Stavnsholt Wastewater Treatment Plant, Denmark
STAR Control®
Pre-study
Overview of the many possibilities
Find your own STAR Control® solution
Economies behind STAR Control®
⊲
⊲
⊲
STAR Control® – Pre-study
What is a pre-study?
A pre-study at the wastewater treatment plant is a thorough
review of the technical and financial possibilities for implemen-
tation of a STAR Control® system. The choice of online control can
be based on the specific conditions at this wastewater treatment
plant.
A pre-study will comprise:
Collection of relevant data
▹	 Flow sheet, dimensions, physical installation, mechanical
	 description etc.
▹	 Analysis results from samples taken at inlet/outlet
▹	 Consumption data (power, chemicals, etc.)
Comparisons with STAR installations at more than 30 plants
A report containing:
▹	 the proposed control system
▹	 the extent of necessary physical modifications and
▹	 a description of the financial aspects and pay-back period
Depending of the plant size, a pre-study will typically require 50-
100 man hours distributed over a period of 1-2 months.
STAR will supply a “sound” return on investment
Our more than 15 years of experience have given us a long list of
references, and Krüger’s STAR team is able to present the most
optimum STAR solution for every individual wastewater treat-
ment plant. Over the years, almost every STAR system has been
extended on the basis of new ideas developed between the ope-
rating managers and Krüger’s STAR team so that an even higher
capacity and a further reduction of the operating costs have been
achieved.
⊲
⊲
⊲
The pre-study gives an overview of the savings
and costs related to STAR Control®:
Savings	
Reduced power consumption for aeration
Reduced consumption of precipitants
Reduced consumption of carbon sources
Reduced “wastewater fee”
Plant modifications can be postponed or minimized
Renovation can be postponed or minimized.
Costs	
Installation of online meters and other mechanical
­equipment
Adjustment of SCADA and/or PLC
Installation of STAR system including a 6-month running-in
period and thorough training of staff
Operation of new online meters
Result	
The pay-back period is calculated on the basis of savings and
costs.
The implementation of a STAR Control® system is a comprehen-
sive project comprising many activities.
The pre-study will provide the possibility of evaluating various
alternatives of plant optimization.
⊲
⊲
⊲
⊲
⊲
⊲
⊲
⊲
⊲
⊲
⊲
STAR2Professional® is a unique control system
developed by Krüger on the basis of many years
of experience and process understanding.
STAR2Professional® reduces the operating
costs and optimizes the process capa-
city on the basis of a combination
of special measurements and
experience.
Pay-back period
The expected pay-back period is illustrated in the pre-study
­report, as e.g. the figure to the left.
During the preparation of the pre-study, the client will participate
in the necessary decisions as to e.g. how many and which online
meters to be used, what can be adjusted (pumps and blowers)
and what are the limitations to be considered.
The calculation may also comprise savings in the building costs by
e.g. admitting more storm water to the plant by means of storm
water control.
In most cases there is a further “profit” in the form of an optimi-
zation of the daily operation just by the implementation of minor
changes on the basis of the very thorough investigations made in
the pre-study and installation phase.
Plant size
STAR has various pay-back periods for the above possibilities. The
list is more or less in order of priority.
Naturally, the savings will be proportional to the size of the plant.
The larger plant the larger savings.
As a rule of thumb, all plants down to a size of 30,000 p.e. will
benefit from online control as alternative to physical increase of
the plant capacity.
Plants down to 50,000 p.e. will benefit from the online control of
the effluent quality to comply with the standards.
Large plants of more than 100,000 p.e. will experience that the
price of a STAR system will account only for a fraction of the costs
related to an extension.
-400
-200
0
200
400
600
800
1.000
0 1 2 3 4 5 6 7 8 9
Payback period Exampleville (100.000 PE)
k€
years 10
When is online control an issue?
The right time to consider a more advanced online control system
is when the wastewater system:
needs an increased biological or hydraulic capacity
must comply with new and more stringent effluent demands
has troubles with complying with present effluent demands
needs a reduction of the operating costs
(better control “pays off”)
operates with very high or low loads
experiences load fluctuations, e.g. from the industry
needs higher safety margins and a more reliable operation
needs better tools for operating and process understanding
⊲
⊲
⊲
⊲
⊲
⊲
⊲
⊲
5 10 15 20
10
15
20
25
30
35
40
N-tot(NH4
+NO3
)[mg/l]
intermittent drift
full luftning
koordinerad förfällning
5 10 15 20
10
15
20
25
30
35
40
N-tot(NH4
+NO3
)[mg/l]
tid [dagar]
intermittent drift koordinerad förfällning
full luftning
Let model simulations show the possibilities
Include a model simulation in the pre-study to determine the
effect of various STAR and process solutions.
Krüger and VWS have integrated STAR operation in WEST
(standard simulation software). On the basis of a few basic
input and configuration, it is possible to test control ideas and
estimate the effect of the online control of the effluent quality.
Intermittent operation Coordinated operation
Intermittent operation Coordinated operation
Days
Traditional
operation
Traditional
operation
STAR Control® – References
Linköping, Sweden
(161.000 p.e.)
N-upgrade by control
Reductions in Carbon dosing
Effluent Nitrogen stabilized
Helsingør, Denmark
(72.000 p.e.)
Economies in operation costs.
Bio-P removal by control.
Storm water control in a.
recirculation plant.
Aalborg Vest, Denmark
(265.000 p.e.)
Economies in operation costs
50% reduction of the needed
extensions in volume of the
secondary clarifiers
Poznan, Poland
(900.000 p.e.)
15% increase in electricity
consumption when
STAR was stopped.
Bruxelles, Belgium
(1,1 mio. p.e.)
Start 2008
Lundtofte, Denmark
(115.000 p.e.)
Economies in operation costs.
Improved effluent quality.
Bio-P removal with control
instead of physical
extension.
Blois, France
(103.000 p.e.)
Savings in electricity 22%.
Bio-P with STAR.
Effluent Nitrogen
stabilised.
For more information,
please contact:
Tine Berenhard Ønnerth
tbq@kruger.dk
Bjergmarken,
Denmark (68.000 p.e.)
Improvements in
the effluent quality.
Expansion postponed
5 years.
Krüger A/S
Gladsaxevej 363
DK-2860 Søborg
Tlf: +45 39 69 02 22
E-mail: kruger@kruger.dk�www.kruger.dk
Klamsagervej 2-4
DK-8230 Åbyhøj
Tlf: +45 87 46 33 00
Sofiendalsvej 88
DK-9200 Aalborg SV
Tlf: +45 98 18 93 00
Marts2008

More Related Content

What's hot

Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Upsite Technologies
 
New technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sandsNew technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sandsProcess Ecology Inc
 
Myths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's NotMyths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's NotUpsite Technologies
 
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...Schneider Electric
 
Generating Cash From Your Backup Generator
Generating Cash From Your Backup GeneratorGenerating Cash From Your Backup Generator
Generating Cash From Your Backup GeneratorSergio A. Guerra
 
Centralized Demand Controlled Ventilation for Labs21 09.23.09
Centralized Demand Controlled Ventilation for Labs21 09.23.09Centralized Demand Controlled Ventilation for Labs21 09.23.09
Centralized Demand Controlled Ventilation for Labs21 09.23.09Chris Abbamonto
 
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T'sData Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T'sUpsite Technologies
 
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually ExclusiveFor Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually ExclusiveUpsite Technologies
 
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingCooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingUpsite Technologies
 
Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)Luis Domínguez
 
Debottlenecking a bulk manufacturing plant
Debottlenecking a bulk manufacturing plantDebottlenecking a bulk manufacturing plant
Debottlenecking a bulk manufacturing plantGBX Summits
 
Calibration of air pollution
Calibration of air pollutionCalibration of air pollution
Calibration of air pollutionECRD2015
 
Calibration of air pollution
Calibration of air pollutionCalibration of air pollution
Calibration of air pollutionECRD IN
 

What's hot (20)

Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
 
Drone Blade Inspections: Turning image collection into lifetime insight
Drone Blade Inspections: Turning image collection into lifetime insightDrone Blade Inspections: Turning image collection into lifetime insight
Drone Blade Inspections: Turning image collection into lifetime insight
 
New technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sandsNew technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sands
 
Myths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's NotMyths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's Not
 
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
 
Generating Cash From Your Backup Generator
Generating Cash From Your Backup GeneratorGenerating Cash From Your Backup Generator
Generating Cash From Your Backup Generator
 
Centralized Demand Controlled Ventilation for Labs21 09.23.09
Centralized Demand Controlled Ventilation for Labs21 09.23.09Centralized Demand Controlled Ventilation for Labs21 09.23.09
Centralized Demand Controlled Ventilation for Labs21 09.23.09
 
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T'sData Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
 
Luke Marshall - One Number to Prioritise Work?
Luke Marshall - One Number to Prioritise Work?Luke Marshall - One Number to Prioritise Work?
Luke Marshall - One Number to Prioritise Work?
 
Experience from TCM, Olav Falk Pedersen (Gassnova) UK/Norway/Canada Meeting 1...
Experience from TCM, Olav Falk Pedersen (Gassnova) UK/Norway/Canada Meeting 1...Experience from TCM, Olav Falk Pedersen (Gassnova) UK/Norway/Canada Meeting 1...
Experience from TCM, Olav Falk Pedersen (Gassnova) UK/Norway/Canada Meeting 1...
 
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually ExclusiveFor Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
 
Abby-Watson-Gamesa
Abby-Watson-GamesaAbby-Watson-Gamesa
Abby-Watson-Gamesa
 
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingCooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
 
Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)
 
Commercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler OptimizaitonCommercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler Optimizaiton
 
Debottlenecking a bulk manufacturing plant
Debottlenecking a bulk manufacturing plantDebottlenecking a bulk manufacturing plant
Debottlenecking a bulk manufacturing plant
 
Sustaining energy performance
Sustaining energy performanceSustaining energy performance
Sustaining energy performance
 
Calibration of air pollution
Calibration of air pollutionCalibration of air pollution
Calibration of air pollution
 
Calibration of air pollution
Calibration of air pollutionCalibration of air pollution
Calibration of air pollution
 
TCM presentation May 2013
TCM presentation May 2013TCM presentation May 2013
TCM presentation May 2013
 

Similar to STAR_prestudy_2008EN

31480,STAR_Control_2013_EN_web
31480,STAR_Control_2013_EN_web31480,STAR_Control_2013_EN_web
31480,STAR_Control_2013_EN_webLudovic Renoux
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Raja Ratnam
 
Practical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and TechniciansPractical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and TechniciansLiving Online
 
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015buildpulse
 
201105 ureason introduction
201105 ureason introduction201105 ureason introduction
201105 ureason introductionUReasonChannel
 
KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitRené Balle
 
EzEnergy - HealthCare
EzEnergy - HealthCareEzEnergy - HealthCare
EzEnergy - HealthCareNelson Pinho
 
Safran Colibrys MS1010 and MEMSIC MXA2500M High-End Accelerometers
Safran Colibrys MS1010 and MEMSIC MXA2500M High-End AccelerometersSafran Colibrys MS1010 and MEMSIC MXA2500M High-End Accelerometers
Safran Colibrys MS1010 and MEMSIC MXA2500M High-End Accelerometerssystem_plus
 
Deep Dive Training Energy Efficiency in Industrial Processes
Deep Dive TrainingEnergy Efficiency in Industrial ProcessesDeep Dive TrainingEnergy Efficiency in Industrial Processes
Deep Dive Training Energy Efficiency in Industrial ProcessesChristoph Emde
 
Jisc con optimisation, improved sustainability across the estate through us...
Jisc   con optimisation, improved sustainability across the estate through us...Jisc   con optimisation, improved sustainability across the estate through us...
Jisc con optimisation, improved sustainability across the estate through us...JISC's Green ICT Programme
 
IRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT CollegeIRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT CollegeIRJET Journal
 
Development of calibrated operational models of existing buildings for real-t...
Development of calibrated operational models of existing buildings for real-t...Development of calibrated operational models of existing buildings for real-t...
Development of calibrated operational models of existing buildings for real-t...IES VE
 
Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...Daniel Coakley
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayARC Advisory Group
 
Sec Process Control Past Present and Future2222
Sec Process Control Past Present and Future2222Sec Process Control Past Present and Future2222
Sec Process Control Past Present and Future2222Roger Colee
 

Similar to STAR_prestudy_2008EN (20)

All Energy Exhibition & Conference, Glasgow, May 2017
All Energy Exhibition & Conference, Glasgow, May 2017All Energy Exhibition & Conference, Glasgow, May 2017
All Energy Exhibition & Conference, Glasgow, May 2017
 
31480,STAR_Control_2013_EN_web
31480,STAR_Control_2013_EN_web31480,STAR_Control_2013_EN_web
31480,STAR_Control_2013_EN_web
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
Practical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and TechniciansPractical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and Technicians
 
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
 
201105 ureason introduction
201105 ureason introduction201105 ureason introduction
201105 ureason introduction
 
KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System Retrofit
 
EzEnergy - HealthCare
EzEnergy - HealthCareEzEnergy - HealthCare
EzEnergy - HealthCare
 
Safran Colibrys MS1010 and MEMSIC MXA2500M High-End Accelerometers
Safran Colibrys MS1010 and MEMSIC MXA2500M High-End AccelerometersSafran Colibrys MS1010 and MEMSIC MXA2500M High-End Accelerometers
Safran Colibrys MS1010 and MEMSIC MXA2500M High-End Accelerometers
 
Cotopaxi Presentation - India
Cotopaxi Presentation - IndiaCotopaxi Presentation - India
Cotopaxi Presentation - India
 
Deep Dive Training Energy Efficiency in Industrial Processes
Deep Dive TrainingEnergy Efficiency in Industrial ProcessesDeep Dive TrainingEnergy Efficiency in Industrial Processes
Deep Dive Training Energy Efficiency in Industrial Processes
 
Jisc con optimisation, improved sustainability across the estate through us...
Jisc   con optimisation, improved sustainability across the estate through us...Jisc   con optimisation, improved sustainability across the estate through us...
Jisc con optimisation, improved sustainability across the estate through us...
 
IRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT CollegeIRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT College
 
Solutions for LNG facilities
Solutions for LNG facilitiesSolutions for LNG facilities
Solutions for LNG facilities
 
Development of calibrated operational models of existing buildings for real-t...
Development of calibrated operational models of existing buildings for real-t...Development of calibrated operational models of existing buildings for real-t...
Development of calibrated operational models of existing buildings for real-t...
 
Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...
 
SES_Southafrica Flyer
SES_Southafrica FlyerSES_Southafrica Flyer
SES_Southafrica Flyer
 
Presentation
PresentationPresentation
Presentation
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
 
Sec Process Control Past Present and Future2222
Sec Process Control Past Present and Future2222Sec Process Control Past Present and Future2222
Sec Process Control Past Present and Future2222
 

More from Ludovic Renoux

160268_Brochure Desalination_EN_LR (2)
160268_Brochure Desalination_EN_LR (2)160268_Brochure Desalination_EN_LR (2)
160268_Brochure Desalination_EN_LR (2)Ludovic Renoux
 
160265_VWT_SPAIN_Brochure_Campo_Dalías_LR_Draft_v02B (1)
160265_VWT_SPAIN_Brochure_Campo_Dalías_LR_Draft_v02B (1)160265_VWT_SPAIN_Brochure_Campo_Dalías_LR_Draft_v02B (1)
160265_VWT_SPAIN_Brochure_Campo_Dalías_LR_Draft_v02B (1)Ludovic Renoux
 
3074,Municipal_Standard_Solutions_EN
3074,Municipal_Standard_Solutions_EN3074,Municipal_Standard_Solutions_EN
3074,Municipal_Standard_Solutions_ENLudovic Renoux
 
Lucien_Grand_plaquette_usine
Lucien_Grand_plaquette_usineLucien_Grand_plaquette_usine
Lucien_Grand_plaquette_usineLudovic Renoux
 
presentation Veolia VWT 3 slides
presentation Veolia VWT 3 slidespresentation Veolia VWT 3 slides
presentation Veolia VWT 3 slidesLudovic Renoux
 
150594_Filtraflo_TGV_EN_v4
150594_Filtraflo_TGV_EN_v4150594_Filtraflo_TGV_EN_v4
150594_Filtraflo_TGV_EN_v4Ludovic Renoux
 
3329,Actiflo_brochure-7_datasheets_EN_09
3329,Actiflo_brochure-7_datasheets_EN_093329,Actiflo_brochure-7_datasheets_EN_09
3329,Actiflo_brochure-7_datasheets_EN_09Ludovic Renoux
 
3319,Datasheet_ActifloCarb_EN_0915
3319,Datasheet_ActifloCarb_EN_09153319,Datasheet_ActifloCarb_EN_0915
3319,Datasheet_ActifloCarb_EN_0915Ludovic Renoux
 
150354_Mkt_Mun_Brochure_STRUVIA_EN_LR (1)
150354_Mkt_Mun_Brochure_STRUVIA_EN_LR (1)150354_Mkt_Mun_Brochure_STRUVIA_EN_LR (1)
150354_Mkt_Mun_Brochure_STRUVIA_EN_LR (1)Ludovic Renoux
 
Brochure_multiflo_2015_EN_v1 (3)
Brochure_multiflo_2015_EN_v1 (3)Brochure_multiflo_2015_EN_v1 (3)
Brochure_multiflo_2015_EN_v1 (3)Ludovic Renoux
 
2751,Brochure_Actina_VWS_ENG_LR_Draft_v0
2751,Brochure_Actina_VWS_ENG_LR_Draft_v02751,Brochure_Actina_VWS_ENG_LR_Draft_v0
2751,Brochure_Actina_VWS_ENG_LR_Draft_v0Ludovic Renoux
 
160035_Filtraflo_Carb_EN_LR (4)
160035_Filtraflo_Carb_EN_LR (4)160035_Filtraflo_Carb_EN_LR (4)
160035_Filtraflo_Carb_EN_LR (4)Ludovic Renoux
 
Brochure_A4_Hydrexfloculants_EN_LR
Brochure_A4_Hydrexfloculants_EN_LRBrochure_A4_Hydrexfloculants_EN_LR
Brochure_A4_Hydrexfloculants_EN_LRLudovic Renoux
 

More from Ludovic Renoux (16)

160268_Brochure Desalination_EN_LR (2)
160268_Brochure Desalination_EN_LR (2)160268_Brochure Desalination_EN_LR (2)
160268_Brochure Desalination_EN_LR (2)
 
160265_VWT_SPAIN_Brochure_Campo_Dalías_LR_Draft_v02B (1)
160265_VWT_SPAIN_Brochure_Campo_Dalías_LR_Draft_v02B (1)160265_VWT_SPAIN_Brochure_Campo_Dalías_LR_Draft_v02B (1)
160265_VWT_SPAIN_Brochure_Campo_Dalías_LR_Draft_v02B (1)
 
3074,Municipal_Standard_Solutions_EN
3074,Municipal_Standard_Solutions_EN3074,Municipal_Standard_Solutions_EN
3074,Municipal_Standard_Solutions_EN
 
PROD040ENG[1]
PROD040ENG[1]PROD040ENG[1]
PROD040ENG[1]
 
Predifloc_EN
Predifloc_ENPredifloc_EN
Predifloc_EN
 
Amonit_EN_bd
Amonit_EN_bdAmonit_EN_bd
Amonit_EN_bd
 
Lucien_Grand_plaquette_usine
Lucien_Grand_plaquette_usineLucien_Grand_plaquette_usine
Lucien_Grand_plaquette_usine
 
presentation Veolia VWT 3 slides
presentation Veolia VWT 3 slidespresentation Veolia VWT 3 slides
presentation Veolia VWT 3 slides
 
150594_Filtraflo_TGV_EN_v4
150594_Filtraflo_TGV_EN_v4150594_Filtraflo_TGV_EN_v4
150594_Filtraflo_TGV_EN_v4
 
3329,Actiflo_brochure-7_datasheets_EN_09
3329,Actiflo_brochure-7_datasheets_EN_093329,Actiflo_brochure-7_datasheets_EN_09
3329,Actiflo_brochure-7_datasheets_EN_09
 
3319,Datasheet_ActifloCarb_EN_0915
3319,Datasheet_ActifloCarb_EN_09153319,Datasheet_ActifloCarb_EN_0915
3319,Datasheet_ActifloCarb_EN_0915
 
150354_Mkt_Mun_Brochure_STRUVIA_EN_LR (1)
150354_Mkt_Mun_Brochure_STRUVIA_EN_LR (1)150354_Mkt_Mun_Brochure_STRUVIA_EN_LR (1)
150354_Mkt_Mun_Brochure_STRUVIA_EN_LR (1)
 
Brochure_multiflo_2015_EN_v1 (3)
Brochure_multiflo_2015_EN_v1 (3)Brochure_multiflo_2015_EN_v1 (3)
Brochure_multiflo_2015_EN_v1 (3)
 
2751,Brochure_Actina_VWS_ENG_LR_Draft_v0
2751,Brochure_Actina_VWS_ENG_LR_Draft_v02751,Brochure_Actina_VWS_ENG_LR_Draft_v0
2751,Brochure_Actina_VWS_ENG_LR_Draft_v0
 
160035_Filtraflo_Carb_EN_LR (4)
160035_Filtraflo_Carb_EN_LR (4)160035_Filtraflo_Carb_EN_LR (4)
160035_Filtraflo_Carb_EN_LR (4)
 
Brochure_A4_Hydrexfloculants_EN_LR
Brochure_A4_Hydrexfloculants_EN_LRBrochure_A4_Hydrexfloculants_EN_LR
Brochure_A4_Hydrexfloculants_EN_LR
 

STAR_prestudy_2008EN

  • 1. Stavnsholt Wastewater Treatment Plant, Denmark STAR Control® Pre-study Overview of the many possibilities Find your own STAR Control® solution Economies behind STAR Control® ⊲ ⊲ ⊲
  • 2. STAR Control® – Pre-study What is a pre-study? A pre-study at the wastewater treatment plant is a thorough review of the technical and financial possibilities for implemen- tation of a STAR Control® system. The choice of online control can be based on the specific conditions at this wastewater treatment plant. A pre-study will comprise: Collection of relevant data ▹ Flow sheet, dimensions, physical installation, mechanical description etc. ▹ Analysis results from samples taken at inlet/outlet ▹ Consumption data (power, chemicals, etc.) Comparisons with STAR installations at more than 30 plants A report containing: ▹ the proposed control system ▹ the extent of necessary physical modifications and ▹ a description of the financial aspects and pay-back period Depending of the plant size, a pre-study will typically require 50- 100 man hours distributed over a period of 1-2 months. STAR will supply a “sound” return on investment Our more than 15 years of experience have given us a long list of references, and Krüger’s STAR team is able to present the most optimum STAR solution for every individual wastewater treat- ment plant. Over the years, almost every STAR system has been extended on the basis of new ideas developed between the ope- rating managers and Krüger’s STAR team so that an even higher capacity and a further reduction of the operating costs have been achieved. ⊲ ⊲ ⊲ The pre-study gives an overview of the savings and costs related to STAR Control®: Savings Reduced power consumption for aeration Reduced consumption of precipitants Reduced consumption of carbon sources Reduced “wastewater fee” Plant modifications can be postponed or minimized Renovation can be postponed or minimized. Costs Installation of online meters and other mechanical ­equipment Adjustment of SCADA and/or PLC Installation of STAR system including a 6-month running-in period and thorough training of staff Operation of new online meters Result The pay-back period is calculated on the basis of savings and costs. The implementation of a STAR Control® system is a comprehen- sive project comprising many activities. The pre-study will provide the possibility of evaluating various alternatives of plant optimization. ⊲ ⊲ ⊲ ⊲ ⊲ ⊲ ⊲ ⊲ ⊲ ⊲ ⊲ STAR2Professional® is a unique control system developed by Krüger on the basis of many years of experience and process understanding. STAR2Professional® reduces the operating costs and optimizes the process capa- city on the basis of a combination of special measurements and experience.
  • 3. Pay-back period The expected pay-back period is illustrated in the pre-study ­report, as e.g. the figure to the left. During the preparation of the pre-study, the client will participate in the necessary decisions as to e.g. how many and which online meters to be used, what can be adjusted (pumps and blowers) and what are the limitations to be considered. The calculation may also comprise savings in the building costs by e.g. admitting more storm water to the plant by means of storm water control. In most cases there is a further “profit” in the form of an optimi- zation of the daily operation just by the implementation of minor changes on the basis of the very thorough investigations made in the pre-study and installation phase. Plant size STAR has various pay-back periods for the above possibilities. The list is more or less in order of priority. Naturally, the savings will be proportional to the size of the plant. The larger plant the larger savings. As a rule of thumb, all plants down to a size of 30,000 p.e. will benefit from online control as alternative to physical increase of the plant capacity. Plants down to 50,000 p.e. will benefit from the online control of the effluent quality to comply with the standards. Large plants of more than 100,000 p.e. will experience that the price of a STAR system will account only for a fraction of the costs related to an extension. -400 -200 0 200 400 600 800 1.000 0 1 2 3 4 5 6 7 8 9 Payback period Exampleville (100.000 PE) k€ years 10 When is online control an issue? The right time to consider a more advanced online control system is when the wastewater system: needs an increased biological or hydraulic capacity must comply with new and more stringent effluent demands has troubles with complying with present effluent demands needs a reduction of the operating costs (better control “pays off”) operates with very high or low loads experiences load fluctuations, e.g. from the industry needs higher safety margins and a more reliable operation needs better tools for operating and process understanding ⊲ ⊲ ⊲ ⊲ ⊲ ⊲ ⊲ ⊲ 5 10 15 20 10 15 20 25 30 35 40 N-tot(NH4 +NO3 )[mg/l] intermittent drift full luftning koordinerad förfällning 5 10 15 20 10 15 20 25 30 35 40 N-tot(NH4 +NO3 )[mg/l] tid [dagar] intermittent drift koordinerad förfällning full luftning Let model simulations show the possibilities Include a model simulation in the pre-study to determine the effect of various STAR and process solutions. Krüger and VWS have integrated STAR operation in WEST (standard simulation software). On the basis of a few basic input and configuration, it is possible to test control ideas and estimate the effect of the online control of the effluent quality. Intermittent operation Coordinated operation Intermittent operation Coordinated operation Days Traditional operation Traditional operation
  • 4. STAR Control® – References Linköping, Sweden (161.000 p.e.) N-upgrade by control Reductions in Carbon dosing Effluent Nitrogen stabilized Helsingør, Denmark (72.000 p.e.) Economies in operation costs. Bio-P removal by control. Storm water control in a. recirculation plant. Aalborg Vest, Denmark (265.000 p.e.) Economies in operation costs 50% reduction of the needed extensions in volume of the secondary clarifiers Poznan, Poland (900.000 p.e.) 15% increase in electricity consumption when STAR was stopped. Bruxelles, Belgium (1,1 mio. p.e.) Start 2008 Lundtofte, Denmark (115.000 p.e.) Economies in operation costs. Improved effluent quality. Bio-P removal with control instead of physical extension. Blois, France (103.000 p.e.) Savings in electricity 22%. Bio-P with STAR. Effluent Nitrogen stabilised. For more information, please contact: Tine Berenhard Ønnerth tbq@kruger.dk Bjergmarken, Denmark (68.000 p.e.) Improvements in the effluent quality. Expansion postponed 5 years. Krüger A/S Gladsaxevej 363 DK-2860 Søborg Tlf: +45 39 69 02 22 E-mail: kruger@kruger.dk�www.kruger.dk Klamsagervej 2-4 DK-8230 Åbyhøj Tlf: +45 87 46 33 00 Sofiendalsvej 88 DK-9200 Aalborg SV Tlf: +45 98 18 93 00 Marts2008