This document provides production capacity, machinery requirements, and financial analysis for 3 product lines (skived & burnished, components, and cut length tubes) of a manufacturing company from FY20 to FY23. Key details include:
- Total planned production capacity in FY23 is 19,000 MT with the largest from cut length tubes at 8,300 MT.
- Common resources include lathes, welding robots, overhead cranes, and testing equipment. There are also 5 white collar and 11 blue collar employees.
- Financial analysis shows actual sales and production volumes in FY23 were lower than planned, resulting in a net loss. Production volume variances contributed positively to the variance in raw material