SlideShare a Scribd company logo
Sudipto Dey
Contact: 09836186564
E-Mail: sudiptodey.23@gmail.com
Scaling new heights of success with hard work & dedication and leaving a mark of excellence on every step.
Domain: Telecom, E&U, Healthcare
Location Preference: Anywhere in India
P R O F I L E S U M M A R Y
• A competent professional with nearly 10 years of experience in Software Testing
• Currently associated with The Linde Group, Kolkata as Senior Specialist
• HP-QC & QTP certified and good knowledge in Selenium
• TMMi certified professional
• Involved in load monitoring and expertise in understanding the business by adopting methods like debugging within
minimum time
• Well versed with C, C++, Core JAVA, Oracle 8i, SQL Server 2000, Microsoft Access, Windows (XP, 2000, NT), etc.
• Successfully completed projects on Leap MRA test, LT merger, Linde Template, LiMA, InTouch, Maximo, EChannel etc.
• Working knowledge of SAP SD and MM module
• Expertise in introducing a set of processes in the area of software release management, test planning, test design, test
execution and defect tracking to improve overall process efficiency and effectiveness
• Proficient in developing templates for Test Strategy, Test Scenarios, Test Case, Defect Report, Periodic and End of
Project Reports, etc.
• Worked in Agile methodology and continuous testing
• Established TCoE(Test Center Of Excellence) Organization at Linde Group.
• Ensured the delivery of quality product releases on schedule using risk analysis and defect containment practices, test
automation, and continuous improvement initiatives
• A keen communicator with honed interpersonal, problem solving and analytical abilities
O R G A N I S A T I O N A L E X P E R I E N C E
Since Sep’09 with The Linde Group, Kolkata as Senior Specialist
Feb’09-Sep’09 with IBM India Pvt. Ltd., Kolkata as System Engineer
Aug’06-Jan’09 with TechMahindra Pvt. Ltd.,Kolkata as Technical Associate
Nov’05-Jul’06 with Price Water House Coopers Ltd., Kolkata as System Consultant
Key Result Areas:
• Monitoring testing activities to ensure the quality and functionality of
assigned systems
• Ensuring timely and accurate test communication with Development Leads,
Project Manager and Senior Management throughout the project life-cycle
• Reviewing project test and implementing schedules; monitoring,
documenting and reporting the current status of testing cycle and overall
project to the management
• Managing offshore QA resources for ensuring timely project completion;
developing quality standards through participating in the initial software
development stages; validating and enhancing the existing QA plan and
strategy
• Preparing, designing and leding the Test Strategy and Test Plan for all projects; carrying out review activities such as
Requirements Review, Design Review, Test Strategy Review and Test Case Review
• Interacting with team members to ensure smooth progress of project work; ensuring adherence to quality norms
throughout the implementation process
• Creating a process to collect information on customer-reported product defects and turn this information into
repeatable test cases to reduce product quality regression in future releases
• Played a key role to set up Test Center Of Excellence (TCoE) in organization. TCoE is team of SAP Functional resource
and Automation tester. Managed both SAP Functional team and automation team and delivered many projects.
Increased automation coverage in many projects.
Highlights:
• Sucessfully developed the Quality Gate Development Process and Procedures; deployed short and long-term Quality
Improvement Programs such as established the centralize testing team called Test Center Of Excellence (TCoE) and
standardized the testing process accross all projects.
• Played a pivotal role in evaluation, selection and deployment of Bug Tracking and Requirements Management System
using HP Quality Center which streamlined Defect Management and Requirement Tracking processes.
• Successful upgrade of HP-QC 9.2 TO 11 & later to ALM 12. Also played a pivotal role in the ALM-TFS integration.
• Merit of developing the Test Automation and Metrics Approach based on Test Director Implementation which enabled
test effectiveness growth and cost reduction of 52%
• Stellar role in assigning work to team members, monitoring their performance and delivering outstanding results such
as delivered functional, regression and validation test with in strict timeline but maintained 100% quality through
coaching, direction, and recognizing QC team members
• Developed Tesing KPIs such as Automation Coverage Trend, Const Per Test Execution etc.
• Played a key role to establish Agile process and continuous testing approach for many projects
E D U C A T I O N
• B-Tech. (Information Technology) from B.P.Poddar Institute of Management and Technology in 2005.
I T S K I L L S
Programming Languages: C, C++, Core JAVA
DBMS: Oracle 8i, SQL Server 2000 and Microsoft Access.
Operating Systems: Windows (XP, 2000, NT)
Test Management Tool: HP ALM
Automation Tools: QTP 12.02(Automated Main frame, SAP, Mobile, CRM and Web
application), Selenium
SAP Module: SD, MM
Performance Testing Tool: HP Load Runner 11
Methodology: Agile, Continuous testing
T R A I N I N G S
• Successfully completed trainings on
o SAP FI by JKT
o HP Load runner 11 by HP
o Internal Training on Testing Concepts (TechMahindra); QTP (TechMahindra); Winrunner
o TMMi training conducted by Experimentus
P E R S O N A L D E T A I L S
Date of Birth: 6th
January 1984
Permanent Address: 31, Natun Para Ghola Road Belghoria, Kolkatta-700083
Languages Known: English, Hindi and Bengali
LinkedIn Profile: Please mention if any
Location Preference: Anywhere in India
(Please refer the ANNEXURE for projects)
ANNEXURE
P R O J E C T S
Project Title: Leap MRA Testing
Company: The Linde Group
Tools: HP ALM
Project Details: Leap is Linde Template Release 2. First go live is for Switzerland is the new
major SAP templates in the Linde World which is getting developed to
harmonize all the SAP templates those are running in different countries. It has
all the modules of SAP like SD, Supply (MM, PP, PM, QM, EWM etc) , FICO etc.
MRA stands for medical risk analysis. MRA testing is essentially focus on all end
to end process area where medical risk is involve as Linde do business in
medical Gas so for every go-live MRA testing is must and closure criteria is
100% pass. It is risk based testing.
Duration: February 2015 – October 2015
Responsibility:
• Responsible for Business process understanding. Working as Manual Test Lead
• Managing SAP functional resources and worked as co-ordinator from onsite between offshore team and project team.
• Resolving Functional process query consulting with Business Process Owners
• Review manual test cases prepared by offshore team understanding URS, FDS and DDS documents
• Defect management.
• Reporting Test creation and execution progress to program management team
Project Title: Linde Template R1 & R2 Merger
Company: The Linde Group
Tools: HP ALM, HP UFT
Project Details: Linde Template Release1 will be merged with Linde Template Release 2 through
code drop of LT R2 into LT R1 box. Merger test is to make sure there is no
impact on already live R1 template due to R2 code drop. It is to make sure R1
countries (Australia, New Zealand, Brazil) should have no impact on their
already live system due to R2 drop.
Duration: March 2015 – October 2015
Responsibility:
• Responsible for Business process understanding. Working as Manual and Automation Test Lead
• Managing SAP functional resources and automation resources and worked as co-ordinator between offshore team and
R1 support team.
• Resolving Functional process query consulting with Business Process Owners
• Getting automated test script created through automation resource and getting them reviewed by process owners
• Defect management both manual and automation defect
• Reporting Test execution and Defect closure progress to stake holders
Project Title: Linde Template Release 1
Company: The Linde Group
Tools: QTP 11, QC 11, HP Load Runner.
Project Details: Linde Template is the new major SAP templates in the Linde World which is
getting developed to harmonize all the SAP templates those are running in
different countries. This new template will rollout in all the regions and all
existing templates will be replaces by this new template. It has all the modules
of SAP like SD, MM, FICO etc.
Duration: February 2011 – till date
Responsibility:
• Responsible for Business process understanding. Working as Automation and Manual Regression Test Lead
• Involved in Automation of Integration Test Cases using QTP
• Resolving Functional and Data issue consulting with Business Process Owners
• Developing manual test cases understanding FDS and FDD documents
• Designing QTP Framework
• Managing performance testing during first go-live
• Offering test management to the project and manage HP ALM 11 as site and project admin.
• Managing regression test cycle before any minor or major release
Project Title: LiMA
Company: The Linde Group
Tools: QTP 11, Meux Add-in, QC 11
Project Details: LiMA is a mobile application used in windows mobile. It is used to scan cylinder
while delivering to customer and scan empty cylinder while taking back from
customer. LiMA has an interface with SAP and communication can happen both
way from LiMA to SAP and vise versa.
Duration: June 2013 – till date
Responsibility:
• Accountable for business process understanding
• Manage manual test team to get the manual test case created taking help from DDS documents.
• Manage automation team to get the automation script created for mobile application using QTP and M-Eux add-in
• Ensured that Agile methodology is followed properly
• Participate in scrum call to understand testing scope and timeline and take necessary action to deliver in time
• Followed Agile methodology and worked as a coordinator between development and test team
• Established continuous testing approach
• Managing Release execution and reporting execution status
• Administering defects and debugging the defects.
Project Title: eChannel
Company: The Linde Group
Tools: Selenium
Project Details: eChannel is a Web Shop used by Linde customers. Cylinders, hard goods items
etc customers can buy from eChannel Web Shop. It is developed by 3rd
party
vendor Valtech and then tested by Linde Testing team. There is a release in
every quarter and before release regression test suite is executed through
automation in quality system. For new functionality new scripts are appended in
the scope. Agile process is followed in this project. In development system
functional testing is performed daily as a part of continuous testing approach
Duration: July 2014 – till date
Responsibility:
• Accountable for business process understanding
• Manage automation team to get the automation script created using Selenium
• Ensured that Agile methodology is followed properly
• Participate in scrum call to understand testing scope and timeline and take necessary action to deliver in time
• Followed Agile methodology and worked as a coordinator between development and test team
• Established continuous testing approach
• Managing Release execution and daily execution and reporting execution status
• Administering defects and debugging the defects.
Project Title: InTouch
Company: The Linde Group
Tools: QTP 11, QC 11
Project Details: InTouch is one of the two major SAP templates implemented in the Linde World.
All InTouch countries execute the same tests manually with their country
specific test data. We have done automation for regression script and supported
from Release 100 to Release 230
Duration: October 2009 – till date
Responsibility:
• Accountable for business process understanding
• Handling automated FICO Test Cases using QTP.
• Managing Release execution and reporting execution status
• Administering defects and debugging the defects.
Project Title: SAP IM
Company: The Linde Group
Tools: QTP 9.5, QC 9.2
Project Details: Develop a global template for the automation of data capture, data entry &
workflow to support efficient approvals of nonPurchase order Invoices, and
resolutions of exceptions based on state-of-the-art technology (SAP IM).
WILL result in increased level of invoice accuracy & reduced volume of
exceptions based on globally aligned set of rules agreed upon between Finance
& Procurement. The development of the SAP IM global template is included in
the scope of the Global Linde SAP Template
Duration: March 2011 – February 2012
Responsibility:
• Involved in automation of SAP IM Test Cases using QTP
Project Title: Maximo
Company: The Linde Group
Project Details: Maximo is an EAM system used for maintaining the assets within different ASU plant
locations. This is a J2EE based product under IBM’s Tivoli suite of solutions. The service
communicates through customized EAI layer (Web methods and SAP connector) for
interfacing with SAP for inbound and outbound transactions.
Duration: March 2011 – January 2012
Project Title: BP One HR (Client: BP)
Company: IBM India Pvt. Ltd.
Tools: QTP 10.0
Project Details: BP One HR transformation program keeps the vision of “One HR for One BP”. In the BP
One HR focus are kept on One Service Delivery Model, One Way of Working, One Set of
Systems, One Approach to Data and One Partnership Framework. In this view, it covers
Personnel Development, Operation, International Mobility and Resourcing.
Duration: Feb 2009 to Aug 2009
Project Title: 21CN Ethernet (Client: British Telecom)
Company: Techmahindra
Duration: January 2007 - January 2009
Tools: QTP 9.0
Project Title: Network Record System (NRS) (Client: British Telecom)
Company: Techmahindra
Duration: August 2007 – October 2007
Tools: QTP 9.0
Project Title: NEO-CST (Client: British Telecom)
Company: Techmahindra
Duration: August 2006 – December 2006
Tools: QTP 9.0
Project Title: Oracle GATE (Client: PWC USA)
Duration: November 2005 – July 2006
Project Title: PeopleSoftGATE (Client: PWC USA)
Duration: November 2005 – July 2006
• Administering defects and debugging the defects.
Project Title: SAP IM
Company: The Linde Group
Tools: QTP 9.5, QC 9.2
Project Details: Develop a global template for the automation of data capture, data entry &
workflow to support efficient approvals of nonPurchase order Invoices, and
resolutions of exceptions based on state-of-the-art technology (SAP IM).
WILL result in increased level of invoice accuracy & reduced volume of
exceptions based on globally aligned set of rules agreed upon between Finance
& Procurement. The development of the SAP IM global template is included in
the scope of the Global Linde SAP Template
Duration: March 2011 – February 2012
Responsibility:
• Involved in automation of SAP IM Test Cases using QTP
Project Title: Maximo
Company: The Linde Group
Project Details: Maximo is an EAM system used for maintaining the assets within different ASU plant
locations. This is a J2EE based product under IBM’s Tivoli suite of solutions. The service
communicates through customized EAI layer (Web methods and SAP connector) for
interfacing with SAP for inbound and outbound transactions.
Duration: March 2011 – January 2012
Project Title: BP One HR (Client: BP)
Company: IBM India Pvt. Ltd.
Tools: QTP 10.0
Project Details: BP One HR transformation program keeps the vision of “One HR for One BP”. In the BP
One HR focus are kept on One Service Delivery Model, One Way of Working, One Set of
Systems, One Approach to Data and One Partnership Framework. In this view, it covers
Personnel Development, Operation, International Mobility and Resourcing.
Duration: Feb 2009 to Aug 2009
Project Title: 21CN Ethernet (Client: British Telecom)
Company: Techmahindra
Duration: January 2007 - January 2009
Tools: QTP 9.0
Project Title: Network Record System (NRS) (Client: British Telecom)
Company: Techmahindra
Duration: August 2007 – October 2007
Tools: QTP 9.0
Project Title: NEO-CST (Client: British Telecom)
Company: Techmahindra
Duration: August 2006 – December 2006
Tools: QTP 9.0
Project Title: Oracle GATE (Client: PWC USA)
Duration: November 2005 – July 2006
Project Title: PeopleSoftGATE (Client: PWC USA)
Duration: November 2005 – July 2006

More Related Content

What's hot

Continuous testing & devops with @petemar5hall
Continuous testing & devops with @petemar5hallContinuous testing & devops with @petemar5hall
Continuous testing & devops with @petemar5hall
Peter Marshall
 
Current vacancies April 2016
Current vacancies April 2016Current vacancies April 2016
Current vacancies April 2016
Lizanne Young
 
I nearshore
I nearshore I nearshore
OpenERP - Project Methodology
OpenERP - Project MethodologyOpenERP - Project Methodology
OpenERP - Project MethodologyOdoo
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management Solution
DevOps.com
 
iSQI Certification Days IREB Stefan Sturm
iSQI Certification Days IREB Stefan SturmiSQI Certification Days IREB Stefan Sturm
iSQI Certification Days IREB Stefan Sturm
Ievgenii Katsan
 
Kelly McGraw's Resume 2016
Kelly McGraw's Resume 2016Kelly McGraw's Resume 2016
Kelly McGraw's Resume 2016Kelly McGraw
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2
amitsonuksms
 
Engineering DevOps and Cloud
Engineering DevOps and CloudEngineering DevOps and Cloud
Engineering DevOps and Cloud
Marc Hornbeek
 
ALM 101: An introduction to application lifecycle management
ALM 101: An introduction to application lifecycle managementALM 101: An introduction to application lifecycle management
ALM 101: An introduction to application lifecycle management
nonlinear creations
 
Demiana-Anis-Resume
Demiana-Anis-ResumeDemiana-Anis-Resume
Demiana-Anis-ResumeDemiana Anis
 
Pmp capm exam preparation
Pmp capm exam preparationPmp capm exam preparation
Pmp capm exam preparationFreedom Monk
 
Engineering Continuous Delivery Architectures
Engineering Continuous Delivery ArchitecturesEngineering Continuous Delivery Architectures
Engineering Continuous Delivery Architectures
Marc Hornbeek
 
Camunda Day New York 2019: Case Study. Organizing a Camunda Hackathon: Lesson...
Camunda Day New York 2019: Case Study. Organizing a Camunda Hackathon: Lesson...Camunda Day New York 2019: Case Study. Organizing a Camunda Hackathon: Lesson...
Camunda Day New York 2019: Case Study. Organizing a Camunda Hackathon: Lesson...
camunda services GmbH
 
PMI-ACP Lesson 10 Agile Metrics
PMI-ACP Lesson 10 Agile MetricsPMI-ACP Lesson 10 Agile Metrics
PMI-ACP Lesson 10 Agile Metrics
Thanh Nguyen
 

What's hot (20)

Continuous testing & devops with @petemar5hall
Continuous testing & devops with @petemar5hallContinuous testing & devops with @petemar5hall
Continuous testing & devops with @petemar5hall
 
Current vacancies April 2016
Current vacancies April 2016Current vacancies April 2016
Current vacancies April 2016
 
I nearshore
I nearshore I nearshore
I nearshore
 
Karthik Subbu Resume
Karthik Subbu ResumeKarthik Subbu Resume
Karthik Subbu Resume
 
OpenERP - Project Methodology
OpenERP - Project MethodologyOpenERP - Project Methodology
OpenERP - Project Methodology
 
S.Baktha-QA-Process-Audits
S.Baktha-QA-Process-AuditsS.Baktha-QA-Process-Audits
S.Baktha-QA-Process-Audits
 
Resume
ResumeResume
Resume
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management Solution
 
iSQI Certification Days IREB Stefan Sturm
iSQI Certification Days IREB Stefan SturmiSQI Certification Days IREB Stefan Sturm
iSQI Certification Days IREB Stefan Sturm
 
Kelly McGraw's Resume 2016
Kelly McGraw's Resume 2016Kelly McGraw's Resume 2016
Kelly McGraw's Resume 2016
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2
 
Arish Ahmed
Arish AhmedArish Ahmed
Arish Ahmed
 
Engineering DevOps and Cloud
Engineering DevOps and CloudEngineering DevOps and Cloud
Engineering DevOps and Cloud
 
ALM 101: An introduction to application lifecycle management
ALM 101: An introduction to application lifecycle managementALM 101: An introduction to application lifecycle management
ALM 101: An introduction to application lifecycle management
 
Ravindra A N
Ravindra A NRavindra A N
Ravindra A N
 
Demiana-Anis-Resume
Demiana-Anis-ResumeDemiana-Anis-Resume
Demiana-Anis-Resume
 
Pmp capm exam preparation
Pmp capm exam preparationPmp capm exam preparation
Pmp capm exam preparation
 
Engineering Continuous Delivery Architectures
Engineering Continuous Delivery ArchitecturesEngineering Continuous Delivery Architectures
Engineering Continuous Delivery Architectures
 
Camunda Day New York 2019: Case Study. Organizing a Camunda Hackathon: Lesson...
Camunda Day New York 2019: Case Study. Organizing a Camunda Hackathon: Lesson...Camunda Day New York 2019: Case Study. Organizing a Camunda Hackathon: Lesson...
Camunda Day New York 2019: Case Study. Organizing a Camunda Hackathon: Lesson...
 
PMI-ACP Lesson 10 Agile Metrics
PMI-ACP Lesson 10 Agile MetricsPMI-ACP Lesson 10 Agile Metrics
PMI-ACP Lesson 10 Agile Metrics
 

Similar to SudiptoDey_Resume - Copy

Suma_Halkude_Resume
Suma_Halkude_ResumeSuma_Halkude_Resume
Suma_Halkude_ResumeSuma Halkude
 
Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016Prem Papabathini
 
Resume_Shameena_Technical Lead_10Yrs
Resume_Shameena_Technical Lead_10YrsResume_Shameena_Technical Lead_10Yrs
Resume_Shameena_Technical Lead_10YrsShameena Nayeem
 
1454178450509Resume_Anushree
1454178450509Resume_Anushree1454178450509Resume_Anushree
1454178450509Resume_AnushreeAnushree Anand
 
Ashok Poreddy_IBM_ Mainframes_8yrs
Ashok Poreddy_IBM_ Mainframes_8yrsAshok Poreddy_IBM_ Mainframes_8yrs
Ashok Poreddy_IBM_ Mainframes_8yrsAshok Reddy
 
Amrapali sawant résumé
Amrapali sawant résuméAmrapali sawant résumé
Amrapali sawant résumé
Amrapali Sawant
 
Balaji_Kumaran_Updated.doc
Balaji_Kumaran_Updated.docBalaji_Kumaran_Updated.doc
Balaji_Kumaran_Updated.docBalaji Kumaran
 
Shoaib Kamal Resume
Shoaib Kamal ResumeShoaib Kamal Resume
Shoaib Kamal Resume
ShoaibMallick
 

Similar to SudiptoDey_Resume - Copy (20)

Suma_Halkude_Resume
Suma_Halkude_ResumeSuma_Halkude_Resume
Suma_Halkude_Resume
 
Resume_Madhu Akkasali
Resume_Madhu AkkasaliResume_Madhu Akkasali
Resume_Madhu Akkasali
 
Abhijit_Testing
Abhijit_TestingAbhijit_Testing
Abhijit_Testing
 
Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016
 
Ravi Prakash v1.1
Ravi Prakash v1.1Ravi Prakash v1.1
Ravi Prakash v1.1
 
Resume
ResumeResume
Resume
 
Resume_Shameena_Technical Lead_10Yrs
Resume_Shameena_Technical Lead_10YrsResume_Shameena_Technical Lead_10Yrs
Resume_Shameena_Technical Lead_10Yrs
 
Noor-Res
Noor-ResNoor-Res
Noor-Res
 
QA lead
QA leadQA lead
QA lead
 
QA lead
QA leadQA lead
QA lead
 
Anubha Srivastava
Anubha SrivastavaAnubha Srivastava
Anubha Srivastava
 
Resume
ResumeResume
Resume
 
1454178450509Resume_Anushree
1454178450509Resume_Anushree1454178450509Resume_Anushree
1454178450509Resume_Anushree
 
Ashok Poreddy_IBM_ Mainframes_8yrs
Ashok Poreddy_IBM_ Mainframes_8yrsAshok Poreddy_IBM_ Mainframes_8yrs
Ashok Poreddy_IBM_ Mainframes_8yrs
 
Dipesh QA Lead
Dipesh QA LeadDipesh QA Lead
Dipesh QA Lead
 
Profile Seema Wadhwa
Profile Seema WadhwaProfile Seema Wadhwa
Profile Seema Wadhwa
 
Rajendra K Basavanna-Profile
Rajendra K Basavanna-ProfileRajendra K Basavanna-Profile
Rajendra K Basavanna-Profile
 
Amrapali sawant résumé
Amrapali sawant résuméAmrapali sawant résumé
Amrapali sawant résumé
 
Balaji_Kumaran_Updated.doc
Balaji_Kumaran_Updated.docBalaji_Kumaran_Updated.doc
Balaji_Kumaran_Updated.doc
 
Shoaib Kamal Resume
Shoaib Kamal ResumeShoaib Kamal Resume
Shoaib Kamal Resume
 

SudiptoDey_Resume - Copy

  • 1. Sudipto Dey Contact: 09836186564 E-Mail: sudiptodey.23@gmail.com Scaling new heights of success with hard work & dedication and leaving a mark of excellence on every step. Domain: Telecom, E&U, Healthcare Location Preference: Anywhere in India P R O F I L E S U M M A R Y • A competent professional with nearly 10 years of experience in Software Testing • Currently associated with The Linde Group, Kolkata as Senior Specialist • HP-QC & QTP certified and good knowledge in Selenium • TMMi certified professional • Involved in load monitoring and expertise in understanding the business by adopting methods like debugging within minimum time • Well versed with C, C++, Core JAVA, Oracle 8i, SQL Server 2000, Microsoft Access, Windows (XP, 2000, NT), etc. • Successfully completed projects on Leap MRA test, LT merger, Linde Template, LiMA, InTouch, Maximo, EChannel etc. • Working knowledge of SAP SD and MM module • Expertise in introducing a set of processes in the area of software release management, test planning, test design, test execution and defect tracking to improve overall process efficiency and effectiveness • Proficient in developing templates for Test Strategy, Test Scenarios, Test Case, Defect Report, Periodic and End of Project Reports, etc. • Worked in Agile methodology and continuous testing • Established TCoE(Test Center Of Excellence) Organization at Linde Group. • Ensured the delivery of quality product releases on schedule using risk analysis and defect containment practices, test automation, and continuous improvement initiatives • A keen communicator with honed interpersonal, problem solving and analytical abilities O R G A N I S A T I O N A L E X P E R I E N C E Since Sep’09 with The Linde Group, Kolkata as Senior Specialist Feb’09-Sep’09 with IBM India Pvt. Ltd., Kolkata as System Engineer Aug’06-Jan’09 with TechMahindra Pvt. Ltd.,Kolkata as Technical Associate
  • 2. Nov’05-Jul’06 with Price Water House Coopers Ltd., Kolkata as System Consultant Key Result Areas: • Monitoring testing activities to ensure the quality and functionality of assigned systems • Ensuring timely and accurate test communication with Development Leads, Project Manager and Senior Management throughout the project life-cycle • Reviewing project test and implementing schedules; monitoring, documenting and reporting the current status of testing cycle and overall project to the management • Managing offshore QA resources for ensuring timely project completion; developing quality standards through participating in the initial software development stages; validating and enhancing the existing QA plan and strategy • Preparing, designing and leding the Test Strategy and Test Plan for all projects; carrying out review activities such as Requirements Review, Design Review, Test Strategy Review and Test Case Review • Interacting with team members to ensure smooth progress of project work; ensuring adherence to quality norms throughout the implementation process • Creating a process to collect information on customer-reported product defects and turn this information into repeatable test cases to reduce product quality regression in future releases • Played a key role to set up Test Center Of Excellence (TCoE) in organization. TCoE is team of SAP Functional resource and Automation tester. Managed both SAP Functional team and automation team and delivered many projects. Increased automation coverage in many projects. Highlights: • Sucessfully developed the Quality Gate Development Process and Procedures; deployed short and long-term Quality Improvement Programs such as established the centralize testing team called Test Center Of Excellence (TCoE) and standardized the testing process accross all projects. • Played a pivotal role in evaluation, selection and deployment of Bug Tracking and Requirements Management System using HP Quality Center which streamlined Defect Management and Requirement Tracking processes. • Successful upgrade of HP-QC 9.2 TO 11 & later to ALM 12. Also played a pivotal role in the ALM-TFS integration. • Merit of developing the Test Automation and Metrics Approach based on Test Director Implementation which enabled test effectiveness growth and cost reduction of 52% • Stellar role in assigning work to team members, monitoring their performance and delivering outstanding results such as delivered functional, regression and validation test with in strict timeline but maintained 100% quality through coaching, direction, and recognizing QC team members • Developed Tesing KPIs such as Automation Coverage Trend, Const Per Test Execution etc. • Played a key role to establish Agile process and continuous testing approach for many projects E D U C A T I O N • B-Tech. (Information Technology) from B.P.Poddar Institute of Management and Technology in 2005. I T S K I L L S Programming Languages: C, C++, Core JAVA DBMS: Oracle 8i, SQL Server 2000 and Microsoft Access. Operating Systems: Windows (XP, 2000, NT) Test Management Tool: HP ALM Automation Tools: QTP 12.02(Automated Main frame, SAP, Mobile, CRM and Web application), Selenium SAP Module: SD, MM Performance Testing Tool: HP Load Runner 11 Methodology: Agile, Continuous testing T R A I N I N G S • Successfully completed trainings on o SAP FI by JKT o HP Load runner 11 by HP o Internal Training on Testing Concepts (TechMahindra); QTP (TechMahindra); Winrunner o TMMi training conducted by Experimentus P E R S O N A L D E T A I L S
  • 3. Date of Birth: 6th January 1984 Permanent Address: 31, Natun Para Ghola Road Belghoria, Kolkatta-700083 Languages Known: English, Hindi and Bengali LinkedIn Profile: Please mention if any Location Preference: Anywhere in India (Please refer the ANNEXURE for projects) ANNEXURE P R O J E C T S Project Title: Leap MRA Testing Company: The Linde Group Tools: HP ALM Project Details: Leap is Linde Template Release 2. First go live is for Switzerland is the new major SAP templates in the Linde World which is getting developed to harmonize all the SAP templates those are running in different countries. It has all the modules of SAP like SD, Supply (MM, PP, PM, QM, EWM etc) , FICO etc. MRA stands for medical risk analysis. MRA testing is essentially focus on all end to end process area where medical risk is involve as Linde do business in medical Gas so for every go-live MRA testing is must and closure criteria is 100% pass. It is risk based testing. Duration: February 2015 – October 2015 Responsibility: • Responsible for Business process understanding. Working as Manual Test Lead • Managing SAP functional resources and worked as co-ordinator from onsite between offshore team and project team. • Resolving Functional process query consulting with Business Process Owners • Review manual test cases prepared by offshore team understanding URS, FDS and DDS documents • Defect management. • Reporting Test creation and execution progress to program management team Project Title: Linde Template R1 & R2 Merger Company: The Linde Group Tools: HP ALM, HP UFT Project Details: Linde Template Release1 will be merged with Linde Template Release 2 through code drop of LT R2 into LT R1 box. Merger test is to make sure there is no impact on already live R1 template due to R2 code drop. It is to make sure R1 countries (Australia, New Zealand, Brazil) should have no impact on their already live system due to R2 drop. Duration: March 2015 – October 2015 Responsibility: • Responsible for Business process understanding. Working as Manual and Automation Test Lead • Managing SAP functional resources and automation resources and worked as co-ordinator between offshore team and R1 support team. • Resolving Functional process query consulting with Business Process Owners • Getting automated test script created through automation resource and getting them reviewed by process owners • Defect management both manual and automation defect • Reporting Test execution and Defect closure progress to stake holders Project Title: Linde Template Release 1 Company: The Linde Group Tools: QTP 11, QC 11, HP Load Runner. Project Details: Linde Template is the new major SAP templates in the Linde World which is getting developed to harmonize all the SAP templates those are running in different countries. This new template will rollout in all the regions and all existing templates will be replaces by this new template. It has all the modules of SAP like SD, MM, FICO etc. Duration: February 2011 – till date Responsibility: • Responsible for Business process understanding. Working as Automation and Manual Regression Test Lead • Involved in Automation of Integration Test Cases using QTP • Resolving Functional and Data issue consulting with Business Process Owners
  • 4. • Developing manual test cases understanding FDS and FDD documents • Designing QTP Framework • Managing performance testing during first go-live • Offering test management to the project and manage HP ALM 11 as site and project admin. • Managing regression test cycle before any minor or major release Project Title: LiMA Company: The Linde Group Tools: QTP 11, Meux Add-in, QC 11 Project Details: LiMA is a mobile application used in windows mobile. It is used to scan cylinder while delivering to customer and scan empty cylinder while taking back from customer. LiMA has an interface with SAP and communication can happen both way from LiMA to SAP and vise versa. Duration: June 2013 – till date Responsibility: • Accountable for business process understanding • Manage manual test team to get the manual test case created taking help from DDS documents. • Manage automation team to get the automation script created for mobile application using QTP and M-Eux add-in • Ensured that Agile methodology is followed properly • Participate in scrum call to understand testing scope and timeline and take necessary action to deliver in time • Followed Agile methodology and worked as a coordinator between development and test team • Established continuous testing approach • Managing Release execution and reporting execution status • Administering defects and debugging the defects. Project Title: eChannel Company: The Linde Group Tools: Selenium Project Details: eChannel is a Web Shop used by Linde customers. Cylinders, hard goods items etc customers can buy from eChannel Web Shop. It is developed by 3rd party vendor Valtech and then tested by Linde Testing team. There is a release in every quarter and before release regression test suite is executed through automation in quality system. For new functionality new scripts are appended in the scope. Agile process is followed in this project. In development system functional testing is performed daily as a part of continuous testing approach Duration: July 2014 – till date Responsibility: • Accountable for business process understanding • Manage automation team to get the automation script created using Selenium • Ensured that Agile methodology is followed properly • Participate in scrum call to understand testing scope and timeline and take necessary action to deliver in time • Followed Agile methodology and worked as a coordinator between development and test team • Established continuous testing approach • Managing Release execution and daily execution and reporting execution status • Administering defects and debugging the defects. Project Title: InTouch Company: The Linde Group Tools: QTP 11, QC 11 Project Details: InTouch is one of the two major SAP templates implemented in the Linde World. All InTouch countries execute the same tests manually with their country specific test data. We have done automation for regression script and supported from Release 100 to Release 230 Duration: October 2009 – till date Responsibility: • Accountable for business process understanding • Handling automated FICO Test Cases using QTP. • Managing Release execution and reporting execution status
  • 5. • Administering defects and debugging the defects. Project Title: SAP IM Company: The Linde Group Tools: QTP 9.5, QC 9.2 Project Details: Develop a global template for the automation of data capture, data entry & workflow to support efficient approvals of nonPurchase order Invoices, and resolutions of exceptions based on state-of-the-art technology (SAP IM). WILL result in increased level of invoice accuracy & reduced volume of exceptions based on globally aligned set of rules agreed upon between Finance & Procurement. The development of the SAP IM global template is included in the scope of the Global Linde SAP Template Duration: March 2011 – February 2012 Responsibility: • Involved in automation of SAP IM Test Cases using QTP Project Title: Maximo Company: The Linde Group Project Details: Maximo is an EAM system used for maintaining the assets within different ASU plant locations. This is a J2EE based product under IBM’s Tivoli suite of solutions. The service communicates through customized EAI layer (Web methods and SAP connector) for interfacing with SAP for inbound and outbound transactions. Duration: March 2011 – January 2012 Project Title: BP One HR (Client: BP) Company: IBM India Pvt. Ltd. Tools: QTP 10.0 Project Details: BP One HR transformation program keeps the vision of “One HR for One BP”. In the BP One HR focus are kept on One Service Delivery Model, One Way of Working, One Set of Systems, One Approach to Data and One Partnership Framework. In this view, it covers Personnel Development, Operation, International Mobility and Resourcing. Duration: Feb 2009 to Aug 2009 Project Title: 21CN Ethernet (Client: British Telecom) Company: Techmahindra Duration: January 2007 - January 2009 Tools: QTP 9.0 Project Title: Network Record System (NRS) (Client: British Telecom) Company: Techmahindra Duration: August 2007 – October 2007 Tools: QTP 9.0 Project Title: NEO-CST (Client: British Telecom) Company: Techmahindra Duration: August 2006 – December 2006 Tools: QTP 9.0 Project Title: Oracle GATE (Client: PWC USA) Duration: November 2005 – July 2006 Project Title: PeopleSoftGATE (Client: PWC USA) Duration: November 2005 – July 2006
  • 6. • Administering defects and debugging the defects. Project Title: SAP IM Company: The Linde Group Tools: QTP 9.5, QC 9.2 Project Details: Develop a global template for the automation of data capture, data entry & workflow to support efficient approvals of nonPurchase order Invoices, and resolutions of exceptions based on state-of-the-art technology (SAP IM). WILL result in increased level of invoice accuracy & reduced volume of exceptions based on globally aligned set of rules agreed upon between Finance & Procurement. The development of the SAP IM global template is included in the scope of the Global Linde SAP Template Duration: March 2011 – February 2012 Responsibility: • Involved in automation of SAP IM Test Cases using QTP Project Title: Maximo Company: The Linde Group Project Details: Maximo is an EAM system used for maintaining the assets within different ASU plant locations. This is a J2EE based product under IBM’s Tivoli suite of solutions. The service communicates through customized EAI layer (Web methods and SAP connector) for interfacing with SAP for inbound and outbound transactions. Duration: March 2011 – January 2012 Project Title: BP One HR (Client: BP) Company: IBM India Pvt. Ltd. Tools: QTP 10.0 Project Details: BP One HR transformation program keeps the vision of “One HR for One BP”. In the BP One HR focus are kept on One Service Delivery Model, One Way of Working, One Set of Systems, One Approach to Data and One Partnership Framework. In this view, it covers Personnel Development, Operation, International Mobility and Resourcing. Duration: Feb 2009 to Aug 2009 Project Title: 21CN Ethernet (Client: British Telecom) Company: Techmahindra Duration: January 2007 - January 2009 Tools: QTP 9.0 Project Title: Network Record System (NRS) (Client: British Telecom) Company: Techmahindra Duration: August 2007 – October 2007 Tools: QTP 9.0 Project Title: NEO-CST (Client: British Telecom) Company: Techmahindra Duration: August 2006 – December 2006 Tools: QTP 9.0 Project Title: Oracle GATE (Client: PWC USA) Duration: November 2005 – July 2006 Project Title: PeopleSoftGATE (Client: PWC USA) Duration: November 2005 – July 2006