SlideShare a Scribd company logo
1 of 1
Download to read offline
REVISIONS
Index Date Description Author
PROJECT No.
CLIENT
PROJECT
REVDRAWING No.
[G] -
DRAWING TITLE
DATE SCALEDRAWN BY CHECKED BY
Unit 2
Leydene Farm
PetersfieldSSC East Meon
Structural Steel Craft Ltd
Droxford Road
GU32 1HG Tel: 01730 823501
www.structuralsteelcaft.co.uk
2273-CPR-0276
58-63 SUMMERLANDS AVENUE
Pryer Construction (uk) Ltd
2378 100
3D Detail
03/06/2016SK
C1
1:75 @ A2
GENERAL NOTES
1. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE NSSS 5TH EDITION
& STRUCTURAL ENGINEERS SPECIFICATION
2. FABRICATION/ERECTION TOLERANCES TO BE IN ACCORDANCE WITH THE
CURRENT NSSS UNLESS OTHERWISE NOTED.
3. ALL STEELWORK TO THE FOLLOWING GRADES UNLESS OTHERWISE NOTED:
i) ROLLED STRUCTURAL SECTIONS - S355
ii) ROLLED HOLLOW SECTION - S355
iii) PLATES - S275
4. REFER TO FABRICATION DRAWINGS FOR FINISH DETAILS
5. ALL CONNECTIONS TO HAVE MIN. 2No. GRADE 8.8 BOLTS
6. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
7. STEELWORK ABBREVIATIONS
TOS - TOP OF STEEL
TOC - TOP OF CONCRETE
TOF - TOP OF FOUNDATION
FFL - FINISHED FLOOR LEVEL
SSL - STRUCTURAL SLAB LEVEL
USBP - UNDERSIDE OF BASEPLATE
AOE - AS OTHER END
USS - UNDERSIDE OF STEEL
CCS - CROSS CENTRES

More Related Content

What's hot

DGI-CHT-TB1-03-DR-M-MOD-004
DGI-CHT-TB1-03-DR-M-MOD-004DGI-CHT-TB1-03-DR-M-MOD-004
DGI-CHT-TB1-03-DR-M-MOD-004
Douglas Hart Snr
 
Macron dynamics msa_r6s_specsheet
Macron dynamics msa_r6s_specsheetMacron dynamics msa_r6s_specsheet
Macron dynamics msa_r6s_specsheet
Electromate
 
Catalogue-SEVENFIVE Page1 16
Catalogue-SEVENFIVE Page1 16Catalogue-SEVENFIVE Page1 16
Catalogue-SEVENFIVE Page1 16
maii13199
 
AT-SBTSZZ-ST-SFD-4019-007-C01
AT-SBTSZZ-ST-SFD-4019-007-C01AT-SBTSZZ-ST-SFD-4019-007-C01
AT-SBTSZZ-ST-SFD-4019-007-C01
E-smile Bashirli
 
Statement Of Results - Structural Steelwork Detailing Diploma
Statement Of Results - Structural Steelwork Detailing DiplomaStatement Of Results - Structural Steelwork Detailing Diploma
Statement Of Results - Structural Steelwork Detailing Diploma
Luke Sarkis
 

What's hot (12)

Tranmission Break
Tranmission BreakTranmission Break
Tranmission Break
 
DGI-CHT-TB1-03-DR-M-MOD-004
DGI-CHT-TB1-03-DR-M-MOD-004DGI-CHT-TB1-03-DR-M-MOD-004
DGI-CHT-TB1-03-DR-M-MOD-004
 
Macron dynamics msa_r6s_specsheet
Macron dynamics msa_r6s_specsheetMacron dynamics msa_r6s_specsheet
Macron dynamics msa_r6s_specsheet
 
Clip End.PDF
Clip End.PDFClip End.PDF
Clip End.PDF
 
Catalogue-SEVENFIVE Page1 16
Catalogue-SEVENFIVE Page1 16Catalogue-SEVENFIVE Page1 16
Catalogue-SEVENFIVE Page1 16
 
1
11
1
 
070002179.PDF
070002179.PDF070002179.PDF
070002179.PDF
 
BM16 Portable Beveling Machine
BM16 Portable Beveling MachineBM16 Portable Beveling Machine
BM16 Portable Beveling Machine
 
AT-SBTSZZ-ST-SFD-4019-007-C01
AT-SBTSZZ-ST-SFD-4019-007-C01AT-SBTSZZ-ST-SFD-4019-007-C01
AT-SBTSZZ-ST-SFD-4019-007-C01
 
Hexagon buffers
Hexagon buffersHexagon buffers
Hexagon buffers
 
082217294199 MENJUAL HAMMER TEST MATEST, KONDISI OK
082217294199 MENJUAL HAMMER TEST MATEST, KONDISI OK 082217294199 MENJUAL HAMMER TEST MATEST, KONDISI OK
082217294199 MENJUAL HAMMER TEST MATEST, KONDISI OK
 
Statement Of Results - Structural Steelwork Detailing Diploma
Statement Of Results - Structural Steelwork Detailing DiplomaStatement Of Results - Structural Steelwork Detailing Diploma
Statement Of Results - Structural Steelwork Detailing Diploma
 

Similar to Summerlands

18. Barnet Cinema HandRail 3D View
18. Barnet Cinema HandRail 3D View18. Barnet Cinema HandRail 3D View
18. Barnet Cinema HandRail 3D View
Savvas Kazakos
 
BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1
Rochelle Abrie
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
Sunit Dhingra
 
EJECTOR-ASSEMBLY.PDF
EJECTOR-ASSEMBLY.PDFEJECTOR-ASSEMBLY.PDF
EJECTOR-ASSEMBLY.PDF
Farhad Ighani
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ssuser3797b9
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITHSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
Sunit Dhingra
 
41088.DD1.09-DETICA - FLOORPLAN & ELEVATION
41088.DD1.09-DETICA - FLOORPLAN & ELEVATION41088.DD1.09-DETICA - FLOORPLAN & ELEVATION
41088.DD1.09-DETICA - FLOORPLAN & ELEVATION
Chi-Sham Tang
 
Appendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork DrawingsAppendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork Drawings
imteyaz ali
 

Similar to Summerlands (20)

18. Barnet Cinema HandRail 3D View
18. Barnet Cinema HandRail 3D View18. Barnet Cinema HandRail 3D View
18. Barnet Cinema HandRail 3D View
 
Hackney Riser
Hackney RiserHackney Riser
Hackney Riser
 
BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1
 
Projects Review Report
Projects  Review ReportProjects  Review Report
Projects Review Report
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
3.4.2 Isolator .pdf
3.4.2 Isolator .pdf3.4.2 Isolator .pdf
3.4.2 Isolator .pdf
 
Villa
VillaVilla
Villa
 
2502
25022502
2502
 
COMPARATIVE ANALYSIS OF STEEL BUILDING ON SLOPING GROUND FOR DIFFERENT ANGLE
COMPARATIVE ANALYSIS OF STEEL BUILDING ON SLOPING GROUND FOR DIFFERENT ANGLECOMPARATIVE ANALYSIS OF STEEL BUILDING ON SLOPING GROUND FOR DIFFERENT ANGLE
COMPARATIVE ANALYSIS OF STEEL BUILDING ON SLOPING GROUND FOR DIFFERENT ANGLE
 
EJECTOR-ASSEMBLY.PDF
EJECTOR-ASSEMBLY.PDFEJECTOR-ASSEMBLY.PDF
EJECTOR-ASSEMBLY.PDF
 
Munger ganga bridge
Munger ganga bridgeMunger ganga bridge
Munger ganga bridge
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
Dokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pileDokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pile
 
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdfBOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
 
IRJET - Parametric Study of RCC, Steel and Composite Structures Under Seismic...
IRJET - Parametric Study of RCC, Steel and Composite Structures Under Seismic...IRJET - Parametric Study of RCC, Steel and Composite Structures Under Seismic...
IRJET - Parametric Study of RCC, Steel and Composite Structures Under Seismic...
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITHSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
 
41088.DD1.09-DETICA - FLOORPLAN & ELEVATION
41088.DD1.09-DETICA - FLOORPLAN & ELEVATION41088.DD1.09-DETICA - FLOORPLAN & ELEVATION
41088.DD1.09-DETICA - FLOORPLAN & ELEVATION
 
05120 steel & structure
05120 steel & structure05120 steel & structure
05120 steel & structure
 
5525
55255525
5525
 
Appendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork DrawingsAppendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork Drawings
 

Summerlands

  • 1. REVISIONS Index Date Description Author PROJECT No. CLIENT PROJECT REVDRAWING No. [G] - DRAWING TITLE DATE SCALEDRAWN BY CHECKED BY Unit 2 Leydene Farm PetersfieldSSC East Meon Structural Steel Craft Ltd Droxford Road GU32 1HG Tel: 01730 823501 www.structuralsteelcaft.co.uk 2273-CPR-0276 58-63 SUMMERLANDS AVENUE Pryer Construction (uk) Ltd 2378 100 3D Detail 03/06/2016SK C1 1:75 @ A2 GENERAL NOTES 1. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE NSSS 5TH EDITION & STRUCTURAL ENGINEERS SPECIFICATION 2. FABRICATION/ERECTION TOLERANCES TO BE IN ACCORDANCE WITH THE CURRENT NSSS UNLESS OTHERWISE NOTED. 3. ALL STEELWORK TO THE FOLLOWING GRADES UNLESS OTHERWISE NOTED: i) ROLLED STRUCTURAL SECTIONS - S355 ii) ROLLED HOLLOW SECTION - S355 iii) PLATES - S275 4. REFER TO FABRICATION DRAWINGS FOR FINISH DETAILS 5. ALL CONNECTIONS TO HAVE MIN. 2No. GRADE 8.8 BOLTS 6. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS 7. STEELWORK ABBREVIATIONS TOS - TOP OF STEEL TOC - TOP OF CONCRETE TOF - TOP OF FOUNDATION FFL - FINISHED FLOOR LEVEL SSL - STRUCTURAL SLAB LEVEL USBP - UNDERSIDE OF BASEPLATE AOE - AS OTHER END USS - UNDERSIDE OF STEEL CCS - CROSS CENTRES