Manufacturing Process of 500MW Turbo Generator
At
Electrical Machinery Block I
B.H.E.L., Haridwar
Manish Kumar Verma
Contents
• Introduction
• Basic Arrangement of TG in Industries
• Parts of Turbo Generator
• Excitation System
• Testing of Turbo Generator
• Cooling System of Turbo Generator
• Conclusion
Introduction
• What is a TURBO GENERATOR ?
• Principle of Electrical Generator
• Basic Arrangement of TURBO
GENERATOR in industries
Generator
Turbine
Exciter
Constituents of Turbo Generator
• Stator Frame
• Stator Core
• Stator Winding
• Overhang Base
• Rotor
TG Stator Core
• 500 MW Stator Core
 Made by Spiral Stacking
 Made of CRGO Si Steel Stampings.
 Advantage of Spiral Stacking- Better Locking
500 MW TG Core Bar
 Used for locking of
stampings
 Made of Mild Steel or
Stainless Steel
Wedge Teeth
Winding Slot
Holes for
Cooling
Holes for
Studs
Core Bar
Slot
TG Stator Winding
Double Layer Winding is Used
Double Layer Winding Concept
Stator Bars
Winding in Stator Core
Manufacturer Data for 500MW TG Stator
Mechanical Specifications
• No of Slots : 48
• No. of Core Bars : 24
• Stator bars numbering:
[1-48 : Lower Stator Bars
51-98 : Upper Stator Bars]
• No. of Baskets : 6
Electrical Specifications
• Terminal Voltage = 21kV
• Rated Current = 28000 A
• Rated P.F. = 0.85 Lagging
• Efficiency = 99.75%
TG Rotor Core and Winding
• Rotor has Concentric Winding.
• 500 MW rotor is made of 2 Poles.
• Rotor Winding bars are placed and
connected in Rotor slots in a opposite
manner (one CW and other ACW)
• Opposite pole windings are connected
using Z conductor
Manufacturer Data for Rotor
V = 400 V ; I = 6000 A
DC Excitation System
Diode Wheel/Rectifier Wheel on Exciter
Schematic of Brushless Exciter
• Automatic Voltage Regulator (AVR)
• Permanent Magnet Pilot Exciter
• Measuring Slipring with Brushes for Field
• Quadrature axis Measuring Coil
• Three Phase Main Exciter
• Diode Rectifier Set
• Three Phase Lead
• Multicontact Connector
• Rotor Winding of TG
• Stator Winding of TG
Manufacturer Data for Exciter
V = 400 V ; I = 6000 A
Testing of Turbo Generator
• Winding Resistance:
[Resistance Measurement of Stator winding, Exciter Stator
and Exciter Rotor Winding using RTD.]
• Insulation Resistance: [Performed before and after HV Test]
[use Meggar to measure IR of Winding w.r.t. earth]
[apply Meggar Voltage for 60 seconds and 600 seconds]
[Calculate PI(Polarization Index) = IR(600 sec)/IR(60 sec)]
PI should be > 2.0 [Lower values of PI indicate bad insulation resistance of machine]
• High Voltage Test:
[use formula : V = (2Vn + 1)kV ; Vn = rated voltage of Generator & V = Applied High Voltage]
[Apply High Voltage between each phase and ground; connect other phases to ground]
[Duration for High Voltage Applying = 1 Minute]
Testing of Turbo Generator Continued…
• Mechanical Heat Run Test:
[RTD, Bearing, Body and Ambient
Temperatures are recorded at equal
intervals till thermal equilibrium is
achieved, then Machine is stopped & Hot
resistance of winding is also measured]
[Over Speed Test : Machine is run at 120%
rated speed for 2 Minutes]
[500 MW TG Test Bed at BHEL, Haridwar, BLK-I]
• Open Circuit Heat Run Test:
[ Machine is run at rated speed and rated voltage. ]
[Power input to Prime Mover, Generator Voltage, Exciter voltage and Current, RTD, Bearing, Body
and Ambient Temperatures are recorded at equal intervals till thermal equilibrium is achieved, then
Machine is stopped & Hot resistance of winding is also measured]
[Sine wave of 3-Phase Voltage is recorded by C.R.O.]
[Phase sequence is tested by using phase sequence indicator]
[All the three phases are checked for balance]
[Noise Level Test: Noise level is measured from different locations of machine and background
noise level is also measured after stopping the machine and actual noise level of machine is
calculated]
[Shaft Voltage measurement: measure using multimeter between D.E. and N.D.E. of Shaft]
[Vibrations Measurement: Vibrations at Horizontal, Vertical, Axial directions at both D.E and N.D.E
are measured using Piezo Electric Sensors]
Testing of Turbo Generator Continued…
Testing of Turbo Generator Continued…
• Short Circuit Heat Run Test:
[ Machine terminals are shorted and machine is run at rated speed and rated
current. ]
[Power input to Prime Mover, Generator Current, Exciter voltage and Current,
RTD, Bearing, Body and Ambient Temperatures are recorded at equal intervals
till thermal equilibrium is achieved, then Machine is stopped & Hot resistance of
winding is also measured]
[Momentary overload Test: Machine is excited to 150% of rated current for 30
Seconds]
• Impedance Test of Rotor:
[A 1-ϕ variable voltage is applied to field winding and currents at 25%, 50%,
75% and 100% voltage are measured]
Cooling System of Turbo Generator
• Hydrogen Cooling is used for Core and Body
• Water Cooling is used for Windings (Distilled Water is used)
Process:
1. Dry air pressure is given to machine using Si
Gel.
2. CO2 Pressure is given to remove air from
machine (Air removed).
3. N2 Pressure is used to take the machine
temperature down. (CO2 removed).
4. Hydrogen Pressure is given to the machine
and maintained.
5. Hydrogen is sucked at high pressure and sent
to chiller which cools the Hydrogen.
Chiller
Conclusion
Experience in Bharat Heavy Electricals Ltd, Haridwar being a Vocational Trainee was very
interesting and inspiring. Though 45 days duration is very little to explore even a single
block of the plant, yet I have tried to learn as much as I could. I got to know about the
industrial equipment which are generally used in an industry.
Besides Technical Knowledge, I also observed management system of plant and working
environment and being one of the leading manufacturing companies of industrial products
B.H.E.L. has very inspiring and positive working environment. This company has very
talented personnel who answered me everything what I asked. This company is doing very
good to improve Power System Efficiency and Power Quality and Safety.
Summer Training BHEL, Haridwar, BLK-I
Summer Training BHEL, Haridwar, BLK-I

More Related Content

What's hot

Manfacturing of turbo generators at BHEL
Manfacturing of turbo generators at BHELManfacturing of turbo generators at BHEL
Manfacturing of turbo generators at BHELPrabhu Raj
 
Training at BHEL Haridwar
Training at BHEL Haridwar Training at BHEL Haridwar
Training at BHEL Haridwar Harshit Bhandari
 
BHEL Haridwar Summer Training
BHEL Haridwar Summer TrainingBHEL Haridwar Summer Training
BHEL Haridwar Summer TrainingArun Gupta
 
A presentation on turbogenerator and excitor
A presentation on turbogenerator and excitorA presentation on turbogenerator and excitor
A presentation on turbogenerator and excitorPRAKHAR MEHROTRA
 
practical training report on turbogenerator
practical training report on turbogeneratorpractical training report on turbogenerator
practical training report on turbogeneratorPriyank Bisht
 
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEM
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEMBHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEM
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEMyash Natani
 
Apresentationonturbogeneratorandexcitor 1312012333
Apresentationonturbogeneratorandexcitor 1312012333Apresentationonturbogeneratorandexcitor 1312012333
Apresentationonturbogeneratorandexcitor 1312012333k,l polytechnic roorkee
 
VPI for turbo generator
VPI for turbo generatorVPI for turbo generator
VPI for turbo generatorRajuEEE
 
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA Jatin Tiwari
 
BHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTBHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTSai Chandu Chandu
 
Wire rod rolling mill
Wire rod rolling millWire rod rolling mill
Wire rod rolling millZhangKerri
 

What's hot (20)

Manfacturing of turbo generators at BHEL
Manfacturing of turbo generators at BHELManfacturing of turbo generators at BHEL
Manfacturing of turbo generators at BHEL
 
Training at BHEL Haridwar
Training at BHEL Haridwar Training at BHEL Haridwar
Training at BHEL Haridwar
 
BHEL Haridwar Summer Training
BHEL Haridwar Summer TrainingBHEL Haridwar Summer Training
BHEL Haridwar Summer Training
 
A presentation on turbogenerator and excitor
A presentation on turbogenerator and excitorA presentation on turbogenerator and excitor
A presentation on turbogenerator and excitor
 
practical training report on turbogenerator
practical training report on turbogeneratorpractical training report on turbogenerator
practical training report on turbogenerator
 
Shashi
ShashiShashi
Shashi
 
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEM
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEMBHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEM
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEM
 
Apresentationonturbogeneratorandexcitor 1312012333
Apresentationonturbogeneratorandexcitor 1312012333Apresentationonturbogeneratorandexcitor 1312012333
Apresentationonturbogeneratorandexcitor 1312012333
 
BHEL_InplantReport
BHEL_InplantReportBHEL_InplantReport
BHEL_InplantReport
 
Bhel HaridwarTraing Report
Bhel HaridwarTraing ReportBhel HaridwarTraing Report
Bhel HaridwarTraing Report
 
VPI for turbo generator
VPI for turbo generatorVPI for turbo generator
VPI for turbo generator
 
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
 
BHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTBHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORT
 
Bhel presentation
 Bhel presentation Bhel presentation
Bhel presentation
 
Parveen bhel
Parveen bhelParveen bhel
Parveen bhel
 
Bhel ppt
Bhel pptBhel ppt
Bhel ppt
 
Bhel report block 4
Bhel report block 4Bhel report block 4
Bhel report block 4
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
BHEL PPT
BHEL PPTBHEL PPT
BHEL PPT
 
Wire rod rolling mill
Wire rod rolling millWire rod rolling mill
Wire rod rolling mill
 

Viewers also liked

basic of Html2(attributes)
basic of Html2(attributes)basic of Html2(attributes)
basic of Html2(attributes)Arslan Butt
 
John Sullins' Resume
John Sullins' ResumeJohn Sullins' Resume
John Sullins' ResumeJohn Sullins
 
Blow-Tech Engineers, Mumbai, Direct Drive Blowers
Blow-Tech Engineers, Mumbai, Direct Drive BlowersBlow-Tech Engineers, Mumbai, Direct Drive Blowers
Blow-Tech Engineers, Mumbai, Direct Drive BlowersIndiaMART InterMESH Limited
 
CV Jager-TS Turbo Machinery specialist, commissioning eng gas compressors
CV Jager-TS Turbo Machinery specialist, commissioning eng gas compressorsCV Jager-TS Turbo Machinery specialist, commissioning eng gas compressors
CV Jager-TS Turbo Machinery specialist, commissioning eng gas compressorssytzejager
 
Radial and axial thrust in centrifugal pump and Methods use to balance them
Radial and axial thrust in centrifugal pump and Methods use to balance themRadial and axial thrust in centrifugal pump and Methods use to balance them
Radial and axial thrust in centrifugal pump and Methods use to balance themshankar shegade
 
Lecture 8-fluid-mech
Lecture 8-fluid-mechLecture 8-fluid-mech
Lecture 8-fluid-mechElias T Maida
 
FSD Boosters Ver001 May15
FSD Boosters Ver001 May15FSD Boosters Ver001 May15
FSD Boosters Ver001 May15Sang Wai
 
45286520 lucky-cement
45286520 lucky-cement45286520 lucky-cement
45286520 lucky-cementpasha55
 

Viewers also liked (19)

basic of Html2(attributes)
basic of Html2(attributes)basic of Html2(attributes)
basic of Html2(attributes)
 
hany tolba- Initial semenar- phd
hany tolba- Initial semenar- phd hany tolba- Initial semenar- phd
hany tolba- Initial semenar- phd
 
Muhammad_Arshad
Muhammad_ArshadMuhammad_Arshad
Muhammad_Arshad
 
John Sullins' Resume
John Sullins' ResumeJohn Sullins' Resume
John Sullins' Resume
 
MKU-businessschool-AACSB-overview
MKU-businessschool-AACSB-overviewMKU-businessschool-AACSB-overview
MKU-businessschool-AACSB-overview
 
Birds
BirdsBirds
Birds
 
Blow-Tech Engineers, Mumbai, Direct Drive Blowers
Blow-Tech Engineers, Mumbai, Direct Drive BlowersBlow-Tech Engineers, Mumbai, Direct Drive Blowers
Blow-Tech Engineers, Mumbai, Direct Drive Blowers
 
CV Jager-TS Turbo Machinery specialist, commissioning eng gas compressors
CV Jager-TS Turbo Machinery specialist, commissioning eng gas compressorsCV Jager-TS Turbo Machinery specialist, commissioning eng gas compressors
CV Jager-TS Turbo Machinery specialist, commissioning eng gas compressors
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Radial and axial thrust in centrifugal pump and Methods use to balance them
Radial and axial thrust in centrifugal pump and Methods use to balance themRadial and axial thrust in centrifugal pump and Methods use to balance them
Radial and axial thrust in centrifugal pump and Methods use to balance them
 
Presentation1
Presentation1Presentation1
Presentation1
 
Lecture 8-fluid-mech
Lecture 8-fluid-mechLecture 8-fluid-mech
Lecture 8-fluid-mech
 
Presentation (BHEL)
Presentation (BHEL)Presentation (BHEL)
Presentation (BHEL)
 
FSD Boosters Ver001 May15
FSD Boosters Ver001 May15FSD Boosters Ver001 May15
FSD Boosters Ver001 May15
 
45286520 lucky-cement
45286520 lucky-cement45286520 lucky-cement
45286520 lucky-cement
 
Presentation For KESC
Presentation For KESCPresentation For KESC
Presentation For KESC
 
BHEL, Block 4, Haridwar
BHEL, Block 4, HaridwarBHEL, Block 4, Haridwar
BHEL, Block 4, Haridwar
 
Axial flow fans
Axial flow fansAxial flow fans
Axial flow fans
 
Steam Turbine
Steam TurbineSteam Turbine
Steam Turbine
 

Similar to Summer Training BHEL, Haridwar, BLK-I

automobile radiator project
automobile radiator projectautomobile radiator project
automobile radiator projectAayushi Jain
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladeshImran Hossain
 
Condition monitoring of rotating electrical machines
Condition monitoring of rotating electrical machinesCondition monitoring of rotating electrical machines
Condition monitoring of rotating electrical machinesAnkit Basera
 
TC-MODULE – 2.pdf
TC-MODULE – 2.pdfTC-MODULE – 2.pdf
TC-MODULE – 2.pdfNayan351985
 
Energy audit & conservation studies for industries
Energy audit & conservation studies for industriesEnergy audit & conservation studies for industries
Energy audit & conservation studies for industriesravindradatar
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
Generator Baisc Construction.pptx
Generator Baisc Construction.pptxGenerator Baisc Construction.pptx
Generator Baisc Construction.pptxSunnyBhardwaj32
 
Ram lal choudhary (DG GENERATOR)
Ram lal  choudhary (DG GENERATOR)Ram lal  choudhary (DG GENERATOR)
Ram lal choudhary (DG GENERATOR)Ramlal Choudhary
 
Practical Variable Speed Drives for Instrumentation and Control Systems
Practical Variable Speed Drives for Instrumentation and Control SystemsPractical Variable Speed Drives for Instrumentation and Control Systems
Practical Variable Speed Drives for Instrumentation and Control SystemsLiving Online
 
Starting and cooling methodes of motor
Starting and cooling methodes of motorStarting and cooling methodes of motor
Starting and cooling methodes of motorJyothis Prasad T
 
Double acting hacksaw using Scotch yoke mechanism By Uprndra Arya.....
Double acting hacksaw using Scotch yoke mechanism By Uprndra Arya.....Double acting hacksaw using Scotch yoke mechanism By Uprndra Arya.....
Double acting hacksaw using Scotch yoke mechanism By Uprndra Arya.....AryaUpendra
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewRidwanul Hoque
 

Similar to Summer Training BHEL, Haridwar, BLK-I (20)

automobile radiator project
automobile radiator projectautomobile radiator project
automobile radiator project
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladesh
 
Condition monitoring of rotating electrical machines
Condition monitoring of rotating electrical machinesCondition monitoring of rotating electrical machines
Condition monitoring of rotating electrical machines
 
TC-MODULE – 2.pdf
TC-MODULE – 2.pdfTC-MODULE – 2.pdf
TC-MODULE – 2.pdf
 
Bangladesh steel re rolling mill (bsrm)
Bangladesh steel re rolling mill (bsrm)Bangladesh steel re rolling mill (bsrm)
Bangladesh steel re rolling mill (bsrm)
 
Energy audit & conservation studies for industries
Energy audit & conservation studies for industriesEnergy audit & conservation studies for industries
Energy audit & conservation studies for industries
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
SSP
SSPSSP
SSP
 
Generator Baisc Construction.pptx
Generator Baisc Construction.pptxGenerator Baisc Construction.pptx
Generator Baisc Construction.pptx
 
Electrical Motor
Electrical Motor Electrical Motor
Electrical Motor
 
Ram lal choudhary (DG GENERATOR)
Ram lal  choudhary (DG GENERATOR)Ram lal  choudhary (DG GENERATOR)
Ram lal choudhary (DG GENERATOR)
 
Practical Variable Speed Drives for Instrumentation and Control Systems
Practical Variable Speed Drives for Instrumentation and Control SystemsPractical Variable Speed Drives for Instrumentation and Control Systems
Practical Variable Speed Drives for Instrumentation and Control Systems
 
Starting and cooling methodes of motor
Starting and cooling methodes of motorStarting and cooling methodes of motor
Starting and cooling methodes of motor
 
Ajay123 ppt
Ajay123 pptAjay123 ppt
Ajay123 ppt
 
Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
 
Double acting hacksaw using Scotch yoke mechanism By Uprndra Arya.....
Double acting hacksaw using Scotch yoke mechanism By Uprndra Arya.....Double acting hacksaw using Scotch yoke mechanism By Uprndra Arya.....
Double acting hacksaw using Scotch yoke mechanism By Uprndra Arya.....
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
Unit 3-4-a
Unit 3-4-aUnit 3-4-a
Unit 3-4-a
 
vdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.pptvdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.ppt
 

Summer Training BHEL, Haridwar, BLK-I

  • 1. Presentation On Manufacturing Process of 500MW Turbo Generator At Electrical Machinery Block I B.H.E.L., Haridwar Manish Kumar Verma
  • 2. Contents • Introduction • Basic Arrangement of TG in Industries • Parts of Turbo Generator • Excitation System • Testing of Turbo Generator • Cooling System of Turbo Generator • Conclusion
  • 3. Introduction • What is a TURBO GENERATOR ? • Principle of Electrical Generator • Basic Arrangement of TURBO GENERATOR in industries Generator Turbine Exciter
  • 4. Constituents of Turbo Generator • Stator Frame • Stator Core • Stator Winding • Overhang Base • Rotor
  • 5. TG Stator Core • 500 MW Stator Core  Made by Spiral Stacking  Made of CRGO Si Steel Stampings.  Advantage of Spiral Stacking- Better Locking 500 MW TG Core Bar  Used for locking of stampings  Made of Mild Steel or Stainless Steel Wedge Teeth Winding Slot Holes for Cooling Holes for Studs Core Bar Slot
  • 6. TG Stator Winding Double Layer Winding is Used Double Layer Winding Concept Stator Bars Winding in Stator Core Manufacturer Data for 500MW TG Stator Mechanical Specifications • No of Slots : 48 • No. of Core Bars : 24 • Stator bars numbering: [1-48 : Lower Stator Bars 51-98 : Upper Stator Bars] • No. of Baskets : 6 Electrical Specifications • Terminal Voltage = 21kV • Rated Current = 28000 A • Rated P.F. = 0.85 Lagging • Efficiency = 99.75%
  • 7. TG Rotor Core and Winding • Rotor has Concentric Winding. • 500 MW rotor is made of 2 Poles. • Rotor Winding bars are placed and connected in Rotor slots in a opposite manner (one CW and other ACW) • Opposite pole windings are connected using Z conductor Manufacturer Data for Rotor V = 400 V ; I = 6000 A
  • 8. DC Excitation System Diode Wheel/Rectifier Wheel on Exciter Schematic of Brushless Exciter • Automatic Voltage Regulator (AVR) • Permanent Magnet Pilot Exciter • Measuring Slipring with Brushes for Field • Quadrature axis Measuring Coil • Three Phase Main Exciter • Diode Rectifier Set • Three Phase Lead • Multicontact Connector • Rotor Winding of TG • Stator Winding of TG Manufacturer Data for Exciter V = 400 V ; I = 6000 A
  • 9. Testing of Turbo Generator • Winding Resistance: [Resistance Measurement of Stator winding, Exciter Stator and Exciter Rotor Winding using RTD.] • Insulation Resistance: [Performed before and after HV Test] [use Meggar to measure IR of Winding w.r.t. earth] [apply Meggar Voltage for 60 seconds and 600 seconds] [Calculate PI(Polarization Index) = IR(600 sec)/IR(60 sec)] PI should be > 2.0 [Lower values of PI indicate bad insulation resistance of machine] • High Voltage Test: [use formula : V = (2Vn + 1)kV ; Vn = rated voltage of Generator & V = Applied High Voltage] [Apply High Voltage between each phase and ground; connect other phases to ground] [Duration for High Voltage Applying = 1 Minute]
  • 10. Testing of Turbo Generator Continued… • Mechanical Heat Run Test: [RTD, Bearing, Body and Ambient Temperatures are recorded at equal intervals till thermal equilibrium is achieved, then Machine is stopped & Hot resistance of winding is also measured] [Over Speed Test : Machine is run at 120% rated speed for 2 Minutes] [500 MW TG Test Bed at BHEL, Haridwar, BLK-I]
  • 11. • Open Circuit Heat Run Test: [ Machine is run at rated speed and rated voltage. ] [Power input to Prime Mover, Generator Voltage, Exciter voltage and Current, RTD, Bearing, Body and Ambient Temperatures are recorded at equal intervals till thermal equilibrium is achieved, then Machine is stopped & Hot resistance of winding is also measured] [Sine wave of 3-Phase Voltage is recorded by C.R.O.] [Phase sequence is tested by using phase sequence indicator] [All the three phases are checked for balance] [Noise Level Test: Noise level is measured from different locations of machine and background noise level is also measured after stopping the machine and actual noise level of machine is calculated] [Shaft Voltage measurement: measure using multimeter between D.E. and N.D.E. of Shaft] [Vibrations Measurement: Vibrations at Horizontal, Vertical, Axial directions at both D.E and N.D.E are measured using Piezo Electric Sensors] Testing of Turbo Generator Continued…
  • 12. Testing of Turbo Generator Continued… • Short Circuit Heat Run Test: [ Machine terminals are shorted and machine is run at rated speed and rated current. ] [Power input to Prime Mover, Generator Current, Exciter voltage and Current, RTD, Bearing, Body and Ambient Temperatures are recorded at equal intervals till thermal equilibrium is achieved, then Machine is stopped & Hot resistance of winding is also measured] [Momentary overload Test: Machine is excited to 150% of rated current for 30 Seconds] • Impedance Test of Rotor: [A 1-ϕ variable voltage is applied to field winding and currents at 25%, 50%, 75% and 100% voltage are measured]
  • 13. Cooling System of Turbo Generator • Hydrogen Cooling is used for Core and Body • Water Cooling is used for Windings (Distilled Water is used) Process: 1. Dry air pressure is given to machine using Si Gel. 2. CO2 Pressure is given to remove air from machine (Air removed). 3. N2 Pressure is used to take the machine temperature down. (CO2 removed). 4. Hydrogen Pressure is given to the machine and maintained. 5. Hydrogen is sucked at high pressure and sent to chiller which cools the Hydrogen. Chiller
  • 14. Conclusion Experience in Bharat Heavy Electricals Ltd, Haridwar being a Vocational Trainee was very interesting and inspiring. Though 45 days duration is very little to explore even a single block of the plant, yet I have tried to learn as much as I could. I got to know about the industrial equipment which are generally used in an industry. Besides Technical Knowledge, I also observed management system of plant and working environment and being one of the leading manufacturing companies of industrial products B.H.E.L. has very inspiring and positive working environment. This company has very talented personnel who answered me everything what I asked. This company is doing very good to improve Power System Efficiency and Power Quality and Safety.