CIS 499 Week 2 Project Deliverable 1: Project Plan Inception NEW
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 110 points
This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment.
Cis 599 Enthusiastic Study / snaptutorial.comStephenson7
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 120 points
This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project
Strayer cis 349 week 10 term paper planning an it infrastructure audit for co...shyaminfo30
STRAYER CIS 349 Week 10 Term Paper Planning An It Infrastructure Audit For Compliance (2 Papers) NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/cis-349-strayer/cis-349-week-10-term-paper-planning-an-it-infrastructure-audit-for-compliance-new
For more classes visit
http://www.assignmentcloud.com
CIS 349 Week 10 Term Paper Planning An It Infrastructure Audit For Compliance (2 Papers) NEW
erm Paper: Planning an IT Infrastructure Audit for Compliance
Due Week 10 and worth 200 points
Case study for communication social portal with share point implementationMike Taylor
Communication Social Portal with SharePoint Implementation for a global infrastructure Engineering, Procurement & Construction company to Improve employee work.
Cis 599 Enthusiastic Study / snaptutorial.comStephenson7
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 120 points
This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project
Strayer cis 349 week 10 term paper planning an it infrastructure audit for co...shyaminfo30
STRAYER CIS 349 Week 10 Term Paper Planning An It Infrastructure Audit For Compliance (2 Papers) NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/cis-349-strayer/cis-349-week-10-term-paper-planning-an-it-infrastructure-audit-for-compliance-new
For more classes visit
http://www.assignmentcloud.com
CIS 349 Week 10 Term Paper Planning An It Infrastructure Audit For Compliance (2 Papers) NEW
erm Paper: Planning an IT Infrastructure Audit for Compliance
Due Week 10 and worth 200 points
Case study for communication social portal with share point implementationMike Taylor
Communication Social Portal with SharePoint Implementation for a global infrastructure Engineering, Procurement & Construction company to Improve employee work.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 110 points
This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both
Cis 499 Enthusiastic Study / snaptutorial.comStephenson05
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 110 points
This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
strayer CIS 498 Week 2 Project Deliverable 1 Project Plan Inception NEW
To purchase this material click below link
http://www.assignmentcloud.com/cis-498-strayer/cis-498-week-2-project-deliverable-1-project-plan-inception-new
For more classes visit
www.assignmentcloud.com
CIS 498 Week 2 Project Deliverable 1 Project Plan Inception
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment.
Cis 590 Enthusiastic Study / snaptutorial.comStephenson06
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 120 points
This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
You are currently the Chief Information Officer (CIO) for an innovative Internet-based
Capstone Project OverviewThe purpose of this capstone project is.docxhumphrieskalyn
Capstone Project Overview
The purpose of this capstone project is for students to assume a senior management approach and apply project management techniques to create an integrative information technology solution to address organizational issues in order to satisfy an executive team and venture capital group. Students will critically assess existing information systems infrastructures, emerging technologies, and how enabling technologies affect organizational strategy. Deliverables 1 through 6 focus on preparing students toward the final capstone project. Skills, experience, and knowledge gained through the completion of prerequisite courses will be used throughout each deliverable. The project contents to be addressed are as follows:
1. Project Deliverable 1: Project Plan Inception.In this deliverable, you will create a project introduction that includes background information of the company, the type of business that the company is involved in, speculation upon outsourcing and offshoring opportunities, identification of skilled information systems personnel need for project, specific types of data that the company collects, and a description of the integrative information systems that the company should have to support the business. You will also create a project plan to record tasks, subtasks, and resources, and identify the schedule of the project. Additionally, the plan will outline the planning, analysis, design, and implementation phases of your project.
Submission Requirements
0. Project Introduction (MS Word)
0. Project Plan (MS Project)
1. Project Deliverable 2: Business Requirements. In this deliverable, you will create an original business requirements document for the project plan using the template provided under Additional Resources in the Student Center tab of the online course shell. You will be asked to describe the detailed project including the scope, possible risks, constraints, and assumptions, integration with other systems and infrastructure, and relevant terms that will be used throughout project. You will also need to update the project plan.
Submission Requirements
0. Business Requirements Document (MS Word)
0. Revised Project Plan (MS Project)
1. Project Deliverable 3: Database and Data Warehousing Design.In this deliverable, you will create a database schema that supports the company’s business and processes, explain and support the database schema, create database tables, normalize the database tables, create an Entity-Relationship (E-R) Diagram and create a Data Flow Diagram (DFD). You will also be asked to create sample queries that will support the organizational reporting needs and screen layouts that illustrate the interface that organizational users will utilize. You will need to update the project plan.
Submission Requirements
0. Design Document (MS Word)
0. Revised Project Plan (MS Project)
1. Project Deliverable 4: Analytics, Interfaces, and Cloud Technology. In this deliverable, you will support t ...
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
You have been made the Chief Information Officer and Chief Technology Officer (CIO / CTO) of an innovative e-Commerce start-up company that a venture capital group has funded. The CEO has given you sixty (60) days to
Business RequirementsReference number Document ControlTawnaDelatorrejs
Business Requirements
Reference number:
Document Control
Change Record
Date
Author
Version
Change Reference
Reviewers
Name
Position
Table of Contents
2Document Control
1
Business Requirements
4
1.1
Project Overview
4
1.2
Background including current process
4
1.3
Scope
4
1.3.1
Scope of Project
4
1.3.2
Constraints and Assumptions
5
1.3.3
Risks
5
1.3.4
Scope Control
5
1.3.5
Relationship to Other Systems/Projects
5
1.3.6
Definition of Terms (if applicable)
5
1 Business Requirements
1.1 Project Overview
Provide a short, yet complete, overview of the project.
1.2 Background including current process
Describe the background to the project, (same section may be reused in the Quality Plan) include:
This project is
The project goal is to
The IT role for this project is
1.3 Scope
1.3.1 Scope of Project
The scope of this project includes a number of areas. For each area, there should be a corresponding strategy for incorporating these areas into the overall project.
Applications
In order to meet the target production date, only these applications will be implemented:
Sites
These sites are considered part of the implementation:
Process Re-engineering
Re-engineering will
Customization
Customizations will be limited to
Interfaces
the interfaces included are:
Architecture
Application and Technical Architecture will
Conversion
Only the following data and volume will be considered for conversion:
Testing
Testing will include only
Funding
Project funding is limited to
Training
Training will be
Education
Education will include
1.3.2 Constraints and Assumptions
The following constraints have been identified:
The following assumptions have been made in defining the scope, objectives and approach:
1.3.3 Risks
The following risks have been identified as possibly affecting the project during its progression:
1.3.4 Scope Control
The control of changes to the scope identified in this document will be managed through the Change Control, with business owner representative approval for any changes that affect cost or timeline for the project.
1.3.5 Relationship to Other Systems/Projects
It is the responsibility of the business unit to inform IT of other business initiatives that may impact the project. The following are known business initiatives:
1.3.6 Definition of Terms (if applicable)
List any definitions that will be used throughout the duration of the project.
5
Project Deliverable 1: Project Plan Inception
Overview
This assignment consists of two sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and/or assume all necessary assumptions needed for the completion of this assignment.
You are currently the Chief Information Officer (CIO) for an innovative Internet-based compa ...
CIS 498 Effective Communication - snaptutorial.comdonaldzs1
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary
BUS 630 Week 1 Assignment Case 2B Mendel Paper Company NEW
BUS 620 Week 2 Assignment Case 3A (Auerbach Enterprises) NEW
BUS 630 Managerial Accounting Week 5 Assignment (Middlehurst House )
BUS 630 Week 4 Assignment Case 6B (Chester &Wayne) NEW
BUS 630 Week 4 Assignment Case 5A (Glaser Health Products) NEW
BUS630 Week 2 DQ1 Product costs NEW
BUS 630 Week 2 DQ 2 Job Order Costing vs. Proess Costing NEW
BUS 630 Week 1 Assignment Case 2B Mendel Paper Company NEW
BUS 620 Week 2 Assignment Case 3A (Auerbach Enterprises) NEW
BUS 630 Managerial Accounting Week 5 Assignment (Middlehurst House )
BUS 630 Week 4 Assignment Case 6B (Chester &Wayne) NEW
BUS 630 Week 4 Assignment Case 5A (Glaser Health Products) NEW
BUS630 Week 2 DQ1 Product costs NEW
BUS 630 Week 2 DQ 2 Job Order Costing vs. Proess Costing NEW
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 110 points
This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both
Cis 499 Enthusiastic Study / snaptutorial.comStephenson05
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 110 points
This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
strayer CIS 498 Week 2 Project Deliverable 1 Project Plan Inception NEW
To purchase this material click below link
http://www.assignmentcloud.com/cis-498-strayer/cis-498-week-2-project-deliverable-1-project-plan-inception-new
For more classes visit
www.assignmentcloud.com
CIS 498 Week 2 Project Deliverable 1 Project Plan Inception
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment.
Cis 590 Enthusiastic Study / snaptutorial.comStephenson06
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 120 points
This assignment consists of two (2) sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
You are currently the Chief Information Officer (CIO) for an innovative Internet-based
Capstone Project OverviewThe purpose of this capstone project is.docxhumphrieskalyn
Capstone Project Overview
The purpose of this capstone project is for students to assume a senior management approach and apply project management techniques to create an integrative information technology solution to address organizational issues in order to satisfy an executive team and venture capital group. Students will critically assess existing information systems infrastructures, emerging technologies, and how enabling technologies affect organizational strategy. Deliverables 1 through 6 focus on preparing students toward the final capstone project. Skills, experience, and knowledge gained through the completion of prerequisite courses will be used throughout each deliverable. The project contents to be addressed are as follows:
1. Project Deliverable 1: Project Plan Inception.In this deliverable, you will create a project introduction that includes background information of the company, the type of business that the company is involved in, speculation upon outsourcing and offshoring opportunities, identification of skilled information systems personnel need for project, specific types of data that the company collects, and a description of the integrative information systems that the company should have to support the business. You will also create a project plan to record tasks, subtasks, and resources, and identify the schedule of the project. Additionally, the plan will outline the planning, analysis, design, and implementation phases of your project.
Submission Requirements
0. Project Introduction (MS Word)
0. Project Plan (MS Project)
1. Project Deliverable 2: Business Requirements. In this deliverable, you will create an original business requirements document for the project plan using the template provided under Additional Resources in the Student Center tab of the online course shell. You will be asked to describe the detailed project including the scope, possible risks, constraints, and assumptions, integration with other systems and infrastructure, and relevant terms that will be used throughout project. You will also need to update the project plan.
Submission Requirements
0. Business Requirements Document (MS Word)
0. Revised Project Plan (MS Project)
1. Project Deliverable 3: Database and Data Warehousing Design.In this deliverable, you will create a database schema that supports the company’s business and processes, explain and support the database schema, create database tables, normalize the database tables, create an Entity-Relationship (E-R) Diagram and create a Data Flow Diagram (DFD). You will also be asked to create sample queries that will support the organizational reporting needs and screen layouts that illustrate the interface that organizational users will utilize. You will need to update the project plan.
Submission Requirements
0. Design Document (MS Word)
0. Revised Project Plan (MS Project)
1. Project Deliverable 4: Analytics, Interfaces, and Cloud Technology. In this deliverable, you will support t ...
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
You have been made the Chief Information Officer and Chief Technology Officer (CIO / CTO) of an innovative e-Commerce start-up company that a venture capital group has funded. The CEO has given you sixty (60) days to
Business RequirementsReference number Document ControlTawnaDelatorrejs
Business Requirements
Reference number:
Document Control
Change Record
Date
Author
Version
Change Reference
Reviewers
Name
Position
Table of Contents
2Document Control
1
Business Requirements
4
1.1
Project Overview
4
1.2
Background including current process
4
1.3
Scope
4
1.3.1
Scope of Project
4
1.3.2
Constraints and Assumptions
5
1.3.3
Risks
5
1.3.4
Scope Control
5
1.3.5
Relationship to Other Systems/Projects
5
1.3.6
Definition of Terms (if applicable)
5
1 Business Requirements
1.1 Project Overview
Provide a short, yet complete, overview of the project.
1.2 Background including current process
Describe the background to the project, (same section may be reused in the Quality Plan) include:
This project is
The project goal is to
The IT role for this project is
1.3 Scope
1.3.1 Scope of Project
The scope of this project includes a number of areas. For each area, there should be a corresponding strategy for incorporating these areas into the overall project.
Applications
In order to meet the target production date, only these applications will be implemented:
Sites
These sites are considered part of the implementation:
Process Re-engineering
Re-engineering will
Customization
Customizations will be limited to
Interfaces
the interfaces included are:
Architecture
Application and Technical Architecture will
Conversion
Only the following data and volume will be considered for conversion:
Testing
Testing will include only
Funding
Project funding is limited to
Training
Training will be
Education
Education will include
1.3.2 Constraints and Assumptions
The following constraints have been identified:
The following assumptions have been made in defining the scope, objectives and approach:
1.3.3 Risks
The following risks have been identified as possibly affecting the project during its progression:
1.3.4 Scope Control
The control of changes to the scope identified in this document will be managed through the Change Control, with business owner representative approval for any changes that affect cost or timeline for the project.
1.3.5 Relationship to Other Systems/Projects
It is the responsibility of the business unit to inform IT of other business initiatives that may impact the project. The following are known business initiatives:
1.3.6 Definition of Terms (if applicable)
List any definitions that will be used throughout the duration of the project.
5
Project Deliverable 1: Project Plan Inception
Overview
This assignment consists of two sections: a project introduction and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and/or assume all necessary assumptions needed for the completion of this assignment.
You are currently the Chief Information Officer (CIO) for an innovative Internet-based compa ...
CIS 498 Effective Communication - snaptutorial.comdonaldzs1
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary
BUS 630 Week 1 Assignment Case 2B Mendel Paper Company NEW
BUS 620 Week 2 Assignment Case 3A (Auerbach Enterprises) NEW
BUS 630 Managerial Accounting Week 5 Assignment (Middlehurst House )
BUS 630 Week 4 Assignment Case 6B (Chester &Wayne) NEW
BUS 630 Week 4 Assignment Case 5A (Glaser Health Products) NEW
BUS630 Week 2 DQ1 Product costs NEW
BUS 630 Week 2 DQ 2 Job Order Costing vs. Proess Costing NEW
BUS 630 Week 1 Assignment Case 2B Mendel Paper Company NEW
BUS 620 Week 2 Assignment Case 3A (Auerbach Enterprises) NEW
BUS 630 Managerial Accounting Week 5 Assignment (Middlehurst House )
BUS 630 Week 4 Assignment Case 6B (Chester &Wayne) NEW
BUS 630 Week 4 Assignment Case 5A (Glaser Health Products) NEW
BUS630 Week 2 DQ1 Product costs NEW
BUS 630 Week 2 DQ 2 Job Order Costing vs. Proess Costing NEW
ash bus 303 week 1, ash bus 303week 1, ash bus 303, his 145, ash bus 303 week 1 tutorial, ash bus 303week 1 assignment, ash bus 303week 1 help, ash bus 303 week 1 dq 1
ash bus 303, ash bus 303 complete course, ash bus 303 entire course, ash bus 303 week 1, ash bus 303 week2, ash bus 303 week 3, ash bus 303 week 4, ash bus 303 week 5, ash bus 303 tutorials, ash bus 303assignments, ash bus 303help
1. Which of the following is NOT a kind of cost associated with maintaining an inventory?
2. In TQM terms, ____ is an organizational goal to provide products or deliver services that meet or exceed customers’ expectations.
3. The easier it is to maintain a working product or fix a broken product, the more ____ that product appears.\
4. ____ productivity is a measure of performance that indicates how much of a particular kind of input it takes to produce an output.
5. ____ is a measure of performance that indicates how many inputs it takes to produce or create an output.
bus 300,strayer bus 300,strayer bus 300 complete course,strayer bus 300 entire course,bus 300 final exam new,strayer bus 300 week 2,strayer bus 300 week 4,strayer bus 300 week 5,bus 300 quiz 9 ch.17 and 18,bus 300 tutorials,bus 300 assignments,bus 300 help
Ash bus 250 week 5 final case analysis paper mattel and toy safetyshyaminfo105
ash BUS 250 Week 5 DQ 1 Social Media,ash BUS 250 Week 5 DQ 2 Corporate Philanthropy,ash BUS 250 Week 5 Final Case Analysis Paper Mattel and Toy Safety,ash bus 250,bus 250,ash bus 250 week 5 tutorial,bus 250 week 5 assignment,ash bus 250 week 5 help
Ash bus 250 week 5 dq 2 corporate philanthropyshyaminfo105
ash BUS 250 Week 5 DQ 1 Social Media,ash BUS 250 Week 5 DQ 2 Corporate Philanthropy,ash BUS 250 Week 5 Final Case Analysis Paper Mattel and Toy Safety,ash bus 250,bus 250,ash bus 250 week 5 tutorial,bus 250 week 5 assignment,ash bus 250 week 5 help
Ash bus 250 week 4 dq 2 consumer privacyshyaminfo105
ash BUS 250 Week 4 Assignment Case Study Vidding Free Expression or Copyright Piracy,ash BUS 250 Week 4 DQ 1 Insider Trading,ash BUS 250 Week 4 DQ 2 Consumer Privacy,ash bus 250,bus 250,ash bus 250 week 4 tutorial,bus 250 week 4 assignment,ash bus 250 week 4 help
Ash bus 250 week 3 dq 2 economics of recylingshyaminfo105
ash BUS 250 Week 3 Assignment Case Study Government Regulation of Tobacco Products,ash BUS 250 Week 3 DQ 2 Economics of Recyling,ash bus 250,bus 250,ash bus 250 week 3 tutorial,bus 250 week 3 assignment,ash bus 250 week 3 help
ash BUS 250 Week 2 Assignment Case Study Alcoa's Core Values in Practice,ash BUS 250 Week 2 DQ 1 Ethical Leadership,ash BUS 250 Week 2 DQ 2 Globalization,ash bus 250,bus 250,ash bus 250 week 2 tutorial,bus 250 week 2 assignment,ash bus 250 week 2 help
Ash bus 250 week 2 dq 1 ethical leadershipshyaminfo105
ash BUS 250 Week 2 Assignment Case Study Alcoa's Core Values in Practice,ash BUS 250 Week 2 DQ 1 Ethical Leadership,ash BUS 250 Week 2 DQ 2 Globalization,ash bus 250,bus 250,ash bus 250 week 2 tutorial,bus 250 week 2 assignment,ash bus 250 week 2 help
ash bus 201 week 5,ash bus 201 week 5,ash bus 201,ash bus 201 ,ash bus 201 week 5 tutorial,ash bus 201 week 5 assignment,ash bus 201 week 5 help,ash bus 201 week 5 dq 1,ash bus 201 week 5 dq 2,ash BUS 201 Week 5 Assignment Job Analysis Boat Captain
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
Ethnobotany and Ethnopharmacology:
Ethnobotany in herbal drug evaluation,
Impact of Ethnobotany in traditional medicine,
New development in herbals,
Bio-prospecting tools for drug discovery,
Role of Ethnopharmacology in drug evaluation,
Reverse Pharmacology.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
Thesis Statement for students diagnonsed withADHD.ppt
Strayer cis 499 week 2 project deliverable 1
1. strayer CIS 499 Week 2 Project
Deliverable 1: Project Plan Inception NEW
To purchase this material click below link
http://www.assignmentcloud.com/cis-499-
strayer/cis-499-week-2-project-deliverable-
1-project-plan-inception-new
For more classes visit
www.assignmentcloud.com
CIS 499 Week 2 Project Deliverable 1:
Project Plan Inception NEW
Project Deliverable 1: Project Plan
Inception
Due Week 2 and worth 110 points
2. This assignment consists of two (2)
sections: a project introduction and a
project plan. You must submit both
sections as separate files for the
completion of this assignment. Label each
file name according to the section of the
assignment it is written for. Additionally,
you may create and / or assume all
necessary assumptions needed for the
completion of this assignment.
The use of specific software has been
suggested however equivalents such as
OpenOffice, Dia, and Open Project are also
permitted. If equivalent tools are used,
files must be saved for grading using
extensions that are readable by their
equivalent Microsoft Windows edition.
Assignment submissions that fail to follow
this request may result in a reduced grade.
3. You are a newly appointed Chief
Information Officer (CIO) of a $25 million
dollar data collection and analysis
company that has been operating less than
two (2) years. It is expected to grow by
60% over the next eighteen (18) months.
Your company currently collects data
using Web analytics and combines it with
operational systems data. Web analytics is
an increasingly important part of most
business marketing plans. Your company
is looking for ways to leverage the
collected data but wants to ensure that the
information technology infrastructure will
support the expected growth that the
company is anticipating. The Chief
Executive Officer (CEO) has given you sixty
(60) days to deliver a comprehensive
information systems project plan to
address the organizational growth that the
4. company is experiencing. The company
will be expanding from one (1) floor to
three (3) floors within six (6) months.
Since this is a relatively new company,
there is currently limited technology
infrastructure to support the business. All
information technology (hardware and
software) must be redesigned to meet
organizational needs. The solution should
be implemented in either a hosted
solution, on-site solution, or a hybrid
model. The CEO is expecting you to
integrate different technologies from
different partners and incorporate
industry best practices and cost-effective
solutions in connection with the
development of technological systems. In
addition, the CEO is extremely interested
in cloud computing technologies and
Software-as-a-Service (SaaS) but is leery of
security issues that may be associated.
5. However, he is sure that you will
implement proper security protocols. The
company currently consists of twenty (20)
employees of which four (4), including
yourself, are dedicated to the IT
organization.
Section 1: Project Introduction
1. Write a four to six (4-6) page project
introduction that documents the current
state of the organization, expands upon
the information given above, and includes
the following:
1. Background information of the
company.
2. Details regarding the type of business
that the company is engaged in.
3. A description of current outsourcing
and offshoring activities.
6. 4. Identification of current skilled
information systems personnel in position
and responsibilities.
5. The specific types of data that the
company collects.
6. A description of the information
systems that the company currently has to
support the business. The description at a
minimum should include the following:
1. Operational Systems and Databases
2. Analytics and Interfaces
• Infrastructure and Security
1. The use of at least two (2) quality
resources in this assignment. Note:
Wikipedia and similar Websites do not
qualify as quality resources.
Section 1 of your assignment must follow
these formatting requirements:
7. • Be typed, double spaced, using Times
New Roman font (size 12), with one-inch
margins on all sides; citations and
references must follow APA or school-
specific format. Check with your professor
for any additional instructions.
• Include a cover page containing the title
of the assignment, the student’s name, the
professor’s name, the course title, and the
date. The cover page and the reference
page are not included in the required
assignment page length.
Section 2: Project Plan
Use Microsoft Project to:
1. Create a project plan (summary and
detailed) using Microsoft Office Project.
The project plan should:
8. 1. Record all tasks, subtasks, resources,
and time related to the project.
2. Outline the planning, analysis, design,
and implementation phases.
3. Develop in accordance with the systems
development life cycle (SDLC).
The specific course learning outcomes
associated with this assignment are:
• Describe the various functions and
activities within the information systems
area, including the role of IT management
and the CIO, structuring of IS management
within an organization, and managing IS
professionals within the firm.
• Use technology and information
resources to research issues in
information systems.
9. • Write clearly and concisely about
strategic issues and practices in the
information systems domain using proper
writing mechanics and technical style
conventions.
10. • Write clearly and concisely about
strategic issues and practices in the
information systems domain using proper
writing mechanics and technical style
conventions.