT20RF1500I12530 Unit of Measure I = Imperial M = Metric 05 In addition Clipperlon offers outstanding chemical resistance across a wide range of temperature extremes. This material has a rather high compressibility characteristics and low minimum seating stress value, therefore highly recommended for low torque applica- tions. Combined with ERIKS gasket cutting facility ensures that each gasket is cut to the exact dimensions of each door to provide the perfect seal. Following an FDA audit a large blue- chip pharmaceutical company contacted ERIKS to assist with changing all of the vessel manway door seals, which were all unique. It was suggested that Leader’s Clipperlon 2115 would be the best solution. Designed for high purity applications such as the pharmaceutical industry, the material is natural white modified PTFE, free from pigments and meets USP-6 compliance which would more that satisfy the demands of the FDA audit. FDA COMPLIANCE WITH CLIPPERLON GASKETS Material Code Thicknesses available in mm 0.5 0.8 1 1.5 2 3 4 PT20 PT20 PT30 PT30 PT50 PT50 PT60 PT60 Egraflex EGRA Clipperlon2110 C211 Clipperlon2100 C210 Clipperlon2115 C215 Flowtite FLOW
  • 173.
    165 Visit us ateriks-techdirect.co.uk Sealing Polymers EPDM Cut Flange Gaskets EPDM rubber has excellent resistance to weathering and ozone; it has good, to very good ageing resistance and low temperature flexibility, low electrical conductivity and satisfactory resistance to polar chemicals. ERIKS Gasket Technology can supply EPDM Cut gaskets that have WRAS approval or FDA approval. These are ideal choices for Food and Pharmaceutical Industries. SCG A Size (1 ¼” = 125 1000mm = 1000) Class eg. 150, 600, PN16, PN40 , TABE or TABF Flange FF=Full Face RF =Raised Face Material see selection chart Specification A, B, C, D or E Product SCG E772 FF 150 M Specification Class A B C D E B16.21 B16.47 A B16.47 B DIN TABLE/BS10 150, 300, 600, 900 1500 150, 300, 600 900 150, 300 600 PN6, PN10, PN16, PN25 PN40 TABA, TABD, TABE, TABF, TABH TABJ, TABK, TABR TABS Part Number Identifier Thickness 15, 20, 30, 50 60 1000 Example: Metric = SCGE772FFPN25M100015 Imperial = SCGAE773RF1500I12530 Unit of Measure I = Imperial M = Metric 15 Chemical Composition E-70-772 E-70-773 Physical Form Sheet/Cut Gaskets Sheet/Cut Gaskets Colour Black White Storage Stability* 10 Years 10 Years Compliance/Approvals WRAS FDA 177.2600-rubber articles for repeated use Specific Gravity 1.13 1.30 Polymer Content 100% 100% Tensile Strength 10.8 Mpa 4.9Mpa Elongation at Break 400% 300% Compression Set 22h/70`C 8% 30% Parametric Material Code E772 E773 Material Code Thicknesses available in mm 1.5 2 3 4 5 6 E-70-772 EPDM E772 E-70-773 EPDM E773 Other thicknesses available on request
  • 174.
    166 Specialist Technical Centres Know-How Sealing Polymers SpiralWound Gaskets Ring Type Joints Specification Class Rings Windings Filler A B C D E B16.50 B16.47 A B16.47 B DIN TABLE 150, 300, 600, 900 1500 150, 300, 600 900 150, 300 600 PN6, PN10, PN16, PN25 PN40 TABA, TABD, TABE, TABF, TABH TABJ, TABK, TABR, TABS 00 No ring 01 316 03 Carbon Steel 02 316L GR Graphite SRI A Class eg. 150, 600, PN16, PN40 , TABE or TABF Filler GR Spiral Wound Gaskets A comprehensive stock of SWG manufactured in accordance with ASME B16.20 is available for immediate delivery. Spiral wound gaskets are used for high pressure and temperature applications. ERIKS has a selection in all conceivable models and in various materials. In addition, special gaskets can be made quickly in our own production facility. All SR and SRI gaskets for these standard flanges are 0.175” (4.5mm) thick, fitted with 0.125” (3.2mm) thick solid metal rings, unless otherwise stated. Windings 02, Specification A, B, C, D or E Product SRI = Inner Outer Ring SR = Outer Ring only 01 GR 150 M Part Number Identifier Inner Ring 00, 01 Outer Ring 01, 03 02 03 Example: Imperial SRIA0102GR03600I125 Metric SRD0002GR03PN40M1000 Size (1 ¼” = 125 1000mm = 1000) Unit of Measure I = Imperial M = Metric 1000
  • 175.
    167 Visit us ateriks-techdirect.co.uk Sealing Polymers Ring Type Joints Ring joint gaskets are used primarily in the up-stream oil and gas industries where high pressures are often encountered. nn Manufactured to API 6A and ASME standards nn Standard materials are soft iron and 316 stainless steel nn Available in a range of styles Size 11 to 303 Shape OVR, OCR, RX or BX (See opposite) Product RTJ RTJ OCR 11 Material SI=Soft Iron SS=316 SI Part Number Identifier Example: RTJOCR11SI RTJRX303SS Style R Octagonal Section - For use with ASME and API flanges with flat bottomed groove Style R Oval Section - For use with ASME and API flanges with flat bottomed or oval groove Style BX Square Octagonal Section - For use in API BX flanges Style RX Asymmetric Octagonal Section - For use in ASME and API flat bottomed grooves
  • 176.
    168 Specialist Technical Centres Know-How Sealing Polymers GraphiteGaskets Novaphit® with XP technology The first graphite gasket that is easy to remove from the flange Long-term non-stick properties throughout the application temperature range from –200°C to +550°C: nn Time and money are saved in maintenance operations thanks to fast gasket replacement without any residue nn Higher plant reliability and less downtime, because the sealing surfaces do not need to be cleaned mechanically and are not therefore damaged Higher oxidation resistance: nn More stable long-term sealing properties nn Consistently low leakage High density graphite (115lb) on the “humps” results in low gas permeability, super sealability and exceptional recovery. By contrast, the exceptionally low density (40lb) compressive inner ring provides an extremely low “minimum design seating stress” of just 800psi. The patented DynaGraph™ bonding process eliminates volume loss due to adhesive bake off, resists over- compression damage, and allows for easy removal from flanges. The new Elastagraph® emission reduction gasket from Leader Gasket Technologies enables fugitive emission control to 50ppm or lower. Manufactured from a combination of high- and low-density graphite, the gasket has unique “humps” and “valleys” in the Elastagraph® corrugated steel, creating a bellows effect to counter the effects of movement and misalignment. The corrugation of the whole gasket – including the metal layer – creates a spring-back effect. ERIKS Leads the way with new emission-reducing gasket Elastograph® The Leader Elastagraph® gasket for standard EN/ASME and non-standard flanges is ideal for process piping, fuel refineries, and other locations where fugitive emissions pose an environmental and health and safety issue. Operating Limits** Specifications Maximum Operating Temperature 1200F Steam – 850F Oxidizing PH Range 0-14 Composition High Purity Inhibited Grade flexible graphite infused over a corrugated metal core Metal Substrate 316L (standard), 304ss, Monel, Zirconium, Hast B276 etc. (other metals available upon request) Values M value = 1.5 Y value = 2000 Most commonly used for standard ANSI/ASME and DIN pipe flange connections. Standard stock items are 316L metal core for 1/2” through 24”. Other special sizes available upon request. Frenzalit, Elastograph® Gland Packings
  • 177.
    169 Visit us ateriks-techdirect.co.uk Sealing Polymers High Temperature Materials High temperature gaskets for extreme applications and environments. Frenzelit NovaMICA® Thermex NovaMICAThermex is a brand-new gasket material based on processed phlogopite mica resistant to continuous temperatures of up to 1000ºC. Suitable for extreme thermal and mechanical applications, especially exhaust. nn Extremely high temperature stability (up to 1000 °C) nn Low long-term leakage even at high temperatures due to the expanded metal insert nn Reliable handling nn Smooth processability by all standard manufacturing processes Gland Packings Material Grades ERIKS Gasket Technology is able to supply a comprehensive range of material grades to suit your specific needs. In addition, we also stock a wide range of extraction tools. GLP 110 065 Size in sq mm 3, 5, 6.5, 8, 9.5, 12.5, 14, 16, 19, 22 or 25 Material 110, 130, 140, 150, 170, 180 or 200 Product GLP All coils are generally supplied at 8mtrs in length Example: GLP140125 GLP200050 Part Number Identifier Material Application 110 130 140 150 170 180 200 Cost effective cotton fibre gland packing with graphite and lubricated Graphite/PTFE with aramid in corners reinforced braided with a silicone rubber core Twisted fibreglass and impregnated with a composite inc. a high percentage of graphite with lubricant General use twisted fibreglass gland packing impregnated with PTFE and silicone lubricant Braided PTFE filament, also impregnated with PTFE dispersion and additional lubricants Braided and manufactured from expanded graphite yarn with an exceptionally high carbon content Extremely hard wearing gland packing with aramid fibres, braided and impregnated with PTFE
  • 178.
    170 Specialist Technical Centres Know-How Sealing Polymers CALL:0845 006 6000 to contact your local workshop Repair or rewind Maintain and Monitor Replace ENGINEERING SITE SERVICES FUNCTIONS: n HV motor and generator rewind n Overhaul of high voltage machines n Partial discharge analysis n Removal, re-installation and commissioning n Site monitoring and testing n Diamond, concentric hairpin or alternator half bar coils produced n Maintenance and repair of HV rotating equipment n In-house copper rolling mill n Fully documented repairs WHY ERIKS: n Timeous effective solutions n Facilities to support a broad range of customers n Largest electrical service providers in the UK HIGH VOLTAGE MACHINES
  • 179.
    FLOW CONTROL Quick reference ERIKS FlowTechnology have the know-how to ensure your plant runs efficiently, keeping expensive downtime to a minimum. Whether you need a solution for Pumps, Hose or Valves ERIKS have the engineering capability, technical experience and supply chain you can rely on, year in year out! 171 Valves Econ® Partner Brands 174 Ball Valves 175 Gate, Globe and Check Valves 176 Butterfly Valves 177 Knife Gate Valves 177 Pumps Hygienic Rotary Lobe Pumps 181, 194 End Suction Pumps 183 Diaphragm Pumps 184-185 Grundfos Pumps 186-187 Munsch Chemical Pumps 188 Gorman-Rupp Pumps 189 Submersible Pumps 190-191 Hydra-cell Pumps 192-193 Hose Pumps 195 Petrol Driven Pumps 196 Coolant Pumps 197 Wobble Pumps 198 DOC 3 Pumps 198 Cavity Pumps 199 Quick Product Reference 174, 169 184-185 192-193 174, 175-177 174 186-187 195 174 180-181 189 190-191 198-199 174 182-183 188 Visit us at eriks-techdirect.co.uk
  • 180.
    172 WHAT WE DO: „„Ball valves „„ Gate, globe and check valves „„ Butterfly valves „„ Valves for marine service „„ Bespoke manufactured solutions „„ Actuators „„ Full range of services from actuation, modifications, drilling, painting and special finishes „„ Testing for pressure, temperature, non-destructive examination and PMI material testing all available LEADING THE WAY IN VALVE TECHNOLOGY ERIKS Flow Control has reputation for supplying quality products, technical know-how and excellent customer service and has been relied upon globally for over 25 years. Strategically placed UK warehouses and 3 technology centres in Leicester, Aberdeen and Glasgow Specialist Technical Centres Know-How
  • 181.
    VALVE TECHNOLOGY 173 SPECIALISTS INVALVE ACTUATION PROJECT MANAGEMENT ERIKS Flow Control works closely with major engineering contractors both in the UK and overseas and has developed frame agreements with highly respected companies within the industry. Our dedicated experienced Projects team have the required high level of technical expertise, to manage your specialist applications from concept to completion. Products can be modified or manufactured to suit the project or precise specification. SERVICES Customer service is at the heart of all we do and our technical expertise is relied upon throughout a wide range of industries. Our total solution service means we are able to support our customers with: „„ Seal changes „„ Special finishes or painting „„ Actuation „„ Modifications „„ Extensions From our in-house actuation centre, our team of technical experts offer an unparalleled level of service. Using Econ® or AMG pneumatic actuators from our vast stock enables both a fast and cost effective total solution. Other brands or types are available and fitted to customers bespoke specifications. „„ Body material: Stainless Steel, Aluminium and Steel „„ Namur Mounting „„ Rack and Pinion „„ Spring Return (Single acting) „„ Fail Open or Close „„ Double Acting „„ Fitted and tested in house with full certification „„ Scotch Yoke „„ Tailored logistical solutions Range of actuator ancillaries including: „„ Solenoids „„ Switchboxes „„ Positioners „„ Speed controllers common to safety requirements „„ 12 / 24 / 48VDC - 110 / 210 / 220 / 240VAC – IP65 / SAFE AREA / IP66 / EXD / EXIA „„ Mounting Kits „„ Filters „„ Manual valve visual indicators Supported by ECON® Electric Actuators „„ Direct Mounted „„ ELA40 – ELA3000 Torque 40-3000Nm „„ IP67, (IP68 ATEX OPTIONAL) „„ 24VDC, 110VAC or 230VAC Visit us at eriks-techdirect.co.uk
  • 182.
    Specialist Technical Centres Know-How Flow Technology 174Econ® , Partner Brands and Ball Valves ® Exclusive to ERIKS The Econosto Group, part of the ERIKS Group, has been developing quality products since 1892 and its ECON® brand products are manufactured to strictly controlled quality standards whilst offering a cost-effective range to complement other market-leading brands supplied. Suitable for a wide variety of applications, the Econ® range includes: nn Valves nn Instrumentation nn Related products Econ® Partner Brands More and more customers are relying on the Econ® brand for their valves and instrumentation. Products that qualify for the Econ® quality mark have been specifically designed to meet the needs of our customers and our sustainability policy. In addition, ERIKS Flow Control supply a broad selection of ‘A’ brands from renowned manufacturers covering all industry sectors, ranging from standard products to high quality sustainable and environmentally-friendly products. Partner Brands ERIKS Flow Control strives to offer the widest range of valves currently available and has formed partnership agreements with some of the industries leading manufacturers including: nn Smith nn Taylor nn JC nn SRi nn Vinco nn Stockham nn Valve Enterprise nn CMO Smith The Newdell Company became part of the ERIKS group in 2010 resulting in the opportunity fo ERIKS Flow Control to offer their highly regarded Smith Valve brand to the UK market. Smith is one of the oldest valve brands for API 602 forged steel valves in the industry today. The products consist of a wide range of gate, globe and check valves used in the oil and gas, refinery, petrochemical and many other industries throughout the world. Smith also offers many speciality products for services such as HF acid, sour gas, cryogenic, chlorine and oxygen. Smith valves are renowned for offering a useful colour coding system, whereby the colour of the handwheel (gate and globe valves) indicates the body/bonnet material of the valve and the nameplate colour (gate, globe and check) indicates the trim material. Taylor For over 50 years, Taylor Valve has been a pioneer in the design, development and manufacture of valves and precision instrumentation. With over 100 US and foreign patents their unique design, precision manufacturing and uncompromising quality has enabled them to build a reputation for excellence. Every Taylor product is designed to meet the highly demanding requirements of oil and gas producers, refiners, chemical plant operators , power generators and the processing industry in order to more effectively control their liquid, steam and gas operations. AMG Pesch AMG Pesch manufactures a range of rack and pinion actuators, positioners, monitoring units and valves to strict quality standards. The patented rod-guide piston design of the actuators ensures drives are maintenance-free, compact and offer high levels of reliability and long service life. Since early 2011, when AMG-Pesch became part of the ERIKS group, ERIKS Flow Control have been able to offer these actuators to the UK market. Inoxpa Expanding their Valve offering to food- processing and pharmaceutical industries ERIKS Flow Control secured UK distributorship for Inoxpa Valves. Founded in Banyoles, Spain, Inoxpa is a renowned and long- standing business group specialised in the manufacture and trade of stainless steel Valves including: nn Butterfly nn Seat nn Diaphragm and Pinch nn C-Top Control Units nn Ball and Check nn Overflow and Vent
  • 183.
    Visit us ateriks-techdirect.co.uk Flow Technology 175 Material Temperature range Brass –20°/+150°C ST/ST –34°/+205°C Size Temperature range 1/4–8 –10°/+200°C –10°/+200°C –10°/+200°C –10°/+200°C Size Temperature range 1/4–2 –34°/+205°C Flanged Floating Ball Valves General Ball Valves nn 1 2 piece in Bronze, Brass, Carbon and Stainless Steels nn Wafer Pattern nn Multi-Port, 3 4 way Trunnion Mounted Ball Valves nn Soft Metal Seated nn Cavity Relief nn Flanged, Screwed, Hub and Weld Ends nn Cryogenic to high temperature nn Metal seats for severe service nn Tandem Valves nn Cast iron, Stainless and Carbon steel (including low temperature options) from stock nn Special alloys available nn 1/2”-16” nn ANSI 150-2500 and DIN Flanges nn V Ball Control nn Firesafe nn NACE nn ATEX nn Low temperature carbon, Stainless and Duplex Stainless steels from stock Special alloys available nn 1/2” - 30” nn ANSI 150-2500. API 3000-15000 nn Firesafe nn NACE 3 Piece Ball Valves nn Stainless and Carbon steel (including low temperature options) from stock nn Special alloys available nn 1/4” - 4” nn ANSI 150-2500 nn Firesafe nn NACE nn Screwed, Weld End and Flanged Ball Valves Ball valves take a lead role in the valve industry and have wide-ranging applications. The high flow capacity coupled with being very simple to automate make ball valves ideal for many applications where an open/close facility is required but not regulating of flow. They can however, be used for regulation with characterised seat/ball combinations.
  • 184.
    Specialist Technical Centres Know-How Flow Technology 176Gate, Globe, Check Butterfly and Knife Gate Valves Size Temperature range 2–16 –9°/+500°C 20 –9°/+500°C 51 Gate, Globe Check Valves When process applications are critical, Gate, Globe or Check Valves are used. Manufactured from a variety of materials makes them suitable for all types of media and they can be modified to customer’s requirements. Forged Steel nn A105, LF2, F304, F316, F11, F22 from stock nn Special alloys available nn Various trim options nn ANSI 150-2500 nn 1/4” - 2” nn Screwed, flanged and weld-end nn Bolted and welded bonnet nn Bellows, sealed and conventional Cast nn Cast iron, Bronze, low temperature Carbon steel and Stainless steel from stock nn Special alloys available nn 2” - 72” nn ANSI 150-2500 also API 6A Wellhead valves nn Flanged, hub and weld ends. nn Wide range of bonnet, gland designs and trim options available gland nn NACE Wafer Lugged Check nn Al-Bronze, Cast iron, Carbon, low temperature Carbon and Stainless steel from stock. nn Special alloys available nn Dual plate, swing and disc type. nn 1/2” - 84” nn ANSI 150- 2500 and DIN to suit a flanged or hub connection Modifications nn Seat, seal, trim and/or bolt changes nn Special operators nn Full actuation nn Painting and coating nn Fabrication, assemblies and pipe pups nn Locking and interlocking nn Flange facing and drilling nn Extended spindles and bonnets nn Cleaning nn Special packaging options Testing nn PMI testing nn Hydraulic and pneumatic tests nn High pressure gas testing nn Low temperature testing nn Hot oil testing nn Non-destructive examination. Dye penetrant, magnetic particle, radiography, ultrasonic etc. nn Ferritescope inspection nn Hardness testing nn Paint thickness verification A full range of testing is available from our Leicester and Aberdeen facilities including:
  • 185.
    Visit us ateriks-techdirect.co.uk Flow Technology 177 Butterfly Valves These valves can be used for many applications either as open/close or simple regulating valves. A useful characteristic of butterfly valves is the availability of different lining materials, this allows for uses ranging from non-aggressive media such as water or air through to chemicals and corrosive media. High Performance Butterfly Valves nn Carbon steel and stainless steel from stock nn Aluminium-bronze and special alloys available to order nn 2”-24” nn ANSI 150 to 300 (other classes available) nn Wafer, Lugged and Flanged nn Firesafe Certified nn Double and triple offset disc nn Soft and metal seated Resilient Seated Valves nn Cast iron from stock nn Carbon Steel, Bronze, Stainless and special alloys available nn 2” - 60” nn PN6 - PN16, ANSI versions available nn Bonded and replaceable liners nn Liners in Nitrile, EPDM, Viton PTFE (others available) Knife Gate Valves Knife gate valves are widely been used in pulp or paper industry applications and for handling slurries, they are also used in the offshore sector and are suitable for a wide range of wet or dry media. Both Uni and bi-directional designs are available, and are ideal where quarter turn valves are unsuitable and can also be fitted with actuators or otherwise modified to suit the customer’s application. Knife Gate stock range nn Cast iron and Stainless steel from stock. nn Cast carbon steel and special alloys available nn 2”-24” (DN50-DN600) nn PN10 also ANSI 150 nn Wafer Pattern nn Handwheel, lever and Double-acting cylinder nn EPDM, Viton, Nitrile, PTFE or metal seats Special valves nn Sizes up to 40” nn Special flange drilling nn Lugged pattern flanged, square flange nn Double knife, Rubber coated blade nn Bi-directional, Penstocks Other valve types We stock a range of other valves in a wide variety of materials and sizes. If we do not have the item you require in stock we will endeavour to obtain it from one of our global suppliers.
  • 186.
    178 YOUR Complete pump solutions ERIKSPump Services provides a comprehensive and cost-effective solution for all your pump requirements, whatever the application. From abstraction, through the production process, to the final discharge, we offer a complete service to take care of every aspect. ERIKS Pump services offers a range of pumps covering all of the configurations and applications you could need Complete capabilities: „„ Design „„ New supply „„ Spares „„ Installation „„ Maintenance „„ Repair „„ Reverse engineering „„ Pump and system energy audits Specialist Technical Centres Know-How
  • 187.
    PUMP TECHNOLOGY 179 CHOOSING FROMTHE MARKET LEADERS A broad range of pump industry experience enables us to put forward solutions on the basis of impartiality and fitness for purpose. We are not constrained by the limitations or range of products. Our focus is clearly aimed at increasing efficiency, reliability, durability, ease of maintenance and product support while reducing operating costs. PUMP PARTNERS: „„ Aro „„ Capari „„ Energy Pumps „„ Gardener Denver „„ GEA Hilge „„ Gorman Rupp „„ Graco „„ Grundfos „„ Munsch „„ Seepex „„ Wanner „„ Xylem (Lowara, Flygt Jabsco) PUMP AUDITS ERIKS’ pump audits, data logging and condition monitoring services will reveal a wide range of information about your pumps, including: „„ Their energy efficiency „„ Their actual performance „„ The efficiency of the complete hydraulic system With these facts and figures to hand, we can work with you to determine whether you should continue to support your existing plant – even through obsolescence – or carry out replacements. We will calculate Whole Life Costs and provide payback analysis, giving you factual evidence on which you can base your final decision. If maintaining existing pumps proves to be the most cost-effective solution, ERIKS Pump Services reverse engineering capabilities mean we can help you to keep your pumps running even after parts obsolescence, and can also modify and up-rate components, for improved performance and reliability. WE ARE FOCUSED ON: „„ Delivering pump repair and refurbishment to a high standard „„ Reliability improvements as collaborative projects „„ Obsolescence risk auditing „„ Site services „„ Repair and maintenance contracts „„ Asset management contracts „„ Supply, installation and commissioning „„ Reverse engineering „„ Energy efficiency testing and system diagnostics „„ Training schemes We are able to conduct pump performance and system testing in our workshops and on site. Our ATEX accreditation qualifies us to carry out work on rotating equipment operating in all hazardous and explosive environments and we have experience of operating on COMAH tier 1 sites. Visit us at eriks-techdirect.co.uk
  • 188.
  • 189.
    Visit us ateriks-techdirect.co.uk Flow Technology 181 Jabsco Lobe Pumps: HP UL Series With a proven 50 year heritage in Lobe Pump manufacture, Jabsco branded lobe pumps are taking the next step in flexibility and value. The Hy~Line+ (HP Series) and Ultra~Line (UL Series) range of lobe pumps replace the Hy~Line, Ultima and 24 Series lobe pump offering the combined strengths and experience on one key platform. Combined strengths and experience on one key platform Jabsco lobe pumps offer high flow, high pressure capabilities from a positive displacement non contacting rotary lobe pump package. With applications in industry, food, beverage and bio-pharmaceutical processing sectors, Jabsco lobe pumps can be found decanting, transferring, filling, spraying, dosing a wide range of fluids in many varied environments (including ATEX designated zones). Product Range The Jabsco HP/UL range of rotary lobe pumps offers low maintenance solutions to pumping needs in multiple markets including essential industrial, demanding food and beverage and critical bio-pharma. Up to 1809 litres per minute and up to 15 bar from a single robust and effective design principle covered by 5 frame sizes. Resilient construction materials ensure long pump life even in the toughest of environments. Clever design allows multiple pump variant configuration from one pump size providing the flexibility to meet ever demanding end user lead times and business needs. Jabsco Lobe Pump Range overview: nn Product Description: High flow, high pressure positive displacement non contacting rotary lobe pump. nn Applications: Industrial, food and beverage, bio-pharmaceutical processing; decanting, transfer, filling, spraying. nn Power Source: Shaft coupled electric motor drive (not provided). How do they work? 1. Fluid is drawn into the pump and completely fills the space between the rotors. 2. Held between the rotor lobes and the pump case, closed cells of fluid are carried smoothly through the pump. 3. The intermeshing rotor lobes positively displace the fluid volume, generating flow and overcoming the discharge pressure. Features nn Modular ordering of port kits, foot kits and pumping unit nn Bi-wing Scimitar and tri-lobe rotors on 3A approved HP series nn All 316L wetted part hygienic construction, comprehensive seal arrangements and EN1935:2004 approved elastomer choice nn Simple design; front loading zero contact rotors shaft seals nn Robust preloaded large diameter shaft taper bearings and Helical gearing nn EHEDG approval on UL models nn Optional all stainless steel construction and USP Class VI elastomers available on selected models nn Materials of construction: 316L wetted parts with epoxy coated aluminium gear cover; choice of seals including C/SS, SiC/SiC, single or double with flush; 304 stainless steel mounting feet with synthetic elastomer sealing joints available in Nitrile, EPDM, Viton and PTFE.
  • 190.
    Specialist Technical Centres Know-How Flow Technology 182 LET’SCONSUME LESS WHILE DOING MORE. www.lowara.co.uk © 2015 Xylem Inc. Lowara is a trademark of Xylem Inc. or one of its subsidiaries. Achieve higher levels of efficiency and performance with the newly designed e-range of in-line and end-suction pumps from Lowara. The system experts of Xylem and its Lowara brand have redesigned and enhanced the hydraulic efficiency of the e-range for an MEI better than 0.6 to exceed the ErP 2015 requirements. Through cutting-edge design, the new e-range provides improved overall system performance, with flows up to 2200 m³/h and heads up to 160 meters, while enabling reduced electricity consumption and lower life cycle costs. And when combined with the Hydrovar variable speed drive, you can see systems energy savings of up to 70%. The e-range is available in several standardized sizes with performance and curves specifically optimized for HVAC applications. Find out more at www.uk.buildings.xylem.com xylem GWP advert 210 x 280 mm.indd 1 07/07/2015 16:27:34 Lowara Pumps
  • 191.
    Visit us ateriks-techdirect.co.uk Flow Technology 183 Lowara e-NSC Series Material options nn Pumphousing: cast iron, ductile iron, stainless steel 1.4401/1.4408, duplex stainless steel 1.4517 nn Impeller: cast iron, bronze, stainless steel 1.4401/1.4408, duplex stainless steel 1.4517 nn Elastomers: EPDM, FPM (other marterials on demand) nn Mechanical face seal: Carbon, Ceramic, Silicon Carbide and Widia Configuration options nn Configurations: Bare shaft, closed coupled and frame mounted Range Overview nn Sizes: DN32 to DN300 nn Power: 1.1 kW – 75 kW (2-pole) 0.25 kW – 315 kW (4-pole) nn Heads up to: 160 m nn Flows up to: 1800 m3/h nn Pressure class: PN16 nn Temperature of pumped liquid: - 25°C to +120°C, extended temperature nn Version -25°C to +140°C nn Variable speed option: Hydrovar High flexibility, heavy duty end suction pumps for building services, public utilities and industry. By combining high efficiency with high flexibility regarding installation, material options and temperature, the new Lowara e-NSC series is the natural choice for water transport, hydronic heating and chiller systems, fire protection systems and a vast number of industrial applications. With efficiency levels well exceeding ErP 2015, the e-NSC series offer long term economical pumping solutions. High efficiency New designed high efficiency hydraulics with MEI values well above the ErP 2015 level and IE3 motors set the basis for very low pperation costs. Long service life easy maintenance Robust design, different bearing frame sizes and stainless steel replaceable wear rings ensure a long service life. The e-NSC is also designed for easy maintenance and all service points are easy reachable to reduce downtime. Adapt to needs In many applications. the need for water is always varying. By equipping the e-NSC with a Hydrovar pump controller, the duty is always exactly where it should be. And it pays off: reducing the speed by 50% reduces the power consumption by 85%. Exactly the right configuration With materials options spanning from cast iron to duplex stainless steel, the e-NSC is the right solution for 1000’s of liquids. Hot or cold The standard e-NSC can handle liquid temperatures from -40°C up to +140°C and the extended temperature version from -40°C up to +140°C. No leakage The e-NSC offers a wide range of mechanical face seal options regarding types and materials.
  • 192.
    Specialist Technical Centres Know-How Flow Technology 184ARO® Diaphragm Pumps ARO® Diaphragm Pumps Non-Metallic Models – Range and Performance MaterialMaterial bar ATEX certified EXPERT Series 1/4” 20 l/min 8.6 bar (125 psi) 1/4” NPT 1/4” BSP 1/4” NPT 1/4” BSP Polypro- pylene PVDF Groundable acetal 1.6 mm With wetted parts in groundable acetal. EXPERT Series 3/8” 40.1 l/min 6.9 bar (100 psi) 3/8” NPT 3/8” BSP 3/8” NPT 3/8” BSP Polypro- pylene PVDF Groundable acetal 1.6 mm With wetted parts in groundable acetal. EXPERT Series 1/2” 54.5 l/min 6.9 bar (100 psi) 1/2” NPT 1/2” BSP 1/2” NPT 1/2” BSP Polypro- pylene PVDF Groundable acetal 2.4 mm With wetted parts in groundable acetal. EXPERT Series 3/4” 56 l/min 6.9 bar (100 psi) 3/4” NPT 3/4” BSP 3/4” NPT 3/4” BSP Polypro- pylene 2.4 mm ­— PRO Series 1” 178 l/min 8.3 bar (120 psi) 1” NPT 1” BSP 1”ANSI/DIN 1” NPT 1” BSP 1”ANSI/DIN Polypro- pylene PVDF 3.2 mm ­— EXPERT Series 1” 200 l/min 8.3 bar (120 psi) 1” NPT 1” BSP 1”ANSI/DIN 1” NPT 1” BSP 1”ANSI/DIN Polypro- pylene PVDF Conductive polypro- pylene 3.2 mm With conductive polypro-pylene motor PRO Series 11 /2 ” 378 l/min 8.3 bar (120 psi) 11 /2 ” ANSI / DIN 11 /2 ” ANSI / DIN Polypro- pylene PVDF 6.4 mm ­— EXPERT Series 11 /2 ” 465 l/min 8.3 bar (120 psi) 11 /2 ” ANSI / DIN 11 /2 ” ANSI / DIN Polypro- pylene PVDF Conductive polypro- pylene 6.4 mm With conductive polypro-pylene motor PRO Series 2” 549 l/min 8.3 bar (120 psi) 2” ANSI / DIN 2” ANSI / DIN Polypro- pylene PVDF 6.4 mm ­— EXPERT Series 2” 696 l/min 8.3 bar (120 psi) 2” ANSI / DIN 2” ANSI / DIN Polypro- pylene PVDF Conductive polypro- pylene 6.4 mm With conductive polypro-pylene motor Specialty Specialty Specialty Specialty Specialty Specialty Specialty Specialty
  • 193.
    Visit us ateriks-techdirect.co.uk Flow Technology 185 Metallic Models – Range and Performance 1/2” EXPERT Series 45.4 l/min 6.9 bar (100 psi) 1/2” NPT 1/2” BSP 1/2” NPT 1/2” BSP Aluminium Stainless steel 2.4 mm All models 3/4” EXPERT Series 51.5 l/min 6.9 bar (100 psi) 3/4” NPT 3/4” BSP 3/4” NPT 3/4” BSP Aluminium 2.4 mm All models 1” PRO Series 133 l/min 8.3 bar (120 psi) 1” NPT 1” BSP 1” NPT 1” BSP Aluminium Cast iron Stainless steel 3.2 mm All models 1” EXPERT Series 197 l/min 8.3 bar (120 psi) 1” NPT 1” BSP 1” NPT 1” BSP Aluminium Cast iron Stainless steel Hastelloy 3.3 mm With aluminium or stainless steel motor 11 /2 ” PRO Series 340 l/min 8.3 bar (120 psi) 1 1 /2 ” NPT 1 1 /2 ” BSP 1 1 /2 ” NPT 1 1 /2 ” BSP Aluminium Cast iron Stainless steel 6.4 mm All models 11 /2 ” EXPERT Series 465 l/min 8.3 bar (120 psi) 1 1 /2 ” NPT 1 1 /2 ” BSP 11 /2 ”ANSI/DIN 1 1 /2 ” NPT 1 1 /2 ” BSP 11 /2 ”ANSI/DIN Aluminium Cast iron Stainless steel Hastelloy 6.4 mm With aluminium or stainless steel motor 2” PRO Series 651 l/min 8.3 bar (120 psi) 2” NPT 2” BSP 2” NPT 2” BSP Aluminium Cast iron Stainless steel 6.4 mm All models 2” EXPERT Series 651 l/min 8.3 bar (120 psi) 2” NPT 2” BSP 2”ANSI/ DIN 2” NPT 2” BSP 2”ANSI/ DIN Aluminium Cast iron Stainless steel Hastelloy 6.4 mm With aluminium or stainless steel motor 3” PRO Series 897 l/min 8.3 bar (120 psi) 3” NPT 3” BSP 3” NPT 3” BSP Aluminium Cast iron Stainless steel 9.5 mm All models 3” EXPERT Series 1041 l/min 8.3 bar (120 psi) 3” NPT 3” BSP 3” NPT 3” BSP Aluminium Cast iron Stainless steel Hastelloy 9.5 mm With aluminium or stainless steel motor Specialty Specialty Specialty Specialty Specialty Specialty Specialty Specialty
  • 194.
    Specialist Technical Centres Know-How Flow Technology 186 be think innovate INDUSTRIALSOLUTIONS PUMPS SYSTEMS FOR INDUSTRIAL APPLICATIONS For more information scan the QR code or go to www.grundfos.co.uk/industry MAGNA1/MAGNA3 High Efficiency Glandless Circulators CM Horizontal Multistage Pumps SMART DIGITAL Digital Dosing Pumps TP In-line Industrial Circulators CR Vertical In-line Multistage Pumps NB(G) NK(G) EN733 and ISO2858 End Suction Pumps MAGNA1/MAGNA3MAGNA1/MAGNA3 TP HYDRO MPC-E One of a range of packaged booster sets SE/SL FEATURING S-TUBE IMPELLER Submersible Waste Water Pumps Particularly in replacement situations, Grundfos understands that sometimes fast delivery is essential. This is why it has invested in stock and systems to create its Fast Track express delivery scheme. Now available on selected models of boosters, borehole, and end suction (NB(G) and NK(G)) pumps, with deliveries as fast as next day. Call your sales manager / office for more details. www.grundfos.co.uk bebe SMART DIGITAL Digital Dosing Pumps Particularly in replacement situations, Grundfos understands that sometimes fast delivery is essential. This is why it has invested in stock and systems to create its Fast Track express delivery scheme. Now available on selected models of boosters, borehole, and end suction (NB(G) and NK(G)) pumps, with deliveries as fast as next day. Call your sales manager / office for more details. GRUNDFOS FAST TRACK FASTER DELIVERY EVERY TIME GRUNDFOS GO REMOTE Smartphone app wireless transceiver for easy set up, diagnostics reporting Grundfos Pumps
  • 195.
    Visit us ateriks-techdirect.co.uk Flow Technology 187 Grundfos Pumps Multistage centrifugal pumps CR(E), CRI(E) , CRN(E) (E version is electronically controlled) IE5 Motors Featured on the latest hydro booster sets and TPE, CRE, CME NBE models, the Grundfos MGE motor with IE5 efficiency is one of the world’s most efficient motors. Selecting a pump with these motors incorporated can mean 10% energy and up to 25% reduction in payback time. End Suction Pumps NB(G), NK(G) nn Standard dimensions according to EN and ISO standards nn Compact design nn Flexible pump range nn EN 12756 shaft seal nn Various shaft seals options nn Cast iron, bronze or stainless steel impeller options nn Cast iron or stainless steel pump housing options HYDRO MPC-E Turnkey booster system with CR(I)(E) pumps for transfer and pressure boosting of water in buildings. Smart Digital Dosing Pumps DDI, DME nn Accuracy: Industry-leading accuracy confirmed by independent study nn Durability: Diaphragm resistant to virtually all chemicals; pump housing IP65/NEMA4X certified nn Reliability: Industry-leading service intervals nn No vapor lock: De-aeration features enable continuous dosing of gassing chemicals nn High viscosity dosing: Handles liquids with viscosities up to 3000 mPas nn Watching your system: Advanced monitoring and self-analysis features nn Any application, anywhere: Any supply voltage, flexible mounting options, and a wide selection of accessories and service kits nn Easy to operate: Intuitive user interface and easy set-up nn Fully flexible control system nn Low energy consumption nn 2-6 pumps in cascade nn Easy installation nn Plug and pump solution no extra programming or cabling required nn Large user-friendly display nn Energy-optimised control nn Data communication nn Perfect constant pressure nn Application-optimised software nn Custom built solutions available nn Reduced noise level nn Space-saving installation – no need for control cabinets nn WRAS approved product. nn Reliability nn High efficiency nn In-line design nn Extensive range nn Service-friendly nn Space-saving nn Superior dry-running protection nn Suitable for slightly aggressive liquids nn E range for high efficiency
  • 196.
    Specialist Technical Centres Know-How Flow Technology 188Non-Metallic Chemical and Self-Priming Pumps NP/NP-B series Standardised Chemical pumps to EN 22858/ISO2858 nn Capacity up to [1200 m³/h] nn Differential head up to 85 [m] nn Temperature range: –20°C up to 110 °C nn Unique mechanical seal design specialised for the individual requirements CM/CM-B series Standardised Chemical pumps to EN 22858/ISO2858 nn Capacity up to [180 m³/h] nn Differential head up to 85 [m] nn Temperature range: –20°C up to 180 °C Vertical chemical pumps in Cantilever design (dry-running proof) or with plain bearing nn Capacity up to 700 [m³/h] nn Head up to 90 [m] nn Length up to 3000 [mm] nn With suction pipe or strainer if required nn Temperature range: –20 °C up to 100°C MUNSCH Chemical pumps are non-metallic and designed for maximum operating reliability, easy maintenance and lowest lifecycle cost to operate in abrasive and corrosive service conditions. Every pump is designed exactly to customer’s specification, and tested to EN ISO 9906 standards before it leaves the factory. Dedicated assembly engineers take full responsibility for the complete assembly of each of their assigned pumps, which results in shorter delivery times and increased quality. Munsch pumps are available in a variety of materials specifically suited to the liquid being used in the application. On request all pumps are available to be supplied with conformance to EU directive 94/9/EC for use in hazardous areas. MUNSCH Chemical Pumps www.munsch.de
  • 197.
    Visit us ateriks-techdirect.co.uk Flow Technology 189 Super U Series Super U Series pumps are among the most efficient self-priming solids-handling pumps available. nn Unique hydraulic design and smooth wall volute casing minimise friction loss and drag nn The multi-vane, open impeller is designed for high efficiency operation yet can still handle limited solids nn Delivering high efficiencies (up to 75%), and performs efficiently across a broad operating range nn Varying machine loads minimally affects operating efficiency 10 Series® Gorman-Rupp 10 Series® pumps are designed for handling: nn Solids nn Corrosive liquids nn Slurries Gorman-Rupp Pumps Super T Series Super T Series pumps are our leading Gorman-Rupp range. nn Robust construction nn Extremely reliable and simplistic operation nn Applications range from pumping thick abrasive slurries/sludges on flooded suction to solid laden wastewater nn Achieving suction lifts of up to 7.5m nn External shimless adjustment nn Dual protection of bearings nn Easy grip cover plate handle Ultra V Series The very latest from the Gorman-Rupp range. nn Ultra V Series pumps combine high head performance with outstanding efficiency nn Priming and solids handling capability nn Available as single stage units (V series) or as extreme heads double stage units (VS series) 80 Series® 80 Series® pumps are designed for non-stop workloads. nn The straight-in-suction design of these high-efficiency pumps guarantees quick, positive self-priming nn Operates at higher suction levels than most other self-priming centrifugal pumps nn Liquid enters directly into the impeller eye nn A suction check valve presents in-line return flow when the pump is shut off nn Minimal maintenance due to fewer moving parts nn Available with self-lubricated mechanical shaft seals
  • 198.
    Specialist Technical Centres Know-How Flow Technology 190Submersible Pumps LB, HS and LSC Series Portable 1 phase submersible drainage pumps. Heavy duty with excellent wear resistance. LSC will pump water levels down to 1mm. KTZ(E) KTV(E) Series Portable 3 phase submersible drainage pumps. Heavy duty with excellent wear resistance and performance in seapage conditions. KRS Series 3 phase submersible drainage pumps. Heavy duty, high volume pumps with 4 pole motors for increased wear resistance and performance in seapage conditions. Tsurumi Manufacturing Company of Japan manufacture a wide range of submersible pumps for use in the toughest of applications found in construction site dewatering, quarries and processing. Their growing reputation has been formed by integrating advance designs with high grade materials to produce pumps with excellent durability and versatility. In many cases, Tsurumi pumps are selected and work reliably, with minimal maintenance, in applications where other brands have previously failed to keep up with the duty. Hence, all Tsurumi submersible pumps carry a 3 year guarantee. The Tsurumi drainage pump range includes: Submersible Pumps series outlet sizes motor sizes flow range head range solids motor/RPM (mm) (kW) (LPM) (mtrs) (mm) LB/HS/LSC 25-80 0.48 - 1.50 205 - 420 11 - 18 6-7 2 pole - 2850 series outlet sizes motor sizes flow range head range solids motor/RPM (mm) (kW) (LPM) (mtrs) (mm) KTZ(E)/KTV(E) 50 - 150 0.75 - 11.0 320 - 2,440 14 - 49 6 - 20 2 pole - 2850 series outlet sizes motor sizes flow range head range solids motor/RPM (mm) (kW) (LPM) (mtrs) (mm) KRS 100 - 250 3 - 22 1,820 - 12,000 8 - 34 12 - 30 4 pole - 1450 nn Pressed steel or aluminium cast iron outer construction nn Urethane rubber impeller nn Double mechanical seal nn Internal motor protection nn 10 Metre power cable nn Available with or without level control nn Cast iron or cast aluminium pressed steel outer construction nn Ductile iron impeller (KTV 0.75kW urethane rubber) nn Cast iron or rubber pump chamber nn Double mechanical seal nn Internal overloads nn 20 metre power cable (KTV 0.75kW: 10 metre) nn Available as manual start or with probe level sensor (KTVE KTZE) nn Cast iron outer construction nn Ductile iron impellers nn Cast-iron pump chamber nn Double mechanical seal nn Internal overloads nn 20 Metre power cable nn Single phase drainage pumps: series LB, HS, LSC nn Three phase drainage pumps: series KTV(E), KTZ(E), KRS nn Three phase high-head pumps: series LH(W), LH nn Three phase sand slurry pumps: series KTV2, KTD, NKZ, KRS2, GPN nn One phase three phase chemical pumps: Series SFQ TM
  • 199.
    Visit us ateriks-techdirect.co.uk Flow Technology 191 LH(W) LH Series 3 phase submersible drainage pumps. Heavy duty, high head pumps incorporating a narrow base area with excellent wear resistance and performance in seapage conditions KTD KTV2 Series Portable 3 phase submersible slurry pumps with agitators. Heavy duty and compact, with excellent wear resistance and performance when pumping slurry, sand, silt etc. KRS2, NKZ GPN Series 3 phase submersible slurry pumps with agitators. Heavy duty, high volume pumps with 4 pole motors for increased wear resistance and performance when pumping slurry, sand, bentonite etc. SFQ TM Series Submersible pumps constructed in 316 grade (1.4436) cast stainless steel or titanium for industrial pumping of sea- water, salt-water and chemicals series outlet sizes motor sizes flow range head range solids motor/RPM (mm) (kW) (LPM) (mtrs) (mm) KTD/KTV2 50 - 80 2.0 - 3.0 425 - 800 20 - 23 8.5 - 10 2 pole - 2850 series outlet sizes motor sizes flow range head range solids motor/RPM (mm) (kW) (LPM) (mtrs) (mm) KRS2/NKZ/GPN 80 - 150 2.2 - 22.0 930 - 5,000 12.6 - 34.0 20 - 30 4 pole - 1450 series outlet sizes motor sizes flow range head range solids motor/RPM (mm) (kW) (LPM) (mtrs) (mm) SFQ/TM 50-80 0.4 - 3.7 290 - 1,180 21.0 - 24.6 6 - 15 2 pole -2850 series outlet sizes motor sizes flow range head range solids motor/RPM (mm) (kW) (LPM) (mtrs) (mm) LH(W)/LH 50 - 200 3 - 110 600 - 6,500 39 - 216 6 - 20 2 pole - 2850 nn Cast iron outer construction nn Chromium iron impellers nn Double mechanical seal nn Internal overloads nn 20 Metre power cable nn Grey cast iron or aluminium and pressed steel outer construction nn Chromium iron impeller and agitator nn Grey cast iron rubber pump chamber nn Double mechanical seal nn Internal overloads nn 20 metre power cable nn Available as manual start or automatic nn Cast iron and steel outer construction nn Impellers: KRS2: 2.2kW to 3.7KW ductile iron, KRS2: 5.5 kW to 11kW all NKZ models: chromium nn Grey cast iron pump chamber and casing nn Double mechanical seal nn Internal overloads nn 20 metre power cable nn Cast stainless steel or titanium and ABS construction nn Pressed stainless steel or ABS strainer nn Double mechanical seal nn Internal overloads nn SQ: 3ph only, TM: 1ph 3ph with automatic options nn 20 metre or 10 metre neoprene power cable
  • 200.
    Specialist Technical Centres Know-How Flow Technology 192 Hydra-CellMetering and Dosing Pumps For both Safe and ATEX/Explosive Environments Unique, seal-less, API 675, positive displacement pumps with multiple, hydraulically balanced diaphragms in a single pump head, designed to feed a precise, predetermined volume of liquid into a system or process. nn Virtually Pulseless Flow nn Meet or exceed API 675 Performance Standards Steady State Accuracy (±1%) Linearity (±3%) Repeatability (±3%) nn Multiple Local and Remote Control Options nn Compact Size… High Performance nn Infinite Turndown Ratios (1) Also applicable for pumps used in ATEX/Explosive Environments where the Variable Frequency Drive is sited in a safe area P100 P200 P300 P400 P500 P600 Flow Range (l/hr) Safe Environments(1) 1 to 85 1 to 256 1 to 256 5 to 764 10 to 1340 20 to 2800 Max Pressure (bar) Safe Environments(1) Metallic 103 PP 17 PVDF 24 Metallic 103 PP 17 PVDF 24 172 Metallic 103 PP 17 PVDF 24 172 Metallic 70 PP 17 PVDF 24 Flow Range (l/hr) ATEX/ Explosive Environments Not Available 1 to 90 1 to 90 5 to 294 Not Available Not Available Max Pressure (bar) ATEX/Explosive Environments Not Available Metallic 100 PP 1 PVDF 24 172 Metallic 100 PP 17 PVDF 24 Not Available Not Available Liquid Head Materials Brass 316L SS Hastelloy Polypropylene PVDF Brass 316L SS Hastelloy Polypropylene PVDF Brass 304 SS 316L SS Hastelloy Brass Cast Iron 316L SS Hastelloy Duplex 2205 S-Duplex 2207 Polypropylene PVDF Brass 316L SS Duplex 2205 Brass Cast Iron 316L SS Hastelloy Duplex 2205 S-Duplex 2207 G13 G03 G04 G10 G25 G35 Flow Range (l/hr) Safe Environments(1) 1.8 to 678 1.8 to 678 1.8 to 678 6 to 1818 24 to 4530 42 to 8400 Max Pressure (bar) Safe Environments(1) Metallic 103 PP 17 PVDF 24 Metallic 103 PP 17 PVDF 24 172 Metallic 103 PP 17 PVDF 24 Metallic 70 PP 17 PVDF 24 103 Flow Range (l/hr) ATEX/ Explosive Environments 19 to 462 38 to 462 19 to 452 60 to 1470 216 to 2600 396 to 6360 Max Pressure (bar) ATEX/Explosive Environments Metallic 60 PP 17 PVDF 24 Metallic 103 PP 17 PVDF 24 172 Metallic 103 PP 17 PVDF 24 Metallic 60 PP 17 PVDF 24 30 Hydra-cell Pumps
  • 201.
    Visit us ateriks-techdirect.co.uk Flow Technology 193 Hydra-Cell Industrial Process Pumps Unique seal-less, positive displacement pumps with multiple, hydraulically balanced diaphragms in a single pump head, for liquid transfer, spraying, filling, blending, cleaning, sampling, injecting, coating, cleaning and mixing. Handles low to high viscosity liquids nn Accurate and Controllable, Virtually Pulseless Flow nn Long Service Life with Low Lifecycle Cost nn Can Run-dry... Indefinitely nn 100% Sealed Safe nn Pumps Aggressive Corrosive Liquids and Abrasives nn Compact Size, High Performance T100 (Low Pressure)(3) T100 (Medium Pressure)(3) T100 (High Pressure)(3) Flow Rate (l/min) up to 366 up to 170 up to 96 Max Pressure (bar) 144 241 345 Liquid Head Materials Nickel Aluminum Bronze (NAB) 316L SS Nickel Aluminum Bronze (NAB) 316L SS Nickel Aluminum Bronze (NAB) (1) For vertical mounting. Available in Brass, Cast iron (Nickel plated) 316L SS (2) For vertical mounting. Available in Brass, Duplex 2205 316L SS (3) API 674 options available G20 G03 G04 G10(3) G12(1) G15(3) G17(2) G25(3) G35(3) Flow Rate (l/min) up to 3.79 up to 11.3 up to 11.3 up to 30.3 up to 50 up to 75.7 up to 140 Max Pressure (bar) Metallic 103 PP 17 PVDF 24 Metallic 103 PP 17 PVDF 24 172 Metallic 103 PP 17 PVDF 24 172 Metallic 70 PP 17 PVDF 24 103 Liquid Head Materials Brass 316L SS Hastelloy Polypropylene PVDF Brass 316L SS Hastelloy Polypropylene PVDF Brass 304 SS 316L SS Hastelloy Brass Cast Iron 316L SS Hastelloy Duplex 2205 S-Duplex 2207 Polypropylene PVDF Brass 316L SS Duplex 2205 Brass Cast Iron 316L SS Hastelloy Duplex 2205 S-Duplex 2207 Cast Iron(Nickel Plated) 316L SS Hastelloy Duplex 2205 S-Duplex 2207 Propane/ Freon Ammonia Polymers Fuels/ D.I. Water Glycols Chlorine Acids/ Glues/ Inks/ Resins Slurries Butane Additives Caustics Adhesives Paints
  • 202.
    Specialist Technical Centres Know-How Flow Technology 194Pumps TECHNICAL DATA PUMP SIZE T30 T80 T125 T225 T425 Max capacity [l/min] 30 80 125 225 425 Volume per stroke* [ml] 70 140 300 700 2600 Max discharge pressure [bar] 8 Max air pressure [bar] 8 Max suction lift dry** [m] 1.5 3 4 5 5 Max suction lift wet [m] 8 Max size of solids ø in [mm] 3 4 6 10 15 Max temp. With EPDM/NBR [°C] 80 Max temp. With PTFE [°C] 110 Weight [kg] 4 8 11 21 35 Low energy diaphragm pumps available on all Tapflo Models. Hygienic Series The sanitary pump range nn T30 - 28 l/min, 1” nn T80 - 78 l/min, 1” nn T125 - 155 l/min, 1 ½” nn T225 - 330 l/min, 2” nn T425 - 570 l/min, 2 ½” nn Reduce carbon footprint nn Lower operational costs reduced air consumption nn Ultra low start pressure 0.1 bar (1.5 PSI) nn Full control and feedback nn Easy to maintain lowest number of parts of any AODD pump nn Low noise nn Low pulsation nn Retrofit to pumps already in the field Achieve up to 70% energy savings Thousands of products available to order on ERIKS WEBSHOP SHOP.ERIKS.CO.UK SHOP.ERIKS .CO.UKSHOP .ERIKS.CO.UK
  • 203.
    Visit us ateriks-techdirect.co.uk Flow Technology 195 Tapflo Hose Pumps Specifications PT hose pumps Pump range Flow rate (l/h) Type/ rpm 20 40 60 80 100 Max Pressure Bars PT10 30 60 90 120 - 8 PT15 100 200 300 400 500 8 PT20 170 340 500 670 880 8 PT25 400 800 1200 1600 2000 15 PT32 750 1500 2250 3000 3750 15 PT40 1170 2340 3510 4680 - 15 PTX40 1600 3200 4800 6400 - 15 PT50 3500 7000 10500 - - 15 PT65 4900 9800 14700 - - 15 PTX65 8000 16000 24000 - - 15 PTX80 11000 22000 - - - 15 Darker cells indicate intensive use. Lighter cells indicate intermittent use. Specifications PTL hose pumps Pump range Flow rate (l/h) Type/ rpm 20 40 60 80 Max Pressure Bars PTL09 20 40 60 80 4 PTL13 49 99 149 198 4 PTL17 130 260 390 520 4 PTL25 390 780 1160 1550 4 PTL30 830 1650 2490 3320 4 PTL45 2300 4620 6920 9240 4 Darker cells indicate intensive use. Lighter cells indicate intermittent use.
  • 204.
    Specialist Technical Centres Know-How Flow Technology 196Pumps SEH - 50x – 2 Water Pump Water Pump 2 (50mm) 4hp Honda GX120 nn Power unit Honda GX120 4hp nn Weight 24kg nn Pump type centrifugal, self-priming nn Maximum output 620 litre/min nn Maximum head 30m SEH - 80x – 3 Water Pump Water Pump 3 (75mm) 5hp Honda GX160 nn Power unit Honda GX160 5.5hp nn Weight 32kg nn Pump type centrifugal, self-priming nn Maximum output 900 litre/min nn Maximum head 26m Part No Description WR/050-022 SHE-50X 2” Petrol Driven Pump WR/030-390 2” Suction hose 6 metre WR/030-306 2” Layflat delivery hose 1 metre (priced per metre) Part No Description WR/050-032 SHE-80X 3” Petrol Driven Pump WR/030-439 3” Suction hose 6 metre WR/030-308 3” Layflat delivery hose 1 metre (priced per metre) Petrol Driven Pumps Self-priming petrol engine driven water pumps, ideal for mobile pumping applications and those unplanned emergencies! nn Powered by top of the range Honda engines to provide years of trouble free service nn Units come complete with full carry frame with rubber feet, hose couplings and suction filter 1 Petrol Driven Pump A very lightweight unit for easy portability. Because of the high pressure and flow rate, it is a very suitable pump for sprinkling and irrigation. Ideal for: nn Irrigation applications nn Pumping of well water nn Feeding or training water from a pond or trough nn Agricultural uses Part No Description WR/050-003 SHE-25L 1” Petrol Driven Pump nn Centrifugal pumps suitable for general water and waste water nn Hygienic pumps – suitable for food and pharmaceutical nn Air operated diaphragm pumps suitable for chemicals, slurries, etc. nn Magnetic drive pumps suitable for chemicals nn Suds coolant pumps suitable for machine coolants Other pumps available from ERIKS
  • 205.
    Visit us ateriks-techdirect.co.uk Flow Technology 197 Part No* Supply Absorbed kW Amps Max Head/Flow SAC/P/IMM50A-XXX-1-240 230V 1-phase 0.11 0.60 3m / 10 l/min SAC/P/IMM63A-XXX-1-240 230V 1-phase 0.30 2.00 6m / 5 l/min SAC/P/IMM63B-XXX-1-240 230V 1-phase 0.40 2.90 7m / 10 l/min SAC/P/IMM71A-XXX-1-240 230V 1-phase 0.53 4.30 11m / 28 l/min SAC/P/IMM71B-XXX-1-240 230V 1-phase 0.78 7.50 13m / 55 l/min SAC/P/IMM50A-XXX-3-380 230/400V 3-phase 0.11 0.30 3m / 10 l/min SAC/P/IMM63A-XXX-3-380 230/400V 3-phase 0.30 0.58 6m / 5 l/min SAC/P/IMM63B-XXX-3-380 230/400V 3-phase 0.40 0.90 7m / 10 l/min SAC/P/IMM71A-XXX-3-380 230/400V 3-phase 0.53 1.40 11m / 28 l/min SAC/P/IMM71B-XXX-3-380 230/400V 3-phase 0.78 1.90 13m / 55 l/min SAC/P/IMM80A-XXX-3-380 230/400V 3 phase 1.15 1.90 16m / 90 l/min SAC/P/IMM80B-XXX-3-380 230/400V 3-phase 1.47 2.80 18m / 60 l/min Coolant Pumps IMM Series Coolant Pumps The IMM range of coolant pumps offers a comprehensive and economical range which is suitable for most machine tool coolants. nn 1-phase or 3-phase options nn Suitable for most machine tool coolants nn Fast delivery Basic Dimensions Type Flange Diameter Outlet Port Stem Lengths IMM50 130mm 3/8 BSP 080,120,150,180 IMM63 180mm 3/4 BSP 150,200,250,300 IMM71 230mm 1 BSP 200,250,325 IMM80 250mm 1.1/4 BSP 200,250,300,350 Part No* Supply Absorbed kW Amps Max Head/Flow SAC/P/SPV12-XXX-1-240 230V 1-phase 0.15 0.65 4m / 7 l/min SAC/P/SPV18-XXX-1-240 230V 1-phase 0.16 0.70 5m / 5 l/min SAC/P/SPV25-XXX-1-240 230V 1-phase 0.30 2.00 6m / 5 l/min SAC/P/SPV33-XXX-1-240 230V 1-phase 0.40 2.90 7m / 5 l/min SAC/P/SPV12-XXX-3-380 230/400V 3-phase 0.15 0.32 4m / 7 l/min SAC/P/SPV18-XXX-3-380 230/400V 3-phase 0.16 0.55 5m / 5 l/min SAC/P/SPV25-XXX-3-380 230/400V 3-phase 0.30 0.58 6m / 5 l/min SAC/P/SPV33-XXX-3-380 230/400V 3-phase 0.40 0.90 7m / 5 l/min SPV Coolant Pumps The SPV range is suitable for most machine tool coolants and offers cost-effective solution to all coolant pump requirements within 1-phase or 3-phase areas. nn 6 standard stem lengths nn 1-phase or 3-phase options nn Suitable for most machine tool coolants Basic Dimensions Flange Diameter Outlet Port Pump Body 130mm 3/4 BSP 98mm * The XXX in the part number should be replaced with the required stem length code – (see above table for options). * The XXX in the part number should be replaced with the required stem length code: (090=90mm, 120=120mm, 170=170mm, 220=220mm, 270=270mm and 350=350mm). IMM71 and IMM80 are available in longer stem lengths – please call for details
  • 206.
    Specialist Technical Centres Know-How Flow Technology 198Pumps Lowara DOC 3 Pump ITT Lowara DOC 3 pumps are versatile, corrosion-resistant and compact. Ideal for the drainage of sumps, cellars, and basements, these pumps have stainless steel housings and are fitted with 10 metres of cable. Applications: nn Emptying of residential sump pits, rainwater tanks or laundry drainage nn Garden and lawn irrigation, with suction from rainwater tanks nn Emergency draining of flooded basements and garages nn Transfer of water from tanks, cisterns and swimming pools nn Water display fountains SEEPEX Wobble Pump The SEEPEX Wobble Pump is a progressive cavity pump. Pumps of this design can be used in almost all industries. They are able to handle liquids of all viscosities and even products with high solids contents. Due to the simple construction wobble pumps are cost effective and easy to maintain. Advantages and Characteristics: nn Accurate linear variable flow rate: up to 10m³/h nn Pulsation free flow nn Pressure: up to 4 bar, 60 psi nn Service-friendly and economical due to simple pump construction nn Rapid exchange of conveying elements due to rotating unit with only one joint nn Space-saving due to short, compact design with directly flanged drive (block design) Where would you imagine the major costs – and therefore potential savings – associated with a pump would arise? The purchase price? The cost of maintenance? Or the running costs? In fact, the purchase price of a pump represents less than 5% of the whole life cost, and even maintenance costs amount to only 8% on average. Which leaves the remaining 87% of the cost taken up by energy consumption. And in some applications, energy costs can actually rise to as much as 95% of the whole life cost – which means there are huge savings to be made through more efficient pump operation and more effective maintenance. But to realise these potential savings, you first need to know what makes pumping so expensive, then how to select the right pump for the job, and finally how best to maintain the pump so it provides optimum performance and maximum energy efficiency. Visit eriks.co.uk/knowhow for more information on pump savings and developing a sustainable pumping action plan. Pump up the savings
  • 207.
    Visit us ateriks-techdirect.co.uk Flow Technology 199 Pump configuration Choosing the right materials of construction is essential for specific applications. We have a wide range of options for casing and hoppers, rotor and stator materials, sealing options and drive choice. Whatever you want to do we can configure the correct pump for you. SEEPEX Progressive Cavity Pumps (PCP) For low and high viscosity products with and without solid particles – we make All Things Flow SEEPEX develops and produces progressive cavity pumps (PCP), macerators and control systems. We offer products for all market sectors including water and waste water, food and beverage, biogas, pharmaceutical, oil and gas and many more. Our product groups have high performance ranges within them. Modular design provides customers with tailor-made pumps for every application. For complex handling we supply competent consulting, planning and project management. Pumps for all applications Low and high viscosity products, containing soft solids can all be pumped by SEEPEX PCP. The basic pump action is low shear, making it ideal for most shear sensitive food products e.g yeast, yogurt, jams and pie-fillings etc. Open hopper pumps transfer high viscosity products, even whole chickens or mango stones are pumped by our specialized solutions. Hygienic ranges which are CIPable are 3A sanitary standard and comply with FDA and EHEDG regulations. Abrasive and corrosive products can also be handled using SEEPEX pumps. Low operating costs Smart Conveying Technology, a patented development from SEEPEX, enables internal inspection and rotor and stator replacement when needed without pipework removal, reducing maintenance time by up to 85%. Adjusting the stator segments restores original pump performance, extending stator life by up to 300%. Level control, dry running protection and over pressure protection are available from SEEPEX for all pumps to optimise performance and reduce operating costs. Product Groups nn N Range: standard configuration, for flowable products 30L/hr - 500m3/hr nn T Range: open hopper with feed auger, for high viscosity products 50L/hr – 500m3/hr nn D Range: metering pumps accurate to +/- 1%, for accurate dosing 200ml/ hr – 1000L/hr nn CS range: Hygienic and easy to clean, for food and pharmaceutical 30L/hr – 130m3/hr nn E range: semi-submersible, for very high suction lifts 30L/hr – 300m3/hr nn W range: single UJ, effective and inexpensive up to 10m3/hr nn M range: macerators, for particle size reduction and pump protection 2m3/ hr – 150m3/hr Accurate metering and dosing Accurate low pulsation linear flow is a characteristic of our pumps, meaning that flow rates are controlled by one variable – pump speed. Simple installation and calibration without the need for check ball valves or calibration pots. Smart Dosing Pumps have intelligent drives for added control functionality Versatile in Operation SEEPEX pumps have an excellent suction lift – up to 9m as standard and more if needed using semi-submersible pumps. They can be installed horizontally or vertically and run both ‘forwards and backwards’ enabling filling and emptying vessels using a single pump. They can generate pressures up to 144 bar if needed and operate at temperatures from -20 °C to 150° C.
  • 208.
    Specialist Technical Centres Know-How Flow Technology 200 CALL:0845 006 6000 to contact your local workshop PUMP SERVICES Repair, overhaul or rewind Repair work carried out on customer’s site or an ERIKS Engineering workshop Maintain and Monitor Preventative maintenance and condition monitoring carried out using the latest technologies Replace If the two remedial actions above have not suitable then a more energy and waste efficient replacement product can be recommended. ENGINEERING SITE SERVICES FUNCTIONS: n Pump repairs and new pump supply n Spare part and kitting capability n Full in-house fabrication and machining facilities n Reverse and surface engineering n Pump coating approved contractors n Stock rationalisation and obsolescence projects n Pump energy audits and testing WHY ERIKS: n Technical and trading partnerships with most major pump suppliers n Reliability improvements and up-rating n Obsolescence risk management n Energy efficiency audits n Certified Pump System Auditors n Active members of the Pump Centre and BPMA
  • 209.
    TOOLS, SAFETY AND MAINTENANCE ERIKSTools, Safety and Maintenance Product business unit are able to provide brand leaders in all of its 3 main product areas – Safety, Tooling and Consumables. Choosing the right tools safety and maintenance equipment is not just about getting the job done more efficiently; it is also about protecting employees from the risk of injury and protecting their employers from potential compensation claims. 201 Wiping Products 204-205 Storage 206-207 Adhesives 208-209 Non-Sparking Tools 210 Safety Footwear 211 Safety Eyewear 212 Respiratory 213 Spill Control 214-215 Gloves 216-219 Lock Boxes and Labelling 220-221 Metal Cutting Tools 222-225 Torque Wrenches 226-227 Live Centres, Chucks Vices 228 Lubricants 229-243 Line Marking 241 Position Sensors 244-245 Torches 246 Variabox 247 Quick Product Reference 240-241 204-205, 211-217, 237230-233, 242 234 238-239 243 235 244-245 247 206-207 220-221 218-219 222-225 246 208-209 228226-227 Quick reference Visit us at eriks-techdirect.co.uk
  • 210.
    TOOLS, safety AND MAINTENANCE TOOLSTechnology Selecting products based purely on price can be unproductive in terms of efficiency, comfort and perhaps most importantly the safety of the user. We understand the stresses and strains you face daily, and can help you select the correct tool for the correct job. ERIKS can provide all the essentials required for a safe and productive environment within an engineering workshop. Our range of products have been carefully selected by experienced Tools, Safety and Maintenance specialists, to ensure you receive the best quality service and value in the marketplace, whilst ensuring your safety. 202 Specialist Technical Centres Know-How
  • 211.
    TOOLS ERIKS provide acomprehensive range of tools, from a wide selection of leading brands. All products and brand partners are selected with careful consideration in terms of reliability, availability, performance and the ergonomic effect to the user. Providing you with the equipment that will enable you to complete tasks in a timely and safe manner. nn Hand Tools nn Cutting Tools nn Power Tools nn Metrology nn Abrasives TOOLS SAFETY AND MAINTENANCE WORKSHOP SAFETY The working environment and conditions determine the most appropriate protection in order to guarantee the safety of people in the workplace. Working alongside our partner suppliers you can rest assured that our range of products conform to all the current legislation and adopt best practice to provide a safe working environment. nn Personal Protective Equipment (PPE) nn Spill Control nn Hand Hygiene nn Janitorial nn Lock Out - Tag Out Systems EQUIPMENT Through ERIKS you can also source all your functional, durable storage solutions with a wide range of workplace equipment. nn Workbenches nn Tool cupboards nn Storage bins nn Perforated and Louvred panels MRO CONSUMABLES ERIKS can provide you with a single source for all your consumable requirements, whether you are looking for lubrication, adhesives, sealants or fasteners we have the products to meet your requirements. All products conform to current safety legislation and are fully traceable attaining COSHH standards. nn Lubrication nn Cutting Fluids and Compounds nn Degreasers nn Adhesives and Sealants nn Fasteners nn Technical Wipes 203 Visit us at eriks-techdirect.co.uk
  • 212.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 204Cloths and Wet Wipes Part No Description RX-PW-CF2138B RX Centrefeed 2 Ply Wiper Rolls Blue RX-PW-CF2138W RX Centrefeed 2 Ply Wiper Rolls White RX Wiping Products New to the RX portfolio are a range of industrial wiping products, they have been carefully selected to provide you with a cost effective solution helping you get the task in hand completed quicker and efficiently, whilst ensuring hygiene levels are kept high. Our products are manufactured to a high quality specification, giving you the confidence that the RX range of Wiping Products will protect your employees and customers reducing the risk of cross contamination and enhance your hygiene controls. 2 Ply Centrefeed Wiper Rolls Highly absorbent solution for dealing with everyday non-hazardous substances nn Pack Size: 6 rolls Part No Description RX-PW-HR225B RX 2 Ply Hygiene Rolls, Blue, 250mm RX-PW-HR225W RX 2 Ply Hygiene Rolls, White, 250mm RX-PW-HR250B RX 2 Ply Hygiene Rolls, Blue, 500mm RX-PW-HR250W RX 2 Ply Hygiene Rolls, White, 500mm 2 Ply Hygiene Rolls RX 2 Ply hygiene rolls provide a solution to a multitude of wiping tasks. 100 sheets/roll nn Pack Sizes: 250mm18 rolls/pack 500mm 9rolls/pack Part No Description RX-PW-LR2380B RX 2 Ply Large Rolls Blue RX-PW-LR2380W RX 2 Ply Large Rolls White 2 Ply Large Rolls The 2 Ply large rolls are the perfect, highly absorbent solution for dealing with a wide variety of applications. nn Pack Size: 2 rolls Part No Description RX-PW-LR3260B RX 3 Ply Wiper Large Roll, Blue 3 Ply Large Rolls The additional thickness ensures even faster absorbance for non-hazrdous spill situations. nn Pack Size: 1 roll
  • 213.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 205 Part No Description RX-NW-LWQB Quarterfold Lite Wipes, Blue RX-NW-LWQG Quarterfold Lite Wipes, Green RX-NW-LWQR Quarterfold Lite Wipes, Red RX-NW-LWQY Quarterfold Lite Wipes, Yellow Part No Description RX-NW-LWRB RX Lite Wipe Roll, Blue Lite Wipe Roll Light-weight, disposable cleaning cloth, ideal for general cleaning tasks. nn Pack Sizes: 500 sheets/roll Tech Wipes Highly absorbent solution for dealing with everyday non-hazardous substances nn Pack Sizes: Various Part No Description RX-WW-SS150 Sani surface sanitising wipes, 150 wipes tubs RX-WW-SS1500 Sani surface sanitising wipes, 1500 wipes tubs Sani Surface Sanitising Wipes Medium-weight wipe eliminating cross-contamination concerns with a single stroke. Suitable for use in a wide range of applications. nn Pack Sizes: 150 wipes/tub 1500 wipes/tub Part No Description RX-WW-MX80 RX Heavy Duty Max Wipes Heavy Duty Max Wipes Heavy duty hand wipe with a textured finish on one side and impregnated with orange scrub for fast cleaning and degreasing. nn Pack Sizes: 1 tub Part No Description RX-WW-MP150 RX Multi-Purpose Hand and Wet Surface Wipes Multi-Purpose Hand and Wet Surface Wipes The ultimate portable wet hand wipe for general applications. nn Pack Sizes: 150 wipes/tub Quarterfold Wipes Reusable product designed for the toughest wiping tasks. nn Pack Sizes: Heavy, 6 packs/25 Lite, 20 packs/50 Part No Description RX-NW-HWQB Quarterfold Heavy Wipes, Blue RX-NW-HWQG Quarterfold Heavy Wipes, Green RX-NW-HWQR Quarterfold Heavy Wipes, Red RX-NW-HWQY Quarterfold Heavy Wipes, Yellow Part No Description RX-NW-TWQB RX Quarterfold Tech Wipes, Blue RX-NW-TWQDW RX Quarterfold Tech Wipes in Dispenser Box, White RX-NW-TWRB RX Tech Wipes Roll, Blue RX-NW-TWRW RX Tech Wipes Roll, White Heavy Wipes Lite Wipes
  • 214.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 206Workplace Storage Why buy Bott Understand The Bott and ERIKS sales team will work together with you to understand your requirements. Develop Using their knowledge and experience they will propose a tailored solution and can provide full 3D simulations giving a clear impression of the proposed workspace. Manufacture Bott products are manufactured here in the UK using the latest sophisticated manufacturing processes, a dedicated workforce and high quality materials. Bott are fully ISO 9001 and ISO 14001 certified. Deliver Bott have their own delivery vehicle fleet to get the products to your site on time and in good condition. Install If required the Bott installation team will unwrap, assemble and position the equipment. Aftercare Bott and ERIKS believe in long-term business relationships, so you can be assured of an excellent aftersales service. Built to last All products undergo a rigorous testing and validation programme, ensuring they are truly fit for purpose. All Bott manufactured workplace storage equipment is proudly covered by a 10 year guarantee so you can be totally confident in the quality and durability of our range.
  • 215.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 207 Bott Cubio A comprehensive storage system designed for the most demanding of applications. The range covers drawer cabinets, cupboards, workbenches and mobile storage solutions. The modular system forms a harmonious solution and can be integrated with the Bott perfo storage range. All Bott Cubio products are epoxy powder coated in a choice of four standard colour schemes and come in a vast range of sizes. Heavy Duty Cabinets nn Heavy duty construction with up to 1000kg U.D.L. capacity nn Centrally lockable with drawer blocking nn 75kg U.D.L. capacity, 100% extension drawers nn Static and mobile versions nn Optional adjustable metal, plastic box and trough section divider kits nn Top trays, worktops and base plinth optional accessories Heavy Duty Cupboards nn Heavy duty construction with up to 1000kg U.D.L. capacity nn Lockable doors with hinged, sliding, up/over and window styles nn Galvanised steel shelves with up to 160kg capacity and wooden shelf/worktop options nn 75kg U.D.L. capacity, 100% extension drawers nn Perfo and louvre backpanels with hook and bin accessories Heavy Duty Benches nn Heavy duty construction with up to 1200kg U.D.L. capacity nn 40mm thick worktops in many styles to cover all applications nn Wide variety of bench styles from basic framework to high capacity storage with integrated cabinets nn Static and mobile options nn Backpanel and overhead shelf and light accessories
  • 216.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 208 UniversalStructural Bonders LIMITLESS BONDING LIMITLESS REPAIR LIMITLESS DESIGN Introducing limitless bonding for limitless design and repair Whatever your industry, Loctite has an adhesive solution. Contact us on 01442 278100 www.loctite.co.uk Henkel Loctite Adhesives
  • 217.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 209 Universal Structur LIMITLES BONDIN LIMITLESS REPAIR Introducing limitless for limitless design a Whatever your industry, Loctite has Contact us on 01442 278100 LOCTITE 243 Medium Strength Threadlocker nn Resists vibration loosening nn Threads are completely sealed nn Temperature resistance up to 180°C nn Improved cure even on mildly oil contaminated parts For general purpose threadlocking LOCTITE HY 4070 Ultra Fast Universal Repair Adhesive – fixtures 60 secondsr nn Gap fill up to 5mm nn Bonds most substrates including metals, most plastics and rubbers nn Good moisture, temperature and chemical resistance LOCTITE HY 4080 Toughened Structural bonding with good impact resistance nn Fixtures in approximately 10 minutes even with a 2mm gap nn Good moisture, temperature and chemical resistance nn Bonds most substrates including metals, most plastics and rubbers LOCTITE HY 4090 Fast Fast and Strong Structural Bonder nn Good moisture, temperature and chemical resistance nn Bonds most substrates including metals, most plastics and rubbers nn Ultimate strength with maximum temperature resistance up to 150°C LOCTITE 638 High strength retaining compound nn Maximium strength nn Prevents fretting nn Gap fill up to 0.25mm nn Temperature resistance up to 180°C Ideal for bonding gears and impellors onto shafts. Use where permanent fixing is required LOCTITE 401, 406 454 Range of instant adhesives nn Thin to gel consistencies nn Temperature resistance up to 120°C nn Handling strength in seconds nn Can be used with LOCTITE 770 nn Polyolefin Primer Suitable for bonding most close fitting plastic and rubber components. Single component LOCTITE 577 Pipe Thread Sealant nn Coarse pipe threads up to 3” BSP nn Instant seal on taper/parallel joints nn Temperature resistance up to 180°C nn Improved cure even on mildly oil contaminated parts For sealing metal coarse threads, locks and seals in any position LOCTITE 577 Flange Sealant nn One product for any shape or size gasket nn Seals scored or damaged rigid flanges nn No gasket relaxation nn Improved heat aging For sealing rigid flanges with gaps up to 0.3mm LOCTITE 3090 2 part instant gel adhesive nn Clear nn Gap fill up to 5mm nn Handling strength – seconds to minutes depending on gap nn Temperature resistance up to 80°C For sealing rigid flanges with gaps up to 0.3mm Continued innovation from LOCTITE New Hybrid Technology Established product range and New Hybrid Technology - Threadlocking - Thread Sealing - Gasketing - Retaining - Structural Bonding - Instant adhesives
  • 218.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 210 RX NON-SPARKING TOOLS TheRange Includes: nn Pliers nn Screwdrivers nn Spanners Wrenches nn Sockets and sets At ERIKS we take your safety seriously and when it comes to using tools in potentially explosive environments we simply don’t offer second best. The RX range of non-sparking safety tools are recommended for use in all potentially explosive environments, all areas where combustible or easily ignitable vapours, liquids and dusts are present and anywhere that a potential fire and explosion risk from sparks is possible. Safety at your fingertips... nn Hex keys nn Hammers nn Brushes nn Chisels and Bars Non-sparking Tools
  • 219.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 211Safety Footwear RX® Securo Safety Shoe The RX Securo is a quality safety shoe made of lightweight materials, with shock absorbent soles and composite toe protection, plus MS3 non-metallic penetration resistant midsole. This makes the RX Footwear one of the most comfortable and stylish on the market. RX® Solido Safety Boot The RX Solido is a quality safety boot made of lightweight materials, with shock absorbent soles and composite toe protection, plus MS3 non-metallic penetration resistant midsole. This makes the RX Footwear one of the most comfortable and stylish on the market. Part No Description UK size W93L-50005 RX Safety Shoe Securo 5 W93L-50006 RX Safety Shoe Securo 6 W93L-50007 RX Safety Shoe Securo 6.5 W93L-50008 RX Safety Shoe Securo 7 W93L-50009 RX Safety Shoe Securo 8 Part No Description UK size W93L-50010 RX Safety Shoe Securo 9 W93L-50011 RX Safety Shoe Securo 9.5 W93L-50012 RX Safety Shoe Securo 10 W93L-50013 RX Safety Shoe Securo 11 W93L-50014 RX Safety Shoe Securo 12 Part No Description UK size W93L-50015 RX Safety Boot Solido 5 W93L-50016 RX Safety Boot Solido 6 W93L-50017 RX Safety Boot Solido 6.5 W93L-50018 RX Safety Boot Solido 7 W93L-50019 RX Safety Boot Solido 8 Part No Description UK size W93L-50020 RX Safety Boot Solido 9 W93L-50021 RX Safety Boot Solido 9.5 W93L-50022 RX Safety Boot Solido 10 W93L-50023 RX Safety Boot Solido 11 W93L-50024 RX Safety Boot Solido 12 nn Composite toe cap which can resist a pressure of 200 J nn Anti-perforation sole made from MS3 textile; very flexible, gives a much better walking comfort, isolates against the cold and/or heat, protects a larger area of the foot nn Scuff pad allows more ‘give’ at the point where the foot flexes. Ideal for jobs where kneeling is required nn Quality uppers stabilises and supports the foot nn TPU heel support nn Reflective accents for high visibility nn Shock-absorbing comfort sole for better walking comfort nn PU/rubber sole material; oil and petrol resistant nn HRO resistant to 300°C contact heat nn SRC sole for improved slip resistance nn Ladder grip prevents slipping on ladders nn Extra wide fit nn Composite toe cap which can resist a pressure of 200 J nn Anti-perforation sole made from MS3 textile; very flexible, gives a much better walking comfort, isolates against the cold and/or heat, protects a larger area of the foot nn Scuff pad allows more ‘give’ at the point where the foot flexes. Ideal for jobs where kneeling is required. nn Quality uppers stabilises and supports the foot nn TPU heel support nn Reflective accents for high visibility nn Shock-absorbing comfort sole for better walking comfort nn PU/rubber sole material; oil and petrol resistant nn HRO resistant to 300°C contact heat nn SRC sole for improved slip resistance nn Ladder grip prevents slipping on ladders nn Extra wide fit RX Safety Footwear
  • 220.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 212 PartNo W93L-50004 Safety Glasses, Goggles and Respiratory Part No W93L-50000 Part No W93L-50001 Part No W93L-50003 Part No W93L-50002 RX Safety Glasses and Goggles Maximum comfort and the highest level of protection are essential when eye-protection must be worn. Features such as lightweight, stability and a perfect fit contribute to this end. RX® Optiflex-V Safety Glasses nn Lightweight stylish design nn Fits over regular glasses without compromising comfort nn Side ventilation nn Polycarbonate lens Optiflex-B Brown polycarbonate lens improves the adaptation of the eye to variable lighting conditions Optiflex-W Green polycarbonate lens offer protection against UV rays and beams of light. Shade 5 Lens Optiflex-C Clear polycarbonate lens, the perfect protection for a wide range of lighting conditions CHOOSING THE RIGHT LENS RX® Optiflex-C Safety Glasses nn Lightweight stylish design nn Clear polycarbonate lens nn Compliant with EN166 and EN170 nn Anti-scratch coating nn Anti-fog coating nn Ventilating RX® Optiflex-C Safety Glasses nn Lightweight stylish design nn Green lens protects against UV rays and beams of light nn Shade 5 lens for oxy-fuel welding and soldering nn Compliant with EN166 and EN169 nn Anti-scratch and anti-fog coating nn Ventilating RX® Optiflex-B Safety Glasses nn Lightweight stylish design nn Brown lens protects against UV rays and beams of light nn Good colour recognition, TSR (traffic signal recognition) nn Compliant with EN166 and EN170 nn Anti-scratch coating nn Anti-fog coating nn Ventilating RX® Optiflex-G Wide Vision Goggles nn Lightweight stylish design with adjustable elastic headband nn Ergonomically designed, 180° wide-vision nn Highest optical quality lens, class 1 nn CE approved, EN166 protection against splashes of chemical liquids and molten metals nn Anti-scratch and anti-fog coating nn Indirect ventilation
  • 221.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 213 Pack Normal Protection Assigned Part No Description Size Factor Protection Factor W93L-50031 RX FFP2 pre-formed disposable mask reinforced 10 12 10 W93L-50033 RX FFP2V P2 pre-formed disposable mask reinforced, valve 10 12 10 W93L-50035 RX FFP3V P2 pre-formed disposable mask reinforced, valve 5 50 20 Normal Protection Assigned Part No Description Packaging Factor Protection Factor W93L-50028 RX FFP1 disposable mask folded 20 4 4 W93L-50027 RX FFP1V disposable mask folded and valve 10 4 4 W93L-50029 RX FFP2 disposable mask folded 20 12 10 W93L-50030 RX FFP2V disposable mask folded and valve 10 12 10 W93L-50032 RX FFP3V disposable mask folded and valve 10 50 20 Normal Protection Assigned Part No Description Packaging Factor Protection Factor W93L-50037 RX FFP1 pre-formed disposable mask 20 4 4 W93L-50036 RX FFP1V pre-formed disposable mask and valve 10 4 4 W93L-50034 RX FFP2 pre-formed disposable mask 20 12 10 W93L-50026 RX FFP2V pre-formed disposable mask and valve 10 12 10 W93L-50025 RX FFP3V pre-formed disposable mask and valve 5 50 20 Respiratory RX® Fold Flat Disposable Mask Single use, lightweight, ergonomically shaped disposable respirator for protection against non-toxic and toxic particles. nn Multi-layered filter medium electrostatically charged nn Ergonomically shaped with adjustable head straps to provide individual fit nn Adjustable nose clip to ensure a good seal around the nose nn Conforms to the European approved standard EN149:2001 and A1:2009NR nn Exhalation valve added for easier breathing (P1V, P2V and P3V) RX® Fold Flat Disposable Mask RX® pre-formed masks are manufactured to the highest standards, providing excellent comfort and protection. A range of protective factors are available both with and without a valve. nn Multi-layered filter medium electrostatically charged nn Ergonomically shaped with adjustable nose clip to ensure a good seal around the nose nn Conforms to the European approved standard EN149:2001 and A1:2009NR nn Exhalation valve added for easier breathing (P1V, P2V and P3V) RX® Fold Flat Disposable Mask Due to its lightweight netted construction, this mask has a very low breathing resistance, so even during the most demanding working conditions the wearer enjoys the highest possible comfort. nn Multi-layered filter medium electrostatically charged nn Reinforced net keeps the mask in its original form making it last longer nn Integrated cover protects the valve avoiding mechanical damage nn Adjustable head straps to provide an individual fit nn Conforms to the European approved standard EN149:2001 and A1:2009NR nn Exhalation valve added for easier breathing (P2V and P3V)
  • 222.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 214 RX® PERFORM+Oil Range Spill Control Advantages of Melt Blown Polypropylene (MBPP) over Traditional Granules Part No Description Size and Packaging Adsorption capacity (L) RX-SC100-O3 Oil Only Heavyweight Triple Layer Pad 41cm x 46cm 100 Pads/Dispenser Box 120L RX-SC200-O3 Oil Only Lightweight Triple Layer Pad 41cm x 46cm 200 Pads/Dispenser Box 154L RX-SC81-O3 Oil Only Heavyweight Triple Layer Roll 81cm x 46m 1 Roll/Box 240L RX-SC41-O3 Oil Only Heavyweight Triple Layer Roll 41cm x 46m 1 Roll/Dispenser Box 120L RX-SC122-O Oil Only Sock 7.6cm dia x 122cm 15 Socks/Box 85L RX-SC305-O Oil Only Sock 7.6cm dia x 305cm 6 Socks/Box 85L RX-SC4646-O Oil Only Pillow 46cm x 46cm 10 Pillows/Box 78L RX Spill Control Spill control is not just incident management, it’s about meeting Legal and Regulatory Frameworks that apply to everyone in today’s environment. Made from Melt Blown Polypropylene (MBPP) RX® adsorbents are a high quality, high performance workplace spill control solution. Products are available for general maintenance use in factories, workshops, and the manufacturing industry where there is a general requirement for a clean workplace. In outdoor situations, where oil and other liquids must be controlled, RX® provides an oil and fuel solution. This is a hydrophobic product which will not adsorb water. For incidents, and day-to-day situations involving chemicals and solvents, the RX® chemical range provides an instantly recognisable and complete solution. Available in: nn Pads nn Rolls nn Socks nn Pillows nn Adsorbs petroleum based liquids and repels water nn Spunbound cover on both sides give superior strength allowing for high abrasion resistance when wiping rough surfaces nn Dimple bonded for added strength and speeds up the wicking of liquids nn Available in two different weights nn Virtually lint-free nn Can be deployed even faster nn Adsorbs spills more quickly nn Flexibility of use; can be used reactively or as a preventative measure nn Easier and quicker to dispose of, can be incinerated nn Granules are dusty and messy and in some cases harmful to employees and machinery nn Lower cost in use, customer can save over 40% RX® Site Surveys ERIKS can offer a full site survey for assessment of suitable leak and spill provision, ensuring full compliance with current health and safety and environmental legislation. RX® Spill Control Training We can provide certified spill control training for first responders or tailored solutions dependant on requirements. This will help with compliance with Environmental Management Systems as set out in ISO 14001. Quicker and faster than granules SITE SURVEYS AND TRAINING
  • 223.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 215 Part No Description Size and Packaging Adsorption capacity (L) RX-SC100-C Perforated Heavyweight Pad 41cm x 46cm 100 Pads/Dispenser Box 134L RX-SC81-C Heavy Weight Perforated Roll 81cm x 46m 1 Roll/Bag 267L RX-SC41-C Heavy Weight Perforated Roll 41cm x 46m 2 Rolls/Bag 134L RX-SC122-C Chemical Sock 7.6cm dia x 122cm 15 Socks/Box 85L RX-SC305-C Chemical Sock 7.6cm dia x 305cm 6 Socks/Box 84L RX-SC4646-C Chemical Pillow 46cm x 46cm 10 Pillows/Box 78L Part No Description Size and Packaging Adsorption capacity (L) RX-SC100-M3 Perforated Heavyweight Pad 41cm x 46cm 100 Pads/Dispenser Box 120L RX-SC200-M3 Perforated Lightweight Pad 41cm x 46cm 200 Pads/Dispenser Box 154L RX-SC81-M3 Perforated Heavyweight Triple Layer Roll 81cm x 46m 1 Roll/Box 240L RX-SC41-M3 Perforated Heavyweight Triple Layer Roll 41cm x 46m 1 Roll/Dispenser Box 120L RX-SC122-M Maintenance Sock 7.6cm dia x 122cm 15 Socks/Box 85L RX-SC305-M Maintenance Sock 7.6cm dia x 305cm 6 Socks/Box 84L RX-SC4646-M Universal Pillow 46cm x 46cm 10 Pillows/Box 78L Part No Description Content Adsorption capacity (L) RX-SCKIT130-M Maintenance Mobile Response Kit 50 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags, Up to 136L 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties RX-SCKIT250-M Maintenance Mobile Response Kit 150 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags, Up to 250L 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties RX-SCKIT130-O Oil Only Mobile Response Kit 50 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags, Up to 136L 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties RX-SCKIT250-O Oil Only Mobile Response Kit 150 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags, Up to 250L 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties RX-SCKIT130-C Chemical Mobile Response Kit 50 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags, Up to 136L 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties RX-SCKIT250-C Chemical Mobile Response Kit 150 Heavyweight Pads, 8 Socks, 4 Pillows, Wet Wipes, 5 Disposable Bags Up to 250L 1 Roll Red/White Barrier Tape, 1 A Frame Floor Sign, 5 Ties Available in: nn Pads nn Rolls nn Socks nn Pillows nn Spunbound cover offers high abrasion resistance when wiping rough surfaces nn Dimple bonded for added strength and faster, easier clean up of spills nn Static resistant, offering greater safety when handling flammable liquids nn Available in two different weights nn Virtually lint-free RX® PERFORM+ Maintenance Range nn Designed to adsorb chemical and other hazardous liquids nn Ideal for use in laboratories, hospitals and chemical storage areas nn Spunbound cover offers high abrasion resistance and added strength when wiping rough surfaces nn Dimple bonded for added strength and faster, easier clean up of spills nn Static resistant, offering greater safety when handling flammable liquids RX® PERFORM+ Maintenance Range Available in: nn Pads nn Rolls nn Socks nn Pillows nn All models available in oil only, Maintenance and Chemical Versions nn Adsorption capacity up to 250 litres nn Wheels give mobility indoors and outdoors RX® Spill Control Mobile Response Kits Adsorption Capacity: nn 136 Litre nn 250 Litre
  • 224.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 216Safety Gloves Part No Glove Size RX-PG-CR5N7 7 RX-PG-CR5N8 8 RX-PG-CR5N9 9 RX-PG-CR5N10 10 RX-PG-CR5N11 11 Part No. Size W93L-50057 6 W93L-50059 7 W93L-50058 8 W93L-50056 9 W93L-50055 10 RX Safety Gloves RX® Safe5 Cut Resistant Glove Seamless knitted high cut resistant liner with a nitrile palm coating that offers outstanding protection. nn The seamless construction provides an exceptional level of comfort, whilst the open back style allows excellent breathability nn This lightweight glove attains to the maximum EN388 standard offering the wearer an excellent level of protection nn The nitrile palm coating is incredibily resilient and flexible, allowing for good gripping ability nn Elasticated, for a snug fit. The knitted wrist is extra long for optimal wrist protection nn Suitable applications include: component handling, assembly, electronics and construction nn Sold in packs of 12 pairs RX® Dyneema® Safe3 Cut Resistant Glove Seamless knitted Dyneema® glove with polyurethane coating. nn The seamless construction provides an exceptional level of comfort, whilst the open back style allows excellent breathability nn This lightweight glove with Dyneema® provides excellent resistance to cuts, abrasion and tears nn The glove has been designed to be tight fitting to give maximum dexterity for the most tactile of operations nn Elasticated, for a snug fit. The knitted wrist is extra long for optimal wrist protection nn Suitable applications include: component handling, assembly, electronics and cutting activities nn Sold in packs of 12 pairs
  • 225.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 217 Part No. Size W93L-50067 6 W93L-50066 7 W93L-50039 8 W93L-50041 9 W93L-50064 10 Part No. Size Colour W93L-50048 6 Black W93L-50051 7 Black W93L-50053 8 Black W93L-50054 9 Black W93L-50047 10 Black W93L-50049 6 White W93L-50046 7 White W93L-50050 8 White W93L-50052 9 White W93L-50044 10 White RX® Top-Flex PU Precision Gloves Seamless knitted nylon glove with polyurethane coating. nn The seamless construction provides an exceptional level of comfort, whilst the open back style allows excellent breathability nn The glove has been designed to be tight fitting to give maximum dexterity for the most tactile of operations nn Knitted elasticated wrist for a snug fit nn Suitable applications include: component handling, assembly, electronics and light engineering nn Available in black or white versions nn Sold in packs of 12 pairs RX® Nitri-4-Grip Safety Gloves for Extra Grip Seamless knitted nylon glove with a light porous breathable foam nitrile coating. nn The seamless construction provides an exceptional level of comfort, whilst the open back style allows excellent breathability nn The snug fit provides maximum dexterity for the most tactile of applications nn As well as providing excellent dry grip, Nitri-4 Grip channels oils and liquids away from the surface ensuring superb wet grip nn Suitable applications include; component handling and assembly nn Sold in packs of 12 pairs
  • 226.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 218Thormas Safety Gloves Part No Glove Size THMS2420031 6 THMS2420032 7 THMS2420033 8 THMS2420034 9 THMS2420035 10 Part No Glove Size THMS2420036 6 THMS2420037 7 THMS2420038 8 THMS2420039 9 THMS2420040 10 Part No Glove Size THMS2420011 6 THMS2420012 7 THMS2420013 8 THMS2420014 9 THMS2420015 10 Thormas Safety Gloves Precision Handling PU Second Skin fit gloves are light but strong with an exceptionally tactile feel and snug fit. They have a close-fitting knitted wrist with a white polyurethane coated palm on a seamless knitted white nylon liner. Hard-wearing and excellent dexterity for applications where fine handling is important. Perfect for inspection jobs where the use of white gloves is desirable. Conform to EN 388 4.1.3.1 Precision Handling PU Second Skin fit gloves are light but strong with an exceptionally tactile feel and snug fit. They have a close-fitting knitted wrist with a black polyurethane coated palm on a seamless knitted black nylon liner. Hard-wearing and excellent dexterity for applications where fine handling is important. Conform to EN 388 4.1.3.1 Precision Grip NIT High quality grey nitrile foam palm coating on a seamless 13g white nylon liner for extra comfort. Open back style allows excellent breathability. Tight fitting to for maximum dexterity for the most tactile of applications. Elasticated knitted wrist for a snug fit. Conform to EN 388: 4.1.2.1
  • 227.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 219 Part No Glove Size THMS2420021 6 THMS2420022 7 THMS2420023 8 THMS2420024 9 THMS2420025 10 Part No Glove Size THMS2420026 6 THMS2420027 7 THMS2420028 8 THMS2420029 9 THMS2420030 10 Part No Glove Size THMS2420016 6 THMS2420017 7 THMS2420018 8 THMS2420019 9 THMS2420020 10 Precision Grip NIT Designed and developed as a breathable glove, the Ultimate Flex has a 15g nylon/spandex grey liner with a black nitrile foam palm coating. Ideal glove for precision handling in dry environments. Suitable for a wide variety of applications such as packaging, logistics and warehousing, using tools and instruments, wiring operations, automotive and construction. Conform to EN 388 4.1.3.1 Precision Grip NIT The Ultimate Flex Pro glove offers cutting edge technology nitrile micro-foam with a black palm coating on a 15g grey nylon/spandex liner. Extremely comfortable for prolonged wear. Excellent dexterity, sensitivity, tactility and fit. Superior grip and abrasion resistance. Good for both wet and dry applications such as handling oily components. Conform to EN 388 4.1.3.1 Cut protection pu3 The HPPE 13g cut resistant grey liner is super-lightweight and flexible for optimum comfort and dexterity. Grey polyurethane palm coating gives excellent handling performance in wet or oily environments as it channels liquids away from the glove surface. Cut level 3 protection for applications with medium cut risk. Thousands of products available to order on ERIKS WEBSHOP SHOP.ERIKS.CO.UK SHOP.ERIKS .CO.UKSHOP .ERIKS.CO.UK
  • 228.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 220 Withbest practice machine-specific procedures, software to easily create and evaluate them, and the tools to isolate any machine from its energy supply, you can avoid accidents during machine interventions and push your go for zero programme to the next level! www.bradyeurope.com/LOTOservices GO FOR ZEROWITH LOCKOUT/TAGOUT Request the Lockout/ Tagout guide book “Safer machine interventions”! Lockout/Tagout Guide Book SAFERMACHINE INTERVENTIONS ENABLE Reduce accidents, increase productivity Print lean safety signs on-site Brady offers durable visual workplace labels, including amongst others lean and 5S labels, floor marking, storage area labels, level indicators, gauge labels, equipment identification labels and logistics labelling. These labels can be printed on-site when needed with a Brady printer. Discover the advantages of visual workplace signs with our complete range of sign label printers. www.bradyeurope.com/diy BRADY UK Wildmere Industrial Estate, Banbury, Oxon OX16 3JU Discover our printers! With best practice machine-specific procedures, software to easily create and evaluate them, and the tools to isolate any machine from its energy supply, you can avoid accidents during machine interventions and push your go for zero programme to the next level! www.bradyeurope.com/LOTOservices GO FOR ZEROWITH LOCKOUT/TAGOUT Request the Lockout/ Tagout guide book “Safer machine interventions”! Lockout/Tagout Guide Book SAFERMACHINE INTERVENTIONS ENABLE Reduce accidents, increase productivity Print lean safety signs on-site Brady offers durable visual workplace labels, including amongst others lean and 5S labels, floor marking, storage area labels, level indicators, gauge labels, equipment identification labels and logistics labelling. These labels can be printed on-site when needed with a Brady printer. Discover the advantages of visual workplace signs with our complete range of sign label printers. www.bradyeurope.com/diy BRADY UK Wildmere Industrial Estate, Banbury, Oxon OX16 3JU Discover our printers! Brady
  • 229.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 221 Discover the advantages of visual workplace signs with our complete range of sign label printers. www.bradyeurope.com/diy BRADY UK Wildmere Industrial Estate, Banbury, Oxon OX16 3JU Discover our printers! Part No Description W15D-54376 BMP21-PLUS Label Printer W15D-57633 19.05mm Vinyl Tape Cartridge - Black on White W15D-57647 19.05mm Vinyl Tape Cartridge - Black on Yellow Part No Description W15D-52690 Portable Metal Group Lock Box Blue W15D-53302 Portable Metal Group Lock Box Yellow W15D-53312 Portable Metal Group Lock Box Red Label Printers and Lock Boxes BMP™ 21-Plus Label Printer Once you experience the BMP™21-PLUS Label Printer’s unstoppable labelling power, you’re not going to want to share. It combines a tough exterior with smart printing capabilities for wires, cables and flat surfaces. nn Drop-lock-and-print cartridges nn Super rugged with moulded rubber bumpers nn Rechargeable lithium-ion battery nn 7 durable continuous materials with widths from 6 to 38.10 mm nn Automatic label formatting for wire wraps, terminal blocks, patch panels and cable flags and general banner labels nn 104 symbols for electric, smart home, safety and datacom nn Label grabber, printer holds label after cutting nn Standard 2 year warranty BBP™ 31 Sign and Label Printer The BBP™31 Sign Label Printer is exactly how a printer is supposed to be. It’s easy to use. It’s packed with functionality. And best of all, it’s got so many material options that this one printer can handle all the labelling needs in your facility. Group Lock Box For group lockout situations involving a large number of workers and equipment nn After machine or process is locked out, the key or keys of the machine are placed in a lock box. Each authorized work team member places a personal lock or tagout device in the group lock box. nn Ensures that no single employee has access to the box unless ALL employees have removed their locks or tags. Part No Description W15D-62522 BBP31 Sign Label Printer QWERTY - UK W15D-57302 101mm Indoor/Outdoor Vinyl Tape - White W15D-57302 101mm Indoor/Outdoor Vinyl Tape - Yellow
  • 230.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 222Metal Cutting Tools HSS Tap and Drill Set nn Brand new 14pc set nn Features E500 straight flute taps and A002 TiN coated jobbers nn Ideal for a wide range of general purpose machining applications nn Contains M3-M12 taps and equivalent pre-tapping dril sizes Part No DORL115NO101 90° Countersink Set nn Metric set (Plastic case) containing G136 HSS 90 degree straight shank countersinks nn For production of 90° countersinks in most materials nn Can also be used as a de-burring tool nn Bright finish, 3 flute, ground all over Part No DORG236-1 A002 TiN Tipped Jobber Drill Numerous aspects of Dormer’s renowned A002’s design contribute to its outstanding all-round capabilities nn Special 118° four facet point enables excellent centring nn Titanium Nitride (TiN) coating not only resists wear but also reduces friction. nn Thick web design optimises the structural strength of the drill Part No DORA002-XX Burrs Dormer’s range of carbide burrs is a high quality, comprehensive program which includes designs and shapes to offer a solution for the majority of applications in all major industry segments. nn Cut styles include aluminium and double cut nn Toughened and hardened steel shanks nn Special brazing elements provide excellent braze strength nn Ball Nose Geometry, skip flute grinding nn TiAIN Coating nn For all general internal and external turning operations nn Tool holders and boring bars available in left hand or right hand nn D style holder with top clamp for increased security nn Available in styles that enable the use of all insert edges Negative Turning Holders and Boring Bars Part No DCLNR PCLNR PCKNR PCBNR Metal Cutting Tools
  • 231.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 223 Negative Turning Inserts Part No CNMG 09/12/16/19 DNMG 11/1504/1506 RNMG 12/15/19 SNMG 12/15/19 TNMG 16/22 VNMG 16 WNMG 06T3/0604/08 nn For all general internal and external turning operations nn Tool holders and boring bars available in left hand or right hand nn D style holder with top clamp for increased security nn Available in styles that enable the use of all insert edges Positive Turning Holders and Boring Bars Part No SCLCR SDNCN SRDCN Positive Turning Inserts nn Available with corner radii 0.2mm - 1.6mm nn Chip Breakers and Grades for all materials and machining conditions nn Toolholders and Boring Bars available nn For all general internal and external turning operations nn Tool holders and boring bars available in left hand or right hand nn D style holder with top clamp for increased security nn Available in styles that enable the use of all insert edges Part No CCGT/MT 06/08/09/12 DCGT/MT 07/11 RCGT/MT 06/08/10/12/16/20 SCMT 09/12 TCGT/MT 09/11/16 VBMT 11/16 VCGT/MT 07/11/13/16 nn Available with corner radii 0.2mm - 1.6mm nn Chip Breakers and Grades for all materials and machining conditions nn Toolholders and Boring Bars available nn For all general internal and external turning operations nn Tool holders and boring bars available in left hand or right hand nn D style holder with top clamp for increased security nn Available in styles that enable the use of all insert edges
  • 232.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 224Metal Cutting Tools Parting Grooving Part No Holder Inserts W24A-71384 XLCFN 2602 J 3.00 (x1) LFMX 3.1-.20TNF2 T8330 (x10) W24A-71385 XLCFN 2603 J 4.00 (x1) LFMX 4.1-.20SNF2:T8330 (x10) W24A-71386 XLCFN 3202 M 3.00 (x1) LFMX 3.1-.20TNF2 T8330 (x10) W24A-71387 XLCFN 3203 M 4.00 (x1) LFMX 4.1-.20SNF2:T8330 (x10) Milling Part No ADMX 07/11/16 U-Drills nn Available in diameters 15mm - 58mm, in lengths 2D, 3D, 4D 5D. nn High drill body stability with low friction coating nn Versatile with high application security Part No SCET 05/06/07/09/12/15 XPET 05/06/07/09/ 11/12/15/19 Strong square insert in Grades and Chip Breakers to suit all materials and machining conditions 2D 3D 4D 5D nn Versatile range of cutters for face milling, shoulder milling, slot milling, plunge milling, ramping and helical interpolation. nn End Mills, Helical End Mills and Face mills available nn For radial parting and grooving applications nn Single edge inserts for production of deeper grooves nn Back stop incorporated within insert for improved depth control nn 4 different kits available Each kit comes with a blade and a packet of 10 x LFMX inserts (T8330 Grade) Chip Breakers and Grades for all materials and machining conditions Available with corner radii 0.2mm - 3.0mm Metal Cutting Tools
  • 233.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 225 Metric Unified Threading Kits nn For the production of external and internal metric threads in most materials nn Tool holders for both conventional and partial profile inserts nn Left hand holders and inserts also available nn Suitable for a wide range of materials A087201 A08910 L700N781 nn A002 TiN coated jobber drills with self centering point nn Excellent performance in a wide range of materials nn Supplied in robust, attractive plastic case Contains nn 19 PC A002 TiN coated jobber drills for general purpose drilling in a wide range of materials nn 1.00mm - 10.0mm x 0.5mm nn 5 PC A002 TiN coated jobber drills with self centering point nn Excellent performance in a wide range of materials nn Supplied in robust, attractive plastic case Contains nn A002 HSS TiN Coated Jobber Drills: nn 4.0, 5.0, 6.0, 8.00 10.00mm nn HSS METRIC COARSE STRAIGHT FLUTE TAP SET (M3-M10) nn Metric coarse taps set for maintenance repair and overhaul nn Manufactured from premium quality HSS nn For increased hardness toughness and improved strength nn Bright finish universally suitable for many materials nn Manufactured to Din standards with chamfer form C for blind and through holes Part No Style W24A-71388 External W24A-71389 External W24A-71390 Internal W24A-71391 Internal
  • 234.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 226 NorbarTorque Wrenches Torque Screwdrivers Versatile, accurate and easy torqueing for smaller fasteners and restricted spaces TT Torque Wrenches For no-nonsense torqueing – comfortable, accurate and easy to use NorTorque® Utilises Norbar’s proven mechanism and internal components and incorporates them into a purposeful and attractive torque wrench Norbar Part No Details NOR13475 TTs1.5 0.3 – 1.5 N�m screwdriver NOR13476 TTs 3.0 0.6 – 3 N�m screwdriver NOR13509 TTs 6.0 1.2 – 6 N�m screwdriver Part No Details NOR13285 TTi 20 1/4 1 – 20 N�m, 10 -180 lbf�in NOR13640 TTi 20 3 /8 1 – 20 N�m, 10 -180 lbf�in NOR13658 TTi 50 3 /8 8 – 50 N�m, 6 – 35 lbf�ft NOR13659 TTi 50 ½ 8 – 50 N�m, 6 – 35 lbf�ft Part No Details NOR130101+ NorTorque® model 60 3 /8 12 - 60 N�m, 10 - 45 lbf�ft NOR130103* NorTorque® model 100 ½ 20 - 100 N�m, 15 - 75 lbf�ft NOR130104 NorTorque® model 200 ½ 40 - 200 N�m, 30 - 150 lbf�ft NOR130105 NorTorque® model 300 ½ 60 - 300 N�m, 45 - 220 lbf�ft NOR130106 NorTorque® model 340 ½ 60 - 340 N�m, 45 - 250 lbf�ft nn Accuracy exceeds the requirement of ISO 6789:2003 nn Tool 'slips' when torque is achieved removing the possibility of 'over- tightening' nn Supplied with a 1/4 hexagon bit holder designed using a 4mm hexagon stem nn Bit holder can be removed and replaced with widely available screwdriver bits nn All tools feature a lock to prevent accidental adjustment of set torque nn Easy torque adjustment without the need of additional specialist tools nn Traceable calibration certificate for the clockwise direction supplied with all adjustable tools nn Accurate to ±3% of reading which meets and exceeds ISO 6789:2003 nn Micrometer scale for simple and error free setting nn All models feature a lock to prevent accidental adjustment of the set torque nn Handle and lens materials resistant to commonly used industrial chemicals nn Adjustment over the entire scale can quickly be achieved and with minimal effort in approximately ten complete turns nn Each wrench is supplied with a traceable calibration certificate nn Accurate to ±3% of reading which meets and exceeds ISO 6789:2003 nn Push/pull lock is fast and intuitive to use and prevents accidental adjustment of the set torque nn Light and fast adjustment saves operator time and effort nn Micrometer scale applying to the primary torque units (N·m on a dual scale wrench) for simple and error free setting nn Tough ratchets with narrow engagement angles for easy positioning in confined spaces nn Convenient hanger feature for tool storage also aids wrench unlocking and adjustment nn Supplied with traceable calibration certificate. + Supplied with a 1/2 sq. dr. adaptor * Supplied with a 3 /8 sq. dr. adaptor
  • 235.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 227 Professional Torque Wrenches Norbar’s Professional torque wrench range has become one of the most popular wrench ranges available worldwide Industrial Torque Wrenches For ultimate torque control in heavy duty applications HandTorque® Designed for use where it is necessary to provide higher torques than would otherwise be possible due to limitations of space or operator strength. Input to the multiplier is via a ratchet torque wrench set to one fifth of the desired output torque. Part No Details NOR15002 Pro 50 3 /8 10 – 50 N�m, 7.5 – 37.5 lbf�ft NOR15003 Pro 100 ½ 20 – 100 N�m, 15 - 75 lbf�ft NOR15004 Pro 200 ½ 40 – 200 N�m, 30- 150 lbf�ft NOR15005 Pro 300 ½ 60 – 300 N�m, 50 – 220 lbf�ft NOR15006 Pro 340 ½ 60 – 340 N�m, 50 – 250 lbf.ft NOR15007 Pro 400 ½ 80 – 400 N�m, 60 – 300 lbf�ft Part No Details NOR12001 3AR 3/4 100 – 500 N�m, 70 – 350 lbf�ft NOR12006 4R 1 150 – 700 N�m, 100 – 500 lbf�ft NOR12007 4AR 3/4 200 – 800 N�m 150 – 600 lbf�ft NOR12009 5R 3/4 300 – 1000 N�m 200 – 750 lbf�ft NOR12012 5AR 1 700 – 1500 N�m 500 – 1000 lbf�ft Part No Details NOR180260 HT3-1000 N�m Kit, ½ input, 3/4 output NOR17220 HT3 1300 N�m Kit, ½ input, 3/4 output NOR17221 HT3 2700 N�m Kit, 3/4 input, 1 output nn Accurate to ±3% of reading which meets and exceeds ISO 6789:2003 nn Large scale for better visibility and more accurate setting nn Fast scale adjustment reducing the effort required to adjust nn Ergonomic new handle with a high proportion of soft-feel, high grip material nn Handle material and lens resist all chemicals in common automotive, industrial and aviation use nn Unique on a torque wrench, the TimeStrip® gives a visual indication that the wrench is due for re-calibration nn Supplied with a traceable calibration certificate nn Unique ‘break action’ mechanism gives unparalleled control over the applied torque nn Perfect for wheel nuts and many other applications nn Accurate to ±4% of reading nn Supplied with traceable calibration certificate nn 5:1 multiplication, accuracy ±4% nn Small and compact design nn Robust construction means minimal maintenance and long life nn 1300 N.m version has a spare 3/4 output square included in the kit
  • 236.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 228 RÖHMLive Centres, Chucks and Compact Vices Live Centres The requirement for high cutting capacities and high working precision demands an additional support by a revolving live centre for many workpieces due to their shape and length. Thanks to their precision bearings, RÖHM live centres offer optimal force absorption and a maximum concentricity deviation of up to 0.003 mm. Thanks to the lifetime lubrication, the centre points are maintenance free. nn Maximum concentricity and optimal force absorption thanks to proven precision bearings nn Special lubrication for long service life and little required maintenance nn Minimum interference contour thanks to slender housing shape Key Bar Chucks With Quick-Acting Jaw Change System The RÖHM key bar chucks with quick-acting jaw change system are used successfully in areas where extremely high clamping forces, high concentricity and reliable long- term repeatability are required. Thanks to the quick-acting jaw change system, the jaws can be quickly and easily turned, changed or offset over the entire clamping range within a few seconds. nn Maximum clamping forces thanks to direct force transfer via the key bar system nn Maximum concentricity and axial run-out tolerance nn High user-friendliness thanks to quick-acting jaw change system NC-Compact Vices NC-compact vices are particularly suited for use on machining centers, milling machines and are ideal for 5-axis machining. These premium vices are very impressive with their stable and compact design for maximum clamping accuracy and optimal workpiece accessibility. By simply turning the clamping force presetting, a clamping force of up to 60 kN can be achieved. With workpieces that are sensitive to deformation, the force amplification can be disabled. nn Large clamping range and precise positioning due to fixed clamping jaw nn The compact design resists deformation for the greatest possible clamping precision nn Consistent clamping force and maximum repeatability of 0.01 mm RÖHM
  • 237.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 229 High Performance LUBRICATION DID YOU KNOW... 36% of rolling bearings fail due inadequate lubrication Product Range nn Lubricants; grease, oil, pastes, dry film lubricants and cleaners nn Lubricators nn Lubrication Systems nn Equipment and accessories including grease guns and storage systems Services nn Application and selection advice nn Lubricant management contracts nn Oil sampling nn Condition Monitoring Products from all the Leading Brands LUBRICATION Technology An effective lubrication service does more than keep machinery functioning smoothly, it can improve reliability, lengthen machinery life, increase efficiency and enhance productivity. We offer lubricants for every industry and every requirement including special lubricants for the Food and Beverage and Pharmaceutical industries to meet the very highest legislative requirements. We bring our experience, our know-how and our passion for technology and we apply them not just at your machinery’s lubrication points but at every stage of your process. We can recommend products across one brand or a range of brands, ensuring the best performance and best value, regardless of supplier. 229
  • 238.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 230 White GreaseSpray Part No RX-WHITEGREASE-400ML High Temperature EP2 Bearing Grease Part No OKS422-400ML ERIKS Lubrication Essentials Open Gear Grease Spray Part No ROC-TUFGEAR SPRAY Wire Rope Spray Part No ROC-WIRE ROPE SPRAY Multi-Purpose Grease EP2 Part No EP2-400G-RX Multi-Purpose Lithium Complex Grease Part No EP2-HP-400G-RX Wide Temperature Range EP2 Grease Part No OKS404-400ML Food Grade EP2 Bearing Grease Part No OKS479-400ML Marine Grease Part No OKS403-400ML Food Safe Silicone Grease Part No OKS1110-80ML OKS110-500G OKS-1111-400ML DON’T FORGET Side Lever Grease Gun Suitable for use with 400ml cartridges Part No: OKS5500 Bearing Greases and Technical Lubricants Bearing Greases ERIKS Lubrication Essentials, featured across pages 220-223, is a range of high quality, readily available items designed to meet the most common industrial lubrication and maintenance applications. ERIKS Lubrication EssentialsYour core lubrication rangeERIKS Lubrication Essentials Your core lubrication range
  • 239.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 231 High Temp Chain Oil Part No OKS352-5LTR Chain Oil Food Grade Gear Oil Part No OKS3720-5LTR OKS3720-25LTR Food Grade Chain Spray Part No OKS3751-500ML Compressor Oil Part No CAS-AIRCOLPD100-20LTR Food Grade Hydraulic Oil Part No OKS3770-5LTR Gear Oil Part No CAS-ALPHASP220-20LTR CAS-ALPHASP320-20LTR Synthetic Gear Oil Part No CAS-ALPHASYNPG320-20KG Chain Spray Part No OKS671-400ML Premium Hydraulic Oil Part No CAS-HYSPINAWS32-20LTR CAS-HYSPINASW46-20LTR Hydraulic Oil Part No EP32-25LTR-RX Dry Film Part No OKS571-400ML Silicone Oil Part No OKS1361-500ML Gear Oil Chain Oil Hydraulic Oil Hydraulic Oil Feedback from our customers has indicated two common problems with lubricant supply... Problem 1 The ever expanding plethora of different lubricants, additives and performance claims is becoming impossible to keep up with. Also, it’s easy to become blinded by the “science” of performance claims which sound too good to be true, but how do you cut through the jargon and find out if it is really the right product for your application? Problem 2 When surveying customer stores we regularly encounter several stocked items which all do exactly the same job, multiplying our customers stock values and wasting their time managing excessive inventory. WHY LUBRICATION ESSENTIALS?
  • 240.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 232 Anti-Seize AirDuster Part No AMB-AIRDUSTER-400ML Jointing Compound Part No ROC-HYLOMAR-100G Rust Remover Part No OKS611-400ML Cutting Oil Part No OKS391-400ML Leak Detector Spray Part No OKS2801-400ML Belt Dressing Spray Part No OKS2901-400ML Moly Paste (and Spray) Part No OKS221-400ML Copper Anti-Seize Paste Part No OKS245-250G Multi- Purpose WD Spray Part No WD40-400ML Multi-Purpose Maintenance Spray with PTFE Part No TRIFLOW-500ML High Perfromance Maintenance Spray Part No OKS641-400ML Food Grade Maintenance Spray Part No OKS371-400ML Maintenance Sprays Workbox Essentials Workbox Essentials Maintenance and Workbox Essentials WHY LUBRICATION ESSENTIALS? The Concept With this in mind we set out to define a core range of items with excellent stock availability, hand picked, by our lubrication engineers to cover as wide a range of applications as possible while always maintaining the very best in performance and compliance. The Products ERIKS Lubrication Essentials range meets the widest variety of applications imaginable from around 50 core items. These are amongst our most popular products and are proven in hundreds of applications across as wide a variety of industrial sectors imaginable.
  • 241.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 233 Temporary Protective Film, Wax Based Part No OKS2101-400ML Food Grade, Anti-Seize Paste Part No OKS252-250G Corrosion Protection Zinc Galvanising Spray, Permanent Part No OKS2511-400ML Zinc Spray Part No RX-ZINCSPRAY-400ML Automatic Lubricator Single-point Automatic Lubricator Part No SIMASL24 Multi Purpose Grease SIMASL10 Food Industry Grease SIMASL01 Water Resistant SIMASL14 Chain Oil SIMASL15 High Temperature Chain Oil SIMASL18 Food Industry Oil n Proven Performance n Simplify and Reduce Inventory n Excellent Availability n Ensure Compliance Bio- degradeable Cleaner Part No OKS2650-500ML Electrical Contact Cleaner Part No OKS2621-400ML Fast Drying Cleaner Part No AMB-AMBERKLFE10-400ML Industrial Degreaser Food Safe Part No AMB-INDDEGREASERFG-500ML Universal Cleaner Part No RX-DEGREASER-400M High Performance Universal Cleaner Part No OKS2611-500ML Multi-Foam Cleaner Part No OKS2631-400ML Cleaners LUBRICATION ESSENTIALS ERIKS Lubrication EssentialsYour core lubrication range Brake Cleaner Part No RX-BRAKECLEANER-500ML Anti-Seize
  • 242.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 234 Becausemy bearings are worth it! maintenance products smart technologies Lubricators The simalube lubricator provides automatic lubrication over a period of one month to a year and can be adjusted in an infinitely variable manner. simalube supplies eve- ry lubricating point with the ideal amount of lubricant – be it oil or grease – so that subsequent manual lubrication is no longer needed and maintenance costs are reduced in the long term. Induction Heaters simatherm induction heaters heat circular metal parts, such as roller bearings, in a very short amount of time, so they can be installed quickly and efficiently. The induc- tive heating of metallic workpieces makes sense from both an economical and ecolo- gical perspective. simatec is the world’s lea- ding manufacturer of these types of heaters. Tools The simatool toolkits enable the fast installati- on and removal of roller bearings and seals. They are used all over the world in machine and maintenance workshops within all indust- ries. Simatec Maintenance Products and Multi-Use Lubricants
  • 243.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 235 WD-40 Multi-Use Product Bulk nn Cleans, protects, penetrates, lubricates and displaces moisture nn Prevents rust and corrosion nn Silicone free nn Easy to use nn Versatile Part No Size WD40-5LTR 5ltr WD40-25LTR 25ltr WD-40 Multi-Use Product WD-40 Multi-Use Product is still ‘the’ maintenance spray for use in Industry for good reason. It helps to keep plant efficiency and operating costs down whilst solving problems and helping to maintain equipment along the way. WD-40 Multi-Use Product stops squeaks and noise, it is designed to drive out water, it cleans and protects equipment prevents corrosion. This is especially relevant for machinery and appliances exposed to the elements, it leaves a protective coating with a dielectric strength of ~38kV, and it penetrates to loosen rusted, seized parts. A useful problem solver for a lot of the tasks faced by technicians and engineering staff today, simply taken care of from one quick convenient application of WD-40 Multi-Use Product. WD-40 Multi-Use Product Aerosols nn Cleans, protects, penetrates, lubricates and displaces moisture nn Prevents rust and corrosion nn Silicone free nn Easy to use nn Versatile nn Smart straw variant available Part No Size WD40-100ML 100ml WD40-SMARTSTRAW-300ML 300ml WD40-SMARTSTRAW-450ML 450ml WD40-600ML 600ml
  • 244.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 236Maintenance Sprays The new range of RX Maintenance Sprays is a complete line-up of readily available products designed to cover the most common industrial applications. Less is More with RX® Maintenance Sprays With an ever-increasing choice of maintenance sprays on the market today, it can be challenging to identify the most compatible solutions for your requirements. Keeping up to date with the latest technology, additives and performance claims can be equally confusing. It is with this in mind that we have developed the RX Maintenance range, which allows you to source all the core products your workshop needs from a single supplier. Each product in this series has been handpicked by ERIKS lubrication engineers to cover as wide a range of applications as possible across a variety of industrial sectors, whilst always maintaining the very best in performance and compliance. Because sometimes less is more. Order your RX® Maintenance Sprays today. Call 0800 006 6000 or visit www.eriks.co.uk
  • 245.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 237 Multi-Purpose Spray with PTFE Multi-purpose oil aerosol spray with PTFE White Grease High-grade white grease aerosol spray with PTFE Zinc Spray High purity zinc aerosol spray for protecting metal surfaces Silicone Spray High-grade silicone oil aerosol spray Super Industrial Degreaser Solvent degreaser aerosol spray removes oil, grease and dirt Part No RX-WHITEGREASE-400ML Part No RX-MULTIOIL+PTFE-400ML Part No RX-FOAMCLEANER-500ML Part No RX-BRAKECLEANER-500ML Part No RX-BIOCLEANER-500ML Part No RX-ZINCSPRAY-400ML Part No RX-SILICONESPRAY-400ML Part No RX-DEGREASER-400ML RX Oil, Grease and Maintenance Sprays Foam Cleaner Foaming aerosol spray cleaner for universal use Brake Cleaner Fast-drying aerosol spray cleaner for brake and clutch parts Biological Small Parts Cleaner Biological cleaner trigger spray RX Lubricants The range of RX products has been developed by ERIKS over many years of practical applica- tion engineering and develop- ment, this knowledge and understanding is designed into all of our products with the aim to increase your performance and extend reliability. Hydraulic Oil Bearing Grease Hydraulic Oil EP32 EP32 hydraulic oil formulated with mineral oil Part No EP32-25LTR-RXL Maintenance Sprays Part No EP2-400G-RX Part No EP2-HP-400G-RX Multi- Purpose Grease EP2 EP2 lithium soap based highly refined mineral oil Multi- Purpose Lithium Complex EP2 lithium complex grease
  • 246.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 238 Trustin TOTAL Lubricants Food Grade Lubricants and Gear Oils Developing your productivity TOTAL are at your side to help you get the best from your machinery and to accompany your development at both local and international levels. Industry specific solutions Each industrial sector has a specific operating environment, their knowledge and experience of industrial applications means that our products are suited perfectly to meet your requirements. Mineral Gear Oils CARTER EP 68 - 1000 For industrial gears, bearings under high loads and high temperatures. Extends oil drain intervals. Protects against micropitting. Part Number Description Size TOTAL-CARTEREP100-208LTR Total Carter EP 100 Gear Oil 208ltr 208 Litre TOTAL-CARTEREP150-208LTR Total Carter EP 150 Gear Oil 208ltr 208 Litre TOTAL-CARTEREP150-20LTR Total Carter EP 150 Gear Oil 20ltr 20 Litre TOTAL-CARTEREP220-208LTR Total Carter EP 220 Gear Oil 208ltr 208 Litre TOTAL-CARTEREP220-20LTR Total Carter EP 220 Gear Oil 20ltr 20 Litre TOTAL-CARTEREP320-208LTR Total Carter EP 320 Gear Oil 208ltr 208 Litre TOTAL-CARTEREP320-20LTR Total Carter EP 320 Gear Oil 20ltr 20 Litre TOTAL-CARTEREP460-208LTR Total Carter EP 460 Gear Oil 208ltr 208 Litre TOTAL-CARTEREP460-20LTR Total Carter EP 460 Gear Oil 20ltr 20 Litre TOTAL-CARTEREP68-208LTR Total Carter EP 68 Gear Oil 208ltr 208 Litre TOTAL-CARTEREP68-20LTR Total Carter EP 68 Gear Oil 20ltr 20 Litre TOTAL-CARTEREP680-208LTR Total Carter EP 680 Gear Oil 208ltr 208 Litre TOTAL-CARTEREP680-20LTR Total Carter EP 680 Gear Oil 20ltr 20 Litre Synthetic Gear Oils CARTER SH For Gears subjected to very high loads and high temperatures in difficult environments, especially gears for wind turbine. Excellent protection against corrosion, wear and micropitting. Extended oil service life due to excellent thermal stability. Can operate outdoors thanks to a very low pour point. CARTER SY For severe temperature conditions and high loads; gears, slideways, plain bearings and (roller) bearings. Excellent level of equipment protection. Extension of oil drain intervals. Extended equipment service life. Part Number Description Size TOTAL-CARTERSH1000-208L Total Carter SH 1000 Gear Oil 208ltr 208 Litre TOTAL-CARTERSH1000-20LTR Total Carter SH 1000 Gear Oil 20ltr 20 Litre TOTAL-CARTERSH150-20LTR Total Carter SH 150 Gear Oil 20ltr 20 Litre TOTAL-CARTERSH220-208LTR Total Carter SH 220 Gear Oil 208ltr 208 Litre TOTAL-CARTERSH220-20LTR Total Carter SH 220 Gear Oil 20ltr 20 Litre TOTAL-CARTERSH320-208LTR Total Carter SH 320 Gear Oil 208ltr 208 Litre TOTAL-CARTERSH320-20LTR Total Carter SH 320 Gear Oil 20ltr 20 Litre TOTAL-CARTERSH460-208LTR Total Carter SH 460 Gear Oil 208ltr 208 Litre TOTAL-CARTERSH460-20LTR Total Carter SH 460 Gear Oil 20ltr 20 Litre TOTAL-CARTERSY150-208LTR Total Carter SY 150 Gear Oil 208ltr 208 Litre TOTAL-CARTERSY150-20LTR Total Carter SY 150 Gear Oil 20ltr 20 Litre TOTAL-CARTERSY220-208LTR Total Carter SY 220 Gear Oil 208ltr 208 Litre TOTAL-CARTERSY220-20LTR Total Carter SY 220 Gear Oil 20ltr 20 Litre TOTAL-CARTERSY320-208LTR Total Carter SY 320 Gear Oil 208ltr 208 Litre TOTAL-CARTERSY320-20LTR Total Carter SY 320 Gear Oil 20ltr 20 Litre TOTAL-CARTERSY460-208LTR Total Carter SY 460 Gear Oil 208ltr 208 Litre TOTAL-CARTERSY460-20LTR Total Carter SY 460 Gear Oil 20ltr 20 Litre TOTAL lubricants offer a comprehensive range of oils, greases and special products for industries such as: n Chemicals n Energy n Metals n Automotive n Original Equipment Manufacturers n Building, Mining and Construction n Papermaking n Food Processing Industry Innovative products Innovation is priority for TOTAL, with several research centres, where chemical and mechanical engineers and specialists in tribology work together. Their close relations with equipment manufacturers enable the formulation and testing of tomorrow’s products, and guarantee optimal performance and protection of your machines.
  • 247.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 239 NEVASTANE Food Grade Lubricants A range of products adapted to your needs, the NEVASTANE range spans a wide array of products that have been completely reformulated to meet the latest requirements of industrial equipment suppliers. Offering improved performance NEVASTANE products protect your equipment and extend its working life, even in the most difficult working conditions and across wide temperature ranges. Part Number Description Size TOTAL-FINAVEST360B-20LTR Total Finavestan A 360B White Oil 20ltr 20 Litre TOTAL-FINAVESTA360B-208L Total Finavestan A 360B White Oil 208ltr 208 Litre TOTAL-FINAVESTANA80B-20L Total Finavestan A 80B White Oil 20ltr 20 Litre TOTAL-LUNARIASH46-208LTR Total Lunaria SH 46 Food Grade Compressor Oil 208ltr 208 Litre TOTAL-LUNARIASH46-20LTR Total Lunaria SH 46 Food Grade Compressor Oil 20ltr 20 Litre TOTAL-LUNARIASH68-20LTR Total Lunaria SH 68 Food Grade Compressor Oil 20ltr 20 Litre TOTAL-N/STANEAF-205LTR Total Nevastane Food Grade Antifreeze 205ltr 205 Litre TOTAL-N/STANEAW22-208LTR Total Nevastane AW 22 Food Grade Hydraulic Oil 208ltr 208 Litre TOTAL-N/STANEAW22-20LTR Total Nevastane AW 22 Food Grade Hydraulic Oil 22ltr 22 Litre TOTAL-N/STANEAW32-208LTR Total Nevastane AW 32 Food Grade Hydraulic Oil 208ltr 208 Litre TOTAL-N/STANEAW32-20LTR Total Nevastane AW 32 Food Grade Hydraulic Oil 20ltr 20 Litre TOTAL-N/STANEAW46-20LTR Total Nevastane AW 46 Food Grade Hydraulic Oil 20ltr 20 Litre TOTAL-N/STANEAW68-20LTR Total Nevastane AW 68 Food Grade Hydraulic Oil 20ltr 20 Litre TOTAL-N/STANECHAINXT-20L Total Nevastane Chain Oil XT Food Grade Chain Oil Xt 20ltr 20 Litre TOTAL-N/STANEEP100-20LTR Total Nevastane EP 100 Food Grade Gear Oil 20ltr 20 Litre TOTAL-N/STANEEP150-20LTR Total Nevastane EP 150 Food Grade Gear Oil 20ltr 20 Litre TOTAL-N/STANEEP220-20LTR Total Nevastane EP 220 Food Grade Gear Oil 20ltr 20 Litre TOTAL-N/STANEEP320-20LTR Total Nevastane EP 320 Food Grade Gear Oil 20ltr 20 Litre TOTAL-N/STANEEP460-20LTR Total Nevastane EP 460 Food Grade Gear Oil 20ltr 20 Litre TOTAL-N/STANEHTF-208LTR Total Nevastane HTF Food Grade Heat Transfer Oil 208ltr 208 Litre TOTAL-N/STANESDO-10LTR Total Nevastane SDO Food Grade Sugar Dissolving Oil 10ltr 10 Litre TOTAL-N/STANESH100-20LTR Total Nevastane SH 100 Food Grade Hydraulic Oil 20ltr 20 Litre TOTAL-N/STANESH32-20LTR Total Nevastane SH 32 Food Grade Hydraulic Oil 20ltr 20 Litre TOTAL-N/STANESH46-208LTR Total Nevastane SH 46 Food Grade Hydraulic Oil 208ltr 208 Litre TOTAL-N/STANESH46-20LTR Total Nevastane SH 46 Food Grade Hydraulic Oil 20ltr 20 Litre TOTAL-N/STANESH68-20LTR Total Nevastane SH 68 Food Grade Hydraulic Oil 20ltr 20 Litre TOTAL-N/STANESIL-207ML Total Nevastane Food Grade Silicone Safe Guard 207ml 207 ml Aerosol TOTAL-N/STANESPGRE-300ML Total Nevastane Food Grade Grease Aerosol 300ml 300 ml Aerosol TOTAL-N/STANESPLUB-300ML Total Nevastane Food Grade Lube Aerosol 300ml 300 ml Aerosol TOTAL-N/STANESY220-25KG Total Nevastane SY 220 Food Grade Gear Oil 25kg 25 Kg TOTAL-N/STANESY460-210KG Total Nevastane SY 460 Food Grade Gear Oil 210kg 210 Kg TOTAL-N/STANESY460-25KG Total Nevastane SY 460 Food Grade Gear Oil 25kg 25 Kg TOTAL-N/STANEXMF0-16KG Total Nevastane XMF 0 Food Grade Grease 16kg 16 Kg TOTAL-N/STANEXMF00-16KG Total Nevastane XMF 00 Food Grade Grease 16kg 16 Kg TOTAL-N/STANEXMF2-16KG Total Nevastane XMF 2 Food Grade Grease 16kg 16 Kg TOTAL-N/STANEXMF2-375G Total Nevastane XMF 2 Food Grade Grease 375g 375 g Cartridge TOTAL-N/STANEXMF2LS-375G Total Nevastane XMF 2 Food Grade Grease Lube Shuttle Cartridge 375g 375 g Cartridge TOTAL-N/STANEXS320-400G Total Nevastane XS 320 Food Grade Grease 400g 400 g Cartridge TOTAL-N/STANEXS80-16KG Total Nevastane XS 80 Food Grade Grease 16Kg 16 Kg TOTAL-N/STANEXS80-400G Total Nevastane XS 80 Food Grade Grease 400g 400 g Cartridge TOTAL-N/STANEXS80LS-400G Total Nevastane XS 80 Food Grade Grease Lube Shuttle Cartridge 400g 400 g Cartridge TOTAL-N/STANEXSH150-208L Total Nevastane XSH 150 Food Grade Gear Oil 208ltr 208 Litre TOTAL-N/STANEXSH150-20L Total Nevastane XSH 150 Food Grade Gear Oil 20ltr 20 Litre TOTAL-N/STANEXSH220-208L Total Nevastane XSH 220 Food Grade Gear Oil 208ltr 208 Litre TOTAL-N/STANEXSH220-20L Total Nevastane XSH 220 Food Grade Gear Oil 20ltr 20 Litre TOTAL-N/STANEXSH320-208L Total Nevastane XSH 320 Food Grade Gear Oil 208ltr 208 Litre TOTAL-N/STANEXSH320-20L Total Nevastane XSH 320 Food Grade Gear Oil 20ltr 20 Litre TOTAL-N/STANEXSH460-20L Total Nevastane XSH 460 Food Grade Gear Oil 20ltr 20 Litre nn Registered NSF H1 nn Free of any compound of animal origin nn GMO free nn Allergen free nn Manufactured in ISO 21469-certified plants nn Innovative packaging Safe and environmentally friendly They have made a commitment to safety, health and respect for the environment. Their RD teams integrate from the initial design stage of new products parameters conducive to the reduction of toxicity risks and VOC emissions, biodegradability, recycling or disposal of the products. High added value services We bring our expertise to help you to optimize the productivity of your machinery and improve your competitiveness. You benefit from our specialist knowledge and high-level after-sales services that include: rationalization and organization of lubrication operations, maintenance and laboratory analyses of the fluids in service, training of your personnel. Thousands of products available to order on ERIKS WEBSHOP SHOP.ERIKS.CO.UK SHOP.ERIKS .CO.UKSHOP .ERIKS.CO.UK
  • 248.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 240Lubricants and Site Safety Paint Solutions Food Grade Lubricants Our market-leading FOODLUBE® food grade products are widely recognised for their pioneering new technologies. FOODLUBE Extreme nn Extreme resistance to water wash-off nn Prevents wear and protects under high load conditions nn Anti-microbial additives protect grease from deterioration and odour nn Significantly extends bearing life nn NSF H1, ISO 21469, Halal and Kosher certified FOODLUBE Premier 1 nn Multi-purpose EP grease nn Highly resistant to water wash-off nn Outstanding corrosion protection nn Excellent oxidation stability increases service life of the grease, extending re-lubrication intervals nn NSF H1, ISO 21469, Halal and Kosher certified STAINLESS STEEL CLEANER Spray nn Effectively removes grease, grime and dirt nn Leaves clean, smear free, polished surface nn NSF A7 registered: used for non-food contact surfaces FOODLUBE Anti-Seize An advanced next-generation anti-seize grease designed specifically for the challenges of the food processing industry. It prevents galling and seizure of joints and fasteners in high temperature / humid environments and those with regular wash-down with chemical cleaning agents. nn Advanced non-drying formula holds lubricating agents in place to allow controlled assembly or disassembly of machinery over extended periods nn Consistent coefficient of friction makes allowances for minor variations in engineering tolerance: nn Increases precision of assembly for critical equipment nn Allows more accurate bolt tension; particularly important for pressurised and gasketed joints nn Optimised for use on stainless steel nn NSF H1, ISO 21469, Halal and Kosher certified Product Description Pack Volume/Weight ROC-FOODLUBE-EXT-18KG ROCOL FOODLUBE Extreme 18kg ROC-FOODLUBE-EXT-380G ROCOL FOODLUBE Extreme Shuttle Cartridge 380g ROC-FOODLUBE-EXT-4KG ROCOL FOODLUBE Extreme 4kg ROC-FOODLUBE-EXTSC-380G ROCOL FOODLUBE Extreme Shuttle Cartridge 380g ROC-FOODLUBE-PREM1-18KG ROCOL FOODLUBE Premier 1 18kg ROC-FOODLUBE-PREM1-380G ROCOL FOODLUBE Premier 1 380g ROC-FOODLUBE-PREM1-4KG ROCOL FOODLUBE Premier 1 4kg ROC-FOODLUBE-ANTISEIZE ROCOL FOODLUBE Anti-seize 500g ROC-SS-CLEANER-400ML ROCOL STAINLESS STEEL CLEANER Spray 400ml
  • 249.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 241 BIOGEN WIRESHIELD® ROCOL BIOGEN WIRESHIELD is a VGP compliant lubricant for wire ropes and ROV umbilicals, proven to excel in the most corrosive of atmospheres. nn Market leading corrosion protection ensures extended rope and umbilical life nn Extreme resistance to water wash off-reduces re-lubrication intervals nn Non-melting formulation; suitable for use in high temperature environments nn Environmentally Acceptable Lubricant (EAL) and Vessel General Permit (VGP) Compliant; can be used in US waters nn BIOGEN® range also includes fluid and spray BIOGEN TUFLUBE ROCOL BIOGEN TUFLUBE is an extreme heavy duty, biodegradable jacking and open gear grease. Designed to protect heavily loaded, slow moving mechanisms in the wettest and most corrosive conditions, it is the ideal lubricant for the protection of critical assets in the marine, offshore and freshwater environments. nn Extreme pressure: unique additive package protects against metal wear nn Extreme adhesion: blend of Hi-Tac boosters ensures staying power, even when submerged nn Extreme temperatures: ideal for use in the hottest and coldest climates nn HOCNF classification ‘E’: certified for use in the North Sea nn VGP compliant: can be used in US waters Product Description Pack Volume/Weight ROC-BIO-WIRESHIELD-160KG ROCOL BIOGEN WIRESHIELD 160kg ROC-BIO-WIRESHIELD-18KG ROCOL BIOGEN WIRESHIELD 18kg ROC-BIOGENTUFLUBE-18KG ROCOL BIOGEN TUFLUBE 18kg ROC-BIOGEN-SPRAY ROCOL BIOGEN Spray 400ml Product Description Pack Volume/Weight ROC-EASYLINE-BLUE-EDGE EASYLINE EDGE Aerosol Line Marking Paint 750ml Blue ROC-EASYLINE-EDGE-APP EASYLINE EDGE Applicator ROC-EASYLINE-EDGE-PLATES EASYLINE EDGE Spare Masking Plates 2 Sets ROC-EASYLINE-FLYEL-EDGE EASYLINE EDGE Aerosol Line Marking Paint 750ml Fl. Yellow ROC-EASYLINE-GREEN-EDGE EASYLINE EDGE Aerosol Line Marking Paint 750ml Green ROC-EASYLINE-GREY-EDGE EASYLINE EDGE Aerosol Line Marking Paint 750ml Grey ROC-EASYLINE-ORANGE-EDGE EASYLINE EDGE Aerosol Line Marking Paint 750ml Orange ROC-EASYLINE-RED-EDGE EASYLINE EDGE Aerosol Line Marking Paint 750ml Red ROC-EASYLINE-WHITE-EDGE EASYLINE EDGE Aerosol Line Marking Paint 750ml White ROC-EASYLINE-YELLOW-EDGE EASYLINE EDGE Aerosol Line Marking Paint 750ml Yellow Line Marking Paint EASYLINE® EDGE The world’s leading aerosol line marking system nn Simple and effective, with consistent results nn Unrivalled clean, sharp line edge definition with 3 line widths nn EASYLINE EDGE paint is touch dry in 10 minutes nn Easy to use, simple set up, ready to paint straight out of the box nn Intuitive applicator with adjustable height settings nn No need for contractors-professional quality line nn Durable, thick and long lasting coating nn Marks up to 100 meters with a 50mm line width* nn EASYLINE EDGE paint is UV stable- powerful colour even after 2000 hours nn Environmentally Safe nn Non-toxic, non-irritant and non-harmful to the environment** *May vary due to surface conditions ** Classified in accordance with Regulation EC No. 1272/2008
  • 250.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 242 AFreudenberg Group Company OKS High Perfomance Lubricants and Multi-Use Lubricants
  • 251.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 243 Tri-Flow Industrial Lubricants Tri-Flow Lubricant is ideal for preventive and corrective maintenance in industrial applications. Tri-Flow will keep equipment in service longer and reduce costly breakdowns caused by worn and grimy parts. Tri-Flow Industrial Lubricant, 200ml nn For general applications nn Formulated with PTFE nn High temperature range (-53°C to +246°C) nn Extends machinery service life Tri-Flow Industrial Lubricant 500ml nn For general applications nn Formulated with PTFE nn High temperature range (-53°C to +246°C) nn Improves machinery performance Tri-Flow Industrial Lubricant Precision Spray (NEW) 500ml nn For hard to reach applications nn Formulated with PTFE nn High temperature range (-53°C to +246°C) nn Reduces operating costs nn Protects against moisture and corrosion Tri-Flow Industrial Lubricant 4ltr nn For larger volume users nn Formulated with PTFE nn High temperature range (-53°C to +246°C) nn Ideal for use on closed system industrial machinery Part No Size TRIFLOW-200ML 200ML Part No Size TRIFLOW-500ML 500ML Part No Size TRIFLOW-PREC-500ML 500ML Part No Size TRIFLOW-4LTR 4LTR Also Available* Tri-Flow Lubricant Drip Bottle, 59ml nn For precision applications nn Formulated with PTFE nn High temperature range (-53C to +246C) nn Ideal for use on nuts, bolts, locks and hinges nn Penetrates inaccessible areas to displace contaminants Part No Size TRIFLOW-DRIP BOTTLE 20Z 59ML *available on extended lead time
  • 252.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 244 PositionSensors Kplus Sensor Constant correction factor Kplus sensors have the same sensing range for all types of metals. They are for example perfectly suited for the detection of aluminium, where conventional sensors show a considerably reduced sensing range. The high switching frequencies enable the monitoring of fast changing switching states. The resistant stainless steel sleeve allows reliable use in oil and coolant applications. The wide temperature range as well as the high protection ratings enable universal use of the new Kplus sensors. IFM Position Sensors M8 connector · 3 wire DC PNP · Output function normally open Type Total Sensing Installation Switching Current Part no. length range frequency load (mm) (mm) [Hz] [mA] M8 40 3 flush 2000 100 IFIES200 M8 40 6 non-flush 2000 100 IFIES201 M12 connector · 3 wire DC PNP Output function normally open Type Total Sensing Installation Switching Current Part no. length range frequency load (mm) (mm) [Hz] [mA] M12 45 4 flush 2000 100 IFIFS297 M12 45 8 non-flush 2000 100 IFIFS298 M12 45 10 non-flush 2000 100 IFIFS299 M12 60 4 flush 2000 100 IFIFS304 M12 60 8 non-flush 2000 100 IFIFS305 M12 60 10 non-flush 2000 100 IFIFS306 M18 45 8 flush 2000 100 IFIGS287 M18 45 12 non-flush 2000 100 IFIGS288 M18 45 15 non-flush 2000 100 IFIGS289 M18 60 8 flush 2000 100 IFIGS290 M18 60 12 non-flush 2000 100 IFIGS291 M18 60 15 non-flush 2000 100 IFIGS292 M30 45 15 flush 2000 100 IFIIS281 M30 60 15 flush 2000 100 IFIIS282 M30 60 22 non-flush 2000 100 IFIIS283 M30 60 30 non-flush 2000 100 IFIIS284 nn Uniform sensing range for the reliable detection of all metals nn Compact dimensions for use in the smallest of space nn Electromagnetic field immune sensor technology to prevent incorrect switching nn High-quality stainless steel housing nn High reliability thanks to protection rating from IP 65 / IP 69KK Further technical data Operating voltage [V DC] 10...30 Reverse polarity protection • Short-circuit protection • Overload protection • Protection IP 65 / IP 66 / IP 67 / IP 68 / IP 69K Protection class III Ambient temperature [°C] -40...85 Housing materials sensing face High-grade stainless steel (316L) sensing face LCP Switching status indication [LED] yellow (4 x 90°)
  • 253.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 245 Electromagnetic field immune Kplus sensors Use in harsh welding applications The inductive Kplus sensors withstand harsh operating conditions and reliably detect metal objects even in case of soiling. The sensor housing and the fixing nuts have a non-stick coating to prevent sticking of weld slag. Strong magnetic fields occur in welding processes. The new sensor technology prevents incorrect switching. The quick connection with the connector and matching cable from the ecolink range is the ideal basis for permanent use M8 connector · 3 wire DC PNP · Output function normally open · stainless steel (316L) anti-spatter Type Total Sensing Installation Switching Current Part no. length range frequency load (mm) (mm) [Hz] [mA] M8 40 3 flush 2000 100 IFIEW200 M8 40 6 non flush 2000 100 IFIEW20 M12 connector · 3 wire DC PNP · Output function normally open · brass anti-spatter Type Total Sensing Installation Switching Current Part no. length range frequency load (mm) (mm) [Hz] [mA] M12 65 4 flush 2000 100 IFIFW204 M18 65 8 flush 2000 100 IFIGW202 M30 65 15 flush 2000 100 IFIIW202 nn Uniform sensing range for the reliable detection of all metals nn Robust design with non-stick coating nn Electromagnetic field immune sensor technology to prevent incorrect switching nn Wide temperature range for universal use nn High protection ratings up to IP 68 / IP 69K Further technical data Operating voltage [V DC] 10...30 Current consumption [mA] 20 Reverse polarity protection • Short-circuit protection • Overload protection • Protection IP 65 / IP 66 / IP 67 / IP 68 / IP 69K Protection class II Ambient temperature [°C] -40...85 Housing materials sensing face LCP Switching status indication [LED] yellow (4 x 90°)
  • 254.
    Specialist Technical Centres Know-How Tools,Safety MAintenance 246 PartNo LEDL7298 LEDL7297 non-rechargeable Part No LED9407 Part No LEDL8404 Part No LEDL9405R Part No LEDL9802QCTP Torches and Headlamps Ledlenser® P7.2 This best-selling medium-sized LED torch is made from uncompromisingly tough, aircraft-grade aluminium for protection against knocks and shocks, It weighs 175g and measures 130mm in length. Delivers up to 320 lumens brightness, a maximum beam distance of 260 metres and as long as 50 hours burn time. nn Advanced Focus System™ Optics nn Speed Focus™ enables smooth single-handed beam focusing nn Corrosion resistant gold plated contacts for better conductivity nn Dynamic Switch™ Ledlenser® P5R.2 - Rechargeable A small, slimline LED hand torch with a durable aluminium body and a high-end CREE LED generating 270 lumens of bright white light for up to 240 metres. nn Recalibrated lens for wide light beam angle nn Robust, yet lightweight aircraft-grade aluminium housing nn Corrosion resistant gold plated contacts for better conductivity nn Smart Light Technology™ - choose from Power, Low Power and Defence Strobe Ledlenser® SEO3 This stylish LED head torch makes light work of any hands-free illumination task, providing superior comfort and excellent light distribution for the user. nn Advanced Focus System™ Optics nn Three Smart Light Technology light functions – Power, Low Power, Signal nn White CREE LED + glare-free red LED for night vision Ledlenser® T2QC This clever T7QC hand torch offers instant white, red, green or blue light from a single multi-coloured CREE Power LED light chip. A prismatic diffuser inside the lens helps optimise light distribution across all colours up to 140 lumens brightness. nn Four colours: white, red (night vision technology and stop signal), green (go signal) and blue (crack detection) nn Prismatic diffuser for optimum light and colour performance nn Quick flick changes light colour instantly nn Fixed focus beam nn Durable metal body Ledlenser® H7R.2 - Rechargeable Up to 300 lumen output on Boost mode combined with up to 60 hours burn time on Low Power (20 lumens), makes this a seriously versatile hands-free lighting companion for any environment. nn Rechargeable Head Lamp packed full of smart technologies and outstanding optics nn Multi-function Dynamic ‘wheel’ switch nn Rear safety light – either red or blinking options Ledlenser® P4BM This slim, metal-bodied pen torch is frequently used by engineers, mechanics and technicians, who like to have on hand a top quality inspection instrument that can throw light into narrow or inaccessible areas. nn Blue Moon Focus System™ delivers a brighter, whiter beam nn Speed Focus™ enables smooth single-handed beam focusing nn Superior rear tail cap switch Part No Colour LEDL6103 Orange LEDL6104 Green Torches and Headlamps
  • 255.
    Visit us ateriks-techdirect.co.uk Tools,Safety Maintenance 247 VARIABOX CEENORM VARIABOX One for all: the VARIABOX meets all requirements for a modern distributor housing and can be individually configured in five different sizes. With versions S, M, L, XL and XXL, as surface-mounting or mobile combination, we always have the right distributor for your needs nn Housing made of high-grade, impact-resistant plastic nn Top and bottom can be sealed together nn Modular expansion on all 4 sides nn Fuse elements arranged below transparent, lockable operating window with userfriendly OTC mechanism (one touch close) nn All CEE sockets with screwless, maintenance free QUICK-CONNECT technology nn The mounting dimension of the panel mounting socket outlets is not manufacturer-specific (standard dimension)
  • 256.
  • 257.
    Visit us atwww.eriks.co.uk 249Index Ball Busings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Bearing Fitting Tools. . . . . . . . . . . . . . . . . . . . . . . 29 Condition monitoring. . . . . . . . . . . . . . . 27-28, 32 Cylindrical Roller Bearings. . . . . . . . . . . . . . . . . . 18 Deep Groove Ball Bearings. . . . . . . . . . . . . . . . . . 6 Housed Units. . . . . . . . . . . . . . . . . . . . . . . . . . 12-13 Housings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Linear Bearings. . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Linear Motion and Actuation. . . . . . . . . . . . . . . . . 8 Lubricators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Needle Roller Bearings. . . . . . . . . . . . . . . . . . . . . 25 Radial Ball Bearings. . . . . . . . . . . . . . . . . . . . . . . . 10 Rotary Bearings. . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Self-Lube® Bearings. . . . . . . . . . . . . . . . . . . . . . 22 SNT Split Plummer Blocks. . . . . . . . . . . . . . . . . 11 Spherical Roller Bearings . . . . . . . . . . . . . . . . . 4-5 Split Roller Bearings. . . . . . . . . . . . . . . . . . . . . . . . 9 Super Precision Bearings. . . . . . . . . . . . . . .19-21 Tapered Roller Bearings. . . . . . . . . . . . . . . . . . . . 14 Test and Measurement Tools. . . . . . . . . . . 29-31 Y-Bearings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Pneumatics. . . . . . . . . . . . . . . . 82-98 Air Preparation. . . . . . . . . . . . . . . . . . . . . . . . . 86-87 Compact Cylinders. . . . . . . . . . . . . . . . . . . . . . . . . 83 Cylinders and Actuators. . . . . . . . . . . . . . . . . . . . 93 Push-in Fittings. . . . . . . . . . . . . . . . . . . . . . . . 84-85 Safety Valves. . . . . . . . . . . . . . . . . . . . . . . . . . 96-97 Suction Cups. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95 Vacuum Pumps. . . . . . . . . . . . . . . . . . . . . . . . . . . . 98 Valves. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88-91 Hydraulics. . . . . . . . . . . . . . . . 99-122 Adaptors. . . . . . . . . . . . . . . . . . . . . . . . . . . . 109-110 Ball Valves. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114 Bladder Accumulators. . . . . . . . . . . . . . . . . . . . 115 Components and Fittings. . . . . . . . . . . . 106-108 EMB Fittings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108 High Pressure Hoses and Couplings. 103-104 Hose Assemblies and Components. . . . . . . 105 Hydraulic Accessories. . . . . . . . . . . . . . . 111-112 Hydraulic Valves and Cylinders. . . . . . 116-119 Hydraulics Course. . . . . . . . . . . . . . . . . . . . . . . .100 Lifeguard Sleeves. . . . . . . . . . . . . . . . . . . . . . . . 101 Oil Transfer Units. . . . . . . . . . . . . . . . . . . . . . . . 113 Repair, Replace Solutions. . . . . . . . . . . 120-122 Self Assembly Starter Kits. . . . . . . . . . . . . . . . 102 Filtration . . . . . . . . . . . . . . . 123-134 Filtration Solutions. . . . . . . . . . . . . . . . . . . . . . . 133 Fluid Filters. . . . . . . . . . . . . . . . . . . . . . . . . 124-125 Fluid Level Gauges. . . . . . . . . . . . . . . . . . 130-131 Panel and Bag Filter. . . . . . . . . . . . . . . . 128-129 Water Filters. . . . . . . . . . . . . . . . . . . . . . . . 125-126 Fluid Filters. . . . . . . . . . . . . . . . . . . . . . . . . 122-123 Oil Cleanliness. . . . . . . . . . . . . . . . . . . . . . . . . . . 130 Panel Bag Filters. . . . . . . . . . . . . . . . . 126-127 Water Filters. . . . . . . . . . . . . . . . . . . . . . . . 124-125 Industrial Hose . . . . . . . . . 135-146 Camlocks and Bellows. . . . . . . . . . . . . . 140-141 Chemical and Pharmaceutical Hose. . . . . . 145 Commodity Hose and Clips. . . . . . . . . . 136-137 Food and Beverage Hose. . . . . . . . . . . . . . . . 144 Industrial Hose Reels and Cable Reels. . . . 146 Metal Hose. . . . . . . . . . . . . . . . . . . . . . . . . 138-139 Rubber Hose. . . . . . . . . . . . . . . . . . . . . . . . . . . . 142 Steam Hose. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 143 Fluid Power Pg 79-146 Bearings Pg 1-32 Power Transmission Pg 33-78 Adapter Chain. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 Chain Accessories. . . . . . . . . . . . . . . . . . . . . . . . . 64 Classic Vee Belts. . . . . . . . . . . . . . . . . . . . . . . . . . 36 Couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52-55 Drives and Rollers. . . . . . . . . . . . . . . . . . . . . . 66-67 Electric Motors. . . . . . . . . . . . . . . . . . . . . 65, 68-69 Emergency Belts. . . . . . . . . . . . . . . . . . . . . . . 38-39 Gearboxes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75-77 High Performance Wedge Belts. . . . . . . . . . . . 37 Inverters. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71-73 Performance Special Chain. . . . . . . . . . . . . 60-63 Pulleys. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46-47 Ribbed Belts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 Roller Chain and Sprockets. . . . . . . . . . . . . 56-57 Shaft Fixings. . . . . . . . . . . . . . . . . . . . . . . . . . . 49-51 Speed Reducer. . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 Tensioners. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 Timing Belts. . . . . . . . . . . . . . . . . . . . . . . 44-45, 48 Total Cost of Ownership. . . . . . . . . . . . . . . . . . . . 70 Vibration Solutions. . . . . . . . . . . . . . . . . . . . . . . . . 78 Wedge Belts. . . . . . . . . . . . . . . . . . . . . . . . . . . 40-41 Thousands of products available to order on ERIKS WEBSHOP SHOP.ERIKS.CO.UK SHOP.ERIKS .CO.UKSHOP .ERIKS.CO.UK
  • 258.
    Specialist Technical Centres Know-How 250 Adhesives. . . . . . . . . . . . . . . . . . . . . . . . . . 208-209 Gloves. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 216-219 Line Marking. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 241 Live Centres, Chucks Vices. . . . . . . . . . . . 228 Lock Boxes and Labelling. . . . . . . . . . . 220-221 Lubricants. . . . . . . . . . . . . . . . . . . . . . . . . . 229-243 Metal Cutting Tools. . . . . . . . . . . . . . . . . 222-225 Non-Sparking Tools. . . . . . . . . . . . . . . . . . . . . . 210 Position Sensors. . . . . . . . . . . . . . . . . . . . 244-245 Respiratory. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 213 Safety Eyewear. . . . . . . . . . . . . . . . . . . . . . . . . . 212 Safety Footwear. . . . . . . . . . . . . . . . . . . . . . . . . 211 Spill Control. . . . . . . . . . . . . . . . . . . . . . . . . 214-215 Storage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 206-207 Torches. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 246 Torque Wrenches. . . . . . . . . . . . . . . . . . . 226-227 Variabox. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247 Wiping Products. . . . . . . . . . . . . . . . . . . . 204-205 Tools, Safety Maintenance pg 201-248 Sealing Polymer pg 147-170 Sealing Technology. . . . . 147-161 Bonded Washer Seals. . . . . . . . . . . . . . . . . . . . 154 Circlips. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156 Clamp Seals. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151 Component Mechanical Seals. . . . . . . 160-161 Elastomeric Rotary Lip Seals. . . . . . . . . . . . . 155 Hydraulic Seals. . . . . . . . . . . . . . . . . . . . . 157-159 O-rings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150-153 Shaft Sleeves. . . . . . . . . . . . . . . . . . . . . . . . . . . . 155 V-Rings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156 Gasket Technology. . . . . . 162-169 Elastograph Gaskets. . . . . . . . . . . . . . . . . . . . . 168 EPDM Cut Flange Gaskets. . . . . . . . . . . . . . . 165 Gasket Sheeting. . . . . . . . . . . . . . . . . . . . 162-163 Gland Packings. . . . . . . . . . . . . . . . . . . . . . . . . . 169 Graphite Gaskets. . . . . . . . . . . . . . . . . . . . . . . . 168 Ring Type Joints. . . . . . . . . . . . . . . . . . . . . . . . . 167 Soft Cut Flange Gaskets. . . . . . . . . . . . . . . . . 164 Spiral Wound Gaskets. . . . . . . . . . . . . . . . . . . . 166 Index Valves. . . . . . . . . . . . . . . . . . 172-177 Ball Valves. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175 Butterfly Valves. . . . . . . . . . . . . . . . . . . . . . . . . . 177 Econ® Partner Brands. . . . . . . . . . . . . . . . . 174 Gate, Globe and Check Valves. . . . . . . . . . . . 176 Knife Gate Valves. . . . . . . . . . . . . . . . . . . . . . . . 177 Pumps. . . . . . . . . . . . . . . . . 177-200 Cavity Pumps. . . . . . . . . . . . . . . . . . . . . . . . . . . . 199 Coolant Pumps. . . . . . . . . . . . . . . . . . . . . . . . . . 197 Diaphragm Pumps. . . . . . . . . . . . . . . . . . 184-185 DOC 3 Pumps. . . . . . . . . . . . . . . . . . . . . . . . . . . 198 End Suction Pumps. . . . . . . . . . . . . . . . . . . . . . 183 Gorman-Rupp Pumps. . . . . . . . . . . . . . . . . . . . 189 Grundfos Pumps. . . . . . . . . . . . . . . . . . . . 186-187 Hose Pumps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195 Hydra-cell Pumps. . . . . . . . . . . . . . . . . . . 192-193 Hygienic Rotary Lobe Pumps. . . . . . . . 181, 194 Munsch Chemical Pumps. . . . . . . . . . . . . . . . .188 Petrol Driven Pumps. . . . . . . . . . . . . . . . . . . . . 196 Submersible Pumps. . . . . . . . . . . . . . . . . 190-191 Wobble Pumps. . . . . . . . . . . . . . . . . . . . . . . . . . . 198 Flow Technology pg 171-200
  • 259.
    Visit us atwww.eriks.co.uk 251
  • 260.
    order online SHOP.ERIKS.CO.UK call0845 006 6000 CallLocal08450066000Issue15 Product Service Know-How 0845 006 6000 Issue15 Your quick guide to our PRODUCTS SERVICES Tools, Safety Maintenance Flow Control Sealing Polymer Fluid Power, Transfer Control Power Transmission Bearings TechDirect