1
G SRIKANTH
E.mail : srikanthg682@gmail.com
Mobile : +919703334815
Professional Summary:
 Overall 3+ years of IT professional experience in BI tool Tableau Desktop and Oracle database
(sql developer) as Software Developer Responsible for understanding, analyzing, designing,
developing, testing and implementation of BI reports for various projects.
 1.2 Years in SQL, PLSQL, Oracle,sql server working as a Developer.
 Worked with connection’s(live, extract)
 Extensive knowledge on Tableau Server and Tableau Reader, Tableau Public.
 Experience in creating aggregates, sets, Joins, bins, hierarchies, sorting, grouping, actions, table
Calculations, calculated measures and parameters
 Experience in creating worksheet level filters, data source level filters that including quick
filters, context filters, sharing filters (local, global filters), cascading filters and dashboard level
filters i.e. use as filter and ignore action. Row level security is implemented by using user
filters.
 Involved in end to end implementation i.e. requirement gathering/analysis, modeling, Design,
Development, Testing and Production rollover of Reporting and Analysis projects
 Involved in publishing of various kinds of interactive data visualizations, dashboards and
workbooks from Tableau Desktop to Tableau Server.
 Creating offline, online maps and also create custom geo coding and WMS-server to build
spatial Visualizations of non-geographic data
 Experience in Tableau Desktop for data visualization through various charts such as bar charts,
line charts combination charts, pivot table, scatter plots, pie charts and packed bubbles and also
use multiple measures for comparison such as Individual Axes, Blended Axes, and Dual Axes
 Designed and developed various analytical reports from multiple data sources by blending data
on a single worksheet in Tableau Desktop.
 Worked on the development of Dashboard reports for the Key Performance Indicators or Key
Progress Indicators for the top management.
 Explore to Data Warehousing Concepts like (Star Schema, Snow Flake schema, fact and
dimensional tables) and software development life cycle (SDLC)
 Ability to manage multiple and varied tasks with enthusiasm, deal with tough and demanding
work priorities, prioritize workload with attention to details
 Flexible and versatile to adapt to any new environment with a strong desire to keep pace with
latest technologies.
Technical Skills:
BI Tools : Tableau 8.X, 9X
Languages : SQL using Oracle
Operating System : Windows w 7,w8
2
Education:
B.Sc(computers) from Nagarjuna University in May 2012.
Professional Experience:
Working as a Software Engineer for Accenture Pvt Ltd, from Mar 2013 to till date.
Project # 1
Project Name: Sales Analytics
Client : ERGO Insurance Group (Europe, Dusseldorf)
Role : Tableau Developer
Environment : Tableau 9 x, Windows, Oracle
Project Description:
ERGO is one of the major insurance groups in Europe. It is represented in more than 30
Countries and mainly concentrating in Europe and Asia. It was founded in the year 1997 with Head-
quarters located at Dusseldorf, Europe. In Europe, ERGO claims to be No.1 in the health and legal
expenses insurance segments.
Responsibilities:
 Understanding and analyzing the business requirements.
 Design, develop and implement the Tableau Business Intelligence reports.
 Created custom SQLs in Oracle to make efficient extract from Oracle database.
 Involved in kick of meetings and requirement gathering/analysis for business information.
 Prepared Functional Specs, Technical Specs Document for the project development.
 Implementing data blending from multiple data sources by blending data on a single
worksheet.
 Designing dashboard templates as per the requirement & dashboards content which includes
complex reports, water fall charts,and Gantt charts, Bubble charts,Cross Tabs, Pie Charts
and Bar Charts.
 Experienced in creating Groups, Dynamic Grouping as well as Sets and Dynamic Sets.
 Developing the Maps with using offline, online maps and also create custom geo coding and
WMS server and developing reports with Filled Maps and Symbol Maps
 Created Normal Filters, Context Filters and Quick Filters on Tableau Reports.
 Working with individual axis, blending axis, dual axis.
 Use Trend Lines, Reference Lines,Forecasting and statistical techniques to describe the data.
 Use parameters and input controls to give users control over certain values.
 Experienced in Create Calculated Fields for applying various functions on data to develop
the report
 Created Actions to navigate to various pages as the user wish.
 Worked on dashboard components
 Responsible for dashboard design, layout, look and feel and development.
 Worked on story points.
3
 Handling the performance tuning of reports to reduce refresh time.
Project # 2
Chapter 2 Project Name: BusinessActivity Monitoring (BAM)
Client : CNO Financial Group (Carmel, US)
Role : Tableau Developer
Environment : Tableau 8x/9.x , Windows, Oracle SQL developer
Project Description:
CNO Financial Group is a financial services holding company whose businesses provide a
range of financial services to consumer and corporate clients. The project involved building a data
repository to organize loan documents that are received from customers, submitted through various
branches and different sales teams. Prior to the development of the system the data existed in various
RDBMS and post development the system is made as single stop for various needs. Real-Time
Dashboards: Designed a Business Activity Monitoring (BAM)solution for a bank that wanted to
increase its throughput of loan applications. System reported the status of loans at each step of the
review process and issued alerts if there were bottlenecks.
Responsibilities:
 Understanding and developing Analytics solution for specific client requirements.
 Designing, Developing interactive Tableau Dashboard reports.
 Creating, maintaining and updating the technical requirements document, design document,
mapping document, implementing and recommending industry BI standards and best
practices.
 Extracted data from various sources and performed data blending.
 Representing data using the Cross Tabs, stacked Bars,Pie Charts and Bar Charts.
 Worked on individual axis, blending axis, dual axis.
 Use Trend Lines, Reference Lines,Forecasting and statistical techniques to describe the data.
 Use parameters and input controls to give users control over certain values.
 Created Actions to navigate to various pages as the user wish.
 Developed various types of complex reports like Drill Down, Drill through, Cross tab reports.
 Created quick filters, table calculations, calculated fields and parameters.
 Created sets,groups and performed conditional sorting and filtering as per the requirements.

srikanthg

  • 1.
    1 G SRIKANTH E.mail :srikanthg682@gmail.com Mobile : +919703334815 Professional Summary:  Overall 3+ years of IT professional experience in BI tool Tableau Desktop and Oracle database (sql developer) as Software Developer Responsible for understanding, analyzing, designing, developing, testing and implementation of BI reports for various projects.  1.2 Years in SQL, PLSQL, Oracle,sql server working as a Developer.  Worked with connection’s(live, extract)  Extensive knowledge on Tableau Server and Tableau Reader, Tableau Public.  Experience in creating aggregates, sets, Joins, bins, hierarchies, sorting, grouping, actions, table Calculations, calculated measures and parameters  Experience in creating worksheet level filters, data source level filters that including quick filters, context filters, sharing filters (local, global filters), cascading filters and dashboard level filters i.e. use as filter and ignore action. Row level security is implemented by using user filters.  Involved in end to end implementation i.e. requirement gathering/analysis, modeling, Design, Development, Testing and Production rollover of Reporting and Analysis projects  Involved in publishing of various kinds of interactive data visualizations, dashboards and workbooks from Tableau Desktop to Tableau Server.  Creating offline, online maps and also create custom geo coding and WMS-server to build spatial Visualizations of non-geographic data  Experience in Tableau Desktop for data visualization through various charts such as bar charts, line charts combination charts, pivot table, scatter plots, pie charts and packed bubbles and also use multiple measures for comparison such as Individual Axes, Blended Axes, and Dual Axes  Designed and developed various analytical reports from multiple data sources by blending data on a single worksheet in Tableau Desktop.  Worked on the development of Dashboard reports for the Key Performance Indicators or Key Progress Indicators for the top management.  Explore to Data Warehousing Concepts like (Star Schema, Snow Flake schema, fact and dimensional tables) and software development life cycle (SDLC)  Ability to manage multiple and varied tasks with enthusiasm, deal with tough and demanding work priorities, prioritize workload with attention to details  Flexible and versatile to adapt to any new environment with a strong desire to keep pace with latest technologies. Technical Skills: BI Tools : Tableau 8.X, 9X Languages : SQL using Oracle Operating System : Windows w 7,w8
  • 2.
    2 Education: B.Sc(computers) from NagarjunaUniversity in May 2012. Professional Experience: Working as a Software Engineer for Accenture Pvt Ltd, from Mar 2013 to till date. Project # 1 Project Name: Sales Analytics Client : ERGO Insurance Group (Europe, Dusseldorf) Role : Tableau Developer Environment : Tableau 9 x, Windows, Oracle Project Description: ERGO is one of the major insurance groups in Europe. It is represented in more than 30 Countries and mainly concentrating in Europe and Asia. It was founded in the year 1997 with Head- quarters located at Dusseldorf, Europe. In Europe, ERGO claims to be No.1 in the health and legal expenses insurance segments. Responsibilities:  Understanding and analyzing the business requirements.  Design, develop and implement the Tableau Business Intelligence reports.  Created custom SQLs in Oracle to make efficient extract from Oracle database.  Involved in kick of meetings and requirement gathering/analysis for business information.  Prepared Functional Specs, Technical Specs Document for the project development.  Implementing data blending from multiple data sources by blending data on a single worksheet.  Designing dashboard templates as per the requirement & dashboards content which includes complex reports, water fall charts,and Gantt charts, Bubble charts,Cross Tabs, Pie Charts and Bar Charts.  Experienced in creating Groups, Dynamic Grouping as well as Sets and Dynamic Sets.  Developing the Maps with using offline, online maps and also create custom geo coding and WMS server and developing reports with Filled Maps and Symbol Maps  Created Normal Filters, Context Filters and Quick Filters on Tableau Reports.  Working with individual axis, blending axis, dual axis.  Use Trend Lines, Reference Lines,Forecasting and statistical techniques to describe the data.  Use parameters and input controls to give users control over certain values.  Experienced in Create Calculated Fields for applying various functions on data to develop the report  Created Actions to navigate to various pages as the user wish.  Worked on dashboard components  Responsible for dashboard design, layout, look and feel and development.  Worked on story points.
  • 3.
    3  Handling theperformance tuning of reports to reduce refresh time. Project # 2 Chapter 2 Project Name: BusinessActivity Monitoring (BAM) Client : CNO Financial Group (Carmel, US) Role : Tableau Developer Environment : Tableau 8x/9.x , Windows, Oracle SQL developer Project Description: CNO Financial Group is a financial services holding company whose businesses provide a range of financial services to consumer and corporate clients. The project involved building a data repository to organize loan documents that are received from customers, submitted through various branches and different sales teams. Prior to the development of the system the data existed in various RDBMS and post development the system is made as single stop for various needs. Real-Time Dashboards: Designed a Business Activity Monitoring (BAM)solution for a bank that wanted to increase its throughput of loan applications. System reported the status of loans at each step of the review process and issued alerts if there were bottlenecks. Responsibilities:  Understanding and developing Analytics solution for specific client requirements.  Designing, Developing interactive Tableau Dashboard reports.  Creating, maintaining and updating the technical requirements document, design document, mapping document, implementing and recommending industry BI standards and best practices.  Extracted data from various sources and performed data blending.  Representing data using the Cross Tabs, stacked Bars,Pie Charts and Bar Charts.  Worked on individual axis, blending axis, dual axis.  Use Trend Lines, Reference Lines,Forecasting and statistical techniques to describe the data.  Use parameters and input controls to give users control over certain values.  Created Actions to navigate to various pages as the user wish.  Developed various types of complex reports like Drill Down, Drill through, Cross tab reports.  Created quick filters, table calculations, calculated fields and parameters.  Created sets,groups and performed conditional sorting and filtering as per the requirements.