A durable false ceiling is a result of two things: 1) good material 2) good installation.
We often select the right material, but many times, the installation is flawed, leading to sub-optimal results.
Here are tips from the false ceiling major - Armstrong. on how to correctly install the false ceiling?
CoFold is the ultimate in exterior folding systems and opens up a wealth of new design possibilities.
The CoFold System has been designed to maximise the flexibility of a room’s living space, removing barriers and enabling the user to have an indoor/outdoor experience by fully opening up exterior walls.
The system which operates with effortless ease combines the benefits of folding doors with the ability to keep out the weather with no corrosion worries. This modern, contemporary feature will increase available living space whilst allowing natural light to envelop the room.
System Capacity
Maximum leaf height - 3300mm
Maximum leaf weight - 100kg
Maximum leaf width - 1000mm
Leaf thickness - 35-68mm*
* For thicker or thinner doors please contact Coastal Technical Team
For doors between 35-47mm use an alternative flush bolt
Applications
Residential and commercial timber exterior folding applications
Specially suited to coastal environments made from 316 stainless steel.
End folding timber doors folding to one or both sides
Standard folding configuration features doors folding outward.
Inward folding doors can be used where the doors are not directly
exposed to the weather.
Premium security features
Recognised weather resistance
The folding unit is not hinged to post, but is pivoted in the track and floor. All door leaves are of equal width. A swing leaf can be included by incorporating an odd number of leaves. For full weather protection, doors, frame and track should incorporate the seals provided in the CoFold range.
Cill and frame construction should be in accordance with the CoFold fixing instructions. Intermediate hangers and hinges are non rebated.
www.coastal-group.com
CoFold is the ultimate in exterior folding systems and opens up a wealth of new design possibilities.
The CoFold System has been designed to maximise the flexibility of a room’s living space, removing barriers and enabling the user to have an indoor/outdoor experience by fully opening up exterior walls.
The system which operates with effortless ease combines the benefits of folding doors with the ability to keep out the weather with no corrosion worries. This modern, contemporary feature will increase available living space whilst allowing natural light to envelop the room.
System Capacity
Maximum leaf height - 3300mm
Maximum leaf weight - 100kg
Maximum leaf width - 1000mm
Leaf thickness - 35-68mm*
* For thicker or thinner doors please contact Coastal Technical Team
For doors between 35-47mm use an alternative flush bolt
Applications
Residential and commercial timber exterior folding applications
Specially suited to coastal environments made from 316 stainless steel.
End folding timber doors folding to one or both sides
Standard folding configuration features doors folding outward.
Inward folding doors can be used where the doors are not directly
exposed to the weather.
Premium security features
Recognised weather resistance
The folding unit is not hinged to post, but is pivoted in the track and floor. All door leaves are of equal width. A swing leaf can be included by incorporating an odd number of leaves. For full weather protection, doors, frame and track should incorporate the seals provided in the CoFold range.
Cill and frame construction should be in accordance with the CoFold fixing instructions. Intermediate hangers and hinges are non rebated.
www.coastal-group.com
This document provides engineering services for facade work on a building located at 250 5th Avenue in New York City. It includes drawings and details for aluminum curtain walls, doors, windows, and slab covers. The drawings depict section details and dimensions for these facade elements. Skyline Facades, located in Greece, prepared the drawings from 2017-2018 for this project.
1) The document provides information on various facade engineering systems developed by Skyline Facades including curtain wall, window, door, and cladding systems.
2) Sections, details and specifications are presented for systems such as the Alkyonis curtain wall, casement window, and lift and slide systems.
3) Information is also given on unitized curtain walls, sliding systems, folding doors, and aluminum composite panel cladding systems suitable for facades.
The document provides details about the proposed redevelopment of a Co-Operative Stores building located at St Andrew's Street in Newcastle Upon Tyne. It includes information about the existing building such as its grade listing, location coordinates, and surrounding context. Floor plans and elevations of the existing building are shown along with proposed details for new internal partitions, doors, windows and facade materials.
Specification of Automatic MS Rolling ShutterTricecomp
General Technical Specification of Automatic MS Rolling Shutter
Curtain the lath sections shall be from 18 gauge (1.25 mm) section with 78mm profile height for curtains the lath section shall be rolled so as to have interlocking curls at both edges and A deep corrugation at the centre with A bridge depth of 16 mm to provide sufficient curtain stiffness for resisting manual pressure and normal wind pressure. Each lath section shall be continuous single piece without any welded joint. When interlocked, the lath section shall have A distance of 75 mm between rolling centres. Each alternate lath section shall be fitted with A malleable cast iron or mild steel clips securely riveted at either end, thus locking the lath section at both ends and preventing lateral movement of the individual lath sections.
Bottom the clips shall be so designed as to fit the contour of the lath sections. The bottom of the rolling shutter, shall be composed of A mild steel plate 3.15 mm thick, reinforced with mild steel angle 35 X 35 X 5 mm at bottom of the plate.
Guide channels these shall be of mild steel deep channel section of rolled, pressed or built up (fabricated) construction. The thickness of the sheet used shall not be less than 3.15 mm. The depth of the guide should be such that there is sufficient clearance between curtain and inner surface of guide. The shutter curtain shall project into the guide at least 40 mm for rolling shutters up to 3.5 M width and 60 mm for greater widths. There shall be A clearance of 10 mm between guide wall and the end clips of the curtain.
Roller the suspension shaft of the roller shall be made of steel pipe conforming to heavy duty of is: 1161. The diameter shall be sufficient to limit deflection of shaft under the weight of the rolling shutter. The deflection of the shaft shall not exceed 5 mm per meter width of the rolling shutter. Diameters of the steel pipe shall be suitably selected and shall be as per IS: 6248. Sizing of pipe diameter for greater widths and heights shall be designed giving due consideration for deflection limit mentioned above. The pipes of the suspension shaft which are clamped to the brackets shall be fitted
Operated drive these shall be motorised operated by an electric motor operating on 400/440V3 phase 50 cycles A.C. Supply with side one operated drive unit with direct drive option, this unit shall be in accordance to the plug-on drive unit system, power supply wired with industrial plug, push button integrated in the housing lid safety mechanism it should have provision for an integrated safety brake and double circuit limit switch which comply with the control switch shall have provision for three station push button with remote control and mobile control feature which allows shutter to move as long as the operating button is being pressed. The motor shall have A push button control, with A minimum of 3 buttons marked “up”, “down” and “stop”. Limit switches
The document contains plans and specifications for the ground floor of a proposed leisure centre. It includes a ground floor plan showing the layout and dimensions of the various spaces including a 25m pool, leisure pool, sports hall, changing village, reception area and squash courts. It also includes a door schedule listing the doors on the ground floor along with general notes specifying building regulations and standards to be followed for construction including fire resistance ratings for structural elements.
A durable false ceiling is a result of two things: 1) good material 2) good installation.
We often select the right material, but many times, the installation is flawed, leading to sub-optimal results.
Here are tips from the false ceiling major - Armstrong. on how to correctly install the false ceiling?
CoFold is the ultimate in exterior folding systems and opens up a wealth of new design possibilities.
The CoFold System has been designed to maximise the flexibility of a room’s living space, removing barriers and enabling the user to have an indoor/outdoor experience by fully opening up exterior walls.
The system which operates with effortless ease combines the benefits of folding doors with the ability to keep out the weather with no corrosion worries. This modern, contemporary feature will increase available living space whilst allowing natural light to envelop the room.
System Capacity
Maximum leaf height - 3300mm
Maximum leaf weight - 100kg
Maximum leaf width - 1000mm
Leaf thickness - 35-68mm*
* For thicker or thinner doors please contact Coastal Technical Team
For doors between 35-47mm use an alternative flush bolt
Applications
Residential and commercial timber exterior folding applications
Specially suited to coastal environments made from 316 stainless steel.
End folding timber doors folding to one or both sides
Standard folding configuration features doors folding outward.
Inward folding doors can be used where the doors are not directly
exposed to the weather.
Premium security features
Recognised weather resistance
The folding unit is not hinged to post, but is pivoted in the track and floor. All door leaves are of equal width. A swing leaf can be included by incorporating an odd number of leaves. For full weather protection, doors, frame and track should incorporate the seals provided in the CoFold range.
Cill and frame construction should be in accordance with the CoFold fixing instructions. Intermediate hangers and hinges are non rebated.
www.coastal-group.com
CoFold is the ultimate in exterior folding systems and opens up a wealth of new design possibilities.
The CoFold System has been designed to maximise the flexibility of a room’s living space, removing barriers and enabling the user to have an indoor/outdoor experience by fully opening up exterior walls.
The system which operates with effortless ease combines the benefits of folding doors with the ability to keep out the weather with no corrosion worries. This modern, contemporary feature will increase available living space whilst allowing natural light to envelop the room.
System Capacity
Maximum leaf height - 3300mm
Maximum leaf weight - 100kg
Maximum leaf width - 1000mm
Leaf thickness - 35-68mm*
* For thicker or thinner doors please contact Coastal Technical Team
For doors between 35-47mm use an alternative flush bolt
Applications
Residential and commercial timber exterior folding applications
Specially suited to coastal environments made from 316 stainless steel.
End folding timber doors folding to one or both sides
Standard folding configuration features doors folding outward.
Inward folding doors can be used where the doors are not directly
exposed to the weather.
Premium security features
Recognised weather resistance
The folding unit is not hinged to post, but is pivoted in the track and floor. All door leaves are of equal width. A swing leaf can be included by incorporating an odd number of leaves. For full weather protection, doors, frame and track should incorporate the seals provided in the CoFold range.
Cill and frame construction should be in accordance with the CoFold fixing instructions. Intermediate hangers and hinges are non rebated.
www.coastal-group.com
This document provides engineering services for facade work on a building located at 250 5th Avenue in New York City. It includes drawings and details for aluminum curtain walls, doors, windows, and slab covers. The drawings depict section details and dimensions for these facade elements. Skyline Facades, located in Greece, prepared the drawings from 2017-2018 for this project.
1) The document provides information on various facade engineering systems developed by Skyline Facades including curtain wall, window, door, and cladding systems.
2) Sections, details and specifications are presented for systems such as the Alkyonis curtain wall, casement window, and lift and slide systems.
3) Information is also given on unitized curtain walls, sliding systems, folding doors, and aluminum composite panel cladding systems suitable for facades.
The document provides details about the proposed redevelopment of a Co-Operative Stores building located at St Andrew's Street in Newcastle Upon Tyne. It includes information about the existing building such as its grade listing, location coordinates, and surrounding context. Floor plans and elevations of the existing building are shown along with proposed details for new internal partitions, doors, windows and facade materials.
Specification of Automatic MS Rolling ShutterTricecomp
General Technical Specification of Automatic MS Rolling Shutter
Curtain the lath sections shall be from 18 gauge (1.25 mm) section with 78mm profile height for curtains the lath section shall be rolled so as to have interlocking curls at both edges and A deep corrugation at the centre with A bridge depth of 16 mm to provide sufficient curtain stiffness for resisting manual pressure and normal wind pressure. Each lath section shall be continuous single piece without any welded joint. When interlocked, the lath section shall have A distance of 75 mm between rolling centres. Each alternate lath section shall be fitted with A malleable cast iron or mild steel clips securely riveted at either end, thus locking the lath section at both ends and preventing lateral movement of the individual lath sections.
Bottom the clips shall be so designed as to fit the contour of the lath sections. The bottom of the rolling shutter, shall be composed of A mild steel plate 3.15 mm thick, reinforced with mild steel angle 35 X 35 X 5 mm at bottom of the plate.
Guide channels these shall be of mild steel deep channel section of rolled, pressed or built up (fabricated) construction. The thickness of the sheet used shall not be less than 3.15 mm. The depth of the guide should be such that there is sufficient clearance between curtain and inner surface of guide. The shutter curtain shall project into the guide at least 40 mm for rolling shutters up to 3.5 M width and 60 mm for greater widths. There shall be A clearance of 10 mm between guide wall and the end clips of the curtain.
Roller the suspension shaft of the roller shall be made of steel pipe conforming to heavy duty of is: 1161. The diameter shall be sufficient to limit deflection of shaft under the weight of the rolling shutter. The deflection of the shaft shall not exceed 5 mm per meter width of the rolling shutter. Diameters of the steel pipe shall be suitably selected and shall be as per IS: 6248. Sizing of pipe diameter for greater widths and heights shall be designed giving due consideration for deflection limit mentioned above. The pipes of the suspension shaft which are clamped to the brackets shall be fitted
Operated drive these shall be motorised operated by an electric motor operating on 400/440V3 phase 50 cycles A.C. Supply with side one operated drive unit with direct drive option, this unit shall be in accordance to the plug-on drive unit system, power supply wired with industrial plug, push button integrated in the housing lid safety mechanism it should have provision for an integrated safety brake and double circuit limit switch which comply with the control switch shall have provision for three station push button with remote control and mobile control feature which allows shutter to move as long as the operating button is being pressed. The motor shall have A push button control, with A minimum of 3 buttons marked “up”, “down” and “stop”. Limit switches
The document contains plans and specifications for the ground floor of a proposed leisure centre. It includes a ground floor plan showing the layout and dimensions of the various spaces including a 25m pool, leisure pool, sports hall, changing village, reception area and squash courts. It also includes a door schedule listing the doors on the ground floor along with general notes specifying building regulations and standards to be followed for construction including fire resistance ratings for structural elements.
This document contains floor plans, elevations, sections and specifications for a proposed school building. The ground floor plan, first floor plan and roof level plan are included along with external elevations, section views and general arrangement drawings. Specifications are provided for the primary structure, foundations, floor and wall builds, windows, doors, solar shading, aircool ventilators and fire ratings. Dimensions are in mm and notes provide information on compliance with building regulations and standards.
The document contains plans and schedules for the construction of an office building including a reception area, boardroom, toilet, and kitchenette. It includes a site plan at a scale of 1:200, construction plan at 1:50, furniture plan at 1:50, and schedules for walls and floors, plumbing fixtures, and furniture. The plans show the layout of the spaces and basic dimensions. The schedules provide information on materials and suppliers for walls, floors, plumbing fixtures, and furniture to be used in the building.
Restoration, extension and upgradation of protected structuresEdel Fox
This document contains information about an existing building including floor plans, elevations, and specifications. It includes:
1. Floor plans of 3 levels that show room layouts and dimensions. There are 14 rooms totaling 1,842 square meters.
2. Elevations of the building showing existing structural elements like concrete beams and columns, brick walls, and fire escapes.
3. A schedule listing the 14 rooms with details on level, area, and quantity.
4. Specifications for existing construction materials and elements including walls, roof, floors, windows and proposed upgrades to improve insulation and waterproofing.
5. Principles of conservation to be followed for any restoration work to the protected
This document contains details and drawings for the Salim Publishing House project completed by Mark Thornton for his third year of Architectural Technology studies. The project involved adapting a four-storey office building located in South Korea to accommodate retail units on the ground floor and open office spaces on the upper floors, ensuring it complied with Irish building regulations. Drawings include floor plans, elevations, sections and construction detail drawings.
The document contains plans and details for a timber roof structure designed by Aaron Kaira. It includes a roof structure plan showing timber rafters and purlins, and sections detailing connections. Rafters are 250x50mm timber at 1200mm centers. Purlins are 75x50mm timber at 1200mm centers. Prefabricated box beams are used to support the rafters. The roof is covered with 0.5mm galvanized steel sheeting over rigid board insulation.
This document provides details for a kitchen renovation project including contact information for John Zierke of Cliq Studios. It then lists cabinetry and appliances to be included in the renovation along with their specifications. Dimensions for the layout and individual components are provided in inches. Notes specify that decorative doors will be applied on site and include additional information for certain items.
1. The document contains plans for 3 apartments in a new development called Hudson Close Apartments. It includes a ground floor plan showing the layout of the apartments, common areas, and details.
2. The plans show the layout of the individual apartments including bedrooms, bathrooms, kitchens, and living areas. Common areas on the ground floor include a hallway and stairwell.
3. Technical specifications are provided for the building materials and construction methods to be used, including the foundations, flooring, walls, roof, ventilation, and other details.
La fuente de alimentación convierte la corriente alterna de la red eléctrica en una corriente continua de baja tensión que usa la computadora. Las fuentes ATX son más seguras que las AT porque se apagan cuando la placa madre y el sistema operativo lo deciden, no solo al presionar un botón. La fuente de alimentación provee energía a discos duros, unidades ópticas, tarjetas de video y sistemas de refrigeración a través de conectores macho y hembra.
Es un software de administración de proyectos diseñado, desarrollado y comercializado por Microsoft para asistir a administradores de proyectos en el desarrollo de planes, asignación de recursos a tareas, dar seguimiento al progreso, administrar presupuesto y analizar cargas de trabajo.
This document defines and describes different types of computer networks. It discusses client-server networks where servers provide services to clients. It also covers personal area networks (PANs), local area networks (LANs), metropolitan area networks (MANs), and wide area networks (WANs). The document outlines common network topologies like bus, star, ring, mesh, and tree configurations. It also defines the roles of network elements like workstations, repeaters, bridges, hubs, and routers. Finally, it discusses the purposes of computer networks which include sharing information and resources while improving transmission speeds and reducing costs.
Este documento presenta un informe sobre redes computacionales realizado por Diego Erazo para Mario Fernando Cabrera en el Centro Internacional de Producción Limpia-LOPE en San Lorenzo, Narino, Colombia en 2015-2016. Explica la historia de las redes informáticas, define diferentes tipos de redes como LAN, MAN, PAN y WAN, y describe sus características, ventajas, desventajas, componentes y alcance.
Learning and development involves changing employee behavior through training and experience. It makes a major contribution to organizational objectives and should be integrated with business and HR strategies. The learning and development process includes analysis, design, development, implementation, and evaluation. Creating a learning culture involves developing a shared vision, empowering employees, providing learning resources and feedback, and having managers act as role models.
The princess feels frustrated by expectations placed on her and goes into the woods. She realizes she desires power and doesn't need a kingdom to feel powerful. After defeating the prince, she becomes corrupted by the power she gains and takes his place on the throne, showing power can corrupt regardless of gender.
El documento provee una introducción al modelo TCP/IP, incluyendo una breve historia de su desarrollo, una explicación de qué es TCP/IP y cómo funciona, una descripción de los protocolos TCP e IP, y un resumen de la nueva versión IPv6. TCP/IP fue desarrollado en 1973 por Vinton Cerf y Robert Kahn y consiste en un conjunto de protocolos que permiten la comunicación entre ordenadores conectados a Internet. IPv6 revisa el formato de datagramas e introduce direcciones más largas para abordar limitaciones de IPv4.
El documento explica los conceptos básicos de una escena en el guion literario, incluyendo los cuatro elementos de la estructura dramática (personajes, acciones, lugares y tiempo), y cómo una escena cambia cuando varía cualquiera de estos elementos. También describe cómo se escribe una escena en el formato de guion, incluyendo indicaciones como INT/EXT, nombres de personajes en mayúsculas, diálogos y acotaciones.
This document contains floor plans, elevations, sections and specifications for a proposed school building. The ground floor plan, first floor plan and roof level plan are included along with external elevations, section views and general arrangement drawings. Specifications are provided for the primary structure, foundations, floor and wall builds, windows, doors, solar shading, aircool ventilators and fire ratings. Dimensions are in mm and notes provide information on compliance with building regulations and standards.
The document contains plans and schedules for the construction of an office building including a reception area, boardroom, toilet, and kitchenette. It includes a site plan at a scale of 1:200, construction plan at 1:50, furniture plan at 1:50, and schedules for walls and floors, plumbing fixtures, and furniture. The plans show the layout of the spaces and basic dimensions. The schedules provide information on materials and suppliers for walls, floors, plumbing fixtures, and furniture to be used in the building.
Restoration, extension and upgradation of protected structuresEdel Fox
This document contains information about an existing building including floor plans, elevations, and specifications. It includes:
1. Floor plans of 3 levels that show room layouts and dimensions. There are 14 rooms totaling 1,842 square meters.
2. Elevations of the building showing existing structural elements like concrete beams and columns, brick walls, and fire escapes.
3. A schedule listing the 14 rooms with details on level, area, and quantity.
4. Specifications for existing construction materials and elements including walls, roof, floors, windows and proposed upgrades to improve insulation and waterproofing.
5. Principles of conservation to be followed for any restoration work to the protected
This document contains details and drawings for the Salim Publishing House project completed by Mark Thornton for his third year of Architectural Technology studies. The project involved adapting a four-storey office building located in South Korea to accommodate retail units on the ground floor and open office spaces on the upper floors, ensuring it complied with Irish building regulations. Drawings include floor plans, elevations, sections and construction detail drawings.
The document contains plans and details for a timber roof structure designed by Aaron Kaira. It includes a roof structure plan showing timber rafters and purlins, and sections detailing connections. Rafters are 250x50mm timber at 1200mm centers. Purlins are 75x50mm timber at 1200mm centers. Prefabricated box beams are used to support the rafters. The roof is covered with 0.5mm galvanized steel sheeting over rigid board insulation.
This document provides details for a kitchen renovation project including contact information for John Zierke of Cliq Studios. It then lists cabinetry and appliances to be included in the renovation along with their specifications. Dimensions for the layout and individual components are provided in inches. Notes specify that decorative doors will be applied on site and include additional information for certain items.
1. The document contains plans for 3 apartments in a new development called Hudson Close Apartments. It includes a ground floor plan showing the layout of the apartments, common areas, and details.
2. The plans show the layout of the individual apartments including bedrooms, bathrooms, kitchens, and living areas. Common areas on the ground floor include a hallway and stairwell.
3. Technical specifications are provided for the building materials and construction methods to be used, including the foundations, flooring, walls, roof, ventilation, and other details.
La fuente de alimentación convierte la corriente alterna de la red eléctrica en una corriente continua de baja tensión que usa la computadora. Las fuentes ATX son más seguras que las AT porque se apagan cuando la placa madre y el sistema operativo lo deciden, no solo al presionar un botón. La fuente de alimentación provee energía a discos duros, unidades ópticas, tarjetas de video y sistemas de refrigeración a través de conectores macho y hembra.
Es un software de administración de proyectos diseñado, desarrollado y comercializado por Microsoft para asistir a administradores de proyectos en el desarrollo de planes, asignación de recursos a tareas, dar seguimiento al progreso, administrar presupuesto y analizar cargas de trabajo.
This document defines and describes different types of computer networks. It discusses client-server networks where servers provide services to clients. It also covers personal area networks (PANs), local area networks (LANs), metropolitan area networks (MANs), and wide area networks (WANs). The document outlines common network topologies like bus, star, ring, mesh, and tree configurations. It also defines the roles of network elements like workstations, repeaters, bridges, hubs, and routers. Finally, it discusses the purposes of computer networks which include sharing information and resources while improving transmission speeds and reducing costs.
Este documento presenta un informe sobre redes computacionales realizado por Diego Erazo para Mario Fernando Cabrera en el Centro Internacional de Producción Limpia-LOPE en San Lorenzo, Narino, Colombia en 2015-2016. Explica la historia de las redes informáticas, define diferentes tipos de redes como LAN, MAN, PAN y WAN, y describe sus características, ventajas, desventajas, componentes y alcance.
Learning and development involves changing employee behavior through training and experience. It makes a major contribution to organizational objectives and should be integrated with business and HR strategies. The learning and development process includes analysis, design, development, implementation, and evaluation. Creating a learning culture involves developing a shared vision, empowering employees, providing learning resources and feedback, and having managers act as role models.
The princess feels frustrated by expectations placed on her and goes into the woods. She realizes she desires power and doesn't need a kingdom to feel powerful. After defeating the prince, she becomes corrupted by the power she gains and takes his place on the throne, showing power can corrupt regardless of gender.
El documento provee una introducción al modelo TCP/IP, incluyendo una breve historia de su desarrollo, una explicación de qué es TCP/IP y cómo funciona, una descripción de los protocolos TCP e IP, y un resumen de la nueva versión IPv6. TCP/IP fue desarrollado en 1973 por Vinton Cerf y Robert Kahn y consiste en un conjunto de protocolos que permiten la comunicación entre ordenadores conectados a Internet. IPv6 revisa el formato de datagramas e introduce direcciones más largas para abordar limitaciones de IPv4.
El documento explica los conceptos básicos de una escena en el guion literario, incluyendo los cuatro elementos de la estructura dramática (personajes, acciones, lugares y tiempo), y cómo una escena cambia cuando varía cualquiera de estos elementos. También describe cómo se escribe una escena en el formato de guion, incluyendo indicaciones como INT/EXT, nombres de personajes en mayúsculas, diálogos y acotaciones.
This document provides installation instructions for heatshrink terminations on 3 core polymeric cables with copper tape or wire screens for indoor use. It describes the materials and tools needed, preparation steps like stripping the cable and cleaning surfaces, and the detailed process for installing the termination which involves applying mastic tapes and heatshrink sleeves in a specific sequence. Safety notes are included to only use a propane torch and obtain a soft flame when heatshrinking. The completed termination is then allowed to cool before use.
This document provides installation instructions for heatshrink terminations on 3 core polymeric cables with copper tape or wire screens for indoor use. It describes the materials and tools needed, preparation steps like stripping the cable and cleaning surfaces, and the detailed process for installing the termination which involves applying mastic tapes and heatshrink sleeves in a specific sequence. Safety notes are included to only use a propane torch and obtain a soft flame when heatshrinking. The completed termination is then allowed to cool before use.
This document provides installation instructions for the Quad-Lock Building System. It begins with safety checks and reviewing other documentation. It then provides step-by-step instructions for installing panels, ties, and brackets to form walls. Details are given for corners, angles, joints and adding accessories. Pre-pour checks are listed and concrete placement instructions emphasize proper consolidation and lifting. Bracing, forming and curing are also outlined.
Installation instruction Mineral wool sandwich panelsMot panels
1. The document provides installation instructions for mineral wool panels, noting that panels should be installed by experienced teams using proper equipment and safety precautions.
2. Instructions are given for removing protective film from panels, cutting panels safely, fastening panels using recommended fasteners, assembling roof and wall panels, and cleaning and maintaining installed panels.
3. Special care must be taken when installing panels to avoid damage and ensure proper sealing, and annual maintenance is recommended to clean the panels and check for any failures.
CoFold is the ultimate in exterior folding systems and opens up a wealth of new design possibilities.
The CoFold System has been designed to maximise the flexibility of a room’s living space, removing barriers and enabling the user to have an indoor/outdoor experience by fully opening up exterior walls.
The system which operates with effortless ease combines the benefits of folding doors with the ability to keep out the weather with no corrosion worries. This modern, contemporary feature will increase available living space whilst allowing natural light to envelop the room.
System Capacity
Maximum leaf height - 3300mm
Maximum leaf weight - 100kg
Maximum leaf width - 1000mm
Leaf thickness - 35-68mm*
* For thicker or thinner doors please contact Coastal Technical Team
For doors between 35-47mm use an alternative flush bolt
Applications
Residential and commercial timber exterior folding applications
Specially suited to coastal environments made from 316 stainless steel.
End folding timber doors folding to one or both sides
Standard folding configuration features doors folding outward.
Inward folding doors can be used where the doors are not directly
exposed to the weather.
Premium security features
Recognised weather resistance
The folding unit is not hinged to post, but is pivoted in the track and floor. All door leaves are of equal width. A swing leaf can be included by incorporating an odd number of leaves. For full weather protection, doors, frame and track should incorporate the seals provided in the CoFold range.
Cill and frame construction should be in accordance with the CoFold fixing instructions. Intermediate hangers and hinges are non rebated.
www.coastal-group.com
This document provides installation instructions for heatshrink joints for 3 core 7.2/12kV XLPE armoured cable. The instructions describe 19 steps for preparing the cable ends, applying stress control tubes and mastic tapes, fitting compression connectors, applying copper mesh and armour clamps, and shrinking outer heatshrink tubes. Key steps include preparing cable ends to specified dimensions, removing semi-conductive layers from cores, fitting stress control and dual wall heatshrink tubes in stages while applying mastic tapes, and fully recovering two outer heatshrink tubes to seal the completed joint. The instructions are intended for trained competent jointers and call for using a propane gas torch to shrink the heatshrink materials.
This document provides installation instructions for heat shrink termination of single core polymeric cables rated between 7.2kV and 36kV. The instructions are as follows:
1. Remove the outer cable sheath to the specified length and remove any fillers.
2. Treat the cable screen by applying mastic tape and removing copper wires or tape to the specified points before attaching an earth braid.
3. Treat the conductive layer by removing it to the specified points using the appropriate tool to avoid damage to the primary insulation.
4. Apply stress relief tape to the specified points before installing stress control tubes and cable lugs using mastic tape. Install anti-track tubes and sheds as required
This document provides installation instructions for a furnace. It includes steps for unpacking the furnace from its pallet and crate, setting up the crucible, assembling the door, preparing and installing the heating elements, and taking electrical measurements with a multimeter. Safety precautions are outlined for handling fragile elements and taking electrical readings. Diagrams illustrate the furnace components and proper element assembly.
1) The document provides installation instructions for heatshrink termination of 3 core polymeric cables with voltages ranging from 7.2kV to 36kV. It describes the steps for preparing the cable, installing stress control tapes and tubes, cable lugs, and rain sheds.
2) Key steps include removing the cable sheath and screens, applying stress control tape, installing cable lugs and boots, and shrinking tubes onto the assembly. Proper distances must be maintained for phase clearance and bending radii.
3) Outdoor terminations require additional rain sheds installed from the bottom up at specified distances between the anti-track tube and shed edges. Indoor distances between phases and grounds are also outlined.
This document provides installation instructions for heatshrink joints on 3 core 7.2/12kV XLPE armoured cable in 3 steps:
1. Prepare the cables and cores to the specified dimensions and install stress control tubes, mastic tapes and connectors.
2. Wrap the joint with tinned copper mesh and armour cage then apply outer shrink tubes.
3. Recover the outer shrink tubes with a heat source and allow the joint to cool before use.
This document provides installation instructions for heatshrink joints on 3 core 7.2/12kV XLPE armoured cable in 3 steps:
1. Prepare the cables and cores to the specified dimensions and install stress control tubes, mastic tapes and connectors.
2. Wrap the joint with tinned copper mesh and armour cage then apply outer shrink tubes.
3. Recover the outer shrink tubes with a heat source and allow the joint to cool before use.
This document provides installation instructions for heatshrink joints on 3 core 7.2/12kV XLPE armoured cable in 3 steps:
1. Prepare the cables and cores to the specified dimensions and install stress control tubes, mastic tapes and connectors.
2. Wrap the joint with tinned copper mesh and armour cage then apply outer shrink tubes.
3. Recover the outer shrink tubes with a heat source and allow the completed joint to cool before use.
This document provides installation instructions for heatshrink termination of 3 core polymeric cables between 7.2kV and 36kV. It describes preparing the cable by removing the outer sheath and screen layers. It then details applying stress control tape and tubes, installing lugs and a breakout boot, and applying an anti-track tube. It provides requirements for indoor terminations including separation distances and positioning cores. It also describes installing rain sheds for outdoor terminations and notes on minimum bending radii during installation.
This document provides installation instructions for installing a tow hitch on a 2012-2016 Tesla Model S. It involves removing various underbody panels and the rear bumper fascia. The hitch plate attaches to existing studs on the frame and additional brackets are installed to reinforce it. A template is provided to cut an access hole in the bumper for the tow ball. Proper safety precautions and labeling of removed hardware is recommended. The installation is designed for up to 200 lbs of tongue weight and 2000 lbs of towing capacity.
This document provides instructions for assembling the JK NAVASSA-5 5-band Yagi antenna. It includes diagrams showing the positioning of elements on the boom and lists the tools, hardware, and steps required for assembly. Key steps include assembling the driven element center sections, mounting elements to plates, attaching plates to the boom, and joining tubing sections to complete the tapered elements. Cautions are provided regarding proper orientation of parts and avoiding overtightening of hardware.
This document provides installation instructions for installing a 2" or 1.25" EcoHitch on a 2012-2016 Tesla Model S. The installation involves removing underbody panels, bumper fascia, and other components to access attachment points for the hitch. Detailed steps and diagrams are provided to guide removal and installation of over 20 components. Safety is emphasized throughout and it is recommended to have the installation performed by a professional.
Similar to SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush Mount (20)
SunMaxx Datasheet Submittal - XMaxx Solar Hot Water Balancing ValvesSunMaxx Solar
The document provides product specifications for SunMaxx Solar balancing valves. It includes model numbers, connection sizes, flow rate ranges, dimensions, materials used, performance characteristics, and installation instructions. The valves contain an integrated flow meter for measuring and balancing flow rates in heating and cooling systems.
SunMaxx Datasheet Submittal - StorMaxx Solar Hot Water TanksSunMaxx Solar
This document provides product specifications for several product lines from SunMaxx Solar, including storage water heaters and tanks. It lists technical details like volume, weight, materials, and components for each model. Key specifications outlined include glass or stainless steel construction, insulation thickness, heat exchanger details, and port sizes. The document also provides overview sections on coil heat exchangers, passthrough accessories, and technical details for copper and stainless steel coils.
SunMaxx Datasheet - FlowMaxx IDL Pre-Insulated Flexible LinesetSunMaxx Solar
This product data sheet provides specifications for FlowMaxx IDL pre-insulated stainless steel piping for solar heating systems. It includes:
1) Details on 5 pipe models varying in diameter, length, pressure rating, and insulation thickness.
2) Descriptions of the stainless steel and insulation materials, thickness, bending radius, and maximum working pressures.
3) Graphs showing the lineset's pressure loss and heat loss at varying flow rates and temperatures.
4) Information on available male and female pipe fittings and quick-connect fitting installation.
SunMaxx Installation Manual - UniMaxx SC 500 AC V3 Solar Pump StationSunMaxx Solar
This document provides installation and commissioning instructions for a UniMaxx Solar Pump Station. It contains:
- A table of contents listing the sections and subsections within the document.
- Safety information and instructions for installing the solar station components, connecting piping, and commissioning the system.
- Descriptions of the solar station components including valves, fittings, sensors and a pump.
- Step-by-step instructions for assembling and installing the solar station, connecting it to other system components, and filling and venting the solar circuit.
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage TanksSunMaxx Solar
This document provides an installation guide for StorMaxx CTEC Series water tanks. It includes requirements for the installation room and tank, descriptions of tank components like insulation, water casing, and electric heating elements. It also provides instructions for connecting a safety relief valve and technical specifications for various tank models.
By refining the layout and replacing furnishings, people can more effectively enjoy themselves in their home environment. If you want to enhance the visual appeal of your home, then residential painting services are at your service. We take responsibility for transforming your dull spaces into vibrant ones. This PPT unveils the difference that professional painters make in elevating the look of your home.
Best Immigration Consultants in Amritsar- SAGA StudiesSAGA Studies
Want to fulfill your study abroad dream? Searching for the best Immigration Consultants?
SAGA Studies is the best immigration consultants in Amritsar, provides student admissions, study visa, spouse and dependent visas, tourist visas, PTE exam assistance,and many more.
Discover How Long Do Aluminum Gutters Last?SteveRiddle8
Many people wonder how long aluminum gutters last. In this ppt, we will cover the lifetime of aluminum gutters, appropriate maintenance procedures, and the advantages of using this material for gutter installation.
eBrand Promotion Full Service Digital Agency Company ProfileChimaOrjiOkpi
eBrandpromotion.com is Nigeria’s leading Web Design/development and Digital marketing agency. We’ve helped 600+ clients in 24 countries achieve growth revenue of over $160+ Million USD in 12 Years. Whether you’re a Startup or the Unicorn in your industry, we can help your business/organization grow online. Thinking of taking your business online with a professionally designed world-class website or mobile application? At eBrand, we don’t just design beautiful mobile responsive websites/apps, we can guarantee that you will get tangible results or we refund your money…
The Fraud Examiner’s Report –
What the Certified Fraud Examiner Should Know
Being a Virtual Training Paper presented at the Association of Certified Fraud Examiners (ACFE) Port Harcourt Chapter Anti-Fraud Training on July 29, 2023.
Job Vacancies in Norway 🇳🇴
Warehouse Workers for Clothing
2year WORKPERMIT 👍
Salary: €3900-4300 per month (Paid twice a month).
Requirements:
* Duties include quality control of products, order picking, packing goods, and applying stickers and labels.
* Work schedule: 8-10 hours per day, 5 days a week.
Documents 📄
*Adhar
Pan
Photo
Education documents
Basic English**o
Education documents
Basic English**
Photo
Education documents
Basic English**
3 Examples of new capital gains taxes in CanadaLakshay Gandhi
Stay informed about capital gains taxes in Canada with our detailed guide featuring three illustrative examples. Learn what capital gains taxes are and how they work, including how much you pay based on federal and provincial rates. Understand the combined tax rates to see your overall tax liability. Examine specific scenarios with capital gains of $500k and $1M, both before and after recent tax changes. These examples highlight the impact of new regulations and help you navigate your tax obligations effectively. Optimize your financial planning with these essential insights!
💼 Dive into the intricacies of capital gains taxes in Canada with this insightful video! Learn through three detailed examples how these taxes work and how recent changes might impact you.
❓ What are capital gains taxes? Understand the basics of capital gains taxes and why they matter for your investments.
💸 How much taxes do I pay? Discover how the amount of tax you owe is calculated based on your capital gains.
📊 Federal tax rates: Explore the federal tax rates applicable to capital gains in Canada.
🏢 Provincial tax rates: Learn about the varying provincial tax rates and how they affect your overall tax bill.
⚖️ Combined tax rates: See how federal and provincial tax rates combine to determine your total tax obligation.
💵 Example 1 – Capital gains $500k: Examine a scenario where $500,000 in capital gains is taxed.
💰 Example 2 – Capital gains of $1M before the changes: Understand how a $1 million capital gain was taxed before recent changes.
🆕 Example 3 – Capital gains of $1M after the changes: Analyze the tax implications for a $1 million capital gain after the latest tax reforms.
🎉 Conclusion: Summarize the key points and takeaways to help you navigate capital gains taxes effectively.
#CapitalGainsTax #Taxation #CanadianTax #InvestmentTax #TaxRates #FinancialPlanning #TaxReform #CapitalGains #TaxExamples 💼💸📊🏢⚖️💵💰🆕
Pruning enhances your garden's visual appeal by keeping plants neat and well-formed. Whether you prefer a formal, structured look or a more natural, free-flowing design, regular pruning helps you achieve and maintain your desired garden style. A well-pruned garden looks cared for and can significantly improve the overall beauty of your outdoor space.
Electrical Testing Lab Services in Dubai.pptxsandeepmetsuae
An electrical testing lab in Dubai plays a crucial role in ensuring the safety and efficiency of electrical systems across various industries. Equipped with state-of-the-art technology and staffed by experienced professionals, these labs conduct comprehensive tests on electrical components, systems, and installations.
METS Lab SASO Certificate Services in Dubai.pdfsandeepmetsuae
Achieving compliance with the Saudi Standards, Metrology and Quality Organization (SASO) regulations is crucial for businesses aiming to enter the Saudi market. METS Laboratories offers comprehensive SASO certification services designed to help companies meet these stringent standards efficiently. Our expert team provides end-to-end support, from initial product assessments to final certification, ensuring that all regulatory requirements are meticulously met. By leveraging our extensive experience and state-of-the-art testing facilities, businesses can streamline their certification process, avoid costly delays, and gain a competitive edge in the market. Trust METS Laboratories to guide you through every step of achieving SASO compliance seamlessly.
The study compares AMUSE's FDM and MJF 3D printing technologies.pptxAmuse
AMUSE offers cutting-edge HP MJF 3D printing services in India that facilitate the effective creation of challenging designs for all kinds of industries.
https://amuse3d.in/hp-mjf-3d-printing-service/
Bridging the Language Gap The Power of Simultaneous Interpretation in RwandaKasuku Translation Ltd
Rwanda is a nation on the rise, fostering international partnerships and economic growth. With this progress comes a growing need for seamless communication across languages. Simultaneous interpretation emerges as a vital tool in this ever-evolving landscape. When seeking the best simultaneous interpretation in Rwanda, Kasuku Translation stands out as a premier choice.
Gujar Industries India Pvt. Ltd is a leading manufacturer of X-ray baggage scanners in India. With a strong focus on innovation and quality, the company has established itself as a trusted provider of security solutions for various industries. Their X-ray baggage scanners are designed to meet the highest standards of safety and efficiency, making them ideal for use in airports, government buildings, and other high-security environments. Gujar Industries India Pvt. Ltd is committed to providing cutting-edge technology and reliable products to ensure the safety and security of their customers.
Forex Copy trading is the mode of trading offering great opportunities to the traders lacking time or in-depth market knowledge, yet willing to use currency trading as a form of investment and to increase their initial funds.
Stay updated on Siddhivinayak Temple events and timings in Houston, TX. Join our spiritual and community gatherings. Visit us now! gaurisiddhivinayak.org
Webroot antivirus helps with online security. Use reliable security software to protect your devices from attacks, providing online security and quiet mind when using technology for business or work.
1. Installation Guide
TitanPower ALDH29 Flat Plate Collector
www.SunMaxxSolar.com
Model Number
TitanPower-ALDH29
Mounting Type
Flush (Pitched Roof)
Free-Standing (Flat Roof)
X
X
3. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
1. Components - 1 Collector Installation
The packaging of the support structure consists of 2 cardboard boxes. The one include the profiles of the support structures and the second one the
accessories for the assembly.
The packages are including the following materials:
# Qty
Part #
Dimensions
Image
1 4 PS272BVDR-005
2 4 PS272BVDR-001
3 8 8x100 DIN 531
4 2
PS272BVDF-015
1.4”
5 2
PS272BVDF-013
2.8”
6 2
PS272BVDF-007
1.4” x 1.4” x 53.6”
7 26 M8 NUT DIN 6923
# Qty
Part #
Dimensions
Image
8 6 M8 x 30 LG DIN 933
9 4
4. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
2. Assembly & Installation - 1 Collector Installation
Step 1: Hook Assembly & Placement
1.1: Assemble the hooks according
to the upper figure.
1.2: Take off of the roof 1 or 2 tiles from the spot you choose as appropriate for the upper left
corner of the frame support. Place the perforated sheet plate on the rafter and on the upper
side of the tile batten, as figure on the left suggests, for better safety and grip. Adjust the “ς”
shaped Nr.1’s height, so as when the tiles are back to position again, the lower horizontal part
of hook Nr.1 stands between the upper and lower tile (figure on the left). Then place the tiles
again and seal.
1.3: Set as starting point the upper left hook. Then place the
upper right hook at distance X from the already placed left
hook. Tighten up the perforated plate on the rafter through
the most convenient holes. Then place lower right hook at
distance Y from the upper left and last the lower right hook
accordingly. After you make sure that all the wood screws are
tightened up and that the height is adjusted (see 1.2), place
the tiles to their positions.
5. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
Alternative Hook Type Placement
You are given the option to choose the type of hook you that fits your needs better. The following procedure gives the description for the use of this
hook (No.9). The placement dimensions are the same with the first option.
1.1: Prepare the four hooks No.9 according to the upper two figures. This hook consists of the main body, 3x nuts M10, a rubber sealing washer and
the plate that connects the hook with the collector’s support structure.
1.2: Take off of the roof 1 or 2 tiles from the spot you choose as
appropriate for the upper left corner of the frame support, until you
find a rafter and a batten and open a hole on the batten to tighten
the rod hook. Make a Φ12 hole to the corresponding spot of the
tile and then put back the tiles in position. Insert No.9 in the hole as
seen in the figures on the left and tighten up the main bolt on the
batten. Then place the rubber washer in the tile’s hole and tighten
washer on tile with the nut. There is no need for excessive force.
1.3: Having in mind the table with the dimensions X, Y provided in
the previews page as well as the corresponding directions given for
option 1, place the rest three hooks Nr.9, as seen in figure on the
left.
Follow the procedure presented in the second step (2.1, 2.2) in the following page, for the assembly of No.6 with No.4 and No.5 as well as the
figures above for the placing of the two No.6 on the hooks. The only difference between the two hook options are the hooks, thus phases 2.1 and
2.2 are identical.
6. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
Step 2: Assemble The Aluminum Profiles
2.1: Place the two No.4 clamps at the edges of one of the No.6 profile, as seen
in the figures above. Don’t tighten up the bolts at this phase.
2.2: Place the two No.5 clamps on the No.6 profile as seen above. Don’t
tighten up the bolts at this phase.
2.3: Tighten up the upper and lower support according to the figures above. Center the two aluminum profiles
relative to the hooks as well as to each other. Tighten up the bolts that connect the hooks to the supports. The
structure is ready for the collector.
7. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
Step 3: Place The Collectors
Both clamps No.4 and No.5 must secure the collector at this stage. Tighten the
M8 nuts in all parts to secure the collector on the support structure. Tighten
until the both types of clamps fit well on the collector like in the drawing on
the left.
ATTENTION: Pay maximum attention during tightening the nuts. Do not apply
extreme force as there is danger to harm the collector or destroy the accesso-
ries of the support structure. Apply the necessary force to secure the collector.
For the clamps No.4 it is necessary to apply opposite force in order to avoid
rotation of the aluminum part.
8. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
9. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
3. Components - 2 Collector Installation
# Qty
Part #
Dimensions
Image
1 6 PS272BVDR-005
2 6 PS272BVDR-001
3 12 8x100 DIN 531
4 4
PS272BVDF-015
1.4”
5 4
PS272BVDF-013
2.8”
6 2
PS272BVDF-007
1.4” x 1.4” x 53.6”
7 42 M8 NUT DIN 6923
# Qty
Part #
Dimensions
Image
8 42 M8 x 30 LG DIN 933
9 6
10. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
4. Assembly & Installation - 2 Collector Installation
Step 1: Hook Assembly & Placement
1.1: Assemble the hooks according to the upper
figure.
1.2: Take off of the roof 1 or 2 tiles from the spot you choose as appropriate
for the upper left corner of the frame support. Place the perforated sheet plate
on the rafter and on the upper side of the tile batten, as figure on the left sug-
gests, for better safety and grip. Then adjust the height of the ¨ς¨ shaped No.1,
in order to avoid contact with the tile. About 30mm clearance is OK. Repeat
procedure for all 6 hooks.
1.3: Set as starting point the upper left hook.
Then place the upper middle hook at distance
X from the already placed left hook. Tighten up
the perforated plate on the rafter through the
most convenient holes. Repeat for upper right
hook in distance X from the upper middle one.
Then place lower right hook at distance Y from
the upper left and repeat for the middle lower
and last the lower right hook accordingly. After
you make sure that all the wood screws are
tightened up and that the height is adjusted
(see 1.2), place the tiles to their positions.
11. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
Alternative Hook Type Placement
You are given the option to choose the type of hook you that fits your needs better. The following procedure gives the description for the use of this
hook (No.9). The placement dimensions are the same with the first option.
1.1: Prepare the six hooks No.9 according to the upper two figures. This hook consists of the main body, 3x nuts M10, a rubber sealing washer and
the plate that connects the hook with the collector’s support structure.
1.2: Take off of the roof 1 or 2 tiles from the spot you choose as
appropriate for the upper left corner of the frame support, until
you find a rafter and a batten and open a hole on the batten to
tighten the rod hook. Make a Φ12 hole to the corresponding
spot of the tile and then put back the tiles in position. Insert No.9
in the hole as seen in the figures on the left and tighten up the
main bolt on the batten. Then place the rubber washer in the
tile’s hole and tighten washer on tile with the nut. There is no
need for excessive force.
Follow the procedure presented in the second
step (2.1, 2.2) in the following page, for the
assembly of No.6 with No.4 and No.5 as well
as the figures above for the placing of the two
No.6 on the hooks. The only difference between
the two hook options are the hooks, thus
phases 2.1 and 2.2 are identical.
12. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
Step 2: Assemble The Aluminum Profiles
2.1: Place the two No.4 clamps at the edges of one of the No.6 profiles and the rest two in the mid-
dle of the same No.6, as seen in the figures above. Don’t tighten up the bolts at this phase. Prepare
the three M8 bolts for the three hooks at the lower side of the same profile as seen above.
2.2: Place the four No.5 clamps on the No.6 profile as seen above. Don’t tighten up the bolts at this phase. Prepare the three M8 bolts for the
three hooks at the lower side of the same profile as seen above.
Step 3: Place The Support Hooks
Tighten up the upper and lower support
according to the figures above. Center
the two aluminum profiles relative to the
hooks as well as to each other. Tighten up
the bolts that connect the hooks to the
supports. The structure is ready for the
collector.
13. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
Step 4: Place The Collectors
For the clamps No.4 it is necessary to
apply opposite force in order to avoid
rotation of the aluminum part.
Both clamps No.4 and No.5 must secure the collector at
this stage. Tighten the M8 nuts in all parts to secure the
collector on the support structure. Tighten until the both
types of clamps fit well on the collector like in the drawing
on the left.
ATTENTION: Pay maximum attention during tightening
the nuts. Do not apply extreme force as there is danger
to harm the collector or destroy the accessories of the
support structure. Apply the necessary force to secure the
collector.
3.1: Take care that the lower part
of the collector is in place. That
means that the collector’s support
frame is grabbed by the two No.5
clamps, as seen in the above figure
on the left. Don’t tighten up yet the
bolts on No.5. You can also attach
the No.4 clamps on the collectors’
sides.
14. SunMaxx Solar | 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.877.270.7875 fax | www.sunmaxxsolar.com
15. 5042-5160 NY 206 Bainbridge NY 13733 | 1.877.786.6299 1.888.270.7875 fax
www.SunMaxxSolar.com