SlideShare a Scribd company logo
Strategies for
Smooth
Pavements
Don Matthews, PE
Pavement Recycling Systems, Inc.
Spring Asphalt Pavement
Conference and Equipment Expo
April 26, 2018
Antonymy of the Smoothness of a Roadway
Construction Practices
DesignStrategy
Poor Best
AppropriatePoor
Really
Bad
Bad
So So
Great
Hitting Here is What
All of Us Owe the Tax
Payers of California
But How Smooth is Smooth?
Should we really pay to get low volume roadways
to the same smoothness standard as an interstate?
The Pavement & Material Partnering Committee is
working diligently towards the ultimate balance
Taxpayer Cost
Quality Contractor Risk
Today’s Presentation
 Review Smoothness Terminology
 Review Issues on Projects for Smoothness
 Brief Overview of 2D and 3D Technology
 Come to the Only Logical Solution to Obtain
Smoothness
Disclaimer
This Presentation is for Educational Purposes Only
The Goal is to Improve All Aspects of Smoothness
Its Should Not Be Used in the Preparation or Defense of
Any Claim or Dispute Without The Written Consent of
the Author and CalAPA
Terminology Overview -
International Roughness Index (IRI)
IRI is a smoothness value obtained by processing a profile
through the ProVAL computer program (algorithm)
It is based on a golden car (representing 70% of vehicles)
It analyzes roughness inputs in a single wheel path
ProVAL
©Copyright the U. of Michigan
Areas of Localized Roughness (ALR)
ALRs are individual roughness locations (caused by bumps or dips) where the IRI of the
existing surface exceeds a specified IRI level. It is expressed by peak IRI value
528’
One Wheel Path Only
Mean Roughness Index (MRI)
MRI is the average of the IRIs from the left and right wheel paths over a 0.1 mile (528)
section of a lane
Definitions –MRI
0.1
mile
0.1
mile
ETW
RWP = Right Wheel Path LWP = Left Wheel Path
ETW
Direction of Travel
RWP
LWP
Ave. IRI = 58 in/mi
Ave. IRI = 62 in/mi
Direction of Travel
MRI = 60 in/mi
Ave. IRI = 64 in/mi
Ave. IRI = 60 in/mi
MRI = 62 in/mi
Terminology - This is NOT a Grinder
This is a:
• Cold Planer
• Mill
• Cold Mill
It typically has conical carbide tipped cutting tools (teeth)
Therefore prohibited by specification for final surfaces
It can have diamond tipped tools. A few have flat teeth
Its head height can change continuously based on a
referencing system or automatic machine guidance
Micro Mill vs
Standard Cold Planer
Micro Milled Surface Standard Milled Surface
Micro Milling Drum
Standard Milling Drum
Smooth surfaces can be obtained with a
standard cold planer
A micro mill finer tool pattern provides:
• Less raveling of exposed aggregate
from traffic
• Smaller ridges and valleys for less
cover needed
• Better surface control for smaller
removals
• Less surface impact due to teeth
wear
In All Cold Planing Best Practices Must Be Followed:
Transitions into and out of cuts must be smooth
The milled surface must be cleaned well
The drum must not be stopped while still in the cut
The mill’s mechanical systems must be maintained
The cutting tools and blocks must be maintained and/or replaced as
needed
Appropriate Continuous Speeds Must be Maintained
Do not out run the pattern – The texture changes as speed
increases. Don’t overrun averaging system
It may not be about production!!
Terminology - This is a Diamond Grinder
Gives a smooth finish
surface. Good for final
surface corrections
Is a “rigid” frame
planer equipped with
diamond tipped blades
Head height is set
and fixed to the
position of the front
and rear wheels
Diamond Grinding or Cold Planing
Corrections Can Only Do So Much
Can only go deeper or wider
Can’t fix a pavement or subgrade
WORKING CRACKS – Respond Dynamically to
Vehicles, Including Inertial Profiler
Working – Not correctible
by grinding or cold planing
Non Working – Likely correctible
by grinding or cold planing
Definitions of Opportunities
and Referencing
Existing Surface (165 MRI)
Opportunity 1 (Improvement to 85 MRI) Opportunity 2 (Improvement to 60 MRI)
Must Be Variable Depth
Existing Surface
MRI (in/mi)
New Surface
MRI (in/mi)
300 120
200 90
150 75
120 65
90 60
60 45
Reasonable Expected Improvement Values
For One Smoothness Opportunity
Originally Suggested Equation Being Considered:
MRIExpected = 0.30 x MRIExisting + 35
Example: With existing MRI of 135
and single overlay, should expect
final surface to improve to a 75 MRI
0.30 x 135 + 35 = 75
So if you want to a achieve a smoothness level but the existing is too
rough for the design strategy, you need to add a smoothness opportunity
In Other Words Want =>75 MRI, Need Existing MRI To Be 135
Existing Pavement Surface
Aggregate Base/Subgrade
Cold Planing
(Mill and Fill)
“Smoothness Opportunities” in HMA
HMA Overlay
Existing Pavement Surface
Aggregate Base/Subgrade
Pre-pave Corrections
Filled HMA
HMA Overlay
Existing Pavement Surface
Aggregate Base/Subgrade
Cold In-place Recycling
With Overlay
CIR
Pre-Pave Corrections (Pre-Pave
Grinding)
Existing Asphalt Surface Prior to Overlay
or Pavement Preservation Seal
Existing Pavement Surface
Aggregate Base/Subgrade
Pre-Pave Correction
Should be a Smoothness
Opportunity
HMA Overlay
But is it?
+/-
Existing Pavement Surface
Entire roadway corrected 100%
to no ALR > than 180 in/mi
Pre Pave Correction
With Overlay
Example
Requires 0.15’ HMA overlay
+/-
Existing Pavement SurfaceHMA Overlay
Referencing system not using pre
pave corrections – Using rougher
shoulder and not corrected
pavement
Pre pave corrections provide little
opportunity to improve to
smoothness
Pre Pave Correction
With Overlay Ex. Cont.
May Need to Set Up Referencing System Differently
Or Allow Correcting in Referencing Locations and Not Wheel Paths
This Would Lead to a True Performance Expectation
of the Final Surface Smoothness
+/-
Existing Pavement SurfaceHMA Overlay
Variable Width
Paving
Variable width paving causes a
change to the head of material
against the screed
Difficult to produce a level,
smooth pavement surface if the
head of material fluctuates
against the screed
Constant Head of Material
 Half auger level
 Constant resistance
 Constant depth
Increased Head of Material
 Increased height
 Resistance increased
 Depth increases
Decreased Head of Material
 Decreased height
 Resistance decreased
 Depth decreases
Head of Material in Front of the Screed
Screed will change its height (relative position) due to the
resistance from the head of material in the auger chamber
+/-
Existing Pavement Surface
Cold Planing as an
Opportunity
Is Cold Planing a
Smoothness Opportunity?
Maybe
Variable Depth
Cold Planing
Must be Used
Constant depth will
transfer the roughness
to the bottom of the
cold planed surface
Good averaging
systems should be
used when cold
planing the existing
surface
Variable Depth
2D Averaging - Sufficient for the
Majority of Applications if an Effective
Correction Strategy is Designed
For 2D Averaging, Referencing Is Important!
Here?
Where Do We Run the Reference Averaging
System While Cold Planing?
Here?
Need to Find
Smoothest
Referencing
Surface
Available
+/-
Existing Pavement Surface
Cold Planing Could
be an Opportunity
But not if the paver
does not use it for 2D
referencing
Paver 2D referencing
needs to be on cold
planed surface if
smoother
Must also consider
matching constraints
Matching Constraints and
Challenges with Smoothness
Existing Pavement Surface
Aggregate Base/Subgrade
Filled HMA
How do you run a
matching shoe on a 120
in/mi MRI shoulder?
But pave a 60 in/mi MRI
just 3 feet over?
Not likely
Need to allow
variable depth
paving with a good
referencing surface
Pre Milling Post Milling
MRI
(in/mi)
MRI
(in/mi)
Change in
MRI
%
Change
127 96 31.2 25%
120 98 21.6 18%
74 77 -2.4 -3%
95 94 1.5 2%
83 145 -61.9 -75%
96 101 -4.8 -5%
77 99 -22.7 -29%
88 114 -26.7 -31%
80 128 -48.1 -60%
78 118 -40.0 -52%
86 88 -2.1 -2%
64 112 -47.7 -74%
65 104 -39.0 -60%
90 123 -33.5 -37%
63 91 -27.8 -44%
72 97 -25.1 -35%
101 96 5.0 5%
79 110 -30.4 -38%
61 140 -78.8 -129%
61 113 -51.5 -84%
70 91 -21.2 -30%
71 105 -33.3 -47%
123 130 -7.0 -6%
72 125 -53.0 -74%
81 75 5.3 7%
77 107 -30.3 -40%
98 106 -8.2 -8%
Highway Project
4” Mill Depth
Made Worse in Many
Cases
In Some Instances Cold
Planing May Not Improve
Smoothness
If delamination occurs,
the cut depth must be
increased
Paving over a
delaminated surface
can result in differential
compaction
A delaminated surface
will also provide a
rough reference line for
the paver
Delamination
For 2D, Referencing Has a
Major Impact on Smoothness
The longer and smoother the reference, the
smoother the pavement .
And Please! –
Once a good reference line is set, trust the
equipment!
Manual adjustment = ALR
Variable depth thin cut ski runs for a cold planer or
paver can be made if necessary
Example Project of True Partnering
Fog Line
Existing Pavement Surface
Cold Plane
Originally Proposed Strategy
No Place for Referencing
for Cold Planer or Paver
Centerline
Variable Width Uneven
Shoulder
Filled HMA
Uneven Fills
Example Project (Cont.)
Fog Line
Existing Pavement Surface
Cold Plane
Partnered Constructed Strategy
Cut Ski Run for Paver
Referencing
Centerline
Shoulder Filled Separately
Filled HMA
Even Width Fill
Existing Pavement Surface
Aggregate Base/Subgrade
Cold In-place Recycling (CIR)
With Overlay
HMA Overlay Smoothness
Opportunity?
CIR
Smoothness
Opportunity?
+/-
Existing Pavement SurfaceCIR
Contractor Spent Weeks of
Corrections in Wheel Path
Old Specification - CIR
Required 75 in/mi MRI
But Paver did Not use
Corrected Surface for
2D referencing
HMA Overlay
Guesss What?
CIR as a Smoothness Opportunity?
CIR tends to make a smooth surface
rougher and rough surface smoother
CIR smoothness is influenced by a
variety of things:
• Many different varying previous
overlays
• Multiple maintenance surface
seals
• Variations in distresses
• Environmental conditions
• Air temperature
• Pavement temperature
Its More About Using Best Paving Practices
Regardless of the existing roadway’s roughness, using best practices
can result in smoothness of the CIR of about 90 in/mi MRI (New Spec)
Approximately a 60 in/mi MRI should then be attainable on the HMA overlay
 CIR Section with Test Project of one mile at end of project
 NB lane
 No ProVAL SAM analysis
 Micro milled with averaging system – Took 4.5 hours
 Corrected average MRI of 95.6 in/mi to 70.7 in/mi
 Corrected 7 areas of ALR over 180 in/mi to no areas of ALR over 180 in/mi
 SB lane
 ProVAL SAM system followed completely using a diamond grinder –
Stopped after 8 hours Corrected Average MRI of 93.9 in/mi to 84.7 in/mi
Tried to correct 3 areas of ALR over 180 in/mi but still had 3 areas of ALR
over 180 in/mi when stopped
Correct CIR With a Micro Mill and Not
Diamond Grinder
Consistency - Head of Material on Screed
Besides Referencing
Consistency = Best Paving Practices
Consistency - Paving Speed
Consistency - Mix Temperature
Check Your Crew Against a Reasonable
Expectation Metric
• Mark Collection Start of Your IP Run Before Paving
• Determine MRI of the Existing Before Paving
• Determine MRI After Paving
• Compare Each 0.1 mile Section With the Equation
MRIExpected = 0.30 x MRIExisting + 35
If You Are Not Meeting Expectations
CalAPA’s ½ Day Training Class
PAVEMENT SMOOTHNESS ESSENTIALS
-- NEW SPECIFICATIONS, TECHNOLOGY
& BEST PRACTICES
Consider Training
Consider Other Technology
Like 3D Modeling and
Machine Control
3D Control -
Total Station Machine Control
The Preferred
Choice When
Required to Cut
to Specific
Grades at
Specific
Elevations
Oakland Airport With 6 Automatic Machined
Controlled Mills Working Simultaneously
Hit Multiple Precise Grade Changes
But 6 Mills Require
Approx. 600’ Approx. 600’ Approx. 600’Approx. 600’
Limited to 1,200’ Spacing
and Leap Frogging of Guns
Traffic control is typically required to
take existing surface readings to build
model
With one set of existing surface
readings models can be made for
control of the cold planer and multiple
paving lifts
Total Station Modeling
An Alternative 3D Solution for Rehab Projects
Uses GPS to Position Horizontally with Scanned Surface for Vertical Road Surface
Can use LiDAR
Relative Surface Scanning
Can also use laser
Relative Surface Scanning
Machine Control is Based Upon Relative
Depth and Not Elevation
Approx. 2 Miles
No Need to Leap Frog Base
Station
Approx. 2 Miles
Traffic control is not required to take
readings to build model
Model cannot be used for multiple
lifts. A new model is required for
paving or if surface has changed at all
Subject to GPS quality issues
Conclusion –
How To Get A Smooth Road
Agency +
Contractor -
Use Best Construction
Practices
Agency -
Incorporate A Design
Strategy Appropriate for
Existing Roadway
Conditions
Contractor
Together
The Only Way to Get
The Best Roadways!
Thank You!
Questions?
dmatthews@pavementrecycling.com
(951) 232-7384

More Related Content

Similar to Strategices for Smooth Pavements

Stringless Paving: Preparing & Handling Models
Stringless Paving: Preparing & Handling ModelsStringless Paving: Preparing & Handling Models
Stringless Paving: Preparing & Handling Models
Jill Reeves
 
3 size reduction
3 size reduction3 size reduction
3 size reduction
ziaul islam
 
MTCE-ISIC-04-Milling Paving.pptx
MTCE-ISIC-04-Milling Paving.pptxMTCE-ISIC-04-Milling Paving.pptx
MTCE-ISIC-04-Milling Paving.pptx
gkchang
 
Inspecting Correctly Slide Show
Inspecting Correctly Slide ShowInspecting Correctly Slide Show
Inspecting Correctly Slide Show
Scott Workman
 
AN OVERVIEW OF PROCESS PARAMETERS OF MICRO GRAVURE COATER TO IMPROVE THE QUAL...
AN OVERVIEW OF PROCESS PARAMETERS OF MICRO GRAVURE COATER TO IMPROVE THE QUAL...AN OVERVIEW OF PROCESS PARAMETERS OF MICRO GRAVURE COATER TO IMPROVE THE QUAL...
AN OVERVIEW OF PROCESS PARAMETERS OF MICRO GRAVURE COATER TO IMPROVE THE QUAL...
IAEME Publication
 
EXPERIMENTAL VERIFICATION OF HONING PROCESS PARAMETERS ON SURFACE ROUGHNESS W...
EXPERIMENTAL VERIFICATION OF HONING PROCESS PARAMETERS ON SURFACE ROUGHNESS W...EXPERIMENTAL VERIFICATION OF HONING PROCESS PARAMETERS ON SURFACE ROUGHNESS W...
EXPERIMENTAL VERIFICATION OF HONING PROCESS PARAMETERS ON SURFACE ROUGHNESS W...
IAEME Publication
 
Lec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdfLec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdf
MdNaimulIslamSany
 
Superpavemixdesign
Superpavemixdesign Superpavemixdesign
Superpavemixdesign
pradip dangar
 
MTP.pptx
MTP.pptxMTP.pptx
MTP.pptx
RahulKundiya1
 
2015 milling
2015 milling2015 milling
2015 milling
Johnathan McBride
 
Mee2016 rapid manufacturing technology
Mee2016 rapid manufacturing technologyMee2016 rapid manufacturing technology
Mee2016 rapid manufacturing technology
Rinky Singh
 
03 adam hand
03 adam hand03 adam hand
Optimization of cutting strategies for forging die manufacturing on cnc milli...
Optimization of cutting strategies for forging die manufacturing on cnc milli...Optimization of cutting strategies for forging die manufacturing on cnc milli...
Optimization of cutting strategies for forging die manufacturing on cnc milli...
eSAT Publishing House
 
6 Six Sigma Catapult Project
6 Six Sigma Catapult Project6 Six Sigma Catapult Project
6 Six Sigma Catapult Project
Anthony "AJ" Schulte
 
Empower CNC Machine
Empower CNC MachineEmpower CNC Machine
Empower CNC Machine
Aditya Infotech
 
Lean Strategies For Injection Molding 3 Hour E Learning
Lean Strategies For Injection Molding 3 Hour E LearningLean Strategies For Injection Molding 3 Hour E Learning
Lean Strategies For Injection Molding 3 Hour E Learning
GaryChastain
 
Optimized cam programming
Optimized cam programmingOptimized cam programming
Optimized cam programming
s4a4rul
 

Similar to Strategices for Smooth Pavements (20)

Stringless Paving: Preparing & Handling Models
Stringless Paving: Preparing & Handling ModelsStringless Paving: Preparing & Handling Models
Stringless Paving: Preparing & Handling Models
 
3 size reduction
3 size reduction3 size reduction
3 size reduction
 
MTCE-ISIC-04-Milling Paving.pptx
MTCE-ISIC-04-Milling Paving.pptxMTCE-ISIC-04-Milling Paving.pptx
MTCE-ISIC-04-Milling Paving.pptx
 
Inspecting Correctly Slide Show
Inspecting Correctly Slide ShowInspecting Correctly Slide Show
Inspecting Correctly Slide Show
 
30120140504012
3012014050401230120140504012
30120140504012
 
AN OVERVIEW OF PROCESS PARAMETERS OF MICRO GRAVURE COATER TO IMPROVE THE QUAL...
AN OVERVIEW OF PROCESS PARAMETERS OF MICRO GRAVURE COATER TO IMPROVE THE QUAL...AN OVERVIEW OF PROCESS PARAMETERS OF MICRO GRAVURE COATER TO IMPROVE THE QUAL...
AN OVERVIEW OF PROCESS PARAMETERS OF MICRO GRAVURE COATER TO IMPROVE THE QUAL...
 
EXPERIMENTAL VERIFICATION OF HONING PROCESS PARAMETERS ON SURFACE ROUGHNESS W...
EXPERIMENTAL VERIFICATION OF HONING PROCESS PARAMETERS ON SURFACE ROUGHNESS W...EXPERIMENTAL VERIFICATION OF HONING PROCESS PARAMETERS ON SURFACE ROUGHNESS W...
EXPERIMENTAL VERIFICATION OF HONING PROCESS PARAMETERS ON SURFACE ROUGHNESS W...
 
Lec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdfLec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdf
 
30120140501007
3012014050100730120140501007
30120140501007
 
30120140501007
3012014050100730120140501007
30120140501007
 
Superpavemixdesign
Superpavemixdesign Superpavemixdesign
Superpavemixdesign
 
MTP.pptx
MTP.pptxMTP.pptx
MTP.pptx
 
2015 milling
2015 milling2015 milling
2015 milling
 
Mee2016 rapid manufacturing technology
Mee2016 rapid manufacturing technologyMee2016 rapid manufacturing technology
Mee2016 rapid manufacturing technology
 
03 adam hand
03 adam hand03 adam hand
03 adam hand
 
Optimization of cutting strategies for forging die manufacturing on cnc milli...
Optimization of cutting strategies for forging die manufacturing on cnc milli...Optimization of cutting strategies for forging die manufacturing on cnc milli...
Optimization of cutting strategies for forging die manufacturing on cnc milli...
 
6 Six Sigma Catapult Project
6 Six Sigma Catapult Project6 Six Sigma Catapult Project
6 Six Sigma Catapult Project
 
Empower CNC Machine
Empower CNC MachineEmpower CNC Machine
Empower CNC Machine
 
Lean Strategies For Injection Molding 3 Hour E Learning
Lean Strategies For Injection Molding 3 Hour E LearningLean Strategies For Injection Molding 3 Hour E Learning
Lean Strategies For Injection Molding 3 Hour E Learning
 
Optimized cam programming
Optimized cam programmingOptimized cam programming
Optimized cam programming
 

More from California Asphalt Pavement Association

Reducing carbon footprint in the asphalt pavement industry
Reducing carbon footprint in the asphalt pavement industryReducing carbon footprint in the asphalt pavement industry
Reducing carbon footprint in the asphalt pavement industry
California Asphalt Pavement Association
 
Industry perspective on cold in-place recycling
Industry perspective on cold in-place recyclingIndustry perspective on cold in-place recycling
Industry perspective on cold in-place recycling
California Asphalt Pavement Association
 
UCPRC perspective on the use of in-place asphalt recycling technologies
UCPRC perspective on the use of in-place asphalt recycling technologiesUCPRC perspective on the use of in-place asphalt recycling technologies
UCPRC perspective on the use of in-place asphalt recycling technologies
California Asphalt Pavement Association
 
Caltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavementsCaltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavements
California Asphalt Pavement Association
 
Update on the latest research with regard to RAP
Update on the latest research with regard to RAPUpdate on the latest research with regard to RAP
Update on the latest research with regard to RAP
California Asphalt Pavement Association
 
Pavement quality focus for local agencies in California
Pavement quality focus for local agencies in CaliforniaPavement quality focus for local agencies in California
Pavement quality focus for local agencies in California
California Asphalt Pavement Association
 
National perspective on asphalt technology and trends from the Asphalt Paveme...
National perspective on asphalt technology and trends from the Asphalt Paveme...National perspective on asphalt technology and trends from the Asphalt Paveme...
National perspective on asphalt technology and trends from the Asphalt Paveme...
California Asphalt Pavement Association
 
Utilizing reclaimed plastics in asphalt pavement mixes
Utilizing reclaimed plastics in asphalt pavement mixesUtilizing reclaimed plastics in asphalt pavement mixes
Utilizing reclaimed plastics in asphalt pavement mixes
California Asphalt Pavement Association
 
Pavement Maintenance tools and technology update
Pavement Maintenance tools and technology updatePavement Maintenance tools and technology update
Pavement Maintenance tools and technology update
California Asphalt Pavement Association
 
Presentation by Caltrans on the department's eTicketing initiative
Presentation by Caltrans on the department's eTicketing initiativePresentation by Caltrans on the department's eTicketing initiative
Presentation by Caltrans on the department's eTicketing initiative
California Asphalt Pavement Association
 
Update on eTicketing technologies for the asphalt pavement industry
Update on eTicketing technologies for the asphalt pavement industryUpdate on eTicketing technologies for the asphalt pavement industry
Update on eTicketing technologies for the asphalt pavement industry
California Asphalt Pavement Association
 
Asphalt industry EPD benchmarking update 2024
Asphalt industry EPD benchmarking update  2024Asphalt industry EPD benchmarking update  2024
Asphalt industry EPD benchmarking update 2024
California Asphalt Pavement Association
 
Women of Asphalt California Branch update 2024
Women of Asphalt California Branch update 2024Women of Asphalt California Branch update 2024
Women of Asphalt California Branch update 2024
California Asphalt Pavement Association
 
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
California Asphalt Pavement Association
 
CalAPA Spring Conference 2024 presentation on Artificial Intelligence
CalAPA Spring Conference 2024 presentation on Artificial IntelligenceCalAPA Spring Conference 2024 presentation on Artificial Intelligence
CalAPA Spring Conference 2024 presentation on Artificial Intelligence
California Asphalt Pavement Association
 
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
California Asphalt Pavement Association
 
Joint Training & Certification Program for construction materials technicians
Joint Training & Certification Program for construction materials techniciansJoint Training & Certification Program for construction materials technicians
Joint Training & Certification Program for construction materials technicians
California Asphalt Pavement Association
 
EPD Pointers at the Asphalt Plant
EPD Pointers at the Asphalt PlantEPD Pointers at the Asphalt Plant
EPD Pointers at the Asphalt Plant
California Asphalt Pavement Association
 
EPD Benchmarks and lessons learned
EPD Benchmarks and lessons learnedEPD Benchmarks and lessons learned
EPD Benchmarks and lessons learned
California Asphalt Pavement Association
 
National perspective on Environmental Product Declarations & the NAPA EPD tool
National perspective on Environmental Product Declarations & the NAPA EPD toolNational perspective on Environmental Product Declarations & the NAPA EPD tool
National perspective on Environmental Product Declarations & the NAPA EPD tool
California Asphalt Pavement Association
 

More from California Asphalt Pavement Association (20)

Reducing carbon footprint in the asphalt pavement industry
Reducing carbon footprint in the asphalt pavement industryReducing carbon footprint in the asphalt pavement industry
Reducing carbon footprint in the asphalt pavement industry
 
Industry perspective on cold in-place recycling
Industry perspective on cold in-place recyclingIndustry perspective on cold in-place recycling
Industry perspective on cold in-place recycling
 
UCPRC perspective on the use of in-place asphalt recycling technologies
UCPRC perspective on the use of in-place asphalt recycling technologiesUCPRC perspective on the use of in-place asphalt recycling technologies
UCPRC perspective on the use of in-place asphalt recycling technologies
 
Caltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavementsCaltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavements
 
Update on the latest research with regard to RAP
Update on the latest research with regard to RAPUpdate on the latest research with regard to RAP
Update on the latest research with regard to RAP
 
Pavement quality focus for local agencies in California
Pavement quality focus for local agencies in CaliforniaPavement quality focus for local agencies in California
Pavement quality focus for local agencies in California
 
National perspective on asphalt technology and trends from the Asphalt Paveme...
National perspective on asphalt technology and trends from the Asphalt Paveme...National perspective on asphalt technology and trends from the Asphalt Paveme...
National perspective on asphalt technology and trends from the Asphalt Paveme...
 
Utilizing reclaimed plastics in asphalt pavement mixes
Utilizing reclaimed plastics in asphalt pavement mixesUtilizing reclaimed plastics in asphalt pavement mixes
Utilizing reclaimed plastics in asphalt pavement mixes
 
Pavement Maintenance tools and technology update
Pavement Maintenance tools and technology updatePavement Maintenance tools and technology update
Pavement Maintenance tools and technology update
 
Presentation by Caltrans on the department's eTicketing initiative
Presentation by Caltrans on the department's eTicketing initiativePresentation by Caltrans on the department's eTicketing initiative
Presentation by Caltrans on the department's eTicketing initiative
 
Update on eTicketing technologies for the asphalt pavement industry
Update on eTicketing technologies for the asphalt pavement industryUpdate on eTicketing technologies for the asphalt pavement industry
Update on eTicketing technologies for the asphalt pavement industry
 
Asphalt industry EPD benchmarking update 2024
Asphalt industry EPD benchmarking update  2024Asphalt industry EPD benchmarking update  2024
Asphalt industry EPD benchmarking update 2024
 
Women of Asphalt California Branch update 2024
Women of Asphalt California Branch update 2024Women of Asphalt California Branch update 2024
Women of Asphalt California Branch update 2024
 
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
 
CalAPA Spring Conference 2024 presentation on Artificial Intelligence
CalAPA Spring Conference 2024 presentation on Artificial IntelligenceCalAPA Spring Conference 2024 presentation on Artificial Intelligence
CalAPA Spring Conference 2024 presentation on Artificial Intelligence
 
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
 
Joint Training & Certification Program for construction materials technicians
Joint Training & Certification Program for construction materials techniciansJoint Training & Certification Program for construction materials technicians
Joint Training & Certification Program for construction materials technicians
 
EPD Pointers at the Asphalt Plant
EPD Pointers at the Asphalt PlantEPD Pointers at the Asphalt Plant
EPD Pointers at the Asphalt Plant
 
EPD Benchmarks and lessons learned
EPD Benchmarks and lessons learnedEPD Benchmarks and lessons learned
EPD Benchmarks and lessons learned
 
National perspective on Environmental Product Declarations & the NAPA EPD tool
National perspective on Environmental Product Declarations & the NAPA EPD toolNational perspective on Environmental Product Declarations & the NAPA EPD tool
National perspective on Environmental Product Declarations & the NAPA EPD tool
 

Recently uploaded

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 

Recently uploaded (20)

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 

Strategices for Smooth Pavements

  • 1. Strategies for Smooth Pavements Don Matthews, PE Pavement Recycling Systems, Inc. Spring Asphalt Pavement Conference and Equipment Expo April 26, 2018
  • 2. Antonymy of the Smoothness of a Roadway Construction Practices DesignStrategy Poor Best AppropriatePoor Really Bad Bad So So Great Hitting Here is What All of Us Owe the Tax Payers of California
  • 3. But How Smooth is Smooth? Should we really pay to get low volume roadways to the same smoothness standard as an interstate? The Pavement & Material Partnering Committee is working diligently towards the ultimate balance Taxpayer Cost Quality Contractor Risk
  • 4. Today’s Presentation  Review Smoothness Terminology  Review Issues on Projects for Smoothness  Brief Overview of 2D and 3D Technology  Come to the Only Logical Solution to Obtain Smoothness
  • 5. Disclaimer This Presentation is for Educational Purposes Only The Goal is to Improve All Aspects of Smoothness Its Should Not Be Used in the Preparation or Defense of Any Claim or Dispute Without The Written Consent of the Author and CalAPA
  • 6. Terminology Overview - International Roughness Index (IRI) IRI is a smoothness value obtained by processing a profile through the ProVAL computer program (algorithm) It is based on a golden car (representing 70% of vehicles) It analyzes roughness inputs in a single wheel path
  • 8. Areas of Localized Roughness (ALR) ALRs are individual roughness locations (caused by bumps or dips) where the IRI of the existing surface exceeds a specified IRI level. It is expressed by peak IRI value
  • 9. 528’ One Wheel Path Only Mean Roughness Index (MRI) MRI is the average of the IRIs from the left and right wheel paths over a 0.1 mile (528) section of a lane
  • 10. Definitions –MRI 0.1 mile 0.1 mile ETW RWP = Right Wheel Path LWP = Left Wheel Path ETW Direction of Travel RWP LWP Ave. IRI = 58 in/mi Ave. IRI = 62 in/mi Direction of Travel MRI = 60 in/mi Ave. IRI = 64 in/mi Ave. IRI = 60 in/mi MRI = 62 in/mi
  • 11. Terminology - This is NOT a Grinder This is a: • Cold Planer • Mill • Cold Mill It typically has conical carbide tipped cutting tools (teeth) Therefore prohibited by specification for final surfaces It can have diamond tipped tools. A few have flat teeth Its head height can change continuously based on a referencing system or automatic machine guidance
  • 12. Micro Mill vs Standard Cold Planer Micro Milled Surface Standard Milled Surface Micro Milling Drum Standard Milling Drum Smooth surfaces can be obtained with a standard cold planer A micro mill finer tool pattern provides: • Less raveling of exposed aggregate from traffic • Smaller ridges and valleys for less cover needed • Better surface control for smaller removals • Less surface impact due to teeth wear
  • 13. In All Cold Planing Best Practices Must Be Followed: Transitions into and out of cuts must be smooth The milled surface must be cleaned well The drum must not be stopped while still in the cut The mill’s mechanical systems must be maintained The cutting tools and blocks must be maintained and/or replaced as needed
  • 14. Appropriate Continuous Speeds Must be Maintained Do not out run the pattern – The texture changes as speed increases. Don’t overrun averaging system It may not be about production!!
  • 15. Terminology - This is a Diamond Grinder Gives a smooth finish surface. Good for final surface corrections Is a “rigid” frame planer equipped with diamond tipped blades Head height is set and fixed to the position of the front and rear wheels
  • 16. Diamond Grinding or Cold Planing Corrections Can Only Do So Much Can only go deeper or wider Can’t fix a pavement or subgrade
  • 17. WORKING CRACKS – Respond Dynamically to Vehicles, Including Inertial Profiler Working – Not correctible by grinding or cold planing Non Working – Likely correctible by grinding or cold planing
  • 18. Definitions of Opportunities and Referencing Existing Surface (165 MRI) Opportunity 1 (Improvement to 85 MRI) Opportunity 2 (Improvement to 60 MRI) Must Be Variable Depth
  • 19. Existing Surface MRI (in/mi) New Surface MRI (in/mi) 300 120 200 90 150 75 120 65 90 60 60 45 Reasonable Expected Improvement Values For One Smoothness Opportunity Originally Suggested Equation Being Considered: MRIExpected = 0.30 x MRIExisting + 35 Example: With existing MRI of 135 and single overlay, should expect final surface to improve to a 75 MRI 0.30 x 135 + 35 = 75
  • 20. So if you want to a achieve a smoothness level but the existing is too rough for the design strategy, you need to add a smoothness opportunity In Other Words Want =>75 MRI, Need Existing MRI To Be 135
  • 21. Existing Pavement Surface Aggregate Base/Subgrade Cold Planing (Mill and Fill) “Smoothness Opportunities” in HMA HMA Overlay Existing Pavement Surface Aggregate Base/Subgrade Pre-pave Corrections Filled HMA HMA Overlay Existing Pavement Surface Aggregate Base/Subgrade Cold In-place Recycling With Overlay CIR
  • 22. Pre-Pave Corrections (Pre-Pave Grinding) Existing Asphalt Surface Prior to Overlay or Pavement Preservation Seal Existing Pavement Surface Aggregate Base/Subgrade Pre-Pave Correction Should be a Smoothness Opportunity HMA Overlay But is it?
  • 23. +/- Existing Pavement Surface Entire roadway corrected 100% to no ALR > than 180 in/mi Pre Pave Correction With Overlay Example Requires 0.15’ HMA overlay
  • 24. +/- Existing Pavement SurfaceHMA Overlay Referencing system not using pre pave corrections – Using rougher shoulder and not corrected pavement Pre pave corrections provide little opportunity to improve to smoothness Pre Pave Correction With Overlay Ex. Cont.
  • 25. May Need to Set Up Referencing System Differently Or Allow Correcting in Referencing Locations and Not Wheel Paths This Would Lead to a True Performance Expectation of the Final Surface Smoothness
  • 26. +/- Existing Pavement SurfaceHMA Overlay Variable Width Paving Variable width paving causes a change to the head of material against the screed Difficult to produce a level, smooth pavement surface if the head of material fluctuates against the screed
  • 27. Constant Head of Material  Half auger level  Constant resistance  Constant depth Increased Head of Material  Increased height  Resistance increased  Depth increases Decreased Head of Material  Decreased height  Resistance decreased  Depth decreases Head of Material in Front of the Screed Screed will change its height (relative position) due to the resistance from the head of material in the auger chamber
  • 28. +/- Existing Pavement Surface Cold Planing as an Opportunity Is Cold Planing a Smoothness Opportunity? Maybe
  • 29. Variable Depth Cold Planing Must be Used Constant depth will transfer the roughness to the bottom of the cold planed surface Good averaging systems should be used when cold planing the existing surface Variable Depth 2D Averaging - Sufficient for the Majority of Applications if an Effective Correction Strategy is Designed
  • 30. For 2D Averaging, Referencing Is Important! Here? Where Do We Run the Reference Averaging System While Cold Planing? Here? Need to Find Smoothest Referencing Surface Available
  • 31. +/- Existing Pavement Surface Cold Planing Could be an Opportunity But not if the paver does not use it for 2D referencing Paver 2D referencing needs to be on cold planed surface if smoother Must also consider matching constraints
  • 32. Matching Constraints and Challenges with Smoothness Existing Pavement Surface Aggregate Base/Subgrade Filled HMA How do you run a matching shoe on a 120 in/mi MRI shoulder? But pave a 60 in/mi MRI just 3 feet over? Not likely Need to allow variable depth paving with a good referencing surface
  • 33. Pre Milling Post Milling MRI (in/mi) MRI (in/mi) Change in MRI % Change 127 96 31.2 25% 120 98 21.6 18% 74 77 -2.4 -3% 95 94 1.5 2% 83 145 -61.9 -75% 96 101 -4.8 -5% 77 99 -22.7 -29% 88 114 -26.7 -31% 80 128 -48.1 -60% 78 118 -40.0 -52% 86 88 -2.1 -2% 64 112 -47.7 -74% 65 104 -39.0 -60% 90 123 -33.5 -37% 63 91 -27.8 -44% 72 97 -25.1 -35% 101 96 5.0 5% 79 110 -30.4 -38% 61 140 -78.8 -129% 61 113 -51.5 -84% 70 91 -21.2 -30% 71 105 -33.3 -47% 123 130 -7.0 -6% 72 125 -53.0 -74% 81 75 5.3 7% 77 107 -30.3 -40% 98 106 -8.2 -8% Highway Project 4” Mill Depth Made Worse in Many Cases In Some Instances Cold Planing May Not Improve Smoothness
  • 34. If delamination occurs, the cut depth must be increased Paving over a delaminated surface can result in differential compaction A delaminated surface will also provide a rough reference line for the paver Delamination
  • 35. For 2D, Referencing Has a Major Impact on Smoothness The longer and smoother the reference, the smoother the pavement . And Please! – Once a good reference line is set, trust the equipment! Manual adjustment = ALR Variable depth thin cut ski runs for a cold planer or paver can be made if necessary
  • 36. Example Project of True Partnering Fog Line Existing Pavement Surface Cold Plane Originally Proposed Strategy No Place for Referencing for Cold Planer or Paver Centerline Variable Width Uneven Shoulder Filled HMA Uneven Fills
  • 37. Example Project (Cont.) Fog Line Existing Pavement Surface Cold Plane Partnered Constructed Strategy Cut Ski Run for Paver Referencing Centerline Shoulder Filled Separately Filled HMA Even Width Fill
  • 38. Existing Pavement Surface Aggregate Base/Subgrade Cold In-place Recycling (CIR) With Overlay HMA Overlay Smoothness Opportunity? CIR Smoothness Opportunity?
  • 39. +/- Existing Pavement SurfaceCIR Contractor Spent Weeks of Corrections in Wheel Path Old Specification - CIR Required 75 in/mi MRI But Paver did Not use Corrected Surface for 2D referencing HMA Overlay Guesss What?
  • 40. CIR as a Smoothness Opportunity? CIR tends to make a smooth surface rougher and rough surface smoother CIR smoothness is influenced by a variety of things: • Many different varying previous overlays • Multiple maintenance surface seals • Variations in distresses • Environmental conditions • Air temperature • Pavement temperature
  • 41. Its More About Using Best Paving Practices Regardless of the existing roadway’s roughness, using best practices can result in smoothness of the CIR of about 90 in/mi MRI (New Spec) Approximately a 60 in/mi MRI should then be attainable on the HMA overlay
  • 42.  CIR Section with Test Project of one mile at end of project  NB lane  No ProVAL SAM analysis  Micro milled with averaging system – Took 4.5 hours  Corrected average MRI of 95.6 in/mi to 70.7 in/mi  Corrected 7 areas of ALR over 180 in/mi to no areas of ALR over 180 in/mi  SB lane  ProVAL SAM system followed completely using a diamond grinder – Stopped after 8 hours Corrected Average MRI of 93.9 in/mi to 84.7 in/mi Tried to correct 3 areas of ALR over 180 in/mi but still had 3 areas of ALR over 180 in/mi when stopped Correct CIR With a Micro Mill and Not Diamond Grinder
  • 43. Consistency - Head of Material on Screed Besides Referencing Consistency = Best Paving Practices Consistency - Paving Speed Consistency - Mix Temperature
  • 44. Check Your Crew Against a Reasonable Expectation Metric • Mark Collection Start of Your IP Run Before Paving • Determine MRI of the Existing Before Paving • Determine MRI After Paving • Compare Each 0.1 mile Section With the Equation MRIExpected = 0.30 x MRIExisting + 35
  • 45. If You Are Not Meeting Expectations CalAPA’s ½ Day Training Class PAVEMENT SMOOTHNESS ESSENTIALS -- NEW SPECIFICATIONS, TECHNOLOGY & BEST PRACTICES Consider Training
  • 46. Consider Other Technology Like 3D Modeling and Machine Control
  • 47. 3D Control - Total Station Machine Control The Preferred Choice When Required to Cut to Specific Grades at Specific Elevations
  • 48. Oakland Airport With 6 Automatic Machined Controlled Mills Working Simultaneously
  • 49. Hit Multiple Precise Grade Changes
  • 50. But 6 Mills Require
  • 51. Approx. 600’ Approx. 600’ Approx. 600’Approx. 600’ Limited to 1,200’ Spacing and Leap Frogging of Guns
  • 52. Traffic control is typically required to take existing surface readings to build model With one set of existing surface readings models can be made for control of the cold planer and multiple paving lifts Total Station Modeling
  • 53. An Alternative 3D Solution for Rehab Projects Uses GPS to Position Horizontally with Scanned Surface for Vertical Road Surface Can use LiDAR Relative Surface Scanning
  • 54. Can also use laser Relative Surface Scanning
  • 55. Machine Control is Based Upon Relative Depth and Not Elevation Approx. 2 Miles No Need to Leap Frog Base Station Approx. 2 Miles Traffic control is not required to take readings to build model Model cannot be used for multiple lifts. A new model is required for paving or if surface has changed at all Subject to GPS quality issues
  • 56. Conclusion – How To Get A Smooth Road Agency + Contractor - Use Best Construction Practices Agency - Incorporate A Design Strategy Appropriate for Existing Roadway Conditions Contractor Together The Only Way to Get The Best Roadways!