This document discusses surgical strikes as a type of military operation. It defines a surgical strike as a pre-emptive attack on a specific target aimed at neutralizing the enemy with minimal collateral damage. Surgical strikes can be carried out via air strikes, airdropping special forces teams, or swift ground operations. Major requirements include accurate intelligence on targets. Examples of major surgical strikes given are the 2015 Indian Army operation against Naga militants in Myanmar, the 2011 US operation to kill Osama bin Laden in Pakistan, and the 2016 Indian Army strikes on terrorist launch pads in Pakistan-occupied Kashmir.