The document provides information on strategic space planning for King Abdullah University of Science & Technology. It includes summaries of existing and proposed space allocation and plans for several buildings on campus. The key buildings discussed are research laboratories, administrative buildings, and academic buildings. Floor plans and occupancy details are presented for proposed reallocations of space from private offices to open workstations and meeting spaces in order to improve collaboration.
This document discusses redefining design problems. It begins by noting that traditional "problems" involve doubt, uncertainty or difficulty, whereas design problems represent opportunities for positive change. The author argues that problems should be viewed as "spaces for change from the real to the ideal." Different types of problems are discussed, including closed problems with single answers, open-ended problems with multiple solutions, complex corporate problems, and "wicked" global problems. The document provides examples and encourages viewing all information as "data" to generate insights and identify opportunities when tackling complex problems. It emphasizes the need to cluster data into themes in order to articulate design problems that suggest related opportunities for change.
The document discusses interior space and how it is defined and structured. Architectural elements like columns, walls, floors and roofs are used to articulate and delineate space. Structural systems like linear, planar and volumetric approaches influence the dimensions and arrangement of interior spaces. Interior design elements like partitions, ceilings, furniture, lighting and finishes are also used to further define spaces and influence spatial qualities within the overall architectural framework.
This document provides details for the proposed Robson Residence development project. It includes a 38-storey residential building development with two towers containing 404 units total. It will have two basement levels for parking, seven floors of podium parking, and a facilities floor. Amenities will include a swimming pool, gym, playground, and sky lounge. The development aims to provide luxury residences with green space and city views in Kuala Lumpur.
This document provides details for the proposed construction of a high-rise building with 6,00,000 square feet of built up area and 2 basements in GIFT City, Gandhinagar, Gujarat. It includes the project requirements, various design options considered, floor plans, and structural and methodology details. The proposed building will be G+28 floors with a central core layout, meeting all required codes. Construction is scheduled to take 2 years using sustainable approaches and modern construction techniques.
The document provides details on the construction execution plan for the Kota Kasablanka 3 project, including:
1) The site plan shows the layout of the construction site including contractor offices, stockyards, batching plant, and labour camps.
2) The construction method uses a zoning system to divide the substructure and superstructure work into priority areas for each tower.
3) A schedule outlines the sequencing of activities in each zone, such as excavation, foundation work, and slab and column construction for the different levels.
Training report at structural consaltancyKaushal Patel
- The document is a project report submitted by Patel Kaushal Ashokbhai for their Bachelor's degree in Civil Engineering at Charotar University of Science and Technology.
- It includes estimation of reinforced concrete footings for a residential high-rise building project called Omorose being constructed by Sai Consultants in Surat, Gujarat.
- Tables are provided giving dimensions, quantities, and totals for the RCC raft foundations and individual footings of three different areas of the building basement.
- The document provides details about Revit projects including a 5-star hotel in Dubai, the Ministry of Interior building in Jeddah, and two plots (007 and 008) for Nashmi TownSquare in Dubai.
- For each project, the location, area, brief description, modeling details, and detail design work produced are outlined. Drawings and renderings from the Revit files are also displayed.
- The projects demonstrate experience with architectural modeling, structural modeling, coordination between disciplines to resolve clashes, and use of Dynamo for repetitive tasks like creating consistently named sheets.
This document discusses redefining design problems. It begins by noting that traditional "problems" involve doubt, uncertainty or difficulty, whereas design problems represent opportunities for positive change. The author argues that problems should be viewed as "spaces for change from the real to the ideal." Different types of problems are discussed, including closed problems with single answers, open-ended problems with multiple solutions, complex corporate problems, and "wicked" global problems. The document provides examples and encourages viewing all information as "data" to generate insights and identify opportunities when tackling complex problems. It emphasizes the need to cluster data into themes in order to articulate design problems that suggest related opportunities for change.
The document discusses interior space and how it is defined and structured. Architectural elements like columns, walls, floors and roofs are used to articulate and delineate space. Structural systems like linear, planar and volumetric approaches influence the dimensions and arrangement of interior spaces. Interior design elements like partitions, ceilings, furniture, lighting and finishes are also used to further define spaces and influence spatial qualities within the overall architectural framework.
This document provides details for the proposed Robson Residence development project. It includes a 38-storey residential building development with two towers containing 404 units total. It will have two basement levels for parking, seven floors of podium parking, and a facilities floor. Amenities will include a swimming pool, gym, playground, and sky lounge. The development aims to provide luxury residences with green space and city views in Kuala Lumpur.
This document provides details for the proposed construction of a high-rise building with 6,00,000 square feet of built up area and 2 basements in GIFT City, Gandhinagar, Gujarat. It includes the project requirements, various design options considered, floor plans, and structural and methodology details. The proposed building will be G+28 floors with a central core layout, meeting all required codes. Construction is scheduled to take 2 years using sustainable approaches and modern construction techniques.
The document provides details on the construction execution plan for the Kota Kasablanka 3 project, including:
1) The site plan shows the layout of the construction site including contractor offices, stockyards, batching plant, and labour camps.
2) The construction method uses a zoning system to divide the substructure and superstructure work into priority areas for each tower.
3) A schedule outlines the sequencing of activities in each zone, such as excavation, foundation work, and slab and column construction for the different levels.
Training report at structural consaltancyKaushal Patel
- The document is a project report submitted by Patel Kaushal Ashokbhai for their Bachelor's degree in Civil Engineering at Charotar University of Science and Technology.
- It includes estimation of reinforced concrete footings for a residential high-rise building project called Omorose being constructed by Sai Consultants in Surat, Gujarat.
- Tables are provided giving dimensions, quantities, and totals for the RCC raft foundations and individual footings of three different areas of the building basement.
- The document provides details about Revit projects including a 5-star hotel in Dubai, the Ministry of Interior building in Jeddah, and two plots (007 and 008) for Nashmi TownSquare in Dubai.
- For each project, the location, area, brief description, modeling details, and detail design work produced are outlined. Drawings and renderings from the Revit files are also displayed.
- The projects demonstrate experience with architectural modeling, structural modeling, coordination between disciplines to resolve clashes, and use of Dynamo for repetitive tasks like creating consistently named sheets.
The document contains plans and drawings for a proposed furniture showroom and office development at 198-200 The Entrance Road in Erina, NSW. It includes a site plan, basement floor plan, ground floor plan, first floor plan, and elevations. The plans show a basement level carpark, ground level showroom and delivery area, and first level offices. The development will include a 1698 sqm showroom, 586 sqm of offices, and a 54 car basement carpark.
The Kohinoor Square project is a mixed-use skyscraper development under construction in Mumbai, India. It comprises a 203m main building with commercial and hotel space, and a 142m residential building. The complex utilizes sustainable design features like sky gardens, high-performance glazing, and rainwater harvesting. It has a composite structural system and pile raft foundation to support the tall towers. Floor plans show retail, office, and residential spaces of different sizes across multiple floors.
Architectural Professional portfolio mailsizeAbhishek Verma
The document provides information about various architectural projects completed by Abhishek Verma. It includes details of the Morjim Hotel Project in Goa which consisted of designing 20 villas with 5 villa types for a beachfront property. It also describes the Hotel Penha De Franca project in Goa which was a proposed 260 bedded 5-star hotel and the role involved designing the parking. Additionally, it mentions the Emerald Crest project in Kodaikanal which was designing a dream house for a client on top of a hill and the role involved redesigning the pool building.
This document summarizes the planning, analysis, and design of a residential apartment building project by three civil engineering students. It includes the building plans, structural drawings, analysis using STAAD Pro software, and manual design of structural elements like slabs, beams, columns, and footings. The building has four floors including a ground floor and is designed as per IS and NBC codes using M20 grade concrete and Fe415 grade steel.
The presentation summarizes the execution plan for a large residential project consisting of 24 towers and 271 villas. Key details include:
- The master plan layout divides the project into 6 parcels for construction.
- Health and safety is a top priority, with certified management systems and extensive training programs for workers.
- Towers will be constructed using aluminum formwork for typical floors and L&T system formwork for basements. A phased formwork movement plan is provided.
- Construction schedules show the planned sequencing of activities like substructure, superstructure and finishes for each tower over a 42 month duration. Major milestones are identified.
This document provides details for preparing an application for environmental clearance of a construction project. It includes the objective to prepare the proposal, methodology which involves providing checklists and drawings to the client. It then provides a case study of the Vatika Urban Expression project with details of the project, population calculation, water and waste management, parking and power requirements. It aims to obtain environmental clearance for the proposed construction.
Here are the key points about high rise buildings from the introduction:
- Tall buildings symbolize power, wealth, and human achievement in overcoming natural limitations through technology.
- Modern innovations like steel frame construction, elevators, and electricity made tall buildings practical structures.
- Advances in materials, construction technology, and building services have enabled the construction of increasingly slender and tall buildings.
- A key challenge is designing tall buildings to withstand environmental forces like wind, which can cause horizontal vibration and excessive motion affecting occupant comfort.
- Ensuring structural safety as well as comfort and serviceability for occupants are important design requirements for tall buildings.
The document provides plans and details for a proposed mixed-use development project at the Sherwin Williams site in Emeryville, California. The project includes 500 residential units across 4 buildings (Buildings B1, B2, C, and D) with retail and office space. Building designs draw from Emeryville's industrial heritage through materials like masonry, brick and metal. Floor plans and unit mixes are provided for each building along with perspective renderings of the project from different angles.
The document contains plans and drawings for a proposed furniture showroom and office development at 198-200 The Entrance Road in Erina, NSW. It includes a site plan, basement floor plan, ground floor plan, first floor plan, and elevations. The plans show a basement level carpark, ground level showroom and delivery area, and first level offices. The development will include a 1698 sqm showroom, 586 sqm of offices, and a 54 car basement carpark.
The Kohinoor Square project is a mixed-use skyscraper development under construction in Mumbai, India. It comprises a 203m main building with commercial and hotel space, and a 142m residential building. The complex utilizes sustainable design features like sky gardens, high-performance glazing, and rainwater harvesting. It has a composite structural system and pile raft foundation to support the tall towers. Floor plans show retail, office, and residential spaces of different sizes across multiple floors.
Architectural Professional portfolio mailsizeAbhishek Verma
The document provides information about various architectural projects completed by Abhishek Verma. It includes details of the Morjim Hotel Project in Goa which consisted of designing 20 villas with 5 villa types for a beachfront property. It also describes the Hotel Penha De Franca project in Goa which was a proposed 260 bedded 5-star hotel and the role involved designing the parking. Additionally, it mentions the Emerald Crest project in Kodaikanal which was designing a dream house for a client on top of a hill and the role involved redesigning the pool building.
This document summarizes the planning, analysis, and design of a residential apartment building project by three civil engineering students. It includes the building plans, structural drawings, analysis using STAAD Pro software, and manual design of structural elements like slabs, beams, columns, and footings. The building has four floors including a ground floor and is designed as per IS and NBC codes using M20 grade concrete and Fe415 grade steel.
The presentation summarizes the execution plan for a large residential project consisting of 24 towers and 271 villas. Key details include:
- The master plan layout divides the project into 6 parcels for construction.
- Health and safety is a top priority, with certified management systems and extensive training programs for workers.
- Towers will be constructed using aluminum formwork for typical floors and L&T system formwork for basements. A phased formwork movement plan is provided.
- Construction schedules show the planned sequencing of activities like substructure, superstructure and finishes for each tower over a 42 month duration. Major milestones are identified.
This document provides details for preparing an application for environmental clearance of a construction project. It includes the objective to prepare the proposal, methodology which involves providing checklists and drawings to the client. It then provides a case study of the Vatika Urban Expression project with details of the project, population calculation, water and waste management, parking and power requirements. It aims to obtain environmental clearance for the proposed construction.
Here are the key points about high rise buildings from the introduction:
- Tall buildings symbolize power, wealth, and human achievement in overcoming natural limitations through technology.
- Modern innovations like steel frame construction, elevators, and electricity made tall buildings practical structures.
- Advances in materials, construction technology, and building services have enabled the construction of increasingly slender and tall buildings.
- A key challenge is designing tall buildings to withstand environmental forces like wind, which can cause horizontal vibration and excessive motion affecting occupant comfort.
- Ensuring structural safety as well as comfort and serviceability for occupants are important design requirements for tall buildings.
The document provides plans and details for a proposed mixed-use development project at the Sherwin Williams site in Emeryville, California. The project includes 500 residential units across 4 buildings (Buildings B1, B2, C, and D) with retail and office space. Building designs draw from Emeryville's industrial heritage through materials like masonry, brick and metal. Floor plans and unit mixes are provided for each building along with perspective renderings of the project from different angles.
Similar to Strategic Space Planning-2014-11-12 (8)
1. King Abdullah University of Science & Technology
Strategic Space Planning
1
2014 Office Services Year End Report
2. 2
Strategic Space Planning
• 1 Applied Mathematics (UN1550)
• 2 Research Laboratory (UN 2300)
• 3 Research Laboratory (UN 2400)
• 4 Research Laboratory (UN 2600)
• 5 Research Laboratory (UN 2700)
• 6 Green House (UN 3200)
• 7 High Bay (UN3300)
• 9 Engineering Science (UN 3450)
• 12 Campus Library (UN 1450)
• 13 Dining Hall (UN 1500)
• 14 Business Data Center (UN UN2200)
• 15 Campus Mosque (UN 2450)
• 16 Administration Building (UN 2500)
• 17 Campus Support Service (UN 2550)
• 18 University Center (UN 2800)
• 19 Conference Center (UN 3550)
• 20 Auditorium (UN 3555)
• 21 Parking Garage (UN 3500)
• 22 Research Park (RP 1010)
• 23 Research Park (RP 1020)
• 24 Research Park (RP1030)
• 25 Cmor (MR 1050)
• 26 Cmor (MR 1010)
• 27 Cmor (MR 1020)
• 28 Cmor (MR 1030)
• 29 Chemical Warehouse (CW0029)
KAUST CAMPUS
3. 3
Strategic Space Planning
Building 2 (UN2300)
Ibn Al-Haytham Building
Building 3 (UN2400)
Ibn Sina Building
Building 5 (UN2700)
Al Kindi Building
2
3
4
5
16 9
1
Building 16 (UN2500)
Administration Building
Building 4 (UN2600)
Al Jazri Building
Building 9 (UN3450)
Engineering Science
Building 14 (UN2200)
Information Technology
Building 1 (UN1550)
Applied Mathematics
28. Open office environment improves collaboration, innovation and employee well-being.
Bldg. # Existing # of Proposed # of
Offices Offices
1 - 224 12
2 - 69 7
3 - 80 2
4 - 63 7
5 - 64 9
9 - 71 17
12 - 5 2
14 - 22 6
16 - 256 52
17 - 12 3
18 - 32 6
PROPOSED
Work Station
for
Professional
Researcher
Support
Teacher
PROPOSED
Office Space
for
Academic
Post-Doc
Executive
Manager
E X I S T I N G
Office Space Assignment
29. Workspace Utilization and Allocation Benchmark
* Note: Cubicle is an open space in the USA
Academic Institution
Based on GSA, General Services Administration Workspace Utilization